600 Assembly Work: 2x + 6y 480
600 Assembly Work: 2x + 6y 480
Fabrications: 4x + 2y ≤ 600
Assembly Work: 2x + 6y ≤ 480
3. GRAPH
(x,y) (x,y)
Fabrications; (0,300) (150,0)
Assmembly Work (0,80) (240,0)
4. What are the feasible points and the equivalent revenue of these points?
Points Coordinates (A, B) Objective Function Total Revenue
NAME:___________________________________ Instructor:__________________
1. Maxwell Manufacturing makes two models of felt tip marking pens. Requirements for
each lot of pens are given below.
GIVEN:
GRAPH
4. What are the feasible points and the equivalent profit of these points?
Points Coordinates Objective Function Total Profit
2.FGR Trucking Co. owns several truck used in hauling crushed stones from three
different plants to three road projects in Pampanga. The contractor in-charge of the
project gives the company the following schedule for next week.
PROJECT Req’t/Week PLANTS Available/week
(truckload) (truckload)
A 1,500 X 1,450
B 1,750 Y 1,600
C 1,400 Z 1,600
Mr. David, the owner of the company figures his cost of transporting from the crushing
plants to each of the road projects are the following.
From/to Project A Project B Project C
Plant X P1,000 P2,000 P 750
Plant Y 1,500 1,750 2,250
Plant Z 2,000 500 1,250
Determine the optimal hauling schedule using VAM. What is the total transportation
costs of the optimal hauling schedule?
TRANSPORTATION TABLEAU:
FROM\TO Project A Project B Project C Supply
Plant X
Plant Y
Plant Z
Demand
IMPROVEMENT INDICES:
ITERATIONS:
FROM\TO Project A Project B Project C Supply
Plant X
Plant Y
Plant Z
Demand
Plant Y
Plant Z
Demand
IMPROVEMENT INDICES:
TOTAL COST:
Source\Destination Quantity Cost/truck Total Cost