S.No Item Description Unit QTY: Total Quantity

This document provides a quantity sheet for a sub-soil drainage system for a building landscape area between several buildings (A1, A2, A9, A10, B11). It lists the linear meters of 4-inch perforated UPVC pipes required between 46 points, totaling 272.58 linear meters. It also lists solid UPVC pipe requirements between some points and cleanout details for 6 points, including pipe heights and quantities.

Uploaded by

Dina Saber
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views2 pages

S.No Item Description Unit QTY: Total Quantity

This document provides a quantity sheet for a sub-soil drainage system for a building landscape area between several buildings (A1, A2, A9, A10, B11). It lists the linear meters of 4-inch perforated UPVC pipes required between 46 points, totaling 272.58 linear meters. It also lists solid UPVC pipe requirements between some points and cleanout details for 6 points, including pipe heights and quantities.

Uploaded by

Dina Saber
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SUB-SOIL DRAINAGE SYSTEM

AEON Project I-G+3


Document Submittal. (013)
Quantity Sheet for Building Landscape Area Between Building (A1&A2&A9&A10&B11)

QTY
S.No Item Description Unit

Supply and install 4 inch diameter UPVC perforated pipes 6 bar for infiltrated water drainage system, including, laying of pipes,
1
fittings, geotextile filter fabric sheet around the pipe, crushed stone , all in accordance with the specifications and drawings.

From Point No. (1 TO 2) LM 0.24


From Point No. (2 TO 3) LM 18.6
From Point No. (3 TO 4) LM 0.17
From Point No. (4 TO 5) LM 13.5
From Point No. (5 TO 7) LM 0.25
From Point No. (6 TO 7) LM 0.3
From Point No. (7 TO 8) LM 15.9
From Point No. (8 TO 9) LM 0.12
From Point No. (9 TO 10) LM 16.3
From Point No. (10 TO 11) LM 0.39
From Point No. (11 TO 12) LM 13.5
From Point No. (13 TO Line Between Point 11& 12) LM 0.31
From Point No. (13 TO 14) LM 11.45
From Point No. (14 TO 15) LM 0.26
From Point No. (15 TO 16) LM 10.81
From Point No. (16 TO 17) LM 0.185
From Point No. (17 TO 18) LM 12.97
From Point No. (18 TO 19) LM 0.33
From Point No. (19 TO 20) LM 13.12
From Point No. (19 TO 22) LM 12.52
From Point No. (20 TO 21) LM 3.5
From Point No. (22 TO 23) LM 0.42
From Point No. (23 TO 24) LM 4.6
From Point No. (24 TO 25) LM 7.14
From Point No. (25 TO 26) LM 5.2
From Point No. (26 TO 27) LM 0.16
From Point No. (27 TO 28) LM 18.14
From Point No. (28 TO 29) LM 0.18
From Point No. (29 TO 30) LM 13.8
From point No. (30 TO 31) LM 0.17
From point No. (31 TO 33) LM 16.85
From point No. (32 TO 33) LM 0.104
From point No. (32 TO 34) LM 13.86
From point No. (34 TO 35) LM 0.23
From point No. (34 TO 36) LM 0.43
From point No. (36 TO 37) LM 10.15
From point No. (37 TO 38) LM 0.06
From point No. (38 TO 39) LM 9.7
From point No. (39 TO 40) LM 3.9
From point No. (40 TO 41) LM 0.09
From point No. (41 TO 42) LM 6.6
From point No. (42 TO 43) LM 3.4
From point No. (43 TO 44) LM 0.23
From point No. (44 TO 45) LM 12.24
From point No. (45 TO 46) LM 0.2
Total Quantity 272.58

Pipe Height QTY


Solid Pipe Solid pipe
S.No Item Description Unit Cleanout Number Finish Level Start Level (Finish Level- Building (A1)
(-0.15 F.F.L) Start Level) (Cleanout Number*Pipe Height)

Supply and install 4 inch diameter UPVC solid pipes 6 bar for infiltrated water drainage system, including, laying of pipes, fittings, connection with manholes,Including supply, install and finishing the required cleanout all in
2
accordance with the specifications and drawings.

From point No.(19 TO 47) LM 35.80


From point No.(47 TO 48) LM 13.12
Point (No-1) LM 1 177.1 175.55 1.55 1.55
Point (No-3) LM 1 177.01 175.55 1.46 1.46
Point (No-6) LM 1 176.91 175.55 1.36 1.36
Point (No-8) LM 1 176.85 175.55 1.3 1.30
Point (No-12) LM 1 176.87 175.55 1.32 1.32
Point (No-14) LM 1 176.88 175.55 1.33 1.33
Point (No-16) LM 1 176.96 175.55 1.41 1.41
Point (No-19) LM 176.82 175.55 1.27 2.14
Point (No-23) LM 1 176.86 175.55 1.31 1.31
Point (No-24) LM 1 176.94 175.55 1.39 1.39
Point (No-25) LM 1 177.82 175.55 2.27 2.27
Point (No-29) LM 1 176.77 175.55 1.22 1.22
Point (No-31) LM 1 176.72 175.55 1.17 1.17
Point (No-32) LM 1 177.88 175.55 2.33 2.33
Point (No-35) LM 1 176.97 175.55 1.42 1.42
Point (No-37) LM 1 177.84 175.55 2.29 2.29
Point (No-39) LM 1 177.46 175.55 1.91 1.91
Point (No-41) LM 1 177.41 175.55 1.86 1.86
Point (No-42) LM 1 177.74 175.55 2.19 2.19
Point (No-44) LM 1 177.52 175.55 1.97 1.97
Point (No-46) LM 1 177.69 175.55 2.14 2.14
Total Quantity 84.26

Contractor Consultant