DCP WIDENING - Coba
DCP WIDENING - Coba
DCP WIDENING - Coba
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
DCP DCP
Point Point
0 0 1 0 0 0 0.0
1 1 6 7.5 6.75 67.5 67.5
1 2 12.5 15 13.75 137.5 70.0
1 3 16.9 19.5 18.20 182.0 114.5
1 4 20 21 20.50 205.0 137.5
1 5 26 23 24.50 245.0 177.5
1 6 29 26 27.50 275.0 207.5
1 7 31.5 33 32.25 322.5 255.0 29.58 5.65
1 8 35 35 35.00 350.0 282.5
1 9 37 36 36.50 365.0 297.5
1 10 38.5 37.1 37.80 378.0 310.5
1 11 40 38.5 39.25 392.5 325.0
1 12 42 39.9 40.95 409.5 342.0
1 13 47.5 42.9 45.20 452.0 384.5
1 14 52.5 44.5 48.50 485.0 417.5
1 15 56 46 51.00 510.0 442.5
1 16 58 47 52.50 525.0 457.5 28.19 6.00
1 17 62 49.5 55.75 557.5 490.0
1 18 65 50 57.50 575.0 507.5
1 19 70.5 51.5 61.00 610.0 542.5
1 20 72 52 62.00 620.0 552.5
1 21 74 53 63.50 635.0 567.5
25.27 6.90
1 22 76.5 54.5 65.50 655.0 587.5
1 23 77 56 66.50 665.0 597.5
1 24 77.4 57.4 67.40 674.0 606.5
0 0 1 1 0 0 0.0
1 1 8.5 4 6.25 62.5 62.5
1 2 11 8 9.50 95.0 32.5
1 3 12 12 12.00 120.0 57.5
30.08 5.53
1 4 13.5 18 15.75 157.5 95.0
1 5 16.6 25 20.80 208.0 145.5
1 6 17.5 31.1 24.30 243.0 180.5
1 7 18 35.2 26.60 266.0 203.5
1 8 18.5 39.5 29.00 290.0 227.5
1 9 19 41 30.00 300.0 237.5 26.14 6.61
1 10 21.5 44.5 33.00 330.0 267.5
1 11 22.5 47.5 35.00 350.0 287.5
1 12 23.5 49.4 36.45 364.5 302.0
1 13 24 50 37.00 370.0 307.5
1 14 25.5 51 38.25 382.5 320.0
1 15 26 52 39.00 390.0 327.5
1 16 26.5 54.4 40.45 404.5 342.0 19.43 9.63
1 17 27 55 41.00 410.0 347.5
1 18 27.4 56.1 41.75 417.5 355.0
1 19 30.4 57.2 43.80 438.0 375.5
1 20 32.2 58 45.10 451.0 388.5
1 21 34.1 60.1 47.10 471.0 408.5
1 22 36 62.2 49.10 491.0 428.5
19.08 9.85
1 23 39.1 63.4 51.25 512.5 450.0
1 24 40.2 63.9 52.05 520.5 458.0
0 0 0 0 0 0 0.0
1 1 3.1 3.1 3.10 31.0 31.0
1 2 6 5.5 5.75 57.5 26.5
1 3 8.2 8 8.10 81.0 50.0
1 4 12 9.5 10.75 107.5 76.5 19.07 9.86
1 5 14.3 11 12.65 126.5 95.5
1 6 15.5 13 14.25 142.5 111.5
1 7 16.5 16.4 16.45 164.5 133.5
1 8 17 17 17.00 170.0 139.0
1 9 18.5 20.4 19.45 194.5 163.5
1 10 19.5 21.5 20.50 205.0 174.0
1 11 20 22 21.00 210.0 179.0
1 12 20.9 23 21.95 219.5 188.5
1 13 22 24.5 23.25 232.5 201.5 14.69 13.73
1 14 22.8 25.5 24.15 241.5 210.5
1 15 23 26.4 24.70 247.0 216.0
1 16 24.5 27.9 26.20 262.0 231.0
1 17 25.5 30.2 27.85 278.5 247.5
1 18 26 33.1 29.55 295.5 264.5
1 19 27.5 34.7 31.10 311.0 280.0 14.00
1 20 28 36.8 32.40 324.0 293.0
1 21 29.4 37.8 33.60 336.0 305.0
14.60
1 22 30.1 39.1 34.60 346.0 315.0
1 23 31.4 40.1 35.75 357.5 326.5
1 24 32.5 40.9 36.70 367.0 336.0
0 0 0 0 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 2.5 5.5 4.00 40.0 15.0
1 3 3 7 5.00 50.0 25.0
1 4 4 8 6.00 60.0 35.0
1 5 6 9.2 7.60 76.0 51.0
1 6 7 11 9.00 90.0 65.0 9.55 23.75
1 7 8 12.1 10.05 100.5 75.5
1 8 9 12.9 10.95 109.5 84.5
1 9 10.1 13 11.55 115.5 90.5
1 10 11 13.5 12.25 122.5 97.5
1 11 12 14 13.00 130.0 105.0
1 12 13 15.1 14.05 140.5 115.5
1 13 14 16 15.00 150.0 125.0
1 14 15 17.5 16.25 162.5 137.5
1 15 16 18.4 17.20 172.0 147.0
1 16 17 20 18.50 185.0 160.0 10.40 21.30
1 17 18 21 19.50 195.0 170.0
1 18 19.4 22.3 20.85 208.5 183.5
1 19 20 24 22.00 220.0 195.0
1 20 20.5 26.1 23.30 233.0 208.0
1 21 22 28.1 25.05 250.5 225.5
1 22 25 29 27.00 270.0 245.0
1 23 27.1 30.2 28.65 286.5 261.5
1 24 28.9 32 30.45 304.5 279.5
1 25 30 33 31.50 315.0 290.0
11.17 19.46
1 26 30.9 34 32.45 324.5 299.5
1 27 31.5 35 33.25 332.5 307.5
1 28 32 36 34.00 340.0 315.0
1 29 33 37 35.00 350.0 325.0
1 30 34 38 36.00 360.0 335.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
0 0 17.3 2.5 0 0 0
1 1 34.6 26.3 30.45 304.5 304.5
1 2 39.4 36.2 37.80 378.0 73.5
1 3 42.3 37.7 40.00 400.0 95.5 45.17 3.30
1 4 44.7 39.4 42.05 420.5 116.0
1 5 46.9 42.1 44.50 445.0 140.5
1 6 62.8 52.3 57.55 575.5 271.0
1 7 67.4 58.5 62.95 629.5 325.0
1 8 68.4 62.8 65.60 656.0 351.5
1 9 69.3 64.7 67.00 670.0 365.5
1 10 70.3 65.7 68.00 680.0 375.5 30.81 5.36
1 11 71 66.5 68.75 687.5 383.0
1 12 71.9 67.4 69.65 696.5 392.0
1 13 72.7 68.3 70.50 705.0 400.5
1 14 73.6 69.2 71.40 714.0 409.5
1 15 74.4 70.1 72.25 722.5 418.0
1 16 75.2 71.9 73.55 735.5 431.0
1 17 76 72.1 74.05 740.5 436.0
1 18 76.7 73 74.85 748.5 444.0
1 19 77.4 74 75.70 757.0 452.5 20.63 8.93
1 20 78.1 75 76.55 765.5 461.0
1 21 78.8 75.5 77.15 771.5 467.0
1 22 79.5 76.5 78.00 780.0 475.5
1 23 80.3 77.4 78.85 788.5 484.0
1 24 81 78.9 79.95 799.5 495.0
1 25 81.6 80.4 81.00 810.0 505.5
1 26 82.4 82 82.20 822.0 517.5
1 27 83.2 83.1 83.15 831.5 527.0 18.72 10.10
1 28 84.5 84.3 84.40 844.0 539.5
1 29 86 85 85.50 855.0 550.5
1 30 87.1 86.1 86.60 866.0 561.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 87 + 000 L. 3.28 M Y : 029 3858 X : 047 6610 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 4.5 6 5.25 52.5 17.5
1 3 7 7 7.00 70.0 35.0
1 4 9 9 9.00 90.0 55.0 13.75 14.94
1 5 11 10.5 10.75 107.5 72.5
1 6 12.5 11.5 12.00 120.0 85.0
1 7 14 12.4 13.20 132.0 97.0
1 8 16 13 14.50 145.0 110.0
1 9 17 14 15.50 155.0 120.0
1 10 18 15 16.50 165.0 130.0
1 11 20 16 18.00 180.0 145.0
1 12 21 17 19.00 190.0 155.0 12.44 16.97
1 13 22.2 18 20.10 201.0 166.0
1 14 24 18.8 21.40 214.0 179.0
1 15 25.2 19 22.10 221.0 186.0
1 16 27 19.8 23.40 234.0 199.0
1 17 28.2 20 24.10 241.0 206.0
1 18 30 20.8 25.40 254.0 219.0
1 19 32 21 26.50 265.0 230.0
1 20 34 22 28.00 280.0 245.0 12.40 17.04
1 21 35.5 23 29.25 292.5 257.5
1 22 37 24 30.50 305.0 270.0
1 23 39 25.5 32.25 322.5 287.5
1 24 40 26.5 33.25 332.5 297.5
1 25 41.1 27.2 34.15 341.5 306.5
1 26 43 28 35.50 355.0 320.0
1 27 44 29.5 36.75 367.5 332.5 12.17 17.45
1 28 45 31 38.00 380.0 345.0
1 29 46 32 39.00 390.0 355.0
1 30 47 33 40.00 400.0 365.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 87 + 100 R. 3.48 M Y : 029 3904 X : 047 6531 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 6 0 0 0.0
1 1 8.4 10.5 9.45 94.5 94.5
1 2 13 14.5 13.75 137.5 43.0
1 3 16 18.5 17.25 172.5 78.0 23.44 7.59
1 4 19.4 21 20.20 202.0 107.5
1 5 21 23 22.00 220.0 125.5
1 6 22 26 24.00 240.0 145.5
1 7 24 29 26.50 265.0 170.5
1 8 26 30.4 28.20 282.0 187.5
1 9 30 32.4 31.20 312.0 217.5
1 10 34 34 34.00 340.0 245.5
1 11 36 36 36.00 360.0 265.5
1 12 38 38 38.00 380.0 285.5 23.31 7.64
1 13 40 41 40.50 405.0 310.5
1 14 42.5 42.2 42.35 423.5 329.0
1 15 45 43 44.00 440.0 345.5
1 16 48 45.5 46.75 467.5 373.0
1 17 51 49 50.00 500.0 405.5
1 18 53 53 53.00 530.0 435.5
1 19 54 55.5 54.75 547.5 453.0 24.43 7.20
1 20 59 58 58.50 585.0 490.5
1 21 62 59.5 60.75 607.5 513.0
1 22 65 61 63.00 630.0 535.5
1 23 69 64 66.50 665.0 570.5
1 24 73 67.2 70.10 701.0 606.5
1 25 80 70.2 75.10 751.0 656.5
1 26 88 73 80.50 805.0 710.5 28.23 6.0
1 27 96 75 85.50 855.0 760.5
1 28 100 77 88.50 885.0 790.5
1 29 78
1 30 81
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 87 + 200 R. 3.50 M Y : 029 3994 X : 047 6478 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 6 5 5.50 55.0 55.0
1 2 14 10 12.00 120.0 65.0
1 3 21 16 18.50 185.0 130.0
1 4 26 22 24.00 240.0 185.0 43.17 3.49
1 5 31 26 28.50 285.0 230.0
1 6 35 31 33.00 330.0 275.0
1 7 39 36 37.50 375.0 320.0
1 8 42 41 41.50 415.0 360.0
1 9 45 43.7 44.35 443.5 388.5
1 10 46.5 45.7 46.10 461.0 406.0
1 11 48 47 47.50 475.0 420.0
1 12 49 48.7 48.85 488.5 433.5
1 13 49.5 50.5 50.00 500.0 445.0 27.50 6.20
1 14 50 52.2 51.10 511.0 456.0
1 15 51 53.4 52.20 522.0 467.0
1 16 51.5 55 53.25 532.5 477.5
1 17 52.2 56 54.10 541.0 486.0
1 18 53 57 55.00 550.0 495.0
1 19 54 58.2 56.10 561.0 506.0
1 20 54.5 59.3 56.90 569.0 514.0
1 21 55 60.3 57.65 576.5 521.5
1 22 56 61.4 58.95 589.5 534.5
1 23 56.5 62.5 59.85 598.5 543.5
1 24 57.2 63.6 60.80 608.0 553.0 20.15 9.20
1 25 58 64.9 61.95 619.5 564.5
1 26 59 66 62.80 628.0 573.0
1 27 59.6 67.1 63.70 637.0 582.0
1 28 60.3 68.3 64.65 646.5 591.5
1 29 61 69 65.45 654.5 599.5
1 30 61.9 70 65.95 659.5 604.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 87 + 300 L. 3.49 M Y : 029 4068 X : 047 6425 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 5 5.5 5.25 52.5 52.5
1 2 10 9.4 9.70 97.0 44.5
1 3 14 13.5 13.75 137.5 85.0
1 4 19 17.5 18.25 182.5 130.0 38.21 4.08
1 5 23.1 21.6 22.35 223.5 171.0
1 6 28 27.2 27.60 276.0 223.5
1 7 34 30 32.00 320.0 267.5
1 8 36.1 32.2 34.15 341.5 289.0
1 9 37.5 34 35.75 357.5 305.0
1 10 38.5 36.6 37.55 375.5 323.0
1 11 41 40.5 40.75 407.5 355.0 34.11 4.71
1 12 42.6 45 43.80 438.0 385.5
1 13 47 50.5 48.75 487.5 435.0
1 14 50 56 53.00 530.0 477.5
1 15 53.5 62 57.75 577.5 525.0
1 16 57 69 63.00 630.0 577.5
1 17 60 78 69.00 690.0 637.5
1 18 63.5 86 74.75 747.5 695.0 39.52 3.91
1 19 67 91 79.00 790.0 737.5
1 20 70 96 83.00 830.0 777.5
1 21 73 100 86.50 865.0 830.0
1 22 76
1 23 80
1 24 83
1 25 89
1 26 95
1 27 98
1 28 100
STA : 87 + 400 R. 3.90 M Y : 029 4088 X : 047 6360 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 4 3.5 3.75 37.5 37.5
1 2 8 7 7.50 75.0 37.5
1 3 12 10.5 11.25 112.5 75.0
1 4 16 11 13.50 135.0 97.5 23.44 7.59
1 5 20 12 16.00 160.0 122.5
1 6 22 13 17.50 175.0 137.5
1 7 23 16 19.50 195.0 157.5
1 8 25 20 22.50 225.0 187.5
1 9 27 24 25.50 255.0 217.5
1 10 28 27 27.50 275.0 237.5
1 11 29.8 29 29.40 294.0 256.5
1 12 31.6 30.5 31.05 310.5 273.0
1 13 35 32 33.50 335.0 297.5 21.28 8.58
1 14 37 34 35.50 355.0 317.5
1 15 38.6 35.6 37.10 371.0 333.5
1 16 40 37.6 38.80 388.0 350.5
1 17 41.5 39 40.25 402.5 365.0
1 18 44 40.1 42.05 420.5 383.0
1 19 46.2 42 44.10 441.0 403.5
1 20 48.5 43 45.75 457.5 420.0
1 21 51 44 47.50 475.0 437.5
1 22 53.5 44.9 49.20 492.0 454.5
1 23 55.5 45.8 50.65 506.5 469.0
1 24 57 46.5 51.75 517.5 480.0 18.25 10.43
1 25 58.5 47.5 53.00 530.0 492.5
1 26 60 48.5 54.25 542.5 505.0
1 27 61 50 55.50 555.0 517.5
1 28 62 51 56.50 565.0 527.5
1 29 63 52 57.50 575.0 537.5
1 30 64 53 58.50 585.0 547.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 87 + 500 L. 3.49 M Y : 029 4090 X : 047 6361 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 2 4 3.00 30.0 30.0
1 2 4 5 4.50 45.0 15.0
1 3 6.5 6 6.25 62.5 32.5
1 4 7.5 7 7.25 72.5 42.5
1 5 8 8 8.00 80.0 50.0 10.75 20.42
1 6 9 9 9.00 90.0 60.0
1 7 10 10 10.00 100.0 70.0
1 8 11.2 11 11.10 111.0 81.0
1 9 12.2 12.4 12.30 123.0 93.0
1 10 13.1 14.4 13.75 137.5 107.5
1 11 15 17 16.00 160.0 130.0
1 12 16.2 20 18.10 181.0 151.0
1 13 18 22.1 20.05 200.5 170.5
1 14 20.2 24.5 22.35 223.5 193.5 15.37 12.97
1 15 22.2 27.2 24.70 247.0 217.0
1 16 25 28.4 26.70 267.0 237.0
1 17 27.4 29.5 28.45 284.5 254.5
1 18 29.5 31.2 30.35 303.5 273.5
1 19 31 33.4 32.20 322.0 292.0
1 20 32.4 35.5 33.95 339.5 309.5
1 21 34 36 35.00 350.0 320.0
1 22 35.4 37 36.20 362.0 332.0
1 23 37 37.5 37.25 372.5 342.5
1 24 38.4 38 38.20 382.0 352.0
1 25 40 39.2 39.60 396.0 366.0 13.72 14.99
1 26 42 40 41.00 410.0 380.0
1 27 43 41 42.00 420.0 390.0
1 28 43.8 42 42.90 429.0 399.0
1 29 44.5 42.6 43.55 435.5 405.5
1 30 45 43.3 44.15 441.5 411.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 87 + 600 R. 3.52 M Y : 029 4140 X : 047 6251 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 3 3 0 0 0.0
1 1 11 10 10.50 105.0 105.0
1 2 18 17 17.50 175.0 70.0
1 3 23 22 22.50 225.0 120.0
1 4 26 26.1 26.05 260.5 155.5
1 5 28.5 31 29.75 297.5 192.5 43.33 3.48
1 6 32.5 35 33.75 337.5 232.5
1 7 38 40 39.00 390.0 285.0
1 8 43 45.1 44.05 440.5 335.5
1 9 48 51 49.50 495.0 390.0
1 10 52.5 57 54.75 547.5 442.5
1 11 57 63 60.00 600.0 495.0
1 12 60.5 68.3 64.40 644.0 539.0
1 13 64.4 74 69.20 692.0 587.0 45.33 3.28
1 14 68.4 79 73.70 737.0 632.0
1 15 73 84 78.50 785.0 680.0
1 16 77.5 90 83.75 837.5 732.5
1 17 82.5 95 88.75 887.5 782.5 44.74 3.34
1 18 87 98 92.50 925.0 820.0
1 19 91 100 95.50 955.0 850.0
1 20 94
1 21 97
1 22 100
STA : 87 + 700 L.3.50 M Y : 029 4105 X : 047 6193 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 7 5 6.00 60.0 60.0
1 2 14.5 11 12.75 127.5 67.5
1 3 23 16.5 19.75 197.5 137.5
1 4 33.5 30 31.75 317.5 257.5
1 5 41 26 33.50 335.0 275.0
1 6 46 33 39.50 395.0 335.0 55.95 2.51
1 7 51 41.5 46.25 462.5 402.5
1 8 55.5 47.5 51.50 515.0 455.0
1 9 60.5 52.5 56.50 565.0 505.0
1 10 65.4 58.5 61.95 619.5 559.5
1 11 69 66 67.50 675.0 615.0
1 12 73 72 72.50 725.0 665.0
1 13 75.4 76 75.70 757.0 697.0
1 14 78.5 81 79.75 797.5 737.5
1 15 81 84 82.50 825.0 765.0
1 16 83 87 85.00 850.0 790.0 42.86 3.53
1 17 84 88 86.00 860.0 800.0
1 18 86 94 90.00 900.0 840.0
1 19 88 96 92.00 920.0 860.0
1 20 89 98 93.50 935.0 875.0
1 21 92 100 96.00 960.0 900.0
1 22 94
1 23 95
1 24 100
STA : 87 + 800 L. 3.49 M Y : 029 4146 X : 047 6194 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 10 12 11.00 110.0 60.0
1 3 15 16.5 15.75 157.5 107.5
1 4 21 19.6 20.30 203.0 153.0
1 5 31 27 29.00 290.0 240.0 40.00 3.85
1 6 35.5 29 32.25 322.5 272.5
1 7 39.4 31 35.20 352.0 302.0
1 8 44 32.5 38.25 382.5 332.5
1 9 47 35 41.00 410.0 360.0
1 10 51 39.4 45.20 452.0 402.0
1 11 55 44 49.50 495.0 445.0
1 12 59 47.2 53.10 531.0 481.0 39.67 3.89
1 13 62 50.4 56.20 562.0 512.0
1 14 66 54 60.00 600.0 550.0
1 15 70 59 64.50 645.0 595.0
1 16 74 62 68.00 680.0 630.0
1 17 79 67 73.00 730.0 680.0
1 18 89 73 81.00 810.0 760.0 44.50 3.36
1 19 96 79 87.50 875.0 825.0
1 20 100 88 94.00 940.0 890.0
1 21 98
1 22 100
STA : 87 + 900 R. 4.62 M Y : 029 4246 X : 047 6185 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 2 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 5 6 5.50 55.0 30.0
1 3 9 7.8 8.40 84.0 59.0
1 4 12 9.8 10.90 109.0 84.0
1 5 14 11.7 12.85 128.5 103.5 28.27 5.98
1 6 16 13 14.50 145.0 120.0
1 7 18 15 16.50 165.0 140.0
1 8 20 17.2 18.60 186.0 161.0
1 9 22.2 20.5 21.35 213.5 188.5
1 10 25 25.5 25.25 252.5 227.5
1 11 29 38.2 33.60 336.0 311.0
1 12 34 32 33.00 330.0 305.0
1 13 39.2 40 39.60 396.0 371.0
1 14 41.7 42 41.85 418.5 393.5
1 15 44 46 45.00 450.0 425.0 28.95 5.80
1 16 47 50 48.50 485.0 460.0
1 17 49.2 53 51.10 511.0 486.0
1 18 51.2 57 54.10 541.0 516.0
1 19 54 61 57.50 575.0 550.0
1 20 57 64.5 60.75 607.5 582.5
1 21 60 68 64.00 640.0 615.0
1 22 63 72 67.50 675.0 650.0
1 23 65.5 76 70.75 707.5 682.5
1 24 68 80 74.00 740.0 715.0 30.86 5.35
1 25 71 84 77.50 775.0 750.0
1 26 74 88 81.00 810.0 785.0
1 27 77 93 85.00 850.0 825.0
1 28 80.2 96 88.10 881.0 856.0
1 29 84 100 92.00 920.0 895.0
1 30 87.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 + 000 L.2.90 M Y : 029 4311 X : 047 6227 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 7 5 6.00 60.0 60.0
1 2 15 11.4 13.20 132.0 72.0
1 3 22 19 20.50 205.0 145.0
1 4 24 28 26.00 260.0 200.0
1 5 27.4 38 32.70 327.0 267.0 47.50 3.09
1 6 35 40 37.50 375.0 315.0
1 7 41 41.5 41.25 412.5 352.5
1 8 45 43 44.00 440.0 380.0
1 9 49 44.5 46.75 467.5 407.5
1 10 51.2 46.5 48.85 488.5 428.5
1 11 54 48 51.00 510.0 450.0
1 12 56.1 50 53.05 530.5 470.5 35.91 4.42
1 13 59 52 55.50 555.0 495.0
1 14 61.8 54 57.90 579.0 519.0
1 15 64.1 57 60.55 605.5 545.5
1 16 66.4 60.5 63.45 634.5 574.5
1 17 68.8 64 66.40 664.0 604.0
1 18 70.4 67.1 68.75 687.5 627.5
1 19 72.3 70 71.15 711.5 651.5
1 20 74 73.4 73.70 737.0 677.0 32.59 4.99
1 21 76.8 76 76.40 764.0 704.0
1 22 77.9 77.5 77.70 777.0 717.0
1 23 79.5 78.5 79.00 790.0 730.0
1 24 82 81 81.50 815.0 755.0
1 25 84 82 83.00 830.0 770.0
1 26 86.2 83.4 84.80 848.0 788.0 28.33 5.96
1 27 88 85 86.50 865.0 805.0
1 28 89.5 87 88.25 882.5 822.5
1 29 90 89 89.50 895.0 835.0
1 30 92 90 91.00 910.0 850.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 + 100 R. 5.21 M Y : 029 4413 X : 047 6233 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 9 9 9.00 90.0 40.0
1 3 12 12 12.00 120.0 70.0
1 4 15 15 15.00 150.0 100.0
1 5 17.4 17.3 17.35 173.5 123.5
1 6 20 21 20.50 205.0 155.0 35.45 4.49
1 7 23.4 24.5 23.95 239.5 189.5
1 8 27.6 29 28.30 283.0 233.0
1 9 33 34 33.50 335.0 285.0
1 10 39 39.4 39.20 392.0 342.0
1 11 44 44 44.00 440.0 390.0
1 12 49.6 48 48.80 488.0 438.0
1 13 55 53 54.00 540.0 490.0
1 14 60 58 59.00 590.0 540.0
1 15 65 62.5 63.75 637.5 587.5 38.89 3.99
1 16 69 67 68.00 680.0 630.0
1 17 72.5 71 71.75 717.5 667.5
1 18 76 74 75.00 750.0 700.0
1 19 79.4 77 78.20 782.0 732.0
1 20 82.4 80.2 81.30 813.0 763.0
1 21 86 83 84.50 845.0 795.0
1 22 89 88 88.50 885.0 835.0
1 23 93 92.5 92.75 927.5 877.5 37.60 4.16
1 24 96 96 96.00 960.0 910.0
1 25 98 100 99.00 990.0 940.0
1 26 100
STA : 88 + 200 L. 3.26 M Y : 029 4499 X : 047 6288 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 2 4 3.00 30.0 30.0
1 2 4 6 5.00 50.0 20.0
1 3 6 7 6.50 65.0 35.0
1 4 8 7.8 7.90 79.0 49.0 12.13 17.53
1 5 10 8.5 9.25 92.5 62.5
1 6 11.5 9.5 10.50 105.0 75.0
1 7 13 10.5 11.75 117.5 87.5
1 8 14.2 11.2 12.70 127.0 97.0
1 9 16 12.2 14.10 141.0 111.0
1 10 17 13 15.00 150.0 120.0
1 11 17.5 14 15.75 157.5 127.5
1 12 18 14.5 16.25 162.5 132.5
1 13 19 15 17.00 170.0 140.0
1 14 21 16 18.50 185.0 155.0 11.55 18.64
1 15 23 18 20.50 205.0 175.0
1 16 25 19 22.00 220.0 190.0
1 17 26 19.5 22.75 227.5 197.5
1 18 27 20 23.50 235.0 205.0
1 19 28.9 21 24.95 249.5 219.5
1 20 31.2 21.5 26.35 263.5 233.5
1 21 34.5 22 28.25 282.5 252.5
1 22 37.4 23 30.20 302.0 272.0
1 23 40.5 24 32.25 322.5 292.5
1 24 43.6 24.5 34.05 340.5 310.5
1 25 45.3 25 35.15 351.5 321.5 13.23 15.68
1 26 46.5 26 36.25 362.5 332.5
1 27 47.5 28 37.75 377.5 347.5
1 28 48.5 30 39.25 392.5 362.5
1 29 50 33 41.50 415.0 385.0
1 30 51.1 35.3 43.20 432.0 397.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 + 300 R. 3.91 M Y : 029 4557 X : 047 6231 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 0 0 0 0.0
1 1 2 1.8 1.90 19.0 19.0
1 2 4 3.4 3.70 37.0 18.0
1 3 7 5 6.00 60.0 41.0
1 4 10 7 8.50 85.0 66.0 22.29 8.09
1 5 13 9 11.00 110.0 91.0
1 6 16 12.3 14.15 141.5 122.5
1 7 19 16 17.50 175.0 156.0
1 8 22 20 21.00 210.0 191.0
1 9 26 24 25.00 250.0 231.0
1 10 30 28.6 29.30 293.0 274.0
1 11 33.5 33.6 33.55 335.5 316.5
1 12 37.6 39.1 38.35 383.5 364.5 34.59 4.63
1 13 42.2 45.3 43.75 437.5 418.5
1 14 46.2 53.3 49.75 497.5 478.5
1 15 50.5 58 54.25 542.5 523.5
1 16 54.5 60 57.25 572.5 553.5
1 17 58 65 61.50 615.0 596.0
1 18 61.5 69 65.25 652.5 633.5
1 19 65 72.6 68.80 688.0 669.0 33.91 4.75
1 20 69 75.5 72.25 722.5 703.5
1 21 71.5 77.4 74.45 744.5 725.5
1 22 75 78 76.50 765.0 746.0
1 23 79 81 80.00 800.0 781.0
1 24 82 84 83.00 830.0 811.0
1 25 85 86.5 85.75 857.5 838.5
1 26 89 89 89.00 890.0 871.0 32.97 4.92
1 27 93.5 91 92.25 922.5 903.5
1 28 95 93 94.00 940.0 921.0
1 29 100 95 97.50 975.0 956.0
1 30 96.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 + 400 L. 3.72 M Y : 029 4584 X : 047 6142 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 4.5 3 3.75 37.5 37.5
1 2 8 6 7.00 70.0 32.5
1 3 11 9 10.00 100.0 62.5
1 4 14 11 12.50 125.0 87.5
1 5 16.5 12.5 14.50 145.0 107.5 25.50 6.82
1 6 19.2 14.5 16.85 168.5 131.0
1 7 22.3 16.5 19.40 194.0 156.5
1 8 26.2 19 22.60 226.0 188.5
1 9 31.1 22 26.55 265.5 228.0
1 10 33.5 25 29.25 292.5 255.0
1 11 42 29 35.50 355.0 317.5
1 12 48 33 40.50 405.0 367.5
1 13 56 37.5 46.75 467.5 430.0 35.15 4.54
1 14 64 42.5 53.25 532.5 495.0
1 15 68.5 48 58.25 582.5 545.0
1 16 70.5 51.5 61.00 610.0 572.5
1 17 73.5 53.5 63.50 635.0 597.5
1 18 77.5 57 67.25 672.5 635.0
1 19 82 59.5 70.75 707.5 670.0
1 20 87.5 61 74.25 742.5 705.0 159.46 0.66
1 21 93.5 62 77.75 777.5 740.0
1 22 97 63 80.00 800.0 762.5
1 23 100 641 370.50 3705.0 3667.5
1 24 64.5
1 25 65.5
1 26 66.2
1 27 67
1 28 68
1 29 69
1 30 70
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 +500 R. 4.14 M Y : 029 4650 X : 047 6069 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 1 0 0 0.0
1 1 1 3 2.00 20.0 20.0
1 2 4 4.5 4.25 42.5 22.5
1 3 6 7 6.50 65.0 45.0
1 4 7.5 9 8.25 82.5 62.5 17.63 10.90
1 5 9.5 10.5 10.00 100.0 80.0
1 6 11 12 11.50 115.0 95.0
1 7 13 15 14.00 140.0 120.0
1 8 15 17.2 16.10 161.0 141.0
1 9 17 19 18.00 180.0 160.0
1 10 18 21 19.50 195.0 175.0
1 11 20 22.5 21.25 212.5 192.5
1 12 22 24 23.00 230.0 210.0
1 13 24 27 25.50 255.0 235.0 20.03 9.27
1 14 26 30 28.00 280.0 260.0
1 15 28 32.5 30.25 302.5 282.5
1 16 31 35 33.00 330.0 310.0
1 17 34.1 38 36.05 360.5 340.5
1 18 36.4 41.3 38.85 388.5 368.5
1 19 38.4 45 41.70 417.0 397.0
1 20 41 49 45.00 450.0 430.0
1 21 44.5 52 48.25 482.5 462.5
1 22 48.1 54 51.05 510.5 490.5
1 23 51.4 57 54.20 542.0 522.0 22.37 8.05
1 24 53 62.3 57.65 576.5 556.5
1 25 54 65.4 59.70 597.0 577.0
1 26 55 68 61.50 615.0 595.0
1 27 55.5 71 63.25 632.5 612.5
1 28 56 74 65.00 650.0 630.0
1 29 57.2 78 67.60 676.0 656.0
1 30 58.2 80 69.10 691.0 671.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 + 600 L. 3.32 M Y : 029 4653 X : 047 5959 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 2 2 2.00 20.0 20.0
1 2 5 4.1 4.55 45.5 25.5
1 3 8 7 7.50 75.0 55.0
1 4 11.5 10 10.75 107.5 87.5
1 5 16 13 14.50 145.0 125.0 28.00 6.05
1 6 21 17 19.00 190.0 170.0
1 7 24 21.5 22.75 227.5 207.5
1 8 26 25.5 25.75 257.5 237.5
1 9 27 28 27.50 275.0 255.0
1 10 29 31 30.00 300.0 280.0
1 11 31 35 33.00 330.0 310.0
1 12 34 35.6 34.80 348.0 328.0
1 13 37 36 36.50 365.0 345.0
1 14 41 37 39.00 390.0 370.0
1 15 45 37.5 41.25 412.5 392.5 24.38 7.22
1 16 49 38 43.50 435.0 415.0
1 17 51.2 39 45.10 451.0 431.0
1 18 54 39.5 46.75 467.5 447.5
1 19 56.2 40.5 48.35 483.5 463.5
1 20 59 42.5 50.75 507.5 487.5
1 21 62 45 53.50 535.0 515.0
1 22 64.5 47 55.75 557.5 537.5
1 23 68.5 50 59.25 592.5 572.5
1 24 73 52 62.50 625.0 605.0
1 25 77 54 65.50 655.0 635.0 26.67 6.44
1 26 81 56.8 68.90 689.0 669.0
1 27 85 59 72.00 720.0 700.0
1 28 88 61 74.50 745.0 725.0
1 29 92 63 77.50 775.0 755.0
1 30 98 66 82.00 820.0 800.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 + 700 R. 6.10 M Y : 029 4650 X : 047 5874 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 7 5 6.00 60.0 20.0
1 3 11 5.5 8.25 82.5 42.5
1 4 14.2 6 10.10 101.0 61.0
1 5 18 7 12.50 125.0 85.0 34.00 4.73
1 6 22.2 10 16.10 161.0 121.0
1 7 30 15 22.50 225.0 185.0
1 8 38 19 28.50 285.0 245.0
1 9 44 25.2 34.60 346.0 306.0
1 10 45 36 40.50 405.0 365.0
1 11 46 40 43.00 430.0 390.0
1 12 46.5 43.5 45.00 450.0 410.0
1 13 47 47.5 47.25 472.5 432.5 30.78 5.37
1 14 48 52 50.00 500.0 460.0
1 15 48.5 56.5 52.50 525.0 485.0
1 16 49 57.5 53.25 532.5 492.5
1 17 49.5 58.5 54.00 540.0 500.0
1 18 50 59.6 54.80 548.0 508.0
1 19 50.6 60.5 55.55 555.5 515.5
1 20 51 61.5 56.25 562.5 522.5
1 21 51.5 62.5 57.00 570.0 530.0
1 22 52 63.5 57.75 577.5 537.5 22.25 8.11
1 23 53.1 65 59.05 590.5 550.5
1 24 54.2 67 60.60 606.0 566.0
1 25 55.5 69 62.25 622.5 582.5
1 26 57.1 70.5 63.80 638.0 598.0
1 27 58.5 72.5 65.50 655.0 615.0
1 28 60 74.4 67.20 672.0 632.0
1 29 61.5 76.5 69.00 690.0 650.0
1 30 63 78.5 70.75 707.5 667.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 +800 L. 3.26 M Y : 029 4726 X : 047 5824 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 3 1 0 0 0.0
1 1 7 3 5.00 50.0 50.0
1 2 10 6 8.00 80.0 30.0
1 3 11.5 8 9.75 97.5 47.5
1 4 12 8.5 10.25 102.5 52.5 12.50 16.86
1 5 12.5 9.5 11.00 110.0 60.0
1 6 13.5 10.5 12.00 120.0 70.0
1 7 14 12 13.00 130.0 80.0
1 8 16 14 15.00 150.0 100.0
1 9 17 16 16.50 165.0 115.0
1 10 19 18 18.50 185.0 135.0
1 11 20 19.5 19.75 197.5 147.5
1 12 21 20.5 20.75 207.5 157.5 13.00 16.04
1 13 22 22 22.00 220.0 170.0
1 14 22.5 24 23.25 232.5 182.5
1 15 24 25 24.50 245.0 195.0
1 16 26 26 26.00 260.0 210.0
1 17 28 29.5 28.75 287.5 237.5
1 18 29.5 35 32.25 322.5 272.5 17.86 10.72
1 19 31 40 35.50 355.0 305.0
1 20 33 45.5 39.25 392.5 342.5
1 21 35 50 42.50 425.0 375.0
1 22 36.5 56.5 46.50 465.0 415.0
1 23 38.5 57.5 48.00 480.0 430.0
1 24 40 58.5 49.25 492.5 442.5
1 25 43 59 51.00 510.0 460.0
1 26 45.5 60 52.75 527.5 477.5 18.67 10.13
1 27 48 61 54.50 545.0 495.0
1 28 51.5 62 56.75 567.5 517.5
1 29 56 63 59.50 595.0 545.0
1 30 58 64 61.00 610.0 560.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 88 + 900 R. 3.51 M Y : 029 4820 X : 047 5850 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 2 0 0 0.0
1 1 4 6 5.00 50.0 50.0
1 2 7 10 8.50 85.0 35.0
1 3 12 12 12.00 120.0 70.0
1 4 14 14.5 14.25 142.5 92.5
1 5 16 16 16.00 160.0 110.0 23.63 7.51
1 6 17.8 18 17.90 179.0 129.0
1 7 20.8 21 20.90 209.0 159.0
1 8 23 24.8 23.90 239.0 189.0
1 9 25.5 29 27.25 272.5 222.5
1 10 27.5 34.2 30.85 308.5 258.5
1 11 31 40.5 35.75 357.5 307.5
1 12 36 72 54.00 540.0 490.0 48.39 3.02
1 13 41 92 66.50 665.0 615.0
1 14 45.5 100 72.75 727.5 677.5
1 15 51
1 16 56
1 17 64
1 18 72
1 19 83
1 20 86
1 21 87
1 22 89
1 23 92
1 24 95
1 25 98
1 26 100
STA : 89 + 000 R. 4.49 M Y : 029 4861 X : 047 5833 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 2 1 0 0 0.0
1 1 6.7 4 5.35 53.5 53.5
1 2 13 7 10.00 100.0 46.5
1 3 19 11.5 15.25 152.5 99.0
1 4 24.5 14.5 19.50 195.0 141.5 33.31 4.86
1 5 27 20 23.50 235.0 181.5
1 6 28.5 23.5 26.00 260.0 206.5
1 7 30.5 28 29.25 292.5 239.0
1 8 33 31 32.00 320.0 266.5
1 9 37.5 35.4 36.45 364.5 311.0
1 10 42 41 41.50 415.0 361.5
1 11 47.2 49 48.10 481.0 427.5
1 12 54 55.5 54.75 547.5 494.0
1 13 57 63.5 60.25 602.5 549.0
1 14 59 65.5 62.25 622.5 569.0 36.00 4.40
1 15 63 66.2 64.60 646.0 592.5
1 16 66 67.3 66.65 666.5 613.0
1 17 69 68.3 68.65 686.5 633.0
1 18 72 69.5 70.75 707.5 654.0
1 19 76 71.5 73.75 737.5 684.0
1 20 81 74.5 77.75 777.5 724.0
1 21 86 77.5 81.75 817.5 764.0
1 22 92 81 86.50 865.0 811.5 36.73 4.29
1 23 96 84 90.00 900.0 846.5
1 24 100 87 93.50 935.0 881.5
1 25 90
1 26 93
1 27 96
1 28 98.5
1 29 100
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 89 + 100 L. 1.90 M Y : 029 4889 X : 047 5754 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 6 5.00 50.0 50.0
1 2 6 10 8.00 80.0 30.0
1 3 8 13.5 10.75 107.5 57.5 22.50 7.99
1 4 9 17 13.00 130.0 80.0
1 5 10 22.5 16.25 162.5 112.5
1 6 11 27.5 19.25 192.5 142.5
1 7 12.5 31.4 21.95 219.5 169.5
1 8 14 34 24.00 240.0 190.0
1 9 15.2 35 25.10 251.0 201.0
1 10 16.5 36.5 26.50 265.0 215.0 20.00 9.28
1 11 18 37.5 27.75 277.5 227.5
1 12 20 39 29.50 295.0 245.0
1 13 21 40.5 30.75 307.5 257.5
1 14 23 43 33.00 330.0 280.0
1 15 26.2 45.5 35.85 358.5 308.5
1 16 28.5 48.3 38.40 384.0 334.0
1 17 30.5 50 40.25 402.5 352.5
1 18 32.5 51.3 41.90 419.0 369.0
1 19 34.4 54.4 44.40 444.0 394.0 21.09 8.68
1 20 36.4 56.5 46.45 464.5 414.5
1 21 38 58.8 48.40 484.0 434.0
1 22 40 62 51.00 510.0 460.0
1 23 41.5 65.5 53.50 535.0 485.0
1 24 44.5 70.5 57.50 575.0 525.0
1 25 46.5 76.5 61.50 615.0 565.0
1 26 47.5 82.5 65.00 650.0 600.0
1 27 48 87 67.50 675.0 625.0 24.14 7.31
1 28 49 89 69.00 690.0 640.0
1 29 50 100 75.00 750.0 700.0
1 30 52
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 89+ 200 R. 3.40 M Y : 029 4941 X : 047 5679 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 3 0 0 0.0
1 1 1 8 4.50 45.0 45.0
1 2 5 10.6 7.80 78.0 33.0
1 3 9 12 10.50 105.0 60.0
1 4 12 13.5 12.75 127.5 82.5
1 5 14 14 14.00 140.0 95.0 23.75 7.46
1 6 16 16 16.00 160.0 115.0
1 7 20 19.2 19.60 196.0 151.0
1 8 24 23 23.50 235.0 190.0
1 9 27.5 27 27.25 272.5 227.5
1 10 31 32 31.50 315.0 270.0
1 11 34 37 35.50 355.0 310.0
1 12 38 42 40.00 400.0 355.0
1 13 42 45 43.50 435.0 390.0 27.68 6.14
1 14 45 46.5 45.75 457.5 412.5
1 15 47 49 48.00 480.0 435.0
1 16 48 52 50.00 500.0 455.0
1 17 49 54.1 51.55 515.5 470.5
1 18 51 59.5 55.25 552.5 507.5
1 19 54 64 59.00 590.0 545.0
1 20 57 67.5 62.25 622.5 577.5
1 21 60 73 66.50 665.0 620.0
1 22 63.5 78 70.75 707.5 662.5 32.96 4.92
1 23 67.5 84 75.75 757.5 712.5
1 24 72 89 80.50 805.0 760.0
1 25 77.2 90 83.60 836.0 791.0
1 26 83 94 88.50 885.0 840.0
1 27 87 100 93.50 935.0 890.0
1 28 92
1 29 95
1 30 100
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 89 + 300 L. 3.26 M Y : 029 5037 X : 047 5684 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 2 0 0 0.0
1 1 3 6 4.50 45.0 45.0
1 2 9 11 10.00 100.0 55.0
1 3 12.5 14.5 13.50 135.0 90.0
1 4 15.5 17 16.25 162.5 117.5 25.86 6.70
1 5 18 18.2 18.10 181.0 136.0
1 6 20.2 20.3 20.25 202.5 157.5
1 7 23.2 22 22.60 226.0 181.0
1 8 25 25.1 25.05 250.5 205.5
1 9 26 28 27.00 270.0 225.0
1 10 28 30.5 29.25 292.5 247.5
1 11 29 32 30.50 305.0 260.0 21.81 8.32
1 12 30.2 33 31.60 316.0 271.0
1 13 31.2 34.5 32.85 328.5 283.5
1 14 33 37.5 35.25 352.5 307.5
1 15 34.1 40 37.05 370.5 325.5
1 16 35.4 41.5 38.45 384.5 339.5
1 17 36.4 43 39.70 397.0 352.0
1 18 37.4 43.5 40.45 404.5 359.5 16.80 11.58
1 19 39 44 41.50 415.0 370.0
1 20 40 44.5 42.25 422.5 377.5
1 21 41.4 45 43.20 432.0 387.0
1 22 42 45.5 43.75 437.5 392.5
1 23 43 43.3 43.15 431.5 386.5
1 24 43.2 47 45.10 451.0 406.0
1 25 44 48 46.00 460.0 415.0
1 26 44.5 48.8 46.65 466.5 421.5
1 27 45 50.2 47.60 476.0 431.0 15.38 12.96
1 28 45.5 51.4 48.45 484.5 439.5
1 29 46 53.4 49.70 497.0 452.0
1 30 46.8 54.5 50.65 506.5 461.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 89 + 400 L. 3.40 M Y : 029 5132 X : 047 5695 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 6.5 8.5 7.50 75.0 75.0
1 2 10.3 15 12.65 126.5 51.5
1 3 16 18 17.00 170.0 95.0 38.70 4.01
1 4 21.1 23 22.05 220.5 145.5
1 5 28.2 25.5 26.85 268.5 193.5
1 6 32.5 30 31.25 312.5 237.5
1 7 37 35 36.00 360.0 285.0
1 8 42.5 39 40.75 407.5 332.5
1 9 45.6 42.2 43.90 439.0 364.0 45.19 3.30
1 10 52 47 49.50 495.0 420.0
1 11 54.5 56 55.25 552.5 477.5
1 12 57.5 64 60.75 607.5 532.5
1 13 60.5 72 66.25 662.5 587.5
1 14 61.2 77 69.10 691.0 616.0
1 15 63 80 71.50 715.0 640.0
1 16 64.1 82 73.05 730.5 655.5
1 17 66 86 76.00 760.0 685.0 38.25 4.07
1 18 70 88 79.00 790.0 715.0
1 19 74 89 81.50 815.0 740.0
1 20 78 90 84.00 840.0 765.0
1 21 83 92 87.50 875.0 800.0
1 22 94 94 94.00 940.0 865.0 38.54 4.04
1 23 96 96 96.00 960.0 885.0
1 24 100 100 100.00 1000.0 925.0
STA : 89 + 500 R. 5.12 M Y : 029 5097 X : 047 5605 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 0 0 0 0.0
1 1 4 5.5 4.75 47.5 47.5
1 2 8 11.5 9.75 97.5 50.0
1 3 12.3 18 15.15 151.5 104.0 37.00 4.25
1 4 17 22.4 19.70 197.0 149.5
1 5 21.5 25 23.25 232.5 185.0
1 6 24.6 28 26.30 263.0 215.5
1 7 27 30.1 28.55 285.5 238.0
1 8 29.1 33 31.05 310.5 263.0
1 9 32.2 36.2 34.20 342.0 294.5 36.63 4.31
1 10 35 40.5 37.75 377.5 330.0
1 11 38.5 46.5 42.50 425.0 377.5
1 12 42.4 55 48.70 487.0 439.5
1 13 45 68 56.50 565.0 517.5
1 14 50 75.5 62.75 627.5 580.0
1 15 56 83.1 69.55 695.5 648.0 45.69 3.25
1 16 62 89 75.50 755.0 707.5
1 17 67.5 94 80.75 807.5 760.0
1 18 74 100 87.00 870.0 822.5
1 19 78.5
1 20 83
1 21 86
1 22 90
1 23 94
1 24 96
1 25 100
STA : 89 + 600 L . 3.42 M Y : 029 5095 X : 047 5517 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 3 5 4.00 40.0 40.0
1 2 5.5 7.5 6.50 65.0 25.0
1 3 8 11 9.50 95.0 55.0
1 4 10 16 13.00 130.0 90.0 38.57 4.03
1 5 13 24 18.50 185.0 145.0
1 6 16 33.4 24.70 247.0 207.0
1 7 20.5 41.5 31.00 310.0 270.0
1 8 25.5 52.5 39.00 390.0 350.0
1 9 30.5 57 43.75 437.5 397.5
1 10 35.5 60.2 47.85 478.5 438.5
1 11 42.5 62 52.25 522.5 482.5 47.21 3.12
1 12 53 64 58.50 585.0 545.0
1 13 59.5 65 62.25 622.5 582.5
1 14 71 69.2 70.10 701.0 661.0
1 15 77.5 72.5 75.00 750.0 710.0
1 16 83 75.5 79.25 792.5 752.5
1 17 88.2 79.5 83.85 838.5 798.5
1 18 91 83 87.00 870.0 830.0 42.73 3.54
1 19 92 87 89.50 895.0 855.0
1 20 94 90 92.00 920.0 880.0
1 21 96 93 94.50 945.0 905.0
1 22 100 96 98.00 980.0 940.0
1 23 100
STA : 89 +700 R.3.62 M Y : 029 5178 X : 047 5423 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 2 2 2.00 20.0 20.0
1 2 4 4.5 4.25 42.5 22.5
1 3 6 6.2 6.10 61.0 41.0
1 4 7 7.6 7.30 73.0 53.0 14.00 14.60
1 5 9 10 9.50 95.0 75.0
1 6 9.5 11.6 10.55 105.5 85.5
1 7 10 13.6 11.80 118.0 98.0
1 8 11.4 16.5 13.95 139.5 119.5
1 9 13 19.5 16.25 162.5 142.5
1 10 14 22.5 18.25 182.5 162.5
1 11 15.1 25.5 20.30 203.0 183.0
1 12 16 28 22.00 220.0 200.0
1 13 16.5 29.6 23.05 230.5 210.5
1 14 17.5 31.2 24.35 243.5 223.5 14.88 13.52
1 15 19 33 26.00 260.0 240.0
1 16 20.2 34.2 27.20 272.0 252.0
1 17 22 36 29.00 290.0 270.0
1 18 23 37 30.00 300.0 280.0
1 19 24 38 31.00 310.0 290.0
1 20 24.5 39 31.75 317.5 297.5
1 21 25 39.6 32.30 323.0 303.0
1 22 25.6 42.2 33.90 339.0 319.0
1 23 26 41.5 33.75 337.5 317.5
1 24 26.7 42.7 34.70 347.0 327.0
1 25 27.2 44 35.60 356.0 336.0 12.77 16.42
1 26 28 45.2 36.60 366.0 346.0
1 27 29 46.2 37.60 376.0 356.0
1 28 29.6 47.5 38.55 385.5 365.5
1 29 30.6 48.5 39.55 395.5 375.5
1 30 31 49.6 40.30 403.0 383.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 89 + 800 R .3.29 M Y : 029 5137 X : 047 5330 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 5 3 4.00 40.0 40.0
1 2 8 4 6.00 60.0 20.0
1 3 12 7 9.50 95.0 55.0 27.40 6.22
1 4 16 9.4 12.70 127.0 87.0
1 5 22.4 13 17.70 177.0 137.0
1 6 27.2 23.4 25.30 253.0 213.0
1 7 30 27.2 28.60 286.0 246.0
1 8 33 30.4 31.70 317.0 277.0
1 9 36.4 35 35.70 357.0 317.0 34.55 4.64
1 10 40.6 37 38.80 388.0 348.0
1 11 44.5 39.5 42.00 420.0 380.0
1 12 48.5 43 45.75 457.5 417.5
1 13 53 48 50.50 505.0 465.0
1 14 56.2 51 53.60 536.0 496.0 34.41 4.66
1 15 60 54.2 57.10 571.0 531.0
1 16 63 56 59.50 595.0 555.0
1 17 65 60 62.50 625.0 585.0
1 18 68.2 63 65.60 656.0 616.0
1 19 70 70 70.00 700.0 660.0
1 20 72 79 75.50 755.0 715.0 38.05 4.10
1 21 73.4 92 82.70 827.0 787.0
1 22 75.4 100 87.70 877.0 837.0
1 23 78
1 24 82
1 25 86.4
1 26 91
1 27 93
1 28 96
1 29 100
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 89 + 900 R. 3.00 M Y : 029 5144 X : 047 5225 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 4 5 4.50 45.0 45.0
1 2 7 7 7.00 70.0 25.0
1 3 9 9 9.00 90.0 45.0 16.67 11.70
1 4 10 11 10.50 105.0 60.0
1 5 12 13 12.50 125.0 80.0
1 6 13 16 14.50 145.0 100.0
1 7 14 18.5 16.25 162.5 117.5
1 8 15 21.4 18.20 182.0 137.0
1 9 15.9 24.2 20.05 200.5 155.5
1 10 17 27.2 22.10 221.0 176.0
1 11 18 29 23.50 235.0 190.0 17.81 10.75
1 12 19.5 30.5 25.00 250.0 205.0
1 13 21 32 26.50 265.0 220.0
1 14 23 34 28.50 285.0 240.0
1 15 24 37 30.50 305.0 260.0
1 16 26 40 33.00 330.0 285.0
1 17 27 43.5 35.25 352.5 307.5
1 18 29 46.5 37.75 377.5 332.5
1 19 32 49.5 40.75 407.5 362.5
1 20 34 52 43.00 430.0 385.0
1 21 37 54.5 45.75 457.5 412.5 20.63 8.93
1 22 40.2 56.5 48.35 483.5 438.5
1 23 44 58.5 51.25 512.5 467.5
1 24 48 60 54.00 540.0 495.0
1 25 51 63 57.00 570.0 525.0
1 26 53 65 59.00 590.0 545.0
1 27 55 67 61.00 610.0 565.0 20.83 8.81
1 28 57 69 63.00 630.0 585.0
1 29 59 72 65.50 655.0 610.0
1 30 61 73 67.00 670.0 625.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 90 + 000 L. 3.00 M Y : 029 5217 X : 047 5175 Date : November 20, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 6 4 5.00 50.0 50.0
1 2 12 9 10.50 105.0 55.0
1 3 18 12 15.00 150.0 100.0 47.50 3.09
1 4 26.4 15 20.70 207.0 157.0
1 5 37 20.5 28.75 287.5 237.5
1 6 45.5 24.5 35.00 350.0 300.0
1 7 63.5 25 44.25 442.5 392.5
1 8 70.5 26.3 48.40 484.0 434.0 48.15 3.04
1 9 75 27 51.00 510.0 460.0
1 10 78 28.3 53.15 531.5 481.5
1 11 81.4 29.5 55.45 554.5 504.5
1 12 84 30 57.00 570.0 520.0
1 13 86 39 62.50 625.0 575.0
1 14 88 49 68.50 685.0 635.0 46.39 3.19
1 15 91 57 74.00 740.0 690.0
1 16 94 68 81.00 810.0 760.0
1 17 96 73.3 84.65 846.5 796.5
1 18 100 77 88.50 885.0 835.0
1 19 80
1 20 83
1 21 86
1 22 88
1 23 90
1 24 92
1 25 96
1 26 100
1 27
1 28
1 29
1 30
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 90 + 100 R. 4.16 M Y : 029 5280 X : 047 5127 Date : November 21, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 0 2 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 5.2 6 5.60 56.0 21.0
1 3 7.4 8 7.70 77.0 42.0
1 4 9 9 9.00 90.0 55.0 13.44 15.38
1 5 11 10 10.50 105.0 70.0
1 6 13 11 12.00 120.0 85.0
1 7 14 12.5 13.25 132.5 97.5
1 8 14.5 14 14.25 142.5 107.5
1 9 15.5 15 15.25 152.5 117.5
1 10 16.4 15.5 15.95 159.5 124.5
1 11 18 16.5 17.25 172.5 137.5
1 12 19.5 17 18.25 182.5 147.5
1 13 21.4 17.5 19.45 194.5 159.5 11.74 18.27
1 14 23.3 18 20.65 206.5 171.5
1 15 25 19 22.00 220.0 185.0
1 16 25.5 19.4 22.45 224.5 189.5
1 17 26.4 20.5 23.45 234.5 199.5
1 18 27.5 21.5 24.50 245.0 210.0
1 19 28.5 22.5 25.50 255.0 220.0
1 20 29.3 23.6 26.45 264.5 229.5
1 21 30 25 27.50 275.0 240.0
1 22 31 26 28.50 285.0 250.0 11.98 17.80
1 23 33 27 30.00 300.0 265.0
1 24 34.4 28.5 31.45 314.5 279.5
1 25 36.4 30.5 33.45 334.5 299.5
1 26 39 32.5 35.75 357.5 322.5
1 27 41.3 35 38.15 381.5 346.5
1 28 43.2 37.5 40.35 403.5 368.5 13.67 15.06
1 29 45.6 40 42.80 428.0 393.0
1 30 48 41 44.50 445.0 410.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 90 + 200 R. 3.28 M Y : 029 5327 X : 047 5027 Date : November 21, 2013
DCP Reading CBR (%)
Blow Cumulative Blow Cumulative DCP
No Blow Point 1 Point 2 Average Penetration (h) (mm/Blow) =10^(2.62-
(Cm) (Cm) (Cm) (mm) (1.27*Log(h)))
0 0 1 1 0 0 0.0
1 1 3.4 3 3.20 32.0 32.0
1 2 6 4.5 5.25 52.5 20.5
1 3 8.6 6.2 7.40 74.0 42.0 17.75 10.80
1 4 11 8 9.50 95.0 63.0
1 5 14 9.5 11.75 117.5 85.5
1 6 16.2 11.5 13.85 138.5 106.5
1 7 19 15 17.00 170.0 138.0
1 8 21.6 17.5 19.55 195.5 163.5
1 9 25 20.6 22.80 228.0 196.0
1 10 28.6 24 26.30 263.0 231.0 21.11 8.67
1 11 30.5 26.6 28.55 285.5 253.5
1 12 32 29.6 30.80 308.0 276.0
1 13 32.5 31 31.75 317.5 285.5
1 14 34 31.5 32.75 327.5 295.5
1 15 35.4 32 33.70 337.0 305.0
1 16 36 32.6 34.30 343.0 311.0
1 17 37 33.5 35.25 352.5 320.5
1 18 37.5 35 36.25 362.5 330.5
1 19 38 36 37.00 370.0 338.0
1 20 38.5 37 37.75 377.5 345.5
1 21 39 38 38.50 385.0 353.0 13.52 15.27
1 22 39.5 39 39.25 392.5 360.5
1 23 40 39.5 39.75 397.5 365.5
1 24 40.6 40 40.30 403.0 371.0
1 25 41 40.5 40.75 407.5 375.5
1 26 41.7 41.2 41.45 414.5 382.5
1 27 42 42 42.00 420.0 388.0
1 28 42.7 42.5 42.60 426.0 394.0
1 29 43 43 43.00 430.0 398.0
1 30 44 43.5 43.75 437.5 405.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 91+ 500 R. 2.90 M Y : 0295693 X : 0474063 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 5.2 7 6.10 61.0 61.0
1 2 6 8 7.00 70.0 9.0
1 3 8.5 9.5 9.00 90.0 29.0
1 4 11 12 11.50 115.0 54.0 15.71 12.61
1 5 15.5 13 14.25 142.5 81.5
1 6 16.5 14 15.25 152.5 91.5
1 7 19 15.2 17.10 171.0 110.0
1 8 20 16 18.00 180.0 119.0
1 9 20.5 17 18.75 187.5 126.5
1 10 21.4 18.6 20.00 200.0 139.0
1 11 22.4 20.5 21.45 214.5 153.5
1 12 23 22 22.50 225.0 164.0
1 13 23.5 23 23.25 232.5 171.5 11.17 19.46
1 14 24 24 24.00 240.0 179.0
1 15 24.4 24.5 24.45 244.5 183.5
1 16 25 25 25.00 250.0 189.0
1 17 26 25.5 25.75 257.5 196.5
1 18 26.4 26 26.20 262.0 201.0
1 19 27.2 26.5 26.85 268.5 207.5
1 20 28 28 28.00 280.0 219.0
1 21 29 29.1 29.05 290.5 229.5
1 22 30.5 31 30.75 307.5 246.5
1 23 32 32 32.00 320.0 259.0
1 24 33 33 33.00 330.0 269.0 11.00 19.83
1 25 34 34.2 34.10 341.0 280.0
1 26 34.5 35.4 34.95 349.5 288.5
1 27 35.5 36.5 36.00 360.0 299.0
1 28 36.5 37.5 37.00 370.0 309.0
1 29 37.3 39 38.15 381.5 320.5
1 30 38 40.2 39.10 391.0 330.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 92 + 200 L. 3.32 M Y : 029 5749 X : 047 3453 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 2 12 7.00 70.0 70.0
1 2 9 14.2 11.60 116.0 46.0
1 3 12 17.3 14.65 146.5 76.5
1 4 15 20.3 17.65 176.5 106.5 27.21 6.28
1 5 17 24 20.50 205.0 135.0
1 6 20 26 23.00 230.0 160.0
1 7 24.1 28 26.05 260.5 190.5
1 8 27.2 29.5 28.35 283.5 213.5
1 9 31.1 31 31.05 310.5 240.5
1 10 33 32.5 32.75 327.5 257.5
1 11 34.5 34 34.25 342.5 272.5 22.50 7.99
1 12 36 35 35.50 355.0 285.0
1 13 37 35.5 36.25 362.5 292.5
1 14 38.2 36.5 37.35 373.5 303.5
1 15 39.4 37 38.20 382.0 312.0
1 16 40.2 38 39.10 391.0 321.0
1 17 41 39 40.00 400.0 330.0
1 18 42.3 40 41.15 411.5 341.5 17.80 10.77
1 19 43.7 40.5 42.10 421.0 351.0
1 20 45.7 41.5 43.60 436.0 366.0
1 21 47.2 42.5 44.85 448.5 378.5
1 22 49 43.3 46.15 461.5 391.5
1 23 50.5 44 47.25 472.5 402.5
1 24 51.5 45.1 48.30 483.0 413.0
1 25 52.5 46.5 49.50 495.0 425.0
1 26 53.5 47.8 50.65 506.5 436.5 16.00 12.32
1 27 54.7 48 51.35 513.5 443.5
1 28 56.7 49 52.85 528.5 458.5
1 29 58.8 49.5 54.15 541.5 471.5
1 30 60 50 55.00 550.0 480.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 92 + 300 R. 5.10 M Y : 029 5696 X : 047 3363 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 7 3 5.00 50.0 50.0
1 2 16 7 11.50 115.0 65.0
1 3 26.5 17 21.75 217.5 167.5
1 4 36 30.5 33.25 332.5 282.5 54.64 2.59
1 5 38.5 36 37.25 372.5 322.5
1 6 41 38.5 39.75 397.5 347.5
1 7 46.1 40.4 43.25 432.5 382.5
1 8 51.1 42 46.55 465.5 415.5
1 9 55.5 43 49.25 492.5 442.5
1 10 63 44 53.50 535.0 485.0
1 11 72.3 45 58.65 586.5 536.5 51.14 2.82
1 12 82 47.1 64.55 645.5 595.5
1 13 94 50.5 72.25 722.5 672.5
1 14 100 53.2 76.60 766.0 716.0
1 15 55.5
1 16 57
1 17 58
1 18 59
1 19 59.4
1 20 60
1 21 60.5
1 22 61
1 23 62
STA : 92 + 400 L. 3.25 M Y : 029 5727 X : 047 3271 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 7 5 6.00 60.0 60.0
1 2 8.5 8 8.25 82.5 22.5
1 3 10.5 9 9.75 97.5 37.5
1 4 12 10.5 11.25 112.5 52.5
1 5 13 11.5 12.25 122.5 62.5 11.67 18.41
1 6 14 13 13.50 135.0 75.0
1 7 15 14 14.50 145.0 85.0
1 8 16.1 15 15.55 155.5 95.5
1 9 17 16 16.50 165.0 105.0
1 10 18 16.6 17.30 173.0 113.0
1 11 18.6 17 17.80 178.0 118.0
1 12 19 18 18.50 185.0 125.0
1 13 20.1 18.5 19.30 193.0 133.0
1 14 21.2 19 20.10 201.0 141.0
1 15 22.5 20 21.25 212.5 152.5 9.50 23.89
1 16 23.5 20.5 22.00 220.0 160.0
1 17 24.5 21 22.75 227.5 167.5
1 18 25 22 23.50 235.0 175.0
1 19 25.5 22.5 24.00 240.0 180.0
1 20 26.5 23.5 25.00 250.0 190.0
1 21 28 24.2 26.10 261.0 201.0
1 22 30 25.3 27.65 276.5 216.5
1 23 31.2 26.5 28.85 288.5 228.5
1 24 33 28.6 30.80 308.0 248.0
1 25 34 30.2 32.10 321.0 261.0 11.25 19.28
1 26 37 32 34.50 345.0 285.0
1 27 38.5 33.5 36.00 360.0 300.0
1 28 39.5 34.5 37.00 370.0 310.0
1 29 41 35.6 38.30 383.0 323.0
1 30 42.5 37 39.75 397.5 337.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 92 + 500 R. 3.25 M Y : 029 5806 X : 047 3248 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 6 6 6.00 60.0 60.0
1 2 8 9 8.50 85.0 25.0
1 3 10 11 10.50 105.0 45.0
1 4 12.2 12 12.10 121.0 61.0
1 5 14.5 14 14.25 142.5 82.5 20.00 9.28
1 6 17.5 16 16.75 167.5 107.5
1 7 20 18.5 19.25 192.5 132.5
1 8 22 19.5 20.75 207.5 147.5
1 9 25 21 23.00 230.0 170.0
1 10 29 23 26.00 260.0 200.0
1 11 32.1 25 28.55 285.5 225.5
1 12 33.5 26.5 30.00 300.0 240.0
1 13 35 28.5 31.75 317.5 257.5
1 14 37 30 33.50 335.0 275.0
1 15 38.5 31 34.75 347.5 287.5
1 16 40.3 31.5 35.90 359.0 299.0
1 17 42.2 32.5 37.35 373.5 313.5 16.93 11.47
1 18 44.2 34 39.10 391.0 331.0
1 19 45.5 35 40.25 402.5 342.5
1 20 46.3 36 41.15 411.5 351.5
1 21 47 37.5 42.25 422.5 362.5
1 22 47.5 39 43.25 432.5 372.5
1 23 48 41.5 44.75 447.5 387.5
1 24 48.5 43.5 46.00 460.0 400.0
1 25 49 44 46.50 465.0 405.0
1 26 49.5 45 47.25 472.5 412.5 14.58 13.86
1 27 50 45.5 47.75 477.5 417.5
1 28 50.5 46 48.25 482.5 422.5
1 29 51 47 49.00 490.0 430.0
1 30 51.5 48 49.75 497.5 437.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 92 + 600 L. 3.24 M Y : 029 5884 X : 047 3299 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 6.5 4.5 5.50 55.0 20.0
1 3 8.5 5 6.75 67.5 32.5 14.29 14.23
1 4 10 7.5 8.75 87.5 52.5
1 5 12 9 10.50 105.0 70.0
1 6 13.2 10.5 11.85 118.5 83.5
1 7 15 12 13.50 135.0 100.0
1 8 17 13.5 15.25 152.5 117.5
1 9 19 14 16.50 165.0 130.0
1 10 20.5 15 17.75 177.5 142.5
1 11 22 15.5 18.75 187.5 152.5
1 12 23 16 19.50 195.0 160.0 14.72 13.70
1 13 24 17 20.50 205.0 170.0
1 14 25.5 18 21.75 217.5 182.5
1 15 27 20 23.50 235.0 200.0
1 16 28.5 23 25.75 257.5 222.5
1 17 29.6 25.1 27.35 273.5 238.5
1 18 31 29 30.00 300.0 265.0
1 19 32 30 31.00 310.0 275.0
1 20 33 31.2 32.10 321.0 286.0
1 21 34 33 33.50 335.0 300.0
1 22 35 34 34.50 345.0 310.0
1 23 36.2 35.5 35.85 358.5 323.5
1 24 37.5 37 37.25 372.5 337.5 13.67 15.06
1 25 39 38.5 38.75 387.5 352.5
1 26 40.2 40.5 40.35 403.5 368.5
1 27 41.2 42 41.60 416.0 381.0
1 28 42 43 42.50 425.0 390.0
1 29 43.5 44 43.75 437.5 402.5
1 30 44 45 44.50 445.0 410.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 92 + 700 R. 3.62 M Y : 029 5939 X : 047 3220 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 5 5 5.00 50.0 50.0
1 2 8 7 7.50 75.0 25.0
1 3 11 9.5 10.25 102.5 52.5 16.67 11.70
1 4 12.5 12 12.25 122.5 72.5
1 5 14 14 14.00 140.0 90.0
1 6 15 15 15.00 150.0 100.0
1 7 16.5 16.1 16.30 163.0 113.0
1 8 19 18.2 18.60 186.0 136.0
1 9 22.4 21.5 21.95 219.5 169.5
1 10 25 25 25.00 250.0 200.0
1 11 27.2 28 27.60 276.0 226.0 19.43 9.63
1 12 29 30.1 29.55 295.5 245.5
1 13 20.3 32 26.15 261.5 211.5
1 14 32 34 33.00 330.0 280.0
1 15 33.3 35 34.15 341.5 291.5
1 16 35.2 36 35.60 356.0 306.0
1 17 37 37 37.00 370.0 320.0
1 18 38.2 37.8 38.00 380.0 330.0
1 19 39.5 39 39.25 392.5 342.5 17.11 11.32
1 20 41.5 40 40.75 407.5 357.5
1 21 43.2 41 42.10 421.0 371.0
1 22 44.3 42 43.15 431.5 381.5
1 23 45.5 43.2 44.35 443.5 393.5
1 24 46.5 44.2 45.35 453.5 403.5
1 25 48 45.2 46.60 466.0 416.0
1 26 50 46.5 48.25 482.5 432.5 16.68 11.69
1 27 52 48.1 50.05 500.5 450.5
1 28 53.8 50 51.90 519.0 469.0
1 29 55 51.6 53.30 533.0 483.0
1 30 56.6 53.5 55.05 550.5 500.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 92 + 850 R. 4.68 M Y : 029 6060 X : 047 3130 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 9 3 6.00 60.0 60.0
1 2 12 6 9.00 90.0 30.0
1 3 13 9 11.00 110.0 50.0 17.08 11.34
1 4 13.5 13 13.25 132.5 72.5
1 5 14.2 15 14.60 146.0 86.0
1 6 15 17.5 16.25 162.5 102.5
1 7 15.5 20 17.75 177.5 117.5
1 8 16 21 18.50 185.0 125.0
1 9 16.5 22.1 19.30 193.0 133.0
1 10 17 26 21.50 215.0 155.0 14.69 13.73
1 11 17.5 30.5 24.00 240.0 180.0
1 12 18 31.5 24.75 247.5 187.5
1 13 18.2 32 25.10 251.0 191.0
1 14 19
STA : 92 + 900 R. 6.15 M Y : 029 6086 X : 047 3114 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 4 3.4 3.70 37.0 37.0
1 2 5.1 5 5.05 50.5 13.5
1 3 7 6 6.50 65.0 28.0
1 4 8 7 7.50 75.0 38.0
1 5 11 8.5 9.75 97.5 60.5 12.22 17.35
1 6 12 10 11.00 110.0 73.0
1 7 14 11 12.50 125.0 88.0
1 8 15 12 13.50 135.0 98.0
1 9 16 13.4 14.70 147.0 110.0
1 10 17.5 14.5 16.00 160.0 123.0
1 11 18.5 16 17.25 172.5 135.5
1 12 19 17 18.00 180.0 143.0
1 13 20 17.5 18.75 187.5 150.5
1 14 21 18 19.50 195.0 158.0
1 15 22 19 20.50 205.0 168.0 10.40 21.30
1 16 22.5 19.5 21.00 210.0 173.0
1 17 23.4 20.5 21.95 219.5 182.5
1 18 24 21.5 22.75 227.5 190.5
1 19 25 22 23.50 235.0 198.0
1 20 26 23 24.50 245.0 208.0
1 21 27 23.3 25.15 251.5 214.5
1 22 27.5 24 25.75 257.5 220.5
1 23 28 25 26.50 265.0 228.0
1 24 29 25.5 27.25 272.5 235.5
1 25 30 26 28.00 280.0 243.0 9.18 24.95
1 26 30.5 26.5 28.50 285.0 248.0
1 27 31.2 27 29.10 291.0 254.0
1 28 32 27.5 29.75 297.5 260.5
1 29 33 28 30.50 305.0 268.0
1 30 34 28.5 31.25 312.5 275.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 + 000 L. 3.12 M Y : 029 6165 X : 047 3036 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 5 0 0 0.0
1 1 5 10 7.50 75.0 75.0
1 2 7 12 9.50 95.0 20.0
1 3 8 13 10.50 105.0 30.0 11.75 18.24
1 4 9 14 11.50 115.0 40.0
1 5 11 15.1 13.05 130.5 55.5
1 6 12 17.1 14.55 145.5 70.5
1 7 14 21 17.50 175.0 100.0
1 8 17 24 20.50 205.0 130.0
1 9 18.5 26 22.25 222.5 147.5
1 10 20.5 27.5 24.00 240.0 165.0
1 11 23 29 26.00 260.0 185.0
1 12 25 32 28.50 285.0 210.0
1 13 27 36.5 31.75 317.5 242.5 36.11 4.38
1 14 28 43.2 35.60 356.0 281.0
1 15 29 53.5 41.25 412.5 337.5
1 16 31 66.6 48.80 488.0 413.0
1 17 35 83 59.00 590.0 515.0
1 18 45 100 72.50 725.0 650.0
1 19 56
1 20 74
1 21 100
1
1
1
1
1
1
1
1
1
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 + 100 L. 3.41 M Y : 029 6232 X : 047 2972 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 4 4.00 40.0 40.0
1 2 7.5 8 7.75 77.5 37.5
1 3 11 11.5 11.25 112.5 72.5 34.17 4.70
1 4 16 16 16.00 160.0 120.0
1 5 23.5 20 21.75 217.5 177.5
1 6 25 24 24.50 245.0 205.0
1 7 30 30 30.00 300.0 260.0
1 8 34.5 38 36.25 362.5 322.5
1 9 39 43 41.00 410.0 370.0
1 10 41.4 47 44.20 442.0 402.0
1 11 43.2 53.5 48.35 483.5 443.5 39.83 3.87
1 12 45.5 58.5 52.00 520.0 480.0
1 13 49 62.5 55.75 557.5 517.5
1 14 53 66 59.50 595.0 555.0
1 15 57.5 70 63.75 637.5 597.5
1 16 62 73 67.50 675.0 635.0
1 17 66 77 71.50 715.0 675.0
1 18 70 80 75.00 750.0 710.0
1 19 75 84 79.50 795.0 755.0 39.35 3.93
1 20 79.1 89 84.05 840.5 800.5
1 21 82 94 88.00 880.0 840.0
1 22 88 96 92.00 920.0 880.0
1 23 89 100 94.50 945.0 905.0
1 24 93
1 25 95
1 26 97
1 27 100
STA : 93 + 200 L. 3.62 M Y : 029 6210 X : 047 2877 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 3 2 0 0 0.0
1 1 6 5 5.50 55.0 55.0
1 2 7 7.5 7.25 72.5 17.5
1 3 9 10.3 9.65 96.5 41.5 18.33 10.37
1 4 11 13 12.00 120.0 65.0
1 5 12.5 16 14.25 142.5 87.5
1 6 14.5 18.5 16.50 165.0 110.0
1 7 17 24.5 20.75 207.5 152.5
1 8 19 28.5 23.75 237.5 182.5
1 9 22.5 35 28.75 287.5 232.5
1 10 26 39.2 32.60 326.0 271.0
1 11 30 47.3 38.65 386.5 331.5
1 12 33.1 51.2 42.15 421.5 366.5 33.11 4.89
1 13 37.1 57 47.05 470.5 415.5
1 14 42 67.3 54.65 546.5 491.5
1 15 44 71 57.50 575.0 520.0
1 16 46 76.5 61.25 612.5 557.5
1 17 48.5 78 63.25 632.5 577.5
1 18 51.1 79.1 65.10 651.0 596.0
1 19 53 80.5 66.75 667.5 612.5
1 20 55.5 82 68.75 687.5 632.5
1 21 62 83 72.50 725.0 670.0
1 22 69 84.5 76.75 767.5 712.5
1 23 78 87 82.50 825.0 770.0 33.70 4.78
1 24 83 88.5 85.75 857.5 802.5
1 25 89 91 90.00 900.0 845.0
1 26 91 96 93.50 935.0 880.0
1 27 93 100 96.50 965.0 910.0
1 28 95
1 29 96
1 30 100
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 +300 R. 3.29 M Y : 029 6207 X : 047 2775 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 5 7 6.00 60.0 25.0
1 3 7 9 8.00 80.0 45.0
1 4 9 11 10.00 100.0 65.0 15.71 12.61
1 5 10.5 12 11.25 112.5 77.5
1 6 12 14 13.00 130.0 95.0
1 7 14 15 14.50 145.0 110.0
1 8 15 17 16.00 160.0 125.0
1 9 17 18 17.50 175.0 140.0
1 10 19 18.5 18.75 187.5 152.5
1 11 21 19 20.00 200.0 165.0
1 12 23 20 21.50 215.0 180.0 13.67 15.06
1 13 24 21 22.50 225.0 190.0
1 14 24.5 22 23.25 232.5 197.5
1 15 25 23 24.00 240.0 205.0
1 16 26 24 25.00 250.0 215.0
1 17 27 25 26.00 260.0 225.0
1 18 28 26.5 27.25 272.5 237.5
1 19 29 28 28.50 285.0 250.0 12.85 16.28
1 20 30 29 29.50 295.0 260.0
1 21 32 30.4 31.20 312.0 277.0
1 22 33 31.1 32.05 320.5 285.5
1 23 34 32.1 33.05 330.5 295.5
1 24 35.5 33 34.25 342.5 307.5
1 25 36.5 34.5 35.50 355.0 320.0
1 26 38 36 37.00 370.0 335.0
1 27 40 37.5 38.75 387.5 352.5 13.83 14.83
1 28 44 39 41.50 415.0 380.0
1 29 46.5 40 43.25 432.5 397.5
1 30 48 42 45.00 450.0 415.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 +400 R. 3.64 M Y : 029 6213 X : 047 2879 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 7.5 9 8.25 82.5 82.5
1 2 13.5 14 13.75 137.5 55.0
1 3 20 17 18.50 185.0 102.5
1 4 22 22 22.00 220.0 137.5 28.21 6.00
1 5 24 24.5 24.25 242.5 160.0
1 6 26 26 26.00 260.0 177.5
1 7 29 27 28.00 280.0 197.5
1 8 31 28.9 29.95 299.5 217.0
1 9 32 29.5 30.75 307.5 225.0
1 10 33 31 32.00 320.0 237.5
1 11 34.2 33.4 33.80 338.0 255.5
1 12 35.5 35.5 35.50 355.0 272.5 21.86 8.29
1 13 37 37.7 37.35 373.5 291.0
1 14 38.5 40 39.25 392.5 310.0
1 15 40.5 42.5 41.50 415.0 332.5
1 16 43 44.4 43.70 437.0 354.5
1 17 45 46.5 45.75 457.5 375.0
1 18 47.2 48 47.60 476.0 393.5
1 19 49 50 49.50 495.0 412.5
1 20 50 51.5 50.75 507.5 425.0
1 21 51 53 52.00 520.0 437.5
1 22 52 54 53.00 530.0 447.5
1 23 53 55.5 54.25 542.5 460.0 17.40 11.08
1 24 53.4 57 55.20 552.0 469.5
1 25 54 58.2 56.10 561.0 478.5
1 26 54.5 59.2 56.85 568.5 486.0
1 27 55 60.4 57.70 577.0 494.5
1 28 56 61.5 58.75 587.5 505.0
1 29 57 62.5 59.75 597.5 515.0
1 30 57.5 63.4 60.45 604.5 522.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 +500 L. 3.47 M Y : 029 6339 X : 047 2620 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 6 5 5.50 55.0 55.0
1 2 9 10 9.50 95.0 40.0
1 3 12 11.5 11.75 117.5 62.5
1 4 13 14 13.50 135.0 80.0 15.43 12.91
1 5 13.5 15 14.25 142.5 87.5
1 6 14 16 15.00 150.0 95.0
1 7 15.1 17.5 16.30 163.0 108.0
1 8 16.2 19 17.60 176.0 121.0
1 9 17 20 18.50 185.0 130.0
1 10 18.2 21 19.60 196.0 141.0
1 11 18.9 22 20.45 204.5 149.5
1 12 19.5 23.5 21.50 215.0 160.0 12.94 16.14
1 13 20.5 24 22.25 222.5 167.5
1 14 22 25.5 23.75 237.5 182.5
1 15 23 27.5 25.25 252.5 197.5
1 16 24 28.4 26.20 262.0 207.0
1 17 25 29.5 27.25 272.5 217.5
1 18 26 30 28.00 280.0 225.0
1 19 26.5 30.5 28.50 285.0 230.0
1 20 27 31 29.00 290.0 235.0
1 21 28 31.5 29.75 297.5 242.5
1 22 28.5 32 30.25 302.5 247.5
1 23 29 32.5 30.75 307.5 252.5 9.75 23.12
1 24 30 33 31.50 315.0 260.0
1 25 30.5 34 32.25 322.5 267.5
1 26 31 34.5 32.75 327.5 272.5
1 27 31.5 35 33.25 332.5 277.5
1 28 32 35.5 33.75 337.5 282.5
1 29 32.5 36 34.25 342.5 287.5
1 30 33 36.5 34.75 347.5 292.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 +600 R. 4.16 M Y : 029 6403 X : 047 2588 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 4 0 0 0.0
1 1 4 5 4.50 45.0 45.0
1 2 8 7 7.50 75.0 30.0
1 3 12 12 12.00 120.0 75.0
1 4 16 16.5 16.25 162.5 117.5
1 5 19 19 19.00 190.0 145.0 23.11 7.73
1 6 21 20.5 20.75 207.5 162.5
1 7 23 22 22.50 225.0 180.0
1 8 24.5 23.5 24.00 240.0 195.0
1 9 26.1 24.5 25.30 253.0 208.0
1 10 27.6 25.5 26.55 265.5 220.5
1 11 29.6 26.6 28.10 281.0 236.0
1 12 30 27.8 28.90 289.0 244.0
1 13 31 29 30.00 300.0 255.0
1 14 32.5 30 31.25 312.5 267.5
1 15 33 31.4 32.20 322.0 277.0
1 16 33.5 34 33.75 337.5 292.5 18.14 10.51
1 17 34.5 37.5 36.00 360.0 315.0
1 18 35.5 40 37.75 377.5 332.5
1 19 36 42.5 39.25 392.5 347.5
1 20 37 46 41.50 415.0 370.0
1 21 40 47.2 43.60 436.0 391.0
1 22 40.5 48.3 44.40 444.0 399.0
1 23 41 49.2 45.10 451.0 406.0
1 24 41.6 50.3 45.95 459.5 414.5
1 25 42.2 51 46.60 466.0 421.0
1 26 43 52.3 47.65 476.5 431.5 15.33 13.01
1 27 43.5 53.3 48.40 484.0 439.0
1 28 44 54.5 49.25 492.5 447.5
1 29 44.5 55 49.75 497.5 452.5
1 30 45 56 50.50 505.0 460.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 +700 L. 3.32 M Y : 029 6428 X : 047 2506 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 2 3 2.50 25.0 25.0
1 2 4 5 4.50 45.0 20.0
1 3 6 7 6.50 65.0 40.0
1 4 8 9 8.50 85.0 60.0
1 5 9 10 9.50 95.0 70.0 12.69 16.55
1 6 10 11 10.50 105.0 80.0
1 7 11 12 11.50 115.0 90.0
1 8 12.5 12.8 12.65 126.5 101.5
1 9 13.5 13.2 13.35 133.5 108.5
1 10 15 14 14.50 145.0 120.0
1 11 15.5 14.5 15.00 150.0 125.0
1 12 16.5 15 15.75 157.5 132.5
1 13 18 16 17.00 170.0 145.0
1 14 19 16.5 17.75 177.5 152.5
1 15 20 17 18.50 185.0 160.0 9.64 23.45
1 16 21 17.5 19.25 192.5 167.5
1 17 22 18 20.00 200.0 175.0
1 18 23 19 21.00 210.0 185.0
1 19 24 19.5 21.75 217.5 192.5
1 20 24.5 20 22.25 222.5 197.5
1 21 25 20.5 22.75 227.5 202.5
1 22 25.5 21 23.25 232.5 207.5
1 23 26 21.5 23.75 237.5 212.5
1 24 27 22 24.50 245.0 220.0
1 25 27.5 22.5 25.00 250.0 225.0 8.67 26.85
1 26 28 23 25.50 255.0 230.0
1 27 29.2 23.5 26.35 263.5 238.5
1 28 30 24 27.00 270.0 245.0
1 29 31 24.5 27.75 277.5 252.5
1 30 32 25 28.50 285.0 260.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 +800 R. 3.66 M Y : 029 6502 X : 047 2538 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 15 10.5 12.75 127.5 127.5
1 2 21 19 20.00 200.0 72.5
1 3 34 24 29.00 290.0 162.5 32.42 5.03
1 4 35.8 25.5 30.65 306.5 179.0
1 5 37 26 31.50 315.0 187.5
1 6 38 26.4 32.20 322.0 194.5
1 7 39 27 33.00 330.0 202.5
1 8 40.5 27.5 34.00 340.0 212.5
1 9 41.6 28 34.80 348.0 220.5
1 10 42.2 28.5 35.35 353.5 226.0
1 11 43 29 36.00 360.0 232.5
1 12 43.2 29.5 36.35 363.5 236.0
1 13 44 30 37.00 370.0 242.5
1 14 44.5 30.5 37.50 375.0 247.5
1 15 45 31 38.00 380.0 252.5 12.44 16.97
1 16 45.5 31.4 38.45 384.5 257.0
1 17 46 32 39.00 390.0 262.5
1 18 46.5 32.4 39.45 394.5 267.0
1 19 47 33 40.00 400.0 272.5
1 20 47.5 33.6 40.55 405.5 278.0
1 21 48 34 41.00 410.0 282.5
1 22 48.5 34.6 41.55 415.5 288.0
1 23 49 35 42.00 420.0 292.5
1 24 49.5 35.7 42.60 426.0 298.5
1 25 50 36 43.00 430.0 302.5
1 26 50.4 36.8 43.60 436.0 308.5
1 27 51 37.8 44.40 444.0 316.5 11.17 19.46
1 28 51.5 38 44.75 447.5 320.0
1 29 52 39.4 45.70 457.0 329.5
1 30 52.5 40 46.25 462.5 335.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 93 +900 L. 3.48 M Y : 029 6553 X : 047 2475 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 4 6 5.00 50.0 15.0
1 3 5 9 7.00 70.0 35.0 15.71 12.61
1 4 7 11.5 9.25 92.5 57.5
1 5 8 13 10.50 105.0 70.0
1 6 9.5 15 12.25 122.5 87.5
1 7 12 17 14.50 145.0 110.0
1 8 15 19 17.00 170.0 135.0
1 9 17 22 19.50 195.0 160.0
1 10 18 23.5 20.75 207.5 172.5
1 11 19 26 22.50 225.0 190.0
1 12 22 28 25.00 250.0 215.0 18.93 9.95
1 13 25 29 27.00 270.0 235.0
1 14 26 29.5 27.75 277.5 242.5
1 15 29.8 34 31.90 319.0 284.0
1 16 33.3 35 34.15 341.5 306.5
1 17 36 36 36.00 360.0 325.0
1 18 37 37 37.00 370.0 335.0
1 19 38 38 38.00 380.0 345.0 17.73 10.82
1 20 39 40.5 39.75 397.5 362.5
1 21 40 42.2 41.10 411.0 376.0
1 22 41 44 42.50 425.0 390.0
1 23 42 46 44.00 440.0 405.0
1 24 43.2 47 45.10 451.0 416.0
1 25 45 48 46.50 465.0 430.0
1 26 47.5 50 48.75 487.5 452.5 17.40 11.08
1 27 49.5 51 50.25 502.5 467.5
1 28 50.5 55.4 52.95 529.5 494.5
1 29 51 56 53.50 535.0 500.0
1 30 53 58.4 55.70 557.0 522.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 94 +000 R. 4.21 M Y : 029 6583 X : 047 2379 Date : November 21, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 4 7 5.50 55.0 20.0
1 3 6 10 8.00 80.0 45.0
1 4 7 11 9.00 90.0 55.0 14.06 14.52
1 5 8 12 10.00 100.0 65.0
1 6 9 14 11.50 115.0 80.0
1 7 10.1 15 12.55 125.5 90.5
1 8 12.5 17 14.75 147.5 112.5
1 9 13 18 15.50 155.0 120.0
1 10 13.5 20.1 16.80 168.0 133.0
1 11 14 21.8 17.90 179.0 144.0
1 12 15 23.5 19.25 192.5 157.5 13.13 15.85
1 13 17 25 21.00 210.0 175.0
1 14 19 26 22.50 225.0 190.0
1 15 20 26.5 23.25 232.5 197.5
1 16 22 27 24.50 245.0 210.0
1 17 23 27.5 25.25 252.5 217.5
1 18 24.5 28 26.25 262.5 227.5
1 19 26 29.5 27.75 277.5 242.5
1 20 29 30.5 29.75 297.5 262.5
1 21 31 31.6 31.30 313.0 278.0
1 22 32.5 33 32.75 327.5 292.5 14.17 14.38
1 23 34 34.6 34.30 343.0 308.0
1 24 35.5 36 35.75 357.5 322.5
1 25 38 37 37.50 375.0 340.0
1 26 40 38 39.00 390.0 355.0
1 27 40.5 40 40.25 402.5 367.5
1 28 41.5 43 42.25 422.5 387.5
1 29 42.5 45 43.75 437.5 402.5
1 30 44 48 46.00 460.0 425.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 94 +100 L. 3.76 M Y : 029 6645 X : 047 2315 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 3 2 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 6 5 5.50 55.0 20.0
1 3 8 7 7.50 75.0 40.0 15.71 12.61
1 4 10.5 9 9.75 97.5 62.5
1 5 13.1 10.4 11.75 117.5 82.5
1 6 14.5 11 12.75 127.5 92.5
1 7 15 14 14.50 145.0 110.0
1 8 19.1 15.5 17.30 173.0 138.0
1 9 22 17 19.50 195.0 160.0
1 10 24.5 19.2 21.85 218.5 183.5
1 11 26.5 22 24.25 242.5 207.5
1 12 29 24 26.50 265.0 230.0 23.38 7.61
1 13 31.5 26.1 28.80 288.0 253.0
1 14 35 29 32.00 320.0 285.0
1 15 38 32 35.00 350.0 315.0
1 16 42 36 39.00 390.0 355.0
1 17 45.5 41 43.25 432.5 397.5
1 18 48 44 46.00 460.0 425.0
1 19 48.5 46 47.25 472.5 437.5
1 20 49 47 48.00 480.0 445.0
1 21 49.5 47.5 48.50 485.0 450.0 20.24 9.14
1 22 50 48 49.00 490.0 455.0
1 23 51.5 48.6 50.05 500.5 465.5
1 24 61.2 49 55.10 551.0 516.0
1 25 62 49.5 55.75 557.5 522.5
1 26 63 50 56.50 565.0 530.0
1 27 63.4 50.6 57.00 570.0 535.0 18.58 10.19
1 28 65 51.2 58.10 581.0 546.0
1 29 65.5 52 58.75 587.5 552.5
1 30 66 52.5 59.25 592.5 557.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 94 + 200 L. 2.97 M Y : 029 6663 X : 047 2230 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 4.5 3 3.75 37.5 37.5
1 2 7 5 6.00 60.0 22.5
1 3 9 7.5 8.25 82.5 45.0
1 4 10.5 8 9.25 92.5 55.0
1 5 12 11 11.50 115.0 77.5
1 6 13 12.5 12.75 127.5 90.0 13.54 15.23
1 7 13.6 13 13.30 133.0 95.5
1 8 14 15 14.50 145.0 107.5
1 9 15 16.5 15.75 157.5 120.0
1 10 17 18 17.50 175.0 137.5
1 11 18 19.5 18.75 187.5 150.0
1 12 19 21 20.00 200.0 162.5
1 13 20.1 23 21.55 215.5 178.0
1 14 22 24.5 23.25 232.5 195.0
1 15 24 26 25.00 250.0 212.5 14.08 14.49
1 16 25.1 27.8 26.45 264.5 227.0
1 17 26 29.8 27.90 279.0 241.5
1 18 27.2 31 29.10 291.0 253.5
1 19 28 33.5 30.75 307.5 270.0
1 20 29 34 31.50 315.0 277.5
1 21 30 35.5 32.75 327.5 290.0
1 22 31 36.1 33.55 335.5 298.0
1 23 32.2 37 34.60 346.0 308.5 12.50 16.86
1 24 33.5 37.6 35.55 355.5 318.0
1 25 34.5 38 36.25 362.5 325.0
1 26 35.5 38.9 37.20 372.0 334.5
1 27 36.5 39.8 38.15 381.5 344.0
1 28 37.5 40.5 39.00 390.0 352.5
1 29 38.5 41 39.75 397.5 360.0
1 30 39 43.5 41.25 412.5 375.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 94 +300 R. 4.10 M Y : 029 6709 X : 047 2129 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 21 16.4 18.70 187.0 187.0
1 2 28 28.5 28.25 282.5 95.5
1 3 35.2 37 36.10 361.0 174.0 47.33 3.11
1 4 39.1 41.5 40.30 403.0 216.0
1 5 43 44 43.50 435.0 248.0
1 6 46.2 48 47.10 471.0 284.0
1 7 48 52.5 50.25 502.5 315.5
1 8 50 54 52.00 520.0 333.0
1 9 51 58 54.50 545.0 358.0
1 10 52.2 56 54.10 541.0 354.0
1 11 54 61 57.50 575.0 388.0 32.87 4.94
1 12 56 63.2 59.60 596.0 409.0
1 13 58.8 66 62.40 624.0 437.0
1 14 64.1 68.5 66.30 663.0 476.0
1 15 67 69 68.00 680.0 493.0
1 16 78 72 75.00 750.0 563.0
1 17 80 73.2 76.60 766.0 579.0
1 18 82.1 75 78.55 785.5 598.5
1 19 83.1 77 80.05 800.5 613.5
1 20 84 78.4 81.20 812.0 625.0 28.08 6.03
1 21 86 79 82.50 825.0 638.0
1 22 87 79.8 83.40 834.0 647.0
1 23 90 80.3 85.15 851.5 664.5
1 24 94 81.5 87.75 877.5 690.5
1 25 96 82.4 89.20 892.0 705.0
1 26 100 83.4 91.70 917.0 730.0
1 27 85
1 28 86
STA : 94 +400 L. 3.21 M Y : 029 6692 X : 047 2052 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 5 4.00 40.0 40.0
1 2 4 6 5.00 50.0 10.0
1 3 4.5 7 5.75 57.5 17.5
1 4 6 7.5 6.75 67.5 27.5 13.44 15.38
1 5 9 8.5 8.75 87.5 47.5
1 6 11 9.6 10.30 103.0 63.0
1 7 13.6 11 12.30 123.0 83.0
1 8 17 12.5 14.75 147.5 107.5
1 9 20.8 14 17.40 174.0 134.0
1 10 22 15 18.50 185.0 145.0
1 11 23.5 17 20.25 202.5 162.5
1 12 24.6 18.2 21.40 214.0 174.0
1 13 25.5 19 22.25 222.5 182.5
1 14 27 21 24.00 240.0 200.0 13.70 15.01
1 15 28.5 21.5 25.00 250.0 210.0
1 16 29.8 23 26.40 264.0 224.0
1 17 31 24 27.50 275.0 235.0
1 18 33 25 29.00 290.0 250.0
1 19 34 25.5 29.75 297.5 257.5
1 20 36 26.8 31.40 314.0 274.0
1 21 37.5 27.3 32.40 324.0 284.0
1 22 39.5 28 33.75 337.5 297.5
1 23 41.2 28.5 34.85 348.5 308.5
1 24 43 29 36.00 360.0 320.0
1 25 44.5 29.4 36.95 369.5 329.5 13.57 15.20
1 26 47 30.2 38.60 386.0 346.0
1 27 50 31 40.50 405.0 365.0
1 28 52 31.4 41.70 417.0 377.0
1 29 54 32 43.00 430.0 390.0
1 30 56.4 33 44.70 447.0 407.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 94 +500 R. 3.53 M Y : 029 6674 X : 047 1965 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 3 0 0 0.0
1 1 3.5 4.4 3.95 39.5 39.5
1 2 4.2 5.5 4.85 48.5 9.0
1 3 5.2 6.4 5.80 58.0 18.5
1 4 6.6 7.4 7.00 70.0 30.5
1 5 7.8 9 8.40 84.0 44.5 10.30 21.56
1 6 9 10.7 9.85 98.5 59.0
1 7 10 12 11.00 110.0 70.5
1 8 11 13.1 12.05 120.5 81.0
1 9 12.3 14 13.15 131.5 92.0
1 10 14 14.5 14.25 142.5 103.0
1 11 15.5 15 15.25 152.5 113.0
1 12 17 15.5 16.25 162.5 123.0
1 13 18 16 17.00 170.0 130.5
1 14 19 17 18.00 180.0 140.5
1 15 20 19 19.50 195.0 155.5 9.53 23.81
1 16 21 20.5 20.75 207.5 168.0
1 17 21.4 21.5 21.45 214.5 175.0
1 18 22 22 22.00 220.0 180.5
1 19 22.5 22.5 22.50 225.0 185.5
1 20 23 23 23.00 230.0 190.5
1 21 23.6 23.5 23.55 235.5 196.0
1 22 24.2 24 24.10 241.0 201.5
1 23 24.6 24.4 24.50 245.0 205.5
1 24 25 25 25.00 250.0 210.5
1 25 25.4 25.4 25.40 254.0 214.5 8.02 29.64
1 26 26 26 26.00 260.0 220.5
1 27 26.5 26.5 26.50 265.0 225.5
1 28 27 27 27.00 270.0 230.5
1 29 27.5 27.5 27.50 275.0 235.5
1 30 28 28 28.00 280.0 240.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 94 +600 R. 5.14 M Y : 029 6727 X : 047 1934 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 3 0 0 0.0
1 1 9.5 11.5 10.50 105.0 105.0
1 2 15 18 16.50 165.0 60.0
1 3 25.6 21.2 23.40 234.0 129.0 33.33 4.85
1 4 29.5 24.1 26.80 268.0 163.0
1 5 32 25.2 28.60 286.0 181.0
1 6 35 26 30.50 305.0 200.0
1 7 37 26.5 31.75 317.5 212.5
1 8 39 27.8 33.40 334.0 229.0
1 9 41 30 35.50 355.0 250.0
1 10 42.6 34 38.30 383.0 278.0
1 11 44.2 37 40.60 406.0 301.0
1 12 46 38.6 42.30 423.0 318.0 24.63 7.13
1 13 47.2 40.2 43.70 437.0 332.0
1 14 48.7 43 45.85 458.5 353.5
1 15 49.7 46.6 48.15 481.5 376.5
1 16 51 48.8 49.90 499.0 394.0
1 17 52.5 51 51.75 517.5 412.5
1 18 54.5 53 53.75 537.5 432.5
1 19 56.6 55 55.80 558.0 453.0
1 20 58 56.5 57.25 572.5 467.5
1 21 60 58 59.00 590.0 485.0
1 22 61 59.6 60.30 603.0 498.0 18.75 10.08
1 23 62 60.5 61.25 612.5 507.5
1 24 62.4 61.2 61.80 618.0 513.0
1 25 63 62.1 62.55 625.5 520.5
1 26 63.5 63 63.25 632.5 527.5
1 27 64 64 64.00 640.0 535.0
1 28 64.5 65.2 64.85 648.5 543.5
1 29 65 66.8 65.90 659.0 554.0
1 30 65.5 68 66.75 667.5 562.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 94 +800 R. 3.71 M Y : 029 6810 X : 047 1806 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 3 0 0 0.0
1 1 1.5 9 5.25 52.5 52.5
1 2 3.6 11 7.30 73.0 20.5
1 3 6.5 13 9.75 97.5 45.0 18.25 10.43
1 4 9.6 15 12.30 123.0 70.5
1 5 11.5 17.2 14.35 143.5 91.0
1 6 13.4 19 16.20 162.0 109.5
1 7 14.7 20.6 17.65 176.5 124.0
1 8 16.5 22.3 19.40 194.0 141.5
1 9 18.3 23.4 20.85 208.5 156.0
1 10 20 25 22.50 225.0 172.5
1 11 21.6 26.5 24.05 240.5 188.0
1 12 23.5 28 25.75 257.5 205.0 17.29 11.17
1 13 25.4 29.8 27.60 276.0 223.5
1 14 27.5 31 29.25 292.5 240.0
1 15 29.3 32.2 30.75 307.5 255.0
1 16 31.5 34 32.75 327.5 275.0
1 17 33.3 36 34.65 346.5 294.0
1 18 35.5 38.1 36.80 368.0 315.5
1 19 37.6 40.5 39.05 390.5 338.0
1 20 39.8 43 41.40 414.0 361.5
1 21 41 45.3 43.15 431.5 379.0
1 22 44.3 47.4 45.85 458.5 406.0 18.58 10.19
1 23 46 49.5 47.75 477.5 425.0
1 24 49 51.5 50.25 502.5 450.0
1 25 50.2 54 52.10 521.0 468.5
1 26 52 56.4 54.20 542.0 489.5
1 27 53.4 58.2 55.80 558.0 505.5
1 28 55 60.2 57.60 576.0 523.5
1 29 57.5 61 59.25 592.5 540.0
1 30 60 62 61.00 610.0 557.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 94 +900 L. 3.49 M Y : 029 6786 X : 048 1720 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 4.5 3.75 37.5 37.5
1 2 5 6 5.50 55.0 17.5
1 3 6 7.2 6.60 66.0 28.5
1 4 7 8 7.50 75.0 37.5
1 5 8 8.6 8.30 83.0 45.5
1 6 9 9 9.00 90.0 52.5 10.05 22.25
1 7 10.2 10 10.10 101.0 63.5
1 8 11.5 11 11.25 112.5 75.0
1 9 13 12 12.50 125.0 87.5
1 10 14.1 13.5 13.80 138.0 100.5
1 11 15 15 15.00 150.0 112.5
1 12 16 16 16.00 160.0 122.5
1 13 17.1 16.5 16.80 168.0 130.5
1 14 18.1 17.5 17.80 178.0 140.5 9.91 22.64
1 15 19 18 18.50 185.0 147.5
1 16 20.1 19 19.55 195.5 158.0
1 17 21.2 20 20.60 206.0 168.5
1 18 22.3 21 21.65 216.5 179.0
1 19 23.3 22 22.65 226.5 189.0
1 20 25 22.9 23.95 239.5 202.0
1 21 26.1 23.4 24.75 247.5 210.0 9.83 22.89
1 22 27 24 25.50 255.0 217.5
1 23 28.2 24.5 26.35 263.5 226.0
1 24 29.6 25 27.30 273.0 235.5
1 25 30.5 26 28.25 282.5 245.0
1 26 31 27 29.00 290.0 252.5 9.45 24.05
1 27 32 27.8 29.90 299.0 261.5
1 28 32.5 28.6 30.55 305.5 268.0
1 29 33 29.3 31.15 311.5 274.0
1 30 34 30.2 32.10 321.0 283.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 95 +000 R. 3.00 M Y : 029 6725 X : 047 1639 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 3 0 0 0.0
1 1 9 8 8.50 85.0 85.0
1 2 11 11 11.00 110.0 25.0
1 3 13 13.5 13.25 132.5 47.5 16.43 11.92
1 4 15 15 15.00 150.0 65.0
1 5 17 16.2 16.60 166.0 81.0
1 6 18.5 18 18.25 182.5 97.5
1 7 20 20 20.00 200.0 115.0
1 8 20.9 20.5 20.70 207.0 122.0
1 9 22 21.1 21.55 215.5 130.5
1 10 23 22 22.50 225.0 140.0
1 11 24 22.5 23.25 232.5 147.5
1 12 25.5 23 24.25 242.5 157.5 11.67 18.41
1 13 26.6 23.5 25.05 250.5 165.5
1 14 27.6 24 25.80 258.0 173.0
1 15 28 25 26.50 265.0 180.0
1 16 29.5 25.5 27.50 275.0 190.0
1 17 30 26 28.00 280.0 195.0
1 18 32 27 29.50 295.0 210.0
1 19 33 29 31.00 310.0 225.0
1 20 35 30.5 32.75 327.5 242.5
1 21 36.5 32 34.25 342.5 257.5
1 22 38.2 33 35.60 356.0 271.0
1 23 39.8 34 36.90 369.0 284.0
1 24 41.1 34.5 37.80 378.0 293.0 11.53 18.68
1 25 42.5 35.5 39.00 390.0 305.0
1 26 43.5 36 39.75 397.5 312.5
1 27 44.5 37 40.75 407.5 322.5
1 28 45.5 38 41.75 417.5 332.5
1 29 45.9 39 42.45 424.5 339.5
1 30 46 40.2 43.10 431.0 346.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 95 +125 L. 3.21 M Y : 029 6782 X : 047 1630 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 2 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 5 4.5 4.75 47.5 12.5
1 3 6 6 6.00 60.0 25.0
1 4 6.5 7.4 6.95 69.5 34.5
1 5 7 8.2 7.60 76.0 41.0 9.90 22.67
1 6 8 9.1 8.55 85.5 50.5
1 7 9 10.2 9.60 96.0 61.0
1 8 10 12 11.00 110.0 75.0
1 9 11 13.5 12.25 122.5 87.5
1 10 12 14.8 13.40 134.0 99.0
1 11 13 16.2 14.60 146.0 111.0
1 12 14 17.3 15.65 156.5 121.5
1 13 15 18.5 16.75 167.5 132.5
1 14 16.1 20.4 18.25 182.5 147.5 11.65 18.45
1 15 17.7 22.5 20.10 201.0 166.0
1 16 18 24.5 21.25 212.5 177.5
1 17 20.6 26 23.30 233.0 198.0
1 18 21.5 28.2 24.85 248.5 213.5
1 19 23 30 26.50 265.0 230.0
1 20 25.6 31.5 28.55 285.5 250.5
1 21 27.7 32.6 30.15 301.5 266.5
1 22 29.6 33.6 31.60 316.0 281.0
1 23 31.2 35.6 33.40 334.0 299.0 14.28 14.24
1 24 32.5 37.2 34.85 348.5 313.5
1 25 34 39.6 36.80 368.0 333.0
1 26 35 43 39.00 390.0 355.0
1 27 36.5 45.7 41.10 411.0 376.0
1 28 38 48.3 43.15 431.5 396.5
1 29 39.5 50.5 45.00 450.0 415.0
1 30 40.6 52.1 46.35 463.5 428.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 95 + 200 R. 3.61 M Y : 029 6941 X : 047 1680 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 10.4 3 6.70 67.0 67.0
1 2 11.1 10.5 10.80 108.0 41.0
1 3 12 18.5 15.25 152.5 85.5
1 4 12.5 24 18.25 182.5 115.5
1 5 13 27 20.00 200.0 133.0 19.80 9.40
1 6 14 31 22.50 225.0 158.0
1 7 14.6 33 23.80 238.0 171.0
1 8 15 34 24.50 245.0 178.0
1 9 16 35 25.50 255.0 188.0
1 10 17 36 26.50 265.0 198.0
1 11 20 37 28.50 285.0 218.0
1 12 27 38 32.50 325.0 258.0
1 13 32 39 35.50 355.0 288.0
1 14 35.5 40 37.75 377.5 310.5
1 15 36.6 40.5 38.55 385.5 318.5
1 16 37.5 41 39.25 392.5 325.5 18.23 10.44
1 17 39.5 42 40.75 407.5 340.5
1 18 42.1 43 42.55 425.5 358.5
1 19 45 44 44.50 445.0 378.0
1 20 46 44.5 45.25 452.5 385.5
1 21 47 45.5 46.25 462.5 395.5
1 22 47.1 46.5 46.80 468.0 401.0
1 23 47.5
1 24 49
1 25 50
1 26 51
STA : 95 + 300 R. 5.21 M Y : 029 6910 X : 047 1751 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 4 24.5 14.25 142.5 142.5
1 2 17 33.1 25.05 250.5 108.0
1 3 34.5 43.5 39.00 390.0 247.5 117.08 1.0
1 4 55.5 51.2 53.35 533.5 391.0
1 5 76.5 61.5 69.00 690.0 547.5
1 6 100 69 84.50 845.0 702.5
1 7 82
1 8 100
STA : 95 + 400 R. 3.26 M Y : 029 6966 X : 047 1683 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 7 5.50 55.0 55.0
1 2 8 9.5 8.75 87.5 32.5
1 3 11 11 11.00 110.0 55.0
1 4 15.5 13 14.25 142.5 87.5 23.44 7.59
1 5 18.3 16 17.15 171.5 116.5
1 6 20 18.5 19.25 192.5 137.5
1 7 23 21 22.00 220.0 165.0
1 8 25.5 23 24.25 242.5 187.5
1 9 29 27 28.00 280.0 225.0
1 10 32.2 29 30.60 306.0 251.0
1 11 35.5 32.5 34.00 340.0 285.0
1 12 39.5 37 38.25 382.5 327.5
1 13 43 41 42.00 420.0 365.0 29.00 5.79
1 14 46 44 45.00 450.0 395.0
1 15 48 46.5 47.25 472.5 417.5
1 16 52 49.5 50.75 507.5 452.5
1 17 55.5 52.5 54.00 540.0 485.0
1 18 59 55.5 57.25 572.5 517.5
1 19 62 58.5 60.25 602.5 547.5
1 20 65 62 63.50 635.0 580.0
1 21 67.5 65 66.25 662.5 607.5
1 22 70 68 69.00 690.0 635.0
1 23 72.5 70 71.25 712.5 657.5
1 24 74.1 73 73.55 735.5 680.5
1 25 76.5 75.2 75.85 758.5 703.5 27.33 6.24
1 26 78 78 78.00 780.0 725.0
1 27 79.5 82 80.75 807.5 752.5
1 28 82 85.1 83.55 835.5 780.5
1 29 84 86 85.00 850.0 795.0
1 30 86 89 87.50 875.0 820.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 95 +500 L. 3.58 M Y : 029 7018 X : 047 1595 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 0 0 0 0.0
1 1 3 3 3.00 30.0 30.0
1 2 5 4 4.50 45.0 15.0
1 3 6.5 5 5.75 57.5 27.5
1 4 8 6.5 7.25 72.5 42.5
1 5 10 7 8.50 85.0 55.0 10.00 22.39
1 6 11.5 8 9.75 97.5 67.5
1 7 13 9 11.00 110.0 80.0
1 8 14 10 12.00 120.0 90.0
1 9 14.5 10.5 12.50 125.0 95.0
1 10 15 11 13.00 130.0 100.0
1 11 16 12 14.00 140.0 110.0
1 12 16.5 13 14.75 147.5 117.5
1 13 17 14 15.50 155.0 125.0
1 14 18 15 16.50 165.0 135.0
1 15 19 17 18.00 180.0 150.0 10.63 20.73
1 16 20 18 19.00 190.0 160.0
1 17 21.5 19 20.25 202.5 172.5
1 18 22.5 20.5 21.50 215.0 185.0
1 19 23 22 22.50 225.0 195.0
1 20 24.5 24 24.25 242.5 212.5
1 21 25.5 25 25.25 252.5 222.5
1 22 26.5 26 26.25 262.5 232.5
1 23 27.5 27.4 27.45 274.5 244.5
1 24 28.5 28.5 28.50 285.0 255.0
1 25 30 29.5 29.75 297.5 267.5 11.18 19.42
1 26 31 30.5 30.75 307.5 277.5
1 27 32 32.5 32.25 322.5 292.5
1 28 33 35 34.00 340.0 310.0
1 29 34.5 36.5 35.50 355.0 325.0
1 30 35.6 37.5 36.55 365.5 335.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 95 +600 R. 3.51 M Y : 029 7071 X : 047 1515 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 4 0 0 0.0
1 1 7 10 8.50 85.0 85.0
1 2 9.5 12 10.75 107.5 22.5
1 3 11.4 14 12.70 127.0 42.0
1 4 13 15 14.00 140.0 55.0 12.56 16.76
1 5 14.5 16.1 15.30 153.0 68.0
1 6 15.6 17.1 16.35 163.5 78.5
1 7 17 18.1 17.55 175.5 90.5
1 8 17.9 19.2 18.55 185.5 100.5
1 9 18.5 20.1 19.30 193.0 108.0
1 10 19.5 21 20.25 202.5 117.5
1 11 20 22 21.00 210.0 125.0
1 12 21 23 22.00 220.0 135.0
1 13 22 24 23.00 230.0 145.0
1 14 23 25 24.00 240.0 155.0 10.38 21.36
1 15 24 26 25.00 250.0 165.0
1 16 25 26.6 25.80 258.0 173.0
1 17 25.5 27.6 26.55 265.5 180.5
1 18 26 28.2 27.10 271.0 186.0
1 19 26.5 29.5 28.00 280.0 195.0
1 20 27.5 31 29.25 292.5 207.5
1 21 28.4 32 30.20 302.0 217.0
1 22 29.3 33 31.15 311.5 226.5
1 23 30.3 34.5 32.40 324.0 239.0 10.10 22.11
1 24 31 35 33.00 330.0 245.0
1 25 31.5 36 33.75 337.5 252.5
1 26 32 37 34.50 345.0 260.0
1 27 32.4 38 35.20 352.0 267.0
1 28 33.4 39 36.20 362.0 277.0 9.68 23.32
1 29 34 39.5 36.75 367.5 282.5
1 30 34.6 40.5 37.55 375.5 290.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 95 +700 L. 3.31 M Y : 029 7168 X : 047 1502 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 3.2 4 3.60 36.0 36.0
1 2 5 5 5.00 50.0 14.0
1 3 7.6 6.5 7.05 70.5 34.5
1 4 9 8.2 8.60 86.0 50.0
1 5 10 9 9.50 95.0 59.0
1 6 10.5 9.5 10.00 100.0 64.0 8.46 27.69
1 7 11.2 10 10.60 106.0 70.0
1 8 12 10.4 11.20 112.0 76.0
1 9 13 11 12.00 120.0 84.0
1 10 13.6 11.5 12.55 125.5 89.5
1 11 14.2 12 13.10 131.0 95.0
1 12 15 12.5 13.75 137.5 101.5
1 13 15.8 13 14.40 144.0 108.0
1 14 17 13.5 15.25 152.5 116.5
1 15 17.8 14 15.90 159.0 123.0
1 16 19 15 17.00 170.0 134.0
1 17 19.8 16 17.90 179.0 143.0
1 18 20.8 17 18.90 189.0 153.0 8.50 27.52
1 19 21.5 17.5 19.50 195.0 159.0
1 20 22.2 18.5 20.35 203.5 167.5
1 21 23 19 21.00 210.0 174.0
1 22 24 20 22.00 220.0 184.0
1 23 25 21 23.00 230.0 194.0
1 24 26 22 24.00 240.0 204.0
1 25 27.1 23 25.05 250.5 214.5
1 26 28.2 23.5 25.85 258.5 222.5
1 27 29.6 24.2 26.90 269.0 233.0 8.88 26.02
1 28 31 25.3 28.15 281.5 245.5
1 29 32.2 26 29.10 291.0 255.0
1 30 33.5 27 30.25 302.5 266.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 95 +800 R. 3.50 M Y : 029 7249 X : 047 1474 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3 4 3.50 35.0 35.0
1 2 4 6.5 5.25 52.5 17.5
1 3 5 8.5 6.75 67.5 32.5
1 4 7 9.5 8.25 82.5 47.5 13.25 15.66
1 5 8.1 11 9.55 95.5 60.5
1 6 9.5 13.4 11.45 114.5 79.5
1 7 11 15 13.00 130.0 95.0
1 8 12 16.2 14.10 141.0 106.0
1 9 13.4 17.8 15.60 156.0 121.0
1 10 14.5 19.2 16.85 168.5 133.5
1 11 16 20.2 18.10 181.0 146.0
1 12 18 21.4 19.70 197.0 162.0 13.33 15.54
1 13 20 22 21.00 210.0 175.0
1 14 21.4 23 22.20 222.0 187.0
1 15 23 24 23.50 235.0 200.0
1 16 24.6 25 24.80 248.0 213.0
1 17 26 26 26.00 260.0 225.0
1 18 27.5 26.8 27.15 271.5 236.5
1 19 29 27.8 28.40 284.0 249.0
1 20 30 28.9 29.45 294.5 259.5 12.29 17.23
1 21 31 29.8 30.40 304.0 269.0
1 22 32 30.5 31.25 312.5 277.5
1 23 33 31 32.00 320.0 285.0
1 24 34 32 33.00 330.0 295.0
1 25 35 32.6 33.80 338.0 303.0
1 26 35.6 33.5 34.55 345.5 310.5
1 27 36.1 34 35.05 350.5 315.5 11.45 18.85
1 28 37 35 36.00 360.0 325.0
1 29 38 36 37.00 370.0 335.0
1 30 38.7 37 37.85 378.5 343.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 95 +900 R. 3.42 M Y : 029 7322 X : 047 1291 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 5 7 6.00 60.0 60.0
1 2 7.5 9.6 8.55 85.5 25.5
1 3 8 10.5 9.25 92.5 32.5
1 4 10 12.5 11.25 112.5 52.5
1 5 11.5 13 12.25 122.5 62.5 11.11 19.58
1 6 13 14 13.50 135.0 75.0
1 7 13.5 15 14.25 142.5 82.5
1 8 14 16.2 15.10 151.0 91.0
1 9 15 17 16.00 160.0 100.0
1 10 16.4 17.5 16.95 169.5 109.5
1 11 17 18 17.50 175.0 115.0
1 12 18 19 18.50 185.0 125.0
1 13 18.4 19.5 18.95 189.5 129.5
1 14 19 20 19.50 195.0 135.0
1 15 19.5 20.5 20.00 200.0 140.0
1 16 20 21 20.50 205.0 145.0 8.25 28.58
1 17 20.4 21.5 20.95 209.5 149.5
1 18 21 22 21.50 215.0 155.0
1 19 21.5 22.5 22.00 220.0 160.0
1 20 22 23 22.50 225.00 165.00
1 21 22.5 23.5 23.00 230.0 170.0
1 22 23 24 23.50 235.0 175.0
1 23 23.5 24.5 24.00 240.0 180.0
1 24 24 25.2 24.60 246.0 186.0 7.38 32.91
1 25 24.5 26.2 25.35 253.5 193.5
1 26 25 27 26.00 260.0 200.0
1 27 25.5 27.5 26.50 265.0 205.0
1 28 26 28 27.00 270.0 210.0
1 29 26.5 28.5 27.50 275.0 215.0
1 30 27 29.3 28.15 281.5 221.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +000 L. 3.36 M Y : 029 7337 X : 047 1292 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 5 2 3.50 35.0 35.0
1 2 6 2.5 4.25 42.5 7.5
1 3 7.5 4 5.75 57.5 22.5
1 4 8 5 6.50 65.0 30.0
1 5 8.5 6 7.25 72.5 37.5
1 6 9 7.5 8.25 82.5 47.5
1 7 9.5 8.5 9.00 90.0 55.0 7.14 34.32
1 8 10 9.2 9.60 96.0 61.0
1 9 10.5 10 10.25 102.5 67.5
1 10 11.5 10.4 10.95 109.5 74.5
1 11 12 11 11.50 115.0 80.0
1 12 13 12 12.50 125.0 90.0
1 13 13.5 12.4 12.95 129.5 94.5
1 14 14 13 13.50 135.0 100.0
1 15 15 14 14.50 145.0 110.0
1 16 15.5 14.6 15.05 150.5 115.5
1 17 16 15.5 15.75 157.5 122.5
1 18 17 16.1 16.55 165.5 130.5
1 19 18 17 17.50 175.0 140.0
1 20 18.5 17.6 18.05 180.5 145.5
1 21 19 18.1 18.55 185.5 150.5
1 22 19.5 19 19.25 192.5 157.5 6.83 36.31
1 23 20.4 19.4 19.90 199.0 164.0
1 24 21 20 20.50 205.0 170.0
1 25 21.5 20.5 21.00 210.0 175.0
1 26 22.4 21 21.70 217.0 182.0
1 27 23 21.4 22.20 222.0 187.0
1 28 24 22 23.00 230.0 195.0
1 29 24.5 22.6 23.55 235.5 200.5
1 30 25 23 24.00 240.0 205.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +100 R 3.50 M Y : 029 7303 X : 047 1202 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 3.3 4 3.65 36.5 36.5
1 2 4.2 4.5 4.35 43.5 7.0
1 3 6 5 5.50 55.0 18.5
1 4 8 6 7.00 70.0 33.5
1 5 9.2 8 8.60 86.0 49.5
1 6 10 10.2 10.10 101.0 64.5 9.64 23.47
1 7 10.6 12 11.30 113.0 76.5
1 8 11.2 13 12.10 121.0 84.5
1 9 12 13.5 12.75 127.5 91.0
1 10 13 14 13.50 135.0 98.5
1 11 14 14.5 14.25 142.5 106.0
1 12 14.5 15 14.75 147.5 111.0
1 13 15 16 15.50 155.0 118.5
1 14 15.5 16.5 16.00 160.0 123.5
1 15 16.4 17 16.70 167.0 130.5
1 16 17 18 17.50 175.0 138.5
1 17 18 19 18.50 185.0 148.5
1 18 19 19.5 19.25 192.5 156.0
1 19 19.4 20 19.70 197.0 160.5 7.63 31.57
1 20 20 20.5 20.25 202.5 166.0
1 21 20.4 21 20.70 207.0 170.5
1 22 21 21.5 21.25 212.5 176.0
1 23 21.6 22 21.80 218.0 181.5
1 24 22.2 22.5 22.35 223.5 187.0
1 25 23 23 23.00 230.0 193.5
1 26 24 23.5 23.75 237.5 201.0
1 27 24.5 24 24.25 242.5 206.0
1 28 24.5
1 29 25
1 30 25.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +200 L 3.48 M Y : 029 7294 X : 047 1092 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 2 0 0 0.0
1 1 4 8 6.00 60.0 60.0
1 2 6 11.2 8.60 86.0 26.0
1 3 9 14.5 11.75 117.5 57.5 18.33 10.37
1 4 10.8 17 13.90 139.0 79.0
1 5 12 19 15.50 155.0 95.0
1 6 13.5 20.5 17.00 170.0 110.0
1 7 14 21.5 17.75 177.5 117.5
1 8 15 23.5 19.25 192.5 132.5
1 9 17 25 21.00 210.0 150.0
1 10 18.1 27 22.55 225.5 165.5 17.14 11.29
1 11 19.5 29.5 24.50 245.0 185.0
1 12 21 31.5 26.25 262.5 202.5
1 13 22.5 33.5 28.00 280.0 220.0
1 14 24.5 35.5 30.00 300.0 240.0
1 15 27.2 37.5 32.35 323.5 263.5
1 16 30 39 34.50 345.0 285.0
1 17 32.5 40.5 36.50 365.0 305.0 18.63 10.16
1 18 35.5 42 38.75 387.5 327.5
1 19 37.5 44 40.75 407.5 347.5
1 20 40.5 46 43.25 432.5 372.5
1 21 45.2 49.5 47.35 473.5 413.5
1 22 50.5 53 51.75 517.5 457.5
1 23 53 55 54.00 540.0 480.0
1 24 54 56 55.00 550.0 490.0
1 25 55.5 58.5 57.00 570.0 510.0 21.17 8.64
1 26 56.2 62.5 59.35 593.5 533.5
1 27 57.5 65 61.25 612.5 552.5
1 28 58.5 67.5 63.00 630.0 570.0
1 29 60 73 66.50 665.0 605.0
1 30 61 78 69.50 695.0 635.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +300 L 3.27 M Y : 029 7292 X : 047 1000 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 3 0 0 0.0
1 1 5 8 6.50 65.0 65.0
1 2 6.5 10 8.25 82.5 17.5
1 3 8.5 12 10.25 102.5 37.5
1 4 10.5 14.1 12.30 123.0 58.0 14.64 13.79
1 5 11.5 16 13.75 137.5 72.5
1 6 13 17.5 15.25 152.5 87.5
1 7 14.5 19 16.75 167.5 102.5
1 8 16 20.5 18.25 182.5 117.5
1 9 18.5 23 20.75 207.5 142.5
1 10 20 26 23.00 230.0 165.0
1 11 20.5 29.5 25.00 250.0 185.0
1 12 21 34.5 27.75 277.5 212.5 17.94 10.66
1 13 22 38.5 30.25 302.5 237.5
1 14 23 40.5 31.75 317.5 252.5
1 15 24.2 42.5 33.35 333.5 268.5
1 16 26 44.4 35.20 352.0 287.0
1 17 29 48.1 38.55 385.5 320.5
1 18 31 53.5 42.25 422.5 357.5
1 19 33 56 44.50 445.0 380.0
1 20 34 58 46.00 460.0 395.0
1 21 36 61.5 48.75 487.5 422.5
1 22 38.2 65.5 51.85 518.5 453.5 27.41 6.22
1 23 41 70 55.50 555.0 490.0
1 24 44.5 77 60.75 607.5 542.5
1 25 47.5 84 65.75 657.5 592.5
1 26 58 90 74.00 740.0 675.0
1 27 61 100 80.50 805.0 740.0
1 28 63.5
1 29 67.5
1 30 70.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +400 R 3.47 M Y : 029 7236 X : 047 0866 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 0 0 0 0.0
1 1 4.5 2 3.25 32.5 32.5
1 2 6 3 4.50 45.0 12.5
1 3 7 5 6.00 60.0 27.5
1 4 8 6 7.00 70.0 37.5
1 5 9 8 8.50 85.0 52.5 11.39 18.98
1 6 9.5 9 9.25 92.5 60.0
1 7 10.5 10.5 10.50 105.0 72.5
1 8 11.5 12 11.75 117.5 85.0
1 9 12 15 13.50 135.0 102.5
1 10 14 17 15.50 155.0 122.5
1 11 15 18.2 16.60 166.0 133.5
1 12 16 19 17.50 175.0 142.5
1 13 17 20 18.50 185.0 152.5 12.50 16.86
1 14 18 21 19.50 195.0 162.5
1 15 19.5 22.5 21.00 210.0 177.5
1 16 21.5 25 23.25 232.5 200.0
1 17 23.5 27.5 25.50 255.0 222.5
1 18 25.5 29.5 27.50 275.0 242.5
1 19 27.5 31 29.25 292.5 260.0
1 20 31.5 31.5 31.50 315.0 282.5
1 21 35 32.5 33.75 337.5 305.0
1 22 40 35 37.50 375.0 342.5 17.17 11.27
1 23 45 38.5 41.75 417.5 385.0
1 24 48 40 44.00 440.0 407.5
1 25 50 40.5 45.25 452.5 420.0
1 26 52.5 41 46.75 467.5 435.0
1 27 57 42 49.50 495.0 462.5
1 28 61 42.5 51.75 517.5 485.0
1 29 65.1 43 54.05 540.5 508.0
1 30 66 43.5 54.75 547.5 515.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +500 L 3.49 M Y : 029 7327 X : 047 0837 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 3.5 3.4 3.45 34.5 34.5
1 2 5 4.5 4.75 47.5 13.0
1 3 6 5.5 5.75 57.5 23.0
1 4 7 6.4 6.70 67.0 32.5
1 5 8 7 7.50 75.0 40.5
1 6 9 8.2 8.60 86.0 51.5 8.88 26.05
1 7 10 9 9.50 95.0 60.5
1 8 11 10 10.50 105.0 70.5
1 9 12.2 10.5 11.35 113.5 79.0
1 10 13.2 11.2 12.20 122.0 87.5
1 11 14.3 12.1 13.20 132.0 97.5
1 12 15.2 13 14.10 141.0 106.5
1 13 16.3 14 15.15 151.5 117.0
1 14 17.3 15 16.15 161.5 127.0
1 15 18.3 16.1 17.20 172.0 137.5
1 16 19.5 17.2 18.35 183.5 149.0
1 17 20.4 18.3 19.35 193.5 159.0 9.57 23.68
1 18 21.4 20 20.70 207.0 172.5
1 19 22.3 20.5 21.40 214.0 179.5
1 20 23.2 21.5 22.35 223.5 189.0
1 21 24 22.5 23.25 232.5 198.0
1 22 25 24 24.50 245.0 210.5
1 23 26 25 25.50 255.0 220.5
1 24 27 26 26.50 265.0 230.5
1 25 28 27.2 27.60 276.0 241.5
1 26 29.4 28.3 28.85 288.5 254.0 9.85 22.82
1 27 30.5 29.5 30.00 300.0 265.5
1 28 31.5 30.5 31.00 310.0 275.5
1 29 32.5 32 32.25 322.5 288.0
1 30 33 33 33.00 330.0 295.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +600 R 3.60 M Y : 029 7427 X : 047 0843 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 2 0 0 0.0
1 1 6 6.5 6.25 62.5 62.5
1 2 11.5 10 10.75 107.5 45.0
2 18 15 16.50 165.0 102.5
1 3 24 21.5 22.75 227.5 165.0
1 4 30 27 28.50 285.0 222.5 43.61 3.45
1 5 34 33.2 33.60 336.0 273.5
1 6 37 40 38.50 385.0 322.5
1 7 38 46 42.00 420.0 357.5
1 8 38.5 50 44.25 442.5 380.0
1 9 39 52 45.50 455.0 392.5
1 10 39.5 55.5 47.50 475.0 412.5
1 11 40.1 60 50.05 500.5 438.0
1 12 40.9 63 51.95 519.5 457.0 35.54 4.47
1 13 41.3 67 54.15 541.5 479.0
1 14 42 70 56.00 560.0 497.5
1 15 42.5 73 57.75 577.5 515.0
1 16 43 75 59.00 590.0 527.5
1 17 43.5 76.5 60.00 600.0 537.5
1 18 44 79 61.50 615.0 552.5 29.28 5.72
1 19 45 84 64.50 645.0 582.5
1 20 45.5 89 67.25 672.5 610.0
1 21 46 94 70.00 700.0 637.5
1 22 46.5 96 71.25 712.5 650.0
1 23 47.2 100 73.60 736.0 673.5
1 24 48
1 25 49
1 26 49.6
1 27 50.4
1 28 51.1
1 29 52
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +700 L. 4.00 M Y : 029 7488 X : 047 0915 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4.6 4.5 4.55 45.5 45.5
1 2 7 6.5 6.75 67.5 22.0
1 3 8.5 8 8.25 82.5 37.0 14.57 13.88
1 4 10.2 9.5 9.85 98.5 53.0
1 5 12 10.5 11.25 112.5 67.0
1 6 14 11.8 12.90 129.0 83.5
1 7 16.5 13 14.75 147.5 102.0
1 8 19.7 14.4 17.05 170.5 125.0
1 9 22.8 15 18.90 189.0 143.5
1 10 25 16 20.50 205.0 159.5
1 11 26.5 17 21.75 217.5 172.0
1 12 28 18 23.00 230.0 184.5 16.08 12.24
1 13 29.5 19 24.25 242.5 197.0
1 14 32 20.7 26.35 263.5 218.0
1 15 34.2 23.5 28.85 288.5 243.0
1 16 35.2 26 30.60 306.0 260.5
1 17 36.6 27.5 32.05 320.5 275.0
1 18 37.5 29.5 33.50 335.0 289.5
1 19 39 31.5 35.25 352.5 307.0
1 20 40.5 33.5 37.00 370.0 324.5
1 21 41.5 34 37.75 377.5 332.0
1 22 42.5 35 38.75 387.5 342.0
1 23 43.5 36 39.75 397.5 352.0
1 24 44.2 37 40.60 406.0 360.5 14.73 13.69
1 25 45 38 41.50 415.0 369.5
1 26 47.2 38.5 42.85 428.5 383.0
1 27 49.5 39 44.25 442.5 397.0
1 28 52 39.5 45.75 457.5 412.0
1 29 54.5 40 47.25 472.5 427.0
1 30 57 40.5 48.75 487.5 442.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 96 +800 R. Y : 029 7499 X : 047 0864 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
HARD SOIL
STA : 96 +900 R. 3.40 M Y : 029 7490 X : 047 0792 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 2 1 0 0 0.0
1 1 6 5.2 5.60 56.0 56.0
1 2 8.6 7 7.80 78.0 22.0
1 3 11.5 10.9 11.20 112.0 56.0 21.80 8.32
1 4 14 13.5 13.75 137.5 81.5
1 5 16.8 16.2 16.50 165.0 109.0
1 6 18 18 18.00 180.0 124.0
1 7 19.2 19 19.10 191.0 135.0
1 8 20.5 20.3 20.40 204.0 148.0
1 9 21.5 22 21.75 217.5 161.5 16.08 12.25
1 10 23 23 23.00 230.0 174.0
1 11 24 24.1 24.05 240.5 184.5
1 12 25.5 25 25.25 252.5 196.5
1 13 27 26 26.50 265.0 209.0
1 14 28.5 28 28.25 282.5 226.5
1 15 30.5 30.2 30.35 303.5 247.5
1 16 33 32.4 32.70 327.0 271.0
1 17 35.2 35.2 35.20 352.0 296.0 19.00 9.91
1 18 38 38 38.00 380.0 324.0
1 19 41 40 40.50 405.0 349.0
1 20 44 42.2 43.10 431.0 375.0
1 21 46 45 45.50 455.0 399.0
1 22 48 47.5 47.75 477.5 421.5
1 23 49.5 51 50.25 502.5 446.5
1 24 50.5 53.5 52.00 520.0 464.0
1 25 51.5 57 54.25 542.5 486.5 21.05 8.70
1 26 52.5 61 56.75 567.5 511.5
1 27 54.4 63.2 58.80 588.0 532.0
1 28 58 72.2 65.10 651.0 595.0
1 29 61 73 67.00 670.0 614.0
1 30 64 73.5 68.75 687.5 631.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 97 +000 R. 3.42 M Y : 029 7508 X : 047 0772 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 2.8 3 2.90 29.0 29.0
1 2 5 5 5.00 50.0 21.0
1 3 6.8 6.1 6.45 64.5 35.5
1 4 8 7.8 7.90 79.0 50.0 13.63 15.11
1 5 9.5 9 9.25 92.5 63.5
1 6 11.2 10.5 10.85 108.5 79.5
1 7 12.5 12.2 12.35 123.5 94.5
1 8 13.6 14 13.80 138.0 109.0
1 9 14.8 15.5 15.15 151.5 122.5
1 10 16.2 17.5 16.85 168.5 139.5
1 11 17.5 18.5 18.00 180.0 151.0
1 12 18.8 20 19.40 194.0 165.0
1 13 20.4 21.3 20.85 208.5 179.5
1 14 22 22.5 22.25 222.5 193.5
1 15 23.6 24.5 24.05 240.5 211.5
1 16 25.6 26.4 26.00 260.0 231.0 15.50 12.83
1 17 27.8 28.5 28.15 281.5 252.5
1 18 29.8 30.5 30.15 301.5 272.5
1 19 31.8 32.6 32.20 322.0 293.0
1 20 33.4 34.4 33.90 339.0 310.0
1 21 35.6 36 35.80 358.0 329.0
1 22 37 37.5 37.25 372.5 343.5
1 23 38.1 39 38.55 385.5 356.5
1 24 39.5 40.1 39.80 398.0 369.0
1 25 41 41 41.00 410.0 381.0
1 26 42 42 42.00 420.0 391.0
1 27 43 43.2 43.10 431.0 402.0 14.62 13.82
1 28 44.8 44.7 44.75 447.5 418.5
1 29 44.5 46.2 45.35 453.5 424.5
1 30 45.5 48 46.75 467.5 438.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 97 +100 R. 3.36M Y : 029 7575 X : 047 0744 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1.5 3 0 0 0.0
1 1 4.5 5 4.75 47.5 47.5
1 2 7 6.2 6.60 66.0 18.5 9.25 24.72
1 3 8.5
1 4 10
1 5 11.2
1 6 12.5
1 7 14
1 8 16
1 9 18.1
1 10 20
1 11 21.5
1 12 22.8
1 13 23.4
1 14 24
STA : 97 +200 L. 6.32 M Y : 029 7659 X : 047 0685 Date : November 22, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 2.5 3 2.75 27.5 27.5
1 2 5 5.5 5.25 52.5 25.0
1 3 8.5 8 8.25 82.5 55.0
1 4 11.5 9 10.25 102.5 75.0
1 5 14.6 11.5 13.05 130.5 103.0
1 6 16 14.5 15.25 152.5 125.0 16.25 12.08
1 7 19 16 17.50 175.0 147.5
1 8 20.5 17 18.75 187.5 160.0
1 9 21.5 17.5 19.50 195.0 167.5
1 10 22 18.5 20.25 202.5 175.0
1 11 23 19.2 21.10 211.0 183.5
1 12 24.5 20 22.25 222.5 195.0
1 13 26 21 23.50 235.0 207.5
1 14 27.5 23 25.25 252.5 225.0
1 15 29 24.4 26.70 267.0 239.5
1 16 30 25 27.50 275.0 247.5
1 17 30.5 26.2 28.35 283.5 256.0 13.81 14.86
1 18 31 27.1 29.05 290.5 263.0
1 19 31.5 28.1 29.80 298.0 270.5
1 20 32 29.5 30.75 307.5 280.0
1 21 32.5 31 31.75 317.5 290.0
1 22 33 33.1 33.05 330.5 303.0
1 23 33.5 34.8 34.15 341.5 314.0
1 24 34 37 35.50 355.0 327.5
1 25 34.6 38.4 36.50 365.0 337.5 13.08 15.91
1 26 36 40.1 38.05 380.5 353.0
1 27 37.2 41.5 39.35 393.5 366.0
1 28 38.7 42 40.35 403.5 376.0
1 29 39 43 41.00 410.0 382.5
1 30 40 44 42.00 420.0 392.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 100 +100 R. 3.64 M Y : 029 8538 X : 046 9704 Date : November 23, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 0 1 0 0 0.0
1 1 8 8 8.00 80.0 80.0
1 2 11 13.5 12.25 122.5 42.5
1 3 13 14 13.50 135.0 55.0 16.43 11.92
1 4 15 15 15.00 150.0 70.0
1 5 16 16.5 16.25 162.5 82.5
1 6 18 17.5 17.75 177.5 97.5
1 7 20 19 19.50 195.0 115.0
1 8 21.1 19.5 20.30 203.0 123.0
1 9 23 20.5 21.75 217.5 137.5
1 10 25 21.5 23.25 232.5 152.5
1 11 26.2 22.5 24.35 243.5 163.5 20.50 9.00
1 12 30.5 24 27.25 272.5 192.5
1 13 34 25.6 29.80 298.0 218.0
1 14 39 29 34.00 340.0 260.0
1 15 43.5 34 38.75 387.5 307.5
1 16 46.5 37 41.75 417.5 337.5
1 17 50.5 40.1 45.30 453.0 373.0
1 18 54 45.1 49.55 495.5 415.5 27.02 6.33
1 19 56.5 49.5 53.00 530.0 450.0
1 20 58.5 55.1 56.80 568.0 488.0
1 21 70 59.5 64.75 647.5 567.5
1 22 73 63.5 68.25 682.5 602.5
1 23 75.5 70 72.75 727.5 647.5
1 24 79 76 77.50 775.0 695.0
1 25 84 80 82.00 820.0 740.0
1 26 89 85 87.00 870.0 790.0 14.00 14.60
1 27 93 90 91.50 915.0 835.0
1 28 96 95 95.50 955.0 875.0
1 29 100 98 99.00 990.0 910.0
1 30 100 50.00 500.0 420.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 100 +125 R. 3.64 M Y : 029 8596 X : 046 9687 Date : November 23, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 0 0 0 0.0
1 1 4 3 3.50 35.0 35.0
1 2 7 6 6.50 65.0 30.0
1 3 10 7.5 8.75 87.5 52.5
1 4 11 9 10.00 100.0 65.0
1 5 12 10 11.00 110.0 75.0 11.67 18.41
1 6 13 10.5 11.75 117.5 82.5
1 7 14 11 12.50 125.0 90.0
1 8 15 11.5 13.25 132.5 97.5
1 9 16 12 14.00 140.0 105.0
1 10 16.5 12.5 14.50 145.0 110.0
1 11 17 13 15.00 150.0 115.0
1 12 18 13.5 15.75 157.5 122.5
1 13 19 14 16.50 165.0 130.0
1 14 20 14.5 17.25 172.5 137.5
1 15 21.5 15 18.25 182.5 147.5
1 16 22 15.5 18.75 187.5 152.5 9.52 23.82
1 17 24 16 20.00 200.0 165.0
1 18 25 16.5 20.75 207.5 172.5
1 19 26.5 17 21.75 217.5 182.5
1 20 27 17.5 22.25 222.5 187.5
1 21 29 18 23.50 235.0 200.0
1 22 31 18.5 24.75 247.5 212.5
1 23 33 19.5 26.25 262.5 227.5
1 24 35 20 27.50 275.0 240.0
1 25 36.1 20.5 28.30 283.0 248.0 9.67 23.37
1 26 37.2 21 29.10 291.0 256.0
1 27 38 22 30.00 300.0 265.0
1 28 39 23 31.00 310.0 275.0
1 29 39.5 24 31.75 317.5 282.5
1 30 40 25 32.50 325.0 290.0
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
STA : 104 +825 L. 3.64 M Y : 029 9182 X : 046 8560 Date : November 23, 2013
DCP Reading Cumulative CBR (%)
Cumulative Blow DCP
Blow No Point 1 Point 2 Average Penetration =10^(2.62-
Blow (mm/Blow)
(h) (1.27*Log(h)))
(Cm) (Cm) (Cm) (mm)
0 0 1 1 0 0 0.0
1 1 4 11 7.50 75.0 75.0
1 2 6 14 10.00 100.0 25.0
1 3 8 16 12.00 120.0 45.0
1 4 9 18 13.50 135.0 60.0
1 5 9.5 19.5 14.50 145.0 70.0 12.22 17.35
1 6 10 21 15.50 155.0 80.0
1 7 11 22 16.50 165.0 90.0
1 8 11.5 23 17.25 172.5 97.5
1 9 12 25 18.50 185.0 110.0
1 10 15 27.3 21.15 211.5 136.5
1 11 20 28.6 24.30 243.0 168.0
1 12 21 29.6 25.30 253.0 178.0
1 13 22 30.2 26.10 261.0 186.0
1 14 22.5 31 26.75 267.5 192.5
1 15 23 32 27.50 275.0 200.0
1 16 24.5 32.5 28.50 285.0 210.0
1 17 26 33 29.50 295.0 220.0 12.00 17.76
1 18 28 34 31.00 310.0 235.0
1 19 30 35 32.50 325.0 250.0
1 20 31 36 33.50 335.0 260.0
1 21 31.5 37 34.25 342.5 267.5
1 22 32 38 35.00 350.0 275.0
1 23 32.4 39.1 35.75 357.5 282.5
1 24 33 40 36.50 365.0 290.0
1 25 34 41 37.50 375.0 300.0
1 26 35 42 38.50 385.0 310.0
1 27 35.5 43 39.25 392.5 317.5
1 28 37 44 40.50 405.0 330.0 11.68 18.37
1 29 38 45 41.50 415.0 340.0
1 30 39.1 46 42.55 425.5 350.5
Acknowledge by: Checked and Approved by: Submitted by:
Employer Personnel Engineer Contractor
YACHIYO ENGINEERING Co.Ltd. NINDYA - LAMPIRI JO.
LEGALIZATION SHEET
NAME SIGNATURE
Nr. DESCRIPTION
OCCUPATION AND OFFICE STAMP
Employer
Sub Project Manager (PPK) 7A
Engineer
YACHIYO Engineering Co. Ltd.
Contractor
NINDYA - LAMPIRI, JO.
Remarks:
0 0 0 1 0 0 0 -
1 1 3 6 4.5 45 45
1 2 6 9 7.5 75 30
1 3 8.5 10.5 9.5 95 50
15.00 13.4
1 4 10.5 11.5 11 110 65
1 5 12.5 12 12.25 123 78
1 6 14.5 12.5 13.5 135 90
1 7 16 13.5 14.75 148 103
1 8 17 14 15.5 155 110
1 9 17.5 14.5 16 160 115
1 10 18 15 16.5 165 120 10.38 21.43
1 11 18.5 15.5 17 170 125
1 12 19 16 17.5 175 130
1 13 19.5 16.5 18 180 135