0% found this document useful (0 votes)
26 views1 page

(Topic Selection Deadline: 4 April, 2019) (Report Deadline: 9 April, 2019) (Presentation Date Will Be Scheduled Later)

This assignment requires students to work in groups of 4-5 members to research and report on an innovative embedded systems project. Students must select a topic by April 4th and submit a report by April 9th, which will provide an overview and architecture of the project with proper references. Each group will later present their project in a 5 minute informal presentation.

Uploaded by

Acharya Suyog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

(Topic Selection Deadline: 4 April, 2019) (Report Deadline: 9 April, 2019) (Presentation Date Will Be Scheduled Later)

This assignment requires students to work in groups of 4-5 members to research and report on an innovative embedded systems project. Students must select a topic by April 4th and submit a report by April 9th, which will provide an overview and architecture of the project with proper references. Each group will later present their project in a 5 minute informal presentation.

Uploaded by

Acharya Suyog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Assignment (A1)[2.

5 marks]
(Topic Selection Deadline: 4th April,2019)
Add your Topic in google Sheet
(Report Deadline : 9th April,2019)
(Presentation Date will be scheduled later)
Case Study: Innovative Embedded System Projects

This assignment will be evaluated per group. The minimum and maximum numbers of students allowed
in the group are 4 and 5. The research should be done on the real embedded projects with proper
reference.

Small informal presentation (~5min) is needed from each group.

Report should contain following details: Overview/Architecture of the Projects with proper reference.

You might also like