Availability Based Tariff
Case i:
If the grid has surplus power at the time and frequency is
above 50.0 cycles, the rate would be lower.
Case ii:
If the excess generation takes place at the time of generation
shortage in the system, the payment for extra generation
would be at a higher rate.