SUB-ACE(DLO). SEM-VI
10. Explain the factors affecting the performance of pile driving equipment’s
11 Enlist & explain the Factor affecting the performance of pumping equipment’s
13. Draw the neat dig of TBM & Explain the working feature of TBM. Enlist parts
of TBM.
14. Explain the Tunnel lining trolley
18. Write the working feature of JUMBO and draw the sketches for the same
ACE QUESTION BANK
SUB-ACE(DLO). SEM-VI
19. Explain Mivan formwork system with diagram
Explain slip formwork formwork system With Diagram. Write Advantage &
Disadvantage
21. Enlist type of tower crane & Explain with the diagram
22. Explain the pipe insertion system in the under ground utility
25. Enlist & Explain the Equipment required for the construction of fly-over
28. Enlist type of tower crane & Explain with the diagram
29. Explain the pipe insertion system in the under ground utility
ACE QUESTION BANK
SUB-ACE(DLO). SEM-VI
33. Enlist & Explain the the Equipment Required for the construction of
Hydropower station.
34. Enlist & Explain the Equipment Required for the construction of Thermal
power station.
35. Enlist & Explain the Equipment Required for the construction of Solar power
station.
36. Enlist & Explain the Equipment Required for the construction of Atomic
power generation.
41. Enlist & Explain the Equipment’s involved in the construction of Metro, mono
Rail.
42. Explain the Methods, techniques involved in the construction of Metro, mono
and maglev Rails.
43. Enlist & Explain The Equipment’s required for construction of an airport
44. Enlist & Explain The Equipment’s required for construction of an sea port.
46. Enlist & Explain The Equipment’s required for operation of an sea port.