0% found this document useful (0 votes)
82 views1 page

Port Harcourt Refining Company Limited: (Internal Memorandum)

Stephen E.N., an Instrument Engineer, applied for 2018 IAP leave from May 22nd to June 12th 2020 to attend to pressing family issues. The request was sent to the Manager of Maintenance through the DM A1&2 and FP1 for consideration and approval.

Uploaded by

Steve
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views1 page

Port Harcourt Refining Company Limited: (Internal Memorandum)

Stephen E.N., an Instrument Engineer, applied for 2018 IAP leave from May 22nd to June 12th 2020 to attend to pressing family issues. The request was sent to the Manager of Maintenance through the DM A1&2 and FP1 for consideration and approval.

Uploaded by

Steve
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PORT HARCOURT REFINING COMPANY LIMITED

(INTERNAL MEMORANDUM)

To: Manager, Maintenance Date: May 20, 2020

Through: DM A1&2, FP1.

From: Instrument Engr. (Shift)

APPLICATION FOR 2018 IAP LEAVE

I hereby apply to observe my 2018 IAP leave to enable me attend to


pressing family issues.

I will commence on the 22nd of May 2020 and will resume back duty on
12th June 2020.

Kindly consider and endorse approval.

STEPHEN, E.N
PF: 19232

You might also like