The document provides a status dashboard for Project Budapest. It shows that the project is 23% complete with 3 outstanding issues. There are 5 ongoing activities listed. A gantt chart shows the planned and actual progress and completion percentages for 13 tasks across the mechanical, electrical, plumbing, and fire fighting systems.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
6K views12 pages

Project Status Dashboard

The document provides a status dashboard for Project Budapest. It shows that the project is 23% complete with 3 outstanding issues. There are 5 ongoing activities listed. A gantt chart shows the planned and actual progress and completion percentages for 13 tasks across the mechanical, electrical, plumbing, and fire fighting systems.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Project Budapest Project Status Dashboard

Project Status ˜ Completed 23% Outstanding Issues 3 6 4

Ongoing Activities: 5 Project Plan Click on the gantt chart to see it in detail
Show Gantt for Actual Show Status? What is current week? 3


Activity % done # List of Activties
Planned
Start Dur
Actual
Start Dur
%
Done 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
1 Duct hangers & Supports 1 5 1 2 0%
Mechanical System HVAC 23% 2 1
Chilled Water Pipe Ha ngers & Supports 5 1 6 58%


███
██

3 2
Ducting Supply, Return, Fresh & Exhaust 4
Air 2 5 35%
4 Volume, Fire & Smoke Damper Fixing 4 8 2 6 10%

Electrical System 32% 5


6
Duct Risers
Duct Insulation
4
4
1
3
3
4
8
6
0%
0%
7 5
Chilled Water Piping - High Level Horizontal 4 4 3 0%

Plumbing System 64% 8


9
10
Chilled Water Pipe Riser
Chilled Water Pipe Lea kage Testing
Chilled Water Pipe Insulation
5
5
6
2
2
5
4
4
6
5
6
7
0%
0%
0%

Fire Fighting System 12% 11


12
13
Fan Coil Unit (FCU) Insta llation
Duct Connection to FCU
Chilled Water Pipe Connection to 9
6
9
FCU
1
3
6
7
8
8
8
3
6
0%
0%
0%

Mechanical Floor / Roof Act 15%


14 Bends, Droppers & Mouth Piece 9 3 9 1 0%
15 Chillers Installati on 9 4 9 4 0%
16 Heat Exchanger Installa tion 10 5 10 2 0%
17 11
Staircase Pres sure Fan Installati on 2 10 5 0%
18 Ga rbage Exhaust Fan Installati on12 6 11 7 0%
Top 5 Issues 19
20
Chilled Water Pump Ins tallation 12
14 llation
Expa ns ion Tank & Press ure Unit Insta
1
5
11
11
5
6
0%
0%
21 Air Scrubbers installati on 14 8 11 1 0%

Find test manager 22


23
Chemical Dozing Pla nt Installation
AHU Installation
14
15
7
4
11
12
3
8
0%
0%
24 Duct Connection to AHU 15 5 14 3 0%

Descope Risky Items 25


26
Pipe Connection to AHU
Kitchen Exhaus t Fan Fixing
15
16
8
8
14
15
5
1
0%
28%

██
27 Ceiling Diffuser Fixing 17 2 15 2 60%

████
28 17 1 16 8 25%
Start System Testing
Grille & Linear Fixing


29 Thermostat Fixing 17 5 16 3 5%
30 Pre commissioning chilled water 18 pumps 1 16 3 16%
31 18 (Static)
Water circulati on in sys tem and drain 1 17 4 3%


Find more money 32 Circulation of water with cleaning19 chemical6 18 7 41%




33 Pre commissioning FAHU’s 19 6 21 5 31%



34 21
Clea ning of all filters and strainers 8 22 7 0%
Demo to user group 35
36
Pre commissioning pressurization 21 fa ns 1
23 (dynamic)
Water circulati on in sys tem and drain 4
23
24
3
6
0%
0%
37 24
Refilling of water and witness by Engineer 1 24 3 0%
38 Prelim. Adjusting and balancing of 24 valves 6 24 5 0%
39 Test and commiss ion chilled water 24pumps7 24 8 0%

Burndown Chart Project Timeline

300 Alpha Out


Investor Private Beta
Presentation Out
First Plan for
200 Prototype Public Beta future
Project
Kickoff Roll out
100

e t ut ta ut re
off yp on Ou Be tu
0 ick ot ati aO l lo
tK ot ent p ha et b lic Ro r fu
r l B fo
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 jec P es A te Pu
Pr
o st Pr iva an
Fir or Pr Pl
st
Daily Completed Planned Actual ve
In

hasan j
Enter Project Status Enter the Project Milestone Data Here

Overall Project Status Green Date Milestone if any


Overall Project Progress 23% May-09 Project Kickoff
Jun-09 First Prototype
Jul-09
Enter Activity Details Aug-09 Investor Presentation
Sep-09 Alpha Out
Ongoing Activities 5 Oct-09
Nov-09 Private Beta Out
List of Activities Dec-09 Public Beta
Jan-10
Activity Completion Feb-10 Roll out
Mechanical System HVAC 23% Mar-10
Electrical System 32% Apr-10 Plan for future
Plumbing System 64%
Fire Fighting System 12%
Mechanical Floor / Roof Activi 15%
Data Here Top 5 Issues

Height Issue Dummy


1 Find test manager 0
2 Descope Risky Items 0
Start System Testing 0
3 Find more money 0
4 Demo to user group 0
0
3 0
2 0
0
1 0
0
2 0
Project Plan - Gantt Chart Template

Planned Actual % Show Gantt for Actual

# List of Activties Start Dur Start Dur Done 1 2 3 4 5 6 7 8 9


1 Duct hangers & Supports 1 5 1 2 0%
2 Chilled Water Pipe Hangers & Sup 1 5 1 6 58%


███
██

3 Ducting Supply, Return, Fresh & E 2 4 2 5 35%
4 Volume, Fire & Smoke Damper Fix 4 8 2 6 10%
5 Duct Risers 4 1 3 8 0%
6 Duct Insulation 4 3 4 6 0%
7 Chilled Water Piping - High Level 5 4 4 3 0%
8 Chilled Water Pipe Riser 5 2 4 5 0%
9 Chilled Water Pipe Leakage Testin 5 2 4 6 0%
10 Chilled Water Pipe Insulation 6 5 6 7 0%
11 Fan Coil Unit (FCU) Installation 6 1 7 8 0%
12 Duct Connection to FCU 9 3 8 3 0%
13 Chilled Water Pipe Connection to 9 6 8 6 0%
14 Bends, Droppers & Mouth Piece 9 3 9 1 0%
15 Chillers Installation 9 4 9 4 0%
16 Heat Exchanger Installation 10 5 10 2 0%
17 Staircase Pressure Fan Installatio 11 2 10 5 0%
18 Garbage Exhaust Fan Installation 12 6 11 7 0%
19 Chilled Water Pump Installation 12 1 11 5 0%
20 Expansion Tank & Pressure Unit In 14 5 11 6 0%
21 Air Scrubbers installation 14 8 11 1 0%
22 Chemical Dozing Plant Installation 14 7 11 3 0%
23 AHU Installation 15 4 12 8 0%
24 Duct Connection to AHU 15 5 14 3 0%
25 Pipe Connection to AHU 15 8 14 5 0%
26 Kitchen Exhaust Fan Fixing 16 8 15 1 28%
27 Ceiling Diffuser Fixing 17 2 15 2 60%
28 Grille & Linear Fixing 17 1 16 8 25%
29 Thermostat Fixing 17 5 16 3 5%
30 Pre commissioning chilled water 18 1 16 3 16%
31 Water circulation in system and dr 18 1 17 4 3%
32 Circulation of water with cleanin 19 6 18 7 41%
33 Pre commissioning FAHU’s 19 6 21 5 31%
34 Cleaning of all filters and strainer 21 8 22 7 0%
35 Pre commissioning pressurization 21 1 23 3 0%
36 Water circulation in system and d 23 4 24 6 0%
37 Refilling of water and witness by 24 1 24 3 0%
38 Prelim. Adjusting and balancing of 24 6 24 5 0%
39 Test and commission chilled wat 24 7 24 8 0%
40 Test and commission heat exchan 24 3 24 2 0%
Actual Show Status? What is current week? 3


10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

██
████







Burn down chart
Deliverable Burn Down
Burned down Balance
Daily
Day Planned Actual Planned Actual Completed
0 250 250 #N/A
1 12 8 238 242 8
2 18 10 220 232 10
3 11 0 209 232 0
4 4 12 205 220 12
5 5 19 200 201 19
6 6 13 194 188 13
7 10 8 184 180 8
8 20 2 164 178 2
9 20 144 #N/A #N/A
10 18 2 126 176 2
11 6 120 #N/A #N/A
12 13 2 107 174 2
13 7 34 100 140 34
14 14 86 #N/A #N/A
15 12 74 #N/A #N/A
16 14 60 #N/A #N/A
17 12 48 #N/A #N/A
18 11 37 #N/A #N/A
19 19 18 #N/A #N/A
20 18 0 #N/A #N/A
Issue Tracker Template
Date
# Issue Priority Open Close
1 Installation of Main LV Panel Low Jul/12 Jul/15
2 Erect Cable Trays Medium Jul/12 Jul/13
3 Cable Trucking High Jul/14 Jul/19
4 Earthing System Low Jul/15 Jul/16
5 LV Cabling Medium Jul/15 Jul/18
6 ELV Cabling Medium Jul/15 Jul/20
7 Main LV Cable Termination Low Jul/15 Jul/22
8 Sub main Cable Termination High Jul/16 Jul/20
9 Wiring for Lighting & Small Power Low Jul/16 Jul/17
10 Wiring for ELV System Medium Jul/18 Jul/25
11 Wiring for Fire Fighting System High Jul/18 Jul/24
12 Circuit Continuity Test Low Jul/18 Jul/25
13 Ceiling Rose & Flexible Drops Medium Jul/22 Jul/24
14 Distribution Boards Dressing Medium Jul/23 Jul/28
15 Bus bar Installation Low Jul/23 Jul/27
16 Lightning Protection System High Jul/23 Jul/30
17 Transformer Installation Medium Jul/23 Jul/25
18 Generator Installation High Jul/23 Jul/28
19 ATS Panel Installation Low Jul/24 Jul/31
20 LV Cabling from Transformer to LV Panel Medium Jul/24 Jul/30
21 Fixing Fire Alarm & Light Fittings Medium Jul/24 Jul/30
22 Fixing Switches, Sockets & Accessories Low Jul/27 Aug/02
23 Circuit continuity test by bus riser High Jul/28 Jul/29
24 Continuity test LV wiring Low Jul/29 Aug/02
25 Pre commissioning ELV fixtures Medium Jul/31 Aug/07
26 Final test and commissioning bus risers High Aug/01 Aug/04
27 Test and commission variable frequency drive Low Aug/01 Aug/05
28 Lighting protection earth resistance test Medium Aug/02 Aug/09
29 Floor MDB, SMDB, MCC panel commissioning Medium Aug/04 Aug/05
30 Test and commission light fixtures Medium Aug/05 Aug/12
31 Test and commission ELV final fixtures High Aug/05 Aug/07
32 Underground Piping Low Aug/06 Aug/09
33 Putting sleeves in concrete slab Medium Aug/07 Aug/09
34 Embedded pipe in concrete slab Medium Aug/07 Aug/08
35 Cutting & Chasing in block walls Low Aug/10 Aug/16
36 Putting Pipes (water supply / drainage) in block walls High Aug/12 Aug/19
37 Horizontal Drainage Piping Low Aug/14 Aug/17
38 Horizontal Water Supply Piping Medium Aug/15 Aug/21
39 Drainage Pipe Water Leakage Testing High Aug/17 Aug/24
40 Water Supply Water Leakage Testing Low Aug/18 Aug/25
41 Vertical (Riser) Drainage Piping Medium Aug/21 Aug/25
42 Vertical (Riser) Water Supply Piping Medium Aug/22 Aug/27
43 Floor Drain (Trap) Fixing High Aug/22 Aug/25
44 Water Heater Installation Low Aug/22 Aug/28
45 Bath Tub / Shower Tray Installation Medium Aug/22 Aug/24
46 Sewage Lift Pump Installation & Piping High Aug/24 Aug/30
47 Water Transfer Pump Installation & Piping Low Aug/24 Aug/27
48 Water Booster Pump Installation & Piping Medium Aug/27
49 Erection of Water Tank & Connections Medium Aug/27
50 Sanitary Ware Installation Medium Aug/29
51 Sanitary Fixture Fixing High Aug/29
52 Water Meter Fixing Low Aug/29
53 Pre commission water transfer & Booster pumps Medium Aug/31
54 Pre commission floor water heaters Medium Sep/01
55 Overhead Roof Water Tank fillup Low Sep/03
56 Flushing & checking leaks in water supply pipes High Sep/04
57 Flushing & checking leaks in drainage pipes Low Sep/05
58 Simultaneous flow test on drainage risers Medium Sep/06
59 Test and commission water transfer & booster pumps High Sep/07
60 User name allows HTML Injection Low Sep/07
Comments
Open Issue Summary
High 3
Medium 6
Low 4
Types of Gantt Gantt Chart Symbols
Planned █
Actual ○

You might also like