SAP Cutover Strategy PDF

The document outlines the plan for migrating SAP systems from one data center to another with the objectives of moving the data center location, refreshing server infrastructure, and adjusting surrounding applications. Key steps include testing transactions on the new servers, backing up the existing system, restoring the backup on the new infrastructure, further testing and cutover, with contingencies to roll back if issues arise. The goal is to transition the live SAP ECC, SRM, Enterprise Portal and PCM systems to the new data center and servers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
366 views6 pages

SAP Cutover Strategy PDF

The document outlines the plan for migrating SAP systems from one data center to another with the objectives of moving the data center location, refreshing server infrastructure, and adjusting surrounding applications. Key steps include testing transactions on the new servers, backing up the existing system, restoring the backup on the new infrastructure, further testing and cutover, with contingencies to roll back if issues arise. The goal is to transition the live SAP ECC, SRM, Enterprise Portal and PCM systems to the new data center and servers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

SAP Migration Strategy

Objective
 Pemindahan Lokasi Data Center , DC CGK  DC Taman Tekno

 Refreshment Infrastruktur Server ,:


• SAP 600,
• SAP SRM,
• SAP Enterprise Portal
• SAP PCM

 Penyesuaian Surrounding Apps SAP


• Fuel Online Garuda
• Human Capital Online
• Citibank Direct Payment
• SCB Direct Payment
• Crew Goods
• Invoice Reader
Migration Requirement
Date PIC Activity Status
1 MII Setup Production Server OK
2 MII Link From DC CGK to DC Taman Tekno OK
3 MII Mapping IP Address Original -> New OK
4 MII Internet Connection to DC Taman Teko OK
5 MII Backup System YTD 16 Mei 2018 OK
6 MII Restore Data YTD 16 Mei 2018 di New Infra OK
7 MII User Testing Critical Transaksi SAP di New Environment OK
8 Asyst Nonaktif Backup Redo-Log On going
Scenario Test
DC Cengkareng
Current Data Position
Production Server

Copy Database
Copy Database Copy delta data
Tgl 16 s/d 19.05.2018 (23.)
DC Taman Tekno

Testing scenario by
user s/d 15.05.18

New Production Server

Done Not started yet


Scenario Migration

Backup & Restore Cut Off Testing


Testing
DB 20 Mei 2018 20 Mei 2018
11 – 15 Mei 2018
16 – 19 Mei 2018 Jam 00.00 Jam 12.00

• Testing Critical Transaction • Full Backup online database • Non aktivasi SAP ECC Production Existing • User melakukan testing di new
by user pada tgl.16 Mei 2018 • Restore delta transaksi database SAP ECC enviroment
• Restore database pada tgl.17 Prod.Taman Tekno • Cut Over
Mei 2018 • Aktivasi SAP ECC Production Taman • Shutdown Old SAP System
Tekno
• Setup surrounding SAP System
• Testing Login SAP ECC Production Taman
Tekno
• Checking integrasi surrounding SAP
System
Roll Back Plan

NO GO ITEM
• Data Tidak konsisten
• User tidak dapat melakukan transaksi di SAP

Toleransi Waktu Roll Back : 20 Mei 2018 , 18.00 WIB

CUT OVER : 21 Mei 2018 , Jam 00.00 WIB