0% found this document useful (0 votes)
158 views2 pages

VHTS Shop Drawing Log: Design & Build Package 4 - Green Line Underground

The document is a shop drawing log for Design & Build Package 4 of the Green Line Underground project. It lists two shop drawings that have been submitted for review with a status of "C" meaning "SONO", which stands for "Sent Out Not Approved". The log provides details of the shop drawings such as description, submission date, and remarks. It also includes a progress summary showing that no shop drawings have been submitted, approved or rejected to date.

Uploaded by

wagwahkiabathe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
158 views2 pages

VHTS Shop Drawing Log: Design & Build Package 4 - Green Line Underground

The document is a shop drawing log for Design & Build Package 4 of the Green Line Underground project. It lists two shop drawings that have been submitted for review with a status of "C" meaning "SONO", which stands for "Sent Out Not Approved". The log provides details of the shop drawings such as description, submission date, and remarks. It also includes a progress summary showing that no shop drawings have been submitted, approved or rejected to date.

Uploaded by

wagwahkiabathe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

VHTS Shop Drawing Log

Design & Build Package 4 - Green Line Underground


Updated As of 21 Jun 2016,Rev 2

Transmittal Details
Status Code : A=Approved; B=Approved with Comments; C=SONO; D=NOWC; E=Failed/Not Approved; F=Responded/Reviewed/Actioned; U= Under Review
REDCO To PSH PSH To REDCO

Planned Submission
Remarks

Status
Rev. #
# Location Code Doc.Type Station Name Dwg No. Shop Drawing Description. Transmittal Date Transmittal Date

1 General DWG All Stations M008-RGL-ELE-DWG-GD-00001 SHOP DRAWING STATION - Under Plate Form Earth Pit Connection Details 22/Aug/16 C1
(All Stations Typical)

2 General DWG All Tunnels M008-RGL-ELE-DWG-GD-00002 SHOP DRAWING TUNNEL - Tunnel Bonding Details 22/Aug/16 C1
(All Tunnels Typical)

Page No.1 of 2
VHTS Shop Drawing Progress Summary

Updated As of 21 Jun 2016

Under Review
Total Rejected /
Sr.No. Description (No's) Submitted to PSH Balance to go with PSH Approved Resubmission's Remarks

1 VHTS Shop Dwg's/Models 0 0 0 0 0 0

450 120%

400
Submission No.--------->

100%

350

300 80%

250

60%

200

150 40%

100

20%

50

- 0%
Week 3

Week4

Week 1

Week 2

Week4

Week 1

Week 2

Week 3

Week4

Week 1

Week 2

Week 3

Week 3

Week4

Week 1

Week 2

Week 3

Week4

Week 1

Week 2

Week 3

Week4

Week 1

Dec-16Week 2

Week 3
Week 3

Week4

Week 1

Week 2

Week4

Week 1

Week 2

Week 3
Jun-16

Jul-16

Sep-16
Apr-16

May-16

Oct-16

Nov-16
Aug-16

Plan (Periodic) Plan Cumulative Actual (Periodic) Actual Cumulative Plan % (Cumulative) Actual % (Cumulative)