Community Tree Risk Assessment
Community Tree Risk Assessment
Community Tree Risk Assessment
Background:
In the past few years, the process of TRA for trees has been standardized by the American National Standards
Institute (ANSI) A300 Standard (Part 9:2010) and the International Society of Arboriculture (ISA) Best
Management Practice (BMP) for Tree Risk Assessment (2011). The procedures for TRA outlined in the ANSI
A300 Part 9 Standard and the ISA Tree Risk Assessment BMP can be used on any tree, either before or after a
storm event to assess tree risk. The key to the use of the procedure by city foresters, FEMA or other
organizations is to define who is qualified to conduct tree risk assessments, the level of assessment that should
be used, the time frame for assessments, and the threshold at which trees should be recommended for
reimbursable mitigation actions such as pruning or removal.
Discussion:
Trees provide numerous benefits to those living and working in the urban environment. These benefits increase
as the age and size of the trees increase. However, as a tree gets older and larger, it is also more likely to shed
branches or develop decay or other conditions that can predispose it to failure. In assessing and managing trees,
we strive to strike a balance between the risk that a tree poses and the benefits that individuals and
communities derive from trees.
The purpose of the ISA TRA BMP is to guide arborists to assess tree risk as accurately and consistently as
possible, to evaluate that risk, and understand which treatments can achieve an acceptable level of risk. Tree
risk assessments can be conducted at different levels and may employ various methods and tools. Three levels
of tree risk assessment are defined and described:
• Level 1: Limited visual – a rapid visual assessment from a specified perspective, looking for serious
defects.
• Level 2: Basic- a visual tree assessment requiring walking around the tree and possibly using simple tools
to assess the tree and site conditions.
• Level 3: Advanced- a more in depth assessment looking at specific factors affecting tree risk.
A primary goal of tree risk assessment is to provide information about the level of risk posed by a tree over a
specific time period. This is accomplished in qualitative tree risk assessment by first determining the categories
for likelihood and consequences of tree failure. These factors are determined by:
1. Evaluating the structural conditions that may lead to failure; the potential loads on the tree; and the
trees’ adaptations to weaknesses—to determine the likelihood of failure.
2. Evaluating the likelihood that a tree or branch could strike people or property or disrupt activities.
3. Assessing the injury, damage or disruption—to estimate the consequences of failure.
A matrix-based, qualitative approach to tree risk assessment is used in the ISA BMP to define the level of risk.
The risk category is then compared to the level of risk that is acceptable to the client, controlling authority, or
societal standards. If the risk category defined for the tree risk exceeds the level of acceptable risk, mitigation is
recommended.
E. Thomas Smiley, Ph.D.
Bartlett Tree Research Laboratories, Charlotte NC
American Planning Association
Scoping Session: Hazardous Tree Management and Post-Disaster Recovery
Table 1. The ISA TRA BMP matrix used to estimate the likelihood of a tree failure impacting a target within a
specified time frame.
Table 2. The ISA TRA BMP risk rating matrix showing the level of risk as the combination of likelihood of a tree
failing and impacting a target, and severity of the associated consequences.
Likelihood of Consequences
Failure and Negligible Minor Significant Severe
Impact
Very likely Low Moderate High Extreme
Likely Low Moderate High High
Somewhat likely Low Low Moderate Moderate
Unlikely Low Low Low Low
The four terms for risk ratings are used to communicate the level of risk and to assist in making recommendations to
the owner or manager for mitigation and inspection frequency. The priority for action depends upon the risk rating and
risk tolerance of the owner or manager.
A hazard tree (syn. “hazardous tree”) is a tree identified as a likely source of harm. Hazardous trees are those
that have been assessed and have been determined to pose an unacceptable risk. A hazard is the tree part(s)
identified as a likely source of harm.
The ISA BMP process is the basis for the ISA Tree Risk Assessment Qualification (TRAQ). This is a 2.5 day class
that presents the information from the BMP and the TRAQ Manual. At the end of the class, TRA skills are tested
and graded. Those who pass the Qualification receive documentation and their names are listed on-line for
verification. This TRA qualification therefore provides training, testing, and verification.
The key to the use of the procedure by city foresters, FEMA or other organizations is to define the threshold at
which trees should be recommended for removal. In general, to preserve trees and maintain the urban tree
canopy, the threshold should be set to ‘Moderate’ or ‘High’. That is, trees that have a ‘Low’ or ‘Moderate’ risk
rating should not be recommended for removal, or removal should not be reimbursed for those trees.
E. Thomas Smiley, Ph.D.