ACB Installation Checklist 1
ACB Installation Checklist 1
NO TASK DESCRIPTION
13 Verify the Insulation Resistance (IR) test results of the Up-stream and
Down-stream isolated Bus of ACB
14 Mention the Poles Resistance (WR) test result of ACB
Sr No
1
2
3
4
5
6
Sr No
1
2
3
4
5
6
Sr No
1
2
3
4
5
6
Sr No
1
2
3
4
5
Engro Polymer & Chemicals
ACB Installation Checklist
PLANT LOCATION:
N: DATE:
INSPECTION REMARKS
TASK DESCRIPTION
NOT
OK NA
OK
a of ACB
chnical adjustment of ACB inside the Panel
B control and CT wiring
llation as per approved size of MOC
Description Valve
R To G
Y To G
B To G
R To Y
R To B
Y to B
Description Valve
R To G
Y To G
B To G
R To Y
R To B
Y to B
Description Valve
R To G
Y To G
B To G
R To Y
R To B
Y to B
Description Valve
R To G
Y To G
B To G
R To Y
R To B
ATION:
REMARKS