This document is a bill of materials for an offsite billboard project. It lists the materials, quantities, and units needed for the site clearing, earthworks, structural works including concrete works and formworks/scaffoldings, steel works, electrical works, and labor for upgrades. Over 650 man-days of labor are needed. The structural works section lists the largest number of material items and quantities needed, including cement, rebar, welding materials, and formwork components.

Uploaded by

Jahara Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
214 views3 pages

BOM - SAMPLE - Offsite Billboard

This document is a bill of materials for an offsite billboard project. It lists the materials, quantities, and units needed for the site clearing, earthworks, structural works including concrete works and formworks/scaffoldings, steel works, electrical works, and labor for upgrades. Over 650 man-days of labor are needed. The structural works section lists the largest number of material items and quantities needed, including cement, rebar, welding materials, and formwork components.

Uploaded by

Jahara Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

BILL OF MATERIALS

Project: Offsite Billboard


Location: LOCATION
Category: -

Item/ Description Unit Qty

SITE CLEARING
Gasoline ltr/s 10.00

DEMOBILIZATION/MOBILIZATION
Diesel ltr/s 20.00

EARTHWORKS
Diesel ltr/s 300.00

STRUCTURAL WORKS
A. Concrete Works
Cement, Holcim bag/s 360.00
Sand cu.m. 25.00
Gravel. 3/4 cu.m. 50.00
Def Bar, 10mm pc/s 410.00
Def Bar, 12mm pc/s 30.00
Def Bar, 16mm pc/s 225.00
Def Bar, 25mm pc/s 117.00
Gi Wire #16 kg/s 170.00
Welded Wire 1/2 mtr/s 1.00
Welded Wire 1/8 mtr/s 1.00
Gasoline ltr/s 30.00
Concrete Nail 4" kg/s 1.00
Concrete Nail 3" kg/s 5.00
Hacksaw Blade 1/2 pc/s 4.00
Level Hose 1/2, Green mtr/s 20.00
Cutting Disc 14" pc/s 2.00
Tansi roll/s 5.00

B. Formworks/Scaffoldings
Formworks
Phenolic 1/2 pc/s 13.00
Rough 2x2x12 pc/s 80.00
Rough 2x3x12 pc/s 40.00
Common Nail 1 1/2" pc/s 5.00
Common Nail 2 1/2" kg/s 10.00
Common Nail 4" kg/s 8.00
Concrete Nail 3" kg/s 3.00
Gi Wire #16 kg/s 2.00

file:///conversion/tmp/scratch/488520358.xlsx 1
Scaffoldings (6% Depreciation)
GI Pipe 1 1/2 Sch 40 pc/s 60.00
Swivel Clamp 1 1/2x1 1/2 pc/s 60.00
H-Frame 1.2x1.7 pc/s 30.00
Cross Brace 1.7 pc/s 40.00
Adj Base Jack 1 1/4x600 pc/s 25.00
Joint Pin pc/s 25.00
GI Wire #16 kg 5.00
Cat Walk, 1.8mtrs x 500mm pc/s 25.00

STEEL WORKS
Angle Bar, 3/16 x 1½ x 1 ½" pc/s 8.00
Angle Bar 1/4x 2 x 2" pc/s 127.00
Angle Bar 1/4x 2 1/2 x 2 1/2" pc/s 25.00
GI Pipe 5" Sch 40 pc/s 20.00
GI Pipe 2" Sch 40 pc/s 3.00
Flat Bar 3/16x1x6m pc/s 70.00
Anchor Bolt, 5/8 x 10 x 2thread x 2bend, 4140 pc/s 55.00
MS Plate, 4x8x6mm (gusset) pc/s 11.00
MS Plate, 4x8x16mm (base) pc/s 2.00
Teflon Film 1"x10m. pc/s 3.00
Cutting Disc 14" pc/s 5.00
Cutting Disc 4" pc/s 40.00
Grinding Disc 4" pc/s 20.00
Epoxy Primer Gray gal 35.00
Lacquer Thinner gal 15.00
Roller Brush 2" pc/s 6.00
Paint Brush 2" pc/s 20.00
Basahan kg 3.00
Oxygen(tank) refill 9.00
Acetylene(tank) refill 4.00
Welding Rod 6011 kg 80.00
Welding Rod 6013 kg 35.00
Carbon Brush, Chopsaw (dewalt) pairs 2.00
Tansi roll 6.00
Chalkstone pc/s 3.00

ELECTRICAL
Bolt and Nuts 3/4 x 2 1/2 pc/s 30.00
Bolt and Nuts 5/8 x 2 1/2 pc/s 10.00
Breaker, 20amps, Bolt On, GE pc/s 1.00
Cutting Disc. #4 pc/s 10.00
Duct Seal kl/s 1.00
Electric Meter kwh i210 class 100 W/ square meter base box/s 1.00
Electrical Tape pc/s 5.00
PVC Clamp 1/2(new) pc/s 50.00
Rubber Tape pc/s 1.00
PVC M. Adapter, ½, Orange, MOLDEX pc/s 40.00
PVC Pipe Conduit 1/2 x10 pc/s 25.00
Epoxy Primer Gray Guilders gal/s 1.00
LED Floodlight, 50watts RS set/s 16.00
G.I Pipe 1 1/2 Schedule 40 pc/s 4.00
Junction Box pc/s 15.00
Lacquer Thinner gal/s 1.00
Nema 3R 2Pole Bolt On pc/s 1.00
Service Wire #6 mtr/s 35.00
THHN Wire #12 Black bx/s 1.00
THHN Wire #12 Red bx/s 1.00
Utility Box set/s 1.00
Weather Proof Plate Royu set/s 1.00
Ws Switch 2 Gang Royu set/s 1.00

file:///conversion/tmp/scratch/488520358.xlsx 2
LABOR FOR UPGRADES
Labor mdays 650.00

Prepared by:

NAME
POSITION

Checked by:

NAME
POSITION

Received by:

NAME
POSITION

Approved by:

NAME
POSITION

file:///conversion/tmp/scratch/488520358.xlsx 3