Without GI Confirmation and Without Confirmation GR Is Not Possible - SAP Blogs PDF
Without GI Confirmation and Without Confirmation GR Is Not Possible - SAP Blogs PDF
Without GI Confirmation and Without Confirmation GR Is Not Possible - SAP Blogs PDF
Krishnendu Das
January 21, 2014 3 minute read
This blog is meant for restriction in the process/production order con rmation if the Goods issue has not
been done. As well if there is no con rmation, Goods receipt is not possible also.
Standard SAP allows con rmation without GI, as well as without con rmation GR is also possible (In normal
setting).
Con rmation without GI can be restricted in the following way as per customizing setting in standard SAP.
Then check goods movement and termination for incorrect goods movement.
This will ensure at the time of con rmation if some incorrect goods movement happens, the
con rmation will be terminated. So without GI no con rmation possible.
We can automate the GR process with con rmation by production scheduling pro le and control key. But
without con rmation GR restriction in di cult from standard setting.
Now “without GI con rmation and without con rmation GR restriction” can be achieved by two user exit.
Below are the details of code and the exit.
User exit:EXIT_SAPMM07M_001
Test case:
Now if we try to do the GR (MIGO) also, system will throw an error as there is no con rmation happened.
The error can be modi ed with suitable text as desired.
Alert Moderator
Assigned tags
As well after doing the Gr the status of the order is PCNF and PDLV.
In this way the con rmation can be restricted without GI and the GR can be restricted without con rmation.
Related Blog Posts
A lot of industries like Pharma, Battery(Silver ion) where the issue is important (for expensive / required
component)
COHV Operationand con
Level Conrmation
rmationshould
That Willbe
A real time, Goods
ect Partial this restriction can
Issue Against beProduction
The used. Order
By Dinesh kumar , Oct 14, 2019
Regards,
Di erence in “Con rmed” date in General data and Dates/Qties tab of Process order
By Krishnendu Das , Dec 24, 2013
Krishnendu.
SAP REM full cycle scenario with basic step
By Umesh Mali , May 12, 2014
Related Questions