Work Inspection Request (Wir) : LB2 GRC Corridor Fabricated Additional Column Material Inspection & Release For Erection
Work Inspection Request (Wir) : LB2 GRC Corridor Fabricated Additional Column Material Inspection & Release For Erection
DESCRIPTION LB2 GRC Corridor Fabricated Additional Column material Inspection & Release For erection
( Item No: 64,66,65,67,68,69,63,111,113,50,14,19,108106,109,110,105,22,23,26,27,29,21,20,24,28,30,135,133,132,3,4,5,6,8
,9,91,92,90,D,J,A,L,F,C)
TICK BOX YES NO NOTE : IF NO, ANY DEVIATION FROM SPECIFICATION(S),APPROVED DRAWING(S) TO BE RECORDED BELOW.
CONTRACTOR QC : ____
Rejoy Baby DATE : _____________ TIME: ______________
STATUS CODE 1 2 3 4 5 6
1-No Exception Taken 2-Exceptions as Noted; Revise & Resubmit for Record 3-Revise and Resubmit
4-Rejected 5-Review Not Required 6-Issued for Construction
THE ENGINEER'S COMMENTS SHALL NOT RELIEVE THE CONTRACTOR OF ANY OF HIS RESPONSIBILITIES UNDER THE CONTRACT .
TICK BOX YES NO NOTE : IF NO, ANY DEVIATION FROM SPECIFICATION(S),APPROVED DRAWING(S) TO BE RECORDED BELOW.
CONTRACTOR QC : ____
Rejoy Baby DATE : _____________ TIME: ______________
STATUS CODE 1 2 3 4 5 6
1-No Exception Taken 2-Exceptions as Noted; Revise & Resubmit for Record 3-Revise and Resubmit
4-Rejected 5-Review Not Required 6-Issued for Construction
THE ENGINEER'S COMMENTS SHALL NOT RELIEVE THE CONTRACTOR OF ANY OF HIS RESPONSIBILITIES UNDER THE CONTRACT .