Plan of Foundation Bar Bending Schedule of Pier Foundation: Ø12 Rings@140c/c P6

The document provides details of the reinforcement bar bending schedule and foundation plan for a pier foundation. It includes information about the number, diameter, length, weight, and layout of reinforcement bars (PF1-PF6) along the bridge axis, across the bridge axis, and around the periphery of the pier foundation. Dimensions of 12,000 mm x 3,550 mm are given for the plan of the foundation.

Uploaded by

Pradip Thapa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views1 page

Plan of Foundation Bar Bending Schedule of Pier Foundation: Ø12 Rings@140c/c P6

The document provides details of the reinforcement bar bending schedule and foundation plan for a pier foundation. It includes information about the number, diameter, length, weight, and layout of reinforcement bars (PF1-PF6) along the bridge axis, across the bridge axis, and around the periphery of the pier foundation. Dimensions of 12,000 mm x 3,550 mm are given for the plan of the foundation.

Uploaded by

Pradip Thapa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

3550

10000

20 @ 100c/c (PF3) along bridge axis

4225 20@100c/c (PF4) across bridge axis

2000
16Ø 6 nos. along the
periphery (PF5)

25@ 100 c/c (PF1) along bridge axis


25@ 100 c/c (PF2) across bridge axis

10000
12000

3550
NOTE :
1. CONC. GRADE 3. STEEL GRADE
a.As specified in the drawing. a.Fe500 is used.

2. CLEAR COVER
a. ABUTMENT CAP - 50 mm
b. BACK WALL - 40mm
c. ABUTMENT - 65 mm

PLAN OF FOUNDATION
BAR BENDING SCHEDULE OF PIER FOUNDATION

Dia. Length Unit Wt.


S.N. Sketch Nos. Weight (Kg.)
(mm) (m) (Kg/m)

PF1 900 11900 900 25 120 13.7 3.858 6342.593

PF2 900 11900 900 25 120 13.7 3.858 6342.593 400

Ø12 Rings@140c/c P6

775
PF3 900 900 20 120 13.7 2.469 4059.259
11900

PF4 20 120 13.7 2.469 4059.259


900 11900 900 M30

DETAILS AT "B"
200 11900
PF5 11900 16 6 48.4 1.580 458.904

3550
1900
CROSS SECTION OF PIER STEM AT X-X
PF6 12 960 2.1 0.889 1792.000
100 100

Total Per Pier Foundation 23054.607