Ducting T&C Forms – Air Conditioning System
JKR/CKM/T & C :______________________
CAWANGAN KEJURUTERAAN MEKANIKAL
JABATAN KERJA RAYA
DUCTING TESTING AND COMMISSIONING PROCEDURE
Ducting
1. Leakage Test
Part 1 – Physical Details
Reading
(a) Section of ductwork to be tested
(b) Drawing number
(c) Pressure classification
(d) Test static pressure
(e) Leakage factor
(f) Surface area of duct under test
(g) Maximum permitted leakage
Part 2 – Test Particulars
Reading
(a) Duct static pressure reading
(b) Type of flow measuring device
(c) Range of measurement of flow measuring device
(d) Reading of flow measuring device
(e) Interpreted air flow leakage rate
(f) Duration of test ( normally 15 minutes )
2. Dimension of Duct
Width and Depth or Periphery Length Area
Diameter ( Millimeters) ( Meters ) ( Square
(Millimeters) Meters )
TOTAL
Ducting T&C Forms – Air Conditioning System
Checked By Contractor: Witness By JKR Representative:
Sign:………………………………….. Sign :…………………………………
Name:………………………………… Name:…………………………………
Date:…………………………………… Date:…………………………………..