HEALTH AND SAFETY MANAGEMENT SYSTEMS

RISK ASSESSMENT: VISITING CONSTRUCTION SITE (OFFICE BASED STAFF)


Staff are responsible for undertaking specific risk assessments for any unforeseen or additional hazards and taking appropriate action to protect their own and others health & safety.
Staff are allowed to stop the work/activity if adequate control measures cannot be put in place

ACTIVITY IDENTIFIED HAZARD PERSONS AT RISK S L RISK LEVEL RISK CONTROL / REDUCTION MEASURES

 Harris Calnan office based staff (visiting construction sites) must


Falls from height or
always report to Site Managers or nominated person to obtain
to a depth, falling
Entry to the Harris Calnan permission to enter the site.
objects, moving
construction office based 2 2 Medium  Staff must get information from the Site Manager of any specific or
machinery and
site staff on sites unusual hazards that may be present on site or areas to avoid.
plant, slips, trips,
 Site induction to be completed or staff visiting the site must be
falls etc
accompanied at all times whilst on site.

 Ground conditions to be assessed and suitable footwear worn


(preferably Safety Shoes).
 In adverse conditions no access to be attempted.
Walking on Harris Calnan
Slips, Trips and  Only designated walkways and safe routes to be used.
construction office based 2 3 High
Falls  Any blocked routes or areas with debris and materials to be
site staff on sites
avoided.
 Any excavated areas to be avoided unless suitably protected with
edge protection or barriers etc.

Approaching
near the Struck by moving Harris Calnan  Areas of machinery and plant movement to be avoided.
moving plant, crush, impact office based 2 3 High  Only designated walkways and safe routes to be used.
machinery and fall injuries staff on sites  Hi-visibility jackets/vests to be worn at all times on site.
and plant

Visiting site
areas where Struck by falling Harris Calnan  Access to areas below working activities to be avoided -where not
operatives are objects, crush and office based 2 3 High possible ask operatives (if possible) works to be suspended.
working impact injuries staff on sites  Hard hat to be worn at all times on site.
overhead

Walking on Harris Calnan  Areas where risk of flying objects i.e. grinding, concrete breaking
Struck by flying
construction office based 2 2 Medium to be avoided.
objects
site staff on sites  Suitable eye protection to be worn.

RISK ASSESSMENT KEY S = Hazard Severity HS3-02-Updated August 2011-Risk Assessment-Visiting Construction Sites Page 1 of 2
Risk Assessment = S x L 1 = Slight 2 = Serious 3 = Major
3 = Likely Medium High High
L = likelihood 2 = Possible Low Medium High
1 = Rare Low Low Medium
HEALTH AND SAFETY MANAGEMENT SYSTEMS
RISK ASSESSMENT: VISITING CONSTRUCTION SITE (OFFICE BASED STAFF)
Staff are responsible for undertaking specific risk assessments for any unforeseen or additional hazards and taking appropriate action to protect their own and others health & safety.
Staff are allowed to stop the work/activity if adequate control measures cannot be put in place

ACTIVITY IDENTIFIED HAZARD PERSONS AT RISK S L RISK LEVEL RISK CONTROL / REDUCTION MEASURES

Harris Calnan
Contact with Electrocutions,
office based 2 2 Medium  All services on site to be assumed live and contact avoided.
live services burns, scalds, falls
staff on sites

Exposure to very
Visiting sites low temperatures,
Harris Calnan  Site visits to only be attempted when safe to do so.
in adverse high winds, icy, wet
office based 2 2 Medium  Extent of visit and areas to be accessed to consider weather
weather slippery conditions
staff on sites conditions, ensuring all practicable precautions are taken.
conditions causing falls, falling
objects
 Areas without edge protection must be avoided.
Visiting high  Only complete, inspected scaffolding to be accessed on site.
Harris Calnan
level area on  Visiting Harris Calnan staff not to use of any contractors equipment
Falls from height office based 2 2 Medium
site or near to i.e. mobile towers, ladders, MEWP’s etc.
staff on sites
excavation  Any access to height to be agreed with Site Management and
suitable controls implemented.

Visiting Harris Calnan  Visiting Harris Calnan staff have a duty to report any unsafe
Noticing any unsafe
construction office based 2 2 Medium actions by site operatives, unsafe condition or any hazard that is
acts or on site
site staff on sites not suitably protected or identified to Site Management urgently.
Visiting Harris Calnan
Fire, burns, scalds,  Actions to be taken in accordance with emergency plan identified at
construction office based 2 2 Medium
smoke inhalation site induction or to follow Site Management instructions.
site staff on sites

Visiting Hit by debris, crush, Harris Calnan  Staff must not visit demolition sites unless absolutely necessary.
demolition trapped, impact, office based 3 2 High  Visiting staff to be accompanied by Site Management at all times.
areas on site falling objects staff on sites  All identified PPE to be worn at all times.

 Harris Calnan staff not to visit unmanned sites alone unless


Visiting Lack of assistance in
Harris Calnan absolutely necessary.
construction accident, personal
office based 2 2 Medium  If visit essential, as lone worker, staff must inform office of visit,
site as a lone health emergency,
staff on sites carry fully charged mobile phone, wear all suitable PPE, limit visit
worker physical violence
to safe open areas.
1

RISK ASSESSMENT KEY S = Hazard Severity HS3-02-Updated August 2011-Risk Assessment-Visiting Construction Sites Page 2 of 2
Risk Assessment = S x L 1 = Slight 2 = Serious 3 = Major
3 = Likely Medium High High
L = likelihood 2 = Possible Low Medium High
1 = Rare Low Low Medium