0% found this document useful (0 votes)
62 views1 page

School of Information Technology & Engineering: Lab Assessment-2

This document provides instructions for a software engineering lab assessment due on August 31, 2020. Students are to design and submit two work breakdown structure diagrams for their project - one based on phases and one based on deliverables. The diagrams must be uploaded to the vtop Lab Assessment-2 by the due date.

Uploaded by

MAHENDRA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views1 page

School of Information Technology & Engineering: Lab Assessment-2

This document provides instructions for a software engineering lab assessment due on August 31, 2020. Students are to design and submit two work breakdown structure diagrams for their project - one based on phases and one based on deliverables. The diagrams must be uploaded to the vtop Lab Assessment-2 by the due date.

Uploaded by

MAHENDRA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

School of Information Technology & Engineering

Software Engineering (CSE3001)


Lab Assessment with J-Component Project

Lab Assessment-2:

Note: [Due Date: 31/08/2020, upload in vtop Lab Assessment-2]

1) Design the below mentioned Work Breakdown Structure (WBS) diagrams for your
project.
a. Phase- based structure
b. Deliverable- based structure

************************