CHAPTER 1. INTRODUCTION
1.1. Background
Power electricity has a very important role to supporting the development of the area,
especially to support the sectors of the construction of the other. The target of energy
development is to provide the energy that is sufficient with a price that affordable by
public.
Along with the growth of the construction area and the other sectors, the energy
request, especially electricity will continue to rise. The development of economic
democracy will be further enhanced. Because of it, energy request in rural areas also
will further increase.
In order to supply the electricity in some areas that still lack electricity supply, PT PLN
plans to develop a Coal Fired Steam Power Plant (CFSPP) with a capacity of 2 x 15
MW in the East Belitung, precisely in the area of Air Kelik Village, Damar District,
Belitung Timur Regency.
To prepare the construction of the power plant, needs to be carried out site
investigation in the field to support the manufacture of Feasibility Study Belitung Coal
Fired Steam Power Plant (CFSPP) with the capacity of 2 x 15 MW.
1.2. Purpose
The purpose of the site investigation activities are as follow:
1-1
Site Investigation
PT PRIMA LAYANAN NASIONAL ENJINIRING
Belitung CFSPP (2x15 MW)
Project Location
1-2
Site Investigation
PT PRIMA LAYANAN NASIONAL ENJINIRING
Belitung CFSPP (2x15 MW)
Item Description
1-3
Site Investigation
PT PRIMA LAYANAN NASIONAL ENJINIRING
Belitung CFSPP (2x15 MW)
Project Manager
Team Leader
1-4