0% found this document useful (0 votes)
820 views5 pages

CPI Task List

1. The document outlines 12 steps for configuring and testing connectivity between SAP CPI and SAP S4, including obtaining tenant details, adding users, enabling messaging services, creating destinations, and deploying certificates. 2. Key steps involve verifying admin access in SAP CPI, adding and assigning roles to an Itelligence user, enabling enterprise messaging, configuring cloud connectors, and creating and verifying connections between the systems. 3. Responsibilities are assigned to the client IT team, Itelligence consultants, and joint teams to complete tasks in SAP CPI, on-premise servers, and SAP S4.

Uploaded by

vikas_anne_1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
820 views5 pages

CPI Task List

1. The document outlines 12 steps for configuring and testing connectivity between SAP CPI and SAP S4, including obtaining tenant details, adding users, enabling messaging services, creating destinations, and deploying certificates. 2. Key steps involve verifying admin access in SAP CPI, adding and assigning roles to an Itelligence user, enabling enterprise messaging, configuring cloud connectors, and creating and verifying connections between the systems. 3. Responsibilities are assigned to the client IT team, Itelligence consultants, and joint teams to complete tasks in SAP CPI, on-premise servers, and SAP S4.

Uploaded by

vikas_anne_1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Step ID Task

1 Get CPI Tenant details


2 Verify admin access
3 Add Itelligence S-user ID[Assign Roles and Authorizations]
4 Assign additional users for accessing SAP CPI
5 Perform Smoke Test
6 Enable Enterprise Messaging Service/Create Space/EM Instance
7 Create sufficient queues for Enterprise Messaging
8 Cloud connector configuration
9 HTTP Destination Creation from SAP CPI to cloud connector
9 Verify connectivity between CPI and SAP S4
10 Create Service user id/communication user for CPI
11 Deploy CPI certificates in SAP S4
System where the task should be performed
SAP CPI
SAP CPI
SAP CPI
SAP CPI
SAP CPI
SAP CPI
SAP CPI
SAP CPI,On-premise server hosting cloud connector software
SAP CPI
SAP CPI
SAP CPI
SAP S4
Dependency/Comments
CPI must be enterprise edition
Admin access to the S-user ID specLfied in the order form
Client must add S-user id of Itelligene CPI consultant with Sufficient roles [AuthGroup.Administ

Create and deploy a test iflow to test CPI system functioning


We need to ensure atleast 10GB data/10 SKU's is allocated to SAP Enterprise Messaging
Based on interfaces

To be shared to third party systems to call SAP CPI. Must have ESBMessaging.send role
Owner Performed By
Client Client IT team
Client Client IT team
Client/Itelligence CPI Consultant Itelligence
Itelligence CPI Consultant Itelligence
Itelligence CPI Consultant Itelligence
Client/SAP/Itelligence SAP/Itelligence
Itelligence/SAP Itelligence/SAP
Itelligence Basis Itelligence Basis
Itelligence CPI Consultant Itelligence Basis
Itelligence CPI Consultant Itelligence CPI Consultant
Itelligence Basis/Client Itelligence Basis/Client
Itelligence Basis Itelligence Basis
https://help.sap.com/viewer/bf82e6b26456494cbdd197057c09979f/Cloud/en-US/6f694dcc608c41d390218848873dc6f3.

You might also like