100% found this document useful (1 vote)
975 views6 pages

Method Statement For Roof Finishing

The document provides a method statement for roof finishing work on the Construction of Lekela Substation 220 KV project in Egypt. It outlines the contractor's contact information, safety regulations, crew and equipment details, and process for installing the roofing system including insulation, membrane, flashing, tiles, and grouting. The appendix includes an organization chart for the project team.

Uploaded by

EmadHassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
975 views6 pages

Method Statement For Roof Finishing

The document provides a method statement for roof finishing work on the Construction of Lekela Substation 220 KV project in Egypt. It outlines the contractor's contact information, safety regulations, crew and equipment details, and process for installing the roofing system including insulation, membrane, flashing, tiles, and grouting. The appendix includes an organization chart for the project team.

Uploaded by

EmadHassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

BRAUNS EGYPT

In front of 34 saint gieni St. Roushdy

Tel No. 002- 035446231 & 0105339344

Fax No. 002- 035232570

E mail :[email protected]

Construction of Lekela Substation 220 KV

Method Statement
For
Roof Finishing Rev (0.0)

Feburary 2020

Page 1 of 5
BRAUNS EGYPT
In front of 34 saint gieni St. Roushdy

Tel No. 002- 035446231 & 0105339344

Fax No. 002- 035232570

E mail :[email protected]

INDEX
1. INTRODUCTION 3
1.1 SCOPE OF WORK 3
2. CREW & EQUIPMENT 3
2.1 PERSONNEL 3
2.2 EQUIPMENTS 3
2.3 SAFETY REGULATION 3
2.3.1 Personal Protective Equipments (PPE) 3
2.3.2 House Keeping 3
2.3.3 Equipment Control 3
2.3.4 Fire Control 3
2.3.5 Falling From Heights Control 4
3. DEFINITION OF PROCESS 4
3.1 Generals 4
3.2 Materials 4
3.3 Installation 4
3.4 Grouting 4

Page 2 of 5
BRAUNS EGYPT
In front of 34 saint gieni St. Roushdy

Tel No. 002- 035446231 & 0105339344

Fax No. 002- 035232570

E mail :[email protected]

1. INTRODUCTION
1.1 Scope of Work

 The method statement is prepared for Roof Finishing for "Construction of Lekela

Substation 220 KV" with reference to following drawings

2. CREW & EQUIPMENTS

2.1 Personnel
 See Attached organization chart. (Appendix A)
2.2 Equipments
 Concrete mixer machine.
 Grinder 9".
 Gas Torch.
 Survey Equipment
 Hand Tools.

2.3 Safety Regulations


2.3.1 Personal Protective Equipments ( PPE)
 PPE to be worn (Safety glasses, gloves, safety footwear and helmet and Harness).

2.3.2 House Keeping

 Roofing tiles, cement, sand, membrane rolls, insulation boards and other materials will be
arranged into groups at appropriate place to gain safe and clean work place.

2.3.3 Equipment Control

 All equipment to be in good condition and inspected by safety supervisor.


 Every Equipment has its portable ABS Fire Extinguisher.

2.3.4 Fire Control

 Portable ABC Fire Extinguisher equipment with required number will be available.

Page 3 of 5
BRAUNS EGYPT
In front of 34 saint gieni St. Roushdy

Tel No. 002- 035446231 & 0105339344

Fax No. 002- 035232570

E mail :[email protected]

2.3.5 Falling from Heights Control

 Warning signs and caution tapes to be placed around area.


 Ground leveling before scaffold erection.
 Life line shall be used where is necessary.
 For working at height safety harness shall be used all the time and all working scaffolds
and catwalks will be secured with kick plate and mid rails.

3. DEFINITION O F PROCESS

3.1 General
• Roof system insulation will be used to prevent water rain from penetrating within
reinforcement concrete slab and controlled at the temperature and humidity to specific
levels without risk of condensation.
3.2 Materials
• All materials will be selected as per the contract.
• The contractor will submit all roofing finishing system to the owner for approval.
• Membrane rolls will be stored vertically in a dry place protected from sun and weather.
• Extruded Polystyrene Rigid Insulation Boards will be 5cm thickness.
• Metal flashing will be 0.5mm thickness of stainless steel, conforming to ASTM, or 1 mm
thickness of aluminium.
• The contractor could start using the design mix of lightweight slope concrete and mortar
after getting the owner approval
3.3 Installation
• Clean the concrete surface and keep dry, smooth and free from any irregularities.
• The contractor will pour lightweight concrete with a minimum drainage slope of 1.5% and
a minimum thickness 50mm as per approved drawing.
• Membrane will be installed according to manufacturer's recommendations; this will be
applied by using gas torch with side laps Bern minimum and with end laps 12cm minimum
• After membrane installation completely the contractor will be tested the membrane by
using water test to get the owner acceptance.
• Membrane flashing will be bonded to the perimeter and vertical of 1 cm minimum above
the finish level.

Page 4 of 5
BRAUNS EGYPT
In front of 34 saint gieni St. Roushdy

Tel No. 002- 035446231 & 0105339344

Fax No. 002- 035232570

E mail :[email protected]

 Thermal insulation rigid boards will be laid in a staggered manner with thickness 5cm.
 Filter fabric will be installed over insulation boards prior to placing roofing tiles.
 Provide clean sand under roofing tiles.
 The roofing cement tiles will be installed using approved mix design mortar.
 The contractor will execute a suitable slope in roofing cement tiles to drainage point.
 Checking level of tiles using spirit level.
 The contractor will install skirting tiles of the same roofing cement tiles.
 The contractor will install approved metal flashing above skirting and use approved sealant on top of
metal flashing according to approved drawing.

3.4 GROUTING
• Tiles will be wetted before Appling grout.
• Joints 3mm or less in width will be grouted with approved cementitious grout.
• Upon completion of the work, all surfaces of tiles will be cleaned properly.

Page 5 of 5
BRAUNS EGYPT FOR REAL ESTATE & CONTRACTING
Construction of Lekela Substation Project 220 kv
Organization Chart
APPENDIX A

Project Manager

Site Manager

HSE Engineer Q.C Manager Site Engineer Surveing Engineer Store Keeper

Safety Supervisor General Supervisor Surveing Team

Safety Officer Supervisor

You might also like