The document discusses source determination in SAP, including:
1. Using source lists and quota arrangements to define sources of supply for materials.
2. The source determination process for manual and automatic purchase requisitions and MRP runs.
3. How to block specific vendors or source list entries from being selected.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
113 views54 pages
12 Source Determination
The document discusses source determination in SAP, including:
1. Using source lists and quota arrangements to define sources of supply for materials.
2. The source determination process for manual and automatic purchase requisitions and MRP runs.
3. How to block specific vendors or source list entries from being selected.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 54
Source Determination
Trainer : Email : Ph : (Australia)
Gurjeet Singh [email protected] +61413159465 Types of Source list records. Uses of using a Source List. Source determination process using source list. Quota Arrangement. Source determination process using Quota Topics arrangement. Covered Automatic source determination in a manual Purchase Requisition. Automatic source determination in MRP run. Vendor and source list blocking process. Use of a Regular vendor Source Determination Overview Source Determination Overview Source List In your company, for some of your materials, there is more than one Business source of supply. You have been asked to ensure Example that source determination is always unique for manual and automatic Purchasing documents. Source List The Source List is used to manage a list of sources for a material in a particular plant and for particular time Functions periods. It has following purposes: of a Defining a Source as fixed source. Source Blocking a Source. List Defining a source for MRP run. Supplementing Source determination with Quota Arrangement. Source List Requirements Source List Requirement for Materials Source List Requirement for Plant
SPRO Material Management
Purchasing Source List Define Source List requirements at Plant level. Different ways of Maintaining Source List Records Maintaining Source List records
Logistics Material Management Purchasing
Master Data Source List ME01/ME05 Source List for Material Group Contracts Source List for Material Group Contract Evaluation of Source Lists The following evaluations are available for Source List – Source List for the material – ME0M Source Analyze Source List – ME06 List Evaluation Assignment (Source List) Create a new material for plant 1000. Create 2 PIRs and 1 scheduling agreement using different vendors for the above material. Goto ME01 and enter your material and plant and press enter. Assignment Generate records by clicking button “Generate (Source List) records” and save your record. 1 Create a new P/req and see if the system assigned a source of supply? Why or Why not? Goto ME01 again and this time select a vendor as “Fixed vendor”. Create a new P/req again and see if the system assigned a source of supply? Why or Why not? In ME01 record, first remove any fixed vendor flag and then for one of your vendor select “Source list usage” as 1 (MRP relevant). Enter some safety stock for your material to Assignment generate some requirements and run MRP (Source List) (MD03) on it within planning horizon. 2 Check if the system generate a P/req? Did system assigned any source of supply? Why or why not? Quota Arrangement For some of your materials you have more than one vendor because you do not wish to rely completely on Business one vendor. Example The requirements for these materials should be distributed among the various supply sources using a fixed ratio. What is Quote Arrangement Creating a Quote Arrangement
Logistics Material Management Purchasing
master Data Quota Arrangement Maintain (MEQ1) Quote Calculation Quote Arrangement Usage Quota Arrangement in MRP Requirement Splitting Requirement for Material – 1000pcs Requirement Lot Size Procedure - ES Splitting Example
In the case of “Quota arrangement with
splitting” the “quota allocated qty” and “quota rating”, both are ignored. To prevent the system from splitting up a requirement that is too small during MRP run, you can specify a minimum quantity for splitting Minimum in the quota header. Splitting Quatity Lot Sizes in Quota Arrangement Maximum and Minimum Lot Sizes Maximum Qty in Quota Arrangement Example : Maximum Quantity Assignment (Quota Arrangement) Create a new material and assign a “quota arrangement usage” in the purchasing view. Create a quota arrangement for this material in plant 1000 with a validity of one year and assign 3 vendors to Assignment this arrangement and save your record. (Quota Create a P/req (make sure the flag “source Arrangement) determination” is ticked) for the same material. Did the system assigned a vendor automatically? Why or why not? If not then troubleshoot what was missing. Once system automatically assigned a vendor to your p/req, open the quota arrangement and monitor the changes. Further Aspects of Source Determination Source Determination during MRP run Source Determination during MRP Run Source Determination outside MRP run Source Determination outside MRP Run Regular Vendor Regular Vendor “Regular vendor” is same like “fixed vendor” but you use the regular vendor if you do not wish to create source list. SPRO Material Management Purchasing Source Determination Define Regular vendor Source Determination for Material Group Source Determination for Material Group Procurement with Catalogue Procurement with Catalogue External Sourcing External Sourcing Blocking Vendors Blocking Vendors (MK05/XK05) Blocking Source List Entries Blocking Source List Enteries a