Rates of Constrution
Rates of Constrution
Rates of Constrution
General
Contractor's Overhead Expenses 5%
Contractor's Profit 10.0%
VAT 6.0%
Income Tax 7%
Exchange rate 1 US$ = BDT 83.50
Provisional sum for Physical % of Installation 5.0%
Contingencies
Provisional Sum for Price 1.5% of FC and 6% of
Contingencies LC Costs
Provisional Sum for alleviations % of Installation 0.29%
program, refer to SCC, Sub-
Clause xxxxxx
International Transport on EXW 13.5%
Price for Pipes
Local transportation from port to 30.0%
site
CD, VAT and Local Transport for 65.5%
Pipes
Fittings for PE/GRP 15%
Fittings for uPVC 30%
Guarantees
Performance Security % of Installation 0.25%
Advance Payment Guarantee % of Installation 0.25%
Insurances
Cargo Insurance % of Installation 0.375%
Installation All Risks % of Installation 0.375%
Insurance
Third Party Liability Insurance % of Installation 0.375%
Basic Rates
Civil Works
Item Unit Rate (BDT) Remarks
Earthwork Med stiff Clay, 3m cum 186.00
Earthwork Med stiff Clay, 5m cum 226.00
Earthwork Med stiff Clay, 7m cum 346.00
Earthwork Med stiff Clay, 9m cum 426.00
Earth Filling (E/E) cum 149.00
Sand filling (FM: 0.80) cum 635.00
Item Unit Rate (BDT) Remarks
Sand filling (FM: 1.20) cum 913.00
BFS sqm 420.00
CC (1:3:6) cum 6,647.00
CC (1:2:4) cum 7,643.00
Brick work (1:4) cum 6,769.00
RCC (1:2:4) cum 7,517.00
RCC (1:1.5:3) cum 8,521.70
MS Rod (60 grade) kg 82.00
Plaster (1:4) sqm 192.50
Enamel Paint sqm 141.90
Epoxy Paint sqm 978.00
RCC Meter chamber with cover no 1,160.50
Polythene 200 micron sqm 42.00
Shal Bollah m 592.00
Sheet pile sqm 609.00
0.00
Man Power 0.00
Field Supervisor/Manager man day 2,200.00
Supervisor/ Field Engineer man day 1,739.93
Head Operator man day 1,100.00
Asstt. operator man day 605.00
Head Detection/Head Mason man day 1,100.00
Surveyor man day 495.00
Asstt. Surveyor man day 330.00
Technical staff/ Plumber/ Mason/ man day 1,275.95
Social Worker
Skilled labour/ Semi Skilled man day 695.97
technician/ Mud Operator
Ordinary/ Casual Labour man day 463.98
Site security man day 220.00
Driver man day 440.00
Sweeper for Odd Job man day 550.00
0.00
0.00
0.00
0.00
Equipments/ Tools 0.00
Diesel HDD Unit day 0.00
Diesel MMX Unit day 0.00
Hydraulic HDD Unit day 13,200.00
Hydraulic MMX Unit day 0.00
Hydro/ Pipe Burst Machine day 7,700.00
Micro Tunneling day 20,000.00
Hydro Test Machine day 1,540.00
GPR day 1,100.00
Compactor day 1,650.00
Scaffolding sqm 59.17
5-ton capacity truck-fare in Dhaka Trip 1,739.93
city i/c loading, unloading
(mm) (Tk) (Tk) (cum) (Tk) (Tk.) (cum) (Tk) (m) (Tk) (sqm) (Tk) (cum) (Tk) (cum) (Tk)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
GRP Pipe (upto 3.00 meter)
200 m 2,213.00 663.90 2.84 527.31 12.56 0.25 1,380.54 2.79 412.92 0.00 0.00 0.00 0.00 0.55 505.42
250 m 2,923.00 876.90 2.99 556.61 13.82 0.25 1,380.54 2.95 435.86 0.00 0.00 0.00 0.00 0.62 562.33
300 m 3,315.00 994.50 3.15 585.90 15.20 0.25 1,380.54 3.10 458.80 0.00 0.00 0.00 0.00 0.68 620.21
350 m 3,315.00 994.50 3.31 615.20 16.72 0.25 1,380.54 3.26 481.74 0.00 0.00 0.00 0.00 0.74 679.08
400 m 5,043.00 1,512.90 3.47 644.49 16.72 0.25 1,380.54 3.41 504.68 0.00 0.00 0.00 0.00 0.81 738.92
450 m 5,177.40 1,553.22 3.62 673.79 18.39 0.25 1,380.54 3.57 527.62 0.00 0.00 0.00 0.00 0.88 799.75
500 m 7,807.00 2,342.10 3.78 703.08 20.23 0.25 1,380.54 3.72 550.56 0.00 0.00 0.00 0.00 0.94 861.55
600 m 10,104.00 3,031.20 4.10 761.67 22.25 0.25 1,380.54 4.03 596.44 0.00 0.00 0.00 0.00 1.08 988.10
700 m 15,281.00 4,584.30 4.45 826.77 24.48 0.26 1,380.54 4.36 645.77 0.00 0.00 0.00 0.00 1.26 1,150.52
800 m 18,120.00 5,436.00 5.28 982.08 26.92 0.26 1,380.54 5.17 765.16 0.00 0.00 0.00 0.00 1.64 1,499.46
900 m 16,570.65 4,971.20 5.64 1,049.74 29.62 0.26 1,380.54 5.51 815.85 0.00 0.00 0.00 0.00 1.86 1,695.97
1,000 m 18,250.80 5,475.24 6.01 1,118.33 32.58 0.26 1,380.54 5.86 867.03 0.00 0.00 0.00 0.00 2.08 1,900.96
1,050 m 19,930.95 5,979.28 6.18 1,148.55 35.84 0.26 1,380.54 6.02 890.47 0.00 0.00 0.00 0.00 2.17 1,984.95
1,200 m 21,611.10 6,483.33 6.77 1,258.29 39.42 0.27 1,380.54 6.56 970.88 0.00 0.00 0.00 0.00 2.56 2,336.39
1,370 m 23,291.24 6,987.37 7.33 1,362.64 43.36 0.27 1,380.54 7.10 1,051.39 0.00 0.00 0.00 0.00 2.90 2,647.05
1,524 m 24,971.39 7,491.42 7.83 1,457.16 47.70 0.27 1,380.54 7.60 1,124.33 0.00 0.00 0.00 0.00 3.22 2,938.24
1,680 m 26,651.54 7,995.46 8.35 1,552.91 52.47 0.27 1,380.54 8.10 1,198.21 0.00 0.00 0.00 0.00 3.55 3,242.70
1,830 m 28,331.69 8,499.51 8.84 1,644.98 57.71 0.27 1,380.54 8.58 1,269.25 0.00 0.00 0.00 0.00 3.88 3,544.43
GRP_Pipe-A Page: 8
Back filling Site Temp Road Restoration D B
Cost*2 Cost*3 Total cost
cleaning Road cutting
Quantity Cost*1 Quantity Cost*1 Fee to
DCC(2018)
=2020year Std Sand CC Total
(cum) (Tk) (Tk.) (cum) (Tk) (Tk.) (Tk.) (Tk.) Sl
1.71 254.79 5.00 0.54 80.46 5,811.99 3,080.98 2,974.92 11,868.00 3.00 0.15 0.00 3.15 1 0.90
1.76 261.87 5.50 0.57 84.93 6,134.88 3,197.20 3,904.15 13,237.00 3.00 0.15 0.00 3.15 2 0.95
1.80 268.20 6.05 0.60 89.40 6,457.77 3,313.65 4,420.15 14,192.00 3.00 0.15 0.00 3.15 3 1.00
1.84 273.79 6.66 0.63 93.87 6,780.66 3,430.34 4,426.74 14,638.00 3.00 0.15 0.00 3.15 3 1.05
1.87 278.63 6.66 0.66 98.34 7,103.54 3,547.26 6,677.61 17,329.00 3.00 0.15 0.00 3.15 4 1.10
1.90 282.73 7.32 0.69 102.81 7,426.43 3,664.42 6,859.14 17,950.00 3.00 0.15 0.00 3.15 5 1.15
1.92 286.08 8.05 0.72 107.28 7,749.32 3,781.81 10,284.66 21,816.00 3.00 0.15 0.00 3.15 6 1.20
1.95 290.55 8.86 0.78 116.22 8,395.10 4,017.30 13,282.53 25,695.00 3.00 0.15 0.00 3.15 7 1.30
1.96 292.04 9.74 0.84 125.16 9,040.87 4,295.64 20,024.68 33,362.00 3.00 0.18 0.00 3.18 8 1.40
2.15 319.61 10.72 0.99 147.51 10,655.32 4,946.84 23,741.15 39,344.00 3.00 0.20 0.00 3.20 9 1.65
2.10 312.90 11.79 1.05 156.45 11,301.09 5,254.99 21,739.70 38,296.00 3.00 0.23 0.00 3.23 10 1.75
2.04 303.22 12.97 1.11 165.39 11,946.87 5,570.07 23,936.98 41,454.00 3.00 0.25 0.00 3.25 11 1.85
2.00 297.26 14.27 1.14 169.86 12,269.76 5,701.76 26,130.19 44,102.00 3.00 0.25 0.00 3.25 12 1.90
1.85 274.91 15.69 1.23 183.27 13,238.42 6,221.00 28,332.81 47,793.00 3.00 0.30 0.00 3.30 13 2.05
1.62 241.47 17.26 1.33 198.47 14,336.24 6,683.08 30,537.71 51,558.00 3.00 0.30 0.00 3.30 14 2.22
1.37 203.75 18.99 1.42 212.24 15,330.74 7,104.01 32,741.73 55,177.00 3.00 0.30 0.00 3.30 15 2.37
1.06 158.33 20.89 1.52 226.18 16,338.15 7,532.68 34,946.54 58,818.00 3.00 0.30 0.00 3.30 16 2.53
0.72 107.82 22.97 1.61 239.59 17,306.82 7,947.01 37,151.47 62,406.00 3.00 0.30 0.00 3.30 17 2.68
2.61 388.89 5.00 0.54 80.46 5,811.99 3,533.97 2,977.43 12,324.00 4.00 0.15 0.00 4.15 1 0.90
2.71 403.42 5.50 0.57 84.93 6,134.88 3,654.17 3,906.91 13,696.00 4.00 0.15 0.00 4.15 2 0.95
2.80 417.20 6.05 0.60 89.40 6,457.77 3,816.40 4,423.19 14,698.00 4.00 0.15 0.00 4.15 3 1.00
2.89 430.24 6.66 0.63 93.87 6,780.66 3,916.18 4,430.09 15,127.00 4.00 0.15 0.00 4.15 3 1.05
2.97 442.53 6.66 0.66 98.34 7,103.54 4,099.77 6,680.96 17,885.00 4.00 0.15 0.00 4.15 4 1.10
3.05 454.08 7.32 0.69 102.81 7,426.43 4,241.80 6,862.82 18,532.00 4.00 0.15 0.00 4.15 5 1.15
3.12 464.88 8.05 0.72 107.28 7,749.32 4,384.07 10,288.71 22,423.00 4.00 0.15 0.00 4.15 6 1.20
3.25 484.25 8.86 0.78 116.22 8,395.10 4,669.32 13,286.98 26,352.00 4.00 0.15 0.00 4.15 7 1.30
3.36 500.64 9.74 0.84 125.16 9,040.87 5,032.70 20,029.57 34,104.00 4.00 0.18 0.00 4.18 8 1.40
3.80 565.46 10.72 0.99 147.51 10,655.32 5,632.30 23,746.54 40,035.00 4.00 0.20 0.00 4.20 9 1.65
3.85 573.65 11.79 1.05 156.45 11,301.09 5,981.14 21,745.63 39,028.00 4.00 0.23 0.00 4.23 10 1.75
3.89 578.87 12.97 1.11 165.39 11,946.87 6,335.97 23,943.49 42,227.00 4.00 0.25 0.00 4.25 11 1.85
3.90 580.36 14.27 1.14 169.86 12,269.76 6,491.61 26,137.36 44,899.00 4.00 0.25 0.00 4.25 12 1.90
3.90 580.36 15.69 1.23 183.27 13,238.42 7,063.63 28,340.69 48,643.00 4.00 0.30 0.00 4.30 13 2.05
3.84 572.25 17.26 1.33 198.47 14,336.24 7,605.56 30,546.38 52,489.00 4.00 0.30 0.00 4.30 14 2.22
3.74 557.47 18.99 1.42 212.24 15,330.74 8,098.82 32,751.27 56,181.00 4.00 0.30 0.00 4.30 15 2.37
3.59 535.30 20.89 1.52 226.18 16,338.15 8,600.75 34,957.03 59,896.00 4.00 0.30 0.00 4.30 16 2.53
3.40 507.14 22.97 1.61 239.59 17,306.82 9,085.54 37,163.02 63,556.00 4.00 0.30 0.00 4.30 17 2.68
GRP_Pipe-A Page: 9
Iteam Material
Pipe price 1
Boxing 0.57
Shall Ballah 0.60
Steel sheet pile 0.85
Sand bedding 0.69
Local carrying
Earth cutting including of road
Pipe installation
Back filling
Site cleaning
Temporary road restoration
3596.4
Cost*1
(Tk)
11
Per m of Shall
bollah
and
considering 4
times reuse.
412.92
Steel sheet piles CC bedding (Cement Concrete) Sand bedding and topping (S3+S4) Back filling (S2)
1*(Depth-Sand Bedding-Pipe
1*(sand bedding+pipe 0.55*sand filling 1.71*Earth filling (Basic
dia/1000-300/1000-
dia+300/1000)*0.9-pi*Pipe dia2/4) FM 1.2 (Basic D71) 600/1000)*width
D69)
This bedding is used for type B GRP
pipe
1*((.15+200/1000+300/1000)*.9- 1*(3.15-.15-200/1000-
0.55*913=505.42 300/1000- 1.71*149=254.79
pi*(200/1000)2/4)=0.55
600/1000)*0.90=1.71
(Tk.)
26
11867.83
Total including
Material Labour Equipment Total Road cutting
charge
27 28 29 30.00 31.00
9 Sheet pile
21.2 sqm 21.20 609.00
10 Manhole Cover (600mm dia)
1 No. 1.00 5000
11 Aluminium Manhole Steps
11 Nos. 11.00 300
12 Pipes (GRP)
1000 mm 1.9 m
500 mm 0.7 m
300 mm 0.6 m
3.2 m 3.20 7,807.00
Total
Av Depth 4m
Av Depth 6m
This plastic film is used to separate areas, to hold items, or to protect surfaces from paint or per
ngular
Dimensions (m)
24,982.40 24,982.40
281,313.59 225,926.93 37,769.74 18,561.06
tect surfaces from paint or permanent damage. Polyethylene film (poly film) is used in a variety of applications suc
Existing
Bottom Top Slab CC, Thick, Pipe dia, Pipe dia, Pipe dia, Bench Grade Manhole Re bar
Thick, t2 Thick, t3 t4 d1 d2 d3 invert, Thick, dia Spacing
0.300 0.300 0.100 1.000 0.500 0.300 1.100 0.300 0.600 0.200
ety of applications such as packaging, plastic bags, labels, building construction, landscaping, and electrical fabricat
N16
weight E/W
kg/m Clearance
1.579 0.150
ng, and electrical fabrication
0
Analysis of Rates: R.C.C Drop Manhole Rectangular
9 Sheet pile
21.2 sqm 21.20 609.00
10 Manhole Cover (600mm dia)
1 No. 1.00 5000
11 Aluminium Manhole Steps
11 Nos. 11.00 300
12 Pipes (GRP)
1000 mm 1.9 m
500 mm 0.7 m
300 mm 0.6 m
3.2 m 3.20 7,807.00
Av Depth 4m
Av Depth 6m
Rectangular
Dimensions (m)
24,982.40
63,000.00
21,000.00
7,807.00
381,066.60 116,789.40
323,938.52 39,272.79 18,799.44
381,066.60 85% 10% 5%
489,738.83 83% 12% 5%
Existing
Bottom Top Slab CC, Thick, Pipe dia, Pipe dia, Pipe dia, Bench Grade Manhole Re bar
Thick, t2 Thick, t3 t4 d1 d2 d3 invert, Thick, dia Spacing
0.300 0.300 0.100 1.000 0.500 0.300 1.100 0.300 0.600 0.200
N16
weight E/W
kg/m Clearance
1.579 0.150
Case of D200mm GRP Pipes
Unit : mm
1,900
3,150
Sand Backfill (S3) 300
350 350
900
Width=0.9m
Quantity Calculation
S1 = 0.540 m2
S2 = 1.710 m2
S3 = 0.419 m2
S4 = 0.135 m2
Excavation 2.835 m2