Installation / User Manual: Apsystems Yc1000-3 3-Phase Microinverter
Installation / User Manual: Apsystems Yc1000-3 3-Phase Microinverter
Installation / User Manual: Apsystems Yc1000-3 3-Phase Microinverter
APsystems America
600 Ericksen Ave NE, Suite 200 Seattle, WA 98110
TEL: 844-666-7035 EMAIL: [email protected]
Specifications subject to change without notice - please ensure you are using
the most recent update found at www.APsystems.com
APsystems Microinverter
APsystems Energy Communication Unit (ECU)
APsystems Energy Monitor and Analysis (EMA) web-based
monitoring and analysis system
Meter
PV
Module Branch J-box
M ic roinv e rte r
PV
Module Neutral
Ground
AC Distribution Panel
ECU
Figure 1
Simple to install
You can install individual PV modules in any combination of module
quantity, orientation, different type and power rate (check on-line module
compatibility or contact APsystems).
APsystems Microinverters are designed to only operate when they can sense
power coming from the grid. Even if they are plugged into the solar array,
they will not turn themselves on until they can read power from the grid.
Figure 2
Click
Figure 3
Cover all unused T connectors with Bus Cable T-CONN Cap to protect the T connectors.
Figure 4
AC connector interface as follows, from left to right PE, N, L3, L2, L1.
Figure 5
PE N L3 L2 L1
Figure 6
NOTE: The status LED for on each microinverter will blink green
three (3) times to indicate normal operation once DC power is applied.
It is important to understand that this “start up” sequence occurs once
the first module is connected to the microinvert and is successfully
generating DC power. The “start up” sequence does NOT reoccur as
additional modules are connected to the same microinverter.
Step 5 - Install a Bus Cable End Cap at the end of AC bus cable.
a.Wire stripping
c.Insert five wires into the core wires hole of the
body.
Figure 7
Figure 8
a. Install an appropriate junction box at a suitable location on the PV
racking system (typically at the end of a branch of modules).
b. Connect the open wire end of the AC bus cable into the junction
box using an appropriate gland or strain relief fitting.
c. Wire the conductors of the AC bus: L1- BLACK; L2 - RED; L3 - BLUE; N -
WHITE; PE – GREEN.
d. Connect the AC branch circuit junction box to the point of utility
Interconnection.
WARNING: Wiring colour code can be different according local regulation,
check all the wires of the installation before connecting to the AC bus to be
sure they match.Wrong cabling can damage irreparably the microinverters,
such an issue is not covered by the warranty.
Figure 9
Operation LED
Flashing Slow Green (10 sec. gap) - Producing power and communicating
with ECU
Flashing Fast Green (2 sec. gap) - Producing power and not
communicating with ECU over 60 minutes
Flashing Red - Not producing power
Steady Red - Electrode assembly ground fault protection
Other Faults
All other faults are reported to the ECU. Refer to the ECU
Installation and Operation Manual for a list of additional faults
and troubleshooting procedures.
D. Close the branch circuit breaker, and verify operation of the replacement
Microinverter.
Note 1: Utility Interconnection Voltage and Frequency Trip Limits and Trip Times
Voltage and frequency limits for utility Interaction
Maximum time (sec) (cycles) at
Simulated utility source
Condition 60 Hza before cessation of
Voltage (V) Frequency (Hz) current to the simulated utility
A < 0.50 Vnor Rated 80ms
B 0.50 Vnor ≤ V < 0.88 Vnor Rated 200ms
C 1.10 Vnor < V < 1.20 Vnor Rated 200ms
D 1.20 Vnor ≤ V Rated 80ms
E Rated f > 60.5 160ms
F Rated f < 59.3 160ms
2018/05/28 REV3.7
22
YC1000-3 Installation/User Manual
Sample Wiring Diagram - 120V/ 208V Three Phase
SOLAR
METER
PANEL
TO METER OR AC
DISTRIBUTION PANEL
YC1000-3
AC BUS CABLE
BLACK - L1
RED - L2
BLUE - L3
WHITE - N
GREEN - PE 15 AMP CIRCUIT
BREAKER PER
BRANCH CIRCUIT
AC JUNCTION BOX
NEUTRAL
BRANCH END CAP INSTALLED
ON THE END OF AC BUS CABLE
GROUND
DISTRIBUTION PANEL
Wiring Diagram
23
YC1000-3 Installation/User Manual
Sample Wiring Diagram - 277V/ 480V Three Phase
SOLAR
METER
PANEL
TO METER OR AC
DISTRIBUTION PANEL
YC1000-3
AC BUS CABLE
BLACK - L1
RED - L2
BLUE - L3
WHITE - N
GREEN - PE
15 AMP CIRCUIT
AC JUNCTION BOX
BREAKER PER
BRANCH CIRCUIT
NEUTRAL
BRANCH END CAP INSTALLED
ON THE END OF AC BUS CABLE
GROUND
Wiring Diagram
DISTRIBUTION PANEL
277V/ 480V THREE PHASE
ECU
ENERGY COMMUNICATION UNIT
YC1000-3 Accessory
Wiring Diagram
Grid
24
Accessories Summary
Accessories
Category Part NO. Name Pic
AC Connector (Male)
6 2300531032 25A AC Male Connector (EN,3-wire)
(Optional)
AC Connector (Female)
7 2300532032 25A AC Female Connector (EN,3-wire)
(Optional)
25
APsystems Microinverter &Energy Communication Unit
Warranty Card
The APsystems Installation Map is a diagram of the physical location of each microinverter in your PV installation. Each APsystems microinverter
has a removable serial number label located on the mounting plate. Peel the label and affix it to the respective location on the APsystems installation
map.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
To register your APsystems microinverter, please mail this warranty registration card to: [email protected]
26