HARGA DASAR SATUAN UPAH

HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.) Perhari

1. Pekerja (L01) Jam - -


2. Tukang (L02) Jam - -
3. Mandor (L03) Jam - -
4. Operator (L04) Jam - -
5. Pembantu Operator (L05) Jam - -
6. Sopir / Driver (L06) Jam - -
7. Pembantu Sopir / Driver (L07) Jam - -
8. Mekanik (L08) Jam - -
9. Pembantu Mekanik (L09) Jam - -
10. Kepala Tukang (L10) Jam - -
11.
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 -


2 Pasir Beton (Kasar) M01a M3 -
3 Pasir Halus (untuk HRS) M01c M3 -
4 Pasir Urug (ada unsur lempung) M01d M3 -
5 Batu Kali M02 M3 -
6 Agregat Pecah Kasar M3 -
7 Agg. Halus LP A M3 -
8 Agregat Lolos = 1 " M3 -
9 Lolos screen1 ukuran ( 0 - 5) M3 -
10 Lolos screen2 ukuran ( 0 - 5) M3 -
11 Lolos screen2 ukuran ( 5 - 9,5) M3 -
12 Lolos screen2 ukuran ( 9.5 - 19,0) M3 -
13 Filler M05 Kg -
14 Batu Belah / Kerakal M06 M3 -
15 Gravel M07 M3 -
16 Bahan Tanah Timbunan M08 M3 -
17 Bahan Pilihan M09 M3 -
18 Aspal M10 KG -
19 Kerosen / Minyak Tanah M11 LITER -
20 Semen / PC (50kg) M12 Zak -
21 Semen / PC (kg) M12 Kg -
22 Besi Beton M13 Kg -
23 Kawat Beton M14 Kg -
24 Kawat Bronjong M15 Kg -
25 Sirtu M16 M3 -
26 Cat Marka (Non Thermoplas) M17a Kg -
27 Cat Marka (Thermoplastic) M17b Kg -
28 Paku M18 Kg -
29 Kayu Perancah M19 M3 -
30 Bensin M20 LITER -
31 Solar M21 LITER -
32 Minyak Pelumas / Olie M22 LITER -
33 Plastik Filter M23 M2 -
34 Pipa Galvanis Dia. 1.6" M24 Batang -
35 Pipa Porus M25 M' -
36 Agr.Base Kelas A M26 M3 -
37 Agr.Base Kelas B M27 M3 -
38 Agr.Base Kelas C M28 M3 -
39 Agr.Base Kelas S M29 M3 -
40 Geotextile M30 M2 -
41 Aspal Emulsi M31 Kg -
42 Gebalan Rumput M32 M2 -
43 Thinner M33 LITER -
44 Glass Bead M34 Kg -
45 Pelat Rambu (Eng. Grade) M35a BH -
46 Pelat Rambu (High I. Grade) M35b BH -
47 Rel Pengaman M36 M' -
48 Beton K-250 M37 M3 -
49 Baja Tulangan (Polos) U24 M39a Kg -
50 Baja Tulangan (Ulir) D32 M39b Kg -
51 Kapur M40 M3 -
52 Chipping M41 M3 -
53 Chipping (kg) M41kg Kg -
54 Cat M42 Kg -
55 Pemantul Cahaya (Reflector) M43 Bh. -
56 Pasir Urug M44 M3 -
57 Arbocell M45 Kg. -
58 Baja Bergelombang M46 Kg -
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
59 Beton K-125 M47 M3 -
60 Baja Struktur M48 Kg -
61 Tiang Pancang Baja Diameter 400 M49 M' -
Tiang Pancang Baja M49 Kg -
62 Tiang Pancang Beton Pratekan M50 M3 -
63 Kawat Las M51 Dos -
64 Pipa Baja M52 Kg -
65 Minyak Fluks M53 Liter -
66 Bunker Oil M54 Liter -
67 Asbuton Halus M55 Ton -
68 Baja Prategang M56 Kg -
69 Baja Tulangan (Polos) U32 M57a Kg -
70 Baja Tulangan (Ulir) D39 M39c Kg -
71 Baja Tulangan (Ulir) D48 M39d Kg -
72 PCI Girder L=17m M58a Buah -
73 PCI Girder L=21m M58b Buah -
74 PCI Girder L=26m M58c Buah -
75 PCI Girder L=32m M58d Buah -
76 PCI Girder L=36m M58e Buah -
77 PCI Girder L=41m M58f Buah -
78 Beton K-300 M59 M3 -
79 Beton K-175 M60 M3 -
80 Cerucuk M61 M -
81 Elastomer M62 buah -
82 Bahan pengawet: kreosot M63 liter -
83 Mata Kucing M64 buah -
84 Anchorage M65 buah -
85 Anti strpping agent M66 Kg -
86 Bahan Modifikasi M67 Kg -
87 Beton K-500 M68 M3 -
88 Beton K-400 M69 M3 -
89 Ducting (Kabel prestress) M70 M' -
90 Ducting (Strand prestress) M71 M' -
91 Beton K-350 M72 M3 -
92 Multipleks 12 mm M73 Lbr -
93 Elastomer jenis 1 M74a buah -
94 Elastomer jenis 2 M74b buah -
95 Elastomer jenis 3 M74c buah -
96 Expansion Tipe Joint Asphaltic Plug M75d M -
97 Expansion Join Tipe Rubber M75e M -
98 Expansion Join Baja Siku M75f M -
99 Marmer M76 Buah -
100 Kerb Type A M77 Buah -
101 Paving Block M78 Buah -
102 Mini Pile 16x16 M1 -
103 Mini Timber Pile M79 M1 -
104 Expansion Joint Tipe Torma M80 M1 -
105 Strip Bearing M81 Buah -
106 Joint Socket Pile 35x35 M82 Set -
107 Joint Socket Pile 16x16x16 M83 Set -
108 Mikro Pile 16x16x16 M84 M1 -
109 Matras Concrete M85 M2 -
110 Assetilline M86 Botol -
111 Oxygen M87 Botol -
112 Batu Bara M88 Kg -
113 Pipa Galvanis Dia 3" M24a M -
114 Pipa Galvanis Dia 1,5" M24b M -
115 Agregat Pecah Mesin 0-5 mm M91 M3 -
116 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 -
117 Agregat Pecah Mesin 20-30 mm M93 M3 -
118 Joint Sealent M94 Ltr -
119 Cat Anti Karat M95 Lbr -
120 Expansion Cap M96 M3 -
121 Polytene 125 mikron M97 Kg -
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
122 Curing Compound M98 Ltr -
123 Kayu Acuan M99 -
124 Additive M67a jam -
125 Casing M100 M2 -
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA
No. URAIAN KO HP KAP. SEWA KET.
DE ALAT/JAM
(di luar PPN)

1 ASPHALT MIXING PLANT E01 294,0 60,0 T/Jam -


2 ASPHALT FINISHER E02 72,4 10,0 Ton -
3 ASPHALT SPRAYER E03 4,0 850,0 Liter -
4 BULLDOZER 100-150 HP E04 155,0 - - -
5 COMPRESSOR 4000-6500 L\M E05 60,0 5.000,0 CPM/(L/m) -
6 CONCRETE MIXER 0.3-0.6 M3 E06 20,0 500,0 Liter -
7 CRANE 10-15 TON E07 138,0 15,0 Ton -
8 DUMP TRUCK 3.5 TON E08 100,0 3,5 Ton -
9 DUMP TRUCK 10 TON E09 190,0 10,0 Ton -
10 EXCAVATOR 80-140 HP E10 133,0 0,9 M3 -
11 FLAT BED TRUCK 3-4 M3 E11 190,0 10,0 ton -
12 GENERATOR SET E12 180,0 135,0 KVA -
13 MOTOR GRADER >100 HP E13 135,0 10.800,0 - -
14 TRACK LOADER 75-100 HP E14 70,0 0,8 M3 -
15 WHEEL LOADER 1.0-1.6 M3 E15 96,0 1,5 M3 -
16 THREE WHEEL ROLLER 6-8 T E16 55,0 8,0 Ton -
17 TANDEM ROLLER 6-8 T. E17 82,0 8,1 Ton -
18 TIRE ROLLER 8-10 T. E18 100,5 9,0 Ton -
19 VIBRATORY ROLLER 5-8 T. E19 82,0 7,1 Ton -
20 CONCRETE VIBRATOR E20 5,5 25,0 - -
21 STONE CRUSHER E21 220,0 50,0 T/Jam -
22 WATER PUMP 70-100 mm E22 6,0 - - -
23 WATER TANKER 3000-4500 L. E23 100,0 4.000,0 Liter -
24 PEDESTRIAN ROLLER E24 8,8 835,00 Ton -
25 TAMPER E25 4,7 121,00 Ton -
26 JACK HAMMER E26 0,0 1.330,00 - -
27 FULVI MIXER E27 345,0 2.005,00 - -
28 CONCRETE PUMP E28 100,0 8,00 M3 -
29 TRAILER 20 TON E29 175,0 20,00 Ton -
30 PILE DRIVER + HAMMER E30 25,0 2,50 Ton -
31 CRANE ON TRACK 35 TON E31 125,0 35,0 Ton -
32 WELDING SET E32 40,0 250,0 Amp -
33 BORE PILE MACHINE E33 150,0 2.000,0 Meter -
34 ASPHALT LIQUID MIXER E34 5,0 1.000,0 Liter -
35 TRONTON E35 150,0 15,0 Ton -
36 COLD MILLING E36 248,0 1.000,0 m -
37 ROCK DRILL BREAKER E37 3,0 - - -
38 COLD RECYCLER E38 900,0 2.200,0 M -
39 HOT RECYCLER E39 400,0 3,0 M -
40 AGGREGAT (CHIP) SPREADER E40 115,0 3,5 M -
41 ASPHALT DISTRIBUTOR E41 115,0 4.000,0 Liter -
42 SLIP FORM PAVER E42 105,0 2,5 M -
43 CONCRETE PAN MIXER E43 134,0 600,0 Liter -
44 CONCRETE BREAKER E44 290,0 20,0 m3/jam -
45 ASPAHLT TANKER E45 190,0 4.000,0 liter -
46 CEMENT TANKER E46 190,0 4.000,0 liter -
47 CONDRETE MIXER (350) E47 20,0 350,0 liter -
48 VIBRATING RAMMER E48 4,2 80,0 KG -
49 TRUK MIXER (AGITATOR) E49 220,0 5,0 M3 -
50 BORE PILE MACHINE E50 125,0 60,0 CM -
51 CRANE ON TRACK 75-100 TON E51 200,0 75,0 Ton -
52 BLENDING EQUIPMENT E52 50,0 30,0 Ton -
53 ASPHALT LIQUID MIXER E34a 40,0 20.000,0 Liter -
54 BAR BENDER E53 3,0 0,0 0 -
55 BAR CUTTER E54 3,0 0,0 0 -
56 BREAKER E55 80,0 3,0 m3/jam -
57 GROUTING PUMP E56 100,0 15,0 Ton -
58 JACK HIDROLIC E57 3,0 150,0 Ton -
59 MESIN LAS E58 3,0 0,2 Ton -
60 PILE DRIVER LEADER, 75 kw E59 70,0 75,0 kw -
61 PILE HAMMER E60 10,0 0,0 0 -
62 PILE HAMMER, 2,5 Ton E61 1,0 2,5 Ton -
63 STRESSING JACK E62 89,0 15,0 Ton -
64 WELDING MACHINE, 300 A E63 5,0 0,0 0 -
No Jenis Peralatan Satuan Harga

1 Helmet Buah -
2 Rompi Buah -
3 Sepatu Buah -
4 Obat - obatan Buah -
5 Pencegahan covid 19 Set -
( masker,sarung
tangan,handsanitazer,t
empat cuci tangan )
Jumlah -
Overhead ....% -
Jumlah total -
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
…………………………………………………………..
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 2.3.(11) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasang U ditch 60.60.120.6 + cover (gandar 5 ton) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 2,3333 - -


2. Tukang (L02) jam 0,9333 - -
3. Mandor (L03) jam 0,4667 - -

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. - U ditch 60.60.120.6 + cover (gandar 5 ton) M' 1,0000 - -

JUMLAH HARGA BAHAN -

C. PERALATAN
1. Crane jam 0,04016 - -
2. Tamper (E25) jam 1,4458 - -
3. Flat Bed Truck (E11) jam 0,2958 - -
4. Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN -

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) -


E. OVERHEAD & PROFIT 0,0 % x D -
F. HARGA SATUAN PEKERJAAN ( D + E ) -
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
…………………………………………………………..
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 2.3.(10) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasang box culvert BC.80.80.120.11 (gandar 20 ton) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 2,3333 - -


2. Tukang (L02) jam 0,9333 - -
3. Mandor (L03) jam 0,4667 - -

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. - box culvert BC.80.80.120.11 (gandar 20 ton) M' 1,0000 - -

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Crane jam 0,04016 - -
2. Tamper (E25) jam 1,4458 - -
3. Flat Bed Truck (E11) jam 0,2958 - -
4. Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN -

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) -


E. OVERHEAD & PROFIT 0,0 % x D -
F. HARGA SATUAN PEKERJAAN ( D + E ) -
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
…………………………………………………………..
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 2.3.(10)a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasang box culvert BC.100.100.120.12,5 (gandar 20 ton) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 2,3333 - -


2. Tukang (L02) jam 0,9333 - -
3. Mandor (L03) jam 0,4667 - -

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. - box culvert BC.100.100.120.12,5 (gandar 20 ton) M' 1,0000 - -

JUMLAH HARGA BAHAN -

C. PERALATAN
1. Crane jam 0,04016 - -
2. Tamper (E25) jam 1,4458 - -
3. Flat Bed Truck (E11) jam 0,2958 - -
4. Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN -

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) -


E. OVERHEAD & PROFIT 0,0 % x D -
F. HARGA SATUAN PEKERJAAN ( D + E ) -
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-311a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1.(1a) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,0151 0,00 0,00


2. Mandor (L03) Jam 0,0076 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Excavator (E10) Jam 0,0076 0,00 0,00


2. Dump Truck (E09) Jam 0,0861 0,00 0,00
3. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-311a
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1.(1a) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Galian Biasa (dibuang setempat) TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,0151 0,00 0,00


2. Mandor (L03) Jam 0,0076 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Excavator (E10) Jam 0,0076 0,00 0,00


2. Dump Truck (E09) Jam 0,0000 0,00 0,00
3. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.3.(1) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0,0037 0,00 0,00


2. Mandor (L02) jam 0,0009 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Motor Grader (E13) jam 0,0009 0,00 0,00
2. Vibro Roller (E19) jam 0,0005 0,00 0,00
3 Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-511

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.1.(1) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A TOTAL HARGA : 0,00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0,0595 0,00 0,00


2. Mandor (L03) jam 0,0085 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Aggrgat A M26 M3 1,2586 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Wheel Loader (E15) jam 0,0085 0,00 0,00
2. Dump Truck (E09) jam 0,2842 0,00 0,00
3. Motor Grader (E13) jam 0,0043 0,00 0,00
4. Tandem Roller (E17) jam 0,0178 0,00 0,00
5. Water Tanker (E23) jam 0,0141 0,00 0,00
6. Alat Bantu Ls 1,0000 0,00 0,00
7.

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-551
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.5.(1) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Lapis Pondasi Atas Bersemen (Cement Treated Base) (CTB)
TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 1,0542 0,00 0,00
2. Tukang (L02) jam 0,3012 0,00 0,00
3. Mandor (L03) jam 0,1506 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN
1. Semen (M12) Kg 76,8750 0,00 0,00

2 Agregat Kasar (M03) M3 1,2586 0,00 0,00

3 Addetive (Retarder) Lt 0,3844 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1 Wheel Loader E15 jam 0,0244 - 0,00
2 Batching Plant jam 0,0753 - 0,00
3 Dump Truck E09 jam 0,2373 - 0,00
4 Vibrator Roller E19 jam 0,0054 - 0,00
5 Water Tank Truck E23 jam 0,0422 - 0,00
6 Screed Paver E42 jam 0,0096 - 0,00
7 Alat Bantu Ls 1,0000 - 0,00
8

JUMLAH HARGA PERALATAN 0,00


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00
E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
G. HARGA SATUAN PEKERJAAN / M3 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1 (2)(a) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,0021 0,00 0,00


2. Mandor (L03) Jam 0,0004 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Aspal (M10) Kg 0,8487 0,00 0,00


2. Kerosene (M11) liter 0,2060 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Asp. Distributor E41 Jam 0,0002 - 0,00


2. Compressor E05 Jam 0,0002 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-611a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1 (1)(a) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,0021 0,00 0,00


2. Mandor (L03) Jam 0,0004 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Aspal (M10) Kg 0,6790 0,00 0,00


2. Kerosene (M11) liter 0,3708 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Asp. Distributor E41 Jam 0,0002 - 0,00


2. Compressor E05 Jam 0,0002 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-632

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3 (2) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Latasir Kelas B (SS-B) TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,1406 0,00 0,00


2. Mandor (L03) Jam 0,0201 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Pasir Kasar (M01a) M3 0,0139 0,00 0,00


2. Pasir Halus (M01c) M3 0,0139 0,00 0,00
3 Semen (M05) Kg 31,5000 0,00 0,00
4 Aspal (M10) Kg 92,7000 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Wheel Loader E15 Jam 0,0096 - 0,00
2. AMP E01 Jam 0,0201 - 0,00
3. Genset E12 Jam 0,0201 - 0,00
4. Dump Truck E09 Jam 0,0268 - 0,00
5. Asphalt Finisher E02 Jam 0,0290 - 0,00
6. Tandem Roller E17 Jam 0,0238 - 0,00
7 P. Tyre Roller E18 Jam 0,0082 - 0,00
8 Alat Bantu Ls 1,0000 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-635a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3(5a) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Laston Lapis Aus (AC-WC) TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,2008 0,00 0,00


2. Mandor (L03) Jam 0,0201 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Lolos screen2 ukuran ( 9.5 - 19,0) M3 0,2978 0,00 0,00


2. Lolos screen2 ukuran ( 0 - 5) M3 0,3523 0,00 0,00
3 Semen (M05) Kg 9,8700 0,00 0,00
4 Aspal (M10) Kg 62,8300 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Wheel Loader E15 Jam 0,0096 - 0,00
2. AMP E01 Jam 0,0201 - 0,00
3. Genset E12 Jam 0,0201 - 0,00
4. Dump Truck E09 Jam 0,6084 - 0,00
5. Asp. Finisher E02 Jam 0,0137 - 0,00
6. Tandem Roller E17 Jam 0,0135 - 0,00
7 P. Tyre Roller E18 Jam 0,0058 - 0,00
8 Alat Bantu Ls 1,0000 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-635c

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3(5c) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Laston Lapis Aus Perata (AC-WC(L)) TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,2008 0,00 0,00


2. Mandor (L03) Jam 0,0201 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Lolos screen2 ukuran ( 9.5 - 19,0) M3 0,2978 0,00 0,00


2. Lolos screen2 ukuran ( 0 - 5) M3 0,3523 0,00 0,00
3 Semen (M05) Kg 9,8700 0,00 0,00
4 Aspal (M10) Kg 62,8300 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Wheel Loader E15 Jam 0,0096 - 0,00
2. AMP E01 Jam 0,0201 - 0,00
3. Genset E12 Jam 0,0201 - 0,00
4. Dump Truck E09 Jam 0,6084 - 0,00
5. Asp. Finisher E02 Jam 0,0137 - 0,00
6. Tandem Roller E17 Jam 0,0135 - 0,00
7 P. Tyre Roller E18 Jam 0,0058 - 0,00
8 Alat Bantu Ls 1,0000 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-636a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3(6a) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Laston Lapis Antara (AC-BC) TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,2008 0,00 0,00


2. Mandor (L03) Jam 0,0201 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Lolos screen2 ukuran ( 9.5 - 19,0) M3 0,3481 0,00 0,00


2. Lolos screen2 ukuran ( 0 - 5) M3 0,3127 0,00 0,00
3 Semen (M05) Kg 9,4500 0,00 0,00
4 Aspal (M10) Kg 57,6800 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Wheel Loader E15 Jam 0,0096 - 0,00
2. AMP E01 Jam 0,0201 - 0,00
3. Genset E12 Jam 0,0201 - 0,00
4. Dump Truck E09 Jam 0,6084 - 0,00
5. Asphalt Finisher E02 Jam 0,0110 - 0,00
6. Tandem Roller E17 Jam 0,0108 - 0,00
7 P. Tyre Roller E18 Jam 0,0046 - 0,00
8 Alat Bantu Ls 1,0000 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-636c

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3(6c) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Laston Lapis Antara Perata (AC-BC(L)) TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0,2008 0,00 0,00


2. Mandor (L03) Jam 0,0201 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Lolos screen2 ukuran ( 9.5 - 19,0) M3 0,3481 0,00 0,00


2. Lolos screen2 ukuran ( 0 - 5) M3 0,3127 0,00 0,00
3 Semen (M05) Kg 9,4500 0,00 0,00
4 Aspal (M10) Kg 57,6800 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN
1. Wheel Loader E15 Jam 0,0096 - 0,00
2. AMP E01 Jam 0,0201 - 0,00
3. Genset E12 Jam 0,0201 - 0,00
4. Dump Truck E09 Jam 0,6084 - 0,00
5. Asphalt Finisher E02 Jam 0,0110 - 0,00
6. Tandem Roller E17 Jam 0,0108 - 0,00
7 P. Tyre Roller E18 Jam 0,0046 - 0,00
8 Alat Bantu Ls 1,0000 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-717a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (7) a PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN :Beton mutu sedang fc’= 20 MPa TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0,8032 0,00 0,00


2. Tukang (L02) jam 0,9036 0,00 0,00
3. Mandor (L03) jam 0,1004 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Semen (M12) Kg 422,3000 0,00 0,00


2. Pasir beton (M01a) M3 0,5412 0,00 0,00
3. Agregat Kasar (M03) M3 0,7440 0,00 0,00
4. Kayu Perancah (M19) M3 0,00 0,00
5. Paku (M18) Kg 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Con Pan. Mixer E43 jam 0,1004 - 0,00


2. Truck Mixer E49 jam 0,4222 - 0,00
3. Water Tanker E23 jam 0,0382 - 0,00
4. Alat Bantu Ls 1,0000 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-717b

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (7) b PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN :Beton mutu sedang fc’= 20 MPa ( site mix ) TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1,3655 0,00 0,00


2. Tukang (L02) jam 1,3655 0,00 0,00
3. Mandor (L03) jam 0,6827 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Semen (M12) Kg 422,3000 0,00 0,00


2. Pasir beton (M01a) M3 0,5412 0,00 0,00
3. Agregat Kasar (M03) M3 0,7440 0,00 0,00
4. Kayu Perancah (M19) M3 0,00 0,00
5. Paku (M18) Kg 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Conc. Mixer E06 jam 0,6827 - 0,00


2. Water Tanker E23 jam 0,0382 - 0,00
3. Alat Bantu Ls 1,0000 - 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D -
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-731

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN :Baja Tulangan U 24 Polos TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0,1050 0,00 0,00


2. Tukang (L02) jam 0,0350 0,00 0,00
3. Mandor (L03) jam 0,0350 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Baja Tulangan (Polos) U24 (M39a) Kg 1,1000 0,00 0,00


2. Kawat Beton (M14) Kg 0,0025 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-733

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (3) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN :Baja Tulangan U 32 Ulir TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0,1050 0,00 0,00


2. Tukang (L02) jam 0,0350 0,00 0,00
3. Mandor (L03) jam 0,0350 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Baja Tulangan (Ulir) U32 (M39b) Kg 1,1000 0,00 0,00


2. Kawat Beton (M14) Kg 0,0200 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-736

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (6) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN :Anyaman Kawat Yang Dilas (Welded Wire Mesh)
TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0,2100 0,00 0,00


2. Tukang (L02) jam 0,0700 0,00 0,00
3. Mandor (L03) jam 0,0350 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Baja Tulangan (M57c) Kg 1,1000 0,00 0,00


2. Kawat Beton (M14) Kg 0,0200 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-7110

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (10) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN :Beton mutu rendah fc’= 10 Mpa TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1,3655 0,00 0,00


2. Tukang (L02) jam 1,3655 0,00 0,00
3. Mandor (L03) jam 0,6827 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Semen (M12) Kg 311,0600 0,00 0,00


2. Pasir beton (M01a) M3 0,5113 0,00 0,00
3. Agregat Kasar (M03) M3 0,9053 0,00 0,00
4 Kayu Perancah (M19) M3 0,0000 0,00 0,00
5 Paku (M18) Kg 0,0000 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Conc. Mixer E06 jam 0,6827 - 0,00


2. Water Tanker E23 jam 0,0382 - 0,00
3. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-716

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (6) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN :Beton mutu sedang fc’= 25 Mpa TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0,8032 0,00 0,00


2. Tukang (L02) jam 1,1044 0,00 0,00
3. Mandor (L03) jam 0,1004 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Semen (M12) Kg 469,6800 0,00 0,00


2. Pasir beton (M01a) M3 0,5097 0,00 0,00
3. Agregat Kasar (M03) M3 0,7440 0,00 0,00
4. Kayu Perancah (M19) M3 0,00 0,00
5. Paku (M18) Kg 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Con Pan Mixer (E43) jam 0,1004 0,00 0,00


2. Truck Mixer (E49) jam 0,4222 0,00 0,00
3. Water Tanker (E23) jam 0,0382 0,00 0,00
4. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-791

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.9.(1) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Pasangan Batu TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 3,8554 0,00 0,00


2. Tukang (L02) jam 0,9639 0,00 0,00
3. Mandor (L03) jam 0,4819 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Batu Kali (M02) M3 1,1700 0,00 0,00


2. Semen (PC) (M12) Kg 176,0000 0,00 0,00
3. Pasir (M01) M3 0,5088 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Conc. Mixer (E06) jam 0,4819 0,00 0,00


2. Water Tanker (E23) jam 0,0014 0,00 0,00
3. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-842

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(2) PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0,6000 0,00 0,00


2. Tukang (L02) jam 0,2250 0,00 0,00
3. Mandor (L03) jam 0,0750 0,00 0,00

JUMLAH HARGA TENAGA 0,00

B. BAHAN

1. Cat Marka (M17a) Kg 1,9500 0,00 0,00


2. Thinner (M33) Liter 1,0500 0,00 0,00
3. Blass Bit (M34) Kg 0,4500 0,00 0,00

JUMLAH HARGA BAHAN 0,00

C. PERALATAN

1. Compressor E05 Jam 0,0750 - 0,00


2. Dump Truck E08 Jam 0,0750 - 0,00
3. Alat Bantu Ls 1,0000 0,00 0,00

JUMLAH HARGA PERALATAN 0,00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0,00


E. OVERHEAD & PROFIT 0,0 % x D 0,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0,00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )

A.2.3.1.9 1 m3 Pengurugan kembali galian tanah


Tenaga
Pekerja / Buruh tak terlatih oh 0,5000 - -
Mandor oh 0,0500 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.2.3.1.11 1 m3 Pengurugan dengan pasir urug


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,3000 - -
Mandor L.04 oh 0,0100 - -
Bahan
Pasir urug m3 1,2000 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.2.3.1.14 1 m3 Pengurugan sirtu padat


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,2500 - -
Mandor L.04 oh 0,0250 - -
Bahan
Sirtu Urug kg 1,2000 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.2.3.1.14a 1 m3 Pengurugan tanah


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,2500 - -
Mandor L.04 oh 0,0250 - -
Bahan
Tanah urug kg 1,2000 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.4.1.2 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 pp


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,6000 - -
Tukang batu L.02 oh 0,2000 - -
Kepala Tukang L.03 oh 0,0200 - -
Mandor L.04 oh 0,0300 - -
Bahan
Batu Bata / Merah m3 140,0000 - -
PC / Portland cement kg 32,9500 - -
Pasir pasang / beton m3 0,0910 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.4.1.8 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 pp


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,3000 - -
Tukang batu L.02 oh 0,1000 - -
Kepala Tukang L.03 oh 0,0100 - -
Mandor L.04 oh 0,0150 - -
Bahan
Batu Bata / Merah m3 70,0000 - -
PC / Portland cement kg 14,3700 - -
Pasir pasang / beton m3 0,0400 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.4.2.2 1 m2 Pemasangan plesteran 1 sp : 2 pp tebal 15 mm


Tenaga
Pekerja / Buruh tak terlatih oh 0,3000 - -
Tukang batu oh 0,1500 - -
Kepala Tukang oh 0,0150 - -
Mandor oh 0,0150 - -
Bahan
PC / Portland cement kg 10,2240 - -
Pasir pasang / beton m3 0,0200 - -
- - - -
Overhead dan profit - - - - -
- - - -
A.4.4.2.26 1 m2 Pemasangan finishing siar pasangan batu kali, campuran 1 sp : 2 pp
Tenaga
Pekerja / Buruh tak terlatih oh 0,3000 - -
Tukang batu oh 0,1500 - -
Kepala Tukang oh 0,0150 - -
Mandor oh 0,0150 - -
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Bahan
PC / Portland cement kg 6,3400 - -
Pasir pasang / beton m3 0,0120 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.4.2.27 1 m2 Pemasangan acian


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,2000 - -
Tukang batu L.03 oh 0,1000 - -
Kepala Tukang L.03 oh 0,0100 - -
Mandor L.04 oh 0,0100 - -
Bahan
PC / Portland cement kg 3,2500 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.4.3.63c 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K225


Tenaga
Tukang batu Oh 0,0600 - -
Pekerja / Buruh tak terlatih Oh 0,2000 - -
Bahan
Paving Stone abu - abu t= 6 cm, K225 M2 1,1000 - -
Pasir pasang / beton M3 0,0350 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur , 1 lapis dasar , 2 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,0200 - -
Tukang cat L.02 oh 0,0630 - -
Kepala Tukang L.03 oh 0,0063 - -
Mandor L.04 oh 0,0030 - -
Bahan
Plamur Tembok Kg 0,1000 - -
Cat Tembok Kg 0,1000 - -
Cat Tembok Kg 0,2600 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.7.1.16 1 m2 Pengecatan permukaan baja dengan menie besi


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,0200 - -
Tukang cat L.02 oh 0,2000 - -
Kepala Tukang L.03 oh 0,0200 - -
Mandor L.04 oh 0,0025 - -
Bahan
Meni besi M2 0,1000 - -
Lem ( Kayu + Tembok ) Kg 0,0100 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.4.2.22 1 m2 Pemasangan plesteran traso 1 sp : 2 traso tebal 1 cm


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,4500 - -
Tukang batu L.03 oh 0,2250 - -
Kepala Tukang L.03 oh 0,0230 - -
Mandor L.04 oh 0,0230 - -
Bahan
PC / Portland cement kg 10,0000 - -
Batu teraso kg 15,0000 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.4.3.43f 1 m2 Pemasangan lantai batu candi hitam


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,7000 - -
Tukang batu L.02 oh 0,3500 - -
Kepala Tukang L.03 oh 0,0350 - -
Mandor L.04 oh 0,0350 - -
Bahan
Batu candi hitam m2 1,0600 - -
PC / Portland cement kg 8,1900 - -
Pasir pasang / beton m3 0,0450 - -
Semen Putih / warna kg 0,6500 - -
- - - -
Overhead dan profit - - - - -
- - - -
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
A.4.4.3.43d 1 m2 Pemasangan lantai batu andesit hijau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0,7000 - -
Tukang batu L.02 oh 0,3500 - -
Kepala Tukang L.03 oh 0,0350 - -
Mandor L.04 oh 0,0350 - -
Bahan
Batu Andisit Hijau m2 1,0600 - -
PC / Portland cement kg 8,1900 - -
Pasir pasang / beton m3 0,0450 - -
Semen Putih / warna kg 0,6500 - -
- - - -
Overhead dan profit - - - - -
- - - -

A.4.7.1.21b 1 m2 Couttting ( Glasur batu alam )


Tenaga
Tukang cat Oh 0,0750 - -
Kepala Tukang Oh 0,0080 - -
Pekerja / Buruh tak terlatih Oh 0,0500 - -
Mandor Oh 0,0030 - -
Bahan
Coatting Ltr 0,3500 - -
HCL / air keras Ltr 0,1600 - -
- - - -
Overhead dan profit - - - - -
- - - -
DAFTAR HARGA SATUAN UPAH TH 2020

PROPINSI : JAWA TIMUR


KABUPATEN : TULUNGAGUNG

NO. URAIAN KODE UPAH/HARI


(Rp)

1 Mandor L 061

2 Mekanik terlatih L 071

3 Mekanik semi terlatih L 072

4 Kepala tukang L 073

5 Tukang L 079

6 Operator terlatih L 081

7 Operator semi terlatih L 082

8 Pembantu operator L 083

9 Sopir L 091

10 Pembantu sopir L 099

11 Buruh tak terlatih L 101

12 Buruh semi terlatih L 103

13 Buruh terlatih L 106


DAFTAR HARGA SATUAN BAHAN/ MATERIAL
TAHUN 2020

PROPINSI : JAWA TIMUR


KABUPATEN : TULUNGAGUNG

NO. URAIAN KEGIATAN SAT Vol KODE HARGA KETERANGAN


1 2 3 4 5 6

II BAHAN BANGUNAN
1 Batu quary/ batu besar (uk.Crussher) m3 M 010
2 Batu split 10 - 15 cm (15 - 20 ) m3 M 020
3 Batu split 8 - 10 cm m3 M 021
4 Batu split 5 - 7 cm m3 M 022
5 Batu spilt 3 - 5 cm m3 M 023
6 Batu split 2 - 3 cm m3 M 024
7 Batu split 1 - 2 cm m3 M 025
8 Batu split 0,5 - 1 cm m3 M 026
9 Agregat halus/pasir bersih m3 M 041
10 Bahan timbunan/sirtu m3 M 040
11 Sirtu royalti m3 MR 042
12 Pasir Urug m3 MR 012
13 Tanah Urug m3 M 050
14 Batu putih/gunung m3
15 Batu putih pecah 5 - 7 m3
16 Batu marmo biasa m2
17 Batu marmo warna m2
18 Batu ampyangan kg
19 Kapur batu m3 M 081
20 Batu merah biji
21 Portland cement (dalam kantong) 40 Kg Zak M 080
22 Portland cement (dalam kantong) 50 Kg Zak M 080
23 Semen putih 40 kg zak
24 Baja ayaman brojong/kawat galfano kg M 162
25 Besi beugel/ baut kg M 163
26 Baja struktur/ besi gelagar baja profil kg M 165
27 Baja, paku-paku jembatan, besi beton kg M 166
28 Besi plat kg
29 Baja siku kg
30 Tulangan beton / Tulangan baja dan kawat baja kg M 167
31 Kawat tali beton kg
32 Paku kg
33 Bitumen asphalt (kemas) kg M 061
34 Aspal curah kg
35 Kerosine liter M 065
36 Solar liter M 183
37 Premium liter M 184
38 Minyak pelumas liter M 185
39 Gemuk/setempet kg
40 Cat Besi kg M 090
41 Minyak cat /Thiner B liter
42 Thinier (primer) / Thiner A liter
43 Meny kayu kg
NO. URAIAN KEGIATAN SAT Vol KODE HARGA KETERANGAN
1 2 3 4 5 6
44 Meny besi kg
45 Cat term kg
46 Glass bird kg
47 Cat tembok kg
48 Cat mengkilap EMCO kg
49 Plamur tembok kg
50 Kuas 4" biji
51 Patok bambu ori / dolken btg
52 Sesek / betek m2
53 Paving stone abu-abu tebal 8 cm K. 225 m2
54 Paving stone berwarna tebal 8 cm K. 225 m2
55 Paving stone abu-abu tebal 6 cm K. 225 m2
56 Paving stone berwarna tebal 6 cm K. 225 m2
57 Paving stone abu-abu tebal 8 cm K. 300 m2
58 Gorong-gorong beton pipa D.20 cm m'
( tp tulangan )
59 Gorong-gorong beton pipa Ф.30 cm m'
( tp tulangan )
60 Gorong-gorong beton pipa Ф.40 cm m'
( tp tulangan )
61 Gorong-gorong beton pipa Ф.50 cm m'
( tp tulangan )
62 Gorong-gorong beton pipa Ф 60 cm m' M 031
( tp tulangan )
63 Gorong-gorong beton pipa Ф 80 cm m' M 033
( tp tulangan )
64 Gorong-gorong beton pipa100 cm m' M 035
( tp tulangan )
65 Alat-alat kerja set M 170
66 Kertas gosok lb
67 Skampal biji
68 Rambu lalu lintas stel
69 Kayu bakar m3
70 Vernis Liter
71 Acuan dari kayu/kayu begesting m3 M 180
72 Solar industri Lt
73 Minyak tanah industri Lt
74 Cikrak bh
75 Keranjang bh
76 Timba cor bh
77 Pacul bh
78 Ganco bh
79 Sekrop bh
80 Arang kg
81 Batu andesit hitam m2
82 Keramik (CENTRO SS1) m2
83 Keramik pola (ASTREA STONE) m2
84 Keramik putih ukuran 30 x 30 m2
85 Granit motif 60 x 60 m2
86 Coatting ltr
87 HCL ( air keras ) ltr
NO. URAIAN KEGIATAN SAT Vol KODE HARGA KETERANGAN
1 2 3 4 5 6

III BAHAN PIPA


1 Pipa Galvanis Ф1,5 " tebal 0,8 mm m'
2 Pipa Galvanis Ф 2 " tebal 0,8 mm m'
3 Pipa Galvanis Ф 2,5 " tebal 0,8 mm m'
4 Pipa Galvanis Ф 3 " tebal 0,8 mm m'
5 Pipa Galvanis Ф 4 " tebal 0,8 mm m'
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT LAPIS PENETRASI/PERMUKAAN MACADAM 50 mm
PERENCANAAN JALAN LOKAL LAPEN ( MENGGUNAKAN BURUH ) K. 618
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES ANGGAPAN
1. Semprotkan aspal tack coat 0,8/ 1. Menggunakan tenaga buruh
m3 2. Agregat pecah tersaring dikirim kelokasi pekerjaan oleh Pemasok
2. Hamparkan agregat kasar 20 m2/ 3. Digunakan agregat pecah tersaring yang murah (agregat kasar < 50mm,agregat pengunci <
m3 25 mm) ( agregat penutup < 12,5 mm)
3. Digilas dan dipadatkan dengan 4. Agregat dimuat ulang ketruck dg tenaga manusia dan dihamparkan dg mesin penghampar agregat
mesin gilas roda baja 8 - 10 ton 5. Tebal padat perkerasan 5 cm
4. Semprotkan aspal (4,81/m2) 6. Pen Mac sesuai rev. Spek Umum B.M 89 - Buku 3
5. Hamparkan lapis seal dg 12,5
chip 80 m2/m3 & cutback 1,251/
m2.

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P Mandor 2,00 3 L 061 6,00 -
E Operator terlatih 2,00 3 L 081 6,00 -
K Pembantu operator 2,00 3 L 083 6,00 -
E Sopir terlatih 1,00 3 L 091 3,00 -
R Pembantu sopir 1,00 3 L 099 3,00 -
J Buruh tak terlatih 66,00 3 L 101 198,00 -
A Buruh terlatih 2,00 3 L 106 6,00 -

PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A Batu pecah 3 - 5 cm m3 M 023 56,00 -
T Batu pecah 2 - 3 cm m3 M 024 31,11 -
E Batu pecah 1 - 2 cm m3 M 025 15,55 -
R Pasir m3 M 041 3,50 -
I Aspal kg M 061 6.270,00 -
A Minyak bakar lt M 065 450,00 -
L Alat bantu ( set @ 3 alat ) set M 170 8,16 -
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R Mesin gilas 3 roda 6 - 8 ton 1,00 3 E 080 15 -
A Mesin penyemprot aspal 1000 lt 1,00 3 E 153 15 -
L Truck bak terbuka 3,5 ton/115 HP 1,00 3 E 221 15 -
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 1.400,00 SATUAN : M2 HARGA SATUAN Rp. - PER M2


OVERHEAD ……...% -
JUMLAH Rp. - PER M2
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT ACUAN UNTUK BETON STRUKTUR
PERENCANAAN JALAN LOKAL ( MENGGUNAKAN BURUH ) K.710
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES ANGGAPAN
1. Pengadaan bahan oleh pemasok1. Kelompok tukang kayu memasang 20 m2 dalam 1 hari
2 Tukang kayu memotong dan 2. 1/3 material dapat dipakai kembali
membuat acuan/perancah 3. Pengadaan bahan oleh leveransir
3 Tukang kayu membongkar acuan/4. Untuk 1 m3 beton dipakai 20 lbr polywood uk. ( 120 x 240 x 1.75cm)
4 perancah setelah beton cukup kuat
5. Tukang kayu membongkar acuan
Kel. Tukang kayu membersihkan
acuan untuk dipakai kembali

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Kepala tukang 1,00 1 L 073 1,00 - -
K Tukang 4,00 1 L 079 4,00 - -
E Buruh tak terlatih 7,00 1 L 101 7,00 - -
R Buruh semi terampil 3,00 1 L.103 3,00 - -
J
A -

PEKERJA -
MATERIAL VOLUME KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M SATUAN VOLUME (Rp.) (Rp.) (Rp.)
A
T Paku kg - 4,00 - -
E Kayu begesting m3 M.180 0,60 - -
R Alat bantu ( set @ 3 alat ) set M.170 0,56 - -
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 20,00 SATUAN : M2 HARGA SATUAN Rp. - PER M3


OVERHEAD ……...% -
JUMLAH Rp. - PER M3
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT MEMBENTUK BAHU JALAN EX GALIAN
PERENCANAAN JALAN LOKAL ( MENGGUNAKAN BURUH ) K. 410
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES ANGGAPAN
1. Material timbunan ditebar 1. Menggunakan tenaga orang ( 60 m3/hari )
dengan tenaga manusia 2. Material timbunan pilihan setebal 10 cm per lapis untuk bahu jalan sebesar 1,5 m
2. Memadatkan bahu jalan dg 3. Supplier menimbun material urugan pada sepanjang bahu jalan
mesin gilas roda baja. 4. Material disebarkan dengan tenaga manusia
5. Pemadatan dengan mesin gilas roda baja

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)

P Mandor 1,00 2 L 061 2,00 - -


E Operator terlatih 1,00 2 L 081 2,00 - -
K Buruh tak terlatih 30,00 2 L 101 60,00 - -
E
R
J
A

PEKERJA -
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
M SATUAN (Rp.) (Rp.) (Rp.)
A
T Alat bantu ( set @ 3 alat ) 1,65 set M 170 - -
E
R
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R Vibrator Roller 1 ton 1,00 2 E 087 10 - -
A
L
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 120,00 SATUAN : M3 HARGA SATUAN Rp. - PER M3


OVERHEAD ...% -
JUMLAH Rp. - PER M3
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT MEMBENTUK BAHU JALAN
PERENCANAAN JALAN LOKAL ( MENGGUNAKAN BURUH ) K. 410
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES ANGGAPAN
1. Material timbunan ditebar 1. Menggunakan tenaga orang ( 60 m3/hari )
dengan tenaga manusia 2. Material timbunan pilihan setebal 10 cm per lapis untuk bahu jalan sebesar 1,5 m
2. Memadatkan bahu jalan dg 3. Supplier menimbun material urugan pada sepanjang bahu jalan
mesin gilas roda baja. 4. Material disebarkan dengan tenaga manusia
5. Pemadatan dengan mesin gilas roda baja

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)

P Mandor 1,00 2 L 061 2,00 - -


E Operator terlatih 1,00 2 L 081 2,00 - -
K Buruh tak terlatih 30,00 2 L 101 60,00 - -
E
R
J
A

PEKERJA -
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
M SATUAN (Rp.) (Rp.) (Rp.)
A
T Alat bantu ( set @ 3 alat ) 1,65 set M 170 - -
E Material Timbunan 144,00 m3 M 050 - -
R
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R Vibrator Roller 1 ton 1,00 2 E 087 10 - -
A
L
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 120,00 SATUAN : M3 HARGA SATUAN Rp. - PER M3


OVERHEAD .....% -
JUMLAH Rp. - PER M3
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT GALIAN TANAH KERAS BERBATU
PERENCANAAN JALAN LOKAL ( MENGGUNAKAN BURUH ) K. 224
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :
1. Digali dengan tenaga manusia 1. Menggunakan tenaga manusia
2. Membuang tanah galian sejauh2. Kapasitas kerja per orang 1.3 m3/hari
30 m dari lubang galian 3. Kedalaman rata-rata galian s/d 3 m
4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Mandor 1,00 1 L 061 1,00 - -
K Buruh tak terlatih 30,00 1 L 101 30,00 - -
E -
R UPAH 2 X
J
A

PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T
E
R Alat bantu ( set @ 3 alat ) set M 170 1,20 - -
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) -

VOLUME 40,00 SATUAN : M3 HARGA SATUAN Rp. - PER M3


OVERHEAD .....% -
JUMLAH Rp. - PER M3
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT GALIAN TANAH UNTUK KONSTRUKSI
PERENCANAAN JALAN LOKAL ( MENGGUNAKAN BURUH ) K. 224
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :
1. Digali dengan tenaga manusia 1. Menggunakan tenaga manusia 40M3/HARI
2. Membuang tanah galian sejauh2. Kapasitas kerja per orang 1.3 m3/hari
30 m dari lubang galian 3. Kedalaman rata-rata galian s/d 3 m
4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Mandor 1,00 1 L 061 1,00 - -
K Buruh tak terlatih 30,00 1 L 101 30,00 - -
E
R
J
A

PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T
E
R Alat bantu set M 170 1,20 - -
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) -

VOLUME 40,00 SATUAN : M3 HARGA SATUAN Rp. - PER M3


OVERHEAD ....% -
JUMLAH Rp. - PER M3
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT PASANG BATU TEPI 15 / 20 CM BOW G2
PERENCANAAN JALAN LOKAL DPUL
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E
K Mandor 0,075 1 L 061 0,075 - -
E Pekerja 1,500 1 L 101 1,500 - -
R -
J
A

Upah : 1 m' = 1/30 PEKERJA -


MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T Batu belah m3 M 020 0,036 - -
E
R
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) -

VOLUME 1,00 SATUAN : M' HARGA SATUAN Rp. - PER M'


OVERHEAD .....% -
JUMLAH Rp. - PER M'
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT KONSTRUKSI LAPIS PONDASI BAWAH (LPB) -Kontruksi Telford
PERENCANAAN JALAN LOKAL ( MENGGUNAKAN BURUH ) K. 516
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

URAIAN ANGGAPAN
1. Material disiapkan di lokasi 1. Menggunakan tenaga manusia
pekerjaan. 2. Material-material dikirim ke lokasi pekerjaan oleh suplier
2. Menghampar pasir setebal 3. Batu sudah dipecah
5 cm 4. Tanah dasar sudah disiapkan.
3. Batu pecah berukuran besar 5. Produksi 200 m3 / 3 hari
(10-15 cm) disusun berdiri
4. Batu pecah yang berukuran
kecil mengisi rongga diatasnya
sehingga rata kemudian dipadat-
kan/digilas dengan mesin gilas
setiap lapis dgn tebal max 5 cm
PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P Mandor 1,00 3 L 061 3,00 - -
E Operator terlatih 1,00 3 L 081 3,00 - -
K Buruh tak terlatih 48,00 3 L 101 144,00 - -
E
R
J
A

PEKERJA -
MATERIAL JUMLAH SATUAN KODE HARGA SATUAN BIAYA SUB TOTAL
M (Rp.) (Rp.) (Rp.)
A
T Batu pecah 10 - 15 cm 180,00 m3 M 020 - -
E Batu pecah 5 - 7 cm 40,00 m3 M 022 - -
R Pasir 70,00 m3 M 041 - -
I Alat bantu ( set @ 3 alat ) 1,75 set M 170 - -
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R Mesin gilas roda besi 1,00 3 E 080 15 - -
A
L
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 200,00 SATUAN : M3 HARGA SATUAN Rp. - PER M3


OVERHEAD ....% -
JUMLAH Rp. - PER M3
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT PASANG BATU TEPI BATU PUTIH BOW G2
PERENCANAAN JALAN LOKAL DPUL
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E
K Mandor 0,075 1 L 061 0,075 - -
E Pekerja 1,500 1 L 101 1,500 - -
R -
J
A

Upah : 1 m' = 1/30 PEKERJA -


MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T Batu putih m3 0,036 - -
E
R
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) -

VOLUME 1,00 SATUAN : M' HARGA SATUAN Rp. - PER M'


OVERHEAD ....% -
JUMLAH Rp. - PER M'
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT KONSTRUKSI LAPIS PONDASI BAWAH (LPB) -Kontruksi Telford Batu Putih
PERENCANAAN JALAN LOKAL ( MENGGUNAKAN BURUH ) K. 516
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

URAIAN ANGGAPAN
1. Material disiapkan di lokasi 1. Menggunakan tenaga manusia
pekerjaan. 2. Material-material dikirim ke lokasi pekerjaan oleh suplier
2. Menghampar pasir setebal 3. Batu sudah dipecah
5 cm 4. Tanah dasar sudah disiapkan.
3. Batu pecah berukuran besar 5. Produksi 200 m3 / 3 hari
(10-15 cm) disusun berdiri
4. Batu pecah yang berukuran
kecil mengisi rongga diatasnya
sehingga rata kemudian dipadat-
kan/digilas dengan mesin gilas
setiap lapis dgn tebal max 5 cm
PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P Mandor 1,00 3 L 061 3,00 - -
E Operator terlatih 1,00 3 L 081 3,00 - -
K Buruh tak terlatih 48,00 3 L 101 144,00 - -
E
R
J
A

PEKERJA -
MATERIAL JUMLAH SATUAN KODE HARGA SATUAN BIAYA SUB TOTAL
M (Rp.) (Rp.) (Rp.)
A
T Batu putih 180,00 m3 - -
E Batu putih pecah 5 - 7 cm 40,00 m3 - -
R Pasir 70,00 m3 M 041 - -
I Alat bantu ( set @ 3 alat ) 1,75 set M 170 - -
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R Mesin gilas roda besi 1,00 3 E 16 15 - -
A
L
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 200,00 SATUAN : M3 HARGA SATUAN Rp. - PER M3


OVERHEAD ....% -
JUMLAH Rp. - PER M3
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA BIAYA PEKERJAAN KODE
PROGRAM JALAN SUB. DIT LABURAN ASPAL SATU LAPIS
PERENCANAAN JALAN LOKAL BURTU 1 ( MENGGUNAKAN BURUH ) K.615
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :
1. Bersihkan pemukaan tdk beraspal1. Hasil kerja 900 m2 / hari
dari oli dan material lepas. 2. Agrerat ukuran tunggal 19 mm tersaring produksi unik pemecah batu di timbun di lokasi
2 Permukaan perkerasan dilapis pekerjaan oleh pemasok.
prime aspek cutback 3. Permukaan yang akan diaspal telah selesai dipadatkan dan terikat dgn binder.
3 Bersihkan dan tutup permukaan4.yg Lapis primer / resep permukaan menggunakan aspal cutback @ 1,6 l / m2
4 sudah dilapisi prime dengan lapis
5. Lapis seal / penutup menggunakan aspal cutback @ 1,6 l/m2
aspal cutback dam serpihan 6. Agregat ukuran tunggal 19 mm dihamparkan dari dum truck penghampar @ 60 m2/m3
agregat serta digilas dengan mesin
7. Sesuai rev aspek umum B.M Maret -89 buku 3
gilas pneumatik roda karet.

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Mandor 1,00 2 L 061 2,00 - -
K Operator terampil 2,00 2 L 081 4,00 - -
E Pembantu operator 2,00 2 L 083 4,00 - -
R Sopir trampil 1,00 2 L 091 2,00 - -
J Pembantu sopir 1,00 2 L 099 2,00 - -
A Buruh tak terlatih 12,00 2 L 101 24,00 - -
Buruh terlatih 2,00 2 L 106 4,00 - -
PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T Batu pecah 1 - 2 cm m3 M 025 30,00 - -
E Aspal kg M 061 3.620,00 - -
R Minyak bakar Lt M 065 1.060,00 - -
I Alat bantu ( set @ 3 alat ) set M 170 0,96 - -
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R Mesin gilas 1,00 2 E 084 10,00 - -
A Mesin penyemprot aspal 1000 lt 1,00 2 E 153 10,00 - -
L Dump truk 3,5 ton / 115 Hp 1,00 2 E 211 10,00 - -
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 1.800,00 SATUAN : M2 HARGA SATUAN Rp. - PER M2


OVERHEAD ....% -
JUMLAH Rp. - PER M2
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT PASANG GORONG-2 PIPA BETON Ф. 40 CM
PERENCANAAN JALAN LOKAL ( PRACETAK TAK BERTULANG, TANPA DINDING KEPALA ) K. 121
& KABUPATEN ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :
1. Gali parit lebar 1,0 m dg dalam 1. Menggunakan tenaga manusia ( tak termasuk dinding kepala )
1 m dibawah elevasi subgrade 2. Pipa beton tak bertulang beli setempat, panjang 4 m dipasang 4 hari
2. Suplai pipa kelokasi pekerjaan 3. Beton kelas C digunakan untuk membungkus pipa dan dasar pipa
3. Letakkan pipa pada atas parit 4. Pengangkutan pipa dan beton sampai tampak pekerjaan
4. Urug kembali dengan beton sekeli-
5. Tidak termasuk penggalian dan pemadatan kembali lapis pekerjaan yang ada
ling pipa sampai elevasi subgrade
5. Jika ada penambahan/penggantian
pipa gorong-2 dibutuhkan
pekerja ekstra.

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Mandor 1,00 4 L 061 4,00 #REF! #REF!
K
E Buruh tak terlatih 7,00 4 L 101 28,00 #REF! #REF!
R
J
A

PEKERJA #REF!
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T Beton massa klas K. 125 m3 K 720 4,50 - -
E Pipa beton tak bertlg Ф.40 cm m M031 8,00 #REF! #REF!
R Alat bantu ( set @ 3 alat ) set M 170 1,12 #REF! #REF!
I
A
L
MATERIAL #REF!
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) #REF!

VOLUME 8,00 SATUAN : M HARGA SATUAN Rp. #REF! PER M


OVERHEAD ....% ( - beton K.125 ) #REF!
JUMLAH Rp. #REF! PER M
DIBULATKAN #REF!
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT PASANG GORONG-2 PIPA BETON Ф. 60 CM
PERENCANAAN JALAN LOKAL ( PRACETAK BERTULANG, TANPA DINDING KEPALA ) K. 121
& KABUPATEN ( MENGGUNAKAN BURUH )
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :
1. Gali parit lebar 1,0 m dg dalam 1. Menggunakan tenaga manusia ( tak termasuk dinding kepala )
1 m dibawah elevasi subgrade 2. Pipa beton pra cetak bertulang 8 m di pasang dalam 4 hari
2. Suplai pipa kelokasi pekerjaan 3. Material pilihan digunakan untuk alas dan mengurug pipa gorong-gorong sampai dibawah perkerasan
3. Letakkan pipa pada atas parit 4. Material diangkut kelokasi pekerjaan oleh pemasok
4. Urug kembali dengan beton sekeli-
5. Tidak termasuk penggalian dan pemadatan kembali lapis pekerjaan yang ada
ling pipa sampai elevasi subgrade
5. Jika ada penambahan/penggantian
pipa gorong-2 dibutuhkan
pekerja ekstra.

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Mandor 1,00 4 L 061 4,00 - -
K
E Buruh tak terlatih 7,00 4 L 101 28,00 - -
R
J
A

PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T Beton massa klas K. 125 m3 K 720 4,50 - -
E Pipa beton tak bertulang Ф.60 cm m M 031 8,00 - -
R Alat bantu ( set @ 3 alat ) set M 170 1,12 - -
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 8,00 SATUAN : M HARGA SATUAN Rp. - PER M


OVERHEAD ...% ( - beton K.125 ) -
JUMLAH Rp. - PER M
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT Mengecat bidang baja Meny Besi 2 kali dan 2 kali cat kilap
PERENCANAAN JALAN LOKAL ( Permukaan Baru ) SNI
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES ANGGAPAN

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)

P Tukang Cat 0,075 1 L 079 0,075 - -


E Kepala Tukang 0,0075 1 L 073 0,0075 - -
K Buruh tak terlatih 0,050 1 L 101 0,050 - -
E Mandor 0,0025 1 L 061 0,0025 - -
R
J
A

PEKERJA -
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
M SATUAN (Rp.) (Rp.) (Rp.)
A
T Meny besi 0,12 Kg - -
E Cat besi 0,26 lt - -
R Minyak Cat / Thiner B 0,0507 lt - -
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN -
TOTAL (Rp.) -

VOLUME 1,00 SATUAN : M2 HARGA SATUAN Rp. - PER M2


OVERHEAD .....% -
JUMLAH Rp. - PER M2
DIBULATKAN -
DIREKTORAT JENDERAL
BINA MARGA DIREKTORAT BINA ANALISA HARGA SATUAN KODE
PROGRAM JALAN SUB. DIT URUG PASIR DASAR DIBAWAH ALAS JALAN
PERENCANAAN JALAN LOKAL SNI
& KABUPATEN
PROPINSI : JAWA TIMUR KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Pekerja 0,300 1 L 101 0,300 - -
K Mandor 0,010 1 L 061 0,010 - -
E
R
J
A

PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T Pasir m3 M 041 1,20 - -
E
R
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) -

VOLUME 1,00 SATUAN : M3 HARGA SATUAN Rp. - PER M3


OVERHEAD .....% -
JUMLAH Rp. - PER M3
DIBULATKAN -
ANALISA HARGA SATUAN KODE
Pek. Menempa memotong, Plat dan baja siku xxxxxxxx
BOW I.2

KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Tukang 9,000 1 L 079 9,000 - -
K Buruh tak terlatih 9,000 1 L 106 9,000 - -
E Kepala Tukang 3,000 1 L 073 3,000 - -
R
J upah 3/4 nya -
A -

PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T Besi plat kg 110,00 - -
E arang kg M 170 30,00 - -
R
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) -

VOLUME 100,00 SATUAN : kg HARGA SATUAN Rp. - PER kg


OVERHEAD ...% -
JUMLAH Rp. - PER kg
DIBULATKAN -
ANALISA HARGA SATUAN KODE
MENGEBUR LUBANG BESI
BOW I.6

KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Tukang 0,050 1 L 079 0,050 - -
K Buruh terlatih 0,050 1 L 106 0,050 - -
E
R
J
A

PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T
E
R
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) -

VOLUME 1,00 SATUAN : ttk HARGA SATUAN Rp. - PER ttk


OVERHEAD ...% -
JUMLAH Rp. - PER ttk
DIBULATKAN -
ANALISA HARGA SATUAN KODE
MEMASANG GELAGAR BESI
BOW F.6
DPUTL
KODE KABUPATEN : TULUNGAGUNG KODE DISAJIKAN OLEH : TANGGAL

PROSES : ANGGAPAN :
1. Semua alat benda dialokasikan jembatan
1. Menggunkan tenaga manusia/ semi manusia

PEKERJA VOLUME HARI KODE TOTAL VOL. UPAH BIAYA SUB TOTAL
ORANG/HARI (Rp/HARI/ORANG (Rp.) (Rp.)
P
E Mandor 0,025 1 L 061 0,025 - -
K Buruh terlatih 0,500 1 L 106 0,500 - -
E Tukang 0,100 1 L 079 0,100 - -
R Kepala tukang 0,010 1 L 073 0,010 - -
J
A

PEKERJA -
MATERIAL SATUAN KODE TOTAL HARGA SATUAN BIAYA SUB TOTAL
M VOLUME (Rp.) (Rp.) (Rp.)
A
T
E
R Besi gelagar kg 100,00 - -
I
A
L
MATERIAL -
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
P KERJA KERJA (Rp./Unit) (Rp.) (Rp.)
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) -

VOLUME 100,00 SATUAN : Kg HARGA SATUAN Rp. - PER Kg


OVERHEAD ...% -
JUMLAH Rp. - PER Kg
DIBULATKAN -
DAFTAR HARGA PERALATAN TH 2020

PROPINSI : JAWA TIMUR


KABUPATEN : TULUNGAGUNG

NO. NAMA ALAT HARGA KODE

1 BULLDOZER 110 HP - E 001


2 MOTOR GRADER 100 HP - E 010
3 HYDRAULIC EXCAVATOR 1,3 M3 90 HP - E 020
4 CRUSHER / SCR 30 t/h 185 HP - E 031
5 LOADER WHEELED 115 HP - E 052
6 ROLLER 3 WHEELED 8 - 10 ton 51 HP - E 080
7 TANDEM ROLLER 6 - 10 ton 40 HP - E 081
8 PHEUMATIC ROLLER 8 - 15 ton 95 HP - E 084
9 VIBRATOR ROLLER 1 ton 12 HP - E 087
10 PLATE VIBRATOR TAMPER 4 HP - E 088
11 CONCRETE VIBRATOR 4 HP - E 089
12 ASPAL SPRAYER TOWED 700 I 25 HP - E 153
13 AMP 30 ton 150 HP - E 155
14 ASPHALT FINISHER 30 HP - E 157
15 WATER TANK TRUCK 115 HP - E 182
16 DUMP TRUCK 3,5 ton 115 HP - E 211
17 DAMP TRUCK 5 ton 145 HP - E 212
18 FLAT BED TRUCK 115 HP - E 221
19 CONCRETE MIXER (125 l) 6 HP - E 251
20 CONCRETE MIXER ( 250 lt ) 10 HP - E 252
21 CONCRETE MIXER ( 500 lt ) 20 HP - E 253
22 COMPRESOR 35 HP - E 301
23 WATER PUMP 8 HP - E 341
24 TRACTOR WHEELER 40 HP - E053
25 ASPAL SPRAYER TOWED 400 L, 6 HP - E.154
26 TRACTOR EQUIPMENT RTC 50HP - E.401

…………………., …………….……………. 2015

CV._____________________________

____________________________________
Direktur / Direktris
DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 0 1

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : BULLDOZER TENAGA = 110 HP

HARGA : Rp. -

UMUR KERJA : 8 Year : 12.000 Jam Faktor (CRF) = 0,20483

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,20483 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 110 x Rp. - = Rp. -

Pelumas = 0,006 x 110 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 1 0

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : MOTOR GRADER TENAGA = 100 HP

HARGA : Rp. -

UMUR KERJA : 8 Year : 12.000 Jam Faktor (CRF) = 0,20483

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,20483 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 100 x Rp. - = Rp. -

Pelumas = 0,006 x 100 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 2 0

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : HIDROULIC EXCAVATOR TENAGA = 90 HP

HARGA : Rp. -

UMUR KERJA : 8 Year : 12.000 Jam Faktor (CRF) = 0,20483

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,20483 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 90 x Rp. - = Rp. -

Pelumas = 0,006 x 90 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 3 1

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : CRUSHER 30 t/h TENAGA = 185 HP

HARGA : Rp. -

UMUR KERJA : 10 Year : 15.000 Jam Faktor (CRF) = 0,18062

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,18062 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 185 x Rp. - = Rp. -

Pelumas = 0,006 x 185 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 5 2

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : LOADER WHEELED TENAGA = 115 HP

HARGA : Rp. -

UMUR KERJA : 8 Year : 12.000 Jam Faktor (CRF) = 0,20483

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,20483 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 115 x Rp. - = Rp. -

Pelumas = 0,006 x 115 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 8 0

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : ROLLER 3 WHEELED TENAGA = 51 HP

HARGA : Rp. -

UMUR KERJA : 10 Year : 15.000 Jam Faktor (CRF) = 0,18062

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,18062 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 51 x Rp. - = Rp. -

Pelumas = 0,006 x 51 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 8 1

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : TANDEM ROLLER 6 - 10 T TENAGA = 40 HP

HARGA : Rp. -

UMUR KERJA : 10 Year : 15.000 Jam Faktor (CRF) = 0,18062

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,18062 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 40 x Rp. - = Rp. -

Pelumas = 0,006 x 40 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 8 4

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : PNEUMATIC ROLLER TENAGA = 95 HP

HARGA : Rp. -

UMUR KERJA : 10 Year : 15.000 Jam Faktor (CRF) = 0,18062

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,18062 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 95 x Rp. - = Rp. -

Pelumas = 0,006 x 95 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 8 7

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : VIBRATOR ROOLER 1 TON TENAGA = 12 HP

HARGA : Rp. -

UMUR KERJA : 6 Year : 9.000 Jam Faktor (CRF) = 0,24668

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,24668 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 12 x Rp. - = Rp. -

Pelumas = 0,006 x 12 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 8 8

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : PLATE VIBRATOR TAMPER TENAGA = 4 HP

HARGA : Rp. -

UMUR KERJA : 6 Year : 9.000 Jam Faktor (CRF) = 0,24668

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,24668 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 4 x Rp. - = Rp. -

Pelumas = 0,006 x 4 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 0 8 9

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : CONCRETE VIBRATOR TENAGA = 4 HP

HARGA : Rp. -

UMUR KERJA : 5 Year : 1.500 Jam Faktor (CRF) = 0,28085

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,28085 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 4 x Rp. - = Rp. -

Pelumas = 0,006 x 4 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 1 5 3

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : ASPHALT PLAYER TOWED TENAGA = 25 HP

HARGA : Rp. -

UMUR KERJA : 6 Year : 9.000 Jam Faktor (CRF) = 0,24668

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,24668 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 25 x Rp. - = Rp. -

Pelumas = 0,006 x 25 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 1 5 7

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : ASPHALT FINISHER 30 HP TENAGA = 30 HP

HARGA : Rp. -

UMUR KERJA : 7 Year : 10.500 Jam Faktor (CRF) = 0,2226

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,2226 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 30 x Rp. - = Rp. -

Pelumas = 0,006 x 30 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 1 8 2

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : WATER TANK TRUCK TENAGA = 115 HP

HARGA : Rp. -

UMUR KERJA : 6 Year : 9.000 Jam Faktor (CRF) = 0,24668

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,24668 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 115 x Rp. - = Rp. -

Pelumas = 0,006 x 115 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 2 1 1

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : DUMP TRUCK 3.5 T TENAGA = 115 HP

HARGA : Rp. -

UMUR KERJA : 6 Year : 9.000 Jam Faktor (CRF) = 0,24668

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,24668 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 115 x Rp. - = Rp. -

Pelumas = 0,006 x 115 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 2 1 2

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : DUMP TRUCK 5 T TENAGA = 145 HP

HARGA : Rp. -

UMUR KERJA : 6 Year : 9.000 Jam Faktor (CRF) = 0,24668

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,24668 = Rp. -

1500

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1500

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 145 x Rp. - = Rp. -

Pelumas = 0,006 x 145 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 2 2 1

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : FLAT BED TRUCK TENAGA = 115 HP

HARGA : Rp. -

UMUR KERJA : 6 Year : 9.000 Jam Faktor (CRF) = 0,24668

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,24668 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 115 x Rp. - = Rp. -

Pelumas = 0,006 x 115 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 2 5 1

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : CONCRETE MIXER 0.125 m3 TENAGA = 6 HP

HARGA : Rp. -

UMUR KERJA : 5 Year : 7.500 Jam Faktor (CRF) = 0,28085

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,28085 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 6 x Rp. - = Rp. -

Pelumas = 0,006 x 6 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 2 5 2

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : CONCRETE MIXER 0.250 m3 TENAGA = 10 HP

HARGA : Rp. -

UMUR KERJA : 5 Year : 7.500 Jam Faktor (CRF) = 0,28085

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,28085 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 10 x Rp. - = Rp. -

Pelumas = 0,006 x 10 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 2 5 3

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : CONCRETE MIXER 0.500 m3 TENAGA = 20 HP

HARGA : Rp. -

UMUR KERJA : 5 Year : 7.500 Jam Faktor (CRF) = 0,28085

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,28085 = Rp. -

1.500.00

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

1.500.00

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 20 x Rp. - = Rp. -

Pelumas = 0,006 x 20 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 3 0 1

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : COMPRESOR AIR TENAGA = 35 HP

HARGA : Rp. -

UMUR KERJA : 8 Year : 6.000 Jam Faktor (CRF) = 0,20483

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,20483 = Rp. -

750

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

750

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 35 x Rp. - = Rp. -

Pelumas = 0,006 x 35 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari

DIBULATKAN = Rp. - / Jam


DIREKTORAT JENDERAL BINA MARGA

DIRETORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN KODE

SUB DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN E 3 4 1

DAN KABUPATEN

PROPINSI KODE KABUPATEN KODE DISIAPKAN TANGGAL

JAWA TIMUR TULUNGAGUNG

JENIS ALAT : PUMP WATER TENAGA = 8 HP

HARGA : Rp. -

UMUR KERJA : 4 Year : 3.000 Jam Faktor (CRF) = 0,33271

(1 Tahun : 300 Hari Kerja

Atau : 1 Hari : 2,5 Jam / kerja

A. BIAYA PEMILIKAN ( OWNERSHIP COSTS ) : ( Rp./ Jam )

1. Depresiasi : 90 % x Alat x (CRF) x 1

Jam/Tahun

= 0,90 x - x 0,33271 = Rp. -

750

2. Lain - lain :

Asuransi 3 % th + PPN 10 % : 3.30 % x Harga

Jam/Tahun

= 0,033 x - = Rp. -

750

Sub Total = Rp. -

B. BIAYA OPERASI ( OPERATION COSTS ) : ( Rp./ Jam )

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 / liter/HP/Jam

Bensin = 0.170 / liter/HP/Jam

Pelumas = 0.006 / liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. - /liter

Bensin = Rp. /liter

Pelumas = Rp. - /liter

Bahan bakar = 0,160 x 8 x Rp. - = Rp. -

Pelumas = 0,006 x 8 x Rp. - = Rp. -

Perbaikan dan Spareparts = 0,600 x Rp. - = Rp. -

( 60 % x Depresiasi )

Sub Total = Rp. -

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A+B = Rp. - + Rp. - = Rp. - / Jam

Atau = 5,00 x Rp. - = Rp. / Hari