SYSTEM REQUIREMENTS
METHANOL INJECTION
SYSTEM NO. 42-10
P-SR-005
Rev. 1, December 1994
Methanol Injection P-SR-005
Rev. 1, December 1994
CONTENTS
1. FOREWORD 2
2. SCOPE 2
3. NORMATIVE REFERENCES 2
4. DEFINITIONS AND ABBREVIATIONS 2
4.1 Definitions 2
4.2 Abbreviations 2
5. FUNCTIONAL REQUIREMENTS 2
5.1 General 2
5.2 Products/Services 2
5.3 Equipment/Schematic 3
5.4 Performance 3
5.5 Regularity 3
5.6 Process/Ambient Conditions 4
5.7 Operational Requirements 4
5.8 Maintenance Requirements 4
5.9 Isolation and Sectioning 4
5.10 Layout Requirements 4
5.11 Interface Requirements 5
5.12 Commissioning Requirements 5
NORSOK Standard 1 of 5
Methanol Injection P-SR-005
Rev. 1, December 1994
1. FOREWORD
This standard has been developed by the NORSOK Standardisation Work Group.
2. SCOPE
3. NORMATIVE REFERENCES
NORSOK Standard
4.1 Definitions
4.2 Abbreviations
5. FUNCTIONAL REQUIREMENTS
5.1 General
Storage and injection of methanol to prevent and dissolve hydrates in production oil and gas
wells, platform and subsea hydrocarbon systems, and as required in other process
applications.
5.2 Products/Services
Not Applicable.
NORSOK Standard 2 of 5
Methanol Injection P-SR-005
Rev. 1, December 1994
5.3 Equipment/Schematic
Tote Tanks/
Boat Loading
Station Low Press.
Pumping Low Press.
Methanol Distribution
Storage
Low Press.
Pumping
5.4 Performance
5.5 Regularity
5.5.1 Regularity
95 %
5.5.2 Sparing
Sparing pumps.
NORSOK Standard 3 of 5
Methanol Injection P-SR-005
Rev. 1, December 1994
Supply to the system will be industrial grade methanol from tote (transportation) tanks (4
m3) or boat loading connection.
From local common panel and field instruments.Indication of storage tank level shall be
available at tote tank/boat loading station.
Shall be adjustable at pump for low capacity injection pumps.Facilities shall be provided for
rate calibration.
5.10.1 Piping
Piping to storage vessel shall be self draining and without pockets. Distribution piping and
number of flange connections shall be minimized.
Hose couplings shall be unique for service. Location to enable gravity feed to storage
vessel.Tote tank area shall allow direct lifting on/off by platform cranes.
NORSOK Standard 4 of 5
Methanol Injection P-SR-005
Rev. 1, December 1994
5.10.4 Pumps
5.10.5 Safety
Pump skid and storage vessel should be located away from other equipment/systems
containing ignition sources to minimize the risk for escalating explosion/fire hazards.
5.11.1 Water
All drip trays shall be sprayed with water to dilute methanol from spill and leakage.
5.11.2 Nitrogen
None.