0% found this document useful (0 votes)
52 views1 page

Preventive Maintenance Checklist: Master Series

This document is a preventive maintenance checklist for a coffee machine. It contains information about the customer, machine details, maintenance tasks to be completed, and a section to record payment details. The maintenance tasks include cleaning and replacing various machine parts, checking for leaks, adjusting settings, and completing training. Upon completion, the customer signs to acknowledge their satisfaction with the work and that the machines are operating properly.

Uploaded by

Humaid Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

Preventive Maintenance Checklist: Master Series

This document is a preventive maintenance checklist for a coffee machine. It contains information about the customer, machine details, maintenance tasks to be completed, and a section to record payment details. The maintenance tasks include cleaning and replacing various machine parts, checking for leaks, adjusting settings, and completing training. Upon completion, the customer signs to acknowledge their satisfaction with the work and that the machines are operating properly.

Uploaded by

Humaid Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Preventive Maintenance Checklist Master Series

Nuova Distribution, 6940 Salashan, Ferndale, WA 98248 FAX: (360) 366-4015, Phone: (360) 366-2226

Customer Name ___________________________________________


Street Address ___________________________________________
City, State, Zip ___________________________________________
Phone Number ___________________________________________
Contact ___________________________________________
Machine Model____________________Serial Number ____________
Other Equipment __________________________________________

Servicing Company_________________________________________
Date _________________________________________
Phone #___________________Technician______________________
‰ Bring U key
‰ Record delivery count total___________
‰ Reset delivery count only if changing grinding burrs
‰ Record washing cycles total ___________
‰ Inventory cleaning supplies, re-order from Nuova Dist
‰ Measure water hardness ___________gpg
‰ Run complete wash cycle
‰ Disassemble and clean delivery unit (code 80004007)
‰ Disassemble and clean milk frothing system
‰ Check milk electrovalve (code 04100010)
‰ Clean bean hopper
‰ Clean drain
‰ Clean refrigeration condensor with brush
‰ Check (visual inspection) for leaks
‰ Check piston alignment for smooth entry
‰ Check upper piston slide (code 06100011) and lubricate
‰ Replace upper piston seal (code 02290020)
‰ Replace lower piston seal (code 02290019)
‰ Disassemble and clean grinder
‰ Change grinding burrs every 15,000 deliveries
‰ Check grind setting adjust if necessary
‰ Check grind times and adjust if necessary
‰ Check coffee and milk dosages and adjust if necessary
‰ Replace stainless steel shower screens (code 03000069)
‰ Complete training (see install sheet)
‰ Return used parts to Nuova Distribution with this work sheet
I acknowledge that the work performed and the operation of the machines meets with
our satisfaction. Signature____________________________Date_________________

Payment: Return this completed form to Nuova Distribution


__________ X _________ = $_____ X __117%__ = $____________
Install hours Hourly rate Amount Nuova enhancer Credited to your account

You might also like