Price Comparison Sheet: KWD 25,500.00 KWD 25,500.00 KWD 25,500.00 KWD 55,500.00 KWD 42,000.00 KWD 27,750.00

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PRICE COMPARISON SHEET

CTP/SCA/B/65001/2020/012-2

Item Description Qty Unit Al Naeem Al Gharby Wael Ibrahim Mohamed Ahmed Hassan Ahmed Jendil & Ali Bairtaq Al Khaleek 4S International

Unit Rate Amount Unit Rate Amount Unit Rate Amount Unit Rate Amount Unit Rate Amount

32 16 00 Curbs & Gutters

32 16 13 29 Precast Concrete Curbs

Workmanship for raised & Sunken Kerbstone (K-


32 16 13 29
1
300) Type 4A and A5. All as per Specification & 15000 m KWD 0.750 11,250.000 KWD 0.750 11,250.000 KWD 0.750 11,250.000 KWD 0.900 13,500.000 KWD 1.200 18,000.000 KWD 1.350 20,250.000
instruction of the engineer.

Ditto - for drain channel and kerbstone 15000 m KWD 0.950 14,250.000 KWD 0.950 14,250.000 KWD 0.950 14,250.000 KWD 0.950 14,250.000 KWD 2.500 37,500.000 KWD 1.450 21,750.000

SUBTOTAL A)
25,500.000 25,500.000 25,500.000 27,750.000 55,500.000 42,000.000
B) Exclusions & adjustments;

- -
Others

SUBTOTAL B) - -

TOTAL (A+B)
KWD 25,500.00 KWD 25,500.00 KWD 25,500.00 KWD 27,750.00 KWD 55,500.00 KWD 42,000.00
For Information: Contact Person Eng. Ebrahim Zakariya Contact Person Wael Ebrahim Contact Person Hassan Ahmed Contact Person Contact Person Contact Person

[Multiple Subcontractors] A directive was take by Head of Contracts to Designation GM Designation Operation Manager Designation Designation Designation

proceed for subject SOW with multiple subcontractors, Hence, 2


Mobile No. 97452001 Mobile No. 60963329 Mobile No. 60666136 Mobile No. Mobile No. Mobile No.
Subcontractors are chosen to perform the job and the 1 Subcontractor shall
be secured as "backup" to use as may require by Project to complete the job
at time. Email. Email. Email. Email. Email.

Remarks Remarks Remarks NEGOTIATIONS Remarks Remarks Remarks

STAGE "BACKUP"
Offer reference & date Position SELECTED Position SELECTED Position Position 2ND LOWEST Position 4TH LOWEST Position 3RD LOWEST

Recommendation Project Manager Riyad Jandali Dept. Manager N.A General Manager Ahmad A/K Al Ibrahim Contracts Department Ali. Ahmed Section Head - Contracts Eng. Adil Khalaf PMO MANAGER M. Radwan

Signature :
Wael Ibrahim Mohamed Ahmed Signature : Signature : Signature : Signature : Signature :
Date : Date : Date : Date : Date : Date :

GM T&SS Eng. Khaldoon Alateeqi Manager Finance Hassan Haidar Serhan CEO/MD Eng. Jamal Al-Houti
Reason to Select: 1. Lowest Quotation, Underbudget

Signature : Signature : Signature :

Date : Date : Date :

CT/P2/PCS/2.0/1216