Drawing Description: Average Average

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

DRAWING SHOP DRAWING PRODUCTION

START (Plan VS.


Actual)

DRAWING DESCRIPTION AVERAGE AVERAGE

T-No. of Day/s T-No. of T-No. of No.of


Sheet/s Day/s Sheet/Day

STRUCTURAL DRAWING 
B1F Piles Layout (9.0) 30 27 1
B2F Piles Layout (4.0) 2 2 1
Foundation 9 11 11 1
1FL/B1F CBP 4 10 6 1
2FL CBP (10.0) 7 4 1
RFL CBP (3.0) 4 3 1
CBP Section drawing 1 9 7 1
CHB Elevation Drawings (4.0) 26 16 1
FINISHING DRAWING 
Standard Detail (42.0) 8 14 2
1FL Finishing Detail (11.0) 19 9 0.5
Mezzanine Finishing Detail - 10 7 0.7
2FL Finishing Detail 80 18 3 0.2
RFL Finishing Detail 7 9 3 0.4
1FL RCP 1 13 4 0.3
MEZZ RCP (14.0) 18 5 0.3
2FL RCP 13 2 0.2
Toilet Detail (13.0) 15 16 1
Kitchen + Dish Return Detail (5.0) 7 3 0.4
Stair Detail 12 19 5 0.3
EXTERNAL WORKS
Rain Water Drainage Detail (51.0) 10 8 1
External Finishing Works 46 7 5 1
GUARD HOUSE
Foundation / CBP 15 3 4 2
Finishing Detail 62 3 4 1
ACTUAL PRODUCTIVITY 3.2 7.0 1.0
SUBMISSION SUBMISSION APPROVAL TOTAL NUMBER OF DAYS (from
DURATION DURATION DURATION Draw Start to Approval)
TO SITE (from TO DESIGNER (from
Drawing Start) (from Drawing Submission
Start) Date)

AVERAGE AVERAGE AVERAGE AVERAGE

T-No. of Day/s T-No. of Day/s T-No. of Day/s T-No. of Day/s T-No. of Week/s

23 17 4 0.6
19 9 11 5 0.7
43 14 66 118 16.9
67 6 32 93 13.3
60 35 49 68 9.7
66 16 31 85 12.1
82 (38.0) 43 76 10.9
42 21 40 73 10.4

27 146 7 35 5
28 48 50 91 13
14 31 33 11 1.6
20 98 6 47 6.7
53 20 19 41 5.9
16 194 5 61 8.7
18 1 0.1
181 13 28 4
17 29 34 56 8
102 54 (1.0) 72 10.3
36 54 2 47 6.7

25 98 (6.0) 40 5.7
63 45 60 83 11.9

39 39 19 58 8.3
33 44 (13.0) 71 10.1
41.4 53.0 23.5 55.0 7.9