1
MOZAMBIQUE TRADE ROUTES
AT CENTER OF GLOBAL LOGISTIC CHAIN
3
TRANSPORT CORRIDORS – LIFELINE OF MOZAMBIQUE
4
CFM PORT TRAFFIC
20,000
15,000
10,000
5,000
0
Maputo Beira Nacala Quelimane Pemba* Total
2009 8,167 3,030 1,270 70 115 12,652
2010 8,606 3,805 1,376 131 160 14,079
2011 11,762 5,704 1,629 186 177 19,458
5
CFM RAIL TRAFFIC
8,000
7,000
6,000
10^3 Ton.Líquidas
5,000
4,000
3,000
2,000
1,000
0
Goba R.Garcia Limpopo CFM-S CFM-C CFM-N Total
2009 577 2,679 504 3,760 554 296 4,610
2010 702 2,637 642 3,981 1,039 272 5,293
2011 772 4,510 723 6,005 1,019 242 7,265
6
MOZAMBIQUE: THE TRANSPORT CHALLENGES
7
TETE – A STRATEGIC COAL HUB
8
Mozambique Railway Network
South Railway Network
Machipanda Line
Sena Line
Nacala Line
Cuamba-Lichinga Line
New Transport Logistic Options
1 MOATIZE – BEIRA – SENA LINE (575 KM)
10
New Transport Logistic Options
New Port and Railway Projects - South
Port of Techobanine
Techobanine-Bostwana Railway Line
Souh-North Railway Line (1)
Port of Macuze
Machipanda Line
Sena Line
Port of Nacala
Malawi Km 44
CAMBULATSISSE
Zambeze Valley VILA-NOVA Km 82
DONA-ANA MARROMEU
Km 487
Km 291 Sugar & Molassos
SENA MIGA
MOATIZE Km 287
INHAMITANGA
Km 545 Km 183
Coal Mines & Other Minerals Zambeze Valley INHAMINGA
Km 157
Zambeze Valley
MUANZA
Operator: CFM & Mining Companies Km 90
Sena Line Present Capacity: 6 MTPA
Sena Line Upgrade:
Stage 1: 10-12 MPTA
Stage 2: 20 MTPA
DONDO
13
Km 0
Beira Port
OIL TERMINAL
GENERAL CARGO
TERMINAL
CONTAINER
TERMINAL
FACT SHEET
Project: New Coal Terminal
Sponsors: CFM, Private Sector
Project Cost: $600m
Capacity: 15-20 MTPA
Land: 52 hectares
Completion: December 2015
14
2. NACALA CORRIDOR (VIA MALAWI): TRANSPORT LOGISTIC OPTION
FACT SHEET
Project: New Railway line Moatize-Nacala,
thru Malawi
Sponsors: CFM, Private Sector (Vale
Emirates)
Project Cost: $3.4Billions
Length: 913 km (Green field:230 km)
Capacity: 22 MTPA
Start-Up 13MTPA: September 2014
Start-Up 15MTPA: November 2015
Start-Up 18MTPA: March 2016
Completion 18MTPA : June 2016
15
PROPOSED NACALA –A-VELHA COAL TERMINAL
Natural Deep Water Port (Capesize + Panamax): 1 berth, depth: -20m CD;
Capacity: 18 Million tons per annum Coal (Coke & Thermal);
Rail Unloading: 1 Wagon Tippler 4.800tph, 2 simultaneous wagons;
Static Stock Yard: 1.455,0 Kt (turn over ~12x);
Stockyard: 3 lines of 5 piles x 97.000ton = 1.455.000 ton (~12 turns);
Stockyard machines: 2 Stackers (4.800tph) & 2 Reclaimers (5.100tph);
Conveyor Belt: capacities of 4.800 and 5.100 tph, speed ~4,0 m/s;
Shiploaders: 2 shiploaders (5.100tph);
Employes During Operation: ~290
16
4. NACALA CORRIDOR THRU MOZAMBIQUE TRANSPORT LOGISTIC OPTION
17
5. MOATIZE – MACUSE TRANSPORT LOGISTIC OPTION
18
MACUZE PORT - INDICATIVE TERMINAL & PORT CONCEPT
19
6. LICHINGA – PEMBA TRANSPORT LOGISTIC OPTION (≈700 KM)
Length: ≈700km
Type: Greenfield
Project Cost: $3b; Port - $0.6b
Capacity: 25 MTPA
20
MENU OF TRANSPORT OPTIONS
Multi Purpose
NACALA Line
Corridor
MOATIZE
New Lines
MACUSE
SENA LINE
Multi Purpose
Corridor
21
MAPUTO ZONE OF INFLUENCE: THE BOUNDARIES
22
MAPUTO ZONE OF INFLUENCE
SECTOR PRODUCT WEST CENTER & CENTER & CENTER & NORTH
MAPH MAPH MAPH
ENERGY Coal Witbank Ermelo
STEEL Magnetite Plalaborwa
STEEL Chrome Rustenburg Witbank Middlelburg Lyndenburg Plalaborwa
STEEL Manganese Nelspruit
INDUSTRY Copper Plalaborwa
CIVIL WORKS Granite Rustenburg Belfast Lyndenburg Potgietersrus
CHEMICALS Secunda
CONTAINER Gauteng Witbank Nelspruit
23
MAPUTO ZONE OF INFLUENCE - COMPETITIVENESS
24
Maputo Port Expansion Areas Map
25
RESSANO GARCIA UPGRADE
FACT SHEET
26
Techobanine Rail and Port Project
DRY BULK
MINERAL
FACT SHEET:
Sponsors: CFM, Private Sector
Project Cost: $5.255b
Railway Length: 1200 km
Completion: June 2016
Port and Rail Capacity: 30-100 MTPA
Completion: 2016
27
DEEP SEA PORT OF TECHOBANINE CONCEPTUAL LAYOUT
WET BULK
INDIAN OCEAN
BREAK WATER NORTH
DRY BULK
28
ACQUISITION OF LOCOMOTIVES AND WAGONS
29
General Financing Issues
GOM Guarantees
Modalities:
30
The real Kings of Logistics
31
THOUGHTS FOR THE DAY
“In the search for partners to acquire
we adopt the same attitude one might
find appropriate in looking for a
spouse: it pays to be active, interested
and open-minded, but it does not pay
to be in a hurry”
Warren Buffet
32