Saudi Aramco Test Report

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.

00 30-Jun-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Pressure Test Report SATR-A-2001 24-Jul-18
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.

System Description: Test Details (Type):


Test/Service Fluid: MAOP: Sys Mat'l Type: Limiting Factor:
Flushing Cleaning Method Used: Accepted: Rejected:
Lay-Up Method: None: Ambient: Wet: Dry: Other :

Pressure Gages/Recorder Temp Gage/Recorder Relief Valve


Test Instruments
PG- PG- PG- PG- PR- TG- TR- RV #
Serial No/Tag No.
Make
Range
Certificate No.
Date Calibrated
Set Pressure
Re-Calibration Due
Date
ITEM Description of Test Parameters
Actual Pass Fail Remarks
No. (Complete Applicable Data Entry Prior to Test)
Test Medium Type/Quality (Indicate method of treatment if req'd in
1 Remarks, i.e., Fluid type, ph, SRB count, O2 Scavenger, etc).

2 SystemTemperature at test:
Test Pressure: Service Test/Others:________
3 Strength Test: ___________ Valve Body: ______________
Tightness Test: ___________ Valve Seat: ______________

4 Preliminary Test Conducted at __________Psig

Area of interest (Indicate flange joints, weld joints, threaded, socket,


5
body)
6 Method of leak detection (direct visual/remote)
Test Duration : a. 30 minutes min for Plant Piping
7 b. 2 hrs. Pipeline strength test/ ______ Tightness Test
c. Others_____________
REPAIRS DURING TEST:

TEST RESULTS: Test Accepted. No leak or loss in pressure observed. State reasons in
Rejected Remarks Section.
AFFIX ANY TEST TAPE TO THIS REPORT (TEST EVIDENCE)

REMARKS:

Contractor / Third-Party Saudi Aramco


Construction Representative PMT Representative
Test is ready for inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department, Name, Initials and
Company, Initials and Date: Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and
Name, Initials and Date:
Date:

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Pressure Test Report SATR-A-2001 24-Jul-18
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.

System Description: Test Details (Type):


QC Supervisor Proponent and Others (Optional)
Quality Record Approved: Name, T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date: Organization,
Initials and Date:

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018)

Saudi Aramco: Company General Use


Rev.2018.06.00

24-Jul-18

Saudi Aramco: Company General Use


30-Jun-18

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018)

Saudi Aramco: Company General Use


Rev.2018.06.00

24-Jul-18

Saudi Aramco: Company General Use


30-Jun-18

Saudi Aramco: Company General Use

You might also like