600 Assembly Work: 2x + 6y 480

This document contains two optimization problems involving maximizing profit or minimizing costs given constraints. The first problem involves an appliance manufacturer that produces two TV models with constraints on available fabrication and assembly hours. It asks to determine the number of each model to produce to maximize total profit. The second problem involves a trucking company transporting crushed stone between plants and construction projects with constraints on supply and demand. It asks to determine the optimal hauling schedule to minimize total transportation costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
775 views5 pages

600 Assembly Work: 2x + 6y 480

This document contains two optimization problems involving maximizing profit or minimizing costs given constraints. The first problem involves an appliance manufacturer that produces two TV models with constraints on available fabrication and assembly hours. It asks to determine the number of each model to produce to maximize total profit. The second problem involves a trucking company transporting crushed stone between plants and construction projects with constraints on supply and demand. It asks to determine the optimal hauling schedule to minimize total transportation costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

MGTESCIENCE QUIZ1

NAME____________________________CLASS SCHEDULE: __________

PROBLEM 1. An appliance manufacturer produces two models of televisions.


Colored TV and Black n white TV. Both models requires fabrications and
assembly work .Each colored TV uses four hours of fabrication and two hours of
assembly. Each Black and White TV uses two hours of fabrication and six hours
of assembly. There are 600 hours of fabrication available per week and 480
hours of assembly hours per week. Each colored TV contributes P1,200 to profit
and each black and white TV contribute P900 to profits. How many colored TV
and black and white TV must the manufacturer produced to maximize profit?

1. What is the objective function?

Max Profit = 1,200x + 900y

2. What are the constraints?

Fabrications: 4x + 2y ≤ 600
Assembly Work: 2x + 6y ≤ 480

Non-negativity constraint: x,y ≥ 0

3. GRAPH

(x,y) (x,y)
Fabrications; (0,300) (150,0)
Assmembly Work (0,80) (240,0)

4. What are the feasible points and the equivalent revenue of these points?
Points Coordinates (A, B) Objective Function Total Revenue

5. How many of each should be produced to maximize revenue?


Model A:
Model B:
6. What are the slack/surplus variable?
COLLEGE OF BUSINESS AND ACCOUNTANCY
2nd Semester, SY 2010-2011
PRELIMINARY EXAMINATION
YQUANTI SET B

NAME:___________________________________ Instructor:__________________

1. Maxwell Manufacturing makes two models of felt tip marking pens. Requirements for
each lot of pens are given below.

Fliptop Model Tiptop Model Available


Plastic 3 4 36
Ink 5 4 40
Assembly
Molding 5 2 30
Time

The profit for either model is $1000 per lot.

GIVEN:

1. What is the objective function?

2. What are the constraints?

GRAPH
4. What are the feasible points and the equivalent profit of these points?
Points Coordinates Objective Function Total Profit

5. What are the optimal point?

6. What are the slack/surplus variable?

2.FGR Trucking Co. owns several truck used in hauling crushed stones from three
different plants to three road projects in Pampanga. The contractor in-charge of the
project gives the company the following schedule for next week.
PROJECT Req’t/Week PLANTS Available/week
(truckload) (truckload)
A 1,500 X 1,450
B 1,750 Y 1,600
C 1,400 Z 1,600
Mr. David, the owner of the company figures his cost of transporting from the crushing
plants to each of the road projects are the following.
From/to Project A Project B Project C
Plant X P1,000 P2,000 P 750
Plant Y 1,500 1,750 2,250
Plant Z 2,000 500 1,250
Determine the optimal hauling schedule using VAM. What is the total transportation
costs of the optimal hauling schedule?

TRANSPORTATION TABLEAU:
FROM\TO Project A Project B Project C Supply
Plant X

Plant Y

Plant Z
Demand

IMPROVEMENT INDICES:

ITERATIONS:
FROM\TO Project A Project B Project C Supply
Plant X

Plant Y

Plant Z

Demand

FROM\TO Project A Project B Project C Supply


Plant X

Plant Y

Plant Z

Demand

IMPROVEMENT INDICES:

TOTAL COST:
Source\Destination Quantity Cost/truck Total Cost