Design of Superstructure - 25m
Design of Superstructure - 25m
3
Density of Concrete = 2.5 t/m
0.150 0.000
ht1 0.050 0.000
0.100
0.250
c/L of symmetry
0.75 0.29
Face of girder
0.40
bw m 0.75 0.75 0.75 0.75 0.73559 0.75 0.290 0.29 0.29 0.29 0.29
MATERIAL USED :
Grade of Reinforcement = Fe 500
fyk = 500 Mpa
Modulus of Elasticity Es = 200000 Mpa
Precast Beam = M 50
fck = 50
fcm = 60 MPa
Ecm = 35000 MPa
TEMPERATURE
o
Coefficent of thermal expansion = 1.2E-05 / C
c/L Brg.
CRASH BARRIER 0.5
FOOTPATH 0
16
15
FOOTPATH 0
CRASH BARRIER 0.5
24.3
25.46
PLAN
16
0.22
0.9
1.6 3.2
Super-structure Cross-section
SECTIONAL PROPERTIES OF PRECAST BEAM:
Density of concrete = 2.5 t/m3
0.75 0.75
1 0.15 1 0
2 0.05 2 0.000
3
4 0.1
5 0.25
0.75 0.75
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.4 -0.25 0 0 1.547 1.500 3.038 3.000 6.075 9.113 12.150
web width bw m 0.75 0.75 0.75 0.75 0.73559 0.75 0.29 0.29 0.29 0.29 0.29
Area A m2 1.200 1.200 1.200 1.200 1.184 1.200 0.683 0.683 0.683 0.683 0.683
IZZ m4 0.256 0.256 0.256 0.256 0.254 0.256 0.198 0.198 0.198 0.198 0.198
Iyy m4 0.056 0.056 0.056 0.056 0.055 0.056 0.017 0.017 0.017 0.017 0.017
yb m 0.800 0.800 0.800 0.800 0.799 0.800 0.753 0.753 0.753 0.753 0.753
yt m 0.800 0.800 0.800 0.800 0.801 0.800 0.847 0.847 0.847 0.847 0.847
EFFECTIVE WIDTH OF BEAM :
lo = Min 24.3
23.8 + 1.547 */ (Effective depth assumed 0.85 times
of Overall depth)
lo = 24.3 m
bef
bef1 bef2
3.2 b= 3.2
1.6 3.2
beff1,2 = 2.721 m
beff = 3.2 m
beff1 = 2.721 m
beff2 = 2.721 m
beff = 3.2 m
SECTIONAL PROPERTIES OF COMPOSITE BEAM :
fcm = Mean value of concrete compressive strength
fcm = fck + 10 */ fcm & fck are in Mpa
A) OUTER GIRDER :
(Equavelent to Precast Beam grade) (Equavelent to Precast Beam grade)
3.2 @ 3.03 3.2 @ 3.03
2 0.15 2 0
3 0.05 3 0.00
4
1.82 1.82
0.29 1.6 1.6
4
5 0.1
6 0.25
0.75 0.75
A) INNER GIRDER :
(Equavelent to Precast Beam grade) (Equavelent to Precast Beam grade)
3.2 @ 3.03 3.2 @ 3.03
2 0.15 2 0
3 0.05 3 0.00
4
1.82 1.82
0.29 1.6 1.6
4
5 0.1
6 0.25
0.75 0.75
1 0.22
1.57
2
1.35
0.4
Section Property
Element B D A cgy' IZZ cgz' Iyy
Factor Nos.
No. m m m 2
m m 4
m m4
1 1 1.040 0.22 1 0.229 0.11 0.070 0 0.0206
2 1 0.400 1.35 1 0.540 0.895 0.111 0 0.0072
1 0.22
1.57
2
1.35
Section Property
Element B D A cgy' IZZ cgz' Iyy
Factor Nos.
No. m m m 2
m m 4
m m4
1 1 0.640 0.22 1 0.141 0.11 0.001 0 0.0048
2 1 0.000 1.35 1 0.000 0.895 0.000 0 0.0000
A) OUTER GIRDER :
(Equavelent to Precast Beam grade) (Equavelent to Precast Beam grade)
3.2 @ 3.03 3.2 @ 3.03
2 0.15 2 0
3 0.05 3 0.00
4
1.82 1.82
0.29 1.6 1.6
4
5 0.1
6 0.25
0.75 0.75
*/Section at support
Cg from top of deck = 0.695 m
Element B D A cgy' cgy'cg A*cgy'cg
Factor Nos.
No. m m m2
m m m3
1 1 3.030 0.220 1 0.667 0.11 0.585 0.38995
2 1 0.000 0.000 2 0.000 0.22 0.475 0
3 0.5 0.000 0.000 2 0.0000 0.220 0.475 0
4 1 0.750 0.475 1 0.356 0.458 0.238 0.08462
*/Section at support
Cg from top of deck = 0.695 m
Element B D A cgy' cgy'cg A*cgy'cg
Factor Nos.
No. m m m
2
m m m
3
A) INNER GIRDER :
(Equavelent to Precast Beam grade) (Equavelent to Precast Beam grade)
3.2 @ 3.03 3.2 @ 3.03
2 0.15 2 0
3 0.05 3 0.00
4
1.82 1.82
0.29 1.6 1.6
4
5 0.1
6 0.25
0.75 0.75
*/Section at support
Cg from top of deck = 0.695 m
Element B D A cgy' cgy'cg A*cgy'cg
Factor Nos.
No. m m m
2
m m m3
1 1 3.030 0.220 1 0.667 0.11 0.585 0.38995
2 1 0.000 0.000 2 0.000 0.22 0.475 0
3 0.5 0.000 0.000 2 0.0000 0.220 0.475 0
4 1 0.750 0.475 1 0.356 0.458 0.238 0.08462
*/Section at support
Cg from top of deck = 0.695 m
Element B D A cgy' cgy'cg A*cgy'cg
Factor Nos.
No. m m m2
m m m3
2 1 0.000 0.000 2 0.000 0 0.695 0.000
3 0.5 0.000 0.000 2 0.0000 0.000 0.695 0.000
4 1 0.750 0.475 1 0.356 0.238 0.458 0.163
Precast Beam
3.000 t/m
1.706 t/m
c/L
Span ref. from jack anchor point -0.15 1.75 1.5 9.15
UDL 3.00 1.71
Shear Force T 0.00 0.00 0.45 0.45 19.75 19.89 15.99 16.07 10.79 5.61 0.43
Shear Force T 0.00 0.26 0.70 0.70 18.66 18.74 16.04 16.10 10.69 5.35 0.00
Deck Slab Dead Load, Inner Girder
Support Reaction = 22.09 T
Section At Unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.4 -0.25 0 0 1.547 1.5 3.0375 3 6.075 9.1125 12.15
Bending Moment Tm 0.00 -0.02 -0.14 -0.14 30.83 29.96 56.69 56.09 97.29 121.65 129.77
Shear Force T 0.00 0.26 0.70 0.70 18.66 18.74 16.04 16.10 10.69 5.35 0.00
Precast Beam Tm 0.00 0.00 -0.03 -0.03 34.11 33.18 60.52 59.92 101.18 126.09 135.25
Deck slab (Outer Girder) Tm 0.00 -0.02 -0.14 -0.14 30.83 29.96 56.69 56.09 97.29 121.65 129.77
Deck slab (Inner Girder) Tm 0.00 -0.02 -0.14 -0.14 30.83 29.96 56.69 56.09 97.29 121.65 129.77
Precast Beam T 0.00 0.00 0.45 0.45 19.75 19.89 15.99 16.07 10.79 5.61 0.43
Deck slab (Outer Girder) T 0.00 0.26 0.70 0.70 18.66 18.74 16.04 16.10 10.69 5.35 0.00
Deck slab (Inner Girder) T 0.00 0.26 0.70 0.70 18.66 18.74 16.04 16.10 10.69 5.35 0.00
SIDL CALCULATION :
3
Density of Concrete = 2.5 t/m
16
0.5 0 15 0 0.5
0.05 thick WC
2
Wearing coat = 0.2 t/m
0.00
Footpath weight = 0.000 t/m
0.35
2
Footpath Live load = 0.000 t/m
= 0.000 t/m
PRESTRESS-CABLE DETAILS:
19-T-13/S system detail
2
Ultimate Tensile stress of one strand = 1861 N/mm
Ultimate breking strength of one strand = 183.7 kN
Nominal dia of strand = 12.7 mm
Nominal Area of strand = 98.7 mm2
Total Nos. of strand = 19
UTS of cable = 349.0 Tonne
2
Area of a cable = 1875.3 mm
= 252.15 Tonne
Stressing Stages :
Stage 1
At Day 10 Strand N-1 Ap UTS
Cable No. 3 Nos. Nos mm2 T
No. of tendons 19 19 0 1875.3 348.99
% Jacking 100
Stage 2
At Day 28 Strands N-1 Ap UTS
Cable No. 1 2 4 Nos. Nos mm2 T
No. of tendons 14 14 16 44 1.5 4342.8 808.20
% Jacking 100 100 100
0.4
7
6
7
0
6 5
0
5
0 4
4 0.4
0.2 3
3
0.4
0.2
0.125 0.4
J1
c/L
Origin
12.550
6 x 0 1 1 2 2 3 3 12.40
z 0 0 0 0 0 0 0 0.00
5 x 0 1 1 2 2 3 3 12.40
z 0 0.00 0 0 0 0 0 0.00
Forces Before Friction & Slip Loss : (Total Force) (90% prestressing) Prestressing factor= 0.9
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance jack 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Length 0.25 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Cable- No.
1 177.0 177.0 177.0 177.0 177.0 177.0 177.0 177.0 177.0
2 177.0 177.0 177.0 177.0 177.0 177.0 177.0 177.0 177.0
3 240.3 240.3 240.3 240.3 240.3 240.3 240.3 240.3 240.3
4 202.3 202.3 202.3 202.3 202.3 202.3 202.3 202.3 202.3
5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Forces Before Friction & Slip Loss : (Horizontal Component) (90% prestressing) Prestressing factor= 0.9
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Cable- No.
1 174.8 174.8 176.1 176.0 177.0 177.0 177.0 177.0 177.0
2 174.8 174.8 176.1 176.0 177.0 177.0 177.0 177.0 177.0
3 239.5 239.5 239.5 239.5 239.7 239.7 239.9 240.2 240.3
4 201.2 201.2 201.2 201.2 201.4 201.4 201.8 202.2 202.3
5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Forces beforeFriction & Slip Loss : (Vertical Component) (90% prestressing) Prestressing factor= 0.9
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Cable- No.
1 28.27 28.27 12.18 13.13 0.00 0.00 0.00 0.00 0.00
2 28.27 28.27 12.18 13.13 0.00 0.00 0.00 0.00 0.00
3 19.95 19.95 18.26 18.36 15.10 15.18 8.65 2.20 0.00
4 21.90 21.90 20.22 20.32 17.08 17.16 10.69 4.30 0.00
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Forces Before Friction & Slip Loss : (Total Force) (110% prestressing) Prestressing factor= 1.1
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance jack 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Length 0.25 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Cable- No.
1 216.4 216.4 216.4 216.4 216.4 216.4 216.4 216.4 216.4
2 216.4 216.4 216.4 216.4 216.4 216.4 216.4 216.4 216.4
3 293.7 293.7 293.7 293.7 293.7 293.7 293.7 293.7 293.7
4 247.3 247.3 247.3 247.3 247.3 247.3 247.3 247.3 247.3
5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Forces Before Friction & Slip Loss : (Horizontal Component) (110% prestressing) Prestressing factor= 1.1
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Cable- No.
1 213.6 213.6 215.2 215.1 216.4 216.4 216.4 216.4 216.4
2 213.6 213.6 215.2 215.1 216.4 216.4 216.4 216.4 216.4
3 292.7 292.7 292.7 292.7 292.9 292.9 293.2 293.6 293.7
4 245.9 245.9 246.0 246.0 246.2 246.2 246.6 247.1 247.3
5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Forces before Friction & Slip Loss : (Vertical Component) (110% prestressing) Prestressing factor= 1.1
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Cable- No.
1 34.56 34.56 14.88 16.04 0.00 0.00 0.00 0.00 0.00
2 34.56 34.56 14.88 16.04 0.00 0.00 0.00 0.00 0.00
3 24.39 24.39 22.32 22.44 18.45 18.55 10.57 2.69 0.00
4 26.77 26.77 24.72 24.84 20.88 20.98 13.07 5.25 0.00
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Forces after Friction & Slip Loss : (Total Force) 100% prestressing force
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Cable- No.
1 169.94 169.94 173.55 173.35 176.39 176.38 177.54 178.69 179.83
2 169.95 169.95 173.55 173.36 176.39 176.38 177.54 178.69 179.83
3 238.90 238.90 240.03 239.99 241.40 241.37 244.19 246.98 248.96
4 200.51 200.51 201.51 201.47 202.74 202.71 205.26 207.79 209.91
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Forces after Friction & Slip Loss : (Horizontal Component) 100% prestressing force
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Cable- No.
1 167.76 167.76 172.61 172.34 176.39 176.38 177.54 178.69 179.83
2 167.77 167.77 172.61 172.34 176.39 176.38 177.54 178.69 179.83
3 238.08 238.08 239.28 239.23 240.78 240.74 243.83 246.89 248.96
4 199.33 199.33 200.42 200.38 201.83 201.80 204.72 207.60 209.91
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Poh 772.9 772.9 784.9 784.3 795.4 795.3 803.6 811.9 818.5
Forces after Friction & Slip Loss : (Vertical Component) 100% prestressing force
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Cable- No.
1 27.14 27.14 11.71 12.62 0.00 0.00 0.00 0.00 0.00
2 27.14 27.14 11.71 12.62 0.00 0.00 0.00 0.00 0.00
3 19.84 19.84 18.19 18.29 15.04 15.12 8.62 2.19 0.00
4 21.70 21.70 20.08 20.17 16.97 17.05 10.63 4.30 0.00
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Poh 95.8 95.8 61.7 63.7 32.0 32.2 19.2 6.5 0.0
Forces after Friction & Slip Loss : (Total Force) (90% prestressing) Prestressing factor= 0.9
Sections 0 0 0 0 0 0 0 0 0
Distance c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Cable- No.
1 152.95 152.95 156.19 156.02 158.75 158.74 159.78 160.82 161.84
2 152.95 152.95 156.20 156.02 158.75 158.74 159.79 160.82 161.85
3 215.01 215.01 216.03 215.99 217.26 217.23 219.77 222.28 224.07
4 180.46 180.46 181.35 181.32 182.47 182.44 184.74 187.01 188.92
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Forces after Friction & Slip Loss : (Horizontal Component) (90% prestressing) Prestressing factor= 0.9
Sections 0 0 0 0 0 0 0 0 0
Distance c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Cable- No.
1 150.99 150.99 155.35 155.11 158.75 158.74 159.78 160.82 161.84
2 150.99 150.99 155.35 155.11 158.75 158.74 159.79 160.82 161.85
3 214.27 214.27 215.35 215.31 216.70 216.66 219.45 222.20 224.07
4 179.40 179.40 180.38 180.34 181.65 181.62 184.25 186.84 188.92
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Poh 695.6 695.6 706.4 705.9 715.9 715.8 723.3 730.7 736.7
Forces after Friction & Slip Loss : (Vertical Component) (90% prestressing) Prestressing factor= 0.9
Sections 0 0 0 0 0 0 0 0 0
Distance c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Cable- No.
1 24.42 24.42 10.54 11.36 0.00 0.00 0.00 0.00 0.00
2 24.42 24.42 10.54 11.36 0.00 0.00 0.00 0.00 0.00
3 17.86 17.86 16.37 16.46 13.53 13.60 7.75 1.97 0.00
4 19.53 19.53 18.07 18.16 15.27 15.34 9.57 3.87 0.00
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Poh 86.2 86.2 55.5 57.3 28.8 28.9 17.3 5.8 0.0
Forces after Friction & Slip Loss : (Total Force) 110% prestressing) Prestressing factor= 1.1
Sections 0 0 0 0 0 0 0 0 0
Distance c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Cable- No.
1 186.94 186.94 190.90 190.69 194.03 194.01 195.29 196.56 197.81
2 186.94 186.94 190.91 190.69 194.03 194.02 195.29 196.56 197.81
3 262.79 262.79 264.04 263.99 265.54 265.50 268.61 271.68 273.86
4 220.56 220.56 221.66 221.61 223.02 222.98 225.79 228.56 230.90
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Forces after Friction & Slip Loss : (Horizontal Component) 110% prestressing) Prestressing factor= 1.1
Sections 0 0 0 0 0 0 0 0 0
Distance c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Cable- No.
1 184.54 184.54 189.87 189.57 194.03 194.01 195.29 196.56 197.81
2 184.54 184.54 189.87 189.58 194.03 194.02 195.29 196.56 197.81
3 261.88 261.88 263.20 263.15 264.85 264.81 268.22 271.58 273.86
4 219.26 219.26 220.46 220.41 222.02 221.98 225.19 228.36 230.90
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Poh 850.2 850.2 863.4 862.7 874.9 874.8 884.0 893.1 900.4
Forces after Friction & Slip Loss : (Vertical Component) 110% prestressing) Prestressing factor= 1.1
Sections 0 0 0 0 0 0 0 0 0
Distance c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Cable- No.
1 29.85 29.85 12.88 13.88 0.00 0.00 0.00 0.00 0.00
2 29.85 29.85 12.88 13.88 0.00 0.00 0.00 0.00 0.00
3 21.82 21.82 20.01 20.12 16.54 16.63 9.48 2.41 0.00
4 23.87 23.87 22.08 22.19 18.66 18.75 11.70 4.73 0.00
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Poh 105.4 105.4 67.9 70.1 35.2 35.4 21.2 7.1 0.0
Calculation of Friction & slip Losses for all cables :
Cable No. & Jacking Force
Cb. No. strands %jack slip As Jack F
no. % mm mm2 Tonne
1 14 100 6 1381.8 196.72
2 14 100 6 1381.8 196.72
3 19 100 6 1875.3 266.98
4 16 100 6 1579.2 224.83
5 0 0 0 0 0.00
6 0 0 0 0 0
7 0 0 0 0 0
Cable NO. 1
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
12.4 0 0.400 0.160 0 12.4 0 0.175 0 0
11.4 1 Linear 0.238 0.160 0 0 11.4 1 Linear 0.175 0 0 0
10 2.4 Parab. 0.125 0 0.160 0.160 10 2.4 Linear 0.175 0 0 0
3 9.4 Linear 0.125 0 0 0.160 3 9.4 Linear 0.175 0 0 0
2 10.4 Linear 0.125 0 0 0.160 2 10.4 Rev.Parab. 0.175 0 0 0
0 12.4 Linear 0.125 0 0 0.160 0 12.4 Linear 0.175 0 0 0
Total = 13.4191 m
= 94.5249 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 12.4 m 6.91591 0.0000
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 shaded Area
0 196.722 169.846 13.4380
1 196.329 170.239 13.0450 13.2415
2.4 190.514 176.054 7.2304 14.1927
9.4 187.866 178.702 4.5818 41.3426
10.4 187.49 179.078 4.2064 4.3941
12.4 186.742 179.826 3.4580 7.66438
Total = 80.8353
Total shaded area = 161.671
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne) rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 169.846 0.16038 0 167.666 27.1225 0 194.198 31.4143 0
1 170.239 1 170.04 0.16038 0 168.054 27.1853 0 194.198 31.4143 0
2.4 176.054 1.4 173.15 0 0 176.054 0 0 196.722 0 0
9.4 178.702 7 177.38 0 0 178.702 0 0 196.722 0 0
10.4 179.078 1 178.89 0 0 179.078 0 0 196.722 0 0
12.4 179.826 2 179.45 0 0 179.826 0 0 196.722 0 0
12.4 179.826 0 179.83 0 0 179.826 0 0 196.722 0 0
200.00
196.72
195.00
190.00
186.74
(Prestress)
185.00
180.00
179.83
175.00
170.00
169.85
165.00 (x)
0 2 4 6 8 10 12 14
After Friction Loss After slip Loss
Cable NO. 2
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
12.4 0 0.4 0.16038 0 12.4 0 -0.175 0 0
11.4 1 Linear 0.23824 0.16038 0 0 11.4 1 Linear -0.175 0 0 0
10 2.4 Parab. 0.125 0 0.16038 0.16038 10 2.4 Linear -0.175 0 0 0
1.5 10.9 Linear 0.125 0 0 0.16038 1.5 10.9 Linear -0.175 0 0 0
1 11.4 Linear 0.125 0 0 0.16038 1 11.4 Rev.Parab. -0.175 0 0 0
0 12.4 Linear 0.125 0 0 0.16038 0 12.4 Linear -0.175 0 0 0
Total = 13.4191 m
= 94.5255 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 12.4 m 6.91324 0.0000
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 shaded Area
0 196.722 169.849 13.4367
1 196.329 170.242 13.0436 13.2401
2.4 190.514 176.056 7.2291 14.1909
10.9 187.303 179.268 4.0177 47.7987
11.4 187.116 179.455 3.8305 1.96204
12.4 186.742 179.829 3.4566 3.64355
Total = 80.8353
Total shaded area = 161.671
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 169.849 0.16038 0 167.669 27.1229 0 194.198 31.4143 0
1 170.242 1 170.05 0.16038 0 168.057 27.1857 0 194.198 31.4143 0
2.4 176.056 1.4 173.15 0 0 176.056 0 0 196.722 0 0
10.9 179.268 8.5 177.66 0 0 179.268 0 0 196.722 0 0
11.4 179.455 0.5 179.36 0 0 179.455 0 0 196.722 0 0
12.4 179.829 1 179.64 0 0 179.829 0 0 196.722 0 0
12.4 179.829 0 179.83 0 0 179.829 0 0 196.722 0 0
200
196.72
195
190
186.74
(Prestress)
185
180 179.83
179.83
175
170 169.85
(x)
165
0 2 4 6 8 10 12 14
Cable NO. 3
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
12.4 0 0.8 0.08314 0 12.4 0 0 0 0
11.4 1 Linear 0.71667 0.08314 0 0 11.4 1 Linear 0 0 0 0
2 10.4 Parab. 0.325 0 0.08314 0.08314 2 10.4 Linear 0 0 0 0
1.5 10.9 Linear 0.325 0 0 0.08314 1.5 10.9 Linear 0 0 0 0
1 11.4 Linear 0.325 0 0 0.08314 1 11.4 Rev.Parab. 0 0 0 0
0 12.4 Linear 0.325 0 0 0.08314 0 12.4 Linear 0 0 0 0
Total = 13.4143 m
= 96.0068 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 12.4 m 7.823 0.0000
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 shaded Area 3
0 266.98 238.767 14.1063
1 266.446 239.301 13.5729 13.8396
10.4 257.814 247.933 4.9407 87.0138
10.9 257.557 248.191 4.6830 2.40592
11.4 257.299 248.448 4.4256 2.27714
12.4 256.785 248.962 3.9115 4.16853
Total = 109.705
Total shaded area = 219.41
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 238.767 0.08314 0 237.942 19.8285 0 266.058 22.1715 0
1 239.301 1 239.03 0.08314 0 238.474 19.8728 0 266.058 22.1715 0
10.4 247.933 9.4 243.62 0 0 247.933 0 0 266.98 0 0
10.9 248.191 0.5 248.06 0 0 248.191 0 0 266.98 0 0
11.4 248.448 0.5 248.32 0 0 248.448 0 0 266.98 0 0
12.4 248.962 1 248.71 0 0 248.962 0 0 266.98 0 0
12.4 248.962 0 248.96 0 0 248.962 0 0 266.98 0 0
265
260 256.79
(Prestress)
255
250 248.96
245
238.77
240
(x)
235
0 2 4 6 8 10 12 14
Cable NO. 4
Change in Angle due to : Change in Angle due to :
Vertical Profile Horizontal Profile
x (O) x(J1) Curve y a1 da1 Sda1 x (O) x(J1) Curve z a2 da2 Sda2
12.4 0 1.2 0.10844 0 12.4 0 0 0 0
11.4 1 Linear 1.09113 0.10844 0 0 11.4 1 Linear 0 0 0 0
1 11.4 Parab. 0.525 0 0.10844 0.10844 1 11.4 Rev.Parab. 0 0 0 0
1.5 10.9 Parab. 0.52631 0.00523 -0.00523 0.10321 1.5 10.9 Linear 0 0 0 0
1 11.4 Parab. 0.525 0 0.00523 0.10844 1 11.4 Rev.Parab. 0 0 0 0
0 12.4 Linear 0.525 0 0 0.10844 0 12.4 Linear 0 0 0 0
Total = 13.4264 m
= 95.95 mm
Calculation of Slip :
Slip allowable = 6 mm
Say slip travels up to > 12.4 m 5.40392 0.0000
x(J1) Po(x) P1(x) (Po - P1) /2 1/2 shaded Area
0 224.825 200.395 12.2152
1 224.376 200.844 11.7660 11.9906
11.4 215.743 209.477 3.1330 77.4751
10.9 216.158 209.062 3.5481 -1.67027
11.4 215.743 209.477 3.1330 1.67027
12.4 215.312 209.908 2.7020 2.91749
Total = 92.3832
Total shaded area = 184.766
x(J1) P1(x) Length Average force a in elev. a in Plan. P1h P1v P1z P0h P0v P0z
m Tonne m (tonne rad. rad. Tonne Tonne Tonne Tonne Tonne Tonne
0 200.395 0.10844 0 199.218 21.689 0 223.504 24.3332 0
1 200.844 1 200.62 0.10844 0 199.664 21.7376 0 223.504 24.3332 0
10.9 209.062 9.9 204.95 0.00523 0 209.059 1.09425 0 224.822 1.17676 0
11.4 209.477 0.5 209.27 0 0 209.477 0 0 224.825 0 0
11.4 209.477 0 209.48 0 0 209.477 0 0 224.825 0 0
12.4 209.908 1 209.69 0 0 209.908 0 0 224.825 0 0
12.4 209.908 0 209.91 0 0 209.908 0 0 224.825 0 0
230
224.83
225
220
(Prestress)
215.31
215
210
209.91
205
200 200.39
195 (x)
0 2 4 6 8 10 12 14
SECTION PROPERTIES
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of Precast Section
Area m2 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.256 0.256 0.254 0.256 0.198 0.198 0.198 0.198 0.198
yb m 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
1 Tonne 0 0 0 0 0 0 0 0 0
2 Tonne 0 0 0 0 0 0 0 0 0
3 Tonne 239.452 239.452 239.522 239.518 239.654 239.651 239.922 240.190 240.282
4 Tonne 0 0 0 0 0 0 0 0 0
5 Tonne 0 0 0 0 0 0 0 0 0
6 Tonne 0 0 0 0 0 0 0 0 0
7 Tonne 0 0 0 0 0 0 0 0 0
Total (P1oh) Tonne 239.5 239.5 239.5 239.5 239.7 239.7 239.9 240.2 240.3
Weighted Average of pre-stress force Tonne 239.5 239.5 239.5 239.6 239.7 239.8 240.1 240.2
Total (F1h) Tonne 214.3 214.3 215.3 215.3 216.7 216.7 219.4 222.2 224.1
Eccen soffit m 0.78 0.78 0.65 0.66 0.55 0.55 0.40 0.33 0.33
Pre-stress loss Tonne 25.18 25.18 24.17 24.21 22.96 22.99 20.47 17.99 16.22
% Loss % 10.52 10.52 10.09 10.11 9.58 9.59 8.53 7.49 6.75
Prestressing force & their eccentricity from cg. of section of Stage I cables :
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Total (F1h) Tonne 214.27 214.27 215.35 215.31 216.70 216.66 219.45 222.20 224.07
eF m 0.02 0.02 0.15 0.14 0.20 0.20 0.35 0.42 0.43
eFc m 0.35 0.35 0.48 0.47 0.68 0.67 0.83 0.90 0.90
Material properties :
1) Losses due to Elastic shortening : At day 10
loss in pre-stres force = 0.5*Ep/Ec*sav.*(N-1)*As
N-1 = Total Nos. of cable -1 = 0 Nos
As = Area of one cable = 1875.3 mm2
2
Modulus of Elasticity of concrete Ec = 33276.4 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
F1h = Horizontal component of pre-stressing force after friction & slip loss
eF = Eccentricity of pre-stressing force from cg. Precast section
eFc = Eccentricity of pre-stressing force from cg. Composite section
sc1 = Stress in Concrete at cg. of pre-stressing force. due to pre-stress
sc2 = Stress in Concrete at cg. of pre-stressing force, due to permanent loads at particular stage.
sc3 = Net stress in Concrete at cg. of pre-stressing force
MSWG = Bending Moment due to selfweight of girder at section x
Permanent Load stresses sc2 N/mm2 0.00 0.00 -0.20 -0.19 -0.62 -0.61 -1.81 -2.70 -2.93
Net stress sc3 N/mm2 1.79 1.79 1.80 1.78 3.01 3.01 2.80 2.57 2.43
Average stress sc3 1.79 1.80 1.79 2.39 3.01 2.90 2.68 2.50
2
Weight average of concrete stresses at cg. of pre-stressing foce. sav. = 2.545 N/mm
Average loss in pre-stres force = 0.00 Tonne
F1h' T 214.27 214.27 215.35 215.31 216.70 216.66 219.45 222.20 224.07
eF m 0.02 0.02 0.15 0.14 0.20 0.20 0.35 0.42 0.43
sc1 N/mm2 1.79 1.79 2.00 1.97 3.63 3.62 4.61 5.27 5.36
Permanent Load stresses sc2 N/mm2 0.00 0.00 -0.20 -0.19 -0.62 -0.61 -1.81 -2.70 -2.93
Net stress sc3 N/mm2 1.789 1.789 1.803 1.781 3.006 3.008 2.795 2.569 2.430
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Crep loss from day 45 To day 90
Creep coefficent = 1.091
Concrete Modulus of elasticity at the time of loading = 33276.4 Mpa
Total Creep loss at day: 90 T 3.051 3.051 3.051 3.051 3.051 3.051 3.051 3.051 3.051
Additional loss from day 45 to day 90 T 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624 0.624
Creep Loss :
For Stage-I cable, On account of Stage-I cable prestressing
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
Creep loss from 10 To day 28 Tonne 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04
Creep loss from 28 To day 28 Tonne -0.02 -0.02 -0.02 -0.02 -0.02 -0.02 -0.02 -0.02 -0.02
Creep loss from 28 To day 29 Tonne 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Creep loss from 29 To day 45 Tonne 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39
Creep loss from 45 To day 90 Tonne 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62
Creep loss from 90 To day 36500 Tonne 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83
Shrinkage Loss :
For Stage-I cable, On account of Stage-I cable prestressing
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
Shrinkage loss from 10 To day 28 Tonne 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30
Shrinkage loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Shrinkage loss from 28 To day 29 Tonne 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
Shrinkage loss from 29 To day 45 Tonne 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Shrinkage loss from 45 To day 90 Tonne 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55
Shrinkage loss from 90 To day 36500 Tonne 6.06 6.06 6.06 6.06 6.06 6.06 6.06 6.06 6.06
Pre-stress loss calculation after Stage II prestressing: (FOR 90% PRESTRESSING FORCE)
Stage : 2
At day 28 Action : Prestressing of stage II cables
2
Modulus of Elasticity of pre-stressing steel Ep : 195000 N/mm
Section properties
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of Precast Section
Area m2 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
Properties of Composite Section
Area m2 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
I gross m4 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yb m 1.12 1.12 1.13 1.12 1.23 1.23 1.23 1.23 1.23
Prestressing force & their eccentricity from cg. of section of Stage II cables :
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Total (F2h) Tonne 481.37 481.37 491.08 490.55 499.15 499.10 503.82 508.48 512.61
eF m 0.137 0.137 0.336 0.333 0.357 0.356 0.432 0.473 0.480
eFc m 0.462 0.462 0.666 0.658 0.830 0.829 0.905 0.946 0.953
2
Modulus of Elasticity of concrete Ec = 35000.0 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
Calculating Stress at the centroid of Ist stage cables due to II stage cables
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Length m 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Forces Left in Ist stage cables at day 28
F1h" Tonne 182.66 182.66 184.75 184.67 187.32 187.25 192.55 197.78 201.42
eF m 0.021 0.021 0.145 0.143 0.204 0.201 0.354 0.423 0.428
B) Elastic shortining of IInd stage cables due to IInd stage cable stressing
At day 28
loss in pre-stres force = 0.5*Ep/Ec*sav.*(N-1)*As
N-1 = Total Nos. of stage II cable - 1 = 1.47 Nos
2
As = Area of one cable = 1875.3 mm
2
Modulus of Elasticity of concrete Ec = 35000.0 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
Calculating Stress at the centroid of IIst stage cables due to II stage cables
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Length 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Forces Left in IIst stage cables after friction & slip loss at day 28
F2h Tonne 481.4 481.4 491.1 490.6 499.2 499.1 503.8 508.5 512.6
eF m 0.137 0.137 0.336 0.333 0.357 0.356 0.432 0.473 0.480
Pre-stressing force at section after Elastic shortining loss due to II stage cables
At day = 28
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Length m 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Forces In I -stage cables
F1h'' T 172.0 172.0 174.1 174.0 176.7 176.6 181.9 187.1 190.8
eF m 0.021 0.021 0.145 0.143 0.204 0.201 0.354 0.423 0.428
F1h'' avg. T 172.0 173.1 174.1 175.4 176.7 179.3 184.5 189.0
Weighted average of pre-stress force I stage cables = 181.754 tonne
Claculation of stresses at the stage-I & stage-II cables afeter ES loss due to prestressing of II stage cables.
At day 28
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Total force in Stage II prestressing after ES loss due to II satge cables.
Fh' Tonne 472.86 472.86 482.56 482.04 490.64 490.58 495.30 499.97 504.09
eF m 0.14 0.14 0.34 0.33 0.36 0.36 0.43 0.47 0.48
eFc m 0.46 0.46 0.67 0.66 0.83 0.83 0.91 0.95 0.95
2
Total stresses N/mm 4.427 4.427 6.105 6.010 9.615 9.607 10.159 10.438 9.985
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO SECOND STAGE
PRESTRESSING :
Net additional steress applied Mpa 3.993 3.993 5.004 4.917 8.993 8.965 11.094 12.386 12.628
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Crep loss from day 45 To day 90
Creep coefficent at day 90 = 0.722
Concrete Modulus of elasticity at the time of loading = 35000 Mpa
Total Creep loss at day: 90 T 7.544 7.544 7.544 7.544 7.544 7.544 7.544 7.544 7.544
Additional loss from day 45 to day 90 T 2.325 2.325 2.325 2.325 2.325 2.325 2.325 2.325 2.325
Immidiate loses in stage I cables due to elastic shortening losses due to second stage pre-stressing
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
At day 28 Elastic shortening Tonne 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Relaxation loss at day 28 To day 29
% loss at day 29 Days % loss 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Dspr Mpa 9.09 9.09 9.09 9.09 9.09 9.09 9.09 9.09 9.09
Total Relaxation loss at day 29 Tonne 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95
Additional loss from day 28 to day 29 Tonne 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Crep loss at day 29 To day 45
Creep coefficent at day 45 = 0.499
Concrete Modulus of elasticity at the time of loading = 35000 Mpa
Total Creep loss at day: 45 T 11.153 11.153 11.153 11.153 11.153 11.153 11.153 11.153 11.153
Additional loss from day 29 to day 45 T 6.351 6.351 6.351 6.351 6.351 6.351 6.351 6.351 6.351
Section properties (Precast Section Only) 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of Precast Section
Area m2 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO CASTING OF DECK SLAB :
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 1875.3 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO CASTING OF DECK SLAB :
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 4342.8 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Creep Loss at different stages: 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Casting of Deck at day = 28
Net additional steress applied Mpa 0.001 0.001 -0.408 -0.390 -1.024 -1.010 -2.128 -2.911 -3.154
Section properties (Composite Section) 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of Composite Section
Area m2 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
I gross m4 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yb m 1.12 1.12 1.13 1.12 1.23 1.23 1.23 1.23 1.23
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO TRANSFER OF SUPER-
STRUCTURE AT PERMANENT BEARINGS.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 1875.3 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO TRANSFER OF SUPER-
STRUCTURE AT PERMANENT BEARINGS.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 4342.8 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Additional creep loss in stage II cables on account of Transfer of super-structure at permanent bearings. :
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
Creep loss from 29 To day 45 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 45 To day 90 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 90 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CALCULATION OF STRESS GAIN ON ACCOUNT OF PLACING OF SIDL : (FOR 90% PRESTRESSING FORCE)
Stage : 5
At day 45 Action : PLACING OF SIDL
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO PLACING OF SIDL.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 1875.3 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Creep Loss at different stages: 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Casting of Deck at day = 45
Net additional steress applied Mpa 0.000 0.000 -0.315 -0.241 -0.955 -0.807 -1.611 -2.144 -2.284
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO PLACING OF SIDL.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 4342.8 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Creep Loss at different stages: 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Creep loss from 45 To day 90 Tonne 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62
Creep loss from 90 To day 36500 Tonne 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83 2.83
Creep loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage I Creep loss from 28 To day 29 Tonne 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25
cable Creep loss from 29 To day 45 Tonne 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97
II cables
Creep loss from 45 To day 90 Tonne 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33
Creep loss from 90 To day 36500 Tonne 8.04 8.04 8.04 8.04 8.04 8.04 8.04 8.04 8.04
10 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Casting of Deck
28 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Stage I Creep loss from 28 To day 29 Tonne -0.35 -0.35 -0.35 -0.35 -0.35 -0.35 -0.35 -0.35 -0.35
cable Creep loss from 29 To day 45 Tonne -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47
Creep loss from 45 To day 90 Tonne -0.36 -0.36 -0.36 -0.36 -0.36 -0.36 -0.36 -0.36 -0.36
slab
Creep loss from 90 To day 36500 Tonne -1.26 -1.26 -1.26 -1.26 -1.26 -1.26 -1.26 -1.26 -1.26
cable Creep loss from 29 To day 45 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bearings
Creep loss from 45 To day 90 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 90 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Creep loss Tonne 17.01 17.01 17.01 17.01 17.01 17.01 17.01 17.01 17.01
Relaxation loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage I Relaxation loss from 28 To day 29 Tonne 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
cable Relaxation loss from 29 To day 45 Tonne 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
cables
Relaxation loss from 45 To day 90 Tonne 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13
Relaxation loss from 90 To day 36500 Tonne 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03 7.03
Total Relaxation loss Tonne 10.57 10.57 10.57 10.57 10.57 10.57 10.57 10.57 10.57
Shrinkage loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage I Shrinkage loss from 28 To day 29 Tonne 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
cable Shrinkage loss from 29 To day 45 Tonne 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
cables
Shrinkage loss from 45 To day 90 Tonne 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55
Shrinkage loss from 90 To day 36500 Tonne 6.06 6.06 6.06 6.06 6.06 6.06 6.06 6.06 6.06
Total Shrinkage loss Tonne 9.76 9.76 9.76 9.76 9.76 9.76 9.76 9.76 9.76
5) IMMIDIATE LOSES IN STAGE I CABLES DUE TO ELASTIC SHORTENING LOSSES DUE TO II STAGE PRE-STRESSING
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stressing
Stage I At day 28 Elastic shortening Tonne 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6
of stage-II
cable
cables
Cr+ Rex+ Sh 10 To day 28 Tonne 6.43 6.43 6.43 6.43 6.43 6.43 6.43 6.43 6.43
ES due to stage II cables At day 28 Tonne 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63
Cr+ Rex+ Sh 28 To day 28 Tonne -0.02 -0.02 -0.02 -0.02 -0.02 -0.02 -0.02 -0.02 -0.02
Stage I
cable Cr+ Rex+ Sh 28 To day 29 Tonne 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Cr+ Rex+ Sh 29 To day 45 Tonne 3.99 3.99 3.99 3.99 3.99 3.99 3.99 3.99 3.99
Cr+ Rex+ Sh 45 To day 90 Tonne 3.37 3.37 3.37 3.37 3.37 3.37 3.37 3.37 3.37
Cr+ Rex+ Sh 90 To day 36500 Tonne 21.58 21.58 21.58 21.58 21.58 21.58 21.58 21.58 21.58
Total Shrinkage loss Tonne 73.17 73.17 72.16 72.19 70.94 70.97 68.45 65.97 64.20
Cr+ Rex+ Sh 10 To day 28 Tonne 31.61 31.61 30.60 30.64 29.38 29.41 26.90 24.42 22.64
ES due to stage II cables At day 28 Tonne 42.24 42.24 41.23 41.27 40.02 40.05 37.53 35.05 33.28
Cr+ Rex+ Sh 28 To day 28 Tonne 42.23 42.23 41.21 41.25 40.00 40.03 37.51 35.03 33.26
Stage I
cable Cr+ Rex+ Sh 28 To day 29 Tonne 44.22 44.22 43.21 43.25 41.99 42.02 39.51 37.03 35.25
Cr+ Rex+ Sh 29 To day 45 Tonne 48.21 48.21 47.20 47.24 45.99 46.02 43.50 41.02 39.25
Cr+ Rex+ Sh 45 To day 90 Tonne 51.58 51.58 50.57 50.61 49.35 49.39 46.87 44.39 42.61
Cr+ Rex+ Sh 90 To day 36500 Tonne 73.17 73.17 72.16 72.19 70.94 70.97 68.45 65.97 64.20
10 To day 28 P Tonne 207.8 207.8 208.9 208.9 210.3 210.2 213.0 215.8 217.6
M Tm 4.3 4.3 30.4 29.9 42.8 42.3 75.5 91.3 93.1
At day 28 P Tonne 197.2 197.2 198.3 198.2 199.6 199.6 202.4 205.1 207.0
M Tm 4.1 4.1 28.8 28.4 40.6 40.2 71.7 86.8 88.6
28 To day 28 P Tonne 197.2 197.2 198.3 198.3 199.7 199.6 202.4 205.2 207.0
M Tm 4.1 4.1 28.8 28.4 40.6 40.2 71.7 86.8 88.6
Stage I
cable
28 To day 29 P Tonne 195.2 195.2 196.3 196.3 197.7 197.6 200.4 203.2 205.0
M Tm 4.1 4.1 28.6 28.1 40.2 39.8 71.0 85.9 87.7
29 To day 45 P Tonne 191.2 191.2 192.3 192.3 193.7 193.6 196.4 199.2 201.0
M Tm 4.0 4.0 28.0 27.6 39.4 39.0 69.6 84.3 86.0
45 To day 90 P Tonne 187.9 187.9 188.9 188.9 190.3 190.3 193.1 195.8 197.7
M Tm 3.9 3.9 27.5 27.1 38.7 38.3 68.4 82.8 84.6
90 To day 36500 P Tonne 166.3 166.3 167.4 167.3 168.7 168.7 171.5 174.2 176.1
M Tm 3.5 3.5 24.3 24.0 34.3 33.9 60.7 73.7 75.3
SUMMARY OF LOSSES IN STAGE II CABLES : (FOR 90% PRESTRESSING FORCE)
1) CREEP LOSS :
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Creep loss from 10 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Stressing of stage- Creep loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage II Creep loss from 28 To day 29 Tonne 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80
cable Creep loss from 29 To day 45 Tonne 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35
II cables
Creep loss from 45 To day 90 Tonne 4.97 4.97 4.97 4.97 4.97 4.97 4.97 4.97 4.97
Creep loss from 90 To day 36500 Tonne 17.19 17.19 17.19 17.19 17.19 17.19 17.19 17.19 17.19
10 To day 28 Tonne 0 0 0 0 0 0 0 0 0
28 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Casting of Deck
Stage II Creep loss from 28 To day 29 Tonne -0.99 -0.99 -0.99 -0.99 -0.99 -0.99 -0.99 -0.99 -0.99
cable Creep loss from 29 To day 45 Tonne -1.30 -1.30 -1.30 -1.30 -1.30 -1.30 -1.30 -1.30 -1.30
Creep loss from 45 To day 90 Tonne -1.02 -1.02 -1.02 -1.02 -1.02 -1.02 -1.02 -1.02 -1.02
slab
Creep loss from 90 To day 36500 Tonne -3.53 -3.53 -3.53 -3.53 -3.53 -3.53 -3.53 -3.53 -3.53
Total Creep loss Tonne 21.37 21.37 21.37 21.37 21.37 21.37 21.37 21.37 21.37
2) IMMIDIATE LOSES IN STAGE II CABLES DUE TO ELASTIC SHORTENING LOSSES DUE TO II STAGE PRE-STRESSING
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stressing of Friction & slip At day 28 Tonne 75.1 75.1 65.4 65.9 57.3 57.3 52.6 48.0 43.8
Stage II
stage-II Elastic shortening 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
cable
cables
Immediate loss Tonne 83.58 83.58 73.88 74.40 65.80 65.86 61.14 56.48 52.35
Relaxation loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage II Relaxation loss from 28 To day 29 Tonne 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95 3.95
cable Relaxation loss from 29 To day 45 Tonne 1.97 1.97 1.97 1.97 1.97 1.97 1.97 1.97 1.97
II cables
Relaxation loss from 45 To day 90 Tonne 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Relaxation loss from 90 To day 36500 Tonne 13.66 13.66 13.66 13.66 13.66 13.66 13.66 13.66 13.66
Total Relaxation loss Tonne 20.52 20.52 20.52 20.52 20.52 20.52 20.52 20.52 20.52
Shrinkage loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage II Shrinkage loss from 28 To day 29 Tonne 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13
cable Shrinkage loss from 29 To day 45 Tonne 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85
II cables
Shrinkage loss from 45 To day 90 Tonne 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58
Shrinkage loss from 90 To day 36500 Tonne 14.02 14.02 14.02 14.02 14.02 14.02 14.02 14.02 14.02
Total Shrinkage loss Tonne 19.59 19.59 19.59 19.59 19.59 19.59 19.59 19.59 19.59
LOSSES IN PRE-STRESS FORCE OF STAGE II CABLES AT DIFFERENT STAGES :
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Fr+slip+ES of Stage I cable At day 10
ES due to stage II cables At day 28 Tonne 83.58 83.58 73.88 74.40 65.80 65.86 61.14 56.48 52.35
Cr+ Rex+ Sh 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage II
cable Cr+ Rex+ Sh 28 To day 29 Tonne 7.90 7.90 7.90 7.90 7.90 7.90 7.90 7.90 7.90
Cr+ Rex+ Sh 29 To day 45 Tonne 8.88 8.88 8.88 8.88 8.88 8.88 8.88 8.88 8.88
Cr+ Rex+ Sh 45 To day 90 Tonne 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20
Cr+ Rex+ Sh 90 To day 36500 Tonne 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50
Total Shrinkage loss Tonne 145.06 145.06 135.36 135.88 127.28 127.33 122.62 117.95 113.82
Cr+ Rex+ Sh 10 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ES due to stage II cables At day 28 Tonne 83.58 83.58 73.88 74.40 65.80 65.86 61.14 56.48 52.35
Cr+ Rex+ Sh 28 To day 28 Tonne 83.58 83.58 73.88 74.40 65.80 65.86 61.14 56.48 52.35
Stage II
cable Cr+ Rex+ Sh 28 To day 29 Tonne 91.48 91.48 81.78 82.30 73.70 73.76 69.04 64.38 60.25
Cr+ Rex+ Sh 29 To day 45 Tonne 100.36 100.36 90.65 91.18 82.57 82.63 77.91 73.25 69.12
Cr+ Rex+ Sh 45 To day 90 Tonne 106.56 106.56 96.85 97.38 88.78 88.83 84.11 79.45 75.32
Cr+ Rex+ Sh 90 To day 36500 Tonne 145.06 145.06 135.36 135.88 127.28 127.33 122.62 117.95 113.82
FORCES LEFT IN STAGE II CABLES AT DIFFERENT STAGES :
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Forces in stage II cables before Friction & slip loss before 28 Tonne 556.4 556.4 556.4 556.4 556.4 556.4 556.4 556.4 556.4
Eccentricity of cables from cg. of precast section m 0.137 0.137 0.336 0.333 0.357 0.356 0.432 0.473 0.480
Eccentricity of cables from cg. of composite section 0.462 0.462 0.666 0.658 0.830 0.829 0.905 0.946 0.953
At day 10 P Tonne
M Tm
10 To day 28 P Tonne
M Tm
At day 28 P Tonne 472.9 472.9 482.6 482.0 490.6 490.6 495.3 500.0 504.1
M Tm 65.0 65.0 162.1 160.7 175.1 174.5 214.1 236.4 242.2
28 To day 28 P Tonne 472.9 472.9 482.6 482.0 490.6 490.6 495.3 500.0 504.1
Forces at different sections at different stages
29 To day 45 P Tonne 456.1 456.1 465.8 465.3 473.9 473.8 478.5 483.2 487.3
M Tm 62.7 62.7 156.5 155.1 169.1 168.6 206.8 228.5 234.1
45 To day 90 P Tonne 449.9 449.9 459.6 459.1 467.7 467.6 472.3 477.0 481.1
M Tm 61.8 61.8 154.4 153.0 166.9 166.4 204.2 225.5 231.1
90 To day 36500 P Tonne 411.4 411.4 421.1 420.6 429.2 429.1 433.8 438.5 442.6
M Tm 56.5 56.5 141.5 140.2 153.2 152.7 187.5 207.3 212.6
FORCES LEFT IN (I+ II) STAGE CABLES AT DIFFERENT STAGES :
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
At day 10 P Tonne 214.27 214.27 215.35 215.31 216.70 216.66 219.45 222.20 224.07
M Tm 4.46 4.46 31.32 30.86 44.12 43.60 77.73 94.00 95.86
10 To day 28 P Tonne 207.84 207.84 208.92 208.88 210.27 210.24 213.02 215.77 217.64
M Tm 4.33 4.33 30.39 29.94 42.81 42.30 75.46 91.28 93.11
At day 28 P Tonne 670.07 670.07 680.85 680.29 690.28 690.19 697.69 705.11 711.10
M Tm 69.07 69.07 190.99 189.09 215.75 214.69 285.78 323.20 330.73
28 To day 28 P Tonne 670.09 670.09 680.87 680.30 690.30 690.21 697.71 705.12 711.12
Forces at different sections at different stages
29 To day 45 P Tonne 647.32 647.32 658.11 657.54 667.54 667.44 674.95 682.36 688.36
M Tm 66.64 66.64 184.48 182.65 208.55 207.52 276.41 312.74 320.12
45 To day 90 P Tonne 637.75 637.75 648.54 647.97 657.97 657.87 665.38 672.79 678.79
M Tm 65.72 65.72 181.91 180.10 205.65 204.63 272.54 308.38 315.70
90 To day 36500 P Tonne 577.67 577.67 588.45 587.89 597.88 597.79 605.29 612.71 618.70
M Tm 59.98 59.98 165.83 164.17 187.51 186.60 248.25 281.04 287.97
Equivalent eccentricity from cg. of precast section m 0.104 0.104 0.282 0.279 0.314 0.312 0.410 0.459 0.465
Equivalent eccentricity from top of precast section m 0.904 0.904 1.083 1.079 1.161 1.159 1.257 1.306 1.313
Forces just after fricticon & slip Horizontal component T 772.9 772.9 784.9 784.3 795.4 795.3 803.6 811.9 818.5
Forces just after fricticon & slip Vertical component T 95.82 95.82 61.68 63.70 32.00 32.16 19.25 6.49 0.00
Vertical component after all losses T 71.61 71.61 46.24 47.75 24.06 24.17 14.50 4.90 0.00
STRESSES IN SECTION AT DIFFERENT STAGES DUE TO PRE-STRESSING FORCES :
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of precast section alone
Area m2 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
Ib m4 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
yt m 0.80 0.80 0.80 0.80 0.85 0.85 0.85 0.85 0.85
Stress at top At day 10 Mpa 1.65 1.65 0.83 0.83 1.28 1.31 -0.12 -0.77 -0.83
Stress at bottom Mpa 1.93 1.93 2.80 2.76 4.86 4.84 6.18 6.84 6.93
Stress at top 10 To day 28 Mpa 1.60 1.60 0.81 0.81 1.25 1.27 -0.11 -0.75 -0.80
Stress at bottom Mpa 1.87 1.87 2.72 2.68 4.71 4.69 6.00 6.64 6.74
At day 28 Mpa 3.43 3.43 -0.27 -0.24 0.87 0.91 -2.03 -3.52 -3.76
Mpa 7.74 7.74 11.75 11.58 18.33 18.29 21.11 22.64 23.02
28 To day 28 Mpa 3.43 3.43 -0.27 -0.24 0.87 0.91 -2.03 -3.52 -3.76
Mpa 7.74 7.74 11.75 11.58 18.33 18.29 21.11 22.64 23.02
Forces at different sections at different stages
Stage II
cable 28 To day 29 Mpa 3.42 3.42 -0.25 -0.22 0.88 0.93 -2.00 -3.49 -3.72
Mpa 7.61 7.61 11.58 11.41 18.07 18.03 20.82 22.35 22.72
29 To day 45 Mpa 3.42 3.42 -0.24 -0.21 0.91 0.95 -1.96 -3.44 -3.68
Mpa 7.44 7.44 11.37 11.20 17.73 17.69 20.46 21.96 22.33
45 To day 90 Mpa 3.41 3.41 -0.22 -0.19 0.92 0.97 -1.93 -3.41 -3.64
Mpa 7.32 7.32 11.21 11.05 17.48 17.44 20.18 21.68 22.05
90 To day 36500 Mpa 3.37 3.37 -0.14 -0.11 1.02 1.06 -1.77 -3.21 -3.43
Mpa 6.53 6.53 10.22 10.08 15.92 15.88 18.47 19.89 20.25
Pre-stress loss calculation from Stage I prestressing to Stage II prestressing : (FOR 110% PRESTRESSING FORCE)
Stage : 1
At day 10 Action : Prestressing of stage I cables
SECTION PROPERTIES
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of Precast Section
Area m2 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
1 Tonne 0 0 0 0 0 0 0 0 0
2 Tonne 0 0 0 0 0 0 0 0 0
3 Tonne 292.663 292.663 292.749 292.744 292.9103 292.9063 293.23812 293.5659 293.678
4 Tonne 0 0 0 0 0 0 0 0 0
5 Tonne 0 0 0 0 0 0 0 0 0
6 Tonne 0 0 0 0 0 0 0 0 0
7 Tonne 0 0 0 0 0 0 0 0 0
Total (P1oh) Tonne 292.7 292.7 292.7 292.7 292.9 292.9 293.2 293.6 293.7
Weighted Average of pre-stress force Tonne 292.7 292.7 292.7 292.8 292.9 293.1 293.4 293.6
Total (F1h) Tonne 261.9 261.9 263.2 263.2 264.9 264.8 268.2 271.6 273.9
Eccen soffit m 0.78 0.78 0.65 0.66 0.55 0.55 0.40 0.33 0.33
Pre-stress loss Tonne 30.78 30.78 29.55 29.59 28.06 28.09 25.02 21.99 19.82
% Loss % 10.52 10.52 10.09 10.11 9.58 9.59 8.53 7.49 6.75
Prestressing force & their eccentricity from cg. of section of Stage I cables :
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Total (F1h) Tonne 261.88 261.88 263.20 263.15 264.85 264.81 268.22 271.58 273.86
eF m 0.02 0.02 0.15 0.14 0.20 0.20 0.35 0.42 0.43
eFc m 0.35 0.35 0.48 0.47 0.68 0.67 0.83 0.90 0.90
Material properties :
1) Losses due to Elastic Shortining : At day 10
loss in pre-stres force = 0.5*Ep/Ec*sav.*(N-1)*As
N-1 = Total Nos. of cable -1 = 0 Nos
As = Area of one cable = 1875.3 mm2
2
Modulus of Elasticity of concrete Ec = 33276.4 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
F1h = Horizontal component of pre-stressing force after friction & slip loss
eF = Eccentricity of pre-stressing force from cg. Precast section
eFc = Eccentricity of pre-stressing force from cg. Composite section
sc1 = Stress in Concrete at cg. of pre-stressing force. due to pre-stress
sc2 = Stress in Concrete at cg. of pre-stressing force, due to permanent loads at particular stage.
sc3 = Net stress in Concrete at cg. of pre-stressing force
MSWG = Bending Moment due to selfweight of girder at section x
2
Permanent Load stresses sc2 N/mm 0.00 0.00 -0.20 -0.19 -0.62 -0.61 -1.81 -2.70 -2.93
Net stress sc3 N/mm2 2.19 2.19 2.25 2.22 3.81 3.81 3.82 3.74 3.62
Average stress sc3 2.19 2.22 2.23 3.02 3.81 3.82 3.78 3.68
2
Weight average of concrete stresses at cg. of pre-stressing foce. sav. = 3.474 N/mm
Average loss in pre-stres force = 0.00 Tonne
F1h' T 261.88 261.88 263.20 263.15 264.85 264.81 268.22 271.58 273.86
eF m 0.02 0.02 0.15 0.14 0.20 0.20 0.35 0.42 0.43
2
sc1 N/mm 2.19 2.19 2.44 2.40 4.44 4.42 5.63 6.44 6.55
2
Permanent Load stresses sc2 N/mm 0.00 0.00 -0.20 -0.19 -0.62 -0.61 -1.81 -2.70 -2.93
Net stress sc3 N/mm2 2.187 2.187 2.247 2.218 3.813 3.812 3.819 3.739 3.621
Time Deepndent losses :
Application of initial pre-stress at = 10 day
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Crep loss from day 45 To day 90
Creep coefficent = 1.091
Concrete Modulus of elasticity at the time of loading = 33276.4 Mpa
Total Creep loss at day: 90 T 4.165 4.165 4.165 4.165 4.165 4.165 4.165 4.165 4.165
Additional loss from day 45 to day 90 T 0.852 0.852 0.852 0.852 0.852 0.852 0.852 0.852 0.852
Creep Loss :
For Stage-I cable, On account of Stage-I cable prestressing
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
Creep loss from 10 To day 28 Tonne 2.76 2.76 2.76 2.76 2.76 2.76 2.76 2.76 2.76
Creep loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 28 To day 29 Tonne 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Creep loss from 29 To day 45 Tonne 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54
Creep loss from 45 To day 90 Tonne 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Creep loss from 90 To day 36500 Tonne 3.87 3.87 3.87 3.87 3.87 3.87 3.87 3.87 3.87
Shrinkage Loss :
For Stage-I cable, On account of Stage-I cable prestressing
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
Shrinkage loss from 10 To day 28 Tonne 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30
Shrinkage loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Shrinkage loss from 28 To day 29 Tonne 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
Shrinkage loss from 29 To day 45 Tonne 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Shrinkage loss from 45 To day 90 Tonne 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55
Shrinkage loss from 90 To day 36500 Tonne 6.06 6.06 6.06 6.06 6.06 6.06 6.06 6.06 6.06
Pre-stress loss calculation after Stage II prestressing: (FOR 110% PRESTRESSING FORCE)
Stage : 2
At day 28 Action : Prestressing of stage II cables
2
Modulus of Elasticity of pre-stressing steel Ep : 195000 N/mm
Section properties
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of Precast Section
Area m2 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
Properties of Composite Section
Area m2 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
I gross m4 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yb m 1.12 1.12 1.13 1.12 1.23 1.23 1.23 1.23 1.23
Prestressing force & their eccentricity from cg. of section of Stage II cables :
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Total (F2h) Tonne 588.34 588.34 600.20 599.56 610.08 610.01 615.77 621.47 626.52
eF m 0.137 0.137 0.336 0.333 0.357 0.356 0.432 0.473 0.480
eFc m 0.462 0.462 0.666 0.658 0.830 0.829 0.905 0.946 0.953
2
Modulus of Elasticity of concrete Ec = 35000.0 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
Calculating Stress at the centroid of Ist stage cables due to II stage cables
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Length m 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Forces Left in Ist stage cables at day 28
F1h" Tonne 217.97 217.97 220.53 220.43 223.67 223.59 230.07 236.46 240.91
eF m 0.021 0.021 0.145 0.143 0.204 0.201 0.354 0.423 0.428
B) Elastic shortining of IInd stage cables due to IInd stage cable stressing
At day 28
loss in pre-stres force = 0.5*Ep/Ec*sav.*(N-1)*As
N-1 = Total Nos. of stage II cable - 1 = 1.47 Nos
As = Area of one cable = 1875.3 mm2
2
Modulus of Elasticity of concrete Ec = 35000.0 N/mm
2
Modulus of Elasticity of tendons Ep = 195000 N/mm
Calculating Stress at the centroid of IIst stage cables due to II stage cables
Sections c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Length 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Forces Left in IIst stage cables after friction & slip loss at day 28
F2h Tonne 588.3 588.3 600.2 599.6 610.1 610.0 615.8 621.5 626.5
eF m 0.137 0.137 0.336 0.333 0.357 0.356 0.432 0.473 0.480
Pre-stressing force at section after Elastic shortining loss due to II stage cables
At day = 28
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Length m 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Forces In I -stage cables
F1h'' T 205.0 205.0 207.5 207.4 210.7 210.6 217.1 223.5 227.9
eF m 0.021 0.021 0.145 0.143 0.204 0.201 0.354 0.423 0.428
F1h'' avg. T 205.0 206.3 207.5 209.1 210.6 213.8 220.3 225.7
Weighted average of pre-stress force I stage cables = 216.87 tonne
Claculation of stresses at the stage-I & stage-II cables afeter ES loss due to prestressing of II stage cables.
At day 28
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Total force in Stage II prestressing after ES loss due to II satge cables.
Fh' Tonne 577.94 577.94 589.80 589.16 599.67 599.60 605.37 611.07 616.12
eF m 0.14 0.14 0.34 0.33 0.36 0.36 0.43 0.47 0.48
eFc m 0.46 0.46 0.67 0.66 0.83 0.83 0.91 0.95 0.95
Total stresses N/mm2 4.902 4.902 6.067 5.967 10.571 10.548 12.101 12.863 12.935
Total stresses N/mm2 5.380 5.380 7.487 7.368 11.915 11.902 12.812 13.323 13.415
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO SECOND STAGE
PRESTRESSING :
Total stress 1.820 1.820 1.851 1.828 3.123 3.124 3.018 2.907 2.833
Total concrete stresses at cg. Stage I cables after stgae prestress applied (after ES loss taken place)
4.902 4.902 6.067 5.967 10.571 10.548 12.101 12.863 12.935
Net additional steress applied Mpa 4.881 4.881 6.116 6.009 10.991 10.957 13.560 15.139 15.435
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Crep loss from day 45 To day 90
Creep coefficent at day 90 = 0.722
Concrete Modulus of elasticity at the time of loading = 35000 Mpa
Total Creep loss at day: 90 T 9.220 9.220 9.220 9.220 9.220 9.220 9.220 9.220 9.220
Additional loss from day 45 to day 90 T 2.842 2.842 2.842 2.842 2.842 2.842 2.842 2.842 2.842
Immidiate loses in stage I cables due to elastic shortening losses due to second stage pre-stressing
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
At day 28 Elastic shortening Tonne 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Relaxation loss at day 28 To day 29
% loss at day 29 Days % loss 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59
Dspr Mpa 8.24 8.24 8.24 8.24 8.24 8.24 8.24 8.24 8.24
Total Relaxation loss at day 29 Tonne 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58
Additional loss from day 28 to day 29 Tonne 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58
Section properties (Precast Section Only) 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of Precast Section
Area m2 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO CASTING OF DECK SLAB :
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 1875.3 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO CASTING OF DECK SLAB :
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 4342.8 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Creep Loss at different stages: 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Casting of Deck at day = 28
Net additional steress applied Mpa 0.001 0.001 -0.408 -0.390 -1.024 -1.010 -2.128 -2.911 -3.154
Section properties (Composite Section) 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Properties of Composite Section
Area m2 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
I gross m4 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yb m 1.12 1.12 1.13 1.12 1.23 1.23 1.23 1.23 1.23
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO TRANSFER OF SUPER-
STRUCTURE AT PERMANENT BEARINGS.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 1875.3 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Additional creep loss in stage I cables on account of Transfer of super-structure at permanent bearings. :
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
Creep loss from 29 To day 45 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 45 To day 90 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 90 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO TRANSFER OF SUPER-
STRUCTURE AT PERMANENT BEARINGS.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 4342.8 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Additional creep loss in stage II cables on account of Transfer of super-structure at permanent bearings. :
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stages
Creep loss from 29 To day 45 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 45 To day 90 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 90 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CALCULATION OF STRESS GAIN ON ACCOUNT OF PLACING OF SIDL : (FOR 110% PRESTRESSING FORCE)
Stage : 5
At day 45 Action : PLACING OF SIDL
CALCULATION OF CREEP LOSS IN STAGE - I CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO PLACING OF SIDL.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 1875.3 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Creep Loss at different stages: 0.000 -0.315 0.075 -0.714 0.148 -0.804 -0.533 -0.140
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Casting of Deck at day = 45
Net additional steress applied Mpa 0.000 0.000 -0.315 -0.241 -0.955 -0.807 -1.611 -2.144 -2.284
CALCULATION OF CREEP LOSS IN STAGE - II CABLES ON ACCOUNT OF ADDITIONAL STRESSES DUE TO PLACING OF SIDL.:
DPc+s+r = Ap [ Ep/Ec f(t,to) sc ]
2
Ap = Area of all prestressing tendons. = 4342.8 mm
Decs = Free shrinkage strain.
Ep = Modulus of elasticity of prestressing steel. = 195000 Mpa
Creep Loss at different stages: 0 1.547 -0.047 1.5375 -0.0375 3.075 3.0375 3.0375
Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Creep loss from 45 To day 90 Tonne 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Creep loss from 90 To day 36500 Tonne 3.87 3.87 3.87 3.87 3.87 3.87 3.87 3.87 3.87
Creep loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage I Creep loss from 28 To day 29 Tonne 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75
cable Creep loss from 29 To day 45 Tonne 3.63 3.63 3.63 3.63 3.63 3.63 3.63 3.63 3.63
II cables
Creep loss from 45 To day 90 Tonne 2.84 2.84 2.84 2.84 2.84 2.84 2.84 2.84 2.84
Creep loss from 90 To day 36500 Tonne 9.83 9.83 9.83 9.83 9.83 9.83 9.83 9.83 9.83
10 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Casting of Deck
28 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Stage I Creep loss from 28 To day 29 Tonne -0.35 -0.35 -0.35 -0.35 -0.35 -0.35 -0.35 -0.35 -0.35
cable Creep loss from 29 To day 45 Tonne -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47 -0.47
Creep loss from 45 To day 90 Tonne -0.36 -0.36 -0.36 -0.36 -0.36 -0.36 -0.36 -0.36 -0.36
slab
Creep loss from 90 To day 36500 Tonne -1.26 -1.26 -1.26 -1.26 -1.26 -1.26 -1.26 -1.26 -1.26
cable Creep loss from 29 To day 45 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bearings
Creep loss from 45 To day 90 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 90 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Creep loss Tonne 23.02 23.02 23.02 23.02 23.02 23.02 23.02 23.02 23.02
Relaxation loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage I Relaxation loss from 28 To day 29 Tonne 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
cable Relaxation loss from 29 To day 45 Tonne 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87
cables
Relaxation loss from 45 To day 90 Tonne 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38
Relaxation loss from 90 To day 36500 Tonne 20.68 20.68 20.68 20.68 20.68 20.68 20.68 20.68 20.68
Total Relaxation loss Tonne 31.08 31.08 31.08 31.08 31.08 31.08 31.08 31.08 31.08
Shrinkage loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage I Shrinkage loss from 28 To day 29 Tonne 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
cable Shrinkage loss from 29 To day 45 Tonne 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
cables
Shrinkage loss from 45 To day 90 Tonne 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55 1.55
Shrinkage loss from 90 To day 36500 Tonne 6.06 6.06 6.06 6.06 6.06 6.06 6.06 6.06 6.06
Total Shrinkage loss Tonne 9.76 9.76 9.76 9.76 9.76 9.76 9.76 9.76 9.76
5) IMMIDIATE LOSES IN STAGE I CABLES DUE TO ELASTIC SHORTENING LOSSES DUE TO II STAGE PRE-STRESSING
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stressing
Stage I At day 28 Elastic shortening Tonne 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0
of stage-II
cable
cables
Cr+ Rex+ Sh 10 To day 28 Tonne 13.13 13.13 13.13 13.13 13.13 13.13 13.13 13.13 13.13
ES due to stage II cables At day 28 Tonne 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00
Cr+ Rex+ Sh 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage I
cable Cr+ Rex+ Sh 28 To day 29 Tonne 2.56 2.56 2.56 2.56 2.56 2.56 2.56 2.56 2.56
Cr+ Rex+ Sh 29 To day 45 Tonne 5.37 5.37 5.37 5.37 5.37 5.37 5.37 5.37 5.37
Cr+ Rex+ Sh 45 To day 90 Tonne 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54
Cr+ Rex+ Sh 90 To day 36500 Tonne 38.27 38.27 38.27 38.27 38.27 38.27 38.27 38.27 38.27
Total Shrinkage loss Tonne 107.64 107.64 106.41 106.45 104.92 104.95 101.88 98.85 96.68
Cr+ Rex+ Sh 10 To day 28 Tonne 43.91 43.91 42.67 42.72 41.18 41.22 38.15 35.12 32.95
ES due to stage II cables At day 28 Tonne 56.91 56.91 55.67 55.72 54.18 54.22 51.15 48.11 45.94
Cr+ Rex+ Sh 28 To day 28 Tonne 56.91 56.91 55.67 55.72 54.18 54.22 51.15 48.11 45.94
Stage I
cable Cr+ Rex+ Sh 28 To day 29 Tonne 59.46 59.46 58.23 58.28 56.74 56.78 53.71 50.67 48.50
Cr+ Rex+ Sh 29 To day 45 Tonne 64.84 64.84 63.60 63.65 62.11 62.15 59.08 56.05 53.88
Cr+ Rex+ Sh 45 To day 90 Tonne 69.37 69.37 68.14 68.18 66.65 66.69 63.61 60.58 58.41
Cr+ Rex+ Sh 90 To day 36500 Tonne 107.64 107.64 106.41 106.45 104.92 104.95 101.88 98.85 96.68
10 To day 28 P Tonne 248.8 248.8 250.1 250.0 251.7 251.7 255.1 258.5 260.7
M Tm 5.2 5.2 36.4 35.8 51.2 50.6 90.4 109.3 111.5
At day 28 P Tonne 235.8 235.8 237.1 237.0 238.7 238.7 242.1 245.5 247.7
M Tm 4.9 4.9 34.5 34.0 48.6 48.0 85.8 103.8 106.0
28 To day 28 P Tonne 235.8 235.8 237.1 237.0 238.7 238.7 242.1 245.5 247.7
M Tm 4.9 4.9 34.5 34.0 48.6 48.0 85.8 103.8 106.0
Stage I
cable
28 To day 29 P Tonne 233.2 233.2 234.5 234.5 236.2 236.1 239.5 242.9 245.2
M Tm 4.9 4.9 34.1 33.6 48.1 47.5 84.8 102.8 104.9
29 To day 45 P Tonne 227.8 227.8 229.1 229.1 230.8 230.8 234.2 237.5 239.8
M Tm 4.7 4.7 33.3 32.8 47.0 46.4 82.9 100.5 102.6
45 To day 90 P Tonne 223.3 223.3 224.6 224.6 226.3 226.2 229.6 233.0 235.3
M Tm 4.7 4.7 32.7 32.2 46.1 45.5 81.3 98.6 100.7
90 To day 36500 P Tonne 185.0 185.0 186.3 186.3 188.0 188.0 191.4 194.7 197.0
M Tm 3.9 3.9 27.1 26.7 38.3 37.8 67.8 82.4 84.3
SUMMARY OF LOSSES IN STAGE II CABLES : (FOR 110% PRESTRESSING FORCE)
1) CREEP LOSS :
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Creep loss from 10 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Stressing of stage- Creep loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage II Creep loss from 28 To day 29 Tonne 6.09 6.09 6.09 6.09 6.09 6.09 6.09 6.09 6.09
cable Creep loss from 29 To day 45 Tonne 8.05 8.05 8.05 8.05 8.05 8.05 8.05 8.05 8.05
II cables
Creep loss from 45 To day 90 Tonne 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30
Creep loss from 90 To day 36500 Tonne 21.80 21.80 21.80 21.80 21.80 21.80 21.80 21.80 21.80
10 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Casting of Deck
28 To day 28 Tonne 0 0 0 0 0 0 0 0 0
Stage II Creep loss from 28 To day 29 Tonne -0.99 -0.99 -0.99 -0.99 -0.99 -0.99 -0.99 -0.99 -0.99
cable Creep loss from 29 To day 45 Tonne -1.30 -1.30 -1.30 -1.30 -1.30 -1.30 -1.30 -1.30 -1.30
Creep loss from 45 To day 90 Tonne -1.02 -1.02 -1.02 -1.02 -1.02 -1.02 -1.02 -1.02 -1.02
slab
Creep loss from 90 To day 36500 Tonne -3.53 -3.53 -3.53 -3.53 -3.53 -3.53 -3.53 -3.53 -3.53
cable Creep loss from 29 To day 45 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
bearings
Creep loss from 45 To day 90 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Creep loss from 90 To day 36500 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Creep loss Tonne 30.30 30.30 30.30 30.30 30.30 30.30 30.30 30.30 30.30
2) IMMIDIATE LOSES IN STAGE II CABLES DUE TO ELASTIC SHORTENING LOSSES DUE TO II STAGE PRE-STRESSING
Losses In ACTION Losess Type Sections Unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.797 1.75 3.2875 3.25 6.325 9.3625 12.4
Stressing Friction & slip At day 28 Tonne 84.7 84.7 76.2 76.6 68.9 69.0 63.6 58.4 53.6
Stage II
of stage-II Elastic shortening 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4
cable
cables
Immediate loss Tonne 95.15 95.15 86.57 87.01 79.30 79.37 74.05 68.80 63.98
Relaxation loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage II Relaxation loss from 28 To day 29 Tonne 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58
cable Relaxation loss from 29 To day 45 Tonne 14.36 14.36 14.36 14.36 14.36 14.36 14.36 14.36 14.36
II cables
Relaxation loss from 45 To day 90 Tonne 2.81 2.81 2.81 2.81 2.81 2.81 2.81 2.81 2.81
Relaxation loss from 90 To day 36500 Tonne 41.36 41.36 41.36 41.36 41.36 41.36 41.36 41.36 41.36
Total Relaxation loss Tonne 62.11 62.11 62.11 62.11 62.11 62.11 62.11 62.11 62.11
Shrinkage loss from 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage II Shrinkage loss from 28 To day 29 Tonne 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13
cable Shrinkage loss from 29 To day 45 Tonne 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85 1.85
II cables
Shrinkage loss from 45 To day 90 Tonne 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.58
Shrinkage loss from 90 To day 36500 Tonne 14.02 14.02 14.02 14.02 14.02 14.02 14.02 14.02 14.02
Total Shrinkage loss Tonne 19.59 19.59 19.59 19.59 19.59 19.59 19.59 19.59 19.59
Cr+ Rex+ Sh 28 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stage II
cable Cr+ Rex+ Sh 28 To day 29 Tonne 8.81 8.81 8.81 8.81 8.81 8.81 8.81 8.81 8.81
Cr+ Rex+ Sh 29 To day 45 Tonne 22.96 22.96 22.96 22.96 22.96 22.96 22.96 22.96 22.96
Cr+ Rex+ Sh 45 To day 90 Tonne 9.42 9.42 9.42 9.42 9.42 9.42 9.42 9.42 9.42
Cr+ Rex+ Sh 90 To day 36500 Tonne 70.81 70.81 70.81 70.81 70.81 70.81 70.81 70.81 70.81
Total Shrinkage loss Tonne 207.15 207.15 198.57 199.01 191.30 191.37 186.05 180.80 175.98
Cr+ Rex+ Sh 10 To day 28 Tonne 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ES due to stage II cables At day 28 Tonne 95.15 95.15 86.57 87.01 79.30 79.37 74.05 68.80 63.98
Cr+ Rex+ Sh 28 To day 28 Tonne 95.15 95.15 86.57 87.01 79.30 79.37 74.05 68.80 63.98
Stage II
cable Cr+ Rex+ Sh 28 To day 29 Tonne 103.96 103.96 95.38 95.83 88.12 88.18 82.87 77.61 72.79
Cr+ Rex+ Sh 29 To day 45 Tonne 126.92 126.92 118.34 118.79 111.08 111.14 105.83 100.57 95.75
Cr+ Rex+ Sh 45 To day 90 Tonne 136.34 136.34 127.76 128.21 120.50 120.56 115.24 109.99 105.17
Cr+ Rex+ Sh 90 To day 36500 Tonne 207.15 207.15 198.57 199.01 191.30 191.37 186.05 180.80 175.98
10 To day 28 P Tonne
M Tm
At day 28 P Tonne 577.9 577.9 589.8 589.2 599.7 599.6 605.4 611.1 616.1
M Tm 79.4 79.4 198.2 196.4 214.0 213.3 261.7 288.9 296.0
28 To day 28 P Tonne 577.9 577.9 589.8 589.2 599.7 599.6 605.4 611.1 616.1
Forces at different sections at different stages
29 To day 45 P Tonne 546.2 546.2 558.0 557.4 567.9 567.8 573.6 579.3 584.3
M Tm 75.0 75.0 187.5 185.8 202.7 202.0 247.9 273.9 280.7
45 To day 90 P Tonne 536.7 536.7 548.6 548.0 558.5 558.4 564.2 569.9 574.9
M Tm 73.7 73.7 184.3 182.7 199.3 198.7 243.9 269.5 276.2
90 To day 36500 P Tonne 465.9 465.9 477.8 477.2 487.7 487.6 493.4 499.1 504.1
M Tm 64.0 64.0 160.5 159.1 174.0 173.5 213.3 236.0 242.2
10 To day 28 P Tonne 248.76 248.76 250.08 250.02 251.73 251.68 255.09 258.45 260.73
M Tm 5.18 5.18 36.38 35.84 51.25 50.64 90.36 109.34 111.55
At day 28 P Tonne 813.70 813.70 826.88 826.19 838.40 838.29 847.46 856.52 863.85
M Tm 84.30 84.30 232.66 230.36 262.62 261.33 347.42 392.79 401.97
28 To day 28 P Tonne 813.70 813.70 826.88 826.19 838.40 838.29 847.46 856.52 863.85
ferent stages
29 To day 45 P Tonne 773.99 773.99 787.17 786.48 798.70 798.58 807.76 816.82 824.14
M Tm 79.77 79.77 220.83 218.63 249.67 248.43 330.87 374.41 383.31
45 To day 90 P Tonne 760.04 760.04 773.22 772.53 784.74 784.63 793.80 802.86 810.19
M Tm 78.39 78.39 217.01 214.84 245.38 244.17 325.20 368.03 376.85
90 To day 36500 P Tonne 650.97 650.97 664.15 663.45 675.67 675.56 684.73 693.79 701.12
M Tm 67.86 67.86 187.65 185.75 212.32 211.28 281.04 318.36 326.46
Equivalent eccentricity from cg. of precast section m 0.104 0.104 0.283 0.280 0.314 0.313 0.410 0.459 0.466
Equivalent eccentricity from top of precast section m 0.904 0.904 1.084 1.080 1.161 1.160 1.258 1.306 1.313
Forces just after fricticon & slip Horizontal component T 772.9 772.9 784.9 784.3 795.4 795.3 803.6 811.9 818.5
Forces just after fricticon & slip Vertical component T 95.82 95.82 61.68 63.70 32.00 32.16 19.25 6.49 0.00
Vertical component after all losses T 80.70 80.70 52.19 53.89 27.19 27.32 16.40 5.55 0.00
Stress at top At day 10 Mpa 2.01 2.01 1.02 1.01 1.57 1.60 -0.14 -0.95 -1.01
Stress at bottom Mpa 2.35 2.35 3.43 3.37 5.93 5.91 7.55 8.36 8.48
Stress at top 10 To day 28 Mpa 1.91 1.91 0.97 0.96 1.49 1.52 -0.14 -0.90 -0.96
Stress at bottom Mpa 2.23 2.23 3.26 3.20 5.64 5.62 7.18 7.95 8.07
At day 28 Mpa 4.15 4.15 -0.35 -0.31 1.03 1.08 -2.48 -4.29 -4.57
Mpa 9.42 9.42 14.29 14.08 22.29 22.24 25.65 27.51 27.97
28 To day 28 Mpa 4.15 4.15 -0.35 -0.31 1.03 1.08 -2.48 -4.29 -4.57
Mpa 9.42 9.42 14.29 14.08 22.29 22.24 25.65 27.51 27.97
29 To day 45 Mpa 3.96 3.96 -0.31 -0.28 1.00 1.05 -2.35 -4.08 -4.43
Mpa 8.94 8.94 13.59 13.39 21.21 21.16 24.44 26.23 26.77
45 To day 90 Mpa 3.95 3.95 -0.29 -0.26 1.02 1.07 -2.31 -4.03 -4.38
Mpa 8.76 8.76 13.36 13.16 20.85 20.80 24.04 25.81 26.36
90 To day 36500 Mpa 3.89 3.89 -0.14 -0.11 1.20 1.25 -2.00 -3.66 -4.00
Mpa 7.33 7.33 11.56 11.39 18.00 17.96 20.93 22.57 23.09
CHECK FOR OUTER GIRDER
SUMMARY OF FORCES FOR OUTER GIRDER:
Impact Factor For LL.
Class A = 0.149
Class 70 R wh. = 0.149
SV Loading = 0
BENDING MOMENT OUTER GIRDER DUE TO PERMANENT LOAD
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.4 -0.25 0 0 1.547 1.5 3.0375 3 6.075 9.1125 12.15
Precast Beam Tm 0.00 0.00 -0.03 -0.03 34.11 33.18 60.52 59.92 101.18 126.09 135.25
Deck Outer Girder Tm 0.00 -0.02 -0.16 -0.14 30.83 29.96 56.69 56.09 97.29 121.65 129.77
Tranfer at Permanent Brg. Tm
SIDL Tm 31.44 24.35 55.34 47.78 76.62 93.65 99.02
Surfacing Tm 9.08 7.17 16.54 13.15 22.56 28.21 30.09
FPDL Tm
FPLL Tm
Governing LL with Impact
Mz Tm 0.00 75.69 58.66 140.07 114.96 200.96 257.60 277.85
Corresponding Fy Mton Tm 0.00
Section properties
Sections unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at m -0.4 -0.25 0 0 1.547 1.5 3.0375 3 6.075 9.1125 12.15
Properties of Precast Section
2
Area m 1.20 1.20 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
yt 0.80 0.80 0.80 0.80 0.80 0.80 0.85 0.85 0.85 0.85 0.85
Properties of Composite Section
Area m2 1.87 1.87 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
I gross m4 0.61 0.61 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yb m 1.12 1.12 1.12 1.12 1.13 1.12 1.23 1.23 1.23 1.23 1.23
yt m 0.70 0.70 0.70 0.70 0.69 0.70 0.59 0.59 0.59 0.59 0.59
Gtop 0.48 0.48 0.48 0.48 0.47 0.48 0.37 0.37 0.37 0.37 0.37
Dbottom Mpa -1.58 -1.58 -1.58 -1.58 -1.59 -1.58 -1.61 -1.61 -1.61 -1.61 -1.61
Gtop Mpa -1.58 -1.58 -1.58 -1.58 -1.59 -1.58 -1.61 -1.61 -1.61 -1.61 -1.61
Girder
Stresses A
Girder
Gbottom Mpa 2.78 2.78 2.78 2.78 2.76 2.78 2.02 2.02 2.02 2.02 2.02
Stresses due to -ve temperature stresses :
Dtop Mpa -2.40 -2.40 -2.40 -2.40 -2.40 -2.40 -2.29 -2.29 -2.29 -2.29 -2.29
Deck
Stresses At
Dbottom Mpa 0.97 0.97 0.97 0.97 0.98 0.97 1.14 1.14 1.14 1.14 1.14
Gtop Mpa 0.97 0.97 0.97 0.97 0.98 0.97 1.14 1.14 1.14 1.14 1.14
Girder
Gbottom Mpa -3.06 -3.06 -3.06 -3.06 -3.04 -3.06 -2.53 -2.53 -2.53 -2.53 -2.53
5) Rare Combination LC-SR5 : At day 29 At the time of transfer over permanent bearings
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
G) Stresses due to differential shrinkage Load factor = 1
Dtop Mpa -0.18 -0.18 -0.18 -0.18 -0.09 -0.09 -0.09 -0.09 -0.09
Deck
Dbottom Mpa -0.36 -0.36 -0.35 -0.36 -0.27 -0.27 -0.27 -0.27 -0.27
Gtop Mpa 0.81 0.81 0.81 0.81 0.90 0.90 0.90 0.90 0.90
Girder
Gbottom Mpa -0.44 -0.44 -0.44 -0.44 -0.35 -0.35 -0.35 -0.35 -0.35
H) -ve temperature stresses Load factor = 1
Dtop Mpa -2.40 -2.40 -2.40 -2.40 -2.29 -2.29 -2.29 -2.29 -2.29
Deck
Dbottom Mpa 0.97 0.97 0.98 0.97 1.14 1.14 1.14 1.14 1.14
Gtop Mpa 0.97 0.97 0.98 0.97 1.14 1.14 1.14 1.14 1.14
Girder
Gbottom Mpa -3.06 -3.06 -3.04 -3.06 -2.53 -2.53 -2.53 -2.53 -2.53
Total Stresses (A+B +C+D+E+F+G)
Dtop Mpa -2.59 -2.59 -1.46 -1.71 -0.28 -0.63 0.59 1.36 1.63
Deck
Dbottom Mpa 0.62 0.62 1.39 1.21 2.20 1.97 2.74 3.23 3.40
Gtop Mpa 5.19 5.19 4.39 4.16 9.31 9.08 10.49 11.61 12.28
Girder
Gbottom Mpa 3.82 3.82 3.86 4.16 5.80 6.54 3.62 1.65 0.81
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
7.3) Rare Combination LC-SR7.3 : At day 90 Structure open to LL + temperature stresses
Total Stresses (A+B)
Gtop Mpa 2.63 2.63 1.82 1.61 6.56 6.33 7.73 8.85 9.53
Girder
Gbottom Mpa 9.66 9.66 9.66 10.00 10.35 11.09 8.17 6.20 5.36
7.4) Rare Combination LC-SR7.4 : At day 90 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.19 5.19 4.39 4.16 9.31 9.08 10.49 11.61 12.28
Girder
Gbottom Mpa 3.82 3.82 3.86 4.16 5.80 6.54 3.62 1.65 0.81
8) Rare Combination LC-SR8 : At day 36500
Total Stresses (A+B)
Gtop Mpa 4.79 4.79 4.24 3.99 9.20 8.92 10.56 11.82 12.54
Girder
Gbottom Mpa 5.77 5.77 5.23 5.65 5.66 6.55 2.97 0.58 -0.39
8.1) Rare Combination LC-SR8.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.84 3.84 3.29 3.04 8.23 7.95 9.59 10.85 11.57
Girder
Gbottom Mpa 7.44 7.43 6.89 7.32 6.87 7.77 4.18 1.79 0.82
8.2) Rare Combination LC-SR8.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.37 5.37 4.83 4.57 9.88 9.61 11.24 12.50 13.22
Girder
Gbottom Mpa 3.93 3.93 3.41 3.82 4.15 5.04 1.45 -0.94 -1.91
8.3) Rare Combination LC-SR8.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.20 3.20 2.51 2.29 7.33 7.10 8.57 9.73 10.41
Girder
Gbottom Mpa 8.55 8.55 8.34 8.70 8.53 9.27 6.20 4.15 3.30
8.4) Rare Combination LC-SR8.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.76 5.76 5.07 4.85 10.08 9.85 11.33 12.48 13.16
Girder
Gbottom Mpa 2.71 2.70 2.54 2.86 3.98 4.72 1.65 -0.40 -1.25
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
2.3) Frequent Combination LC-SF2.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.84 3.84 2.82 2.67 7.41 7.28 8.41 9.33 9.93
Girder
Gbottom Mpa 7.44 7.43 8.01 8.18 9.57 9.98 8.05 6.75 6.17
1.4) Frequent Combination LC-SF1.4 : At day 90 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 4.80 4.80 3.67 3.52 8.29 8.16 9.22 10.11 10.70
Girder
Gbottom Mpa 5.04 5.04 5.84 5.98 8.67 9.07 7.29 6.07 5.50
2.4) Frequent Combination LC-SF2.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.37 5.37 4.36 4.21 9.06 8.93 10.06 10.99 11.59
Girder
Gbottom Mpa 3.93 3.93 4.53 4.68 6.84 7.25 5.32 4.02 3.44
SECTION PROPERTIES
Sections unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at m -0.4 -0.25 0 0 1.547 1.5 3.0375 3 6.075 9.1125 12.15
Properties of Precast Section
Area m2 1.20 1.20 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
yt m 0.80 0.80 0.80 0.80 0.80 0.80 0.85 0.85 0.85 0.85 0.85
Properties of Composite Section
Area m2 1.87 1.87 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
I gross m4 0.61 0.61 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yb m 1.12 1.12 1.12 1.12 1.13 1.12 1.23 1.23 1.23 1.23 1.23
yt m 0.70 0.70 0.70 0.70 0.69 0.70 0.59 0.59 0.59 0.59 0.59
Gtop m 0.48 0.48 0.48 0.48 0.47 0.48 0.37 0.37 0.37 0.37 0.37
5) Rare Combination LC-SR5 : At day 29 At the time of transfer over permanent bearings
SUMMARY FOR SLS RARE COMBINATION 0.00 1.55 -0.05 1.54 -0.04 3.08 3.04 3.04
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
1) Rare Combination LC-SR1 : At the time of 1st stage prestress, just after ES loss of Stage -I cables
Total Stresses (A+B)
Gtop Mpa 2.01 2.01 2.09 2.05 4.16 4.16 4.19 4.46 4.79
Girder
Gbottom Mpa 2.35 2.35 2.35 2.33 3.63 3.63 3.69 3.55 3.32
2) Rare Combination LC-SR2 At day 28 Just before II Stage prestressing
Total Stresses (A+B)
Gtop Mpa 1.91 1.91 2.04 2.00 4.09 4.09 4.20 4.50 4.84
Girder
Gbottom Mpa 2.24 2.24 2.18 2.17 3.33 3.33 3.33 3.15 2.92
3) Rare Combination LC-SR3 : At day 28 Just after II Stage prestressing after ES
Total Stresses (A+B)
Gtop Mpa 4.15 4.15 0.72 0.72 3.62 3.65 1.86 1.12 1.22
Girder
Gbottom Mpa 9.42 9.42 13.22 13.05 19.98 19.96 21.80 22.71 22.82
4) Rare Combination LC-SR4 : At day 28 At the time of casting of deck slab
Total Stresses (A+B)
Gtop Mpa 4.14 4.14 1.70 1.66 6.05 6.05 6.03 6.33 6.79
Girder
Gbottom Mpa 9.42 9.42 12.25 12.11 17.82 17.82 18.09 18.08 17.87
5) Rare Combination LC-SR5 : At day 29 At the time of transfer over permanent bearings
Total Stresses (A+B)
Gtop Mpa 4.27 4.27 1.85 1.81 6.22 6.22 6.22 6.52 6.98
Girder
Gbottom Mpa 9.20 9.20 11.99 11.85 17.46 17.46 17.71 17.68 17.47
6) Rare Combination LC-SR6 : At day 45 At the time of placing of sidl
Total Stresses (A+B)
Gtop Mpa 4.49 4.49 2.60 2.49 7.18 7.09 7.52 8.07 8.52
Girder
Gbottom Mpa 8.66 8.65 10.47 10.52 14.71 14.98 14.15 13.49 13.19
7) Rare Combination LC-SR7 : At day 90 Structure open to LL
Total Stresses (A+B)
Gtop Mpa 4.76 4.76 3.48 3.24 8.53 8.26 9.34 10.32 10.92
Girder
Gbottom Mpa 8.32 8.32 8.69 9.06 10.85 11.73 8.80 6.76 5.97
7.1) Rare Combination LC-SR7.1 : At day 90 Structure open to LL + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.81 3.81 2.53 2.29 7.56 7.29 8.37 9.35 9.95
Girder
Gbottom Mpa 9.99 9.99 10.35 10.73 12.07 12.95 10.01 7.97 7.19
7.2) Rare Combination LC-SR7.2 At day 90 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.34 5.34 4.07 3.82 9.22 8.95 10.02 11.00 11.60
Girder
Gbottom Mpa 6.49 6.49 6.87 7.23 9.34 10.22 7.28 5.24 4.46
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
7.3) Rare Combination LC-SR7.3 : At day 90 Structure open to LL + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.17 3.17 1.75 1.54 6.66 6.44 7.36 8.23 8.79
Girder
Gbottom Mpa 11.11 11.11 11.80 12.12 13.72 14.45 12.03 10.33 9.67
7.4) Rare Combination LC-SR7.4 : At day 90 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.73 5.73 4.31 4.10 9.42 9.19 10.11 10.99 11.55
Girder
Gbottom Mpa 5.26 5.26 6.00 6.27 9.17 9.90 7.48 5.78 5.12
8) Rare Combination LC-SR8 : At day 36500
Total Stresses (A+B)
Gtop Mpa 5.30 5.30 4.24 3.99 9.38 9.11 10.32 11.36 11.97
Girder
Gbottom Mpa 6.57 6.57 6.57 6.97 7.75 8.63 5.43 3.25 2.45
8.1) Rare Combination LC-SR8.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 4.35 4.35 3.29 3.04 8.41 8.14 9.35 10.39 11.00
Girder
Gbottom Mpa 8.24 8.24 8.23 8.64 8.96 9.85 6.64 4.47 3.66
8.2) Rare Combination LC-SR8.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.88 5.88 4.83 4.57 10.07 9.79 11.00 12.05 12.65
Girder
Gbottom Mpa 4.73 4.73 4.74 5.13 6.23 7.12 3.91 1.74 0.93
8.3) Rare Combination LC-SR8.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.71 3.71 2.51 2.29 7.51 7.28 8.34 9.27 9.84
Girder
Gbottom Mpa 9.35 9.35 9.68 10.02 10.61 11.35 8.66 6.83 6.14
8.4) Rare Combination LC-SR8.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 6.27 6.27 5.07 4.85 10.27 10.04 11.09 12.03 12.60
Girder
Gbottom Mpa 3.51 3.51 3.88 4.18 6.06 6.80 4.11 2.28 1.60
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
2.3) Frequent Combination LC-SF2.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 4.35 4.35 2.82 2.67 7.59 7.47 8.17 8.88 9.37
Girder
Gbottom Mpa 8.24 8.24 9.34 9.50 11.66 12.06 10.51 9.43 9.01
2.4) Frequent Combination LC-SF2.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.88 5.88 4.36 4.21 9.24 9.12 9.82 10.53 11.02
Girder
Gbottom Mpa 4.73 4.73 5.86 5.99 8.93 9.33 7.78 6.70 6.28
Section properties
Sections unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at m -0.4 -0.25 0 0 1.547 1.5 3.0375 3 6.075 9.1125 12.15
Properties of Precast Section
2
Area m 1.20 1.20 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
yt 0.80 0.80 0.80 0.80 0.80 0.80 0.85 0.85 0.85 0.85 0.85
Properties of Composite Section
Area m2 1.87 1.87 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
I gross m4 0.61 0.61 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yb m 1.12 1.12 1.12 1.12 1.13 1.12 1.23 1.23 1.23 1.23 1.23
yt m 0.70 0.70 0.70 0.70 0.69 0.70 0.59 0.59 0.59 0.59 0.59
Gtop 0.48 0.48 0.48 0.48 0.47 0.48 0.37 0.37 0.37 0.37 0.37
5) Rare Combination LC-SR5 : At day 29 At the time of transfer over permanent bearings
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
2.3) Frequent Combination LC-SF2.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.84 3.90 2.81 2.71 7.48 7.38 8.62 9.63 10.29
Girder
Gbottom Mpa 7.44 7.28 8.25 8.30 10.21 10.50 8.85 7.65 6.99
1.4) Frequent Combination LC-SF1.4 : At day 90 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 4.80 4.87 3.66 3.56 8.36 8.27 9.43 10.41 11.06
Girder
Gbottom Mpa 5.04 4.89 6.08 6.09 9.31 9.59 8.10 6.97 6.32
2.4) Frequent Combination LC-SF2.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.37 5.44 4.35 4.24 9.13 9.03 10.27 11.28 11.94
Girder
Gbottom Mpa 3.93 3.77 4.76 4.79 7.48 7.77 6.13 4.92 4.26
SECTION PROPERTIES
Sections unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Section at m -0.4 -0.25 0 0 1.547 1.5 3.0375 3 6.075 9.1125 12.15
Properties of Precast Section
Area m2 1.20 1.20 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
I gross m4 0.26 0.26 0.26 0.26 0.25 0.26 0.20 0.20 0.20 0.20 0.20
yb m 0.80 0.80 0.80 0.80 0.80 0.80 0.75 0.75 0.75 0.75 0.75
yt m 0.80 0.80 0.80 0.80 0.80 0.80 0.85 0.85 0.85 0.85 0.85
Properties of Composite Section
Area m2 1.87 1.87 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
I gross m4 0.61 0.61 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yb m 1.12 1.12 1.12 1.12 1.13 1.12 1.23 1.23 1.23 1.23 1.23
yt m 0.70 0.70 0.70 0.70 0.69 0.70 0.59 0.59 0.59 0.59 0.59
Gtop m 0.48 0.48 0.48 0.48 0.47 0.48 0.37 0.37 0.37 0.37 0.37
5) Rare Combination LC-SR5 : At day 29 At the time of transfer over permanent bearings
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
7.3) Rare Combination LC-SR7.3 : At day 90 Structure open to LL + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.17 3.24 1.74 1.57 6.73 6.54 7.57 8.53 9.15
Girder
Gbottom Mpa 11.11 10.95 12.04 12.23 14.36 14.97 12.83 11.23 10.49
7.4) Rare Combination LC-SR7.4 : At day 90 Structure open to LL - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.73 5.80 4.30 4.13 9.49 9.30 10.32 11.28 11.90
Girder
Gbottom Mpa 5.26 5.11 6.24 6.39 9.81 10.42 8.29 6.68 5.94
8) Rare Combination LC-SR8 : At day 36500
Total Stresses (A+B)
Gtop Mpa 5.30 5.36 4.22 4.02 9.45 9.22 10.53 11.66 12.33
Girder
Gbottom Mpa 6.57 6.41 6.81 7.09 8.39 9.15 6.23 4.16 3.27
8.1) Rare Combination LC-SR8.1 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 4.35 4.41 3.27 3.07 8.49 8.25 9.56 10.69 11.36
Girder
Gbottom Mpa 8.24 8.08 8.46 8.76 9.60 10.36 7.44 5.37 4.49
8.2) Rare Combination LC-SR8.2 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.88 5.95 4.81 4.60 10.14 9.90 11.22 12.34 13.01
Girder
Gbottom Mpa 4.73 4.58 4.98 5.25 6.87 7.63 4.71 2.64 1.76
8.3) Rare Combination LC-SR8.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 3.71 3.78 2.49 2.32 7.58 7.39 8.55 9.57 10.20
Girder
Gbottom Mpa 9.35 9.19 9.92 10.14 11.25 11.86 9.46 7.73 6.97
8.4) Rare Combination LC-SR8.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 6.27 6.34 5.06 4.88 10.34 10.14 11.30 12.32 12.95
Girder
Gbottom Mpa 3.51 3.35 4.11 4.29 6.70 7.32 4.91 3.18 2.42
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
2.3) Frequent Combination LC-SF2.3 : At day 36500 + temperature stresses
Total Stresses (A+B)
Gtop Mpa 4.35 4.41 2.80 2.71 7.66 7.57 8.38 9.17 9.72
Girder
Gbottom Mpa 8.24 8.08 9.58 9.62 12.30 12.58 11.31 10.33 9.84
2.4) Frequent Combination LC-SF2.4 : At day 36500 - temperature stresses
Total Stresses (A+B)
Gtop Mpa 5.88 5.95 4.34 4.24 9.31 9.22 10.03 10.83 11.38
Girder
Gbottom Mpa 4.73 4.58 6.10 6.11 9.57 9.85 8.58 7.60 7.11
Sections unit c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Distance m 0.25 0.25 1.80 1.75 3.29 3.25 6.33 9.36 12.40
G) Stresses due to differential shrinkage Load factor = 1
Dtop Mpa -0.18 -0.18 -0.18 -0.18 -0.09 -0.09 -0.09 -0.09 -0.09
Deck
Dbottom Mpa -0.36 -0.36 -0.35 -0.36 -0.27 -0.27 -0.27 -0.27 -0.27
Gtop Mpa 0.81 0.81 0.81 0.81 0.90 0.90 0.90 0.90 0.90
Girder
Gbottom Mpa -0.44 -0.44 -0.44 -0.44 -0.35 -0.35 -0.35 -0.35 -0.35
H) +ve temperature stresses Load factor = 0.5
Dtop Mpa 2.02 2.02 2.02 2.02 2.05 2.05 2.05 2.05 2.05
Deck
Dbottom Mpa -0.79 -0.79 -0.79 -0.79 -0.81 -0.81 -0.81 -0.81 -0.81
Gtop Mpa -0.79 -0.79 -0.79 -0.79 -0.81 -0.81 -0.81 -0.81 -0.81
Girder
Gbottom Mpa 1.39 1.39 1.38 1.39 1.01 1.01 1.01 1.01 1.01
Total Stresses (A+B +C+D+E+F+G)
Dtop Mpa 1.84 1.93 2.08 2.05 2.37 2.30 2.51 2.67 2.78
Deck
Dbottom Mpa -1.15 -1.08 -0.98 -1.00 -0.81 -0.86 -0.73 -0.62 -0.56
Gtop Mpa 3.96 4.03 2.09 2.02 6.77 6.72 7.27 7.91 8.42
Girder
Gbottom Mpa 9.72 9.56 11.71 11.65 15.87 16.03 15.45 14.87 14.49
Max Compressive stress = 16.030 Mpa < 18.00 Mpa Linear Creep
Max Tensle Stress = 2.02 Mpa >= -3.52 Mpa OK
Shear Force at precast section alone Tm 0.00 1.64 54.45 54.77 45.41 45.60 30.45 15.53 0.60
Additional Shear Force at Composite section Tm 0.00 0.00 79.70 80.02 64.06 82.64 63.92 44.59 31.41
Section At Unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
Area of prestressing steel Ap mm2 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1
Cg. of prestressing force (from deck top) m 0.90 0.90 1.08 1.08 1.16 1.16 1.26 1.31 1.31
Shear Force at Precast section alone Vc1 Tonne 1.64 54.45 54.77 45.41 45.60 30.45 15.53 0.60
Vertical Component of prestress force Tonne 76.15 49.22 50.82 25.62 25.75 15.45 5.22 0.00
Vc1' Tonne -59.29 15.08 14.11 24.91 25.00 18.09 11.35 0.60
tS Mpa -0.50 0.13 0.12 0.37 0.37 0.27 0.17 0.01
Check tS ≤ fctd OK OK OK OK OK OK OK OK
Stress at composite centriod due to Moment at Precast section alone
Moment at precast section MPC -0.24 87.68 85.23 158.24 156.62 267.93 334.44 357.78
Stress at composite centriod scm Mpa 0.00 1.14 1.08 3.79 3.75 6.41 8.00 8.56
Factored shear force VED Tonne 1.64 134.15 134.79 109.46 128.24 94.37 60.12 32.01
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Shear Reinforcement
Provide Minimum
Provide Minimum
Provide Minimum
Provide Minimum
Provide Minimum
Provide Minimum
Check
NA
NA
Shear Capacity Assuming Section is cracked :
Design Shear Resitance
VRdc = Max ( 0.12 k (80 r1 fck )0.33 + 0.15 scp ) bw d ( IRC 112 / clause 10.3.2 (2) )
(nmin +0.15scp ) bw d
3.03
k = Min 1 + √ 200/d d is depth in mm
2 0.75 0.22
= 1.349
0.15
0.05
r1 = Min Asl /bw d
0.02 0.115 1.82
0.29 1.05 1.60
Asl provided 16 f 5 Nos. NA
2
Asl provided = 1005.31 mm 0.115
bw = 0.29 m 0.10
r1 = 0.00212 0.25
Section At Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
Prestressing Force after all losses Tonne 0.00 0.00 614.32 614.32 626.30 625.67 636.78 636.67 645.01 653.25 659.91
Area of precast section m2 0.00 0.00 1.20 1.20 1.18 1.20 0.68 0.68 0.68 0.68 0.68
Area of composite section m2 0.00 0.00 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
bw m 0.75 0.75 0.75 0.75 0.74 0.75 0.29 0.29 0.29 0.29 0.29
2
Asl provided mm 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31 1005.31
Factored shear force Tonne 0.00 1.64 134.15 134.79 109.46 128.24 94.37 60.12 32.01
Shear Reinforcement
Provide Minimum
Check
Shear Reinf.
Required
NA
NA
NA
NA
NA
NA
NA
CHECK FOR SECTION MAXIMUM SHEAR CAPACITY :
Vccd = 0 T
Vtd = 0 T
Variation of q 45
o
≥ q ≥ 21.80
o
Considering q = 45
o
for maximum shear capacity of section
VRdmax = acw * bw * z * n1 * fcd / ( cot q +tan q) ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
acw = 1
= 0.6
Section At Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
scp = NED/ Ac Mpa 5.29 5.21 9.33 9.33 9.45 9.57 9.67
acw 1.24 1.23 1.25 1.25 1.25 1.25 1.25
bw m 0.74 0.75 0.29 0.29 0.29 0.29 0.29
z m 1.24 1.24 1.32 1.32 1.41 1.46 1.47
VRdmax 1510.98 1531.3 639.599 638.878 686.327 709.858 713.138
Factored shear force VNS Tonne 134.15 134.79 109.46 128.24 94.37 60.12 32.01
Check OK OK OK OK OK OK OK
q = 0.5 sin-1 [ 2*VNS / (acw * bw * z * v1 * fcd) ] ( IRC 112 / clause 10.3.3.2 Eq 10.8 )
Section At Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
VNS T 134.15 134.79 109.46 128.24 94.37 60.12 32.01
bw m 0.74 0.75 0.29 0.29 0.29 0.29 0.29
d m 1.64 1.64 1.64 1.64 1.64 1.64 1.64
z m 1.24 1.24 1.32 1.32 1.41 1.46 1.47
q deg 5.11 5.07 10.01 11.83 7.98 4.88 2.58
q adopted deg 45 21.8 21.8 21.8 21.8 21.8 21.8
FINDING DESIGN SHEAR REINFORCEMENT REQUIREMENT
VNS = VRds = (Asw/s) *z *fywd *cotq ( IRC 112 / clause 10.3.3.2 Eq 10.7 )
Section At Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
VNS T 134.15 134.79 109.46 128.24 94.37 60.12 32.01
bw m 0.74 0.75 0.29 0.29 0.29 0.29 0.29
z m 1.24 1.24 1.32 1.32 1.41 1.46 1.47
qdesign deg 45.00 21.80 21.80 21.80 21.80 21.80 21.80
Asw/s mm2/m 3112.0 1254.7 956.0 1121.2 768.1 473.0 250.7
Additional requirement (suspension reinf)
Asw,min /s mm2/m 74.90 76.37 29.53 59.06 59.06 59.06 59.06
Provide Asw Legs nos 4 4 4 2 2 2 2
dia mm 12 12 12 12 12 12 12
spacing mm 100 100 100 200 200 200 200
Asw/s provide 4523.9 4523.9 4523.9 1131.0 1131.0 1131.0 1131.0
Check Ok/Revise OK OK OK OK OK OK OK
CONTROL OF SHEAR WITHIN WEBS :
Concrete Tensile streang prior to cracing in biaxial state
fctb = (1 - 0.8 s3/fck) fctk,0.05
fck = 50 Mpa
fctk,0.05 = 2.5 Mpa
Shear Force at precast section alone Tm 0.00 1.21 40.33 40.57 33.63 33.78 22.56 11.50 0.45
Additional Shear Force at Composite section Tm 0.00 0.00 54.55 54.73 43.36 56.23 43.28 30.13 20.99
Section At Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
Area of prestressing steel Ap mm2 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1
Cg. of prestressing force (from deck top) m 0.90 0.90 1.08 1.08 1.16 1.16 1.26 1.31 1.31
Axial stress (due to pre stress) fx Mpa 5.12 5.29 5.21 9.33 9.33 9.45 9.57 9.67
*stresses due to bending are ignored
Maximum Principal stress
s3 (comp)= [fx/2 + 1/2 (fx2 + 4tv2)] Mpa 5.17 5.35 5.27 9.50 9.59 9.61 9.65 9.70
s1 (tens) = [fx/2 - 1/2 (fx2 + 4tv2)] Mpa -0.05 -0.06 -0.06 -0.17 -0.26 -0.16 -0.08 -0.03
fctb Mpa 2.29 2.29 2.29 2.12 2.12 2.12 2.11 2.11
reinforcement
reinforcement
reinforcement
reinforcement
reinforcement
reinforcement
reinforcement
reinforcement
Minmum
Minmum
Minmum
Minmum
Minmum
Minmum
Minmum
Minmum
for crack
crack
crack
crack
crack
crack
crack
for crack
Provide
Provide
Provide
Provide
Provide
Provide
Provide
Provide
for
for
for
for
for
for
Check s1 < fctb
Minimum Reinforcement Requirement For Crack Control
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
Reinforcement requirement in bottom flange
b 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
h considered 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
Act = b*h m2 69000 69000 69000 69000 69000 69000 69000 69000 69000
As,min web = r0s,min * Kc *Act mm2 560.63 560.63 560.63 560.63 560.63 560.63 560.63 560.63 560.63
Reinforcement provided (both face ) mm2 804.25 804.25 804.25 804.25 804.25 804.25 804.25 804.25 804.25
Check OK OK OK OK OK OK OK OK OK
Total bottom flange width including bottom flange 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
Nos of bar required at bottom 5 5 5 5 5 5 5 5 5
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
Reinforcement requirement in Top flange
b 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
h considered 0.175 0.175 0.175 0.175 0.175 0.175 0.175 0.175 0.175
Act = b*h m2 40250 40250 40250 40250 40250 40250 40250 40250 40250
As,min = r0s,min * Kc *Act mm2 327.03 327.03 327.03 327.03 327.03 327.03 327.03 327.03 327.03
vEdi = b VEd /z bi
bi = 0.75 m bi = 0.75
r = As /Ai
As = Area of reinforcement crossing the inter face
Ai = Interface area of joint
a = 90 deg
VED T 0.00 0.00 79.70 80.02 64.06 82.64 63.92 44.59 31.41
z m 1.060 1.239 1.235 1.317 1.315 1.413 1.461 1.468
vEdi N/mm2 0.000 0.857 0.864 0.649 0.838 0.603 0.407 0.285
Legs nos 4 4 4 4 4 4 4 4
Provide Asw dia mm 12 12 12 12 12 12 12 12
spacing mm 125 125 125 125 125 200 200 200
Asw/s provide 3619.1 3619.1 3619.1 3619.1 3619.1 2261.9 2261.9 2261.9
Check As ≥ As,min OK OK OK OK OK OK OK OK
r 0.0048 0.0048 0.0048 0.0048 0.0048 0.0030 0.0030 0.0030
vRdi N/mm2 1.2588 1.2588 1.2588 1.2588 1.2588 0.7868 0.7868 0.7868
Check vEDi ≤ vRdi OK OK OK OK OK OK OK OK
CHECK FOR SHEAR IN FLANGED PORTION: ( IRC 112 / clause 10.3.5)
o
Variation of qf 45 ≥ q ≥ 26.5 o
For compression flange
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
vEdf Mpa 0.00 1.12 1.13 0.85 1.09 0.79 0.53 0.37
qdesign deg 26.50 26.50 26.50 26.50 26.50 26.50 26.50 26.50
Asf /sf mm2/m 0.00 282.32 284.38 213.56 275.82 198.59 133.93 93.91
As there will be transverse bending will exist along with shear b/w precast beam & deck
Check for Minimum Requirement in transverse direction
Reinforcement requirement for transverse bending of deck
2
As, deck = 2000 mm /m ( Including Top & Bottom Both reinf)
dia mm 16 16 16 16 16 16 16 16 16
At Bottom spacing mm 150 150 150 150 150 150 150 150 150
As,trans 2680.83 2680.83 2680.83 2680.83 2680.83 2680.83 2680.83 2680.83 2680.83
0.15 0.00 Cu
0.05 0.00 xu lxu
0.10 Tu
0.25
0.75 0.75
Section At Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
2
Area of prestressing steel Ap mm 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1 6218.1
Cg. of prestressing force (from girder top) m 0.90 0.90 1.08 1.08 1.16 1.16 1.26 1.31 1.31
Cg. of prestressing force (from deck top) m 1.12 1.12 1.30 1.30 1.38 1.38 1.48 1.53 1.53
Total prestressing force T 650.97 650.97 664.15 663.45 675.67 675.56 684.73 693.79 701.12
Prestrain at cg. Of cables 0.0054 0.0054 0.0055 0.0055 0.0056 0.0056 0.0056 0.0057 0.0058
Strain at cg. of prestressing steel 0.021 0.021 0.025 0.025 0.026 0.026 0.028 0.030 0.030
Total strain at cg. of prestressing cables = prestrain + bending strain 0.026 0.026 0.030 0.030 0.032 0.032 0.034 0.035 0.035
Total tensile force fpd*Ap T 875.4 875.4 875.4 875.4 875.4 875.4 875.4 875.4 875.4
Calculating Compression force
Area of compression force upto hfcd m2 0.3920 0.3920 0.3920 0.3920 0.3920 0.3920 0.3920 0.3920 0.3920
Total compression force = hfcd * Ac Tonne 875.4 875.4 875.4 875.4 875.4 875.4 875.4 875.4 875.4
Total compression C - Total Tension T 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Check OK OK OK OK OK OK OK OK OK
Cg. of compression force below deck top m 0.0647 0.0647 0.0647 0.0647 0.0647 0.0647 0.0647 0.0647 0.0647
Lever arm b/w Tension & compression force m 1.0596 1.0596 1.2393 1.2353 1.3167 1.3152 1.4129 1.4614 1.4681
Moment capacity Tm 927.577 927.577 1084.96 1081.42 1152.71 1151.41 1236.93 1279.34 1285.25
Factored moment at section Tm 0.00 0.00 259.54 218.64 472.00 416.57 712.30 896.63 960.88
Check OK OK OK OK OK OK OK OK OK
STRESS CALCULATION DUE TO TEMPERATURE GIRDER:
Coefficent of thermal expansion = 1.2E-05
2
Ec = 35000 N/mm
2
Es = 200000 N/mm
1.82
1.82
1.27 1.82 0.29 1.05 0.82
f7 f7
0.1
f8
f8 f9 0.25
f9 -0.8
0.15 f10 0.25 f10 0.25
2.1 0.75 -6.6
e0 x SA - q x SAy = a x SAt
e0 x 1.328 - q x 0.796 = 1.2E-05 x 5.962 ------------------- (1)
x x
e0 SAy - q x SAy2 = a x SAyt
e0 x 0.79571 - q x 0.953 = 1.2E-05 x 0.764 ------------------- (2) + ve = compression
- ve = tension
By solving equation (1) & (2)
e0 = 9.6E-05
q = 7.1E-05 rad./m
STRESSES AT
Dtop Dbottom Gtop Gbottom 4.11
Points Depth f ei = Ec ( at + yq - eo ) ytop 0.00 0.22 0.22 1.82
mm N/mm2 Eigen stresses N/mm2 N/mm2 N/mm2 N/mm2 -2.25
0 0
f1 0 4.11
f2 0.15 -1.32 4.10675 -1.61455 -1.61455 2.02227
f3 0.22 -1.61
f4 0.4 -2.38
f5 0.37 -2.25 Stresses At cg. Of steel & outermost
f6 0.42 -2.33 steel is in steel
f7 1.47 0.27
f8 1.57 0.52
2.02
f9 1.67 0.77
f10 1.82 2.02
1.82 0 Positive temp. stress
e0 x SA - q x SAy = a x SAt
x x
x x x
e0 x 1.367 - q x 0.810 = 1.2E-05 x -5.015 ------------------- (1)
e0 SAy - q x SAy
2
= a x SAyt
e0 x 0.810 - q x 0.966 = 1.2E-05 x -1.750 ------------------- (2)
STRESSES AT
Dtop Dbottom Gtop Gbottom -2.29
Points Depth f ei = Ec ( at + yq - eo ) ytop 0.00 0.22 0.22 1.82
mm N/mm2 Eigen stresses N/mm2 N/mm2 N/mm2 N/mm2
0 0 1.64
f1 0 -2.29
f2 0.22 1.14 -2.287 1.140 1.140 -2.526
f3 0.25 1.61
f4 0.37 1.62
f5 0.5 1.64 Stresses At cg. Of steel & outermost
f6 0.42 1.63 steel is in steel
f7 1.32 0.77
f8 1.47 0.41 -2.53
f9 1.57 0.17
f10 1.82 -2.53
Positive temp. stress
1.82 0
1.82
1.82
1 1.82 1.45 0.82
f7
f8
0.25
f7
f7 -0.8
0.15 f8 f9 0.25
2.1 0.75 -6.6
e0 x SA - q x SAy = a x SAt
e0 x 1.867 - q x 1.29732 = 1.2E-05 x 6.224 ------------------- (1)
STRESSES AT
Dtop Dbottom Gtop Gbottom 4.04
Points Depth f ei = Ec ( at + yq - eo ) ytop 0.00 0.22 0.22 1.82
-2.15
2 2 2 2 2
mm N/mm Eigen stresses N/mm N/mm N/mm N/mm
0 0
f1 0 4.04
f2 0.15 -1.32 4.04 -1.58 -1.58 2.78
f3 0.22 -1.58
f4 0.4 -2.27
f5 0.37 -2.15 Stresses At cg. Of steel & outermost
f6 0.37 -2.15 steel is in steel
f7 1.67 1.46
f8 1.82 2.78
Positive temp. stress
1.82 0 Positive temp. stress
e0 x SA - q x SAy = a x SAt
e0 x 1.867 - q x 1.29732 = 1.2E-05 x -5.137 ------------------- (1)
STRESSES AT
Dtop Dbottom Gtop Gbottom
-2.40
Points Depth f ei = Ec ( at + yq - eo ) ytop 0.00 0.22 0.22 1.82
mm N/mm2 Eigen stresses N/mm2 N/mm2 N/mm2 N/mm2
0 0 1.41
f1 0 -2.40
f2 0.22 0.97 -2.40 0.97 0.97 -3.06
f3 0.25 1.43
f4 0.37 1.42
f5 0.5 1.41 Stresses At cg. Of steel & outermost
f6 0.37 1.42 steel is in steel
f7 1.32 0.35
0.00
f8 1.57 -0.30 0.00
f9 1.82 -3.06
1.82 0 Positive temp. stress
Dtop 0.00 N/mm2 4.04 4.04 4.04 4.04 4.04 4.04 4.11 4.11 4.11 4.11 4.11
STRESSES AT
Dbottom 0.22 N/mm2 -1.58 -1.58 -1.58 -1.58 -1.59 -1.58 -1.61 -1.61 -1.61 -1.61 -1.61
Gtop 0.22 N/mm2 -1.58 -1.58 -1.58 -1.58 -1.59 -1.58 -1.61 -1.61 -1.61 -1.61 -1.61
2
Gbottom 1.82 N/mm 2.78 2.78 2.78 2.78 2.76 2.78 2.02 2.02 2.02 2.02 2.02
Dtop N/mm2
STRESSES AT
0.00 -2.40 -2.40 -2.40 -2.40 -2.40 -2.40 -2.29 -2.29 -2.29 -2.29 -2.29
Dbottom 0.22 N/mm2 0.97 0.97 0.97 0.97 0.98 0.97 1.14 1.14 1.14 1.14 1.14
2
Gtop 0.22 N/mm 0.97 0.97 0.97 0.97 0.98 0.97 1.14 1.14 1.14 1.14 1.14
2
Ast_cg 1.82 N/mm -3.06 -3.06 -3.06 -3.06 -3.04 -3.06 -2.53 -2.53 -2.53 -2.53 -2.53
Design of Anchorage Zone
Design of anchorage zone
UTS of cables = 348.993 Tonne
Design forces for anchorage = 1.1 *UTS IRC 112 :2011 clause no. 13.2.3
= 383.9 Tonne
0.75
0.75
1.6
5
0
4
0.4
3
0.4
0.4
Clear cover = 45 mm
Crack width = 0.25 mm under 0.85*UTS
Reinforcement stress limited to = 300 Mpa to avoid crack width check.
Sequence of stressing
S.N Cable No. Design force cg. From bottom
Tonne m
1 4 383.9 1.2
2 3 383.9 0.8
3 1&2 767.785 0.4
Provide 6 legged 12 f stp @ 120 c/c in a distance 0.8 m from the far end
2 2
Ast provided = 4523.89 mm > 4198.826 mm OK
2
Steel reinf required = 134962 / 300 = 449.874 mm
Provide 2 legged 16 f stp @ 120 c/c in a distance 0.4 m from loaded end
2 2
Ast provided = 1340.41 mm > 449.87421 mm OK
A m2 1.87 1.87 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
Composite section Izz m4
0.61 0.61 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yt m 0.70 0.70 0.70 0.70 0.69 0.70 0.59 0.59 0.59 0.59 0.59
dcen m 0.59 0.59 0.59 0.59 0.58 0.59 0.48 0.48 0.48 0.48 0.48
2
Fs/Ac N/mm 0.07 0.07 0.07 0.07 0.07 0.07 0.10 0.10 0.10 0.10 0.10
Mcs Fs*dcen Tm 8.00 8.00 8.00 8.00 7.96 8.00 6.62 6.62 6.62 6.62 6.62
Top N/mm2 0.09 0.09 0.09 0.09 0.09 0.09 0.08 0.08 0.08 0.08 0.08
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.06 0.06 0.06 0.06 0.06 0.06 0.05 0.05 0.05 0.05 0.05
Top N/mm2 0.06 0.06 0.06 0.06 0.06 0.06 0.05 0.05 0.05 0.05 0.05
Girder 2
Bottom N/mm -0.15 -0.15 -0.15 -0.15 -0.15 -0.15 -0.16 -0.16 -0.16 -0.16 -0.16
Net Stresses at deck/ bottom fibers
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2
Top N/mm 0.00 -0.03 -0.03 -0.03 -0.03 -0.03 -0.03 -0.02 -0.02 -0.02 -0.02 -0.02
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.22 -0.06 -0.06 -0.06 -0.06 -0.06 -0.06 -0.04 -0.04 -0.04 -0.04 -0.04
Top N/mm2 0.22 0.14 0.14 0.14 0.14 0.14 0.14 0.15 0.15 0.15 0.15 0.15
Girder 2
Bottom N/mm 1.82 -0.07 -0.07 -0.07 -0.07 -0.07 -0.07 -0.06 -0.06 -0.06 -0.06 -0.06
1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-0.07 -0.06
Support Section Mid Span
A m2 1.87 1.87 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
Composite section Izz m4
0.61 0.61 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yt m 0.70 0.70 0.70 0.70 0.69 0.70 0.59 0.59 0.59 0.59 0.59
dcen m 0.59 0.59 0.59 0.59 0.58 0.59 0.48 0.48 0.48 0.48 0.48
2
Fs/Ac N/mm 0.29 0.29 0.29 0.29 0.30 0.29 0.41 0.41 0.41 0.41 0.41
Mcs Fs*dcen Tm 31.97 31.97 31.97 31.97 31.80 31.97 26.47 26.47 26.47 26.47 26.47
Top N/mm2 0.36 0.36 0.36 0.36 0.36 0.36 0.31 0.31 0.31 0.31 0.31
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.25 0.25 0.25 0.25 0.25 0.25 0.19 0.19 0.19 0.19 0.19
Top N/mm2 0.25 0.25 0.25 0.25 0.25 0.25 0.19 0.19 0.19 0.19 0.19
Girder 2
Bottom N/mm -0.59 -0.59 -0.59 -0.59 -0.59 -0.59 -0.64 -0.64 -0.64 -0.64 -0.64
Net Stresses at deck/ bottom fibers
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2
Top N/mm 0.00 -0.12 -0.12 -0.12 -0.12 -0.12 -0.12 -0.06 -0.06 -0.06 -0.06 -0.06
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.22 -0.24 -0.24 -0.24 -0.24 -0.24 -0.24 -0.18 -0.18 -0.18 -0.18 -0.18
Top N/mm2 0.22 0.54 0.54 0.54 0.54 0.54 0.54 0.60 0.60 0.60 0.60 0.60
Girder 2
Bottom N/mm 1.82 -0.29 -0.29 -0.29 -0.29 -0.29 -0.29 -0.23 -0.23 -0.23 -0.23 -0.23
1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-0.29 -0.23
Support Section Mid Span
A m2 1.87 1.87 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
Composite section Izz m4
0.61 0.61 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yt m 0.70 0.70 0.70 0.70 0.69 0.70 0.59 0.59 0.59 0.59 0.59
dcen m 0.59 0.59 0.59 0.59 0.58 0.59 0.48 0.48 0.48 0.48 0.48
Fs/Ac N/mm2 0.44 0.44 0.44 0.44 0.44 0.44 0.61 0.61 0.61 0.61 0.61
Mcs Fs*dcen Tm 48.14 48.14 48.14 48.14 47.88 48.14 39.84 39.84 39.84 39.84 39.84
Top N/mm2 0.55 0.55 0.55 0.55 0.54 0.55 0.46 0.46 0.46 0.46 0.46
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.37 0.37 0.37 0.37 0.37 0.37 0.29 0.29 0.29 0.29 0.29
2
Top N/mm 0.37 0.37 0.37 0.37 0.37 0.37 0.29 0.29 0.29 0.29 0.29
Girder 2
Bottom N/mm -0.88 -0.88 -0.88 -0.88 -0.88 -0.88 -0.96 -0.96 -0.96 -0.96 -0.96
Net Stresses at deck/ bottom fibers
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2
Top N/mm 0.00 -0.18 -0.18 -0.18 -0.18 -0.18 -0.18 -0.09 -0.09 -0.09 -0.09 -0.09
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.22 -0.36 -0.36 -0.36 -0.36 -0.35 -0.36 -0.27 -0.27 -0.27 -0.27 -0.27
Top N/mm2 0.22 0.81 0.81 0.81 0.81 0.81 0.81 0.90 0.90 0.90 0.90 0.90
Girder 2
Bottom N/mm 1.82 -0.44 -0.44 -0.44 -0.44 -0.44 -0.44 -0.35 -0.35 -0.35 -0.35 -0.35
1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-0.44 -0.35
Support Section Mid Span
A m2 1.87 1.87 1.87 1.87 1.85 1.87 1.35 1.35 1.35 1.35 1.35
Composite section Izz m4
0.61 0.61 0.61 0.61 0.61 0.61 0.51 0.51 0.51 0.51 0.51
yt m 0.70 0.70 0.70 0.70 0.69 0.70 0.59 0.59 0.59 0.59 0.59
dcen m 0.59 0.59 0.59 0.59 0.58 0.59 0.48 0.48 0.48 0.48 0.48
Fs/Ac N/mm2 0.77 0.77 0.77 0.77 0.78 0.77 1.06 1.06 1.06 1.06 1.06
Mcs Fs*dcen Tm 83.93 83.93 83.93 83.93 83.47 83.93 69.47 69.47 69.47 69.47 69.47
Top N/mm2 0.95 0.95 0.95 0.95 0.95 0.95 0.81 0.81 0.81 0.81 0.81
due to Moment
Stress at fibers
deck
Component
2
Bottom N/mm 0.65 0.65 0.65 0.65 0.65 0.65 0.51 0.51 0.51 0.51 0.51
2
Top N/mm 0.65 0.65 0.65 0.65 0.65 0.65 0.51 0.51 0.51 0.51 0.51
Girder 2
Bottom N/mm -1.54 -1.54 -1.54 -1.54 -1.54 -1.54 -1.67 -1.67 -1.67 -1.67 -1.67
Net Stresses at deck/ bottom fibers
Section At unit Face Jacking c/L brg. c/L brg. deff TS L/8 TE 2L/8 3L/8 4L/8
Dist. From c/L brg. m -0.40 -0.25 0.00 0.00 1.55 1.50 3.04 3.00 6.08 9.11 12.15
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2
Top N/mm 0.00 -0.32 -0.32 -0.32 -0.32 -0.32 -0.32 -0.16 -0.16 -0.16 -0.16 -0.16
due to Moment
Stress at fibers
Deck
Component
2
Bottom N/mm 0.22 -0.62 -0.62 -0.62 -0.62 -0.62 -0.62 -0.46 -0.46 -0.46 -0.46 -0.46
Top N/mm2 0.22 1.42 1.42 1.42 1.42 1.42 1.42 1.57 1.57 1.57 1.57 1.57
Girder 2
Bottom N/mm 1.82 -0.77 -0.77 -0.77 -0.77 -0.77 -0.77 -0.61 -0.61 -0.61 -0.61 -0.61
1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-0.77 -0.61
Support Section Mid Span
G1 G2 G3 G4 G5 G6
J1 J2 J3 J4 J5 J6 J7 J8 J9 J10
Maximum Hogging Bending moment due to all loads (Ref. STAAD output): ULS; = 86.274 t.m
Maximum Hogging Bending moment due to all loads (Ref. STAAD output): SLS (R & QP) = 63.483 t.m
Maximum Sagging Bending moment due to all loads (Ref. STAAD output): ULS; = 26.376 t.m
Maximum Sagging Bending moment due to all loads (Ref. STAAD output): SLS (R & QP) = 19.385 t.m
Maximum Shear Force due to all loads (Ref. STAAD output): ULS; = 101.501 t
Maximum Shear Force due to all loads (Ref. STAAD output): SLS (Rare & QP) = 74.688 t
FOR SERVICE CONDITION:
FOR HOGGING
Unfactored ULS SLS R SLS QP
MOMENT
B.M. Corr.B.M
S.No LOAD TYPE Factors Factors Factors
(t.m) (t.m)
1 SW of Girder+Deck slab 1.34 0.00 1.35 1.00 1.00
2 SIDL 1.74 0.00 1.35 1.00 1.00
3 Live Load 6.97 0.00 1.00 1.00 0.00
4 WC 0.01 0.00 1.75 1.20 1.20
Sum with Impact 10.06 11.14 10.06 3.09
FOR SAGGING
Unfactored ULS SLS R SLS QP
MOMENT
B.M. Corr.B.M
S.No LOAD TYPE Factors Factors Factors
(t.m) (t.m)
1 SW of Girder+Deck slab 0.50 0.00 1.35 1.00 1.00
2 SIDL 0.30 0.00 1.35 1.00 1.00
3 Live Load 3.96 0.00 1.00 1.00 0.00
4 WC 0.01 0.00 1.75 1.20 1.20
Sum with Impact 4.77 5.06 4.77 0.81
DESIGN FORECES
Hogging Sagging Shear Force
Load Combination
Tm Tm Tonne
ULS 215.84 69.68 101.50
SLS Rare 156.95 50.56 74.69
SLS Quasi Permanent 156.95 50.56 72.23
FOR JACKING CONDITION -When all the jacks are lifted with same force
G1 G2 G3 G4 G5
72.23 t 61.45 t 59.35 t 61.45 72.23
0.7
0.7 1.8 0.7 0.7 1.8 0.7 0.7 1.8 0.7 1.8 0.7
J1 J2 J3 J4 J5 J6 J7 J8
40.84 40.84 40.84 40.84 40.84 40.84 40.84 40.84
G1 G2 G3 G4 G5
99.539 t 84.99005 t 82.1483 t 84.99005 0 99.539
0.7
0.7 1.8 0.7 0.7 1.8 0.7 0.7 1.8 0.7 1.8 0.7
J1 J2 J3 J4 J5 J6 J7 J8
56.4 56.4 56.4 56.4 56.4 56.4 56.4 56.4
DESIGN FORCES
Maximum hogging moment = 215.839 t-m
2 2
Reinforcement at Top Ast = 5180.486 mm Reinforcement at Bottom Ast = 1963.495 mm
Layer 1 32 f 4 Nos. @ 92.67 mm c/c Layer 1 25 f 4 Nos. @ 95.00 mm c/c
Layer 2 25 f 4 Nos. @ 95.00 mm c/c Layer 2 20 f 0 Nos. @ - mm c/c
Layer 3 10 f 0 Nos. @ - mm c/c Layer 3 20 f 0 Nos. @ - mm c/c
Layer 4 10 f 0 Nos. @ - mm c/c Layer 4 20 f 0 Nos. @ - mm c/c
Layer 5 10 f 0 Nos. @ - mm c/c Layer 5 20 f 0 Nos. @ - mm c/c
Check for Shear {ULS: Basic Combination (Max Shear Force as per Clause 10.3.2 & 10.3.3 of IRC: 112-2011)}
K αcc ϒm fcd σcp ρ1 VRd.c1 Vmin VRd.c2 VEd
Section Ved 1+√(200/d) Ned Ned/Ac Asl Asl/(bw.d) (0.12*K*(80*ρ1*fck)^0.33 0.031*K *f (vmin+0.15.σc
3/2 VRd.c 0.5*bw*d*0.6*( Check
Cl. 6.4.2.8 αcc*fck/ϒm +0.15*σcp)*bw.d
<=2 <=0.2*fcd <=0.02 ck1/2 p)bw.d 1-fck/310)*fcd
Shear
Support 101.501 1.365 0.670 1.500 17.867 0 0.000 5180.486 0.009 29.946 0.313 19.113 29.946 285.245 1.000
Reinf reqd
0.22 0.15
0.05
. 0.23
0.29
c/L Girder
Class-A Loading
Contact width perpendicular to span = 250 mm
Contact width parallel to span = 500 mm
Distance between two loads perpendicular to span dist.A 1.2 m
Concentrated load = 5.7 t
Class A Wheel
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cant 8.550 0.700 1.220 1.210 6.604
2 A cont 8.488 1.100 2.257 1.728 4.591
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cant 8.550 0.700 1.220 1.210 6.604
2 A cont 8.488 1.100 2.257 1.728 4.591
3 A cont 8.488 0.400 1.290 1.245 6.372
4 A cont 8.488 1.400 2.428 1.813 4.376
0.9 0.9
1.600 3.200 3.200 1.600
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.900 2.062 1.630 4.867
2 A cont 8.488 0.900 2.062 1.630 4.867
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.550 1.564 1.382 5.741
2 A cont 8.488 0.850 2.003 1.601 4.955
3 A cont 8.488 0.850 2.003 1.601 4.955
4 A cont 8.488 0.550 1.564 1.382 5.741
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.700 1.802 1.500 5.289
2 A cont 8.488 0.700 1.802 1.500 5.289
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.540 1.547 1.373 5.778
2 A cont 8.488 0.860 2.015 1.607 4.937
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.860 2.015 1.607 4.937
2 A cont 8.488 0.540 1.547 1.373 5.778
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.380 1.251 1.225 6.476
2 A cont 8.488 1.020 2.187 1.693 4.686
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 1.020 2.187 1.693 4.686
2 A cont 8.488 0.380 1.251 1.225 6.476
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.700 1.802 1.500 5.289
2 A cont 8.488 0.700 1.802 1.500 5.289
3 A cont 8.488 1.100 2.257 1.728 4.591
4 A cant 8.550 0.700 1.220 1.210 6.604
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.860 2.015 1.607 4.937
2 A cont 8.488 0.540 1.547 1.373 5.778
3 A cont 8.488 1.100 2.257 1.728 4.591
4 A cant 8.550 0.700 1.220 1.210 6.604
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.380 1.251 1.225 6.476
2 A cont 8.488 1.020 2.187 1.693 4.686
3 A cont 8.488 1.100 2.257 1.728 4.591
4 A cant 8.550 0.700 1.220 1.210 6.604
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 1.020 2.187 1.693 4.686
2 A cont 8.488 0.380 1.251 1.225 6.476
3 A cont 8.488 1.100 2.257 1.728 4.591
4 A cant 8.550 0.700 1.220 1.210 6.604
Loading - 15 Class A - 2 Lane (1 Lane placed near 0.33 L from support 1, case - I)
1.067 0.033
1.80 0.33 1.37 1.83
1.600 3.200 3.200 1.600
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 1.067 2.229 1.714 4.629
2 A cont 8.488 0.333 1.156 1.155 6.869
3 A cont 8.488 1.367 2.416 1.807 4.391
4 A cant 8.550 0.033 0.420 0.419 19.071
Loading - 16 Class A - 2 Lane (1 Lane placed near 0.33 L from support 2, case - II)
0.333 0.767
1.8 1.067 0.633 1.8
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 A cont 8.488 0.333 1.156 1.155 6.869
2 A cont 8.488 1.067 2.229 1.714 4.629
3 A cont 8.488 0.633 1.700 1.450 5.471
4 A cant 8.550 0.767 1.300 1.250 6.393
2
Max. tyre pressure = 5.273 kg/cm
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 0.305 1.111 1.110 6.055
2 70RW cont 6.250 0.755 1.893 1.556 4.320
3 70RW cont 6.250 0.965 2.146 1.682 3.996
4 70RW cont 6.250 0.515 1.517 1.368 4.913
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 1.190 2.337 1.778 3.780
2 70RW cont 6.250 0.740 1.872 1.546 4.347
3 70RW cont 6.250 0.740 1.872 1.546 4.347
4 70RW cont 6.250 1.190 2.337 1.778 3.780
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 1.290 2.395 1.807 3.720
2 70RW cont 6.250 0.840 2.004 1.612 4.170
3 70RW cont 6.250 0.640 1.725 1.472 4.566
4 70RW cont 6.250 1.090 2.262 1.741 3.861
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 1.390 2.438 1.828 3.677
2 70RW cont 6.250 0.940 2.119 1.669 4.027
3 70RW cont 6.250 0.540 1.560 1.390 4.835
4 70RW cont 6.250 0.990 2.171 1.695 3.965
Loading - 5 Class 70R - 1 Lane (max sagging, case - I)
2.34
1.600 3.200 3.200 1.600
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 0.410 1.323 1.271 5.288
2 70RW cont 6.250 0.860 2.028 1.624 4.139
3 70RW cont 6.250 0.860 2.028 1.624 4.139
4 70RW cont 6.250 0.410 1.323 1.271 5.288
2.18
1.600 3.200 3.200 1.600
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 0.250 0.993 0.992 6.775
2 70RW cont 6.250 0.700 1.815 1.517 4.431
3 70RW cont 6.250 1.020 2.200 1.710 3.931
4 70RW cont 6.250 0.570 1.611 1.415 4.750
2.50
1.600 3.200 3.200 1.600
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 0.570 1.611 1.415 4.750
2 70RW cont 6.250 1.020 2.200 1.710 3.931
3 70RW cont 6.250 0.700 1.815 1.517 4.431
4 70RW cont 6.250 0.250 0.993 0.992 6.775
1.93
1.600 3.200 3.200 1.600
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 0.090 0.621 0.620 10.840
2 70RW cont 6.250 0.360 1.224 1.222 5.500
3 70RW cont 6.250 1.360 2.427 1.823 3.687
4 70RW cont 6.250 0.910 2.087 1.653 4.066
Loading - 9 Class 70R Lane (max sagging, case - V)
0.090
0.730 0.45 1.48 0.45
2.66
1.600 3.200 3.200 1.600
Load Nos. Vehicle Location Load (t) a (m) bef (m) bef1 (m) Load (t/m)
1 70RW cont 6.250 0.730 1.858 1.539 4.367
2 70RW cont 6.250 1.180 2.330 1.775 3.787
3 70RW cont 6.250 0.540 1.560 1.390 4.835
4 70RW cont 6.250 0.090 0.621 0.620 10.840
Summary of Forces due to permanent Loads
Bending Moment
S.No. Moment at DL SIDL Surfacing Settalment
T-m T-m T-m T-m
1 Cantilever Portion
Face of haunch 0.413 0.975 0.140
Face of web 0.578 1.200 0.197
Intermediate supports
Girder Top Flage Face Hog 0.120 0.030 0.080 3.148 0.000 5.065 5.318 ok
Girder web Face Hog 0.280 0.070 0.140 4.227 0.000 7.058 7.411
Intermediate span
Intermediate Mid Span Sag -0.057 -0.014 -0.093 -4.400 0.000 -6.859 -7.202 ok
Intermediate span
Intermediate Mid Span Sag -0.057 -0.014 -0.093 -4.400 0.000 -4.564 -4.564
MATERIAL PROPERTIES :
Grade of concrete = M 40 MPa PERMISSIBLE STRESSES
Grade of Reinforcement = Fe 500 MPa 1) Premissble concrete compressive stresses
fywd = 0.8 fyk = 400 MPa Load Combi Permissble Stress
Clear cover = 45 mm SLS Rare 0.48 fck = 19.2 Mpa
Modulus of Elasticity steel Es = 200000 Mpa SLS QP 0.36 fck = 14.4 Mpa
For short Term loading Ecm = 33000 Mpa
For long Term loading Ecm' = 16500 Mpa
fcteff Mean tensile strength = fctm = 3.00 Mpa 2) Permissble Tensile stress in steel = 0.8 fy
fcd = 0.447 fck = 17.88 Mpa = 400 Mpa
Creep factor f = 1.00 = 300 Mpa For Rare
euk = 0.0045 3) Permissible crack width wk combination
eud = 0.0041 SLS QP Load combination = 0.3 mm
ecu2 = 0.0035
xumax/d = 0.4636
Reinforcement provided
Reinforcement at top
2
Layer-1 16 f @ 220 c/c = 1271 mm
Layer-1 10 f @ 220 c/c
Reinforcement at bottom
2
Layer-1 16 f @ 220 c/c = 1271 mm
Layer-1 10 f @ 220 c/c
A) ULS CAPACITY CHECK
Provided
min
2 2 2
Load comb. Tm mm mm mm mm mm mm mm mm
Cantilever Portion
Cantilever (Girder Top Flange Face)
6.071 1000 220 167 1270.92 77.417 38.18 UR, OK 923.527 OK 250.5 OK
Cantilever (Girder Web Face)
9.003 1000 420 367 1270.92 170.132 38.18 UR, OK 589.433 OK 550.5 OK
Intermediate supports
Girder Top Flage Face
5.318 1000 220 167 1270.92 77.417 38.18 UR, OK 808.953 OK 250.5 OK
Girder web Face
7.411 1000 420 367 1270.92 170.132 38.18 UR, OK 485.21 OK 550.5 OK
Intermediate span
Intermediate Mid Span
7.202 1000 220 167 1271 77.417 38.18 UR, OK 1095.52 OK 250.5 OK
Distribution Renforcement :
2
At Least 20% of the main Reinforcement (Refer IRC:112 clause 16.6.1.1) Requirement in Top face 254 mm
2
Bottom face 254 mm
Reinforcement in deck in longitudinal direction
2
Top face = 10 f @ 200 = 393 mm OK
2
Bottom face = 10 f @ 200 = 393 mm OK
2
Secondary transverse reinforcement = 0.2 x 392.699 = 78.5398 mm /m
2
Provide reinforcement as = 10 f @ 200 = 392.699 mm Ok
Intermediate supports
Girder Top Flage Face
SLS (R Comb.) 3.38 1000.00 167.00 1270.92 6.47 44.8342 2E+08 9.91 19.2 OK 174.80 300 OK
SLS (QP Comb.) 0.23 1000.00 167.00 1270.92 12.12 57.9612 2E+08 0.54 14.4 OK 12.25 300 OK
smax =3.4c +
0.17 f /rPeff
hc,eff =Min [ 2.5 ( rpeff = ssc - kt fct,eff ( 1+ ae
ssc
h - d ) , ( h - x/3 ) Aceff = Asprovide As/Ac,eff x =neutral
ae = rP,eff ) / rP,eff ] /Es
Load comb. , h/2] hc,eff *b d axis depth kt Es/Ecm' , 0.6ssc/Es ] wk check
2 2
mm mm mm mm Mpa mm
Cantilever Portion
Cantilever (Girder Top Flange Face)
SLS QP 110 110000 1270.92 0.012 388.421 81.41 57.96 0.5 12.12 0.00024 0.095 OK
Cantilever (Girder Web Face)
SLS QP 132.5 132500 1270.92 0.010 436.575 46.21 92.04 0.5 12.12 0.00014 0.061 OK
Intermediate supports
Girder Top Flage Face
SLS QP 110 110000 1270.92 0.012 388.421 12.25 57.96 0.5 12.12 3.7E-05 0.014 OK
Girder web Face
SLS QP 132.5 132500 1270.92 0.010 436.575 11.46 92.04 0.5 12.12 3.4E-05 0.015 OK
Intermediate span
Intermediate Mid Span
SLS QP 110 110000 1270.92 0.012 388.421 8.74 57.96 0.5 12.12 2.6E-05 0.010 OK
Bearing Loads and Forces
Load Calculation Over Bearings :
24.3 m
* Fh (breaking force) is considered 20 % of the first train load plus five per cent of the loads on the lanes in excess of two
Centrifugal Force
C = WV2/127R = 0.00 t
= 0.24
Av = 2Ah / 3 = 0.16
± Ve reaction over B2 or B1
Due to Dead Load seismic component = 1.8 tonne
Due to SIDL seismic component = 0.2 tonne
Due to Surfacing seismic component = 0.3 tonne
Due to Footpath DL seismic component = 0.0 tonne
Due to Footpath LL seismic component = 0.0 tonne
Due to Permanent load seismic component = 2.4 tonne
*/ At free End Bearing Location Horizontal force in transverse direction will be as at Fixed end.
Load Combinations :
LC-1 Non Seismic, Without Live Load
LC-2 Non Seismic, Service conditions
LC-3 Seismic Sx=1, Sz=0.3, Sy =±0.3, Service conditions
LC-4 Seismic Sx=0.3, Sz=1, Sy =±0.3, Service conditions
LC-5 Seismic Sx=0.3, Sz=0.3, Sy =±1, Service conditions
Load Calculation Over Bearings :
24.3 m
* Fh (breaking force) is considered 20 % of the first train load plus five per cent of the loads on the lanes in excess of two
Centrifugal Force
C = WV2/127R = 0.00 t
Seismic Transverse
Seismic componet of permanent Load 9.12 -9.12 0.45 1.5 0.45
Seismic componet of Live load 1.78 -1.78 0.45 1.5 0.45
Seismic Vertical
Seismic componet of PL +LL 16.73 -13.14 0.45 0.45 1.5
Seismic Transverse
Seismic componet of permanent Load 9.12 -9.12 81.78 0.45 1.5 0.45
Seismic componet of Live load 1.78 -1.78 8.60 0.45 1.5 0.45
Seismic Vertical
Seismic componet of PL +LL 16.73 -13.14 0.45 0.45 1.5
Seismic Transverse
Seismic componet of permanent Load 9.12 -9.12 81.78 0.45 1.5 0.45
Seismic componet of Live load 1.78 -1.78 8.60 0.45 1.5 0.45
Seismic Vertical
Seismic componet of PL +LL 16.73 -13.14 0.45 0.45 1.5
Seismic Transverse
Seismic componet of permanent Load 9.12 -9.12 0.45 1.5 0.45
Seismic componet of Live load 1.78 -1.78 0.45 1.5 0.45
Seismic Vertical
Seismic componet of PL +LL 16.73 -13.14 0.45 0.45 1.5
Seismic Transverse
Seismic componet of permanent Load 0.00 0.00 0.45 1.5 0.45
Seismic componet of Live load 0.00 0.00 0.45 1.5 0.45
Seismic Vertical
Seismic componet of PL +LL 0.00 0.00 0.45 0.45 1.5
Seismic Transverse
Seismic componet of permanent Load 0.00 0.00 0.00 0.45 1.5 0.45
Seismic componet of Live load 0.00 0.00 0.00 0.45 1.5 0.45
Seismic Vertical
Seismic componet of PL +LL 0.00 0.00 0.45 0.45 1.5
Seismic Vertical
Seismic componet of PL +LL 0.00 0.00 0.45 0.45 1.5
Seismic Transverse
Seismic componet of permanent Load 0.00 0.00 0.45 1.5 0.45
Seismic componet of Live load 0.00 0.00 0.45 1.5 0.45
Seismic Vertical
Seismic componet of PL +LL 0.00 0.00 0.45 0.45 1.5
Total Force Over Bearings B2 Working Load factor
Transverse Guided B2 Vmax Vmin HL HT
t t t t
LC-1 Non Seismic, Without Live Load 111.5 75.9 0.0 0.0
LC-2 Non Seismic, Service conditions 234.4 64.3 7.6 0.0
LC-3 Seismic Sx=1, Sz=0.3, Sy =±0.3, Service conditions 132.9 73.9 0.0 0.0
LC-4 Seismic Sx=0.3, Sz=1, Sy =±0.3, Service conditions 132.9 73.9 0.0 0.0
LC-5 Seismic Sx=0.3, Sz=0.3, Sy =±1, Service conditions 132.9 73.9 0.0 0.0