TRACKING LIST RFIN RAPID Jan2017
TRACKING LIST RFIN RAPID Jan2017
TRACKING LIST RFIN RAPID Jan2017
SUMMARY RFIN
1 2 1+2
CANCEL 864 201 1065
ACCEPTED 8227 1837 10064
Rejected 902 28 930
12059 = 12059
SUMMARY RFIN
TEM ALL SR1 SR2 SR3 SR4 SR5 SR6 SR7
Total RFIN by trade 5 940 161 194 265 520 226 637 529
Closed RFIN 5 937 161 194 265 520 226 637 529
Pending RFIN 0 3 0 0 0 0 0 0 0
Percentage KPI 100.00% 99.68% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
PERIOD ENDING: A
TOTAL
SR8 SR9 ZN1 ZN2 ZN3 ZN4 ZN5 ZN6 SAJ TCF TSF
(Accumulative)
16
`
R
t 8, 2020
Survey TNC
closed 1 closed 2 open 1 open 2 closed 1 closed 2 open 1 open 2
145 3 0 0 7 0 0 0
33 0 0 0 0 0 0 0
53 0 0 0 0 0 0 0
7 0 0 0 163 245 0 2
42 0 0 0 123 72 0 0
0 0 0 0 0 0 0 0
0 0 0 0 1 0 0 0
37 1 0 0 1 0 0 0
317 4 0 0 295 317 0 2
321 0 612 2 16
321 614 12075
99% 48%
August 8, 2020
`
SUMMARY OF RFIN Update: 8.4.2015
No. List of Contractors Total RFIN Issued Closed RFIN Pending RFIN Percentage Closed
1 UEMB 862 195 667 22.62%
2 PROPEL 167 182 -15 108.98%
3 Instant Option 1345 109 1236 8.10%
4 MENTA 105 53 52 50.48%
5 Lian Fatt 220 18 202 8.18%
6 Wee Guan 239 27 212 11.30%
7 How Thong 136 37 99 27.21%
8 Paneagle 127 3 124 2.36%
9 Hani Ent 38 13 25 34.21%
10 PPEC 289 23 266 7.96%
11 Ocned Water 447 39 408 8.72%
12 Infra Tech 19 12 7 63.16%
13 Dorce 1091 11 1080 1.01%
14 Sinaran 13 3 10 23.08%
15 AEIE 472
16 Hikmat Hijau 0
17 PSJV 230
18 Pek Chew KL 3
19
20
21
22
23
24
25
SUBMITTED TO PTOD
QAQC CONCTRUCTION SURVEY TNC
RFIN by Dept CVS STR BLD ELE MNE ARC/LNDS TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CPC STR BLD ELE MNE ARC TKG PIP
1188 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00132 EN MUHIB (QAQC) PSJV PSJV 28-Mar-15 ALL CIV Material XLPE/PVC/SWA/CU 3C 185mm 11 KV-15 drums total 28-Mar-15 30-Mar-15 11.00am CLOSED 2-Apr-15 5 ACCEPTED QAQC 1
1189 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00133 EN MUHIB (QAQC) PSJV PSJV 1-Apr-15 ALL CIV Material XLPE/PVC/SWA/CU 3C 185mm 11 KV-30 drums total 2-Apr-15 4-Apr-15 10.00am CLOSED 5-Apr-15 3 ACCEPTED QAQC 1
1368 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00026 MR ANG / EN AZLAN PSJV PSJV 8-Apr-15 SR5 ELE Electrical To inspect the cable pulling works at SR5 first layer 9-Apr-15 11-Apr-15 10.00am CLOSED 25-Apr-15 16 ACCEPTED Construction 1
1369 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00027 MR ANG / EN AZLAN PSJV PSJV 4-Mar-15 SR5 ELE Electrical To inspect the excavation works at SR5 first layer 5-Mar-15 8-Mar-15 9.00am CLOSED 16-Apr-15 42 ACCEPTED Construction 1
1370 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00028 MR ANG / EN AZLAN PSJV PSJV 7-Apr-15 SR5 ELE Electrical To inspect the sand bedding at SR5 first layer 8-Apr-15 10-Apr-15 10.30am CLOSED 16-Apr-15 8 ACCEPTED Construction 1
1477 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00035 MR ANG / EN AZLAN PSJV PSJV 14-Apr-15 SR2 ELE Electrical To do inspection for excavation works ( CH600-CH950) 15-Apr-15 17-Apr-15 11.00am CLOSED 17-Apr-15 2 ACCEPTED Construction 1
1575 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00155 EN MUHIB (QAQC) PSJV PSJV 16-Apr-15 ALL CIV Electrical to do inspection to material: UPVC slab 17-Apr-15 19-Apr-15 9.30am CLOSED 22-Apr-15 5 ACCEPTED QAQC 1
1582 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00038 MR ANG / EN AZLAN PSJV PSJV 17-Apr-15 SR5 ELE Electrical To do inspection for soil backfilling works at SR5 20-Apr-15 22-Apr-15 10.00am CLOSED 30-Apr-15 10 ACCEPTED Construction 1
(CH1600-CH1100
1585 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00041 MR ANG / EN AZLAN PSJV PSJV 17-Apr-15 SR5 ELE Electrical To do inspection for cable pulling works at SR5 22-Apr-15 24-Apr-15 10.00am CLOSED 25-Apr-15 3 ACCEPTED Construction 1
(CH1100-CH700)
1753 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00045 MR ANG / EN AZLAN PSJV PSJV 23-Apr-15 SR5 ELE Electrical to do inspection for second layer cable pulling works at 24-Apr-15 26-Apr-15 10.00am CLOSED 25-Apr-15 1 ACCEPTED Construction 1
SR 5 CH1100-CH700)
1919 RAPID-P20A1-UEMB-SR5-PIP-RFIN-00047 MR ANG / EN AZLAN PSJV PSJV 24-Apr-15 SR5 ELE Electrical To inspect soil backfilling works at chainage 700-110 25-Apr-15 27-Apr-15 8.00am CLOSED 29-Apr-15 4 ACCEPTED Construction 1
2006 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00238 MR ANG / EN AZLAN PSJV PSJV 2-May-15 SR7 ELE Electrical To inspect cable pulling works at SR7 CH650-CH1150 5-May-15 7-May-15 10.00am CLOSED 10-Jun-15 36 ACCEPTED Construction 1
LHS
2126 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00245 MR ANG / EN AZLAN PSJV PSJV 7-May-15 SR7 ELE Electrical To do inspection for sand backfilling works at SR7 7-May-15 9-May-15 4.00pm CLOSED 10-Jun-15 34 ACCEPTED Construction 1
CH700-CH1150 RHS and UPVC slab installation
SUBMITTED TO PTOD
QAQC CONCTRUCTION SURVEY TNC
RFIN by Dept CVS STR BLD ELE MNE ARC/LNDS TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CPC STR BLD ELE MNE ARC TKG PIP
2164 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00047 MR ANG / EN AZLAN PSJV PSJV 8-May-15 SR2 ELE Electrical Soil backfill works for 11KV electrical cable installation 9-May-15 11-May-15 10.00am CLOSED 10-Jun-15 32 ACCEPTED Construction 1
at SR2 CH300-CH550 RHS
2276 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00111 MR ANG / EN AZLAN PSJV PSJV 12-May-15 SR3 ELE Electrical Excavation works for 11kv electrical cable installation 13-May-15 15-May-15 9.00am CLOSED 10-Jun-15 28 ACCEPTED Construction 1
at SR3 CH300-CH550 RHS
2279 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00114 MR ANG / EN AZLAN PSJV PSJV 12-May-15 SR3 ELE Electrical Sand backfill and UPVC slab installation for 11KV 13-May-15 15-May-15 5.00pm CLOSED 10-Jun-15 28 ACCEPTED Construction 1
electrical cable installation at SR3 CH300-CH550 RHS
2325 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00271 MR ANG / EN AZLAN PSJV PSJV 13-May-15 SR7 ELE Electrical Sand bedding and compaction works for 11KV electrical 14-May-15 16-May-15 9.00am CLOSED 10-Jun-15 27 ACCEPTED Construction 1
cable installation at SR 7 CH1250-1600 LHS
2401 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00128 MR ANG / EN AZLAN PSJV PSJV 12-May-15 SR3 ELE Electrical Sand backfill and UPVC slab installation for 11KV 13-May-15 15-May-15 5.00pm CLOSED 12-Oct-15 152 ACCEPTED Construction 1
electrical cable installation at SR3 CH650-CH900 RHS
2629 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00203 EN MUHIB (QAQC) PSJV PSJV 21-May-15 ALL CIV Material XLPE/SWA/PVC 3C 185MM CU 11KV 23-May-15 25-May-15 9.00AM CLOSED 10-Jun-15 18 ACCEPTED QAQC 1
2770 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00267 MR ANG / EN AZLAN PSJV PSJV 26-May-15 SR4 ELE Electrical Excavation works at SR4 CH400-750 RHS for cable 26-May-15 28-May-15 9.00am CLOSED 10-Jun-15 15 ACCEPTED Construction 1
installation
2773 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00270 MR ANG / EN AZLAN PSJV PSJV 26-May-15 SR4 ELE Electrical Sand bedding first layer for electrical cable installation 26-May-15 28-May-15 10.00am CLOSED 10-Jun-15 15 ACCEPTED Construction 1
at SR 4 CH 400-750 RHS
SUBMITTED TO PTOD
QAQC CONCTRUCTION SURVEY TNC
RFIN by Dept CVS STR BLD ELE MNE ARC/LNDS TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CPC STR BLD ELE MNE ARC TKG PIP
2882 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00272 MR ANG / EN AZLAN PSJV PSJV 29-May-15 SR6 ELE Electrical Excavation works for electrical cable installation at SR 6 30-May-15 1-Jun-15 10.00am CLOSED 07-Jul-15 38 ACCEPTED Construction 1
CH700-CH1150 RHS
2888 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00289 MR ANG / EN AZLAN PSJV PSJV 29-May-15 SR4 ELE Electrical Sand bessing works for electrical cable installation 30-May-15 1-Jun-15 9.00am CLOSED 7-Jul-15 38 ACCEPTED Construction 1
CH750-CH900 RHS
3400 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00341 MR ANG / EN AZLAN PSJV PSJV 19-Jun-15 SR4 ELE Cable pulling Cable pulling works ( 1st layer) for loop 20-Jun-15 22-Jun-15 4.00pm CLOSED 04-Aug-15 45 ACCEPTED Construction 1
16,15,14,13,12,11,10,9 at SR4 CH 900-1000 RHS
3492 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00346 MR ANG / EN AZLAN PSJV PSJV 24-Jun-15 SR4 ELE Sand Backfill Sand backfill and UPVC slab installation works for 24-Jun-15 26-Jun-15 9.00am CLOSED 04-Aug-15 41 ACCEPTED Construction 1
electrical cable installation at SR4 CH900-1000 RHS
SUBMITTED TO PTOD
QAQC CONCTRUCTION SURVEY TNC
RFIN by Dept CVS STR BLD ELE MNE ARC/LNDS TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CPC STR BLD ELE MNE ARC TKG PIP
3572 RAPID-P20A1-UEMB-All-CIV-RFIN-00253 EN MUHIB (QAQC) PSJV PSJV 26-Jun-15 All CIV Material Material receiving for 11KV nexans Jointing kit 29-Jun-15 1-Jul-15 9.30 am CLOSED 08-Jul-15 9 ACCEPTED QAQC 1
3711 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00324 MR ANG / EN AZLAN PSJV PSJV 1-Jul-15 SR6 ELE Sand bedding Sand bedding works for electrical Cable installation at 2-Jul-15 4-Jul-15 10.00am CLOSED 04-Aug-15 33 ACCEPTED Construction 1
SR6 CH 1250-CH1600 RHS
3946 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00344 MR ANG / EN AZLAN PSJV PSJV 8-Jul-15 SR6 ELE cable Pulling Cable pulling works for loop 1 at SR6 CH1600-1200 LHS 9-Jul-15 11-Jul-15 10.00am CLOSED 04-Aug-15 26 ACCEPTED Construction 1
3950 RAPID-P20A1-UEMB-All-ELE-RFIN-00276 EN MUHIB (QAQC) PSJV PSJV 8-Jul-15 ALL ELE Material Material receiving of XLPE/SWA/PVC/CN 3C 185mm 9-Jul-15 11-Jul-15 8.30am CLOSED 12-Aug-15 34 ACCEPTED QAQC 1
11KV quantity 10 Drums (Length 5 KM)
4072 RAPID-P20A1-UEMB-SR8-ELE-RFIN-00181 MR ANG / EN AZLAN PSJV PSJV 11-Jul-15 SR8 ELE Cable pulling Cable pulling works for loop 10 at SR8 CH700-1150 RHS 13-Jul-15 15-Jul-15 10.00am CLOSED 4-Aug-15 22 ACCEPTED Construction 1
4133 RAPID-P20A1-UEMB-SR8-ELE-RFIN-00194 MR ANG / EN AZLAN PSJV PSJV 14-Jul-15 SR8 ELE Excavation Excavation works for 11 KV electrical cable installation 15-Jul-15 17-Jul-15 10.00am CLOSED 4-Aug-15 20 ACCEPTED Construction 1
at SR8 CH 700- CH 1150 LHS
4135 RAPID-P20A1-UEMB-SR8-ELE-RFIN-00196 MR ANG / EN AZLAN PSJV PSJV 14-Jul-15 SR8 ELE Cable pulling Cable pulling works for loop 16 at SR8 CH700-1150 LHS 15-Jul-15 17-Jul-15 12.00am CLOSED 4-Aug-15 20 ACCEPTED Construction 1
4145 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00183 MR ANG / EN AZLAN PSJV PSJV 21-Jul-15 SR3 ELE Cable pulling Cable puliing works for loop 5,8,9,10 and 16 at SR 3 CH 22-Jul-15 24-Jul-15 2.00pm CLOSED 26-Aug-15 35 ACCEPTED Construction 1
250 -400 RHS.
4416 RAPID-P20A1-UEMB-SR8-ELE-RFIN-00211 MR ANG / EN AZLAN PSJV PSJV 29-Jul-15 SR8 ELE Excavation Excavation works for 11kv electrical cable installation 30-Jul-15 1-Aug-15 11.00am CLOSED 26-Aug-15 27 ACCEPTED Construction 1
at SR8 CH 1200 - 1600 LHS
4419 RAPID-P20A1-UEMB-SR8-ELE-RFIN-00214 MR ANG / EN AZLAN PSJV PSJV 29-Jul-15 SR8 ELE Cable pulling Cable pulling works for loop 5 and 8 at SR8 CH 1200- 30-Jul-15 1-Aug-15 12.00pm CLOSED 26-Aug-15 27 ACCEPTED Construction 1
1600 LHS
SUBMITTED TO PTOD
QAQC CONCTRUCTION SURVEY TNC
RFIN by Dept CVS STR BLD ELE MNE ARC/LNDS TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CPC STR BLD ELE MNE ARC TKG PIP
4423 RAPID-P20A1-UEMB-All-ELE-RFIN-00298 EN MUHIB (QAQC) PSJV PSJV 29-Jun-15 ALL ELE Material Material receiving for XLPE /SWA/PVC 3C 185mm2 CN 30-Jul-15 1-Aug-15 10.00am CLOSED 30-Jul-15 0 ACCEPTED QAQC 1
11kv
4753 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00127 MR ANG / EN AZLAN PSJV PSJV 12-Aug-15 SR2 ELE Soil Backfill Soil Backfill works for 11KV electrical cable installation 13-Aug-15 15-Aug-15 4.00om CLOSED 4-Sep-15 22 ACCEPTED Construction 1
at SR2 1000-1200 RHS
4756 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00394 MR ANG / EN AZLAN PSJV PSJV 12-Aug-15 SR4 ELE Cable pulling Cable pulling works ( 1 st layer) for loop 13-Aug-15 15-Aug-15 11.00am CLOSED 04-Sep-15 22 ACCEPTED Construction 1
16,15,13,10,9,8,7,& 6 at SR4 CH 350-500 RHS
4759 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00397 MR ANG / EN AZLAN PSJV PSJV 12-Aug-15 SR4 ELE Sand backfill Sand backfill and UPVC slab installation works for 11KV 13-Aug-15 15-Aug-15 4.00pm CLOSED 04-Sep-15 22 ACCEPTED Construction 1
electrical cable installation at SR4 CH 350-500 RHS
4934 RAPID-P20A1-UEMB-All-ELE-RFIN-00343 EN MUHIB (QAQC) PSJV PSJV 18-Aug-15 ALL ELE Material Material receiving for XLPE /SWA/PVC 3C 185mm2 CN 19-Aug-15 21-Aug-15 10.00am CLOSED 29-Aug-15 10 ACCEPTED QAQC 1
at UEMB Storage area, Total 10 Drums/5KM
4937 RAPID-P20A1-UEMB-SR8-ELE-RFIN-00249 MR ANG / EN AZLAN PSJV PSJV 18-Aug-15 SR8 ELE Cable pulling Cabble pulling works for loop 9 at SR8 CH1200-1400 19-Aug-15 21-Aug-15 2.00pm CLOSED 04-Sep-15 16 ACCEPTED Construction 1
RHS
5074 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00425 MR ANG / EN AZLAN PSJV PSJV 24-Aug-15 SR6 ELE Sand bedding works Sand bedding works for 11 KV electrical cable 25-Aug-15 27-Aug-15 10.00am CLOSED 04-Sep-15 10 ACCEPTED Construction 1
installation at SR6 CH 1450-1600 RHS
SUBMITTED TO PTOD
QAQC CONSTRUCTION SURVEY TNC
RFIN by Dept CVS STR BLD ELE MNE ARC/LNDS TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CVS STR BLD ELE MNE ARC TKG PIP CPC STR BLD ELE MNE ARC TKG PIP
Submission Date
No PIC/MANAGER Requested by Requested by Date Section/Area Discipline Inspection Description of Works Inspection Status closed KPI (days) Remarks 1 2 O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C O C
299 RAPID-P20A1-UEM-ALL-ELE-00676 MR ANG / EN AZHAR PSJV PSJV 15-Feb-16 ALL ELE Jointing works Repair cable fault for LooP 15 at SR2/SR7 16-Feb-16 18-Feb-16 5.00pm CLOSED 24-Feb-16 8 ACCEPTED construction 1
1556 RAPID-P20A1-UEMB-SR8-ELE-RFIN-00480 protellus protellus protellus 5-Nov-15 SR8 ELE repair To repair cable fault for Loop 8 at 10-Nov-15 12-Nov-15 10.00am CLOSED 10-Nov-15 0 ACCEPTED construction 1
SR8/3-4
Total RFIN BY MANAGER
ANG
ROSDIN
MISBAH SAMSEAR SUBRI RAMESH MUHIB ANDREW
Total Pending
Total Pending
Total issues Total Close Total pending with
with QAQC
RFIN this week RFIN this week with UEMB Construction
PMC
PMC
313 27 225 34 27
313
0
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(TEMPORARY WORKS)
Submission
RFI No. Requested by Section/Area Discipline Inspection Description of Works Inspection Status Date closed KPI (days) Remarks
Date
41 RAPID-P20A1-UEMB-ALL-STR-RFIN-00039 PROPEL 9-Dec-14 ALL STR Testing Trial mix for concrete G20N, G25N & G30N 12-Dec-14 14-Dec-14 10.00 am CLOSED 22-Jan-15 41 ACCEPTED
59 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00059 Norhazah 31-Dec-14 ALL CIV Testing Compaction Test for ACBC 28 1-Jan-15 3-Jan-15 10.00am CLOSED 2-Jan-15 1 ACCEPTED
63 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00051 Instant option 23-Dec-14 ALL CIV Testing Alliance Precast Industries (API) factory 24-Dec-14 26-Dec-14 10.00am CLOSED 22-Jan-15 29 ACCEPTED
visit for U-Drain.
66 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00003 Menta 20-Dec-14 SR2 CIV Roadwork trimming subase 22-Dec-14 24-Dec-14 08.00 am CLOSED 21-Jan-15 30 ACCEPTED
104 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00057 PROPEL 23-Dec-14 SR6 CIV Roadwork FDT for subgrade CH1200-CH600 24-Dec-14 26-Dec-14 11.00am CLOSED 16-Jan-15 23 ACCEPTED
105 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00060 PROPEL 19-Dec-14 SR6 CIV Roadwork FDT for Subbase at CH890-CH1160 20-Dec-14 22-Dec-14 2.00pm CLOSED 16-Jan-15 27 ACCEPTED
116 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00012 Zaki 17-Dec-14 SR7 CIV Testing Mackintosh probe test at soggy area at 19-Nov-14 21-Nov-14 10.00 am CLOSED 12-Jan-15 54 ACCEPTED
service road 7 (CH 800 - CH900)
120 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00019 PROPEL 18-Dec-14 SR7 CIV Roadwork Joint dipping subbase at Service Road 7 - 19-Nov-14 21-Nov-14 10.00 am CLOSED 16-Jan-15 58 ACCEPTED
CH860 to CH700
129 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00003 Misbah 14-Jan-15 ZN2 BLD Survey Joint Survey Inspection 14-Jan-15 16-Jan-15 4.00pm CLOSED 15-Jan-15 1 ACCEPTED
130 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00004 Nik 15-Jan-15 ZN2 BLD Building Inspection for PDA Test Equipment 17-Jan-15 19-Jan-15 9.00am CLOSED 22-Jan-15 5 ACCEPTED
2
RAPID-P20A1-UEMB-TEM-BLD-RFIN-00002 1) Pegging & Preparation formwork
En Misbah 11-Oct-14 site office BLD Installation building 11-Oct-14 13-Oct-14 8.00 am CLOSED 13-Oct-14 0
2) Laying BRC & piping
3) Concreting base slab
RAPID-P20A1-UEMB-IPMT-CVS-RFI-GEN-0002
3
RAPID-P20A1-UEMB-TEM-BLD-RFIN-00003
En Halim 14-Oct-14 site office BLD Installation building site office concreting base slab 14-Oct-14 16-Oct-14 8.00 am CLOSED 29-Oct-14 13
RAPID-P20A1-UEMB-IPMT-CVS-RFI-GEN-0003
4
RAPID-P20A1-UEMB-TEM-BLD-RFIN-00004
En Halim 17-Oct-14 site office BLD Installation building Repair site cabin roof 17-Oct-14 19-Oct-14 3.00 pm CLOSED 29-Oct-14 10
RAPID-P20A1-UEMB-IPMT-CVS-RFI-GEN-0004
5
RAPID-P20A1-UEMB-TEM-BLD-RFIN-00005
En Halim 23-Oct-14 site office BLD Installation building Welding works (hot works) 24-Oct-14 26-Oct-14 8.00 am CLOSED 29-Oct-14 3 REJECTED
RAPID-P20A1-UEMB-IPMT-CVS-RFI-GEN-0005
12/26/2014
TOTAL RFIN CLOSED RFIN
1 1
1 1
1 1
1 1
1 1
1
5 5
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(ALL LOCATION)
3 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00003 En Misbah 4-Oct-14 ALL CIV Survey Checking existing ground level 9-Oct-14 11-Oct-14 10.00 am CLOSED 13-Oct-14 2 ACCEPTED Surveyor 1 1
4 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00004 Azlan 3-Nov-14 ALL CIV Survey Survey works for boundary 4-Nov-14 6-Nov-14 8.00 am CLOSED 07-Nov-14 1 ACCEPTED Surveyor 1 1
7 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00007 En Halim 18-Oct-14 ALL CIV Testing Drilling borehole for S.I No 15,14,13,12,11,8,7,5 20-Oct-14 22-Oct-14 5.00 pm CLOSED 22-Oct-14 0 ACCEPTED 1 1
Joint sampling for crusher run (Hong Leong Quarry & Gunung
8 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00008 PROPEL 20-Oct-14 ALL CIV Site visit Berlian Quarry) & sand (Johor mining @ Soon Ho Quarry & 23-Oct-14 25-Oct-14 9.00 am CLOSED 25-Oct-14 0 ACCEPTED 1 1
Kejora Development Holding))at quarry
9 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00009 En Halim 20-Oct-14 ALL CIV Testing Packing samples for soaked CBR testing (Service road 3, 6 & 7) 21-Oct-14 23-Oct-14 8.30 am CLOSED 23-Oct-14 0 ACCEPTED 1 1
10 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00010 En Halim 21-Oct-14 ALL CIV Testing MP 14,13,12,11,10,9,8,7,6 & HA 8,7,6,4,5 & BH 2 23-Oct-14 25-Oct-14 8.30 am CLOSED 25-Oct-14 0 REJECTED 1 1
11 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00011 En Halim 23-Oct-14 ALL CIV Testing Packing samples for soaked CBR testing (Service road 4 & 8) 24-Oct-14 26-Oct-14 8.00 am CLOSED 25-Oct-14 1 ACCEPTED 1 1
Joint sampling for geotextile -Tencate TS50 (for tensile test &
12 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00012 PROPEL 24-Oct-14 ALL CIV Testing permeability test) 28-Oct-14 30-Oct-14 2.00 pm CLOSED 30-Oct-14 0 ACCEPTED 1 1
UEMB QAQC
14 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00014 NORAZAH 30-Oct-14 ALL CIV Testing Penetration of soaked CBR 4-Nov-14 6-Nov-14 3.00 pm CLOSED 26-Nov-14 20 ACCEPTED 1 1
18 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00018 PROPEL 10-Nov-14 ALL CIV Testing CBR testing for crusher run and sand 11-Nov-14 13-Nov-14 11.00 am CLOSED 11-Nov-14 0 REJECTED QAQC 1 1
19 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00019 PROPEL 4-Nov-14 ALL CIV Roadwork laying Geotextile - Tencate TS 50 6-Nov-14 8-Nov-14 2.00 pm CLOSED 11-Dec-14 35 REJECTED 1 1
20 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00020 PROPEL 6-Nov-14 ALL CIV Roadwork Joint dipping at CH700 - CH1020 7-Nov-14 9-Nov-14 11.00 am CLOSED 27-Nov-14 20 ACCEPTED 1 1
23 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00023 PROPEL 15-Nov-14 ALL CIV Testing Joint sampling at Swee Quarry (Aggregate & quarry dust) 16-Nov-14 18-Nov-14 10.00 am CLOSED CANCEL 1 1
28 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00028 Instant option 20-Nov-14 ALL CIV Site visit Inspection for 600 X 600 U-drain at OKA Factory Senai 24-Nov-14 26-Nov-14 10.00 am CLOSED 28-Nov-14 4 REJECTED QAQC 1 1
31 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00031 PROPEL 24-Nov-14 ALL CIV Sampling Sampling for Geogrid (GX 80/80) for material testing 25-Nov-14 27-Nov-14 10.00 am CLOSED 27-Nov-14 2 ACCEPTED QAQC 1 1
UEMB QAQC
32 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00032 24-Nov-14 ALL CIV Site visit Inspection for 600 X 600 U-drain with OKA representative 25-Nov-14 27-Nov-14 10.00 am CLOSED 28-Nov-14 3 ACCEPTED QAQC 1 1
NORAZAH
33 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00033 PROPEL 26-Nov-14 ALL CIV Testing Material Testing for Geogrid (GX 80/80) 28-Nov-14 30-Nov-14 10.00 am CLOSED 01-Dec-14 3 ACCEPTED QAQC 1 1
34 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00034 PROPEL 27-Nov-14 ALL CIV Testing Plant trial for ACBC 28 (supplier: Swee Quarry, Ulu Tiram) 3-Dec-14 5-Dec-14 10.00 am CLOSED 08-Dec-14 5 ACCEPTED 1 1
39 RAPID-P20A1-UEMB-ALL-STR-RFIN-00039 PROPEL 9-Dec-14 ALL STR Testing Trial mix for concrete G20N, G25N & G30N 12-Dec-14 14-Dec-14 10.00 am CLOSED 22-Jan-15 41 ACCEPTED QAQC 1 1
40 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00040 UEMB QAQC SYAFIQ 11-Dec-14 ALL CIV Sampling Sampling Subbase & Roadbase at Soon Hoo Quarry 12-Dec-14 14-Dec-14 10.00 am CLOSED 12-Dec-14 0 ACCEPTED QAQC 1 1
41 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00041 UEMB QAQC SYAFIQ 11-Dec-14 ALL CIV Testing Testing Subbase & Roadbase at Geolab 11-Dec-14 13-Dec-14 10.00 am CLOSED 12-Dec-14 1 ACCEPTED QAQC 1 1
43 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00043 PROPEL 11-Dec-14 ALL CIV Material Delivery Inspection for material for Geogrid GX 80/80 13-Dec-14 15-Dec-14 10.00 am CLOSED 6-Mar-15 83 ACCEPTED QAQC 1 1
46 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00046 PROPEL 17-Dec-14 ALL CIV Sampling Material testing for roadbase. Source from YTL Quarry 18-Dec-14 20-Dec-14 10.00 am CLOSED 12-Feb-15 56 ACCEPTED QAQC 1 1
49 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00049 PROPEL 20-Dec-14 ALL CIV Testing Material testing crusher run (sieve analysis) 22-Dec-14 24-Dec-14 10.00am CLOSED 22-Dec-14 0 ACCEPTED 1 1
50 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00050 How thong 20-Dec-14 ALL CIV Testing factory visit for spun pile at ICP factory, Senai 23-Dec-14 25-Dec-14 11.00am CLOSED 23-Dec-14 0 ACCEPTED 1 1
51 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00051 Instant option 23-Dec-14 ALL CIV Testing Alliance Precast Industries (API) factory visit for U-Drain. 24-Dec-14 26-Dec-14 10.00am CLOSED 22-Jan-15 29 ACCEPTED 1 1
52 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00052 How thong 26-Dec-14 ALL CIV Testing 14 days compression test for trial mix G20N, G25N & 30N 27-Dec-14 29-Dec-14 10.30am CLOSED 1-Jan-15 5 ACCEPTED 1 1
53 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00053 How Thong 26-Dec-14 ALL CIV Testing Trial mix G35N & G45N 27-Dec-14 29-Dec-14 10.30am CLOSED CANCEL 1 1
54 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00054 Lian Fatt 29-Dec-14 ALL CIV Site visit Factory visit for U-drain & box-culvert 29-Dec-14 31-Dec-14 9.00am CLOSED 31-Dec-14 2 ACCEPTED 1 1
55 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00055 Uem Azah 29-Dec-14 ALL CIV Site visit Factory visit for U-drain & box-culvert 29-Dec-14 31-Dec-14 9.00am CLOSED 4-Feb-15 37 REJECTED 1 1
56 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00056 Menta 29-Dec-14 ALL CIV Site visit Material testing for roadbase. Source from Seri Pengerang 30-Dec-14 1-Jan-15 10.00am CLOSED 31-Dec-14 1 REJECTED 1 1
57 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00057 How thong 30-Dec-14 ALL CIV Site visit factory visit for spun pile - XA3 at ICP factory, Senai 2-Jan-15 4-Jan-15 3.00pm CLOSED 21-Jan-15 19 REJECTED 1 1
58 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00058 Menta 30-Dec-14 ALL CIV Testing Sampling & grading for roadbase (source:Menta stockpile) 5-Jan-15 7-Jan-15 10.00am CLOSED 22-Jan-15 17 REJECTED 1 1
UEMB QAQC
59 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00059 31-Dec-14 ALL CIV Testing Compaction Test for ACBC 28 (CH1040-CH1140) 1-Jan-15 3-Jan-15 10.00am CLOSED 2-Jan-15 1 ACCEPTED 1 1
NORAZAH
60 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00060 PROPEL 1-Jan-15 ALL CIV Site visit Rectification work/inspection for NCR No 001 2-Jan-15 4-Jan-15 10.00am CLOSED 16-Jan-15 14 ACCEPTED 1 1
61 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00061 How thong 2-Jan-15 ALL CIV Testing 7 days compression test for trial mix G20N, G25N & 30N 3-Jan-15 5-Jan-15 10.00am CLOSED 6-Mar-15 62 REJECTED 1 1
65 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00065 Misbah 15-Jan-15 ALL CIV Survey Joint Survey monitoring settlement marker 16-Jan-15 18-Jan-15 10.00am CLOSED 16-Jan-15 0 ACCEPTED 1 1
66 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00066 UEMB QAQC SYAFIQ 17-Jan-15 ALL CIV Testing Mackintosh Probe for Box Culvert 19-Jan-15 21-Jan-15 08.00am CLOSED 29-Jan-15 10 REJECTED 1 1
Test Cube (Compression Test) for cube G35N & G45N 28 days.
69 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00069 How thong 21-Jan-15 ALL CIV Testing To achieve characteristic strength of design mix G35N & G45N 24-Jan-15 26-Jan-15 10.00am CLOSED 4-Feb-15 11 REJECTED QAQC 1 1
UEMB QAQC
70 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00070 22-Jan-15 ALL CIV Site visit Plant trial for ACBC 28 at Gunung Berlian Quarry 28-Jan-14 30-Jan-14 9.00am CLOSED 2-Feb-15 370 ACCEPTED QAQC 1 1
NORAZAH
71 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00071 Instant option 22-Jan-15 ALL CIV Site visit Factory Visit to API for load test at Ulu Yam Selangor 29-Jan-15 31-Jan-15 10.30am CLOSED 20-Apr-15 81 REJECTED QAQC 1 1
72 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00072 UEMB QAQC SYAFIQ 23-Jan-15 ALL CIV Testing Mackintosh Probe for Box Culvert 24-Jan-15 26-Jan-15 09.00am CLOSED 24-Jan-15 0 ACCEPTED QAQC 1 1
73 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00073 En Misbah 24-Jan-15 ALL CIV Survey Joint survey monitoring settlement marker 23-Jan-15 25-Jan-15 09.00am CLOSED CANCEL Surveyor 1 1
75 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00075 Instant option 27-Jan-15 ALL CIV Sampling Tensile and Bending test for rebar (T10, T12 and T16) 31-Jan-15 2-Feb-15 10.00am CLOSED 12-Feb-15 12 ACCEPTED 1 1
Factory visit to API box culvert surchage load test Lot 9022,
77 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00077 Instant option 29-Jan-15 ALL CIV Testing 2-Feb-15 4-Feb-15 11.00am CLOSED 5-Feb-15 3 ACCEPTED 1 1
Jalan Sg Buaya kg Koskan 48200 Rawang Selangor
78 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00078 Peneagle 29-Jan-15 ALL CIV Testing sand grading for Interlocking block 2-Feb-15 4-Feb-15 11.00am CLOSED 4-Feb-15 2 REJECTED 1 1
79 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00079 Menta 29-Jan-15 ALL CIV Sampling Joint sampling aggregate for subbase and roadbase 30-Jan-15 1-Feb-15 10.00am CLOSED CANCEL QAQC 1 1
80 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00080 UEMB QAQC SYAFIQ 30-Jan-15 ALL CIV Testing ACBC 28 testing 31-Jan-15 2-Feb-15 10.00am CLOSED 25-Feb-15 25 ACCEPTED 1 1
81 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00081 Paneagle 3-Feb-15 ALL CIV Testing Sand grading - Interloking block 6-Feb-15 8-Feb-15 10.00am CLOSED 9-Feb-15 3 ACCEPTED 1 1
82 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00082 Menta 4-Feb-15 ALL CIV Testing Sand grading - Interloking block 7-Feb-15 9-Feb-15 10.00am CLOSED 9-Feb-15 2 ACCEPTED 1 1
83 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00083 Menta 10-Feb-15 ALL CIV Testing Rebar testing for tensie and bending (Ann Joo) T10,T12 and T16 11-Feb-15 13-Feb-15 10.00am CLOSED 23-Feb-15 12 ACCEPTED 1 1
84 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00084 Menta 10-Feb-15 ALL CIV Testing Sampling for roadbase (Hong Leong) to send to Geolab for CBR 11-Feb-15 13-Feb-15 10.00am CLOSED 11-Feb-15 0 REJECTED 1 1
Factory visit for the road kerb at SEE HACK CEMENT PRODUCT
85 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00085 UEMB QAQC SYAFIQ 11-Feb-15 ALL CIV Testing at Taman Sri Alam Johor Bahru 12-Feb-15 14-Feb-15 10.00am CLOSED 12-Feb-15 0 ACCEPTED 1 1
86 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00086 UEMB QAQC SYAFIQ 11-Feb-15 ALL CIV Testing Factory visit for RC Piles at API HULU SELANGOR 13-Feb-15 15-Feb-15 10.00am CLOSED 25-Jun-15 132 REJECTED 1 1
87 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00087 UEMB QAQC SYAFIQ 11-Feb-15 ALL CIV Testing Re Bar testing (T10, T12, T16) Amsteel bend & Tensile Test 16-Feb-15 18-Feb-15 10.00am CLOSED 16-Feb-15 0 ACCEPTED 1 1
88 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00088 UEMB QAQC ADZIM 12-Feb-15 ALL CIV Testing Interloking block Light Duty test 12-Feb-15 14-Feb-15 08.00am CLOSED 28-Feb-15 16 ACCEPTED 1 1
89 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00089 UEMB QAQC SYAFIQ 11-Feb-15 ALL CIV Testing MP test at Service Road 4,6 and 7 for U drain and Box Culvert 12-Feb-15 14-Feb-15 10.00am CLOSED 26-Feb-15 14 ACCEPTED 1 1
90 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00090 UEMB QAQC SYAFIQ 16-Feb-15 ALL CIV Testing CBR testing for crusher run and sand 16-Feb-15 18-Feb-15 10.00am CLOSED 25-Feb-15 9 ACCEPTED Iwan 1 1
93 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00093 Peneagle 24-Feb-15 ALL CIV Testing Inspection for coring test and road kerb 25-Feb-15 27-Feb-15 10.00am CLOSED CANCEL QAQC 1 1
94 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00094 Azlan 28-Feb-15 ALL CIV Testing Compression test for coring road kerb 3-Mar-15 5-Mar-15 9.00am CLOSED 4-Mar-15 1 REJECTED Iwan 1 1
95 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00095 Azlan 28-Feb-15 ALL ELE Piping GI pipe 150mm x 6m Class B material delivery for inspection 2-Mar-15 4-Mar-15 9.00am CLOSED 14-Mar-15 12 ACCEPTED Iwan 1 1
96 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00096 Azlan 2-Mar-15 ALL CIV Piping testing for site mix sand and aggregate 3-Mar-15 5-Mar-15 9.00am CLOSED 14-Mar-15 11 ACCEPTED lan 1 1
97 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00097 UEMB QAQC ADZIM 2-Mar-15 ALL CIV Piping Marshall Test for SR8 3-Mar-15 5-Mar-15 9.00am CLOSED 14-Mar-15 11 ACCEPTED lan 1 1
Cube compression test for trial mix and site mix for kerb
98 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00098 Uem Azlan 3-Mar-15 ALL CIV Testing bedding 4-Mar-15 6-Mar-15 9.00am CLOSED 14-Mar-15 10 ACCEPTED lan 1 1
99 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00099 azah 6-Mar-15 ALL CIV Testing Plant Trial For ACBC 28 at Paramount Quarry Kulai Johor, 10-Mar-15 12-Mar-15 10.00am CLOSED 11-Mar-15 1 ACCEPTED 1 1
100 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00100 UEMB QAQC SYAFIQ 6-Mar-15 ALL CIV Testing Test Cube Crush at Holcim 7-Mar-15 9-Mar-15 9.00am CLOSED 14-Mar-15 7 ACCEPTED 1 1
101 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00101 UEMB QAQC SYAFIQ 6-Mar-15 ALL CIV Testing Marshal test for SR 3 and 5 7-Mar-15 9-Mar-15 10.00am CLOSED 18-Mar-15 11 ACCEPTED 1 1
102 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00102 UEMB QAQC ADZIM 9-Mar-15 ALL CIV Roadwork RFIN for colse NCR no 2. SR2 and SR8) 10-Mar-15 12-Mar-15 09.00am CLOSED 19-Mar-15 9 ACCEPTED 1 1
103 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00103 UEMB QAQC ADZIM 9-Mar-15 ALL CIV Testing Cube Crushing Test at Holsim 10-Mar-15 12-Mar-15 02.00pm CLOSED 14-Mar-15 4 CANCEL 1 1
104 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00104 UEMB QAQC ADZIM 12-Mar-15 ALL CIV Testing Marsall test for Paramount Quarry 12-Mar-15 14-Mar-15 9.00am CLOSED 14-Mar-15 2 ACCEPTED 1 1
105 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00105 UEMB QAQC ADZIM 13-Mar-15 ALL CIV Testing Cube Crushing Test at Holsim 14-Mar-15 16-Mar-15 11.00am CLOSED 14-Mar-15 0 ACCEPTED 1 1
106 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00106 UEMB QAQC ADZIM 16-Mar-15 ALL CIV Testing Cube Crushing test at Holcim 16-Mar-15 18-Mar-15 11.00am CLOSED 16-Mar-15 0 ACCEPTED 1 1
107 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00107 Instant option 16-Mar-15 ALL CIV Testing Bending test for T20 rebar (Southern Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
108 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00108 Instant option 16-Mar-15 ALL CIV Testing Bending test for R6 rebar (Southern Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
109 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00109 Instant option 16-Mar-15 ALL CIV Testing Tensile test for T20 rebar (Southern Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
110 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00110 Instant option 16-Mar-15 ALL CIV Testing Tensile test for R6 rebar (Southern Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
111 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00111 How thong 16-Mar-15 ALL CIV Testing Tensile test for T20 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
112 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00112 How thong 16-Mar-15 ALL CIV Testing Bending test for T20 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
113 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00113 How thong 16-Mar-15 ALL CIV Testing Tensile test for T16 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
114 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00114 How thong 16-Mar-15 ALL CIV Testing Bending test for T16 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
115 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00115 How thong 16-Mar-15 ALL CIV Testing Tensile test for T12 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 19-Mar-15 0 ACCEPTED 1 1
116 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00116 How thong 16-Mar-15 ALL CIV Testing Bending test for T12 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
117 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00117 uem Azah 17-Mar-15 ALL CIV Testing Piezocone test at SR6 and SR 7 (CPT) 18-Mar-15 20-Mar-15 10.00am CLOSED CANCEL QAQC 1 1
118 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00118 Ocned Water 18-Mar-15 ALL CIV Testing Tensile test for T10 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 25-Mar-15 6 ACCEPTED 1 1
119 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00119 Ocned Water 18-Mar-15 ALL CIV Testing Bending test for T10 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 24-Mar-15 5 ACCEPTED 1 1
120 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00120 Ocned Water 18-Mar-15 ALL CIV Testing Tensile test for R6 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED CANCEL 1 1
121 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00121 Ocned Water 18-Mar-15 ALL CIV Testing Bending test for r6 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED CANCEL 1 1
122 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00122 Ocned Water 18-Mar-15 ALL CIV Testing Tensile test for T25 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 25-Mar-15 6 ACCEPTED 1 1
123 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00123 Ocned Water 18-Mar-15 ALL CIV Testing Bending test for T25 rebar (Malaysia Steel) 19-Mar-15 21-Mar-15 10.00am CLOSED 30-Mar-15 11 ACCEPTED 1 1
124 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00124 uem Azah 19-Mar-15 ALL M&E Testing FAT for M&E materials 24-Mar-15 26-Mar-15 9.00am CLOSED 27-Mar-15 3 ACCEPTED 1 1
125 RAPID-P20A1-UEMB-ALL-STR-RFIN-00125 uem Azah 26-Mar-15 ALL STR Material Trial Mix G35 RPD SR 28-Mar-15 30-Mar-15 09.30am CLOSED 29-Mar-15 1 REJECTED 1 1
126 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00126 UEMB QAQC ADZIM 23-Mar-15 ALL CIV Testing Cube Crushing test at Holcim 24-Mar-15 26-Mar-15 11.00am CLOSED 27-Mar-15 3 ACCEPTED 1 1
127 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00127 Zunaidi 27-Mar-15 ALL CIV Testing Cube Crushing test at Holcim 28-Mar-15 30-Mar-15 11.00am CLOSED 28-Mar-15 0 ACCEPTED 1 1
128 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00128 UEMB QAQC ADZIM 23-Mar-15 ALL CIV Testing Cube Crushing test at Holcim 24-Mar-15 26-Mar-15 11.00am CLOSED 25-Mar-15 1 ACCEPTED 1 1
129 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00129 UEMB QAQC ADZIM 30-Mar-15 ALL CIV Testing Cube Crushing test at Holcim 31-Mar-15 2-Apr-15 11.00am CLOSED 31-Mar-15 0 ACCEPTED 1 1
130 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00130 UEMB QAQC ADZIM 31-Mar-15 ALL CIV Testing Cube Crushing test at Holcim 1-Apr-15 3-Apr-15 10.00am CLOSED 1-Apr-15 0 ACCEPTED 1 1
131 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00131 UEMB QAQC ADZIM 1-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 2-Apr-15 4-Apr-15 10.00am CLOSED 2-Apr-15 0 ACCEPTED 1 1
132 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00132 MNE 28-Mar-15 ALL CIV Material XLPE/PVC/SWA/CU 3C 185mm 11 KV-15 drums total 28-Mar-15 30-Mar-15 11.00am CLOSED 2-Apr-15 5 ACCEPTED 1 1
133 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00133 MNE 1-Apr-15 ALL CIV Material XLPE/PVC/SWA/CU 3C 185mm 11 KV-30 drums total 2-Apr-15 4-Apr-15 10.00am CLOSED 5-Apr-15 3 ACCEPTED 1 1
134 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00134 UEMB QAQC ADZIM 2-Apr-15 ALL CIV Testing Test cube 7 day for site mix road kerb at bus stop 8/9 3-Apr-15 5-Apr-15 09.00am CLOSED 3-Apr-15 0 ACCEPTED 1 1
135 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00135 UEMB QAQC ADZIM 2-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 3-Apr-15 5-Apr-15 9.30am CLOSED 4-Apr-15 1 ACCEPTED 1 1
137 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00137 UEMB QAQC ADZIM 3-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 4-Apr-15 6-Apr-15 10.00am CLOSED 4-Apr-15 0 ACCEPTED 1 1
138 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00138 Azah 4-Apr-15 ALL CIV Testing Mackintosh Probe Test ( MPT)- Location as per attached 6-Apr-15 8-Apr-15 10.00am CLOSED 6-Apr-15 0 ACCEPTED 1 1
139 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00139 UEMB QAQC ADZIM 6-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 6-Apr-15 8-Apr-15 10.00am CLOSED 7-Apr-15 1 ACCEPTED 1 1
141 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00141 UEMB QAQC ADZIM 7-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 8-Apr-15 10-Apr-15 3.00am CLOSED 11-Apr-15 3 ACCEPTED 1 1
142 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00142 UEMB QAQC ADZIM 7-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 8-Apr-15 10-Apr-15 3.00am CLOSED 11-Apr-15 3 ACCEPTED 1 1
143 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00143 UEMB QAQC AIZAT 7-Apr-15 ALL CIV Testing stump G/LA-D/10-20 8-Apr-15 10-Apr-15 3.00pm CLOSED 10-Apr-15 2 ACCEPTED 1 1
144 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00144 UEMB QAQC AIZAT 9-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 10-Apr-15 12-Apr-15 2.30pm CLOSED 11-Apr-15 1 ACCEPTED 1 1
145 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00145 UEMB QAQC AIZAT 10-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 11-Apr-15 13-Apr-15 2.30pm CLOSED 15-Apr-15 4 ACCEPTED 1 1
146 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00146 UEMB QAQC AIZAT 13-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 13-Apr-15 15-Apr-15 2.30pm CLOSED 15-Apr-15 2 ACCEPTED 1 1
147 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00147 UEMB QAQC AIZAT 13-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 14-Apr-15 16-Apr-15 2.30pm CLOSED 14-Apr-15 0 ACCEPTED 1 1
148 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00148 UEMB QAQC AIZAT 14-Apr-15 ALL CIV Calibration Calibration of cube crushing test me=achine at UEMB lab 15-Apr-15 17-Apr-15 9.00am CLOSED 15-Apr-15 0 ACCEPTED 1 1
149 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00149 UEMB QAQC AIZAT 14-Apr-15 ALL CIV Testing Cube Crushing test at Geolab 15-Apr-15 17-Apr-15 10.00am CLOSED 15-Apr-15 0 REJECTED 1 1
150 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00150 UEMB QAQC AIZAT 14-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 15-Apr-15 17-Apr-15 2.30pm CLOSED 16-Apr-15 1 ACCEPTED 1 1
151 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00151 UEMB QAQC AIZAT 15-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 16-Apr-15 18-Apr-15 9.00am CLOSED 16-Apr-15 0 ACCEPTED 1 1
152 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00152 azah 16-Apr-15 ALL CIV JMS Joint Measurement for road works & dranage area 17-Apr-15 19-Apr-15 9.30am CLOSED 20-Apr-15 3 ACCEPTED 1 1
153 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00153 azah 16-Apr-15 ALL CIV JMS Joint Measurement for Potable Water Tank and STP area 17-Apr-15 19-Apr-15 9.30am CLOSED CANCEL 1 1
154 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00154 azah 16-Apr-15 ALL BLD CIV Joint Measurement for Building area 17-Apr-15 19-Apr-15 9.30am CLOSED CANCEL 1 1
155 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00155 PSJV 16-Apr-15 ALL ELE Electrical to do inspection to material: UPVC slab 17-Apr-15 19-Apr-15 9.30am CLOSED 22-Apr-15 5 ACCEPTED 1 1
156 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00156 UEMB QAQC AIZAT 17-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 17-Apr-15 19-Apr-15 2.30pm CLOSED 18-Apr-15 1 ACCEPTED 1 1
157 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00157 UEMB QAQC AIZAT 17-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 18-Apr-15 20-Apr-15 2.30pm CLOSED 20-Apr-15 2 ACCEPTED 1 1
158 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00158 UEMB QAQC AIZAT 18-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 20-Apr-15 22-Apr-15 2.30pm CLOSED 25-Apr-15 5 ACCEPTED 1 1
159 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00159 UEMB QAQC AIZAT 20-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 20-Apr-15 22-Apr-15 2.30pm CLOSED 10-Jun-15 51 ACCEPTED 1 1
Incoming material for inspection as per attached delivery
160 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00160 Instant option 21-Apr-15 ALL CIV Material 22-Apr-15 24-Apr-15 10.00am CLOSED 25-Apr-15 3 ACCEPTED 1 1
order. At IORSB store.
161 RAPID-P20A1-UEMB-ALL-PIP-RFIN-00161 Instant option 21-Apr-15 ALL PIP Material Piping valve material receiving for inspection. 22-Apr-15 24-Apr-15 10.00am CLOSED 10-Jun-15 49 ACCEPTED 1 1
162 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00162 UEMB QAQC AIZAT 20-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 20-Apr-15 22-Apr-15 2.30pm CLOSED 30-Apr-15 10 ACCEPTED 1 1
164 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00164 UEMB QAQC AIZAT 22-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 23-Apr-15 25-Apr-15 2.30pm CLOSED 25-Apr-15 2 ACCEPTED 1 1
165 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00165 UEMB QAQC AIZAT 22-Apr-15 ALL CIV Testing Cube Crushing test at Lab UEMB 23-Apr-15 25-Apr-15 4.00pm CLOSED 10-Jun-15 48 ACCEPTED 1 1
166 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00166 UEMB QAQC AIZAT 23-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 24-Apr-15 26-Apr-15 2.30pm CLOSED 25-Apr-15 1 ACCEPTED 1 1
167 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00167 UEMB QAQC AIZAT 25-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 25-Apr-15 27-Apr-15 2.30pm CLOSED 30-Apr-15 5 ACCEPTED 1 1
168 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00168 UEMB QAQC AIZAT 27-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 27-Apr-15 29-Apr-15 2.30pm CLOSED 10-Jun-15 44 ACCEPTED 1 1
169 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00169 UEMB QAQC AIZAT 27-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 27-Apr-15 29-Apr-15 4.00pm CLOSED 10-Jun-15 44 ACCEPTED 1 1
170 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00170 UEMB QAQC AIZAT 28-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 28-Apr-15 30-Apr-15 2.30pm CLOSED 10-Jun-15 43 ACCEPTED 1 1
171 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00171 UEMB QAQC AIZAT 29-Apr-15 ALL CIV Testing Calibration of Cube Crushing test instrument. 29-Apr-15 1-May-15 11.00am CLOSED 29-Apr-15 0 ACCEPTED 1 1
172 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00172 UEMB QAQC AIZAT 29-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 29-Apr-15 1-May-15 2.30pm CLOSED 10-Jun-15 42 ACCEPTED 1 1
174 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00174 UEMB QAQC AIZAT 29-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 30-Apr-15 2-May-15 2.30pm CLOSED 10-Jun-15 41 ACCEPTED 1 1
175 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00175 UEMB QAQC AIZAT 30-Apr-15 ALL CIV Testing Tensile & Bending test for R25 & R20 ( Malaysian steel) 5-May-15 7-May-15 9.00am CLOSED 10-Jun-15 36 REJECTED 1 1
176 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00176 UEMB QAQC AIZAT 30-Apr-15 ALL CIV Testing Tensile & Bending test for B & N 5-May-15 7-May-15 9.00am CLOSED 10-Jun-15 36 REJECTED 1 1
177 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00177 UEMB QAQC AIZAT 30-Apr-15 ALL CIV Testing Cube Crushing test at Holcim 5-May-15 7-May-15 2.30pm CLOSED 10-Jun-15 36 ACCEPTED 1 1
178 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00178 UEMB QAQC AIZAT 6-May-15 ALL CIV Testing Cube Crushing test at Holcim 6-May-15 8-May-15 2.30pm CLOSED 10-Jun-15 35 ACCEPTED 1 1
179 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00179 UEMB QAQC AIZAT 6-May-15 ALL CIV Testing Cube Crushing test at Holcim 7-May-15 9-May-15 2.30pm CLOSED 10-Jun-15 34 ACCEPTED 1 1
180 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00180 UEMB QAQC AIZAT 7-May-15 ALL CIV Testing Cube Crushing test at Holcim 8-May-15 10-May-15 3.00pm CLOSED 08-May-15 0 ACCEPTED 1 1
181 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00181 Instant option 8-May-15 ALL CIV Material Inspection material of piping (Ductile Iron all Plange Tee) 9-May-15 11-May-15 9.10am CLOSED 07-Jun-15 29 ACCEPTED 1 1
183 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00183 UEMB QAQC AIZAT 8-May-15 ALL CIV Testing Tensile & Bending test for R25 & R20 ( Soutrthern steel) 9-May-15 11-May-15 9.00am CLOSED 10-Jun-15 32 ACCEPTED 1 Check
1 Malaysian steel or shourten steel
184 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00184 UEMB QAQC AIZAT 8-May-15 ALL CIV Testing Tensile Test for Anchor bolt 9-May-15 11-May-15 9.00am CLOSED 10-Jun-15 32 ACCEPTED 1 1
185 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00185 UEMB QAQC AIZAT 8-May-15 ALL CIV Testing Cube Crushing test at Holcim 9-May-15 11-May-15 3.00pm CLOSED 10-Jun-15 32 ACCEPTED 1 1
UEMB QAQC
186 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00186 9-May-15 ALL CIV Testing Installation of settlement plate at SR 6 & SR4 11-May-15 13-May-15 9.00am CLOSED 11-May-15 0 ACCEPTED 1 1
SUDARMAN
187 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00187 UEMB QAQC AIZAT 11-May-15 ALL CIV Testing Cube Crushing test at Holcim 12-May-15 14-May-15 3.00pm CLOSED 10-Jun-15 29 ACCEPTED 1 1
189 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00189 UEMB QAQC AIZAT 11-May-15 ALL CIV Testing Cube Crushing test at Holcim 13-May-15 15-May-15 3.00pm CLOSED 10-Jun-15 28 ACCEPTED 1 1
190 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00190 UEMB QAQC SYAFIQ 11-May-15 ALL CIV Testing Factory Acceptance Test (FAT) for Neutral Earth Resistor (NER) 14-May-15 16-May-15 10.30am CLOSED 24-May-15 10 ACCEPTED 1 1
193 RAPID-P20A1-UEMB-ALL-PIP-RFIN-00193 Instant option 13-May-15 ALL CIV Material Inspection material at IORSB RC Spigot & soket 14-May-15 16-May-15 9.30am CLOSED 06-Jun-15 23 ACCEPTED 1 1
194 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00194 UEMB QAQC AIZAT 14-May-15 ALL CIV Testing Cube Crushing test at Holcim 15-May-15 17-May-15 9.00am CLOSED 10-Jun-15 26 ACCEPTED 1 1
Cube crushing test for Hani ent for trial mix for site mix road
195 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00195 UEMB QAQC AIZAT 14-May-15 ALL CIV Testing kerb for 28 day 15-May-15 17-May-15 3.00pm CLOSED 16-May-15 1 ACCEPTED 1 1
196 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00196 UEMB QAQC AIZAT 15-May-15 ALL CIV Testing Brick crushing test at UEMB Lab 16-May-15 18-May-15 9.00am CLOSED 16-May-15 0 REJECTED 1 1
197 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00197 UEMB QAQC AIZAT 15-May-15 ALL CIV Testing Cube Crushing test at Holcim 16-May-15 18-May-15 3.00pm CLOSED CANCEL 1 1
UEMB QAQC
199 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00199 19-May-15 ALL CIV Testing Cube Crushing test at Holcim 20-May-15 22-May-15 3.00pm CLOSED 20-Jun-15 31 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
200 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00200 20-May-15 ALL CIV Testing Cube Crushing test at Holcim 21-May-15 23-May-15 3.00pm CLOSED 21-May-15 0 ACCEPTED 1 1
KHAIRIL
201 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00201 azah 21-May-15 ALL CIV Testing Cube test for clay brick (Maybrick Sdn Bhd-Liwo) 22-May-15 24-May-15 9.00am CLOSED 10-Jun-15 19 ACCEPTED 1 1
UEMB QAQC
202 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00202 21-May-15 ALL CIV Testing Cube Crushing test at Holcim 23-May-15 25-May-15 3.00pm CLOSED 10-Jun-15 18 ACCEPTED 1 1
KHAIRIL
203 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00203 PSJV 21-May-15 ALL CIV Material XLPE/SWA/PVC 3C 185MM CU 11KV 23-May-15 25-May-15 9.00AM CLOSED 10-Jun-15 18 ACCEPTED 1 1
204 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00204 UEMB QAQC SYAFIQ 17-May-15 ALL CIV Testing Factory acceptance Test FAT for Rapid Camp 33KV GIS 18-May-15 20-May-15 9.00AM CLOSED 24-Jun-15 37 ACCEPTED 1 1
UEMB QAQC
205 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00205 22-May-15 ALL CIV Testing Cube Crushing test at Holcim 23-May-15 25-May-15 3.00pm CLOSED 10-Jun-15 18 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
206 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00206 23-May-15 ALL CIV Testing Test cube for site mix 7 days at Lab UEMB 25-May-15 27-May-15 3.00pm CLOSED 25-May-15 0 ACCEPTED 1 1
SUDARMAN
UEMB QAQC
207 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00207 23-May-15 ALL CIV Testing Cube Crushing test at Holcim 25-May-15 27-May-15 3.00pm CLOSED 10-Jun-15 16 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
208 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00208 25-May-15 ALL CIV Testing Joint sampling crusherun stockpile phase 2 26-May-15 28-May-15 10.00am CLOSED 26-Jun-15 31 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
209 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00209 KHAIRIL 30-May-15 ALL CIV Testing Sieve analysis crusher run from stock pile phase 2 1-Jun-15 3-Jun-15 9.00am CLOSED 03-Jun-15 2 ACCEPTED 1 1
UEMB QAQC
210 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00210 KHAIRIL 25-May-15 ALL CIV Testing Cube Crushing test at Holcim 26-May-15 28-May-15 3.00pm CLOSED 26-May-15 0 ACCEPTED 1 1
UEMB QAQC
211 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00211 KHAIRIL 26-May-15 ALL CIV Testing Cube Crushing test at Holcim 27-May-15 29-May-15 3.00pm CLOSED 26-May-15 -1 ACCEPTED 1 1
213 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00213 How Thong 27-May-15 ALL ELE Testing Factory acceptian tast (FAT) for Distribution switchbord 29-May-15 31-May-15 10.00am CLOSED 29-May-15 0 ACCEPTED 1 1
214 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00214 Liwo 27-May-15 ALL CIV Testing MP test at SR4 and SR5 28-May-15 30-May-15 3.00pm CLOSED 10-Jun-15 13 ACCEPTED 1 1
UEMB QAQC
215 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00215 27-May-15 ALL CIV Testing Cube Crushing test at Holcim 28-May-15 30-May-15 3.00pm CLOSED 10-Jun-15 13 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
216 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00216 27-May-15 ALL CIV Testing MP test at phase 2 (SR8,SR7,SR1) 28-May-15 30-May-15 3.00pm CLOSED 10-Jun-15 13 ACCEPTED 1 1
KHAIRIL
217 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00217 Liwo 28-May-15 ALL CIV Testing MP test at Service Road 3,4,6,7. 29-May-15 31-May-15 10.00am CLOSED 01-Jun-15 3 REJECTED 1 1
UEMB QAQC CBR test for road at common faciloities,Common building and
219 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00219 30-May-15 ALL CIV Testing 1-Jun-15 3-Jun-15 9.00am CLOSED 03-Jun-15 2 ACCEPTED 1 1
KHAIRIL small package camp
UEMB QAQC
220 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00220 30-May-15 ALL CIV Testing FDT for compection at RP2a and RP4 1-Jun-15 3-Jun-15 9.00am CLOSED 01-Jun-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
221 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00221 30-May-15 ALL CIV Testing Cube test at Holcim 1-Jun-15 3-Jun-15 3.00pm CLOSED 06-Jun-15 5 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
222 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00222 2-Jun-15 ALL CIV Testing Cube test at Holcim 3-Jun-15 5-Jun-15 9.00am CLOSED 03-Jun-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
223 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00223 2-Jun-15 ALL CIV Testing Cibe test at UEMB Lab road kerb BS 7 4-Jun-15 6-Jun-15 3.00pm CLOSED 10-Jun-15 6 ACCEPTED 1 1
KHAIRIL
224 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00224 Liwo 3-Jun-15 ALL CIV Testing MP test at SR4,6,7 4-Jun-15 6-Jun-15 2.00pm CLOSED 04-Jun-15 0 ACCEPTED 1 1
UEMB KHAIRIL
226 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00226
IZWAN 3-Jun-15 ALL CIV Testing Cube test at Holcim 4-Jun-15 6-Jun-15 3.00pm CLOSED CANCEL 1 1
UEMB QAQC
227 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00227 KHAIRIL 10-Jun-15 ALL CIV Testing Cube test at Holcim 10-Jun-15 12-Jun-15 3.00pm CLOSED 10-Jun-15 0 ACCEPTED 1 1
UEMB KHAIRIL
228 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00227a
IZWAN 11-Jun-15 ALL CIV Testing Cube test at Holcim 12-Jun-15 14-Jun-15 3.00pm CLOSED CANCEL 1 1
229 RAPID-P20A1-UEMB-ALL-ELE-RFIN-00228 Shauki 11-Jun-15 ALL ELE Material Receiving material on site 5 m street light poles (87 Nos) 12-Jun-15 14-Jun-15 10.00 am CLOSED 19-Sep-15 99 ACCEPTED 1 1
230 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00229 Hasnol 11-Jun-15 ALL CIV Material Material receiving inspection precast U-Drain 12-Jun-15 14-Jun-15 9.00am CLOSED 17-Jun-15 5 ACCEPTED 1 1
231 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00230 Hasnol 11-Jun-15 ALL CIV Material Material receiving inspection for U-Drain 12-Jun-15 14-Jun-15 9.00am CLOSED 17-Jun-15 5 ACCEPTED 1 1
UEMB QAQC
232 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00231 11-Jun-15 ALL CIV Testing MP test at SR7,SR8 for Phase 2 12-Jun-15 14-Jun-15 1.00pm CLOSED 14-Jun-15 2 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
233 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00232 11-Jun-15 ALL CIV Trial Mix Trial mix at Holcim Plant (Grade 20/25 P) 12-Jun-15 14-Jun-15 3.00pm CLOSED 12-Jun-15 0 ACCEPTED 1 1
NORAZAH
234 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00233 Liwo 12-Jun-15 ALL CIV Testing Mackintosh probe testing at SR2, SR3, SR4, SR7 and SR8 13-Jun-15 15-Jun-15 10.00am CLOSED 13-Jun-15 0 ACCEPTED 1 1
UEMB QAQC
235 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00234 12-Jun-15 ALL CIV Testing Cube test at Holcim 13-Jun-15 15-Jun-15 1.00pm CLOSED 13-Jun-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
236 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00235 13-Jun-15 ALL CIV Testing Cube test at Holcim (Trial mix G c20/25p NSC) 3 days 15-Jun-15 17-Jun-15 3.00pm CLOSED 15-Jun-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
237 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00235a 13-Jun-15 ALL CIV Testing Cube test at Holcim 15-Jun-15 17-Jun-15 3.00pm CLOSED 16-Jun-15 1 ACCEPTED 1 1
KHAIRIL
UEMB KHAIRIL
238 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00236
IZWAN 13-Jun-15 ALL CIV Testing cube test for road kerb bus stop (28 days) 15-Jun-15 17-Jun-15 9.00am CLOSED CANCEL 1 1
UEMB QAQC
241 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00239 KHAIRIL 16-Jun-15 ALL CIV Testing Cube test at Holcim 17-Jun-15 19-Jun-15 3.00pm CLOSED 17-Jun-15 0 ACCEPTED 1 1
242 RAPID-P20A1-UEMB-ALL-PIP-RFIN-00240 Instant option 18-Jun-15 ALL PIP Testing NDT test for S-Band at SR7/SR3 19-Jun-15 21-Jun-15 11.00am CLOSED 24-Jun-15 5 ACCEPTED 1 1
UEMB QAQC
243 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00241 KHAIRIL 17-Jun-15 ALL CIV Testing Cube test at Holcim 19-Jun-15 21-Jun-15 3.00pm CLOSED 19-Jun-15 0 CANCEL 1 1
UEMB KHAIRIL
244 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00242
IZWAN 19-Jun-15 ALL CIV Testing Cube test at Holcim 20-Jun-15 22-Jun-15 3.00pm CLOSED 20-Jun-15 0 ACCEPTED 1 1
245 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00243 Liwo 20-Jun-15 ALL CIV Testing Mackintosh Probe testing at SR6 & SR7 22-Jun-15 24-Jun-15 3.00pm CLOSED 23-Jun-15 1 ACCEPTED 1 1
UEMB QAQC
246 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00244 20-Jun-15 ALL CIV Testing Cube test at UEMB Lab road kerb BS 7 (28 days) 25-Jun-15 27-Jun-15 9.00am CLOSED 26-Jun-15 1 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
247 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00245 20-Jun-15 ALL CIV Testing Cube test at Holcim 22-Jun-15 24-Jun-15 3.00pm CLOSED 22-Jun-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
248 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00246 22-Jun-15 ALL CIV Testing Cube test at Holcim 23-Jun-15 25-Jun-15 3.00pm CLOSED 24-Jun-15 1 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
249 RAPID-P20A1-UEMB-ALL-CIV-RFIN-00247 5-Jun-15 ALL CIV Testing Cube test at Holcim 8-Jun-15 10-Jun-15 3.00pm CLOSED 10-Jun-15 2 ACCEPTED 1 1
KHAIRIL
250 RAPID-P20A1-UEMB-All-CIV-RFIN-00248 UEMB QAQC SYAFIQ 9-Mar-15 ALL CIV Testing Drilling borehole for SI no.2 and SI no.3 10-Mar-15 12-Mar-15 9.00am CLOSED 17-Nov-15 252 ACCEPTED 1 1
UEMB KHAIRIL
251 RAPID-P20A1-UEMB-All-CIV-RFIN-00249
IZWAN 23-Jun-15 ALL CIV Testing Cube test at Holcim 24-Jun-15 26-Jun-15 10.00AM CLOSED 24-Jun-15 0 ACCEPTED 1 1
UEMB QAQC
252 RAPID-P20A1-UEMB-All-CIV-RFIN-00250 23-Jun-15 ALL CIV Testing premix test at Geolab, taman perling 25-Jun-15 27-Jun-15 CLOSED 28-Jun-15 3 REJECTED 1 1
KHAIRIL
UEMB QAQC soak CBR testing at Geolab, taman Perling for subgrade
253 RAPID-P20A1-UEMB-All-CIV-RFIN-00251 23-Jun-15 ALL CIV Testing 25-Jun-15 27-Jun-15 CLOSED 28-Jun-15 3 REJECTED 1 1
KHAIRIL (common facilities,Common building and small package
255 RAPID-P20A1-UEMB-All-CIV-RFIN-00253 PSJV 26-Jun-15 All ELE Material Material receiving for 11KV nexans Jointing kit 29-Jun-15 1-Jul-15 9.30 am CLOSED 08-Jul-15 9 ACCEPTED 1 1
Material receiving inspection for Collapsible lighting poles (5M
256 RAPID-P20A1-UEMB-All-ELE-RFIN-00254 AEIE 26-Jun-15 All ELE Material 27-Jun-15 29-Jun-15 10.00am CLOSED 24-Aug-15 58 ACCEPTED 1 1
and 15M)
UEMB QAQC
257 RAPID-P20A1-UEMB-All-CIV-RFIN-00255 KHAIRIL 27-Jun-15 ALL CIV Testing cube test at Holcim 29-Jun-15 1-Jul-15 3.00 pm CLOSED 29-Jun-15 0 ACCEPTED 1 1
UEMB QAQC
259 RAPID-P20A1-UEMB-All-CIV-RFIN-00257 KHAIRIL 29-Jun-15 ALL CIV Testing cube test at Holcim 30-Jun-15 2-Jul-15 3.00 pm CLOSED 30-Jun-15 0 ACCEPTED 1 1
261 RAPID-P20A1-UEMB-All-CIV-RFIN-00259 Liwo 29-Jun-15 ALL CIV Testing Mackintosh Probe testing at SR6 and SR8 30-Jun-15 2-Jul-15 10.00am CLOSED 02-Jul-15 2 ACCEPTED 1 1
UEMB QAQC
262 RAPID-P20A1-UEMB-All-CIV-RFIN-00260 30-Jun-15 ALL CIV Testing Cube test at Holcim 1-Jul-15 3-Jul-15 3.00pm CLOSED 01-Jul-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
263 RAPID-P20A1-UEMB-All-CIV-RFIN-00261 30-Jun-15 ALL CIV Testing FDT for roadbase at SR2, CH1000-1130 1-Jul-15 3-Jul-15 10.00am CLOSED 03-Jul-15 2 ACCEPTED 1 1
KHAIRIL
UEMB QAQC soak CBR testing at Geolab, taman Perling for subgrade
264 RAPID-P20A1-UEMB-All-CIV-RFIN-00262 30-Jun-15 ALL CIV Testing 1-Jul-15 3-Jul-15 10.00am CLOSED 11-Nov-15 133 ACCEPTED 1 1
KHAIRIL (common facilities,Common building and small package camp
UEMB QAQC
265 RAPID-P20A1-UEMB-All-CIV-RFIN-00263 30-Jun-15 ALL CIV Testing Premix test for MA4 at Geolab, Taman perling 1-Jul-15 3-Jul-15 10.00am CLOSED 01-Jul-15 0 ACCEPTED 1 1
KHAIRIL
UEMB KHAIRIL
266 RAPID-P20A1-UEMB-All-CIV-RFIN-00264
IZWAN 26-Jun-15 ALL CIV Testing Cube test at Holcim 27-Jun-15 29-Jun-15 3.00pm CLOSED 27-Jun-15 0 ACCEPTED 1 1
UEMB QAQC
267 RAPID-P20A1-UEMB-All-CIV-RFIN-00265 1-Jul-15 ALL CIV Testing Cube test at Holcim 2-Jul-15 4-Jul-15 3.00pm CLOSED 02-Jul-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
268 RAPID-P20A1-UEMB-All-CIV-RFIN-00266 2-Jul-15 ALL CIV Testing Cube test at Holcim 3-Jul-15 5-Jul-15 3.00pm CLOSED 03-Jul-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
271 RAPID-P20A1-UEMB-All-CIV-RFIN-00269 3-Jul-15 ALL CIV Testing Cube test at Holcim 4-Jul-15 6-Jul-15 3.00pm CLOSED 04-Jul-15 0 ACCEPTED 1 1
KHAIRIL
272 RAPID-P20A1-UEMB-All-PIP-RFIN-00270 Instant Option 4-Jul-15 ALL PIP Testing Inspection for S Band MP 1 Testing at Lua Brother SB 6-Jul-15 8-Jul-15 9.30pm CLOSED CANCEL 1 1
UEMB QAQC
273 RAPID-P20A1-UEMB-All-CIV-RFIN-00271 KHAIRIL 4-Jul-15 ALL CIV Testing Cube test at Holcim 6-Jul-15 8-Jul-15 3.00pm CLOSED 08-Jul-15 2 ACCEPTED 1 1
UEMB QAQC
274 RAPID-P20A1-UEMB-All-CIV-RFIN-00272 KHAIRIL 6-Jul-15 ALL CIV Testing Cube test at Holcim 7-Jul-15 9-Jul-15 3.00pm CLOSED 07-Jul-15 0 ACCEPTED 1 1
UEMB QAQC
275 RAPID-P20A1-UEMB-All-CIV-RFIN-00273 KHAIRIL 7-Jul-15 ALL CIV Testing Cube test at Holcim 8-Jul-15 10-Jul-15 3.00pm CLOSED 08-Jul-15 0 ACCEPTED 1 1
UEMB QAQC
276 RAPID-P20A1-UEMB-All-CIV-RFIN-00274 KHAIRIL 8-Jul-15 ALL CIV Testing Cube test at Holcim 9-Jul-15 11-Jul-15 3.00pm CLOSED 09-Jul-15 0 ACCEPTED 1 1
UEMB QAQC
277 RAPID-P20A1-UEMB-All-CIV-RFIN-00275 KHAIRIL 8-Jul-15 ALL CIV Sampling Joint Sampling sand bedding ( stockpile area) 9-Jul-15 11-Jul-15 8.30am CLOSED 10-Jul-15 1 ACCEPTED 1 1
UEMB QAQC
279 RAPID-P20A1-UEMB-All-CIV-RFIN-00277 9-Jul-15 ALL CIV Testing Cube test at Holcim 10-Jul-15 12-Jul-15 3.00pm CLOSED 10-Jul-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
280 RAPID-P20A1-UEMB-All-CIV-RFIN-00278 10-Jul-15 ALL CIV Testing Cube test at Holcim 11-Jul-15 13-Jul-15 3.00pm CLOSED 11-Jul-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
284 RAPID-P20A1-UEMB-All-CIV-RFIN-00282 11-Jul-15 ALL CIV Testing Cube test at Holcim 13-Jul-15 15-Jul-15 3.00pm CLOSED 13-Jul-15 0 ACCEPTED 1 1
KHAIRIL
285 RAPID-P20A1-UEMB-All-PIP-RFIN-00283 Instant option 11-Jul-15 ALL PIP Trust Block Request for inspection of trust block concreting at SR7/SR4 12-Jul-15 14-Jul-15 3.00pm CLOSED 28-Aug-15 47 ACCEPTED 1 1
UEMB QAQC
289 RAPID-P20A1-UEMB-All-CIV-RFIN-00287 KHAIRIL 14-Jul-15 ALL CIV Testing Cube test at Holcim 15-Jul-15 17-Jul-15 3.00pm CLOSED 16-Jul-15 1 ACCEPTED 1 1
UEMB QAQC
290 RAPID-P20A1-UEMB-All-CIV-RFIN-00288 KHAIRIL 22-Jul-15 ALL CIV Testing Cube test for coring at STP/Clarifire tank at Geolab Perling 23-Jul-15 25-Jul-15 9.00am CLOSED 21-Jul-15 -2 ACCEPTED 1 1
UEMB QAQC
291 RAPID-P20A1-UEMB-All-CIV-RFIN-00289 KHAIRIL 22-Jul-15 ALL CIV Testing Cube test at Holcim 23-Jul-15 25-Jul-15 10.00am CLOSED 23-Jul-15 0 ACCEPTED 1 1
UEMB QAQC
293 RAPID-P20A1-UEMB-All-CIV-RFIN-00291 KHAIRIL 20-Jul-15 ALL CIV Testing Cube test at Holcim 20-Jul-15 22-Jul-15 3.00pm CLOSED 20-Jul-15 0 CANCEL 1 1
UEMB QAQC
294 RAPID-P20A1-UEMB-All-CIV-RFIN-00292 24-Jul-15 ALL CIV Testing Cube test at Holcim 25-Jul-15 27-Jul-15 3.00pm CLOSED 11-Nov-15 109 ACCEPTED 1 1
KHAIRIL
295 RAPID-P20A1-UEMB-All-ELE-RFIN-00293 Uem Zikri 25-Jul-15 ALL ELE Material Material inspection for GI pipe (150mmx6m) and 100mmx6m) 27-Jul-15 29-Jul-15 3.00pm CLOSED 04-Aug-15 8 ACCEPTED 1 1
UEMB KHAIRIL
296 RAPID-P20A1-UEMB-All-CIV-RFIN-00293A
IZWAN 25-Jul-15 ALL CIV Testing Cube test at Holcim 27-Jul-15 29-Jul-15 3.00pm CLOSED CANCEL 1 1
297 RAPID-P20A1-UEMB-All-CIV-RFIN-00294 Liwo 27-Jun-15 ALL CIV Testing Mackintosh Probe testing at SR5 & SR8 28-Jul-15 30-Jul-15 10.00am CLOSED 30-Jul-15 2 ACCEPTED 1 1
UEMB QAQC
298 RAPID-P20A1-UEMB-All-STR-RFIN-00295 28-Jun-15 ALL STR Testing Cube test at HOLCIM 29-Jul-15 31-Jul-15 3.00pm CLOSED 29-Jul-15 0 ACCEPTED 1 1
KHAIRIL
299 RAPID-P20A1-UEMB-All-STR-RFIN-00296 Instant option 28-Jun-15 ALL CIV Drainage work inspection for rebar and formwork and caping beam along SR5 29-Jul-15 31-Jul-15 3.00pm CLOSED 02-Dec-15 126 ACCEPTED 1 1
301 RAPID-P20A1-UEMB-All-ELE-RFIN-00298 PSJV 29-Jun-15 ALL ELE Material Material receiving for XLPE /SWA/PVC 3C 185mm2 CN 11kv 30-Jul-15 1-Aug-15 10.00am CLOSED 30-Jul-15 0 ACCEPTED 1 1
UEMB QAQC
302 RAPID-P20A1-UEMB-All-CIV-RFIN-00299 30-Jul-15 ALL STR Testing Cube test at HOLCIM 30-Jul-15 1-Aug-15 3.00pm CLOSED 30-Jul-15 0 CANCEL 1 1
KHAIRIL
UEMB QAQC
306 RAPID-P20A1-UEMB-All-CIV-RFIN-00303 KHAIRIL 30-Jul-15 ALL STR Testing Cube test at HOLCIM 31-Jul-15 2-Aug-15 3.00pm CLOSED 31-Jul-15 0 ACCEPTED 1 1
UEMB QAQC
307 RAPID-P20A1-UEMB-All-CIV-RFIN-00303A KHAIRIL 31-Jul-15 ALL CIV Testing Cube test at HOLCIM 1-Aug-15 3-Aug-15 3.00pm CLOSED 11-Aug-15 10 ACCEPTED 1 1
308 RAPID-P20A1-UEMB-All-MNE-RFIN-00304 How thong 31-Jul-15 ALL STR Testing Sieve analysis for filter media of pressure filter tank 1-Aug-15 3-Aug-15 10.30am CLOSED 11-Nov-15 102 REJECTED 1 1
UEMB QAQC
314 RAPID-P20A1-UEMB-All-CIV-RFIN-00310 1-Aug-15 ALL CIV Testing Cube test at HOLCIM 3-Aug-15 5-Aug-15 3.00pm CLOSED 03-Aug-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
318 RAPID-P20A1-UEMB-All-CIV-RFIN-00314 3-Aug-15 ALL CIV Testing Cube test at HOLCIM 4-Aug-15 6-Aug-15 3.00pm CLOSED 8-Aug-15 4 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
323 RAPID-P20A1-UEMB-All-CIV-RFIN-00319 KHAIRIL 5-Aug-15 ALL CIV Testing Cube test at HOLCIM 6-Aug-15 8-Aug-15 3.00pm CLOSED 6-Aug-15 0 ACCEPTED 1 1
UEMB QAQC
326 RAPID-P20A1-UEMB-All-CIV-RFIN-00322 6-Aug-15 ALL CIV Testing Cube test at HOLCIM 7-Aug-15 9-Aug-15 3.00pm CLOSED 7-Aug-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
328 RAPID-P20A1-UEMB-All-CIV-RFIN-00324 7-Aug-15 ALL CIV Testing Cube test at HOLCIM 8-Aug-15 10-Aug-15 3.00pm CLOSED 8-Aug-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
329 RAPID-P20A1-UEMB-All-CIV-RFIN-00324A 8-Aug-15 ALL CIV Testing Cube test at HOLCIM 10-Aug-15 12-Aug-15 3.00pm CLOSED 10-Aug-15 0 ACCEPTED 1 1
KHAIRIL
330 RAPID-P20A1-UEMB-All-PIP-RFIN-00325 Khidmat Hijau 9-Aug-15 ALL PIP Material Material inspection for water recticulation pipe 9-Aug-15 11-Aug-15 10.00am CLOSED 21-Aug-15 12 ACCEPTED 1 1
UEMB QAQC
331 RAPID-P20A1-UEMB-All-CIV-RFIN-00326 10-Aug-15 ALL CIV Testing Cube test at HOLCIM 11-Aug-15 13-Aug-15 3.00pm CLOSED 11-Aug-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
332 RAPID-P20A1-UEMB-All-CIV-RFIN-00327 11-Aug-15 ALL CIV Testing Cube test at HOLCIM 13-Aug-15 15-Aug-15 3.00pm CLOSED 15-Aug-15 2 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
338 RAPID-P20A1-UEMB-All-CIV-RFIN-00333 KHAIRIL 13-Aug-15 ALL CIV Testing Cube test at HOLCIM 13-Aug-15 15-Aug-15 3.00pm CLOSED 15-Aug-15 2 ACCEPTED 1 1
339 RAPID-P20A1-UEMB-All-ELE-RFIN-00334 AEIE 14-Aug-15 ALL ELE Material Receiving material inspection for feeder pillar 14-Aug-15 16-Aug-15 10.00am CLOSED CANCEL 1 1
340 RAPID-P20A1-UEMB-All-ELE-RFIN-00335 AEIE 14-Aug-15 ALL ELE Material Receiving material inspection for junction box at street lighting 14-Aug-15 16-Aug-15 10.00am CLOSED 15-Aug-15 1 REJECTED 1 1
UEMB QAQC
344 RAPID-P20A1-UEMB-All-CIV-RFIN-00339 KHAIRIL 17-Aug-15 ALL CIV Testing Cube test at HOLCIM 17-Aug-15 19-Aug-15 3.00pm CLOSED 18-Aug-15 1 ACCEPTED 1 1
UEMB QAQC
347 RAPID-P20A1-UEMB-All-CIV-RFIN-00342 17-Aug-15 ALL CIV Testing Cube test at HOLCIM 19-Aug-15 21-Aug-15 3.00pm CLOSED 20-Aug-15 1 ACCEPTED 1 1
KHAIRIL
349 RAPID-P20A1-UEMB-All-CIV-RFIN-00344 UEMB NIZAN 19-Aug-15 ALL CIV Road Work Laying of geogrid, laying of roadbase, joint dipping 20-Aug-15 22-Aug-15 2.00pm CLOSED 02-Nov-15 74 ACCEPTED 1 1
350 RAPID-P20A1-UEMB-All-CIV-RFIN-00345 UEMB NIZAN 19-Aug-15 ALL CIV Road Work Laying of sub base, joint dipping 20-Aug-15 22-Aug-15 2.00pm CLOSED 02-Nov-15 74 ACCEPTED 1 1
351 RAPID-P20A1-UEMB-All-CIV-RFIN-00346 UEMB NIZAN 19-Aug-15 ALL CIV Road Work Preparation of subgrade, joint dipping 20-Aug-15 22-Aug-15 2.00pm CLOSED 12-Nov-15 84 ACCEPTED 1 1
352 RAPID-P20A1-UEMB-All-ELE-RFIN-00347 Refer RAPID-P20A1-UEMB-TCF-ELE-RFIN-00001 CLOSED CANCEL 1 1
354 RAPID-P20A1-UEMB-All-STR-RFIN-00349 Gapura 19-Aug-15 ALL STR Material For inspect material for open air cinema. 20-Aug-15 22-Aug-15 8.00am CLOSED 05-Sep-15 16 ACCEPTED 1 1
UEMB QAQC
355 RAPID-P20A1-UEMB-All-CIV-RFIN-00350 KHAIRIL 19-Aug-15 ALL CIV Testing FDT test for Subgrade at Raundbout 6 ( SR3/SR6) 19-Aug-15 21-Aug-15 4.00pm CLOSED 19-Aug-15 0 ACCEPTED 1 1
UEMB QAQC
356 RAPID-P20A1-UEMB-All-CIV-RFIN-00351 KHAIRIL 19-Aug-15 ALL CIV Testing FDT test for Subbase at Raundbout 6 ( SR3/SR6) 20-Aug-15 22-Aug-15 4.00pm CLOSED 22-Aug-15 2 ACCEPTED 1 1
UEMB QAQC
357 RAPID-P20A1-UEMB-All-CIV-RFIN-00352 KHAIRIL 19-Aug-15 ALL CIV Testing Cube test at HOLCIM 21-Aug-15 23-Aug-15 3.00am CLOSED 22-Aug-15 1 ACCEPTED 1 1
UEMB QAQC
359 RAPID-P20A1-UEMB-All-PIP-RFIN-00354 KHAIRIL 22-Aug-15 ALL CIV Testing Cube test at HOLCIM 24-Aug-15 26-Aug-15 3.00am CLOSED 26-Aug-15 2 ACCEPTED 1 1
360 RAPID-P20A1-UEMB-All-STR-RFIN-00355 Gapura 21-Aug-15 ALL STR Material For inspect material for Cinema 22-Aug-15 24-Aug-15 8.00am CLOSED 05-Sep-15 14 ACCEPTED 1 1
363 RAPID-P20A1-UEMB-All-ELE-RFIN-00358 AEIE 25-Aug-15 ALL ELE Material Receiving material inspection for feeder pillar 7 units 27-Aug-15 29-Aug-15 10.00am CLOSED 08-Sep-15 12 ACCEPTED 1 1
UEMB KHAIRIL
368 RAPID-P20A1-UEMB-All-CIV-RFIN-00363
IZWAN 1-Sep-15 ALL CIV Testing Cube test at Holcim 2-Sep-15 4-Sep-15 9.00am CLOSED 2-Sep-15 0 ACCEPTED 1 1
370 RAPID-P20A1-UEMB-All-ELE-RFIN-00365 AEIE 2-Sep-15 ALL ELE Material Incoming received material inspection for LV cable 3-Sep-15 5-Sep-15 10.00am CLOSED 6-Sep-15 3 REJECTED 1 1
371 RAPID-P20A1-UEMB-All-ELE-RFIN-00366 AEIE 2-Sep-15 ALL ELE Material Incoming received Material inspection for Lantern Lighting 3-Sep-15 5-Sep-15 10.00am CLOSED 08-Sep-15 5 ACCEPTED 1 1
372 RAPID-P20A1-UEMB-All-ELE-RFIN-00367 Refer RAPID-P20A1-UEMB-TCF-ELE-RFIN-00003 CLOSED CANCEL 1 1
374 RAPID-P20A1-UEMB-All-ELE-RFIN-00369 AEIE 2-Sep-15 ALL ELE Testing and material Armor cable 400mm Sq x 4C inspections 3-Sep-15 5-Sep-15 11.00am CLOSED CANCEL 1 1
375 RAPID-P20A1-UEMB-All-STR-RFIN-00370 Gapura 2-Sep-15 ALL STR Material For inspect material open air cinema Hollow & Plate 3-Sep-15 5-Sep-15 9.00pm CLOSED 08-Sep-15 5 ACCEPTED 1 1
376 RAPID-P20A1-UEMB-All-PIP-RFIN-00371 Instant option 2-Sep-15 ALL PIP Testing Welder performance Qualification for S-Bens 3-Sep-15 5-Sep-15 10.00am CLOSED 08-Sep-15 5 ACCEPTED CANCEL 1 1
377 RAPID-P20A1-UEMB-All-STR-RFIN-00372 Samion 2-Sep-15 ALL STR Material Material verification for open Cinema Structure 3-Sep-15 5-Sep-15 2.00pm CLOSED 04-Oct-15 31 REJECTED 1 1
UEMB QAQC
378 RAPID-P20A1-UEMB-All-CIV-RFIN-00373 2-Sep-15 ALL CIV Testing Cube test at Holcim 3-Sep-15 5-Sep-15 3.00pm CLOSED 03-Sep-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
379 RAPID-P20A1-UEMB-All-CIV-RFIN-00374 3-Sep-15 ALL CIV Testing FDT for roadbase at Roundabout 6 (SR3/SR6) 4-Sep-15 6-Sep-15 9.00am CLOSED 07-Sep-15 3 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
380 RAPID-P20A1-UEMB-All-CIV-RFIN-00375 KHAIRIL 4-Sep-15 ALL CIV Testing Cube test at Holcim 4-Sep-15 6-Sep-15 3.00pm CLOSED 04-Sep-15 0 ACCEPTED 1 1
381 RAPID-P20A1-UEMB-All-STR-RFIN-00376 Gapura 3-Sep-15 ALL STR Site visit Material installation for roof water pump house 4-Sep-15 6-Sep-15 10.00am CLOSED 07-Sep-15 3 ACCEPTED 1 1
UEMB QAQC
385 RAPID-P20A1-UEMB-All-CIV-RFIN-00380 7-Sep-15 ALL CIV Testing Cube test at Holcim 8-Sep-15 10-Sep-15 3.00pm CLOSED 08-Sep-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
386 RAPID-P20A1-UEMB-All-CIV-RFIN-00381 KHAIRIL 4-Sep-15 ALL CIV Testing Cube test at Holcim 5-Sep-15 7-Sep-15 3.00pm CLOSED 08-Sep-15 3 ACCEPTED 1 1
UEMB KHAIRIL 10-Sep-15 ALL CIV Test Cube test at Holcim 11-Sep-15 13-Sep-15 3.00pm 11-Sep-15
390 RAPID-P20A1-UEMB-All-CIV-RFIN-00385
IZWAN
CLOSED 0 ACCEPTED 1 1
UEMB QAQC Joint sampling and testing for sand (Subbase) (Sources: ason
391 RAPID-P20A1-UEMB-All-CIV-RFIN-00386 11-Sep-15 ALL CIV Test 11-Sep-15 13-Sep-15 3.00pm CLOSED 12-Sep-15 1 ACCEPTED 1 1
KHAIRIL Quarry, kota tinggi)
UEMB KHAIRIL
392 RAPID-P20A1-UEMB-All-CIV-RFIN-00387
IZWAN 12-Sep-15 ALL CIV Test Cube test at Holcim 14-Sep-15 16-Sep-15 3.00pm CLOSED 14-Sep-15 0 ACCEPTED 1 1
393 RAPID-P20A1-UEMB-All-STR-RFIN-00388 Gapura 12-Sep-15 ALL STR Test Welder performance Qualification 14-Sep-15 16-Sep-15 1.00pm CLOSED 01-Oct-15 17 ACCEPTED 1 1
395 RAPID-P20A1-UEMB-All-ELE-RFIN-00390 Opensis 17-Sep-15 ALL ELE Material Receiving material inspection for Access card system 18-Sep-15 20-Sep-15 2.00pm CLOSED CANCEL 1 1
397 RAPID-P20A1-UEMB-All-ELE-RFIN-00392 Opensis 3-Sep-15 ALL ELE Material Receiving material inspection for Access card system 3-Sep-15 5-Sep-15 4.00pm CLOSED 11-Sep-15 8 ACCEPTED 1 1
UEMB QAQC
398 RAPID-P20A1-UEMB-All-CIV-RFIN-00393
KHAIRIL
17-Sep-15 ALL CIV Test Cube test at Holcim 18-Sep-15 20-Sep-15 3.00pm CLOSED CANCEL 1 1
399 RAPID-P20A1-UEMB-All-STR-RFIN-00394 Samion 17-Sep-15 ALL STR Material Material verification for open Cinema Structure at Ulu Tiram 18-Sep-15 20-Sep-15 9.00am CLOSED 04-Oct-15 16 ACCEPTED 1 1
UEMB KHAIRIL 19-Sep-15 ALL CIV Test Cube test at Holcim 21-Sep-15 23-Sep-15 3.00pm
400 RAPID-P20A1-UEMB-All-CIV-RFIN-00395
IZWAN
CLOSED CANCEL 1 1
UEMB QAQC Cube test at Geolab Taman Perling (Coring concrete at mosque
401 RAPID-P20A1-UEMB-All-STR-RFIN-00396 19-Sep-15 ALL CIV Test 21-Sep-15 23-Sep-15 10.00am CLOSED 29-Sep-15 8 REJECTED 1 1
KHAIRIL 3 points)
UEMB KHAIRIL
402 RAPID-P20A1-UEMB-All-CIV-RFIN-00397
IZWAN 28-Sep-15 ALL CIV Test Cube test at Holcim 29-Sep-15 1-Oct-15 3.00pm CLOSED 29-Sep-15 0 ACCEPTED 1 1
UEMB KHAIRIL
404 0
IZWAN 28-Sep-15 ALL CIV Test Cube test at Holcim 1-Oct-15 3-Oct-15 3.00pm CLOSED CANCEL 1 1
UEMB QAQC
405 RAPID-P20A1-UEMB-All-CIV-RFIN-00400 29-Sep-15 ALL CIV testing Bending and tensile testing for rebar (IORSB-STP2) 29-Sep-15 1-Oct-15 2.30pm CLOSED 29-Sep-15 0 ACCEPTED 1 1
KHAIRIL
406 RAPID-P20A1-UEMB-All-STR-RFIN-00401 Gapura 28-Sep-15 ALL STR Test For inspect material for open air cinema at Danamin workshop 29-Sep-15 1-Oct-15 3.00pm CLOSED 04-Oct-15 5 ACCEPTED 1 1
final visual truss roof for RT2-1, RT2-2, TT 1-3, TT 1-4 and
407 RAPID-P20A1-UEMB-All-STR-RFIN-00402 Gapura 2-Oct-15 ALL STR Blasting Painting TT 1-5 to release blasting painting 2-Oct-15 4-Oct-15 10.00am CLOSED CANCEL 1 1
408 RAPID-P20A1-UEMB-All-ELE-RFIN-00403 UEMB Basiq 7-Oct-15 ALL ELE Test UHF-FM Radio Coverage and performance joint walk test 7-Oct-15 9-Oct-15 4.00pm CLOSED CANCEL 1 1
409 RAPID-P20A1-UEMB-All-ELE-RFIN-00404 PSJV 7-Oct-15 ALL ELE Material Material receiving for 11KV XLPE/SWA/PVC 3C 185MM 8-Oct-15 10-Oct-15 3.00pm CLOSED 09-Oct-15 1 ACCEPTED 1 1
UEMB KHAIRIL
411 RAPID-P20A1-UEMB-All- CIV-RFIN-00406
IZWAN 10-Oct-15 ALL CIV Test Cube test at Holcim 11-Oct-15 13-Oct-15 3.00pm CLOSED CANCEL 1 1
UEMB QAQC
412 RAPID-P20A1-UEMB-All- CIV-RFIN-00407 KHAIRIL 10-Oct-15 ALL CIV Test Bore hole no 9 11-Oct-15 13-Oct-15 8.00am CLOSED 11-Oct-15 0 ACCEPTED 1 1
UEMB QAQC
413 RAPID-P20A1-UEMB-All- CIV-RFIN-00408 11-Oct-15 ALL CIV Test Bore hole no 1 12-Oct-15 14-Oct-15 8.00am CLOSED 16-Nov-15 35 ACCEPTED 1 1
KHAIRIL
414 RAPID-P20A1-UEMB-All- ELE-RFIN-00409 PSJV 15-Oct-15 ALL ELE Material 16-Oct-15 18-Oct-15 10.00am CLOSED 20-Oct-15 4 ACCEPTED 1 1
Material receiving for XLPE/SWA/PVC/CN 3C X 185mm 11KV.
Total length :5 Drums 2.5KM
416 RAPID-P20A1-UEMB-All- STR-RFIN-00411 Gapura 15-Oct-15 ALL STR Material Inspect receiving material for open Air cinema 16-Oct-15 18-Oct-15 10.00am CLOSED 16-Nov-15 31 ACCEPTED 1 1
426 RAPID-P20A1-UEMB-All- ELE-RFIN-00421 AEIE 17-Oct-15 ALL Stockpile ELE Material Receiving material inspection for feeder piller at Stockpile area 19-Oct-15 21-Oct-15 2.00pm CLOSED 28-Oct-15 9 ACCEPTED 1 1
UEMB QAQC
428 RAPID-P20A1-UEMB-All- CIV-RFIN-00423 15-Oct-15 ALL CIV Testing Tensile test for bolt 20 (Cinema) Samion Iron work 16-Oct-15 18-Oct-15 12.00pm CLOSED 11-Nov-15 26 ACCEPTED CANCEL 1 1
KHAIRIL
UEMB QAQC
429 RAPID-P20A1-UEMB-All- CIV-RFIN-00424 16-Oct-15 ALL CIV Testing Bore Hole 4 at Bus stop 5/4 Phase 2 17-Oct-15 19-Oct-15 8.00am CLOSED 17-Oct-15 0 ACCEPTED 1 1
KHAIRIL
UEMB KHAIRIL 20-Oct-15 ALL CIV Testing Cube crushering test for core sample from mosque ( Raft 21-Oct-15 23-Oct-15 11.00am
430 RAPID-P20A1-UEMB-All- CIV-RFIN-00425
IZWAN Foundation slab) Point 3,4,6,7
CLOSED CANCEL 1 1
432 RAPID-P20A1-UEMB-All- ELE-RFIN-00427 Opensis 21-Oct-15 ALL ELE Material Receive material inspection for radio system 21-Oct-15 23-Oct-15 4.00pm CLOSED 04-Nov-15 14 ACCEPTED 1 1
UEMB QAQC
434 RAPID-P20A1-UEMB-All- CIV-RFIN-00429 26-Oct-15 ALL CIV Test Cube test at Holcim 27-Oct-15 29-Oct-15 3.00pm CLOSED 27-Oct-15 0 ACCEPTED 1 1
KHAIRIL
UEMB KHAIRIL
436 RAPID-P20A1-UEMB-All- STR-RFIN-00431
IZWAN 28-Oct-15 ALL CIV Test Cube test at Lafarge 28-Oct-15 30-Oct-15 3.00pm CLOSED 28-Oct-15 0 CANCEL 1 1
437 RAPID-P20A1-UEMB-All- ELE-RFIN-00432 PSJV 29-Oct-15 All ELE Material Material receiving - 10 Drums 11KV cable at Stockpile phase 2 30-Oct-15 1-Nov-15 9.00am CLOSED 11-Nov-15 12 ACCEPTED 1 1
439 RAPID-P20A1-UEMB-All- ELE-RFIN-00434 Liwo 26-Oct-15 ALL ELE Test Earth Resistance test for loop 8, loop9, loop 10 27-Oct-15 29-Oct-15 10.00am CLOSED 30-Oct-15 3 ACCEPTED 1 1
442 RAPID-P20A1-UEMB-All- PIP -RFIN-00437 Instant option 2-Nov-15 ALL PIP Material Inspection for receiving material for Fire Hydrant Hose 3-Nov-15 5-Nov-15 10.00am CLOSED 06-Jan-16 64 REJECTED 1 1
UEMB QAQC
447 RAPID-P20A1-UEMB-All- CIV -RFIN-00442 3-Nov-15 ALL CIV Test Cube test at Holcim 4-Nov-15 6-Nov-15 11.00am CLOSED 26-Nov-15 20 ACCEPTED 1 1
KHAIRIL
452 RAPID-P20A1-UEMB-All- ELE -RFIN-00447 Liwo 6-Nov-15 ALL ELE Testing Earth Resistance test for loop 5, loop 6, loop 16 6-Nov-15 8-Nov-15 8.00am CLOSED 06-Nov-15 0 ACCEPTED 1 1
ACME Bestari 6-Nov-15 ALL ELE equipment Delivery of RAPID - Radio site interconnection system 6-Nov-15 8-Nov-15 8.00am 8-Mar-16
453 RAPID-P20A1-UEMB-All- ELE -RFIN-00448
using microwave link (18m Band) - as per delivery order CLOSED 123 ACCEPTED 1 1
454 RAPID-P20A1-UEMB-All- CIV -RFIN-00449 UEMB Nizan 6-Nov-15 ALL CIV Road Work Inspection for abortine work at Roundabout 1 6-Nov-15 8-Nov-15 11.00am CLOSED 17-Nov-15 11 ACCEPTED 1 1
455 RAPID-P20A1-UEMB-All- CIV -RFIN-00450 UEMB Nizan 6-Nov-15 ALL CIV Road Work Inspection for abortine work at Roundabout 4 6-Nov-15 8-Nov-15 11.30am CLOSED 17-Nov-15 11 ACCEPTED 1 1
456 RAPID-P20A1-UEMB-All- CIV -RFIN-00451 UEMB Nizan 6-Nov-15 ALL CIV Road Work Inspection for abortine work at Roundabout 6 6-Nov-15 8-Nov-15 11.30am CLOSED 17-Nov-15 11 ACCEPTED 1 1
457 RAPID-P20A1-UEMB-All- ELE -RFIN-00452 Opensis 6-Oct-15 ALL ELE Radio coverage test UHF-FM Radio Coverage and performance joint walk test 7-Oct-15 9-Oct-15 11.30am CLOSED 04-Nov-15 28 ACCEPTED 1 1
458 RAPID-P20A1-UEMB-All- CIV-RFIN-00453 instant Option 7-Oct-15 ALL CIV Survey Joint survey for allignment roundabout 3 at SR2/SR6 8-Oct-15 10-Oct-15 9.00am CLOSED 07-Nov-15 30 ACCEPTED 1 1
WQT for 2nd batch for project steel structure open Cinema
461 RAPID-P20A1-UEMB-All- STR-RFIN-00456 HIKMAH Oil & GAS 6-Nov-15 ALL STR Material building 7-Nov-15 9-Nov-15 10.00am CLOSED 16-Nov-15 9 CANCEL 1 1
467 RAPID-P20A1-UEMB-All- STR-RFIN-00462 Gapura 14-Nov-15 ALL STR Welding Final visual to release B/P 14-Nov-15 16-Nov-15 10.00am CLOSED CANCEL 1 1
468 RAPID-P20A1-UEMB-All- STR-RFIN-00463 Gapura 14-Nov-15 ALL STR Material Final visual to release B/P 14-Nov-15 16-Nov-15 10.00am CLOSED CANCEL 1 1
469 RAPID-P20A1-UEMB-All- CIV-RFIN-00464 UEMB NURUL 15-Nov-15 ALL CIV Testing cube test at holcim 13-Nov-15 15-Nov-15 4.30pm CLOSED 26-Nov-15 11 ACCEPTED 1 1
470 RAPID-P20A1-UEMB-All- CIV-RFIN-00465 UEMB AIMI 6-Nov-15 ALL CIV Testing cube test at holcim 7-Nov-15 9-Nov-15 4.30pm CLOSED 26-Nov-15 17 ACCEPTED 1 1
471 RAPID-P20A1-UEMB-All- PIP-RFIN-00466 Instant option 17-Oct-15 ALL PIP Tie Point Tie in point installation for fire water line at SR2, SR3 and SR4 18-Nov-15 20-Nov-15 1.00pm CLOSED 02-Dec-15 12 ACCEPTED 1 1
472 RAPID-P20A1-UEMB-All- PIP-RFIN-00467 Instant option 17-Oct-15 ALL PIP Tie Point Tie in point installation for potable water line at SR3, SR4 18-Nov-15 20-Nov-15 1.00pm CLOSED 08-Dec-15 18 ACCEPTED 1 1
473 RAPID-P20A1-UEMB-All- PIP-RFIN-00468 Instant option 17-Oct-15 ALL PIP Tie Point Tie in point installation for sewerage water line at SR2, SR4 18-Nov-15 20-Nov-15 1.00pm CLOSED 08-Dec-15 18 ACCEPTED 1 1
Instant option 17-Oct-15 ALL PIP Tie Point S-bend installation for potable water line at SR4, SR3, SR6 18-Nov-15 20-Nov-15 3.00pm
476 RAPID-P20A1-UEMB-All- PIP-RFIN-00471
and SR7
CLOSED CANCEL 1 1
480 RAPID-P20A1-UEMB-All- CIV-RFIN-00475 UEMB Aimi 16-Oct-15 ALL CIV Testing cube test at holcim 17-Nov-15 19-Nov-15 3.00pm CLOSED CANCEL 1 1
481 RAPID-P20A1-UEMB-All- STR-RFIN-00476 Samion 19-Oct-15 ALL STR Welding Inspection welding joint for column 20-Nov-15 22-Nov-15 10.00am CLOSED 7-Dec-15 17 REJECTED 1 1
482 RAPID-P20A1-UEMB-All- STR-RFIN-00477 Samion 19-Oct-15 ALL STR NDT/MPI test Inspection NDT services (MPI test) for column 20-Nov-15 22-Nov-15 10.00am CLOSED 7-Dec-15 17 REJECTED 1 1
Hydrant pillar and isolation value installation for fire water line
483 RAPID-P20A1-UEMB-All- PIP-RFIN-00478 Instant option 20-Nov-15 ALL PIP Installation
at SR2, SR3, SR4, SR5, SR6 SR7, and SR8 Phase 1
21-Nov-15 23-Nov-15 1.00pm CLOSED 18-Apr-16 149 REJECTED 1 1
484 RAPID-P20A1-UEMB-All- STR-RFIN-00479 Gapura 20-Nov-15 ALL STR Welding Final visual release blasting painting 20-Nov-15 22-Nov-15 10.30am CLOSED CANCEL 1 1
485 RAPID-P20A1-UEMB-All- STR-RFIN-00480 Gapura 20-Nov-15 ALL STR Welding Final visual release blasting painting 20-Nov-15 22-Nov-15 10.30am CLOSED CANCEL 1 1
486 RAPID-P20A1-UEMB-All- STR-RFIN-00481 Gapura 20-Nov-15 ALL STR Welding Final visual release blasting painting 20-Nov-15 22-Nov-15 10.30am CLOSED 16-Jan-16 57 ACCEPTED 1 1
UEMB QAQC
489 RAPID-P20A1-UEMB-All- CIV-RFIN-00484 KHAIRIL 25-Nov-15 ALL CIV Test Cube test at Holcim 25-Nov-15 27-Nov-15 11.00am CLOSED CANCEL 1 1
491 RAPID-P20A1-UEMB-All- CIV-RFIN-00486 coremanpower 26-Nov-15 ALL CIV Road Work Inspection for FDT test for subgrade at Roundabout 4 26-Nov-15 28-Nov-15 12.00pm CLOSED 26-Nov-15 0 ACCEPTED 1 1
492 RAPID-P20A1-UEMB-All- CIV-RFIN-00487 coremanpower 26-Nov-15 ALL CIV Road Work preparation of subgrade at roundabout 4, joint dipping 26-Nov-15 28-Nov-15 12.00pm CLOSED 14-Dec-15 18 ACCEPTED 1 1
493 RAPID-P20A1-UEMB-All- CIV-RFIN-00488 coremanpower 26-Nov-15 ALL CIV Road Work Inspection for FDT test for subbase at Roundabout 4 26-Nov-15 28-Nov-15 2.00pm CLOSED 26-Nov-15 0 ACCEPTED 1 1
494 RAPID-P20A1-UEMB-All- CIV-RFIN-00489 coremanpower 26-Nov-15 ALL CIV Road Work preparation of subbase at roundabout 4, joint dipping 26-Nov-15 28-Nov-15 2.00pm CLOSED 14-Dec-15 18 ACCEPTED 1 1
495 RAPID-P20A1-UEMB-All- CIV-RFIN-00490 coremanpower 26-Nov-15 ALL CIV Road Work Inspection for FDT test for Roadbase at Roundabout 4 26-Nov-15 28-Nov-15 4.00pm CLOSED 29-Jul-16 246 ACCEPTED 1 1
496 RAPID-P20A1-UEMB-All- CIV-RFIN-00491 coremanpower 26-Nov-15 ALL CIV Road Work preparation of Roadbase at roundabout 4, joint dipping 26-Nov-15 28-Nov-15 4.00pm CLOSED 14-Dec-15 18 ACCEPTED 1 1
497 RAPID-P20A1-UEMB-All-STR-RFIN-00492 AME ENG SDB BHD 26-Nov-15 ALL STR Structure Fit Up inspection for steel structure at Senai 28-Nov-15 30-Nov-15 10.00am CLOSED CANCEL 1 1
498 RAPID-P20A1-UEMB-All-STR-RFIN-00493 AME ENG SDB BHD 26-Nov-15 ALL STR Structure welding inspection for steel structre at senai 1-Dec-15 3-Dec-15 10.00am CLOSED CANCEL 1 1
499 RAPID-P20A1-UEMB-All-STR-RFIN-00494 AME ENG SDB BHD 26-Nov-15 ALL STR Structure Painting inspection for steel structure at senai 3-Dec-15 5-Dec-15 10.00am CLOSED CANCEL 1 1
500 RAPID-P20A1-UEMB-All-CIV-RFIN-00495 Amman Tech 26-Nov-15 ALL CIV Road Work Laying base course at rounabout 5 27-Nov-15 29-Nov-15 10.00am CLOSED CANCEL 1 1
issue 27/11
501 RAPID-P20A1-UEMB-All-CIV-RFIN-00496 Amman Tech 26-Nov-15 ALL CIV Road Work Tray test for prime coat at roundabout 5 26-Nov-15 28-Nov-15 10.00am CLOSED 1-Feb-16 67 ACCEPTED 1 1
issue 27/12
502 RAPID-P20A1-UEMB-All-STR-RFIN-00497 Gapura 21-Nov-15 ALL STR Material Material inspection record at Denamin 21-Nov-15 23-Nov-15 9.00am CLOSED 11-Dec-15 20 ACCEPTED 1 1
aimi receive
504 RAPID-P20A1-UEMB-All-ELE-RFIN-00499 AEIE 30-Nov-15 ALL ELE Material Receiving materialof 60nos(1set) Galvapole street lighting 30-Nov-15 2-Dec-15 11.00am CLOSED 30-Nov-15 0 ACCEPTED 1 1
505 RAPID-P20A1-UEMB-All-CIV-RFIN-00500 Amman Tech 30-Nov-15 ALL CIV Road Work FDT test for subgrade at Roundabout 2 30-Nov-15 2-Dec-15 10.00am CLOSED 30-Nov-15 0 ACCEPTED 1 1
507 RAPID-P20A1-UEMB-All-CIV-RFIN-00502 Amman Tech 30-Nov-15 ALL CIV Road Work FDT test for subbase at Roundabout 2 1-Dec-15 3-Dec-15 3.00pm CLOSED 1-Dec-15 0 ACCEPTED 1 1
511 RAPID-P20A1-UEMB-All-STR-RFIN-00506 Gapura 30-Nov-15 ALL STR Painting Painting reportTT2-10,TT2-1,TT1-6,TT2-6,TT2-3 30-Nov-15 2-Dec-15 11.00am CLOSED 11-Dec-15 11 ACCEPTED 1 1
512 RAPID-P20A1-UEMB-All-CIV-RFIN-00507 UEMB AIMI 30-Nov-15 ALL CIV testing Cube test at Holcim 30-Nov-15 2-Dec-15 4.00pm CLOSED CANCEL 1 1
518 RAPID-P20A1-UEMB-All-STR-RFIN-00513 Gapura 1-Dec-15 ALL STR Painting Final painting inspection & painting report:RT3a-1,r3b-1 1-Dec-15 3-Dec-15 10.00am CLOSED 11-Dec-15 10 ACCEPTED 1 1
Final painting inspection & painting reportR3A-6, R3B-6,R3A-
4,R3B-4,R3A-3,R3B-3,R3A-1,F1/2-4,RG-2,R1-10,R5-10,R1-
519 RAPID-P20A1-UEMB-All-STR-RFIN-00514 Gapura 1-Dec-15 ALL STR Painting 12,R5-10,R1-12,R5-12,BR-1,BR-2,BR-3,BR-4,BR-5,BR-6,BR-7,BR- 1-Dec-15 3-Dec-15 10.00am CLOSED 11-Dec-15 10 ACCEPTED 1 1
8,BR-9,BR-10,BR-11,BR-12,BR-13,BR-14,TT1-7,TT1-8,M2-3,M2-
4,M2-8,M2-10,M2-11
520 RAPID-P20A1-UEMB-All-ELE-RFIN-00515 Liwo 2-Dec-15 ALL ELE Testiing Testing report for Phase 1 compact substation 3-Dec-15 5-Dec-15 10.00am CLOSED 3-Dec-15 0 ACCEPTED 1 1
pada andrew
523 RAPID-P20A1-UEMB-All-CIV-RFIN-00518 Amman Tech 30-Nov-15 ALL CIV Roadwork Tray test for prime coat at roundabout 6 1-Dec-15 3-Dec-15 5.00pm CLOSED CANCEL 1 1
524 RAPID-P20A1-UEMB-All-CIV-RFIN-00519 Amman Tech 3-Dec-15 ALL CIV Roadwork laying base course atRoundabout 6 3-Dec-15 5-Dec-15 5.00pm CLOSED 1-Feb-16 60 ACCEPTED 1 1
525 RAPID-P20A1-UEMB-All-CIV-RFIN-00520 Amman Tech 3-Dec-15 ALL CIV Roadwork Tray test for roundabout 2 2-Dec-15 4-Dec-15 3.00pm CLOSED CANCEL 1 1
526 RAPID-P20A1-UEMB-All-CIV-RFIN-00521 Amman Tech 3-Dec-15 ALL CIV Roadwork laying ACBC atRoundabout 2 4-Dec-15 6-Dec-15 3.00pm CLOSED 1-Feb-16 59 ACCEPTED 1 1
527 RAPID-P20A1-UEMB-All-CIV-RFIN-00522 Amman Tech 3-Dec-15 ALL CIV Roadwork Joint survey as per work done at roundabout no 2 3-Dec-15 5-Dec-15 10.00am CLOSED 03-Dec-15 0 ACCEPTED 1 1
528 RAPID-P20A1-UEMB-All-CIV-RFIN-00523 Amman Tech 3-Dec-15 ALL CIV Roadwork Joint survey as per work done at roundabout no 6 3-Dec-15 5-Dec-15 10.00am CLOSED 03-Dec-15 0 ACCEPTED 1 1
529 RAPID-P20A1-UEMB-All-CIV-RFIN-00524 Amman Tech 3-Dec-15 ALL CIV Roadwork Joint survey as per work done at roundabout no 5 3-Dec-15 5-Dec-15 10.00am CLOSED 03-Dec-15 0 ACCEPTED 1 1
532 RAPID-P20A1-UEM-ALL-STR-RFIN-00527 AME ENG SDB BHD 7-Dec-15 ALL STR Painting painting inspection 8-Dec-15 10-Dec-15 2.00pm CLOSED CANCEL 1 1
535 RAPID-P20A1-UEM-ALL-CIV-RFIN-00530 coremanpower 8-Dec-15 ALL CIV Roadwork Inspection for FDT test for subgrade at roundabout 1 9-Dec-15 11-Dec-15 2.00pm CLOSED 9-Dec-15 0 ACCEPTED 1 1
537 RAPID-P20A1-UEM-ALL-CIV-RFIN-00532 coremanpower 8-Dec-15 ALL CIV Roadwork Inspection for FDT test for subbase at roundabout 1 9-Dec-15 11-Dec-15 2.00pm CLOSED 9-Dec-15 0 ACCEPTED 1 1
UEMB QAQC
538 RAPID-P20A1-UEM-ALL-CIV-RFIN-00533
KHAIRIL
1-Dec-15 ALL CIV testing Premix sample testing at Geolab, Taman Perling 2-Dec-15 4-Dec-15 9.00am CLOSED CANCEL 1 1
UEMB QAQC
539 RAPID-P20A1-UEM-ALL-CIV-RFIN-00534 KHAIRIL 3-Nov-15 ALL CIV testing CBR and Proctor test for subgrade (Soil) SR1,SR5,SR2 and SR9 3-Nov-15 5-Nov-15 9.00am CLOSED 18-Nov-15 15 ACCEPTED 1 1
540 RAPID-P20A1-UEM-ALL-CIV-RFIN-00535 UEMB AIMI 9-Dec-15 ALL CIV testing Cube test at Holcim 9-Dec-15 11-Dec-15 9.00am CLOSED CANCEL 1 1
542 RAPID-P20A1-UEM-ALL-PIP-RFIN-00537 Instant option 9-Dec-15 ALL PIP Testing Flow test for hose reel in fire water hydrent at SR7, SR8,SR6 10-Dec-15 12-Dec-15 10.00am CLOSED 24-Jan-16 45 ACCEPTED 1 1
543 RAPID-P20A1-UEM-ALL-ELE-RFIN-00538 AEIE 10-Dec-15 ALL ELE Material Inspection of material receiving of Earth chamber (SAG EC-2) 11-Dec-15 13-Dec-15 9.00am CLOSED 21-Dec-15 10 ACCEPTED 1 1
Inspection of material receiving of street lighting pole
544 RAPID-P20A1-UEM-ALL-ELE-RFIN-00539 AEIE 10-Dec-15 ALL ELE Material 70nos(1set) 12-Dec-15 14-Dec-15 2.00pm CLOSED 21-Dec-15 9 ACCEPTED 1 1
Flushing for HDPE fire water pipe line at SR1, SR5, SR6, SR7,
545 RAPID-P20A1-UEM-ALL-PIP-RFIN-00540 instant Option 11-Dec-15 ALL PIP Testing 12-Dec-15 14-Dec-15 11.00am CLOSED 24-Jan-16 43 ACCEPTED 1 1
SR8 phase 2
547 RAPID-P20A1-UEM-ALL-PIP-RFIN-00542 instant Option 11-Dec-15 ALL PIP Testing Flushing for HDPE sewerage water pipe at SR6, Sr7 SR8 phase 2 12-Dec-15 14-Dec-15 11.00am CLOSED 24-Jan-16 43 ACCEPTED 1 1
551 RAPID-P20A1-UEM-ALL-STR-RFIN-00546 HIKMAH Oil & GAS 7-Dec-15 ALL STR Material Blasting & painting inspection open air cinema bulding 8-Dec-15 10-Dec-15 4.00pm CLOSED 22-Jul-16 227 CANCEL 1 1
552 RAPID-P20A1-UEM-ALL-STR-RFIN-00547 HIKMAH Oil & GAS 8-Dec-15 ALL STR Material Final inspection open aie cinema building before delivery 9-Dec-15 11-Dec-15 10.00am CLOSED 22-Jul-16 226 CANCEL 1 1
554 RAPID-P20A1-UEM-ALL-CIV-RFIN-00549 UEMB AIMI 17-Dec-15 ALL CIV Testing Cube test at Holcim 17-Dec-15 19-Dec-15 4.00pm CLOSED CANCEL 1 1
558 RAPID-P20A1-UEM-ALL-STR-00553 AME ENG SDB BHD 17-Dec-15 ALL STR Welding 22-Dec-15 24-Dec-15 10.00am CLOSED CANCEL 1 1
Fit up inspection for steel structure open air cinema 4
559 RAPID-P20A1-UEM-ALL-STR-00554 AME ENG SDB BHD 17-Dec-15 ALL STR Welding Welding inspection for Open air cinema 4 22-Dec-15 24-Dec-15 10.00am CLOSED CANCEL 1 1
561 RAPID-P20A1-UEM-ALL-STR-00556 AME ENG SDB BHD 17-Dec-15 ALL STR Painting Painting inspection for Open Air Cinema 4 30-Dec-15 1-Jan-16 10.00am CLOSED CANCEL 1 1
562 RAPID-P20A1-UEM-ALL-STR-00557 AME ENG SDB BHD 11-Dec-15 ALL STR Painting 14-Dec-15 16-Dec-15 2.00pm CLOSED CANCEL 1 1
Blasting painting inspection open air cinema 4
564 RAPID-P20A1-UEM-ALL-CIV-00559 coremanpower 8-Dec-15 ALL CIV Roadwork Inspection for FDT test for Roadbase at Roundabout 1 8-Dec-15 10-Dec-15 4.30pm CLOSED 29-Jul-16 234 ACCEPTED 1 1
567 RAPID-P20A1-UEM-ALL-ELE-00562 Opensis 18-Dec-15 ALL ELE Material Access Card system (ACS) Badge creation workstation 19-Dec-15 21-Dec-15 2.00pm CLOSED 9-Jan-16 21 ACCEPTED 1 1
579 RAPID-P20A1-UEM-ALL-STR-00574 AME ENG SDB BHD 2-Jan-16 ALL STR Survey Vertically inspection on Open air cinema 2 3-Jan-16 5-Jan-16 10.00am CLOSED 3-Jan-16 0 CANCEL 1 1
583 RAPID-P20A1-UEM-ALL-CIV-00578 LIAN FATT 4-Jan-16 all CIV Survey As built drawings SR3,SR8,SR8 phase 2, SR2 and SR1 phase 1 5-Jan-16 7-Jan-16 10.00am CLOSED CANCEL 1 1
584 RAPID-P20A1-UEM-ALL-CIV-00579 UEMB AIMI 4-Jan-16 all CIV testing Cube test at Holcim 4-Jan-16 6-Jan-16 4.30pm CLOSED CANCEL 1 1
588 RAPID-P20A1-UEM-ALL-STR-00583 seribu bio 7-Jan-16 aLL STR Material Positive material inspection at LVA Brothers, Sg. Rengit 8-Jan-16 10-Jan-16 11.00am CLOSED CANCEL 1 1
Sluice valve and non return valve set installation for sewerage
596 RAPID-P20A1-UEM-ALL-PIP-00591 Instant option 8-Jan-16 ALL PIP Installation water and fire water pipe line at SR1,SR5,SR6,SR7, and SR8 10-Jan-16 12-Jan-16 9.00am CLOSED 24-Jan-16 14 ACCEPTED 1 1
phase 2
600 RAPID-P20A1-UEM-ALL-ELE-00595 Opensis 18-Dec-15 ALL ELE access control system Access conctrol system (ACS) server CLOSED CANCEL 1 1
607 RAPID-P20A1-UEM-ALL-STR-00602 HIKMAH Oil & GAS 12-Jan-16 ALL STR Material Inspection deliver material at site to check and verify 12-Jan-16 14-Jan-16 5.00pm CLOSED 18-Aug-16 219 ACCEPTED 1 1
structural (fabrication) base on delivery order
608 RAPID-P20A1-UEM-ALL-CIV-00603 UEMB AIMI 12-Jan-16 ALL CIV testing Cube test at Holcim 12-Jan-16 14-Jan-16 4.00pm CLOSED CANCEL 1 1
625 RAPID-P20A1-UEM-ALL-ELE-00620 AEIE 16-Jan-16 ALL ELE Material Receiving material 70W lantern(30nos) 19-Jan-16 21-Jan-16 12.00pm CLOSED 19-Jan-16 0 ACCEPTED 1 1
2units of mototrbo Xir p8600 UHF Non I.S.C (Non GPS) Non
display standard package includes, main transceiver, Lion
637 RAPID-P20A1-UEM-ALL-ELE-00632 UEMB Azizi 21-Jan-16 ALL ELE equipment 22-Jan-16 24-Jan-16 3.10pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
battery, IMPRES Rapid Charger, Spring Belt Clip standard whip
antenna and user manual at Uemb site office
Earth resistance test for phase 2 compact substation at
638 RAPID-P20A1-UEM-ALL-ELE-00633 LIWO 26-Jan-16 ALL ELE earth resistance test 26-Jan-16 28-Jan-16 2.00pm CLOSED 29-Jan-16 3 ACCEPTED 1 1
SR1,SR2,SR5,SR6,SR7,SR8
640 RAPID-P20A1-UEM-ALL-ELE-00635 LIWO 28-Jan-16 ALL ELE Material Receiving inspection for compact substation , 6nos at2MVA 28-Jan-16 30-Jan-16 2.00pm CLOSED 29-Jan-16 1 ACCEPTED 1 1
642 RAPID-P20A1-UEM-ALL-ELE-00637 AME Eng sdn bhd 27-Jan-16 ZN1 STR MPI TESTING WITNESS NOT (MPI) INSPECTION FOR OPEN AIR CINEMA 1 29-Jan-16 31-Jan-16 10.30Am CLOSED CANCEL 1 1
644 RAPID-P20A1-UEM-ALL-ELE-00639 LIWO 1-Feb-16 ALL ELE testing phase 2 compact substation test report 1-Feb-16 3-Feb-16 2.00pm CLOSED 1-Feb-16 0 ACCEPTED 1 1
645 RAPID-P20A1-UEM-ALL-ARC-00640 Gapura 2-Feb-16 ALL ARC Fencing Material delivery inspection for fencing EPR4,EPR5 and EPR6 2-Feb-16 4-Feb-16 2.00pm CLOSED 2-Feb-16 0 ACCEPTED 1 1
650 RAPID-P20A1-UEM-ALL-ELE-00645 Opensis 10-Feb-16 ALL ELE access card system Access card (Blank Mifare card) 15000pcs at Teluk Ramunia 11-Feb-16 13-Feb-16 6.00pm CLOSED 16-Feb-16 5 ACCEPTED 1 1
651 RAPID-P20A1-UEM-ALL-ELE-00646 Opensis 10-Feb-16 ALL ELE access card system Access card (Blank Mifare card) 5000pcs at Teluk Ramunia 11-Feb-16 13-Feb-16 6.00pm CLOSED 16-Feb-16 5 ACCEPTED 1 1
652 RAPID-P20A1-UEM-ALL-STR-00647 AME ENG 5-Feb-16 ALL STR Survey Vertically inspection on Open air cinema 4 6-Feb-16 8-Feb-16 9.30am CLOSED 28-Jul-16 173 CANCEL 1 1
653 RAPID-P20A1-UEMB-ALL-STR-00648 AME ENG 5-Feb-16 ALL STR Material Material receiving inspection at site Open air cinema 1 6-Feb-16 8-Feb-16 1.00pm CLOSED 20-May-16 104 ACCEPTED 1 1
654 RAPID-P20A1-UEM-ALL-STR-00649 Gapura 5-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/014 6-Jan-16 8-Jan-16 3.00pm CLOSED 18-Feb-16 43 ACCEPTED 1 1
655 RAPID-P20A1-UEM-ALL-STR-00650 Gapura 5-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/015 6-Jan-16 8-Jan-16 3.00pm CLOSED 18-Feb-16 43 ACCEPTED 1 1
656 RAPID-P20A1-UEM-ALL-STR-00651 Gapura 6-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/016 7-Jan-16 9-Jan-16 3.00pm CLOSED 18-Feb-16 42 ACCEPTED 1 1
657 RAPID-P20A1-UEM-ALL-STR-00652 Gapura 7-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/017 8-Jan-16 10-Jan-16 3.00pm CLOSED 18-Feb-16 41 ACCEPTED 1 1
658 RAPID-P20A1-UEM-ALL-STR-00653 Gapura 8-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/018 9-Jan-16 11-Jan-16 3.00pm CLOSED 18-Feb-16 40 ACCEPTED 1 1
659 RAPID-P20A1-UEM-ALL-STR-00654 Gapura 11-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/019 12-Jan-16 14-Jan-16 3.00pm CLOSED 18-Feb-16 37 ACCEPTED 1 1
660 RAPID-P20A1-UEM-ALL-STR-00655 Gapura 11-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/020 12-Jan-16 14-Jan-16 3.00pm CLOSED 18-Feb-16 37 ACCEPTED 1 1
661 RAPID-P20A1-UEM-ALL-STR-00656 Gapura 13-Jan-16 ALL STR Material material receiving on site (D/O: 2016-0007) 14-Jan-16 16-Jan-16 3.00pm CLOSED 18-Feb-16 35 ACCEPTED 1 1
662 RAPID-P20A1-UEM-ALL-STR-00657 Gapura 14-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/021 15-Jan-16 17-Jan-16 3.00pm CLOSED 18-Feb-16 34 ACCEPTED 1 1
663 RAPID-P20A1-UEM-ALL-STR-00658 Gapura 15-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/022 16-Jan-16 18-Jan-16 3.00pm CLOSED 18-Jan-16 2 ACCEPTED 1 1
664 RAPID-P20A1-UEM-ALL-STR-00659 Gapura 18-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/023 19-Jan-16 21-Jan-16 3.00pm CLOSED 18-Feb-16 30 ACCEPTED 1 1
665 RAPID-P20A1-UEM-ALL-STR-00660 Gapura 19-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/024 20-Jan-16 22-Jan-16 3.00pm CLOSED 18-Feb-16 29 ACCEPTED 1 1
666 RAPID-P20A1-UEM-ALL-STR-00661 Gapura 20-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/025 21-Jan-16 23-Jan-16 3.00pm CLOSED 18-Feb-16 28 ACCEPTED 1 1
667 RAPID-P20A1-UEM-ALL-STR-00662 Gapura 26-Jan-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/026 27-Jan-16 29-Jan-16 3.00pm CLOSED 18-Feb-16 22 ACCEPTED 1 1
668 RAPID-P20A1-UEM-ALL-STR-00663 Gapura 2-Feb-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/027 3-Feb-16 5-Feb-16 3.00pm CLOSED 18-Feb-16 15 ACCEPTED 1 1
669 RAPID-P20A1-UEM-ALL-STR-00664 Gapura 11-Feb-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/028 12-Feb-16 14-Feb-16 3.00pm CLOSED 18-Feb-16 6 ACCEPTED 1 1
670 RAPID-P20A1-UEM-ALL-STR-00665 AME Eng sdn bhd 12-Feb-16 ALL STR Material mir Inspection for multipurpose court project 16-Feb-16 18-Feb-16 10.30Am CLOSED CANCEL 1 1
672 RAPID-P20A1-UEM-ALL-STR-00667 Gapura 15-Feb-16 ALL STR Material material receiving on site (D/O: DMSB/DO/GP/029 18-Feb-16 20-Feb-16 3.00pm CLOSED 18-Feb-16 0 ACCEPTED 1 1
673 RAPID-P20A1-UEMB-ALL-STR-00668 AME ENG SDN BHD 20-Feb-16 ALL STR Material Material erection inspection at site Open ari cinema 1 22-Feb-16 24-Feb-16 9.00am CLOSED 20-May-16 88 ACCEPTED 1 1
674 RAPID-P20A1-UEMB-ALL-STR-00669 AME ENG SDN BHD 20-Feb-16 ALL STR Material Material erection inspection at site Open ari cinema 2 22-Feb-16 24-Feb-16 9.30am CLOSED 20-May-16 88 ACCEPTED 1 1
675 RAPID-P20A1-UEMB-ALL-STR-00670 AME ENG SDN BHD 20-Feb-16 ALL STR Material Material erection inspection at site Open ari cinema 4 22-Feb-16 24-Feb-16 10.00am CLOSED 20-May-16 88 ACCEPTED 1 1
676 RAPID-P20A1-UEMB-ALL-STR-00671 AME ENG SDN BHD 18-Feb-16 ALL STR Material Material receiving inspection at site Open ari cinema 1 19-Feb-16 21-Feb-16 10.30am CLOSED 20-May-16 91 ACCEPTED 1 1
677 RAPID-P20A1-UEMB-ALL-STR-00672 AME ENG SDN BHD 19-Feb-16 ALL STR Material Final sample inspection at site Open air cinema 4-punchlist 22-Feb-16 24-Feb-16 2.00pm CLOSED 20-May-16 88 ACCEPTED 1 1
678 RAPID-P20A1-UEMB-ALL-STR-00673 AME ENG SDN BHD 20-Feb-16 ALL STR Material Final inspection on painting at site Open air cinema 4 22-Feb-16 24-Feb-16 10.00am CLOSED 20-May-16 88 ACCEPTED 1 1
Final visual inspection for roof and RWDP 1,2,3,4,5,6 and wall
679 RAPID-P20A1-UEM-ALL-STR-00674 AME ENG SDN BHD 20-Feb-16 ALL STR Material 22-Feb-16 24-Feb-16 10.30Am CLOSED 16-Mar-16 23 ACCEPTED 1 1
cladding installation at Open air cinema 4
680 RAPID-P20A1-UEM-ALL-CIV-00675 UEMB ASWAD 24-Feb-16 ALL CIV Drainage work inspection of capping beam(final) 24-Feb-16 26-Feb-16 3.00pm CLOSED 9-Apr-16 45 ACCEPTED 1 1
681 RAPID-P20A1-UEM-ALL-ELE-00676 PSJV 15-Feb-16 ALL ELE Jointing works Repair cable fault for LooP 15 at SR2/SR7 16-Feb-16 18-Feb-16 5.00pm CLOSED 24-Feb-16 8 ACCEPTED 1 1
Inspection of receiving material street pole 8meters 21 pole
682 RAPID-P20A1-UEM-ALL-ELE-00677 AEIE 27-Feb-16 ALL ELE Material 28-Feb-16 1-Mar-16 2.00pm CLOSED 29-Feb-16 1 1 1
C/W concrete footing 70nos
684 RAPID-P20A1-UEM-ALL-ELE-00679 AEIE 27-Feb-16 ALL ELE Material Inspection material receiving of earth chamber SAG FM) 27-Feb-16 29-Feb-16 2.00pm CLOSED 29-Feb-16 2 ACCEPTED 1 1
685 RAPID-P20A1-UEM-ALL-ELE-00680 AEIE 27-Feb-16 ALL ELE Material Inspection material receiving of cable trunking/cable tray 27-Feb-16 29-Feb-16 2.00pm CLOSED 29-Feb-16 2 ACCEPTED 1 1
688 RAPID-P20A1-UEM-ALL-CIV-00683 Yuzuki 29-Feb-16 ALL CIV Fencing Install chainlink, barbed wire and straining wire at location 1-Mar-16 3-Mar-16 11.00am CLOSED 24-Mar-16 23 ACCEPTED 1 1
i) LP 11 SSM/3
ii)LP 11 SSM/2
iii) LP 11 SSM/1
Install boom gate & loo[ detector, and install Goose neck at
697 RAPID-P20A1-UEM-ALL-ELE-00692 flexi team 28-Mar-16 ALL ELE Booms gate & turntile entrance SR3, and entrance of Small package (ZN2) & Common 30-Mar-16 1-Apr-16 11.30am CLOSED 22-Apr-16 23 ACCEPTED 1 1
building (ZN3)
700 RAPID-P20A1-UEM-ALL-CIV-00695 Instant option 28-Mar-16 ALL CIV Installation Installation of M.S grating at SR6,4,2,7,5 28-Mar-16 30-Mar-16 4.00pm CLOSED CANCEL 1 1
no need to
UEMB RIDWAN
701 RAPID-P20A1-UEM-ALL-ELE-00696 6-Apr-16 ALL ELE Punchlist Inspection for punchlist at F8-S5,part of SR1,SR2,SR7 & SR8 6-Apr-16 8-Apr-16 4.00pm CLOSED 20-May-16 44 CANCEL submit RFIN for 1 1
RATAG punchlist
no need to
UEMB RIDWAN
702 RAPID-P20A1-UEM-ALL-ELE-00697 RATAG 6-Apr-16 ALL ELE Punchlist Inspectionfor punchlist at F8-S4,part of SR1,SR2,SR5,SR6 & SR7 6-Apr-16 8-Apr-16 4.00pm CLOSED 20-May-16 44 CANCEL submit RFIN for 1 1
punchlist
710 RAPID-P20A1-UEM-ALL-PIP-00705 Instant option 15-Apr-16 ALL PIP Installation Fire hydrant assembly installation at SR2,3,4,5,6,7,8 phase 1 16-Apr-16 18-Apr-16 3.00pm CLOSED 27-Apr-16 11 ACCEPTED 1 1
719 RAPID-P20A1-UEM-ALL-LNDS-00714 Hasbullah landscape 10-May-16 ALL LNDS Material Site preparation and planting work at Bus station area 11-May-16 13-May-16 11.00am CLOSED 23-May-16 12 ACCEPTED 1 1
720 RAPID-P20A1-UEM-ALL-LNDS-00715 Hasbullah landscape 10-May-16 ALL LNDS Material Supply trees for Bus station area 11-May-16 13-May-16 11.00am CLOSED 23-May-16 12 ACCEPTED 1 1
728 RAPID-P20A1-UEM-ALL-ELE-00723 Opensis 6-Jun-16 ALL ELE Material Blank Mifare Card (15 000PCS) 10-Jun-16 12-Jun-16 11.00AM CLOSED 10-Jun-16 0 ACCEPTED 1 1
729 RAPID-P20A1-UEM-ALL-ELE-00724 Opensis 6-Jun-16 ALL ELE Material Blank Mifare Card (14 000PCS) 10-Jun-16 12-Jun-16 11.00AM CLOSED 10-Jun-16 0 ACCEPTED 1 1
730 RAPID-P20A1-UEM-ALL-LND-00725 Ming Landscape 10-Jun-16 ALL LND Site measurement Supply shrub for along main road (Roundabout) 11-Jun-16 13-Jun-16 11.00AM CLOSED 16-Jul-16 35 ACCEPTED 1 1
731 RAPID-P20A1-UEM-ALL-ELE-00726 Opensis 16-Jun-16 ALL ELE Material Blank Mifare Card (12 000PCS) 17-Jun-16 19-Jun-16 10.00am CLOSED 10-Aug-16 54 ACCEPTED 1 1
732 RAPID-P20A1-UEM-ALL-ELE-00727 afiintra tech 19-Apr-16 ALL ELE installation testing and commissioning of printer and scanner 20-Jun-16 22-Jun-16 10.00am CLOSED 20-Apr-16 -61 ACCEPTED 1 1
735 RAPID-P20A1-UEM-ALL-ELE-00730 afiintra tech 20-Jun-16 ALL ELE installation tnc AP Aruba Wireless at Admin 2 and CSB 20-Jun-16 22-Jun-16 10.00am CLOSED 20-Jun-16 0 ACCEPTED 1 1
736 RAPID-P20A1-UEM-ALL-ELE-00731 afiintra tech 20-Jun-16 ALL ELE installation installation of CCTV system at Gate 1 20-Jun-16 22-Jun-16 10.00am CLOSED 5-Aug-16 46 ACCEPTED 1 1
737 RAPID-P20A1-UEM-ALL-ELE-00732 afiintra tech 20-Jun-16 ALL ELE installation installation of CCTV system at Gate 2 20-Jun-16 22-Jun-16 10.00am CLOSED 5-Aug-16 46 ACCEPTED 1 1
738 RAPID-P20A1-UEM-ALL-ELE-00733 afiintra tech 20-Jun-16 ALL ELE installation installation of CCTV system at Gate 3 20-Jun-16 22-Jun-16 10.00am CLOSED 5-Aug-16 46 ACCEPTED 1 1
739 RAPID-P20A1-UEM-ALL-ELE-00734 afiintra tech 20-Jun-16 ALL ELE testing testing and commisioning of CCTV system at Gate 1 20-Jun-16 22-Jun-16 10.00am CLOSED 12-Oct-16 114 ACCEPTED 1 1
740 RAPID-P20A1-UEM-ALL-ELE-00735 afiintra tech 20-Jun-16 ALL ELE testing testing and commisioning of CCTV system at Gate 2 20-Jun-16 22-Jun-16 10.00am CLOSED 12-Oct-16 114 ACCEPTED 1 1
741 RAPID-P20A1-UEM-ALL-ELE-00736 afiintra tech 20-Jun-16 ALL ELE installation installation of AP Aruba wireless 20-Jun-16 22-Jun-16 10.00am CLOSED 20-Jun-16 0 ACCEPTED 1 1
743 RAPID-P20A1-UEM-ALL-CIV-00738 khairil 12-May-15 ALL CIV testing sieve analysis for subbase and roadbase from UEMB stockpile 5-Dec-15 7-Dec-15 10.00am CLOSED CANCEL 1 1
748 RAPID-P20A1-UEM-ALL-ELE-00743 Opensis 30-Jun-16 ALL ELE Material Blank Mifare Card (14 000PCS) 30-Jun-16 2-Jul-16 10.00am CLOSED 10-Aug-16 41 ACCEPTED 1 1
754 RAPID-P20A1-UEM-ALL-ELE-00749 AEIE 18-Jul-16 ALL ELE equipment inspection of received coarse sand 18-Jul-16 20-Jul-16 10.00am CLOSED CANCEL 1 1
759 RAPID-P20A1-UEM-ALL-ELE-00754 Opensis 20-Jul-16 ALL ELE Material Blank Mifare Card (20000 pcs) 22-Jul-16 24-Jul-16 2.00pm CLOSED 3-Aug-16 12 ACCEPTED 1 1
762 RAPID-P20A1-UEM-ALL-CIV-00757 Instant option 25-Jul-16 ALL CIV Material Inspection of GI Pipe bracket at TCC 25-Jul-16 27-Jul-16 10.00am CLOSED CANCEL 1 1
764 RAPID-P20A1-UEM-ALL-ELE-00759 afiintra tech 14-Jul-16 ALL ELE Material installation of CCTV Camera System at Small Packages Area 14-Jul-16 16-Jul-16 10.00am CLOSED 5-Aug-16 22 ACCEPTED 1 1
767 RAPID-P20A1-UEMB-ALL-ELE-00762 afiintra tech 22-Jun-16 ALL ELE Material installation of CCTV Camera System at PTZ TAC Areas 22-Jun-16 24-Jun-16 10.00am CLOSED 5-Aug-16 44 ACCEPTED 1 1
768 RAPID-P20A1-UEMB-ALL-ELE-00763 afiintra tech 1-Jul-16 ALL ELE Material installation of CCTV Camera System at Common Building Areas 1-Jul-16 3-Jul-16 10.00am CLOSED 5-Aug-16 35 ACCEPTED 1 1
772 RAPID-P20A1-UEMB-ALL-ELE-00767 ACME Bestari 2-Aug-16 ALL ELE Installation Joint Inspection for RFIN Installation as per attached documents 2-Aug-16 4-Aug-16 10.00am CLOSED CANCEL 1 1
774 RAPID-P20A1-UEMB-ALL-ELE-00769 ACME Bestari 2-Aug-16 ALL ELE Installation Joint Inspection for RFIN Installation as per attached documents 3-Aug-16 5-Aug-16 3.30pm CLOSED CANCEL 1 1
777 RAPID-P20A1-UEMB-ALL-ELE-00772 ACME Bestari 11-Aug-16 ALL ELE Material Delivery of APC 5VA Smart URS - as per delivery order 11-Aug-16 13-Aug-16 5.00pm CLOSED 13-Aug-16 2 ACCEPTED 1 1
785 RAPID-P20A1-UEMB-ALL-ELE-00780 afiintra tech 15-Aug-16 ALL ELE testing testing and commisioning of CCTV system at PTZ TAC areas 18-Jun-16 20-Jun-16 10.00am CLOSED 12-Oct-16 116 ACCEPTED 1 1
787 RAPID-P20A1-UEMB-ALL-ELE-00782 AEIE 16-Aug-16 ALL ELE Installation installation of metering pad at Sebong tower 18-Jun-16 20-Jun-16 10.00am CLOSED 19-Aug-16 62 ACCEPTED 1 1
790 RAPID-P20A1-UEMB-ALL-ELE-00785 AEIE 16-Aug-16 ALL ELE functionality test functionality test for area lighting bus stop 3,4 FP HM 2 18-Jun-16 20-Jun-16 10.00am CLOSED 19-Aug-16 62 ACCEPTED 1 1
792 RAPID-P20A1-UEMB-ALL-ELE-00787 AEIE 16-Aug-16 ALL ELE functionality test functionality test for area lighting and street lighting from FP S5 18-Jun-16 20-Jun-16 10.00am CLOSED 19-Aug-16 62 ACCEPTED 1 1
793 RAPID-P20A1-UEMB-ALL-ELE-00788 AEIE 16-Aug-16 ALL ELE functionality test functionality test for area lighting and street lighting from FP S3 18-Jun-16 20-Jun-16 10.00am CLOSED 19-Aug-16 62 ACCEPTED 1 1
801 RAPID-P20A1-UEMB-ALL-MNE-00796 Shrinyo 15-Aug-16 ALL MNE installation AC Installation inspection at Cabin turnstile No 1 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
802 RAPID-P20A1-UEMB-ALL-MNE-00797 Shrinyo 15-Aug-16 ALL MNE testing AC funtional testing at Authority building at Cabin turnstile No 1 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
803 RAPID-P20A1-UEMB-ALL-MNE-00798 Shrinyo 15-Aug-16 ALL MNE installation wall mounted fan Installation inspection at Cabin turnstile No 1 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
805 RAPID-P20A1-UEMB-ALL-MNE-00800 Shrinyo 15-Aug-16 ALL MNE installation AC Installation inspection at Cabin turnstile No 2 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
806 RAPID-P20A1-UEMB-ALL-MNE-00801 Shrinyo 15-Aug-16 ALL MNE testing AC funtional testing at Authority building at Cabin turnstile No 2 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
807 RAPID-P20A1-UEMB-ALL-MNE-00802 Shrinyo 15-Aug-16 ALL MNE installation wall mounted fan Installation inspection at Cabin turnstile No 2 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
809 RAPID-P20A1-UEMB-ALL-MNE-00804 Shrinyo 15-Aug-16 ALL MNE installation AC Installation inspection at Cabin turnstile No 4 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
810 RAPID-P20A1-UEMB-ALL-MNE-00805 Shrinyo 15-Aug-16 ALL MNE testing AC funtional testing at Authority building at Cabin turnstile No 4 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
811 RAPID-P20A1-UEMB-ALL-MNE-00806 Shrinyo 15-Aug-16 ALL MNE installation wall mounted fan Installation inspection at Cabin turnstile No 4 16-Aug-16 18-Aug-16 9.30am CLOSED 17-Aug-16 1 ACCEPTED 1 1
821 RAPID-P20A1-UEMB-ALL-ELE-00816 Opensis 24-Aug-16 ALL ELE material blank mifare card (10,00pcs) at Central Security Building 24-Aug-16 26-Aug-16 4.00pm CLOSED 23-Sep-16 30 ACCEPTED 1 1
822 RAPID-P20A1-UEMB-ALL-ELE-00817 Opensis 24-Aug-16 ALL ELE material ACS workstation (BQ item 1570.03.9) 24-Aug-16 26-Aug-16 4.00pm CLOSED 23-Sep-16 30 ACCEPTED 1 1
826 RAPID-P20A1-UEMB-ALL-ELE-00821 AEIE 29-Aug-16 ALL ELE lux test lux test for road lighting at Bus stop 30-Aug-16 1-Sep-16 4.00pm CLOSED 30-Aug-16 0 ACCEPTED 1 1
827 RAPID-P20A1-UEMB-ALL-ELE-00822 AEIE 29-Aug-16 ALL ELE lux test lux test at road lighting at SR 4 and SR 7 30-Aug-16 1-Sep-16 4.00pm CLOSED 30-Aug-16 0 ACCEPTED 1 1
828 RAPID-P20A1-UEMB-ALL-ELE-00823 AEIE 29-Aug-16 ALL ELE lux test lux test for car park at CSS 30-Aug-16 1-Sep-16 4.00pm CLOSED 30-Aug-16 0 ACCEPTED 1 1
inspection of cable laying for CCTV PT2 at TAC Area Fibre optic
829 RAPID-P20A1-UEMB-ALL-ELE-00824 iszda 25-Aug-16 ALL ELE cable laying 4 Core Cable 27-Aug-16 29-Aug-16 2.00pm CLOSED 28-Aug-16 1 ACCEPTED 1 1
inspection of cable laying 8 core fibre optic cable for CCTV and
830 RAPID-P20A1-UEMB-ALL-ELE-00825 iszda 15-Jul-16 ALL ELE cable laying internal rapid network 16-Jul-16 18-Jul-16 2.00pm CLOSED 28-Aug-16 43 ACCEPTED 1 1
inspection of cable laying 4 core fibre optic cable for CCTV and
832 RAPID-P20A1-UEMB-ALL-ELE-00827 iszda 21-Jul-16 ALL ELE cable laying 22-Jul-16 24-Jul-16 2.00pm CLOSED 28-Aug-16 37 ACCEPTED 1 1
internal rapid network
836 RAPID-P20A1-UEMB-ALL-ELE-00831 ACME Bestari 24-Aug-16 ALL ELE preconcrete joint inspection for general alarm system stump as per attached 25-Aug-16 27-Aug-16 2.00pm CLOSED 28-Aug-16 3 ACCEPTED 1 1
837 RAPID-P20A1-UEMB-ALL-ELE-00832 AEIE 3-Oct-16 ALL ELE equipment Inspection of received diesel generator set (3 unit) 4-Oct-16 6-Oct-16 8.00am CLOSED 10-Nov-16 37 ACCEPTED 1 1
838 RAPID-P20A1-UEMB-ALL-ELE-00833 AEIE 3-Oct-16 ALL ELE equipment Inspection of received diesel generator set (3 unit) 4-Oct-16 6-Oct-16 8.00am CLOSED 10-Nov-16 37 ACCEPTED 1 1
839 RAPID-P20A1-UEMB-ALL-ELE-00834 AEIE 3-Oct-16 ALL ELE Installation installation 2 generator et at GA4 (Siren 4) 4-Oct-16 6-Oct-16 8.00am CLOSED 10-Nov-16 37 ACCEPTED 1 1
840 RAPID-P20A1-UEMB-ALL-ELE-00835 AEIE 3-Oct-16 ALL ELE Installation installation 2 generator et at GA3 (Siren 3) 4-Oct-16 6-Oct-16 8.00am CLOSED 10-Nov-16 37 ACCEPTED 1 1
841 RAPID-P20A1-UEMB-ALL-ELE-00836 AEIE 3-Oct-16 ALL ELE Installation installation 2 generator et at GA2 (Siren 2) 4-Oct-16 6-Oct-16 8.00am CLOSED 10-Nov-16 37 ACCEPTED 1 1
845 RAPID-P20A1-UEMB-ALL-ELE-00840 AEIE 3-Oct-16 ALL ELE Installation Installation change over box at GA 4 (Siren 4) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
846 RAPID-P20A1-UEMB-ALL-ELE-00841 AEIE 3-Oct-16 ALL ELE Installation Installation change over box at GA 3 (Siren 3) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
847 RAPID-P20A1-UEMB-ALL-ELE-00842 AEIE 3-Oct-16 ALL ELE Installation Installation change over box at GA 2 (Siren 2) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
851 RAPID-P20A1-UEMB-ALL-ELE-00846 AEIE 3-Oct-16 ALL ELE Installation Earthing installation for change over at GA2 (Siren 2) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
852 RAPID-P20A1-UEMB-ALL-ELE-00847 AEIE 3-Oct-16 ALL ELE Installation Earthing installation for change over at GA3 (Siren 3) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
853 RAPID-P20A1-UEMB-ALL-ELE-00848 AEIE 3-Oct-16 ALL ELE Installation Earthing installation for change over at GA4 (Siren 4) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
854 RAPID-P20A1-UEMB-ALL-ELE-00849 AEIE 3-Oct-16 ALL ELE Installation Earthing installation for 2 generator set at GA4 (Siren 4) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
855 RAPID-P20A1-UEMB-ALL-ELE-00850 AEIE 3-Oct-16 ALL ELE Installation Earthing installation for 2 generator set at GA3 (Siren 3) 4-Oct-16 6-Oct-16 10.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
856 RAPID-P20A1-UEMB-ALL-ELE-00851 AEIE 3-Oct-16 ALL ELE Installation Earthing installation for 2 generator set at GA2 (Siren 2) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
857 RAPID-P20A1-UEMB-ALL-ELE-00852 AEIE 3-Oct-16 ALL ELE testing Earthing test for change over at GA4 (Siren 4) 4-Oct-16 6-Oct-16 9.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
858 RAPID-P20A1-UEMB-ALL-ELE-00853 AEIE 3-Oct-16 ALL ELE testing Earthing test for change over at GA3 (Siren 3) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
859 RAPID-P20A1-UEMB-ALL-ELE-00854 AEIE 3-Oct-16 ALL ELE testing Earthing test for change over at GA2 (Siren 2) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
860 RAPID-P20A1-UEMB-ALL-ELE-00855 AEIE 3-Oct-16 ALL ELE testing Earthing test for 2 generator set r at GA4 (Siren 4) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
861 RAPID-P20A1-UEMB-ALL-ELE-00856 AEIE 3-Oct-16 ALL ELE testing Earthing test for 2 generator set r at GA3 (Siren 3) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
862 RAPID-P20A1-UEMB-ALL-ELE-00857 AEIE 3-Oct-16 ALL ELE testing Earthing test for 2 generator set r at GA2 (Siren 2) 4-Oct-16 6-Oct-16 11.00am CLOSED 11-Nov-16 38 ACCEPTED 1 1
867 RAPID-P20A1-UEMB-ALL-ELE-00862 afiintra tech 6-Oct-16 ALL MNE testing Commisioning CCTV 7-Oct-16 9-Oct-16 11.00am CLOSED 12-Oct-16 5 ACCEPTED 1 1
875 RAPID-P20A1-UEMB-ALL-ELE-00870 deven 14-Sep-16 ALL ELE Material Material delivery for (Instrumentation & Telecommunication) 15-Sep-16 17-Sep-16 5.00pm CLOSED 28-Nov-16 74 ACCEPTED 1 1
877 RAPID-P20A1-UEMB-ALL-ELE-00872 ACME Bestari 5-Oct-16 ALL ELE Installation Joint inspection of IPBX Telephone system as per delivery order 6-Oct-16 8-Oct-16 2.00pm CLOSED 7-Oct-16 1 ACCEPTED 1 1
905 RAPID-P20A1-UEMB-ALL-ELE-00900 afiintra tech 28-Oct-16 ALL ELE installation Installation of Sophos Enterprise Console (Anti-virus) 28-Oct-16 30-Oct-16 10.00am CLOSED 23-Nov-16 26 ACCEPTED 1 1
906 RAPID-P20A1-UEMB-ALL-ELE-00901 afiintra tech 11-Nov-16 ALL ELE installation Installation of Backup Exec 15 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
907 RAPID-P20A1-UEMB-ALL-ELE-00902 afiintra tech 11-Nov-16 ALL ELE installation Installation of IT Dell PowerEdge R430 - Vmware ESXI 6 Host 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
908 RAPID-P20A1-UEMB-ALL-ELE-00903 afiintra tech 11-Nov-16 ALL ELE installation Installation of Dell PowerVault MD3460 - Storage 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
909 RAPID-P20A1-UEMB-ALL-ELE-00904 afiintra tech 11-Nov-16 ALL ELE installation Installation of Dell PowerVault NX3230 - NAS Storage 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
910 RAPID-P20A1-UEMB-ALL-ELE-00905 afiintra tech 11-Nov-16 ALL ELE installation Installation of Cisco Network Management System (NMS) 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
911 RAPID-P20A1-UEMB-ALL-ELE-00906 afiintra tech 11-Nov-16 ALL ELE installation Installation of Dell PowerVault TL2000 - Tape Library 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
912 RAPID-P20A1-UEMB-ALL-ELE-00907 afiintra tech 28-Oct-16 ALL ELE Testing Testing of Sophos Enterprise Console (Anti-virus) 28-Oct-16 30-Oct-16 10.00am CLOSED 23-Nov-16 26 ACCEPTED 1 1
913 RAPID-P20A1-UEMB-ALL-ELE-00908 afiintra tech 11-Nov-16 ALL ELE Testing Testing of Backup Exec 15 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
914 RAPID-P20A1-UEMB-ALL-ELE-00909 afiintra tech 11-Nov-16 ALL ELE Testing Testing of IT Dell PowerEdge R430 - Vmware ESXI 6 Host 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
915 RAPID-P20A1-UEMB-ALL-ELE-00910 afiintra tech 11-Nov-16 ALL ELE Testing Testing of Dell PowerVault MD3460 - Storage 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
916 RAPID-P20A1-UEMB-ALL-ELE-00911 afiintra tech 11-Nov-16 ALL ELE Testing Testing of Dell PowerVault NX3230 - NAS Storage 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
917 RAPID-P20A1-UEMB-ALL-ELE-00912 afiintra tech 11-Nov-16 ALL ELE Testing Testing of Cisco Network Management System (NMS) 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
918 RAPID-P20A1-UEMB-ALL-ELE-00913 afiintra tech 11-Nov-16 ALL ELE Testing Testing of Dell PowerVault TL2000 - Tape Library 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
919 RAPID-P20A1-UEMB-ALL-ELE-00914 afiintra tech 28-Oct-16 ALL ELE Commisioning Commisioning of Sophos Enterprise Console (Anti-virus) 28-Oct-16 30-Oct-16 10.00am CLOSED 23-Nov-16 26 ACCEPTED 1 1
920 RAPID-P20A1-UEMB-ALL-ELE-00915 afiintra tech 11-Nov-16 ALL ELE Commisioning Commisioning of Backup Exec 15 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
921 RAPID-P20A1-UEMB-ALL-ELE-00916 afiintra tech 11-Nov-16 ALL ELE Commisioning Commisioning of IT Dell PowerEdge R430 - Vmware ESXI 6 Host 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
922 RAPID-P20A1-UEMB-ALL-ELE-00917 afiintra tech 11-Nov-16 ALL ELE Commisioning Commisioning of Dell PowerVault MD3460 - Storage 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
923 RAPID-P20A1-UEMB-ALL-ELE-00918 afiintra tech 11-Nov-16 ALL ELE Commisioning Commisioning of Dell PowerVault NX3230 - NAS Storage 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
924 RAPID-P20A1-UEMB-ALL-ELE-00919 afiintra tech 11-Nov-16 ALL ELE Commisioning Commisioning of Cisco Network Management System (NMS) 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
925 RAPID-P20A1-UEMB-ALL-ELE-00920 afiintra tech 11-Nov-16 ALL ELE Commisioning Commisioning of Dell PowerVault TL2000 - Tape Library 11-Nov-16 13-Nov-16 10.00am CLOSED 23-Nov-16 12 ACCEPTED 1 1
928 RAPID-P20A1-UEMB-ALL-ELE-00923 iszda 3-Dec-16 ALL ELE Testing Testing of PA systems and siren system at Multipurpose Court 7-Dec-16 9-Dec-16 2.30pm CLOSED 4-Jan-17 28 ACCEPTED 1 1
940 937
1858
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(SERVICE ROAD 1)
RFI No. Requested by Submission Date Section/Area Discipline Inspection Description of Works Inspection Status Date closed KPI (days) Remarks TOTAL RFIN
1 RAPID-P20A1-UEMB-SR1-CIV-RFIN-00001 Lian Fatt 15-Aug-15 SR1 CIV Dranage works Installation of box culvert size 4000mmx1800mm 16-Aug-15 18-Aug-15 10.00am CLOSED 10-Sep-15 25 ACCEPTED 1 1
c/w LID at SR1 between SR7 Phase 2
5 RAPID-P20A1-UEMB-SR1-CIV-RFIN-00005 Lian Fatt 3-Sep-15 SR1 CIV Dranage works Installation of box culvert size 4500mm x 4-Sep-15 6-Sep-15 10.00am CLOSED 17-Sep-15 13 ACCEPTED 1 1
2100mm at SR1 phase 2 main road crossing
19 RAPID-P20A1-UEMB-SR1-CIV-RFIN-00019 Lian Fatt 19-Sep-15 SR1 CIV Dranage works Survey works setting coordinates and invert level 20-Sep-15 22-Sep-15 10.00am CLOSED 20-Sep-15 0 ACCEPTED 1 1
at SR1 between SR5 to SR6
159 RAPID-P20A1-UEMB-SR1-CIV-RFIN-00159 FAIZAL 11-May-15 SR1 CIV Drainage Work Installation box culvert size 4000mm X 1800mm 12-May-15 14-May-15 9.00am CLOSED 1-Sep-16 478 ACCEPTED 1 1
160 RAPID-P20A1-UEMB-SR1-CIV-RFIN-00160 FAIZAL 23-May-15 SR1 CIV Drainage Work Installation box culvert size 2100mm X 1200mm 24-May-15 26-May-15 9.00am CLOSED 1-Sep-16 466 ACCEPTED 1 1
161 RAPID-P20A1-UEMB-SR1-CIV-RFIN-00161 MAZLAN 19-Jan-17 SR1 CIV Drainage Work Installation Of MS Grating Cover for sump at SR 1 20-Jan-17 22-Jan-17 9.00am CLOSED 20-Jan-17 0 ACCEPTED 1 1
161 161
12/26/2014
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(SERVICE ROAD 2)
1 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00001 Zaki 17-Nov-14 SR2 CIV Sampling Taking sample at existing subgrade for CBR 17-Nov-14 19-Nov-14 9.00 am CLOSED 26-Nov-14 9
test
2 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00002 UEMB QAQC SYAFIQ 17-Dec-14 SR2 CIV Roadworks Works 1) Laying subbase 2) Joint Dipping 3)FDT 18-Dec-14 20-Dec-14 3.00 pm CLOSED 15-Jan-15 28
3 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00003 Menta 20-Dec-14 SR2 CIV Roadworks Works trimming subase 22-Dec-14 24-Dec-14 08.00 am CLOSED 21-Jan-15 30
4 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00004 Menta 22-Dec-14 SR2 CIV Roadworks Works FDT subgrade 23-Dec-14 25-Dec-14 10.00 am CLOSED 06-Mar-15 73
6 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00005a Menta 21-Jan-15 SR2 CIV Roadworks Works -FDT for subase material 31-Dec-14 2-Jan-15 10.00 am CLOSED 02-Feb-15 33
7 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00006 Menta 24-Dec-14 SR2 CIV Roadworks Works Trimming Subgrade and FDT subgrade 26-Dec-14 28-Dec-14 10.00am CLOSED 11-Mar-15 75
8 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00007 Menta 24-Dec-14 SR2 CIV Roadworks Works Laying subbase material, dipping subbase & 26-Dec-14 28-Dec-14 10.00am CLOSED 06-Mar-15 70
FDT on subbase
10 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00009 Menta SR2 CIV Roadworks Works Trimming & dipping Subgrade and laying 27-Dec-14 29-Dec-14 10.00am CLOSED 04-Mar-15 67
subbase
16 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00015 Menta 16-Jan-15 SR2 CIV Roadworks Works Laying subbase material (4) 17-Jan-15 19-Jan-15 10.00am CLOSED 20-Jan-15 3
18 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00017 Menta 28-Jan-15 SR2 CIV Roadworks Works Rectification for geogrid lapping 29-Jan-15 31-Jan-15 10.00am CLOSED 30-Jan-15 1
19 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00018 Menta 28-Jan-15 SR2 CIV Roadworks Works Laying geogrid - roadbase 1st layer 29-Jan-15 31-Jan-15 10.00am CLOSED 02-Feb-15 4
21 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00020 Menta 31-Jan-15 SR2 CIV Roadworks Works Laying 2nd layer roadbase for trimming and 1-Feb-15 3-Feb-15 08.00am CLOSED 23-Feb-15 22
joint dipping
23 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00022 Propel 5-Mar-15 SR2 CIV Roadworks Works Spray Prime coat at CH 120-CH190 & 6-Mar-15 8-Mar-15 9.00am CLOSED 08-Mar-15 2
CH320-CH550
24 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00023 Propel 5-Mar-15 SR2 CIV Roadworks Works Lay ACBC 28 at CH120-CH190 & CH320- 6-Mar-15 8-Mar-15 9.00am CLOSED 15-Mar-15 9
CH550
26 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00025 Propel 7-Mar-15 SR2 CIV Roadworks Works Spray Prime coat on Roadbase at CH620- 9-Mar-15 11-Mar-15 9.00am CLOSED 12-Mar-15 3
CH870 (SR2)
28 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00027 Propel 12-Mar-15 SR2 CIV Surveyor As Built at 320- CH 870 13-Mar-15 15-Mar-15 10.00am CLOSED 13-Mar-15 0
Levelling,excavation & fill in crusher run
29 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00028 Sinaran 6-Feb-15 SR2 CIV Dranage works compaction works. Installation u-drain size 7-Feb-15 9-Feb-15 5.00pm CLOSED 20-Feb-15 13
1200mmx900mm
30 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00029 Sinaran 12-Mar-15 SR2 CIV Dranage works Material delivery U drain size 1200mm x 13-Mar-15 15-Mar-15 10.00am CLOSED 14-Mar-15 1
900mm
36 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00035 PSJV 14-Apr-15 SR2 ELE Electrical To do inspection for excavation works 15-Apr-15 17-Apr-15 11.00am CLOSED 17-Apr-15 2
( CH600-CH950)
38 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00037 PSJV 22-Apr-15 SR2 ELE Electrical To do inspection for excavation works at 23-Apr-15 25-Apr-15 3.00pm CLOSED 23-Apr-15 0
SR2 at CH950-CH600 & CH 550-CH380
42 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00041 Instant option 29-Apr-15 SR2 PIP Piping Inspection RC pipe Culvert CH600 (FW) 30-Apr-15 2-May-15 9.30am CLOSED 03-May-15 3
43 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00042 PSJV 7-May-15 SR2 ELE Electrical Excavation works at SR2 CH300-CH550 RHS 8-May-15 10-May-15 10.00am CLOSED 08-May-15 0
for 11KV electrical
44 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00043 PSJV 7-May-15 SR2 ELE Electrical Sand bedding works and compaction at SR 8-May-15 10-May-15 10.00am CLOSED 09-Dec-15 215
2 CH300-CH550 RHS for 11KV electrical
45 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00044 PSJV 7-May-15 SR2 ELE Electrical Cable pulling works at SR2 CH300-CH500 8-May-15 10-May-15 10.00am CLOSED 08-May-15 0
RHS (Loop 8 & 16)
46 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00045 PSJV 8-May-15 SR2 ELE Electrical Sand backfill and UPVC slab installation for 9-May-15 11-May-15 9.00am CLOSED 29-May-15 20
11KV electrical Cable installation
47 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00046 PSJV 8-May-15 SR2 ELE Electrical Excavation works for 11KV electrical cable 9-May-15 11-May-15 10.00am CLOSED 10-Jun-15 32
installation at SR2 CH300-CH550 LHS
48 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00047 PSJV 8-May-15 SR2 ELE Electrical Soil backfill works for 11KV electrical cable 9-May-15 11-May-15 10.00am CLOSED 10-Jun-15 32
installation at SR2 CH300-CH550 RHS
68 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00066 Opensis 30-May-15 SR2 ELE Electrical Laying corrugate HDPE pipe Inside trench 1-Jun-15 3-Jun-15 11.00am CLOSED 07-Jul-15 36
at SR 2 (7/8) CH250 -CH650
69 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00067 Opensis 30-May-15 SR2 ELE Electrical Backfilling soil for Corrugated HDPE pipe at 1-Jun-15 3-Jun-15 11.00am CLOSED 10-Jun-15 9
SR2 CH250-CH650
72 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00070 Syahir 4-Jun-15 SR2 CIV Roadworks Works Preparation subgrade layer at SR2 5-Jun-15 7-Jun-15 4.00pm CLOSED 05-Aug-15 61
75 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00073 Lian Fatt 8-Jun-15 SR2 CIV Dranage works Installation of U drain 1200mm x 750mm 9-Jun-15 11-Jun-15 9.00am CLOSED 17-Sep-15 100
CH100-CH200 RHS
76 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00074 Syahir 10-Jun-15 SR3 CIV Roadworks Works Preparation subgrade layer and trimming 11-Jun-15 13-Jun-15 11.00am CLOSED 02-Nov-15 144
subgrade layer
80 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00078 Sinaran 15-Jun-15 SR2 CIV Dranage works Installation works for U-Drain size 16-Jun-15 18-Jun-15 3.00pm CLOSED 02-Jul-15 16
1500x600x1M at SR 2 CH950-1000
83 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00081 UEMB QAQC 20-Jun-15 SR2 CIV Roadworks Works FDT for subgrade at SR2 (CH100-1130) 21-Jun-15 23-Jun-15 8.00am CLOSED 26-Jun-15 5
KHAIRIL
84 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00082 UEMB QAQC 20-Jun-15 SR2 CIV Roadworks Works FDT for subbase at SR2 (CH100-1130) 21-Jun-15 23-Jun-15 4.00pm CLOSED 26-Jun-15 5
KHAIRIL
95 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00093 Sinaran 3-Jul-15 SR2 CIV Dranage works Installation works for UD 1200mm x 4-Jul-15 6-Jul-15 3.00pm CLOSED 05-Aug-15 32
600mmx 1M at SR 2 CH 1150-1100 RHS
99 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00097 Sinaran 10-Jul-15 SR2 CIV Dranage works Installation works for U drain 11-Jul-15 13-Jul-15 3.00pm CLOSED 13-Aug-15 33
1200mmx600mmx1M at SR2
103 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00101 Instant option 29-Jul-15 SR2 PIP Excavation inspection request for excavation trench in 30-Jul-15 1-Aug-15 10.00am CLOSED 08-Dec-15 131
SR2 from CH420 - 650 for HDPE pipe
107 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00105 Sinaran 4-Aug-15 SR2 CIV Dranage works inspection formwork, rebar, concreting 5-Aug-15 7-Aug-15 3.00pm CLOSED 30-Oct-15 86
work for sump base 2 at SR2 CH 1100
108 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00106 Sinaran 4-Aug-15 SR2 CIV Dranage works Inspection post concreting works for 2 nos 5-Aug-15 7-Aug-15 3.00pm CLOSED 28-Sep-15 54
sump base at SR 2 CH1100
Instant option 5-Aug-15 SR2 PIP RCP Culvert Inspection for RC pipe HDPE pipe 6-Aug-15 8-Aug-15 10.00am
109 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00107
culvert installation at SR2 CH0-CH1200 CLOSED CANCEL
111 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00109 Instant option 6-Aug-15 SR2 PIP Piping Road Crossing at SR2 17M RCP pipe culvert 6-Aug-15 8-Aug-15 10.00am CLOSED 08-Dec-15 124
112 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00110 Instant option 6-Aug-15 SR2 PIP Piping Excavation at SR 2 from CH980-1280 for 7-Aug-15 9-Aug-15 10.00am CLOSED 28-Aug-15 21
Lying HDPE pipe
115 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00113 Instant option 7-Aug-15 SR2 PIP Excavation Excavation in SR2 from CH 420-650 for 7-Aug-15 9-Aug-15 12.00pm CLOSED 17-Sep-15 41
laying HDPE pipe
116 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00114 Instant option 7-Aug-15 SR2 PIP Road Crossing Road crossing on SR2 RCP pipe culvert 15 8-Aug-15 10-Aug-15 10.00am CLOSED 5-Sep-15 28
meter
120 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00118 Instant option 8-Aug-15 SR2 PIP Welding HDPE pipe welding at Sr 2 from CH 980 - 9-Aug-15 11-Aug-15 11.00am CLOSED 10-Sep-15 32
1280 for fire water
123 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00121 Instant option 11-Aug-15 SR2 PIP Piping Excavation at SR2 from CH600 to 980 for 12-Aug-15 14-Aug-15 11.00am CLOSED 4-Sep-15 23
sewarage water and fire water
127 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00125 PSJV 12-Aug-15 SR2 ELE Cable pulling Cable pulling works for loop 3,4,5,6,7,& 16 13-Aug-15 15-Aug-15 12.00pm CLOSED 4-Sep-15 22
at SR 2 CH1000-1200 RHS
131 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00129 Instant option 13-Aug-15 SR2 PIP Welding HDPE pipe welding at SR2 CH600-980 for 14-Aug-15 16-Aug-15 9.00am CLOSED 09-Sep-15 26
Fire water
132 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00130 Instant option 13-Aug-15 SR2 PIP Welding HDPE pipe welding at SR2 CH600-980 for 14-Aug-15 16-Aug-15 9.00am CLOSED 10-Sep-15 27
Sewarege water
137 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00135 Instant option 19-Aug-15 SR2 PIP Backfill and compaction Inspction for backfill and compaction at 20-Aug-15 22-Aug-15 8.00am CLOSED 4-Sep-15 15
SR2. CH100-CH1200
144 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00142 Instant option 23-Aug-15 SR2 PIP Test Pressure & leak test sewerage water at SR2 24-Aug-15 26-Aug-15 9.00am CLOSED 01-Oct-15 38
CH 280-1280
146 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00144 Instant option 9-Sep-15 SR2 ELE Excavation Excavation trench SR2 (CH950-1200) for 10-Sep-15 12-Sep-15 9.00am CLOSED 12-Oct-15 32
laying HDPE corrugated pipe
148 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00146 Liwo 9-Sep-15 SR2 ELE Compact Substation Inspection of compact substation 10-Sep-15 12-Sep-15 12.00pm CLOSED 15-Sep-15 5
installation at SR2
156 RAPID-P20A1-UEMB-SR2-PIP-RFIN-00154 Instant option 14-Oct-15 SR2 PIP installation of hydrant Inspection for hydrant pillar and chamber 15-Oct-15 17-Oct-15 10.00am CLOSED 31-Oct-15 16
pillar and chamber valve at SR2 CH0-CH1200
159 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00157 Instant option 26-Oct-15 SR2 CIV Road works Laying of Subbase jointing at SR2 - SR6 27-Oct-15 29-Oct-15 9.00am CLOSED 01-Feb-16 97
Roundabout 3
160 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00158 Instant option 26-Oct-15 SR2 CIV Test FDT for subgrade at SR 2-SR6 Rounabout 3 27-Oct-15 29-Oct-15 9.00am CLOSED 14-Nov-15 18
161 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00159 Instant option 26-Oct-15 SR2 CIV Test FDT for subbase at SR 2-SR6 Rounabout 3 27-Oct-15 29-Oct-15 9.00am CLOSED 14-Nov-15 18
162 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00160 Instant option 26-Oct-15 SR2 CIV Test FDT for road base at SR2 roundbout 3 27-Oct-15 29-Oct-15 9.00am CLOSED 14-Nov-15 18
163 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00161 Yuzuki 5-Nov-15 SR2 CIV Fencing Excavation install and concreting post at LP 5-Nov-15 7-Nov-15 11.00am CLOSED 27-Nov-15 22
16 SSI/5 and LP 16 SSI/4
164 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00162 Instant option 6-Nov-15 SR2 CIV Survey Joint survey for allignment SR2 at CH1000 - 7-Nov-15 9-Nov-15 10.00am CLOSED 07-Nov-15 0
CH1300
165 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00163 Instant option 17-Dec-15 SR2 CIV Turfing Turfing works at SR2 18-Dec-15 20-Dec-15 9.00am CLOSED 20-Jun-16 185
166 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00164 Sinaran 9-Feb-15 SR2 CIV survey Joint survey drain alignment at CH276.81 9-Feb-15 11-Feb-15 3.00pm CLOSED 9-Feb-15 0
RHS to CH565.462 RHS at SR2
168 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00166 Sinaran 9-Feb-15 SR2 CIV survey Joint survey drain alignment at CH614.337 9-Feb-15 11-Feb-15 5.00am CLOSED 9-Feb-15 0
LHS to CH951.375 RHS at SR2
Mackintosh probe at CS 2MVA LP15,
169 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00167 Liwo 4-Jan-15 SR2 CIV mackintosh probe SSN/2, CS-2MVA,(LP11,SSJ/2) CS-2MVA 5-Jan-15 7-Jan-15 10.00am CLOSED 5-Jan-15 0
(LP11,SSJ/1), CS-2MVA (LP12,SSJ/14
171 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00169 coremanpower 1-Jan-15 SR2 CIV roadwork Laying ACBC29 at roundabout 1 2-Jan-15 4-Jan-15 9.00am CLOSED 1-Feb-15 30
172 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00170 Paneagle 6-Jan-15 SR2 CIV crossing bridge Slab crossing bridge before concrete 6-Jan-15 8-Jan-15 2.30pm CLOSED 1-Feb-15 26
173 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00171 omitech road 22-Jan-15 SR2 CIV road signanges installation of road signages at SR1 22-Jan-15 24-Jan-15 2.30pm CLOSED 22-Jan-15 0
181 RAPID-P20A1-UEMB-SR2-CIV-RFIN-00179 coremanpower 19-Apr-16 SR2 CIV sliding gate Installation ofsliding gate 6-Apr-16 8-Apr-16 10.00am CLOSED 20-Jun-16 75
188 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00186 zulfaqar 24-Oct-15 SR2 CIV roadwork preparation of roadbase and dipping at SR8 26-Oct-15 28-Oct-15 8.00am CLOSED 24-Aug-16 303
Roundabout 2
189 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00187 zulfaqar 28-Oct-15 SR2 CIV roadwork preparation of roadbase and dipping at SR8 29-Oct-15 31-Oct-15 8.00am CLOSED 24-Aug-16 300
Roundabout 3
190 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00188 zulfaqar 31-Oct-15 SR2 CIV roadwork preparation of subgrade and dipping at SR2 2-Nov-15 4-Nov-15 8.00am CLOSED 24-Aug-16 296
CH70-CH1200
191 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00189 zulfaqar 2-Nov-15 SR2 CIV roadwork preparation of subgrade and dipping at SR2 3-Nov-15 5-Nov-15 8.00am CLOSED 24-Aug-16 295
CH270-CH400
192 RAPID-P20A1-UEMB-SR2-ELE-RFIN-00190 zulfaqar 6-Nov-15 SR2 CIV roadwork preparation of subbase and dipping at SR8 7-Nov-15 9-Nov-15 8.00am CLOSED 24-Aug-16 291
CH300-CH560
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
No aktiviti
REJECTED 1 1
No aktiviti
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED Construction 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED CANCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
194 194
5a
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(SERVICE ROAD 3)
1 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00001 En Halim 15-Oct-14 SR3 CIV Survey Pegging road alignment at service road 3 15-Oct-14 17-Oct-14 10.00 am CLOSED 15-Oct-15 363
4 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00004 PROPEL 16-Oct-14 SR3 CIV Testing FDT sub-base (sand) at CH1100 20-Oct-14 22-Oct-14 4.00 pm CLOSED 22-Oct-14 0
5 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00005 PROPEL 16-Oct-14 SR3 CIV Testing FDT sub-base (crusher run) at CH1100 21-Oct-14 23-Oct-14 4.00 pm CLOSED 23-Oct-14 0
6 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00006 En Halim 17-Oct-14 SR3 CIV Testing Packing sample soil for CBR testing 17-Oct-14 19-Oct-14 8.00 am CLOSED 19-Oct-14 0
7 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00007 PROPEL 18-Oct-14 SR3 CIV Testing FDT for subgrade layer CH 1100 20-Oct-14 22-Oct-14 8.00 am CLOSED 29-Oct-14 7
8 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00008 PROPEL 18-Oct-14 SR3 CIV Roadwork Preparation of subgrade at Ch1000 - Ch1200 20-Oct-14 22-Oct-14 8.00 am CLOSED 29-Oct-14 7
9 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00009 PROPEL 18-Oct-14 SR3 CIV Roadwork laying Geotextile - Tencate TS 50 20-Oct-14 22-Oct-14 8.00 am CLOSED 29-Oct-14 7
12 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00012 Instant Option 12-Jan-15 SR3 CIV Drainage Excavation for U-Drain, Prepare Bedding and Lay U- 13-Jan-15 15-Jan-15 08.00am CLOSED 23-Feb-15 39
Drain
16 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00016 Instant Option 15-Jan-15 SR3 CIV Survey Joint Survey to check and confirm allignment and 16-Jan-15 18-Jan-15 2.00pm CLOSED 16-Jan-15 0
level of u-drain at sr3 CH0-CH320
17 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00017 Menta 16-Jan-15 SR3 CIV Roadwork Trimming, dipping, FDT Subgrade and laying, FDT 17-Jan-15 19-Jan-15 10.00am CLOSED 06-Mar-15 46
subbase
18 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00018 Instant Option 17-Jan-15 SR3 CIV Drainage Excavation, prepare bedding and Lay U-Drain 19-Jan-15 21-Jan-15 08.00am CLOSED 21-Mar-15 59
19 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00019 Menta 19-Jan-15 SR3 CIV Roadwork Trimming, dipping, FDT Subgrade and laying, FDT 20-Jan-15 22-Jan-15 10.00am CLOSED 04-Mar-15 41
subgrade and subbase
20 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00020 Instant Option 19-Jan-15 SR3 CIV Drainage Receiving U-drain 1200 X 900 19-Jan-15 21-Jan-15 11.00am CLOSED 20-Jan-15 -1
21 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00021 Instant Option 22-Jan-15 SR3 CIV Drainage Excavation, Prepare Bedding and Lay U-Drain 23-Jan-15 25-Jan-15 2.00pm CLOSED 30-Jan-15 5
CH400R-CH500R
23 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00023 Menta 26-Jan-15 SR3 CIV Roadwork Laying geogrid and first layer road base CH400- 27-Jan-15 29-Jan-15 08.00am CLOSED 07-Feb-15 9
CH1200
24 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00024 Menta 26-Jan-15 SR3 CIV Roadwork FDT for first layer Road base CH400-CH1200 27-Jan-15 29-Jan-15 11.00am CLOSED 12-Feb-15 14
25 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00025 Menta 28-Jan-15 SR3 CIV Roadwork FDT roadbase 1st layer 28-Jan-15 30-Jan-15 10.00am CLOSED 06-Mar-15 35
26 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00026 Menta 28-Jan-15 SR3 CIV Roadwork Roadbase 1st layer (200mm) - laying geogrid 28-Jan-15 30-Jan-15 10.00am CLOSED 28-Feb-15 29
(CH90-CH380)
28 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00028 Instant Option 28-Jan-15 SR3 CIV Drainage Receiving U-Drain 900x750 31-Jan-15 2-Feb-15 11.00am CLOSED 23-Feb-15 21
29 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00029 Instant Option 7-Feb-15 SR3 PIP Piping Rreceving RCP 600mm dia (6m length) 6-Feb-15 8-Feb-15 11.00am CLOSED 28-Feb-15 20
30 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00030 Instant Option 7-Feb-15 SR3 PIP Piping Rreceving HDP pipe 315 mm 7-Feb-15 9-Feb-15 11.00am CLOSED 04-Feb-15 -5
Rreceving RC pipe
31 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00031 Instant Option 10-Feb-15 SR3 PIP Piping 11-Feb-15 13-Feb-15 11.00am CLOSED 28-Feb-15 15
(300mm,375mm,450mm,600mm)
32 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00032 Instant Option 11-Feb-15 SR3 PIP Piping Rreceving DHPE pipe 315 mm 12-Feb-15 14-Feb-15 93.00pm CLOSED 15-Feb-15 1
33 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00033 Instant Option 13-Feb-15 SR3 PIP Piping Receiving RCP culvert class Z Variuos size inspection 14-Feb-15 16-Feb-15 03.00pm CLOSED 04-Mar-15 16
34 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00034 Menta 14-Feb-15 SR3 CIV Roadwork 2nd Layer Road Base FDT test 14-Feb-15 16-Feb-15 03.00pm CLOSED 06-Mar-15 18
35 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00035 Menta 14-Feb-15 SR3 CIV Roadwork 2nd Layer Road Base - Laying and trimming 14-Feb-15 16-Feb-15 03.00pm CLOSED 20-Feb-15 4
36 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00036 Menta 23-Feb-15 SR3 CIV Roadwork Roadbase- Trimming touch up Level and 23-Feb-15 25-Feb-15 02.00pm CLOSED 25-Nov-15 273
Preparation for hand over
37 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00037 Menta 24-Feb-15 SR3 CIV Roadwork 2nd Layer Road Base FDT test (CH 0-CH1200) 24-Feb-15 26-Feb-15 02.00pm CLOSED 11-Mar-15 13
38 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00038 Instant Option 24-Feb-15 SR3 PIP Piping Receiving & Inspecting of metarial (HDPE pipe size 24-Feb-15 26-Feb-15 02.00pm CLOSED 06-Mar-15 8
620mm)
40 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00040 PROPEL 26-Feb-15 SR3 CIV Roadwork Spray Prime coat from CH1200-CH300 26-Feb-15 28-Feb-15 08.00pm CLOSED 10-Mar-15 10
41 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00041 PROPEL 26-Feb-15 SR3 CIV Roadwork Lay ACBC 28 from CH1200-CH400 27-Feb-15 1-Mar-15 08.00pm CLOSED 10-Mar-15 9
43 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00043 UEMB QAQC 2-Mar-15 SR3 CIV Roadwork Coring ACBC 28 at SR3 CH 1200-CH400) 4-Mar-15 6-Mar-15 10.00am CLOSED 06-Mar-15 0
NORAZAH
44 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00044 PROPEL 2-Mar-15 SR3 CIV Roadwork Spray Prime coat and ACBC 28. 3-Mar-15 5-Mar-15 10.00am CLOSED 05-Mar-15 0
45 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00044a PROPEL 2-Mar-15 SR3 CIV Roadwork Spray Prime coat CH80-180 and CH270-340 2-Mar-15 4-Mar-15 10.00am CLOSED 05-Mar-15 1
46 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00044b PROPEL 2-Mar-15 SR3 CIV Roadwork Lay ACBC at CH80-180 and CH270-CH340 2-Mar-15 4-Mar-15 10.00am CLOSED 15-Mar-15 11
47 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00045 PROPEL 4-Mar-15 SR3 CIV Roadwork As build at CH80-CH1180 5-Mar-15 7-Mar-15 10.00am CLOSED 05-Mar-15 0
Excavation Sub Laying U Drain 900x900 at SR 3
48 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00046 Wee Guan 7-Mar-15 SR3 CIV Drainage 9-Mar-15 11-Mar-15 07.30 am CLOSED 20-Mar-15 11
CH600-CH300
49 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00047 Wee Guan 7-Mar-15 SR3 CIV Drainage Laying U drain 900x900 at SR3 CH300-CH600 9-Mar-15 11-Mar-15 07.30 am CLOSED 20-Mar-15 11
50 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00048 Hasnul 9-Mar-15 SR3 CIV Drainage Delivery for RC U-Drain size 900x900 at SR3 RHS 10-Mar-15 12-Mar-15 11.00am CLOSED 14-Mar-15 4
51 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00049 Wee Guan 11-Mar-15 SR3 CIV Drainage Laying U drain and Box Culvert 900x900 CH300- 12-Mar-15 14-Mar-15 08.00am CLOSED 20-Mar-15 8
CH600
53 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00051 Uem Hasnol 13-Mar-15 SR3 CIV Drainage Material delivery inspection U drain size 900X900 14-Mar-15 16-Mar-15 11.00am CLOSED 15-Mar-15 1
55 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00053 Uem Hasnol 14-Mar-15 SR3 CIV Drainage To carried aout MP test at SR3 CH320 RHS ( 1 Point) 15-Mar-15 17-Mar-15 11.00am CLOSED 15-Mar-15 0
56 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00054 Wee Guan 14-Mar-15 SR3 CIV Drainage Udrain Box Culvert Installation size 900x900 16-Mar-15 18-Mar-15 08.00am CLOSED 25-Mar-15 9
57 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00055 Wee Guan 14-Mar-15 SR3 CIV Drainage Excavation for laying and box culvert size 900. 16-Mar-15 18-Mar-15 08.00am CLOSED 25-Mar-15 9
59 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00057 Instant Option 16-Mar-15 SR3 CIV Drainage Taking T20 rebar sample for testing ( Tensile & 17-Mar-15 19-Mar-15 08.00pm CLOSED 18-Mar-15 1
Bending) (Southern Steel) 2nos sample 1 M length
60 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00058 Instant Option 16-Mar-15 SR3 CIV Drainage Taking R6 rebar sample for testing ( Tensile & 17-Mar-15 19-Mar-15 08.00am CLOSED 18-Mar-15 1
Bending) (Southern Steel) 2nos sample 1 M length
63 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00061 PPEC 19-Mar-15 SR3 CIV Survey Joint Survey for checking box culvert alignment 20-Mar-15 22-Mar-15 09.00am CLOSED 20-Mar-15 0
(B/C 2100x1500, B/C @100x 1200, B/C 2100x1500)
66 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00064 Wee Guan 21-Mar-15 SR3 CIV Drainage Excavation for laying u drain and box culvert size 24-Mar-15 26-Mar-15 08.00am CLOSED 25-Mar-15 1
900x900 ( CH300-500)
69 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00067 UEMB QAQC 25-Mar-15 SR3 CIV Testing MP test SR 3 ( Box Culvert Crossing ) CH 270 26-Mar-15 28-Mar-15 10.00pm CLOSED 27-Mar-15 1
NORAZAH
70 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00068 Instant Option 26-Mar-15 SR3 PIP Piping Receiving HDPE pipe (500mm brown stripe) at LOR 27-Mar-15 29-Mar-15 10.00am CLOSED 27-Mar-15 0
yard
73 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00071 Wee Guan 26-Mar-15 SR3 CIV Drainage Installation / laying udrain size 900x900 CH300- 27-Mar-15 29-Mar-15 08.00am CLOSED 30-Mar-15 3
CH500
74 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00072 Wee Guan 26-Mar-15 SR3 CIV Drainage Laying crusherun 0.15 and compact for laying u 27-Mar-15 29-Mar-15 08.00am CLOSED 30-Mar-15 3
drain 900x900 CH300CH500
75 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00073 Instant Option 27-Mar-15 SR3 PIP Piping Receiving HDPE pipe (315MM od, RED STRIPE) 28-Mar-15 30-Mar-15 10.00am CLOSED 28-Mar-15 0
76 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00074 Sabri 26-Mar-15 SR3 CIV Surveyor joint survey for as built GI pipe Crissing for HV. 27-Mar-15 29-Mar-15 8.40am CLOSED 27-Mar-15 0
Street lighting, Fiber optic cable at SR 3/7
77 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00075 Sabri 26-Mar-15 SR3 CIV Surveyor joint survey for as built GI pipe Crissing for HV. 27-Mar-15 29-Mar-15 9.15am CLOSED 27-Mar-15 0
Street lighting, Fiber optic cable at SR 3/6
80 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00078 Instant Option 3-Apr-15 SR3 PIP Piping Lay 450mm RCP culvert for fire water crossing at 4-Apr-15 6-Apr-15 09.00am CLOSED 18-Apr-15 14
SR3 CH320-CH340
81 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00079 Instant Option 6-Apr-15 SR3 PIP Piping Receiving DI Sluice Valve at IOR Storeyard 7-Apr-15 9-Apr-15 10.00am CLOSED 20-Apr-15 13
83 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00081 Instant Option 6-Apr-15 SR3 PIP Piping Receiving GI flange standard hole at IOR storeyard 7-Apr-15 9-Apr-15 11.00am CLOSED 10-Apr-15 3
84 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00082 Instant Option 6-Apr-15 SR3 PIP Piping Receiving various filting ( Flange, Ball 7-Apr-15 9-Apr-15 10.00am CLOSED 10-Apr-15 3
valve,elbow,tee,socket,bush, etc)
88 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00086 PPEC 7-Apr-15 SR3 CIV Drainage Inspection for received material u drain 8-Apr-15 10-Apr-15 08.00am CLOSED 10-Jun-15 63
89 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00087 PPEC 11-Apr-15 SR3 CIV Drainage Received material u drain at SR 3 13-Apr-15 15-Apr-15 08.00am CLOSED 10-Jun-15 58
90 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00088 PPEC 11-Apr-15 SR3 CIV Drainage Excavation and install of u drain with 225x225x225 13-Apr-15 15-Apr-15 08.00am CLOSED 20-Apr-15 7
of single size aggregate at CH 650 SR3. Back fill.
91 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00089 Menta 24-Jan-15 SR3 CIV Roadwork FDT sub base CH 430-CH1150 24-Jan-15 26-Jan-15 10.00am CLOSED 25-Jan-15 1
92 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00090 Menta 28-Jan-15 SR3 CIV Roadwork 1st layer road base-FDT test ch 720-ch900 29-Jan-15 31-Jan-15 2.00pm CLOSED 30-Jan-15 1
93 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00091 Instant Option 15-Apr-15 SR3 PIP Piping Receiving HDPE pipe 16-Apr-15 18-Apr-15 10.00am CLOSED 22-Apr-15 6
95 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00093 PPEC 15-Apr-15 SR3 CIV Drainage Receiving u drain SR3 16-Apr-15 18-Apr-15 10.00am CLOSED CANCEL
96 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00094 Instant Option 16-Apr-15 SR3 CIV Drainage Receiving rebar size T20 southern steel 17-Apr-15 19-Apr-15 11.00am CLOSED 18-Apr-15 1
97 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00095 PPEC 18-Apr-15 SR3 CIV Drainage Excavation and install u drain, Back fill and install 19-Apr-15 21-Apr-15 8.00am CLOSED 30-Apr-15 11
225x225x225 single size aggregate for weep hole
98 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00096 PPEC 18-Apr-15 SR3 CIV Drainage Receiving u drain SR3 20-Apr-15 22-Apr-15 8.00am CLOSED 25-Apr-15 5
99 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00097 PPEC 22-Apr-15 SR3 CIV Drainage Inspection for received material U drain 23-Apr-15 25-Apr-15 8.00am CLOSED CANCEL
102 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00100 Instant Option 29-Apr-15 SR3 PIP Piping Excavation trench at SR3 HDPE pipe CH200-1200 30-Apr-15 2-May-15 9.00am CLOSED 10-Jun-15 41
105 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00103 Instant Option 5-May-15 SR3 PIP Piping Excavation trench HDPE pipe for SR3 CH00-CH1200 5-May-15 7-May-15 9.30am CLOSED 08-May-15 3
Instant Option 8-May-15 SR3 PIP Survey Request for survey pegging for Hydrant point, 9-May-15 11-May-15 10.00am
108 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00106
Valve location and viking johnson compling SR3 CLOSED CANCEL
110 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00108 PPEC 8-May-15 SR3 CIV Drainage Receiving material Udrainfor SR3 9-May-15 11-May-15 10.00am CLOSED CANCEL
111 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00109 Opensis 11-May-15 SR3 PIP Piping Receiving material inspection for wased sand.30 13-May-15 15-May-15 10.00am CLOSED 17-Nov-15 188
Tannes (1 load)
112 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00110 Menta 23-Feb-15 SR3 CIV Roadwork FDT CH450-CH1750 2nd layer road base 24-Feb-15 26-Feb-15 10.00am CLOSED 10-Jun-15 106
115 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00113 PSJV 12-May-15 SR3 ELE Electrical Cable pulling works for l00p 5,8,9,10 & 14 at SR3 13-May-15 15-May-15 4.00pm CLOSED 10-Jun-15 28
CH300-CH550 RHS
119 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00117 Instant Option 12-May-15 SR3 PIP Piping Request for pressure test for SR3 HDPE fire water 13-May-15 15-May-15 8.30am CLOSED 4-Sep-15 114
pipe (CH200-580)
124 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00122 Opensis 12-May-15 SR3 CIV Electrical Excavation works for HDPE pipe laying at SR3 ch 13-May-15 15-May-15 3.00pm CLOSED 23-Jun-15 41
1000-ch 1250
125 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00123 Opensis 12-May-15 SR3 CIV Electrical Backfilling works for HDPE pipes at SR3 13-May-15 15-May-15 3.00pm CLOSED 15-May-15 2
126 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00124 Opensis 12-May-15 SR3 CIV Electrical HDPE pipe laying inside trench at SR3 ch 1000-1250 13-May-15 15-May-15 3.00pm CLOSED 23-Jun-15 41
128 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00126 PSJV 12-May-15 SR3 ELE Electrical Sand bedding for 11kv electrical cable installation 13-May-15 15-May-15 9.00pm CLOSED 22-May-15 9
at SR3 CH650-CH900 RHS
129 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00127 PSJV 12-May-15 SR3 ELE Electrical Cable pulling works for l00p 2,5,9 at SR3 CH650- 13-May-15 15-May-15 4.00pm CLOSED 12-Oct-15 152
CH900 RHS
132 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00130 PPEC 16-May-15 SR3 CIV Drainage Joint inspection for work done at SR 3 dranage 18-May-15 20-May-15 8.00am CLOSED 12-Nov-15 178
work
135 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00133 Instant Option 20-May-15 SR3 CIV Drainage Installation U drain SR3 1200x900 CH1000-CH1153 21-May-15 23-May-15 10.30am CLOSED 03-Oct-15 135
145 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00143 Instant Option 25-May-15 SR3 CIV Drainage Backfilling works after u drain 1200x600 installation 26-May-15 28-May-15 3.00pm CLOSED 12-Nov-15 170
at CH1153-CH1240
148 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00146 Opensis 27-May-15 SR3 ELE Electrical Excavation work for laying corrugated HDPE pipe 4' 28-May-15 30-May-15 11.00am CLOSED 23-Jun-15 26
(100mm) inside trench at SR3 CH650-CH900
151 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00149 Lian Fatt 2-Jun-15 SR3 CIV Survey Joint survey for c0-0rsinate and alignment UD 3-Jun-15 5-Jun-15 11.00am CLOSED 03-Jun-15 0
1200mm-750mm at SR3
155 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00153 Sinaran 7-May-15 SR3 CIV Drainage Installation works for U-Drain size 1500 mm x 1500 8-May-15 10-May-15 3.00 pm CLOSED 02-Jul-15 55
mm x 1 m at Service Road No. 3 Ch1100 - 1050
159 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00157 Sinaran 14-May-15 SR3 CIV Drainage Installation works for U-Drain size 1500 mm x 1500 15-May-15 17-May-15 3.00 pm CLOSED 02-Jul-15 48
mm x 1 m at Service Road No. 3 Ch1200 - 1150
161 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00159 Sinaran 18-May-15 SR3 CIV Drainage Installation works for U drain size 19-May-15 21-May-15 3.00 pm CLOSED 02-Jul-15 44
1500mmx1500mmx1M at SR 3 CH 1250-1200
162 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00160 AEIE 9-Jun-15 SR3 ELE Material Material receiving for inspection (footing for 15m 10-Jun-15 12-Jun-15 10.00am CLOSED 23-Jun-15 13
and 5m Street Light)
163 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00161 Liwo 15-Jun-15 SR3 CIV Compact substation Inspection of compection installation at Sr 3-1MVA 16-Jun-15 18-Jun-15 10.15am CLOSED 04-Aug-15 49
164 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00162 Azrul MNE 19-Jun-15 SR3 ELE Material Inspection of GI pipe (Material receiving) 20-Jun-15 22-Jun-15 10.00am CLOSED 24-Aug-15 65
165 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00163 PSJV 23-Jun-15 SR3 ELE Excavation Excavation works for 11KV electrical Cable 24-Jun-15 26-Jun-15 3.00pm CLOSED 04-Aug-15 41
installation at SR 3 CH 1000-
166 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00164 PSJV 23-Jun-15 SR3 ELE Sand Bedding Sand bedding works to 11KV electrical cable 24-Jun-15 26-Jun-15 3.00pm CLOSED 04-Aug-15 41
installation at SR3 CH1000-CH1200 RHS
169 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00167 PSJV 23-Jun-15 SR3 ELE Soil Backfill Soil backfill works for 11KV electrical cable 24-Jun-15 26-Jun-15 4.00pm CLOSED 04-Aug-15 41
installation at SR 3 CH1000-1200 RHS
170 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00168 AEIE 2-Jul-15 SR3 ELE Material Material Receiving inspection for 5m Compond 3-Jul-15 5-Jul-15 8.30am CLOSED 03-Jul-15 0
lighting poles and 8 m Street lighting poles
171 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00169 AEIE 3-Jul-15 SR3 ELE Material Received material inspection for 20 sets of 70W 4-Jul-15 6-Jul-15 9.00am CLOSED 07-Jul-15 3
HPSV Lantern
174 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00172 PPEC 3-Jul-15 SR3 CIV Rebar&formwor Dismantling of Formwork for sump pit CH250 SR3 5-Jul-15 7-Jul-15 10.00am CLOSED 05-Jul-15 0
176 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00174 PPEC 6-Jul-15 SR3 CIV Drainage Inspection for RC sump wall SR 3 CH 250 8-Jul-15 10-Jul-15 10.00am CLOSED 08-Jul-15 0
179 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00177 AEIE 6-Jul-15 SR3 ELE Material Washed sand for sand bedding 7-Jul-15 9-Jul-15 9.00am CLOSED 7-Jul-15 0
182 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00180 Instant Option 13-Jul-15 SR3 CIV Excavation Excavation and laying 700x900 u drain 14-Jul-15 16-Jul-15 9.30am CLOSED 10-Sep-15 58
185 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00183 PSJV 21-Jul-15 SR3 ELE Cable pulling Cable puliing works for loop 5,8,9,10 and 16 at SR 3 22-Jul-15 24-Jul-15 2.00pm CLOSED 26-Aug-15 35
CH 250 -400 RHS.
191 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00189 Sinaran 24-Jul-15 SR3 CIV Dranage Inspection post concreting works for capping beam 25-Jul-15 27-Jul-15 11.00am CLOSED 13-Aug-15 19
at Sr3 CH1100-1125 LHS
193 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00191 Instant Option 24-Jul-15 SR3 PIP Testing Leaking test fire water 315mm of SR3 (CH250-600) 25-Jul-15 27-Jul-15 11.00am CLOSED 04-Aug-15 10
194 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00192 Opensis 28-Jul-15 SR3 ELE Backfill Backfill work trench at SR 3 (7 - 8) CH 250 - CH 600 29-Jul-15 31-Jul-15 11.00am CLOSED 04-Sep-15 37
195 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00193 Opensis 28-Jul-15 SR3 ELE Excavation Excavation and laying of HDPE corrugated pipe 29-Jul-15 31-Jul-15 11.00am CLOSED 26-Aug-15 28
inside trench at SR 3 (7-8) CH 250 - CH600
196 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00194 Opensis 28-Jul-15 SR3 ELE Backfill Backfill work trench at SR 3 (6 - 7) CH 600 - CH 850, 29-Jul-15 31-Jul-15 11.00am CLOSED 26-Aug-15 28
LHS
199 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00197 Opensis 28-Jul-15 SR3 ELE Excavation Excavation and laying of HDPE corrugated pipe 29-Jul-15 31-Jul-15 11.00am CLOSED 26-Aug-15 28
inside trench at SR 3 (6-7) CH600 - CH950, RHS
204 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00202 UEMB ABDUL HADI 27-Jul-15 SR3 CIV Concreting Inspection for formwork, rebar, concreting 28-Jul-15 30-Jul-15 3.00pm CLOSED 22-Aug-15 25
205 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00203 UEMB ABDUL HADI 28-Jul-15 SR3 CIV Concreting Inspection for formwork, rebar, concreting wall: 29-Jul-15 31-Jul-15 9.30am CLOSED 27-Aug-15 29
sump 88,89,90,91,114,115. Base: sump 53.
209 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00207 PPEC 4-Aug-15 SR3 CIV survey Joint survey asbuilt dranage SR3 CH 700-CH900 6-Aug-15 8-Aug-15 10.00am CLOSED CANCEL
210 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00208 Uem Hadi 4-Aug-15 SR3 CIV Dranage Inspection for rebar, formwork and concreting 5-Aug-15 7-Aug-15 3.00pm CLOSED 19-Aug-15 14
work (wall:sunp 54)
217 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00215 UEMB KHAIRIL 3-Sep-15 SR3 CIV testing FDT for roadbase at T-junction SR3/SR5 4-Sep-15 6-Sep-15 9.00am CLOSED 05-Sep-15 1
218 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00216 Instant Option 8-Sep-15 SR3 ELE Backfilling Backfilling trench at SR3 CH 200 9-Sep-15 11-Sep-15 1.00pm CLOSED 12-Oct-15 33
219 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00217 Instant Option 8-Sep-15 SR3 ELE Excavation and laying af Excavation and laying of HDPE corrgated pipe 9-Sep-15 11-Sep-15 10.00am CLOSED 12-Oct-15 33
HDPE concrete pipe inside trench at SR3 CH 200
226 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00224 Yuzuki 30-Sep-15 SR3 CIV Fencing Excavation, installation and concreting at SR 3 for 1-Oct-15 3-Oct-15 2.00pm CLOSED 1-Oct-15 0
Compact sub -LP2,SSCF/2
228 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00226 Paneagle 10-Oct-15 SR3 CIV Crossing Bridge (Compact Sub) Crossing bridge base slab 10-Oct-15 12-Oct-15 4.00pm CLOSED CANCEL
Instant Option 12-Oct-15 SR3 ELE Installation of Manhole Installation of manhole at SR3 Common 13-Oct-15 15-Oct-15 10.00am
229 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00227
building area (Internal Manhole) CLOSED CANCEL
Concreting for wall and slab for crossing bridge
230 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00228 Paneagle 12-Oct-15 SR3 CIV Crossing Bridge at SR3- Compact sub 12-Oct-15 14-Oct-15 4.00pm CLOSED CANCEL
231 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00229 Instant Option 14-Oct-15 SR3 PIP Tie in installation Installation of tie in at SR3 CH0-CH1200 15-Oct-15 17-Oct-15 10.00am CLOSED 08-Dec-15 54
235 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00233 PPEC 27-Oct-15 SR3 CIV Road works Retest Grading for premix at Roundabout 4 28-Oct-15 30-Oct-15 8.00am CLOSED 03-Nov-15 6
236 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00234 Instant Option 16-Apr-15 SR3 PIP Welding Inspection for HDPE pipe (Potable water) SR3 17-Apr-15 19-Apr-15 10.00am CLOSED 24-Nov-15 221
CH600-800
237 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00235 Instant Option 16-Apr-15 SR3 PIP Welding Inspection for HDPE pipe (Sewerage water) SR3 17-Apr-15 19-Apr-15 10.00am CLOSED 02-Dec-15 229
CH600-800
Instant Option 19-Nov-15 SR3 ELE Installation rework for manhole installation at SR3- Admin 20-Nov-15 22-Nov-15 10.00am
238 RAPID-P20A1-UEMB-SR3-PIP-RFIN-00236
building area CLOSED 09-Apr-16 141
240 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00238 UEMB Nizan 22-Nov-15 SR3 CIV Testing FDT for roadbase(CH300-CH400) 22-Nov-15 24-Nov-15 11.00am CLOSED 22-Nov-15 0
241 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00239 PPEC 22-Nov-15 SR3 CIV Roadwork Application of Prime coat at Service road 3 (SR3) 23-Nov-15 25-Nov-15 8.00am CLOSED CANCEL
242 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00240 PPEC 22-Nov-15 SR3 CIV Roadwork Laying of ACBC 28 at Service road 3 (SR3) 23-Nov-15 25-Nov-15 12.00pm CLOSED 11-Apr-16 140
243 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00241 coremanpower 1-Jan-16 SR3 CIV Roadwork Laying of ACBC 28 at Roundabout 4 (SR3 & SR8) 2-Jan-16 4-Jan-16 10.00am CLOSED 1-Feb-16 30
245 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00243 omitech 23-Jan-16 SR3 CIV road signanges installation of road signages at SR3 23-Jan-16 25-Jan-16 2.00pm CLOSED 23-Jan-16 0
Prepare and concreting base slab for sliding gate at
246 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00244 coremanpower 19-Apr-16 SR3 CIV Material 27-Mar-16 29-Mar-16 10.00am CLOSED 27-Mar-16 0
SR3
247 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00245 coremanpower 19-Apr-16 SR3 CIV sliding gate Installation of sliding gate 29-Mar-16 31-Mar-16 11.00am CLOSED 20-Jun-16 83
249 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00247 zulfaqar 26-Nov-15 SR3 CIV Turfing Turfing work at SR3 27-Nov-15 29-Nov-15 10.00am CLOSED 20-Jun-16 206
250 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00248 AEIE 20-Jul-16 SR3 ELE miggering meggering incoming cable 1x4c 70mm sq 21-Jul-16 23-Jul-16 10.00am CLOSED 26-Jul-16 5
xlpe/swa/pvc for FP-S2 from LP6,SSI/2
251 RAPID-P20A1-UEMB-SR3-ELE-RFIN-00249 AEIE 20-Jul-16 SR3 ELE installation installation of underground cable laying for SP-S2 21-Jul-16 23-Jul-16 10.00am CLOSED 26-Jul-16 5
from LP6,SS1/2 1x4c 70mmsq xlpe/swa/pvc
252 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00250 zulfaqar 20-Oct-15 SR3 ELE road works Preparation of subgrade and dipping at CH1000 - 21-Oct-15 23-Oct-15 10.00am CLOSED 28-Jul-16 281
CH1300
253 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00251 zulfaqar 7-Nov-15 SR3 CIV roadwork Preparation of subgrade and dipping at SR3 CH60 - 9-Nov-15 11-Nov-15 8.00am CLOSED 23-Aug-16 288
CH200
258 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00256 zulfaqar 16-Nov-15 SR3 CIV roadwork Preparation of subbase and dipping at SR3 CH620 - 17-Nov-15 19-Nov-15 8.00am CLOSED 23-Aug-16 280
CH900
259 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00257 zulfaqar 28-Nov-15 SR3 CIV roadwork Preparation of subbase and dipping at SR3 CH1000 30-Nov-15 2-Dec-15 8.00am CLOSED 23-Aug-16 267
- CH1300
Preparation of Roadbase and dipping at
260 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00258 zulfaqar 1-Dec-15 SR3 CIV roadwork 2-Dec-15 4-Dec-15 8.00am CLOSED 23-Aug-16 265
Roundabout 4
263 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00261 FAIZAL 14-Jan-15 SR3 CIV Drainage Installation of box culvert size 3600mm X 2400mm 15-Jan-15 17-Jan-15 9.00am CLOSED 1-Sep-16 595
264 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00262 AMIN 13-Apr-15 SR3 CIV Drainage installation of works of U-drain size 14-Apr-15 16-Apr-15 9.00am CLOSED 1-Sep-16 506
900mmz900mm and backfilling and mortar jointing
265 RAPID-P20A1-UEMB-SR3-CIV-RFIN-00263 MAZLAN 19-Jan-17 SR3 CIV Drainage Work Installation Of MS Grating Cover for sump at SR 3 20-Jan-17 22-Jan-17 9.00am CLOSED 20-Jan-17 0
266
267
268
12/26/2014
Remarks TOTAL RFIN CLOSED RFIN
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ChangeCH 750-
CH600 to 250-580
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
NCEL 1 1
REJECTED 1 1
No Activity
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
Change (CH0-
ACCEPTED CH1000) to 1 1
(CH580-1280)
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
NCEL 1 1
REJECTED 1 1
No Activity
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
NCEL 1 1
NCEL 1 1
NCEL 1 1
NCEL 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
NCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
265 265
44 a 44b
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(SERVICE ROAD 4)
1 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00001 En Misbah 8-Oct-14 SR4 CIV Testing Mackintosh Probe testing (MP 30,29, 28&21) 9-Oct-14 11-Oct-14 8.00 am CLOSED 10-Oct-14 1
2 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00002 Azlan 18-Oct-14 SR4 CIV Survey Joint survey inspection for drainage alignment (Precat 19-Oct-14 21-Oct-14 10.00 am CLOSED 26-Jan-15 99
U-drain 600 X 600 - 118m length)
3 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00003 Instant Option 1-Dec-14 SR4 CIV Drainage Excavation & Laying U-drain 2-Dec-14 4-Dec-14 11.00 am CLOSED 12-Dec-14 10
5 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00005 Instant Option 8-Dec-14 SR4 CIV Drainage Laying of Pre-cast concrete U-drain 10-Dec-14 12-Dec-14 3.00 pm CLOSED 12-Feb-15 64
6 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00006 Instant Option 8-Dec-14 SR4 CIV Drainage Excavation for U-drain 600 X 600 10-Dec-14 12-Dec-14 3.00 pm CLOSED 23-Jan-15 44
9 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00009 Instant Option 18-Dec-14 SR4 CIV Drainage Receiving U-drain size 900 X 900 & 900 x 750 19-Dec-14 21-Dec-14 4.00 pm CLOSED 07-Feb-15 50
10 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00010 Instant Option 18-Dec-14 SR4 CIV Drainage Receiving U-drain size 600 X 600 & 450 x 450 18-Dec-14 20-Dec-14 4.00 pm CLOSED 07-Feb-15 51
11 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00011 Instant Option 18-Dec-14 SR4 CIV Drainage Receiving U-drain size 900 X 600 16-Dec-14 18-Dec-14 4.00 pm CLOSED 26-Feb-15 72
12 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00012 Instant Option 19-Dec-14 SR4 CIV Drainage Material Delivery Inspection for i) U-Drain (900x900) ii) 20-Dec-14 22-Dec-14 10.00 am CLOSED 27-Feb-15 69
Box Culvert (1500x1500) and iii) Geotextile
13 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00013 Instant Option 22-Dec-14 SR4 CIV Drainage receiving u drain sized 900x900 23-Dec-14 25-Dec-14 3.00pm CLOSED 23-Feb-15 62
14 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00014 Instant Option 24-Dec-14 SR4 CIV Drainage Receiving U-Drain size 900x900 26-Dec-14 28-Dec-14 10.00am CLOSED 28-Feb-15 64
15 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00015 Instant Option 24-Dec-14 SR4 CIV Drainage To inspect the drainage work 26-Dec-14 28-Dec-14 10.00am CLOSED 12-Feb-15 48
16 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00016 Instant Option 24-Dec-14 SR4 CIV Drainage To inspect the installation of pre-cast U-Drain 26-Dec-14 28-Dec-14 10.00am CLOSED 12-Feb-15 48
21 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00021 Instant Option 26-Dec-14 SR4 CIV Drainage To verify & confirm the alignment of U-drain at CH30L- 29-Dec-14 31-Dec-14 10.00am CLOSED 26-Jan-15 28
CH354L
-Backfilling
-Backfilling
-Excavation of trench U-drain
-Backfilling
26 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00026 Instant Option 29-Dec-14 SR4 CIV Drainage Receiving U-drain 900 X 900 30-Dec-14 1-Jan-15 10.00am CLOSED 18-Mar-15 78
-Backfilling
28 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00028 Instant Option 30-Dec-14 SR4 CIV Drainage Receiving box culvert size 2100 X 1800 31-Dec-14 2-Jan-15 2.00pm CLOSED 04-Feb-15 35
30 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00030 Instant Option 31-Dec-14 SR4 CIV Drainage Receiveing U-Drain 900x750 and 1200x900 3-Jan-15 5-Jan-15 2.00pm CLOSED 26-Feb-15 54
31 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00031 Instant Option 31-Dec-14 SR4 CIV Drainage Receiivng U-Drain 900x900 1-Jan-15 3-Jan-15 2.00pm CLOSED 27-Feb-15 57
32 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00032 Instant Option 31-Dec-14 SR4 CIV Drainage Receiivng U-Drain 900x900 4-Jan-15 6-Jan-15 1.00pm CLOSED 27-Feb-15 54
34 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00034 Instant Option 6-Jan-15 SR4 CIV Drainage Joint survey to check alignment & level at SR 4C CH00R - 7-Jan-15 9-Jan-15 10.00am CLOSED 27-Aug-15 232
CH352R
35 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00035 Instant Option 6-Jan-15 SR4 CIV Drainage Joint survey to check & confirm drain level & alignment 7-Jan-15 9-Jan-15 11.00am CLOSED 7-Jun-15 151
7 level at SR 4 CH30L - CH354L
36 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00036 Instant Option 6-Jan-15 SR4 CIV Drainage Joint survey to check & confirm drain alignment & level 7-Jan-15 9-Jan-15 2.00pm CLOSED 07-Jun-15 151
at SR 4L CH422L - CH715L
38 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00038 Instant Option 6-Jan-15 SR4 CIV Drainage Receiving U-drain 900 X 900 7-Jan-15 9-Jan-15 2.00pm CLOSED 06-Feb-15 30
39 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00039 Instant Option 8-Jan-15 SR4 CIV Drainage - Excavation - Preparing Bedding - Lay U-Drain 9-Jan-15 11-Jan-15 8.00am CLOSED 23-Feb-15 45
40 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00040 Instant Option 9-Jan-15 SR4 CIV Drainage Receiving U-Drain & Box Culvert (Various Sizes) - 7-Jan-15 9-Jan-15 08.00am CLOSED 06-Feb-15 30
Backdated
41 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00041 Instant Option 9-Jan-15 SR4 CIV Drainage Receiving U-Drain & Box Culvert (Various Sizes) 10-Jan-15 12-Jan-15 08.00am CLOSED 14-Mar-15 63
43 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00043 Instant Option 12-Jan-15 SR4 CIV Drainage Receiving U-Drain and Box Culvert (various sizes) 13-Jan-15 15-Jan-15 11.00am CLOSED 20-Mar-15 66
46 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00046 Instant Option 14-Jan-15 SR4 CIV Drainage Receiving U-Drain and Box Culvert (various sizes) 15-Jan-15 17-Jan-15 11.00am CLOSED 06-Mar-15 50
47 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00047 Instant Option 14-Jan-15 SR4 CIV Drainage 1) Excavation (2) Prepare Bedding (3) Laying of U-Drain 16-Jan-15 18-Jan-15 08.00am CLOSED 20-Jan-15 4
48 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00048 Instant Option 14-Jan-15 SR4 CIV Drainage Receiving U-Drain 900x900mm 17-Jan-15 19-Jan-15 11.00am CLOSED 06-Mar-15 48
49 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00049 Instant Option 15-Jan-15 SR4 CIV Survey Joint survey to check and confirm allignment and level 16-Jan-15 18-Jan-15 3.00pm CLOSED 16-Jan-15 0
of box culvert at SR4 CH
50 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00050 Instant Option 15-Jan-15 SR4 CIV Drainage Excavation, Prepare bedding and Lay U-Drain CH420 17-Jan-15 19-Jan-15 08.00am CLOSED 30-Jan-15 13
51 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00051 Instant Option 16-Jan-15 SR4 CIV Drainage Receiving U-drain 1) 1500x1500 (2) 1200x900 17-Jan-15 19-Jan-15 11.00am CLOSED 11-Mar-15 53
52 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00052 Instant Option 16-Jan-15 SR4 CIV Survey Joint Survey to check and confirm allignment and level 20-Jan-15 22-Jan-15 10.00am CLOSED 23-Jan-15 3
at SR4 CH0-CH90.96 SR4 CH6=5 (Drain 1500x900)
53 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00053 Instant Option 17-Jan-15 SR4 CIV Drainage Excavation, Prepare bedding and Lay U-Drain and Box 19-Jan-15 21-Jan-15 08.00am CLOSED 17-Mar-15 57
Culvert CH190-CH250R
54 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00054 Ikhwan 19-Jan-15 SR4 CIV Drainage Joint Measurement Inspections 20-Jan-15 22-Jan-15 10.00am CLOSED 20-Jan-15 0
56 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00056 MENTA 21-Jan-15 SR4 CIV Roadworks Trimming Subgrade, Dipping for subgrade level, laying 20-Jan-15 22-Jan-15 08.00am CLOSED 06-Mar-15 45
subase material and FDT subgrade and subbase
57 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00057 Instant Option 22-Jan-15 SR4 CIV Survey Joint Survey to check and confirm the allignment and 23-Jan-15 25-Jan-15 10.00am CLOSED 23-Jan-15 0
level of road at SR4A
58 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00058 Instant Option 22-Jan-15 SR4 CIV Drainage Excavation, Prepare Bedding and Lay U-Drain 23-Jan-15 25-Jan-15 2.00pm CLOSED 30-Jan-15 7
59 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00059 MENTA 22-Jan-15 SR4 CIV Roadworks Subbase -Trimming - Dipping and Layin 23-Jan-15 25-Jan-15 08.00am CLOSED 26-Jan-15 3
60 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00060 MENTA 22-Jan-15 SR4 CIV Roadworks FDT Subbase CH0-CH300 23-Jan-15 25-Jan-15 08.00am CLOSED 31-Jan-15 8
61 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00061 MENTA 22-Jan-15 SR4 CIV Roadworks Trimming subgrade and dipping for bus stop CH30- 23-Jan-15 25-Jan-15 08.00am CLOSED 26-Jan-15 3
CH300
62 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00062 MENTA 22-Jan-15 SR4 CIV Roadworks Subbase - Laying - Trimming - Dipping for Bus Stop 23-Jan-15 25-Jan-15 08.00am CLOSED 02-Feb-15 10
CH30-CH300
63 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00063 Zaki 23-Jan-15 SR4 CIV Drainage Joint Measurement Inspections 23-Jan-15 25-Jan-15 9.30am CLOSED 23-Jan-15 0
64 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00064 Instant Option 23-Jan-15 SR4 CIV Drainage Preparing subgrade and Joint Dipping for Subgrade at 24-Jan-15 26-Jan-15 11.00am CLOSED 02-Feb-15 9
SR4B CH40-CH110
65 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00065 Instant Option 23-Jan-15 SR4 CIV Drainage Receiving Box Culvert various size (a) 1500x1500 (b) 24-Jan-15 26-Jan-15 10.00am CLOSED 02-Feb-15 9
600x450 © 600x600
66 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00066 MENTA 26-Jan-15 SR4 CIV Roadworks Roadbase 1st layer Trimming, Laying geogrid (CH0- 26-Jan-15 28-Jan-15 10.00am CLOSED 07-Feb-15 12
CH40) Laying Roadbase 1st layer CH0-CH310
67 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00067 MENTA 26-Jan-15 SR4 CIV Roadworks FDT Roadbase 1st layer at CH0-CH310 26-Jan-15 28-Jan-15 10.00am CLOSED 06-Mar-15 39
68 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00068 UEMB QAQC SYAFIQ 23-Jan-15 SR4 CIV Roadworks FDT for subgrade at SR4B CH40-CH110 24-Jan-15 26-Jan-15 10.00am CLOSED 02-Feb-15 9
69 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00069 Instant Option 26-Jan-15 SR4 CIV Survey Joint Survey to check and confirm allignment for box 27-Jan-15 29-Jan-15 10.00am CLOSED 27-Jan-15 0
culvert
70 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00070 Instant Option 26-Jan-15 SR4 CIV Drainage Receiving U-Drain 2100x1800 OKA 27-Jan-15 29-Jan-15 11.00am CLOSED 18-Mar-15 50
71 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00071 Instant Option 26-Jan-15 SR4 CIV Roadworks Prepare subbase and joint dipping for subbase CH10- 28-Jan-15 30-Jan-15 08.00am CLOSED 02-Feb-15 5
CH170
72 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00072 Instant Option 26-Jan-15 SR4 CIV Roadworks FDT for subbase at SR4B CH10-CH170 28-Jan-15 30-Jan-15 11.00am CLOSED 11-Mar-15 42
73 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00073 MENTA 26-Jan-15 SR4 CIV Roadworks Subgrade preparation, trimming and dipping 27-Jan-15 29-Jan-15 08.00am CLOSED 20-Jan-15 -7
74 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00074 MENTA 26-Jan-15 SR4 CIV Roadworks FDT for subgrade at SR4 CH310-CH690 27-Jan-15 29-Jan-15 11.00am CLOSED 30-Jan-15 3
75 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00075 Instant Option 28-Jan-15 SR4 CIV Drainage Construction of RC Sump (Sump S3) aat CH15, Sump 2 at 29-Jan-15 31-Jan-15 10.00am CLOSED 05-Oct-15 249
CH40 and CH50
76 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00076 Instant Option 29-Jan-15 SR4 CIV Survey Joint survey for as-built drawing for U-Drain at SR4 2-Feb-15 4-Feb-15 09.00am CLOSED 12-Feb-15 10
CH300R-CH600R
77 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00077 Instant Option 29-Jan-15 SR4 CIV Drainage Receiving Box Culvert (1) 600x600 (2) 600x450 29-Jan-15 31-Jan-15 11.00am CLOSED 01-Apr-15 62
78 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00078 Instant Option 29-Jan-15 SR4 CIV Roadworks Trimming and preparing subgrade at SR4A CH40-CH110 29-Jan-15 31-Jan-15 2.00pm CLOSED 12-Feb-15 14
Joint Dipping per subgrade
79 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00079 Instant Option 29-Jan-15 SR4 CIV Drainage Receiving U-Drain 2100x1800 31-Jan-15 2-Feb-15 11.00am CLOSED 23-Feb-15 23
80 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00080 Instant Option 29-Jan-15 SR4 CIV Drainage Receiving Box Culvert 4800x1200 30-Jan-15 1-Feb-15 2.00pm CLOSED 23-Feb-15 24
81 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00081 Instant Option 30-Jan-15 SR4 CIV Drainage Excavation, prepare bedding and laying 31-Jan-15 2-Feb-15 08.00am CLOSED 20-Mar-15 48
82 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00082 Instant Option 30-Jan-15 SR4 CIV Drainage Receiving U-Darain (a) 1500x1500 (b) 1500x900 1-Feb-15 3-Feb-15 08.00am CLOSED 04-Feb-15 3
83 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00083 Instant Option 30-Jan-15 SR4 CIV Drainage Receiving U-Drain 2100x1800 31-Jan-15 2-Feb-15 08.00am CLOSED 23-Feb-15 23
84 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00084 Instant Option 30-Jan-15 SR4 CIV Roadworks Prepariing subbase for roadwork, joint dipping for 31-Jan-15 2-Feb-15 08.00am CLOSED 12-Feb-15 12
subbase for roadwork at SR4A CH20-CH110
85 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00085 Instant Option 30-Jan-15 SR4 CIV Roadworks FDT for subbase ch20-ch110 1-Feb-15 3-Feb-15 08.00am CLOSED 10-Jun-15 129
86 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00086 MENTA 31-Jan-15 SR4 CIV Roadworks 2nd layer roadbase - laying and trimming (CH0-CH310) 2-Feb-15 4-Feb-15 11.00am CLOSED 25-Feb-15 23
87 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00087 MENTA 31-Jan-15 SR4 CIV Roadworks 2nd layer roadbase - FDT Testing (CH0-CH310) 2-Feb-15 4-Feb-15 11.00am CLOSED 31-Jan-15 -2
88 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00088 Instant Option 4-Feb-15 SR4 CIV Drainage Receiving Box Culvert 4800x2100 4-Feb-15 6-Feb-15 1.00pm CLOSED 23-Feb-15 19
89 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00089 Instant Option 4-Feb-15 SR4 CIV Drainage Receiving U-Drain (a) 1500x900 (b) 1500x1500 5-Feb-15 7-Feb-15 2.00pm CLOSED 10-Feb-15 5
90 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00090 Instant Option 4-Feb-15 SR4 CIV Drainage Excavation Trench, Prepare bedding to receive U-Drain 5-Feb-15 7-Feb-15 08.00am CLOSED 16-Feb-15 11
and Lay U-Drain
91 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00091 Instant Option 4-Feb-15 SR4 CIV Drainage Prepare sump at SR4 at SR4 CH50L (S2) and S4/5 at 6-Feb-15 8-Feb-15 2.00pm CLOSED 05-Oct-15 241
SR4A CH120R
93 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00093 Instant Option 4-Feb-15 SR4 CIV Drainage Joint survey for as-built drawing (SR4 CH700-CH1000) 6-Feb-15 8-Feb-15 10.00am CLOSED 07-Feb-15 1
94 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00094 Menta 3-Feb-15 SR4 CIV Road Work 2and Layer roadbase (Bus Stop) ch0-ch700 4-Feb-15 6-Feb-15 10.00am CLOSED 28-Feb-15 24
95 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00095 Menta 3-Feb-15 SR4 CIV Road Work FDT testing for 2nd layer roadbase (Bus Stop) 4-Feb-15 6-Feb-15 10.00am CLOSED 06-Feb-15 2
96 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00096 Instant Option 7-Feb-15 SR4 CIV Drainage Receving U drain & Box Culvert (1500x1500 7-Feb-15 9-Feb-15 10.00am CLOSED 14-Mar-15 35
UD,1500x900 UD, 2100x1800BC,2100x1800UD)
97 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00097 Instant Option 7-Feb-15 SR4 CIV Drainage Re Bar & Base formwork inspection for sump S2 at CH 9-Feb-15 11-Feb-15 09.00am CLOSED 14-Mar-15 33
70 & CH 90 SR 4B
Instant Option 9-Feb-15 SR4 CIV FDT test for roadwork at SR4A CH 20-CH110 and 10-Feb-15 12-Feb-15 09.00am 10-Feb-15
98 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00098 Testing SR4B CH 10-CH 170 CLOSED 0
99 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00099 Instant Option 10-Feb-15 SR4 CIV Drainage Post-Concrete Inspection for sumps at SR4B 11-Feb-15 13-Feb-15 10.00am CLOSED 11-Feb-15 0
100 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00100 Instant Option 10-Feb-15 SR4 CIV Drainage Receiving U-Drain 2100x1800 (oka) 11-Feb-15 13-Feb-15 11.00am CLOSED 11-Mar-15 28
101 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00101 Instant Option 10-Feb-15 SR4 CIV Survey Joint survey to check and confirm level and allignment 11-Feb-15 13-Feb-15 10.00am CLOSED 11-Feb-15 0
of u-drain at sr4 CH110-CH371
102 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00102 Menta 11-Feb-15 SR4 CIV Road Work FDT test sub base ch350-ch650 12-Feb-15 14-Feb-15 10.00am CLOSED 06-Mar-15 22
103 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00103 Menta 11-Feb-15 SR4 CIV Road Work Sub Base - Laying and Trimming 12-Feb-15 14-Feb-15 10.00am CLOSED 25-Feb-15 13
105 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00105 Instant Option 11-Feb-15 SR4 CIV Drainage Receiving U drain and box culvert (API) 2100X1800 box 12-Feb-15 14-Feb-15 10.00am CLOSED 06-Mar-15 22
culvert and 1500 x 900 udrain
106 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00106 Instant Option 12-Feb-15 SR4 CIV Drainage Receiving U drain 2100X1800 OKA 13-Feb-15 15-Feb-15 10.00am CLOSED 06-Mar-15 21
107 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00107 Instant Option 12-Feb-15 SR4 CIV Drainage Joint Survey for as built dranage at SR4A and SR4B 13-Feb-15 15-Feb-15 10.00am CLOSED 13-Feb-15 0
108 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00108 Instant Option 24-Feb-15 SR4 CIV Drainage Reciving & inspecting of metarial ( u-drain 2100x1800, L- 25-Feb-15 27-Feb-15 10.00am CLOSED 04-Mar-15 7
shape wall)
109 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00109 Instant Option 24-Feb-15 SR4 CIV Drainage Excavate trench at set CH170-CH310) Prepare bedding 25-Feb-15 27-Feb-15 10.00am CLOSED 17-Mar-15 20
and Lay u drain
110 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00110 Instant Option 24-Feb-15 SR4 CIV Drainage Inspection of re-bar arragement for sump S2 at SR4 CH 25-Feb-15 27-Feb-15 10.00am CLOSED 14-Mar-15 17
60 & sump S9 at SR4 CH 100 and CH125
111 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00110a Instant Option 27-Feb-15 SR4 CIV Drainage Concrete pour for sump S2 at SR4 CH60 & Sump9 at SR4 27-Feb-15 1-Mar-15 11.00am CLOSED 06-Apr-15 38
CH100 &CH 25
112 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00111 Menta 2-Mar-15 SR4 CIV Road Work 2nd Road Base Topup / touch up to level, Trimming. 2-Mar-15 4-Mar-15 02.00PM CLOSED 12-Mar-15 10
(CH120- CH 190)
113 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00112 Menta 2-Mar-15 SR4 CIV Road Work Sub base Laying and trimming (CH 1950-2150) 2-Mar-15 4-Mar-15 10.00am CLOSED 12-Mar-15 10
114 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00113 Menta 2-Mar-15 SR4 CIV Road Work Sub Grade trimming and Laying (CH750-950) 2-Mar-15 4-Mar-15 02.00PM CLOSED 15-Mar-15 13
116 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00115 Propel 28-Feb-15 SR4 CIV Drainage Spray prime coat at at CH0-40, Lay Acbc at CH0-40 3-Mar-15 5-Mar-15 10.00am CLOSED 17-Mar-15 14
117 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00116 Propel 2-Mar-15 SR4 CIV Road Work Spray prime coat, Lay Acbc 2-Mar-15 4-Mar-15 5.00am CLOSED 17-Mar-15 15
118 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00117 Azlan 2-Mar-15 SR4 CIV Road Work Spray prime coat, Lay Acbc 2-Mar-15 4-Mar-15 5.00am CLOSED 06-Mar-15 4
119 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00118 Uem Azlan 2-Mar-15 SR4 CIV Testing FDT test for SR4A = ch20-110 and SR4B= CH10-170 2-Mar-15 4-Mar-15 5.00am CLOSED CANCEL
120 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00119 MENTA 4-Mar-15 SR4 CIV Road Work Roadbase Laying and Trimming 5-Mar-15 7-Mar-15 10.00am CLOSED 02-Nov-15 242
121 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00120 Instant Option 4-Mar-15 SR4 CIV Drainage Trench excavation, Prepare Bedding, Lay L Shape arain 5-Mar-15 7-Mar-15 10.00am CLOSED 15-Mar-15 10
( SR4 CH 600)
123 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00122 Instant Option 4-Mar-15 SR4 CIV Survey Joint Servay to Check and comfirm alignment & level for 5-Mar-15 7-Mar-15 10.00am CLOSED 05-Mar-15 0
U-drain size 4500)x2100 at SR4 CH 600
124 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00123 Instant Option 4-Mar-15 SR4 CIV Drainage Concrete pour for wall at sump 9 & sump 3 (reffer to 5-Mar-15 7-Mar-15 2.00pm CLOSED 11-Mar-15 6
drawing)
125 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00124 Instant Option 6-Mar-15 SR4 CIV Drainage Inspection of rebare for sump 8 at SR4A and Concrete 7-Mar-15 9-Mar-15 2.00pm CLOSED 14-Mar-15 7
pour for base
126 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00125 Instant Option 6-Mar-15 SR4 CIV Drainage Concrete pour for Sump 11 and 12 (wall) at SR4 7-Mar-15 9-Mar-15 1.00pm CLOSED 14-Mar-15 7
127 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00126 Instant Option 11-Mar-15 SR4 CIV Drainage Inspection of rebar for Sump's wall (Sump 12 at SR4) 12-Mar-15 14-Mar-15 2.00pm CLOSED 13-Mar-15 1
128 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00127 Instant Option 11-Mar-15 SR4 CIV Drainage Concrete pour for sump's wall (Sump 12 at SR4) 13-Mar-15 15-Mar-15 4.00Pm CLOSED 13-Mar-15 0
129 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00128 Propel 12-Mar-15 SR4 CIV Surveyor As Built SR4A CH 0- 120 and 4B CH0-167 13-Mar-15 15-Mar-15 09.00am CLOSED 13-Mar-15 0
130 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00129 Instant Option 16-Mar-15 SR4 CIV Drainage Rebar Inspection for sump 21 base at SR4(T15) 17-Mar-15 19-Mar-15 10.00am CLOSED 04-Apr-15 18
131 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00130 Instant Option 16-Mar-15 SR4 CIV Drainage Concrete pour for Sump's base ( Sump 21 ) at SR4 17-Mar-15 19-Mar-15 2.00pm CLOSED 20-Mar-15 3
132 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00131 Propel 16-Mar-15 SR4 CIV Road Work Lay ACBC 28 (CH480- Ch 670) 17-Mar-15 19-Mar-15 09.00am CLOSED 18-Mar-15 1
133 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00132 Propel 16-Mar-15 SR4 CIV Road Work Spray Prime Coat(CH480- Ch 670) 17-Mar-15 19-Mar-15 09.00am CLOSED 18-Mar-15 1
134 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00133 PPEC 19-Mar-15 SR4 CIV Road Work Inspection for receiving material unipave interlocking 20-Mar-15 22-Mar-15 08.00am CLOSED 21-Mar-15 1
concrete paver
135 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00134 Zaki 20-Mar-15 SR4 CIV Trial Pit Excavation of Trial Pit to Peat Soil identifactio 21-Mar-15 23-Mar-15 10.00am CLOSED 25-Mar-15 4
UEMB QAQC
136 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00135 19-Mar-15 SR4 CIV Drainage cube test for sump wall S8 & S12 20-Mar-15 22-Mar-15 10.00am CLOSED 21-Mar-15 1
NORAZAH
137 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00136 Instant Option 19-Mar-15 SR4 CIV Drainage Trench excavation, Prepare Bedding for 2100 X 1800 UD 19-Mar-15 21-Mar-15 10.00am CLOSED 25-Mar-15 6
at SR4 CH110-CH80
138 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00137 Instant Option 19-Mar-15 SR4 CIV Drainage Lay 2100 X 1800 UD at SR4 CH110 - Ch080 19-Mar-15 21-Mar-15 10.00am CLOSED 25-Mar-15 6
139 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00138 Propel 20-Mar-15 SR4 CIV Road Work Lay Premix at SR 4 ( CH 480 -CH670) 24-Mar-15 26-Mar-15 09.00am CLOSED 28-Mar-15 4
140 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00139 Instant Option 24-Mar-15 SR4 CIV Drainage Receiving U drain 2100 x1800 25-Mar-15 27-Mar-15 02.00am CLOSED 27-Mar-15 2
142 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00141 Instant Option 24-Mar-15 SR4 CIV Drainage L shape wall & dry weather flow (For Drain size 25-Mar-15 27-Mar-15 09.00am CLOSED 30-Mar-15 5
4800x2100) at SR 4 CH300-CH320
146 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00145 Instant Option 25-Mar-15 SR4 CIV Drainage Concrete pour for sump 21 wall at SR4 CH 20 and 26-Mar-15 28-Mar-15 11.00am CLOSED 28-Mar-15 2
jointing wall for 2100x 1800 UD at SR4/SR7 rounabout
147 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00146 MENTA 26-Mar-15 SR4 CIV Drainage Road base/ Crusherun excavation to Check thicness 26-Mar-15 28-Mar-15 10.00am CLOSED 25-Nov-15 244
149 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00148 Instant Option 26-Mar-15 SR4 CIV Drainage Excavate trench & prepare bedding for L shape wall 27-Mar-15 29-Mar-15 10.30am CLOSED 29-Mar-15 2
(4800x2100) at SR4 CH680-CH660
UEMB QAQC
150 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00149 26-Mar-15 SR4 CIV Testing MP test at SR 4 ( CH 40-CH 370) 5 points 27-Mar-15 29-Mar-15 10.30am CLOSED 27-Mar-15 0
NORAZAH
151 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00150 Instant Option 27-Mar-15 SR4 CIV Drainage Formwork&rebar inspection for sump 17 base at SR4 28-Mar-15 30-Mar-15 09.00am CLOSED 28-Mar-15 0
CH420L
152 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00151 Instant Option 27-Mar-15 SR4 CIV Drainage Concrete pour for Sump 17 at SR4 CH420L 28-Mar-15 30-Mar-15 09.00am CLOSED 30-Mar-15 2
153 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00152 Instant Option 27-Mar-15 SR4 CIV Drainage Excavate trench & prepare bedding for L shape wall 30-Mar-15 1-Apr-15 09.00am CLOSED 31-Mar-15 1
(4800x2100) at SR4 CH660-CH640
154 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00153 Instant Option 27-Mar-15 SR4 CIV Drainage Lay L shape wall c/w dry wather flow (4800x2100) at 30-Mar-15 1-Apr-15 10.30am CLOSED 01-Apr-15 2
SR4 CH660-CH640
155 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00154 Instant Option 27-Mar-15 SR4 CIV Drainage Excavate trench for L shape wall for 4800x2100 drain at 30-Mar-15 1-Apr-15 10.30am CLOSED 31-Mar-15 1
SR4 CH 640-CH620
156 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00155 Instant Option 27-Mar-15 SR4 CIV Drainage Receiving L shape wall ( 2250x2090) with dry weather 28-Mar-15 30-Mar-15 09.00am CLOSED 28-Mar-15 0
flow channel
PPEC 27-Mar-15 SR4 CIV Drainage Inspection for received material 80mm interlocking 28-Mar-15 30-Mar-15 08.00am
157 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00156
block CLOSED CANCEL
162 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00161 ppec 1-Apr-15 SR4 CIV Interlocking Inspection for received material at SR 4 bus stop 7 2-Apr-15 4-Apr-15 8.00am CLOSED 04-Apr-15 2
166 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00165 Instant Option 7-Apr-15 SR4 CIV Drainage Concrete pour for sump 17 wall at SR4 CH 420 8-Apr-15 10-Apr-15 09.00am CLOSED 08-Apr-15 0
169 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00168 Instant Option 9-Apr-15 SR4 CIV Drainage Concrete pour per sump S27 CH 420 11-Apr-15 13-Apr-15 11.00am CLOSED 25-Apr-15 14
170 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00169 Instant Option 9-Apr-15 SR4 CIV Drainage Inspection for reinforcement and formwork ( Wall) 11-Apr-15 13-Apr-15 11.00am CLOSED 11-Apr-15 0
172 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00171 Instant Option 11-Apr-15 SR4 CIV Drainage Instalation for L shape 4500x2100 at SR4 CH 700 LHS 11-Apr-15 13-Apr-15 2.30pm CLOSED 20-Apr-15 9
173 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00172 Instant Option 11-Apr-15 SR4 CIV Drainage Installation for Lshape at SR4 CH 700 ( LHS 12-Apr-15 14-Apr-15 10.00am CLOSED 24-Apr-15 12
174 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00173 Instant Option 11-Apr-15 SR4 CIV Drainage Concrete works for slab sump 27 12-Apr-15 14-Apr-15 11.00am CLOSED 20-Apr-15 8
175 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00174 Instant Option 11-Apr-15 SR4 CIV Drainage Inspetion form works sump 16 (wall) 12-Apr-15 14-Apr-15 9.00am CLOSED 18-Apr-15 6
176 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00175 Instant Option 11-Apr-15 SR4 CIV Drainage Rebar work for capping beam at SR4 ch700 (RHS) 12-Apr-15 14-Apr-15 9.00am CLOSED 20-Apr-15 8
177 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00176 Instant Option 13-Apr-15 SR4 CIV Drainage Concrete works for gab area SR4 ( G45) 14-Apr-15 16-Apr-15 9.00am CLOSED 17-Apr-15 3
179 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00178 Instant Option 13-Apr-15 SR4 CIV Drainage Lean concrete for sump 18,19,20 at SR4 14-Apr-15 16-Apr-15 10.30am CLOSED 20-Apr-15 6
180 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00179 Instant Option 13-Apr-15 SR4 CIV Drainage Take out L shape drain 2 nos at CH 550 RHS and 14-Apr-15 16-Apr-15 10.30am CLOSED 18-Apr-15 4
excavation temporary tranch
181 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00180 MENTA 26-Jan-15 SR4 CIV Road works 1st Layer road base - FDT test 27-Jan-15 29-Jan-15 2.00pm CLOSED 28-Jan-15 1
182 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00181 MENTA 9-Feb-15 SR4 CIV Road works FDT test-Subgrade ( CH600-CH700), Sub Base (CH350- 10-Feb-15 12-Feb-15 2.00pm CLOSED 13-Feb-15 3
CH650)
183 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00182 Instant Option 14-Apr-15 SR4 CIV Drainage Concrete pournfor capping beam at SR4 CH100-CH140 15-Apr-15 17-Apr-15 11.00am CLOSED 16-Apr-15 1
(LHS)
184 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00183 Instant Option 14-Apr-15 SR4 CIV Drainage Concrete pour for capping beam at sr 4 CH700-CH600 15-Apr-15 17-Apr-15 11.30am CLOSED 16-Apr-15 1
188 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00187 Instant Option 16-Apr-15 SR4 CIV Drainage Concrete works for base slab Sump 18,19,20, 17-Apr-15 19-Apr-15 3.00pm CLOSED 20-Apr-15 3
189 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00188 Instant Option 17-Apr-15 SR4 CIV Drainage Concrete works for gab area at SR4 Lshape 18-Apr-15 20-Apr-15 2.30pm CLOSED 20-Apr-15 2
193 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00192 Instant Option 23-Apr-15 SR4 CIV Drainage Concrete works atCapping Beam SR4 CH450-CH400) LHS 24-Apr-15 26-Apr-15 9.00am CLOSED 27-Apr-15 3
195 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00194 Instant Option 23-Apr-15 SR4 CIV Drainage Inspection for rebar and formwork for sump 14 (Slab) 24-Apr-15 26-Apr-15 10,00am CLOSED 27-Apr-15 3
196 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00195 Instant Option 23-Apr-15 SR4 CIV Drainage Concrete works for base slab sump 14 24-Apr-15 26-Apr-15 2.30am CLOSED 26-Apr-15 2
198 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00197 Instant Option 25-Apr-15 SR4 CIV Drainage Install L shape 4800x2100 CH460-400 RHS 27-Apr-15 29-Apr-15 10.00am CLOSED 30-Apr-15 3
199 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00198 Instant Option 25-Apr-15 SR4 CIV Drainage Concrete works for base slab sump 14 27-Apr-15 29-Apr-15 10.30am CLOSED 27-Apr-15 0
200 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00199 Instant Option 25-Apr-15 SR4 CIV Drainage Inspection for rebar and formwork for sump 14 (Slab) 27-Apr-15 29-Apr-15 10.30am CLOSED 30-Apr-15 3
201 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00200 Instant Option 25-Apr-15 SR4 CIV Drainage Concrete works for base slab sump 13 27-Apr-15 29-Apr-15 3.00pm CLOSED 27-Apr-15 0
202 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00201 Instant Option 25-Apr-15 SR4 CIV Drainage Inspection rebar and formwork at sump 13 (Slab) 27-Apr-15 29-Apr-15 3.00pm CLOSED 29-Apr-15 2
203 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00202 Instant Option 29-Apr-15 SR4 CIV Drainage Joint inspection rebar & formwork sump 13 (Base slab) 30-Apr-15 2-May-15 11.00am CLOSED 30-Apr-15 0
204 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00203 Instant Option 29-Apr-15 SR4 CIV Drainage Concreting works for base slab sump 13 30-Apr-15 2-May-15 11.00am CLOSED 02-May-15 2
205 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00204 Instant Option 30-Apr-15 SR4 CIV Drainage concrete work for wall sump 20 2-May-15 4-May-15 9.30am CLOSED 02-May-15 0
207 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00206 Instant Option 30-Apr-15 SR4 CIV Drainage Back filling L-shape drainage at SR-4 CH400-CH700 2-May-15 4-May-15 9.30am CLOSED 07-May-15 5
208 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00207 Instant Option 30-Apr-15 SR4 CIV Drainage Inspection Rebar & Formwork at sump 20 ( wall) 2-May-15 4-May-15 9.30am CLOSED 05-May-15 3
209 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00208 Instant Option 4-May-15 SR4 CIV Drainage inspection for wall rebar and formwork Sump 19 5-May-15 7-May-15 11.00am CLOSED 07-May-15 2
210 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00209 Instant Option 4-May-15 SR4 CIV Drainage Inspection for wall rebar and formwork for sump 20 5-May-15 7-May-15 9.30am CLOSED 06-May-15 1
211 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00210 Instant Option 4-May-15 SR4 CIV Drainage Concreting works for sump 20 5-May-15 7-May-15 9.30am CLOSED 05-May-15 0
212 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00211 Instant Option 4-May-15 SR4 CIV Drainage Concreting works for sump 19 5-May-15 7-May-15 11.00am CLOSED 05-May-15 0
213 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00212 Instant Option 4-May-15 SR4 CIV Drainage install wall rebar and formwork for sump 14 5-May-15 7-May-15 10.00am CLOSED 08-May-15 3
214 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00213 Instant Option 4-May-15 SR4 CIV Drainage Installation wall rebar and formwork for sump 18 5-May-15 7-May-15 10.00am CLOSED 20-May-15 15
216 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00215 Instant Option 4-May-15 SR4 CIV Drainage install wall rebar and formwork for sump 13 6-May-15 8-May-15 10.00am CLOSED 08-May-15 2
217 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00216 Instant Option 6-May-15 SR4 CIV Drainage Inspection rebar and formwork for sump 14 7-May-15 9-May-15 3.00pm CLOSED 09-May-15 2
218 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00217 Instant Option 6-May-15 SR4 CIV Drainage Concreting works Sump 14 7-May-15 9-May-15 3.00pm CLOSED 09-May-15 2
219 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00218 Instant Option 6-May-15 SR4 CIV Drainage Inspection rebar and formwork for sump 18 7-May-15 9-May-15 3.00pm CLOSED 09-May-15 2
220 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00219 Instant Option 6-May-15 SR4 CIV Drainage Concreting works Sump 18 7-May-15 9-May-15 3.00pm CLOSED 09-May-15 2
221 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00220 Instant Option 7-May-15 SR4 CIV Drainage Excavation works for sump 118 at SR4 8-May-15 10-May-15 10.00am CLOSED 09-May-15 1
222 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00221 Instant Option 7-May-15 SR4 CIV Drainage Excavation works for sump 119 8-May-15 10-May-15 10.00am CLOSED 14-May-15 6
225 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00224 Instant Option 11-May-15 SR4 CIV Drainage Concreting works for sump 13 (wall) 11-May-15 13-May-15 4.00pm CLOSED 27-Jan-16 261
226 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00225 Instant Option 12-May-15 SR4 CIV Drainage Inspection rebar and formwork for SUMP 118 (base slab) 13-May-15 15-May-15 11.00am CLOSED 18-May-15 5
227 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00226 Instant Option 12-May-15 SR4 CIV Drainage Concreting works for sump 118 (base slab) 13-May-15 15-May-15 2.00pm CLOSED 15-May-15 2
228 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00227 Menta 2-Mar-15 SR4 CIV Road Work FDT at CH750-1000 (Sub Grade and Sub Base) 3-Mar-15 5-Mar-15 3.00pm CLOSED 04-Mar-15 1
234 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00233 Instant Option 13-May-15 SR4 CIV Drainage Excavation work for sump 15 14-May-15 16-May-15 9.00am CLOSED 03-Oct-15 142
235 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00234 Instant Option 13-May-15 SR4 CIV Drainage Inspection rebar and formwork for sump 15 14-May-15 16-May-15 3.00pm CLOSED 16-May-15 2
236 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00235 Instant Option 13-May-15 SR4 CIV Drainage Concreting work for sump 15 14-May-15 16-May-15 4.00pm CLOSED 16-May-15 2
237 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00236 PPEC 13-May-15 SR4 CIV Road work Laying of precast road kerb for bus bay at Bustop 7 14-May-15 16-May-15 8.00am CLOSED 17-Nov-15 187
238 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00237 Instant Option 13-May-15 SR4 CIV Drainage Excavation for out let (Check Dam 14-May-15 16-May-15 10.00am CLOSED 30-Oct-15 169
241 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00240 Instant Option 15-May-15 SR4 CIV Drainage Concreting works for base slab sump 15 16-May-15 18-May-15 11.30am CLOSED 19-May-15 3
243 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00242 Instant Option 17-May-15 SR4 CIV Drainage Inspection rebar and formwork sump 119 18-May-15 20-May-15 10.30am CLOSED 18-May-15 0
244 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00243 Instant Option 17-May-15 SR4 CIV Drainage Concreting work for sump 119 (Base slab) 18-May-15 20-May-15 10.30am CLOSED 20-May-15 2
245 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00244 Instant Option 17-May-15 SR4 CIV Drainage Concreting work for sump 22 18-May-15 20-May-15 11.00am CLOSED 20-May-15 2
246 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00245 Instant Option 17-May-15 SR4 CIV Drainage Inspection rebar and formwork sump 22 18-May-15 20-May-15 11.00am CLOSED 19-May-15 1
247 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00246 Instant Option 17-May-15 SR4 CIV Drainage Inspection rebar and formwork sump 15 18-May-15 20-May-15 2.00pm CLOSED 20-May-15 2
248 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00247 Instant Option 17-May-15 SR4 CIV Drainage Concreting work for sump 15 18-May-15 20-May-15 2.00pm CLOSED 21-May-15 3
258 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00257 Instant Option 21-May-15 SR4 CIV Drainage Concreting work (Capping beam) CH620-CH700 22-May-15 24-May-15 10.30am CLOSED 25-May-15 3
259 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00258 Instant Option 22-May-15 SR4 CIV Drainage Inspection rebar and formwork (Sump 15) wall 23-May-15 25-May-15 2.00pm CLOSED 25-May-15 2
260 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00259 Instant Option 22-May-15 SR4 CIV Drainage Concreting sump 15 ( wall) 23-May-15 25-May-15 2.30pm CLOSED 25-May-15 2
262 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00261 Instant Option 25-May-15 SR4 CIV Drainage Concreting work capping beam CH950-CH500 26-May-15 28-May-15 10.00am CLOSED 28-May-15 2
263 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00262 Instant Option 25-May-15 SR4 CIV Drainage Inspection rebar and formwork for wall ( sump 15) 26-May-15 28-May-15 10.00am CLOSED 26-May-15 0
264 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00263 Instant Option 25-May-15 SR4 CIV Drainage Concreting works for wall sump 15 26-May-15 28-May-15 10.30am CLOSED 26-May-15 0
265 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00264 Instant Option 25-May-15 SR4 CIV Drainage Inspection rebar and formwork for strut beam sump 17 26-May-15 28-May-15 3.00pm CLOSED 26-May-15 0
266 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00265 Instant Option 25-May-15 SR4 CIV Drainage Concreting work for strut beam sump 17 26-May-15 28-May-15 3.30pm CLOSED 26-May-15 0
UEMB QAQC
280 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00279 28-May-15 SR4 CIV Road Work FDT for subgrade layer (CH1890-CH1950) 28-May-15 30-May-15 3.00pm CLOSED 28-May-15 0
NORAZAH
UEMB QAQC
281 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00280 28-May-15 SR4 CIV Road Work FDT for subbase layer (CH1890-CH1950) 29-May-15 31-May-15 3.00pm CLOSED 28-May-15 -1
NORAZAH
UEMB QAQC
282 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00281 28-May-15 SR4 CIV Road Work FDT for Roadbase layer (CH1890-CH1950) 30-May-15 1-Jun-15 3.00pm CLOSED 1-Jun-15 2
NORAZAH
303 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00302 Instant Option 1-Jun-15 SR4 CIV Drainage Inspection rebar and formwork (wall)Sump 22 2-Jun-15 4-Jun-15 10.00am CLOSED 2-Jun-15 0
304 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00303 Instant Option 1-Jun-15 SR4 CIV Drainage Inspection rebar and formwork (wall)Sump 23 2-Jun-15 4-Jun-15 10.00am CLOSED 2-Jun-15 0
305 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00304 Instant Option 1-Jun-15 SR4 CIV Drainage Concreting for sump 22 (wall) 2-Jun-15 4-Jun-15 10.30am CLOSED 2-Jun-15 0
306 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00305 Instant Option 1-Jun-15 SR4 CIV Drainage Concreting work base slab sump 23 2-Jun-15 4-Jun-15 11.30am CLOSED 2-Jun-15 0
308 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00307 Instant Option 1-Jun-15 SR4 CIV Drainage concreting work for capping beam CH800-CH751 2-Jun-15 4-Jun-15 11.30am CLOSED 4-Jun-15 2
311 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00310 Instant Option 4-Jun-15 SR4 PIP Piping Request for inspection of HDPE pipe (Sewerage water) 5-Jun-15 7-Jun-15 9.00am CLOSED 30-Sep-15 117
Welding at SR4 CH100-900)
316 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00315 Instant Option 4-Jun-15 SR4 CIV Drainage Inspection rebar and formwork sump 119 (wall) 5-Jun-15 7-Jun-15 10.00am CLOSED 5-Jun-15 0
317 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00316 Instant Option 4-Jun-15 SR4 CIV Drainage Inspection rebar and formwork sump 118 (wall) 5-Jun-15 7-Jun-15 10.00am CLOSED 5-Jun-15 0
318 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00317 Instant Option 4-Jun-15 SR4 CIV Drainage Concreting work sump 119 (wall) 5-Jun-15 7-Jun-15 10.00am CLOSED 5-Jun-15 0
319 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00318 Instant Option 4-Jun-15 SR4 CIV Drainage Concreting work sump 118 (wall) 5-Jun-15 7-Jun-15 10.00am CLOSED 5-Jun-15 0
322 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00321 Opensis 10-Jun-15 SR4 ELE Excavation Excavation work, laying HDPE corrugated pipe inside 11-Jun-15 13-Jun-15 11.00am CLOSED 7-Jul-15 26
trench and backfill trench at SR 4 (6 - 7) CH 400 - 750
323 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00322 Instant Option 9-Jun-15 SR4 CIV rebar and Inspection for rebar and formwork for copping beam CH 10-Jun-15 12-Jun-15 3.00pm CLOSED 12-Jun-15 2
formwork 375 to CH 225
324 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00323 Syahir 10-Jun-15 SR4 CIV Roadworks Rectification work (Removing ACBC layer at hearing 11-Jun-15 13-Jun-15 3.00pm CLOSED 05-Aug-15 55
area)
325 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00324 Instant Option 9-Jun-15 SR4 CIV Drainage Inspection for concreting work (Capping Beam) 10-Jun-15 12-Jun-15 3.30pm CLOSED 12-Jun-15 2
326 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00325 Instant Option 13-Jun-15 SR4 CIV Drainage Concrete work for struck beam sump 17 at SR 4 15-Jun-15 17-Jun-15 10.30am CLOSED 19-Jun-15 4
327 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00326 Instant Option 13-Jun-15 SR4 CIV Drainage Inspection rebar and formwork for strut beam sump 17 15-Jun-15 17-Jun-15 10.30am CLOSED 19-Jun-15 4
at SR 4
328 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00327 Instant Option 13-Jun-15 SR4 CIV Drainage Concrete work for struck beam sump 15 at SR 4 15-Jun-15 17-Jun-15 10.00am CLOSED 19-Jun-15 4
329 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00328 Instant Option 13-Jun-15 SR4 CIV Drainage Concrete work for struck beam sump 15 at SR 4 15-Jun-15 17-Jun-15 10.00am CLOSED 19-Jun-15 4
330 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00329 Instant Option 13-Jun-15 SR4 PIP Piping Pressure test for HDPE pipe (Fire) SR4 CH0-1000 15-Jun-15 17-Jun-15 10.00am CLOSED 9-Oct-15 116
332 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00331 Instant Option 13-Jun-15 SR4 CIV Drainage Concrete works for capping beam ar SR4 CH400-700 RHS 15-Jun-15 17-Jun-15 2.00pm CLOSED 27-Jan-16 226
Compact
333 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00332 Liwo 15-Jun-15 SR4 CIV Inspection of compection installation at SR 4-1MVA 16-Jun-15 18-Jun-15 10.30am CLOSED 04-Aug-15 49
substation
Inspection for rebar and formwork capping beam
334 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00333 Instant Option 16-Jun-15 SR4 CIV Drainage 17-Jun-15 19-Jun-15 9.00am CLOSED 20-Jun-15 3
CH248-CH171
335 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00334 Instant Option 16-Jun-15 SR4 CIV Drainage Inspection for concreting capping beam CH248-CH171 17-Jun-15 19-Jun-15 9.00am CLOSED 20-Jun-15 3
336 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00335 Instant Option 16-Jun-15 SR4 CIV Drainage Inspection for concreting capping beam CH400-CH730 17-Jun-15 19-Jun-15 9.00am CLOSED 20-Jun-15 3
345 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00344 AEIE 19-Jun-15 SR4 ELE Erection Erection 15M road lighting poles at bus station SR4 22-Jun-15 24-Jun-15 3.00pm CLOSED 7-Jul-15 15
rebar and Inspection for rebar & formwork and concreting for
352 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00351 Instant Option 26-Jun-15 SR4 CIV 29-Jun-15 1-Jul-15 10.30am CLOSED 30-Jun-15 1
formwork capping beam
354 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00353 Opensis 30-Jun-15 SR4 ELE Backfill Backfill works trench at SR4 CH 150- CH350) 1-Jul-15 3-Jul-15 11.00am CLOSED 04-Aug-15 34
355 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00354 Nizan 1-Jul-15 SR4 CIV Road Work Laying of roadbase at defect area 14M Width road 3-Jul-15 5-Jul-15 3.00pm CLOSED 05-Aug-15 33
357 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00356 AEIE 3-Jul-15 SR4 ELE Installation 15M Floodlight pole installation 4-Jul-15 6-Jul-15 9.00am CLOSED 13-Jan-16 193
358 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00357 AEIE 3-Jul-15 SR4 ELE Installation 8M Steel Lighting pole installation 4-Jul-15 6-Jul-15 9.00am CLOSED CANCEL
360 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00359 Instant Option 3-Jul-15 SR4 PIP Sand Bedding Laying sand bedding at Trench SR4 CH70 STP tank 4-Jul-15 6-Jul-15 10.30am CLOSED 08-Dec-15 155
Laying Cruher run for 100mm THK and sand for 30mm
387 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00386 PPEC 30-Jul-15 SR4 CIV Road work leveling and compaction to lay interlocking 60mm ligh 31-Jul-15 2-Aug-15 8.00am CLOSED 26-Nov-15 118
duti for work way Bus stop 7
389 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00388 PPEC 28-Jul-15 SR4 CIV Road work inspection for rebar, formwork and concreting for 29-Jul-15 31-Jul-15 10.00am CLOSED 03-Oct-15 66
(Restraint bean bus stop 7
390 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00389 Instant Option 31-Jul-15 SR4 PIP concreting works Concreting for support block at SR4 CH000-1200 for 1-Aug-15 3-Aug-15 8.00am CLOSED 08-Dec-15 127
HDPE pipe
392 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00391 UEMB QAQC 10-Aug-15 SR4 CIV Testing FDT for Subgrade at Bustop 7 ( SR4) 11-Aug-15 13-Aug-15 8.00am CLOSED 13-Aug-15 2
KHAIRIL
393 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00392 PSJV 12-Aug-15 SR4 ELE Excavation works Excavation works for 11KV electrical cable installation at 13-Aug-15 15-Aug-15 9.00am CLOSED 04-Sep-15 22
SR4 CH350-500 RHS
394 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00393 PSJV 12-Aug-15 SR4 ELE Sand bedding sand bedding works ( 1st layer) for 11 KV electrical cable 13-Aug-15 15-Aug-15 9.00am CLOSED 04-Sep-15 22
installation at SR 4 CH 350- 500 RHS
395 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00394 PSJV 12-Aug-15 SR4 ELE Cable pulling Cable pulling works ( 1 st layer) for loop 13-Aug-15 15-Aug-15 11.00am CLOSED 04-Sep-15 22
16,15,13,10,9,8,7,& 6 at SR4 CH 350-500 RHS
396 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00395 PSJV 12-Aug-15 SR4 ELE Sand bedding Sand bedding ( 2nd layer) works for 11KV electrical 13-Aug-15 15-Aug-15 2.00pm CLOSED 04-Sep-15 22
cable installation at SR4 CH350-500 RHS
397 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00396 PSJV 12-Aug-15 SR4 ELE Cable pulling Cable pulling ( 2nd layer) works for loop 2,4,5 at SR4 CH 13-Aug-15 15-Aug-15 3.00pm CLOSED 04-Sep-15 22
350-500 RHS
398 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00397 PSJV 12-Aug-15 SR4 ELE Sand backfill Sand backfill and UPVC slab installation works for 11KV 13-Aug-15 15-Aug-15 4.00pm CLOSED 04-Sep-15 22
electrical cable installation at SR4 CH 350-500 RHS
399 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00398 PSJV 12-Aug-15 SR4 ELE Soil backfill Soil backfill works for 11 KV electrical cable installation 13-Aug-15 15-Aug-15 5.00pm CLOSED 04-Sep-15 22
at SR4 CH350-500 RHS
400 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00399 PSJV 17-Aug-15 SR4 ELE Excavation works Excavation works for 11 KV electrical cable installation 18-Aug-15 20-Aug-15 9.00am CLOSED 04-Sep-15 17
at SR4 CH0- CH 350 RHS
401 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00400 PSJV 17-Aug-15 SR4 ELE Sand bedding Sand bedding works for 11 KV electrical cable 18-Aug-15 20-Aug-15 10.00am CLOSED 04-Sep-15 17
installation at SR4 CH0-CH350 RHS
402 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00401 PSJV 17-Aug-15 SR4 ELE Cable pulling Cable pulling works for loop 5,8,9 at SR 4 CH 0-CH350 18-Aug-15 20-Aug-15 3.00pm CLOSED 04-Sep-15 17
RHS
403 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00402 PSJV 17-Aug-15 SR4 ELE Sand backfill Sand backfill and UPVC slab installation works for 11KV 18-Aug-15 20-Aug-15 4.00pm CLOSED 04-Sep-15 17
electrical cable installation at SR4 CH0- CH 350 RHS
404 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00403 PSJV 17-Aug-15 SR4 ELE Soil backfill Soil backfill works for 11 kv electrical cable installation 18-Aug-15 20-Aug-15 5.00pm CLOSED 04-Sep-15 17
at SR 4 CH0- CH 350 RHS
PPEC 18-Aug-15 SR4 CIV Filling sand and compact, laying interlocking paver 20-Aug-15 22-Aug-15 8.00am CLOSED
405 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00404 Road work for walkway 60mm at Bus stop 8
14-Dec-15 116
406 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00405 Instant Option 19-Aug-15 SR4 PIP Welding Inspection of HDPE fire water at SR4 (CH0-1200) 20-Aug-15 22-Aug-15 9.00am CLOSED CANCEL
407 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00406 Instant Option 20-Aug-15 SR4 PIP Sand beding sand bedding UD sr4 from for laying fire water pipe 21-Aug-15 23-Aug-15 10.00am CLOSED 4-Sep-15 14
411 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00410 Instant Option 20-Aug-15 SR4 PIP Backfill Backfilling in SR4 21-Aug-15 23-Aug-15 10.00am CLOSED 16-Oct-15 56
412 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00411 Instant Option 20-Aug-15 SR4 PIP welding welding HDPE pipe fire water in SR4 21-Aug-15 23-Aug-15 10.00am CLOSED 11-Sep-15 21
excavation work
416 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00415 UEMB CONST 25-Aug-15 SR4 CIV and laying Excavation works,laying of Hardcore, Lean concrete oil 26-Aug-15 28-Aug-15 10.00am CLOSED 10-Sep-15 15
ZULAKMAL interceptor 1 and 2 Bus stop 7 SR4
Hardcore
419 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00418 Instant Option 2-Sep-15 SR4 PIP Tie in installation Inspection for tie in installation at SR4 CH100-CH1200 3-Sep-15 5-Sep-15 1.00pm CLOSED 08-Dec-15 94
422 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00421 Seribu Bio 11-Sep-15 SR4 CIV Material Receiving material inspection for polyfelt Is50 4mx175m 12-Sep-15 14-Sep-15 2.00pm CLOSED 12-Sep-15 0
UEMB QAQC
423 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00422 7-Sep-15 SR4 CIV Testing FDT for roadbase at SR4 CH1000-CH1100 8-Sep-15 10-Sep-15 4.00pm CLOSED 10-Sep-15 2
KHAIRIL
Excavation
428 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00427 UEMB ZULAKMAL 17-Sep-15 SR4 CIV work/laying excavation work, laying of hardcore, lean concrete base 18-Sep-15 20-Sep-15 4.30pm CLOSED 21-Sep-15 3
hardcore/lean drainage crossing bus stop 7 service road 4
concrete
429 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00428 UEMB ZULAKMAL 18-Sep-15 SR4 CIV concrete inspection for formwork,rebar, concreting base drainage 19-Sep-15 21-Sep-15 5.00pm CLOSED 21-Sep-15 2
crossing bus stop 7 service road 4
430 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00429 Instant Option 29-Sep-15 SR4 CIV Survey Joint survey for hydrant pillar finishing level at SR4 30-Sep-15 2-Oct-15 9.00am CLOSED CANCEL
Street Lighting
431 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00430 Instant Option 3-Oct-15 SR4 ELE Installation of street light at SR41,4b 4-Oct-15 6-Oct-15 9.00am CLOSED 17-Oct-15 13
installation
432 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00431 AEIE 5-Oct-15 SR4 ELE 8 meter street Inspection installation pole street lighting lighting 5-Oct-15 7-Oct-15 10.00am CLOSED 7-Oct-15 2
lighting for 8 meter 11 nos
434 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00433 UEMB AMIN 7-Oct-15 SR4 CIV Road works Preparation subgrade for 14m & 7m road at SR4 CH680- 8-Oct-15 10-Oct-15 10.00am CLOSED 3-Nov-15 26
CH770, Joint dipping.
435 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00434 UEMB AMIN 7-Oct-15 SR4 CIV Testing FDT test for subgrade at SR4 CH 680-CH770 8-Oct-15 10-Oct-15 10.00am CLOSED 9-Oct-15 1
437 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00436 UEMB AMIN 7-Oct-15 SR4 CIV Testing FDT test for sub Base at SR4 CH 680-CH770 9-Oct-15 11-Oct-15 10.00am CLOSED 10-Oct-15 1
439 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00438 UEMB AMIN 7-Oct-15 SR4 CIV Testing FDT test for Road Base at SR4 CH 680-CH770 9-Oct-15 11-Oct-15 10.00am CLOSED 12-Oct-15 3
441 RAPID-P20A1-UEMB-SR4- CIV-RFIN-00440 UEMB AMIN 25-Oct-15 SR4 CIV testing FDT test for road base at CH 570-690 26-Oct-15 28-Oct-15 10.00am CLOSED 02-Nov-15 7
442 RAPID-P20A1-UEMB-SR4- CIV-RFIN-00441 PPEC 13-Oct-15 SR4 CIV Road work Inspection for application of prime coat at SR4 13-Oct-15 15-Oct-15 4.00pm CLOSED 13-Oct-15 0
443 RAPID-P20A1-UEMB-SR4- CIV-RFIN-00442 PPEC 13-Oct-15 SR4 CIV Road works Inspection for laying of ACBC 28 at SR4 14-Oct-15 16-Oct-15 10.00am CLOSED 02-Nov-15 19
445 RAPID-P20A1-UEMB-SR4- PIP-RFIN-00444 Instant Option 14-Oct-15 SR4 PIP Mock Up Mock Up for installation of fire hose box, Hydrant pillar 15-Oct-15 17-Oct-15 10.00am CLOSED 08-Dec-15 52
and Valve Chamber at DR4
446 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00437A UEMB QAQC 15-Oct-15 SR4 CIV Road works premix coring at SR4 15-Oct-15 17-Oct-15 10.00am CLOSED 02-Nov-15 18
KHAIRIL
PPEC 18-Oct-15 SR4 CIV Inspection for application of prime coat at Service 19-Oct-15 21-Oct-15 8.00am
447 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00438 Road work road 4 CLOSED CANCEL
448 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00439A PPEC 18-Oct-15 SR4 CIV Road works Inspection for laying of ACBC 28 at Service Road 4 19-Oct-15 21-Oct-15 5.00pm CLOSED 02-Nov-15 14
450 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00441A PPEC 21-Oct-15 SR4 CIV Dranage works Inspection for Brickwall Sump 22-Oct-15 24-Oct-15 9.00am CLOSED 11-Nov-15 18
451 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00442A PPEC 21-Oct-15 SR4 CIV Material Inspection for material receiving Interlocking Paver 22-Oct-15 24-Oct-15 9.00am CLOSED 11-Nov-15 20
Block
453 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00444 PPEC 26-Oct-15 SR4 CIV Road work Inspection for application of prime coat at SR4 27-Oct-15 29-Oct-15 8.00am CLOSED CANCEL
454 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00445 PPEC 26-Oct-15 SR4 CIV Road works Inspection for laying ACBC28 at SR4 (14m width road) 27-Oct-15 29-Oct-15 12.00pm CLOSED 02-Nov-15 6
456 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00447 PPEC 27-Oct-15 SR4 CIV Road works Inspection for laying of UPVC pipe (200mm) at Bus stop 28-Oct-15 30-Oct-15 12.00pm CLOSED 14-Dec-15 47
7
457 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00448 PPEC 28-Oct-15 SR4 CIV Road works Inspection for installation of Rain water Down pipe 29-Oct-15 31-Oct-15 9.00am CLOSED 12-Nov-15 12
299mm at Bus stop 7
Laying Crusher run for 100mm THK and sand for 50mm
459 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00450 PPEC 28-Oct-15 SR4 CIV Road works Leveling and compaction to lay interlocking 60mm Light 29-Oct-15 31-Oct-15 9.00am CLOSED 03-Nov-15 5
Duty For walk way at Bus stop 7
460 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00451 yuzuki 29-Oct-15 SR4 CIV fencing Install Chinlink, Barbed wire and straining wire at 29-Oct-15 31-Oct-15 9.00am CLOSED 11-Nov-15 13
location CP1 SSA/2 and LP1 SS A/3
462 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00453 PPEC 2-Nov-15 SR4 CIV Material Inspection for receiving material of interlocking paver 3-Nov-15 5-Nov-15 9.00am CLOSED 20-Nov-15 15
vblock at Bus stop 7
465 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00456 UEMB AMIN 25-Oct-15 SR4 CIV Testing FDT test for road base at Mess Hall road 26-Oct-15 28-Oct-15 10.00am CLOSED CANCEL
468 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00459 UEMB NIZAN 12-Nov-15 SR4 CIV Road work Verge filling works and turfing works 13-Nov-15 15-Nov-15 10.30am CLOSED CANCEL
472 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00463 AEIE 24-Nov-15 SR4 ELE Pole installation Inspection 15M pole at SR4 Installation -4nos 25-Nov-15 27-Nov-15 11.00am CLOSED 8-Dec-15 13
473 RAPID-P20A1-UEMB-SR4-PIP-RFIN-00464 Instant Option 10-Dec-15 SR5 PIP Mock Up Mock up test for coating ''KUMBAHAN''- letters in 11-Dec-15 13-Dec-15 9.00am CLOSED 24-Jan-16 44
sewerage water S-bend and tie in points at SR4
474 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00465 paneagle 17-Dec-15 SR4 CIV crossing bridge Inspection for crossing bridge at compaction substation 18-Dec-15 20-Dec-15 10.30am CLOSED 1-Feb-16 45
(SR4,SR7,SR8)
476 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00467 Nizan 17-Dec-15 SR4 CIV Roadworks FDT for roadbase at SR4 18-Dec-15 20-Dec-15 10.30am CLOSED 18-Dec-15 0
480 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00471 AEIE 18-Jan-16 SR5 ELE underground cable Underground street lighting cable laying 4C x 16mm2 20-Jan-16 22-Jan-16 2.00pm CLOSED 29-Feb-16 40
XLPE/SWA/PVC. FP-S1 Circuit 1
482 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00473 AEIE 18-Jan-16 SR4 ELE Feeder pillar Feeder pillar installation and cable termination FP-S1 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3
483 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00474 AEIE 18-Jan-16 SR4 ELE Earthing test Earthing installation inspection FP-S1 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3
484 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00475 AEIE 18-Jan-16 SR4 ELE underground cable Underground street lighting cable laying 4Cx16mm2 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3
XLPE/SWA/PVC FP-S1 circuit no. 2
485 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00476 AEIE 18-Jan-16 SR4 ELE underground cable underground street lighting cable laying 4Cx16mm2 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3
XLPE/SWA/PVC FP-S3 Circuit no 1
486 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00477 AEIE 18-Jan-16 SR4 ELE underground cable underground cable laying for street lighting 4Cx16mm2 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3
XLPE/SWA/PVC FP-S3 Circuit no 2
underground high mask lighting cable 4Cx16mm2
487 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00478 AEIE 18-Jan-16 SR4 ELE underground cable XLPE/CWA/PVC FP-S3 circuit no. 3 ,circuit no 4 and 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3
circuit no 5
Earthing
488 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00479 AEIE 18-Jan-16 SR4 ELE earthing installation inspection FP-S3 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3
installation
489 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00480 AEIE 18-Jan-16 SR4 ELE Feeder pillar feeder pillar installation and cable termination FP-S3 20-Jan-16 22-Jan-16 2.00pm CLOSED 13-Feb-16 24
490 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00481 AEIE 18-Jan-16 SR4 ELE Earthing test FP S3 earthing - earth resistance test 20-Jan-16 22-Jan-16 2.00pm CLOSED 15-Feb-16 26
492 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00483 AEIE 18-Jan-16 SR4 ELE Earthing test FP-S1 earth resistance test 20-Jan-16 22-Jan-16 2.00pm CLOSED 15-Feb-16 26
493 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00484 omitech 25-Jan-16 SR4 CIV road ,marking line Road marking line at SR4 (CH1600-CH400) 25-Jan-16 27-Jan-16 9.00am CLOSED CANCEL
494 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00485 omitech 24-Jan-16 SR4 CIV road signages installation road signages 24-Jan-16 26-Jan-16 9.00am CLOSED 24-Jan-16 0
495 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00486 UEMB ZULAKMAL 22-Sep-15 SR4 CIV road signages Inspection for formwork,rebar,concreting wall and slab 23-Sep-15 25-Sep-15 2.00pm CLOSED 23-Sep-15 0
for drainage crossing Bus stop 7 SR4
496 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00487 UEMB RIDWAN 6-Apr-16 SR4 ELE punchlist Inspection for punchlist at Bus stop 7 for high mast 6-Apr-16 8-Apr-16 3.30pm CLOSED 23-Sep-15 -196
RATAG lighting
498 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00489 Instant Option 6-Apr-15 SR4 CIV Drainage Lay 4800x2100 L shape drain at SR4 CH 600-CH560 7-Apr-15 9-Apr-15 2.3 CLOSED 20-Apr-15 13
503 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00494 zulfaqar 10-Oct-15 SR4 CIV Roadworks preparation of subgrade and dipping at roundabout 8 11-Oct-15 13-Oct-15 8.00am CLOSED 28-Jul-16 291
504 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00495 khairil izwan 10-Oct-15 SR4 CIV Testing tray test at SR4 (CH 680-770), spray prime coat 13-Oct-15 15-Oct-15 8.00am CLOSED CANCEL
meggering incoming cable 1x4c 70mm sq xlpe/swa/pvc
505 RAPID-P20A1-UEMB-SR4-ELE-RFIN-00496 AEIE 20-Jul-16 SR4 ELE miggering for FP-S1 from LP1,SSA/2 21-Jul-16 23-Jul-16 8.00am CLOSED 26-Jul-16 5
509 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00500 zulfaqar 21-Jan-15 SR4 CIV roadworks preparation of subgrade and dipping at SR4 CH0-CH130 22-Jan-15 24-Jan-15 8.00am CLOSED 28-Jul-16 553
512 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00503 zulfaqar 31-Oct-15 SR4 CIV roadwork preparation of subbase and dipping at SR4 CH0 - CH130 2-Nov-15 4-Nov-15 8.00am CLOSED 23-Aug-16 295
513 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00504 zulfaqar 2-Nov-15 SR4 CIV roadwork preparation of subbase and dipping at Roundabout 8 3-Nov-15 5-Nov-15 8.00am CLOSED 23-Aug-16 294
514 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00505 zulfaqar 23-Nov-15 SR4 CIV roadwork preparation of Roadbase and dipping at Roundabout 8 24-Nov-15 26-Nov-15 8.00am CLOSED 23-Aug-16 273
515 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00506 zulfaqar 4-Dec-15 SR4 CIV roadwork preparation of Roadbase and dipping at SR4 CH0 - CH40 5-Dec-15 7-Dec-15 8.00am CLOSED 23-Aug-16 262
516 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00507 FAIZAL 28-Jan-15 SR4 CIV Drainage Installation box culvert size 600mm X 450mm 29-Jan-15 31-Jan-15 9.00am CLOSED 1-Sep-16 581
517 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00508 FAIZAL 30-Jan-15 SR4 CIV Drainage Installation box culvert size 1500mm X 1500mm 31-Jan-15 2-Feb-15 9.00am CLOSED 1-Sep-16 579
520 RAPID-P20A1-UEMB-SR4-CIV-RFIN-00511 MAZLAN 19-Jan-17 SR4 CIV Drainage Work Installation Of MS Grating Cover for sump at SR 4 20-Jan-17 22-Jan-17 9.00am CLOSED 20-Jan-17 0
12/26/2014
NEW STATUS
Remarks TOTAL RFIN CLOSED RFIN
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CANCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CANCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CANCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
belum masuk
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
No Activity
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
REJECTED 1 1
No Activity
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED CANCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
No Activity
REJECTED 1 1
No Activity
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
Pada Construction
ACCEPTED 1 1
Pada Construction
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CANCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
Pada arul
ACCEPTED 1 1
pada arul
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED CANCEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
REJECTED 1 1
REJECTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
Fail
REJECTED 1 1
reject
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
*patutnya SR8, salah
register
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
REJECTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
REJECTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
*patutnya SR7 tp ter
regstr SR4
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
CEL 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
CEL 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
ACCEPTED 1 1
520 520
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(SERVICE ROAD 5)
1 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00001 UEMB QAQC SYAFIQ 30-Jan-15 SR5 CIV Roadwork MP Test along Service Road 5 1-Feb-15 3-Feb-15 09.00am CLOSED 12-Feb-15 11 ACCEPTED
2 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00002 Mentar 03-Fab-15 SR5 CIV Roadwork FDT test for subgrade 4-Feb-15 6-Feb-15 10.00am CLOSED 23-Feb-15 19 REJECTED
3 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00003 Mentar 03-Fab-15 SR5 CIV Roadwork Subgrade - Trimining 4-Feb-15 6-Feb-15 10.00am CLOSED 14-Feb-15 10 ACCEPTED
4 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00004 Menta 06-Fab-15 SR5 CIV Roadwork Subgrade - Trimining,laying 7-Feb-15 9-Feb-15 10.00am CLOSED 12-Feb-15 5 ACCEPTED
5 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00005 Menta 06-Fab-15 SR5 CIV Roadwork Sub base - FDT test 7-Feb-15 9-Feb-15 10.00am CLOSED 4-Mar-15 25 ACCEPTED
8 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00008 Menta 11-Fab-15 SR5 CIV Roadwork 2nd Road Base- FDT testing 12-Feb-15 14-Feb-15 10.00am CLOSED 11-Mar-15 27 ACCEPTED
9 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00009 Menta 11-Fab-15 SR5 CIV Roadwork 2nd Road Base- Laying, trimming 12-Feb-15 14-Feb-15 10.00am CLOSED 25-Feb-15 13 ACCEPTED
10 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00010 Menta 14-Fab-15 SR5 CIV Roadwork 2nd Road Base- FDT Test 16-Feb-15 18-Feb-15 10.00am CLOSED 15-Feb-15 -1 REJECTED
11 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00011 Menta 14-Fab-15 SR5 CIV Roadwork 2nd Road Base- Laying and Trimming 16-Feb-15 18-Feb-15 10.00am CLOSED 15-Feb-15 -1 ACCEPTED
12 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00012 Menta 23-Fab-15 SR5 CIV Roadwork 2nd Road Base-FDT test 23-Feb-15 25-Feb-15 02.00pm CLOSED 6-Mar-15 11 ACCEPTED
14 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00014 Propel 23-Fab-15 SR5 CIV Roadwork Spray Prime Coat SR5 CH 990-CH1600 24-Feb-15 26-Feb-15 09.00am CLOSED 17-Mar-15 21 ACCEPTED
15 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00015 Propel 23-Fab-15 SR5 CIV Roadwork Laying premix SR 5 CH990-CH1600 25-Feb-15 27-Feb-15 09.00am CLOSED 15-Mar-15 18 ACCEPTED
17 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00017 Propel 25-Fab-15 SR5 CIV Roadwork Spray Prime Coat SR5 CH1670-ch1900 26-Feb-15 28-Feb-15 09.00am CLOSED 26-Feb-15 0 CANCEL
19 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00019 Propel 25-Fab-15 SR5 CIV Roadwork Tray Test ACBC SR5 CH 1670-CH1900) 26-Feb-15 28-Feb-15 09.00am CLOSED 26-Mar-15 28 REJECTED
UEMB QAQC
20 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00020 2-Mar-15 SR5 CIV Roadwork Coring ACBC 28 at SR5 Ch 990-CH1900 4-Mar-15 6-Mar-15 10.00am CLOSED 6-Mar-15 2 ACCEPTED
NORAZAH
21 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00021 Propel 4-Mar-15 SR5 CIV Roadwork As Bukid at CH990-1890 5-Mar-15 8-Mar-15 9.00am CLOSED 5-Mar-15 0 ACCEPTED
33 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00033 Menta 10-Fab-15 SR5 CIV Roadwork FDT test road base-CH100-CH1920 12-Feb-15 14-Feb-15 03.00pm CLOSED 14-Feb-15 2 ACCEPTED
62 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00062 instant Option 6-May-15 SR5 CIV Dranage Backfilling works SR5 CH1600-CH1138 7-May-15 9-May-15 4.00pm CLOSED 12-Nov-15 189 ACCEPTED
69 RAPID-P20A1-UEMB-SR5-PIP-RFIN-00069 Menta 5-Feb-15 SR5 CIV Roadwork FDT test subgrade CH980-CH1900 6-Feb-15 8-Feb-15 3,00pm CLOSED 6-Feb-15 0 ACCEPTED
73 RAPID-P20A1-UEMB-SR5-PIP-RFIN-00073 Instant Option 26-May-15 SR5 PIP Piping Request for moke up hydrant pillar at SR5 26-May-15 28-May-15 10.00am CLOSED 16-Oct-15 143 ACCEPTED
81 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00081 Opensis 4-Jun-15 SR5 ELE Electrical Backfill trench work at SR5 (3-4) 5-Jun-15 7-Jun-15 10.00am CLOSED 23-Jun-15 18 ACCEPTED
94 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00094 Instant Option 11-Jun-15 SR5 CIV Excavation Excavation for sump 98 at SR 5 12-Jun-15 14-Jun-15 10.00 am CLOSED 05-Aug-15 54 ACCEPTED
95 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00095 Instant Option 11-Jun-15 SR5 CIV Excavation Excavation for sump 99 at SR 5 12-Jun-15 14-Jun-15 11.00 am CLOSED 05-Aug-15 54 ACCEPTED
96 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00096 Instant Option 11-Jun-15 SR5 CIV Excavation Excavation for sump 100 at SR 5 12-Jun-15 14-Jun-15 1.30 pm CLOSED 05-Aug-15 54 ACCEPTED
97 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00097 Instant Option 11-Jun-15 SR5 CIV Excavation Excavation for sump 101 at SR 5 12-Jun-15 14-Jun-15 3.00pm CLOSED 05-Aug-15 54 ACCEPTED
98 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00098 Instant Option 11-Jun-15 SR5 CIV Excavation Excavation for sump 97 at SR 5 12-Jun-15 14-Jun-15 9.00 am CLOSED 05-Aug-15 54 ACCEPTED
99 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00099 Instant Option 13-Jun-15 SR5 CIV Dranage Concrete work at base sump 97 at SR 5 15-Jun-15 17-Jun-15 9.00 am CLOSED 19-Jun-15 4 ACCEPTED
101 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00101 Instant Option 13-Jun-15 SR5 CIV Dranage Concrete work at base sump 98 at SR 5 15-Jun-15 17-Jun-15 9.30 am CLOSED 19-Jun-15 4 ACCEPTED
106 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00106 Instant Option 13-Jun-15 SR5 CIV Dranage Concreting works at base sump 100 15-Jun-15 17-Jun-15 11.00am CLOSED 19-Jun-15 4 ACCEPTED
107 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00107 Instant Option 13-Jun-15 SR5 CIV Dranage Concreting work at base sump 99 15-Jun-15 17-Jun-15 10.00am CLOSED 19-Jun-15 4 ACCEPTED
108 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00108 Instant Option 13-Jun-15 SR5 CIV Dranage Concreting work at base sump 101 15-Jun-15 17-Jun-15 11.30am CLOSED 19-Jun-15 4 ACCEPTED
125 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00125 Opensis 24-Jul-15 SR5 ELE Backfill Backfill work trench at SR5 CH1500-1600 25-Jul-15 27-Jul-15 11.00am CLOSED 11-Sep-15 48 ACCEPTED
134 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00134 Opensis 11-Aug-15 SR5 ELE Backfill Backfill work trench at SR5 CH650-1200 12-Aug-15 14-Aug-15 11.00am CLOSED 04-Sep-15 23 ACCEPTED
S1-Y1/4S1-Y1/5,S1-Y1/5,S1-R2/8,S1-
141 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00141 AEIE 20-Aug-15 SR5 ELE Installation R2/9,S1-B1/4,S1-B1/5,S1-Y2/8,S1- 21-Aug-15 23-Aug-15 3.30pm CLOSED 04-Sep-15 14 ACCEPTED
R1/5,S1-B2/7,S1-B2/8
instant Option 28-Aug-15 SR5 PIP survey Joint survey As built level fire Hydrent 29-Aug-15 31-Aug-15 9.00am CLOSED
147 RAPID-P20A1-UEMB-SR5-PIP-RFIN-00147
at SR5 11 point Hydrant CANCEL
PPEC 17-Sep-15 SR5 CIV Laying of bimdercorse at CH100- 18-Sep-15 20-Sep-15 8.00am CLOSED
152 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00152 Road work 400,CH600-800 CANCEL
Mock up for fire hose box Mok up for installation of fire hose box,
163 RAPID-P20A1-UEMB-SR5-PIP-RFIN-00163 instant Option 14-Oct-15 SR5 PIP 15-Oct-15 17-Oct-15 10.00am CLOSED 08-Dec-15 52 REJECTED
installation Hydrant pillar and valve chamber at SR5
PPEC 29-Oct-15 SR5 CIV Material Inspection of received U Drain 30-Oct-15 1-Nov-15 2.00pm CLOSED
178 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00178
1500x900 at SR5 CANCEL
Instant Option 5-Nov-15 SR5 PIP testing pressure and leak test for fie water 7-Nov-15 9-Nov-15 10.00am 30-May-16
185 RAPID-P20A1-UEMB-SR5-PIP-RFIN-00185
pipe at SR5 phase 2 CH00-700
CLOSED 205 ACCEPTED
Instant Option 6-Nov-15 SR5 CIV Preparation of sub base and joint 7-Nov-15 9-Nov-15 9.00am 7-Nov-15
187 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00187 Road work dipping at SR 5 CH550 - CH 350
CLOSED 0 ACCEPTED
190 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00190 UEMB NIZAN 12-Nov-15 SR5 CIV Road work Verge filling works and turfing works 13-Nov-15 15-Nov-15 10.30am CLOSED 13-Nov-15 0 ACCEPTED
195 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00195 Instant Option 18-Nov-15 SR5 CIV road works lay of ACBC 19-Nov-15 21-Nov-15 9.00am CLOSED CANCEL
196 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00196 Instant Option 18-Nov-15 SR5 CIV road works lay of trime coat & spray test 18-Nov-15 20-Nov-15 11.00am CLOSED CANCEL
197 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00197 Instant Option 21-Nov-15 SR5 CIV road works Coring test for ACBC at SR5 CH700 - 0 22-Nov-15 24-Nov-15 11.00am CLOSED 24-Nov-15 2 REJECTED
199 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00199 Instant Option 16-Nov-15 SR5 CIV Roadwork FDT for roadbase at SR5 from CH0-CH700 17-Nov-15 19-Nov-15 10.00am CLOSED 29-Jul-16 255 ACCEPTED
200 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00200 Instant Option 10-Nov-15 SR5 CIV Roadwork FDT for subbase at SR5 from CH0-CH701 12-Nov-15 14-Nov-15 3.00pm CLOSED CANCEL
201 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00201 Instant Option 31-Dec-15 SR5 CIV Turfing Turfing works at DR5-phase 2 2-Jan-16 4-Jan-16 1.00pm CLOSED CANCEL
209 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00209 omitech road 21-Jan-16 SR5 CIV Road line marking road line marking at SR5 22-Jan-16 24-Jan-16 2.00pm CLOSED CANCEL
211 RAPID-P20A1-UEMB-SR5-CIV-RFIN-00211 omitech road 25-Jan-16 SR5 CIV road signanges installation of road signages 25-Jan-16 27-Jan-16 9.00am CLOSED 25-Jan-16 0 ACCEPTED
218 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00218 AEIE 20-Apr-16 SR5 ELE installation FP-S4 installation and termination 21-Apr-16 23-Apr-16 4.00pm CLOSED 3-May-16 12 ACCEPTED
Meggering outgoing cable 1x4C 16mm sq.
219 RAPID-P20A1-UEMB-SR5-ELE-RFIN-00219 AEIE 26-Apr-16 SR5 ELE migger test 27-Apr-16 29-Apr-16 4.45pm CLOSED 11-May-16 14 ACCEPTED
XLPE/SWA/PVC for FP-S4
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
CANCEL 1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
226 226
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(SERVICE ROAD 6)
1 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00001 En Halim 4-Oct-14 SR6 CIV Testing Drilling bore hole for S.I No 6 4-Oct-14 6-Oct-14 8.30 am CLOSED 11-Oct-14 5 ACCEPTED 1 1
7 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00007 Ikram PROPEL 1-Dec-14 SR6 CIV Roadwork FDT of sub-grade Service Road 6 - Bus stop 1 1-Dec-14 3-Dec-14 2.00 pm CLOSED 08-Dec-14 7 ACCEPTED 1 1
8 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00008 Ikram PROPEL 1-Dec-14 SR6 CIV Roadwork Laying subbase at Service Road 6 - Bus stop 1 2-Dec-14 4-Dec-14 8.00 am CLOSED 25-Feb-15 85 ACCEPTED 1 1
9 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00009 Ikram PROPEL 3-Dec-14 SR6 CIV Roadwork Joint dipping at Service Road 6 - Bus stop 1 4-Dec-14 6-Dec-14 11.00am CLOSED 08-Dec-14 4 ACCEPTED 1 1
10 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00010 Ikram PROPEL 3-Dec-14 SR6 CIV Roadwork FDT of subbase Service Road 6 - Bus stop 1 4-Dec-14 6-Dec-14 1.00 pm CLOSED 15-Dec-14 11 ACCEPTED 1 1
13 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00013 Ikram PROPEL 3-Dec-14 SR6 CIV Roadwork FDT of sub-grade Service Road 6 - Bus stop 3 4-Dec-14 6-Dec-14 1.00 pm CLOSED 29-Dec-14 25 ACCEPTED 1 1
16 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00016 Ikram PROPEL 3-Dec-14 SR6 CIV Roadwork FDT of sub-grade Service Road 6 - Bus stop 2 4-Dec-14 6-Dec-14 1.00 pm CLOSED 10-Dec-14 6 ACCEPTED 1 1
17 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00017 Ikram PROPEL 4-Dec-14 SR6 CIV Roadwork Laying subbase at Service Road 6 - Bus stop 10 5-Dec-14 7-Dec-14 10.00 am CLOSED 25-Feb-15 82 ACCEPTED 1 1
18 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00018 Ikram PROPEL 4-Dec-14 SR6 CIV Roadwork Laying roadbase at Service Road 6 - Bus stop 1 5-Dec-14 7-Dec-14 10.00 am CLOSED 25-Feb-15 82 ACCEPTED 1 1
19 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00019 Ikram PROPEL 5-Dec-14 SR6 CIV Roadwork Laying subbase at Service Road 6 - Bus stop 2 7-Dec-14 9-Dec-14 10.00 am CLOSED 16-Dec-14 9 ACCEPTED 1 1
20 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00020 Ikram PROPEL 5-Dec-14 SR6 CIV Roadwork Laying subbase at Service Road 6 - Bus stop 3 7-Dec-14 9-Dec-14 10.00 am CLOSED 25-Feb-15 80 ACCEPTED 1 1
21 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00021 Ikram PROPEL 6-Dec-14 SR6 CIV Roadwork Laying roadbase at Service Road 6 - Bus stop 1 6-Dec-14 8-Dec-14 10.00 am CLOSED 25-Feb-15 81 ACCEPTED 1 1
23 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00023 Ikram PROPEL 8-Dec-14 SR6 CIV Testing FDT of sub-grade Service Road 6 - Bus stop 3 9-Dec-14 11-Dec-14 2.00 pm CLOSED 02-Feb-15 55 REJECTED 1 1
25 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00025 Ikram PROPEL 8-Dec-14 SR6 CIV Testing FDT of subbase Service Road 6 - Bus stop 2 9-Dec-14 11-Dec-14 10.00 am CLOSED 29-Dec-14 20 ACCEPTED 1 1
26 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00026 Ikram PROPEL 8-Dec-14 SR6 CIV Roadwork Laying roadbase at Service Road 6 - Bus stop 2 10-Dec-14 12-Dec-14 2.00 pm CLOSED 25-Feb-15 77 ACCEPTED 1 1
29 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00029 Ikram PROPEL 10-Dec-14 SR6 CIV Roadwork Laying roadbase at Service Road 6 - Bus stop 2 11-Dec-14 13-Dec-14 9.00 am CLOSED 25-Feb-15 76 ACCEPTED 1 1
30 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00030 Ikram PROPEL 11-Dec-14 SR6 CIV Roadwork Laying subbase at Service Road 6 - Bus stop 3 12-Dec-14 14-Dec-14 9.00 am CLOSED 25-Feb-15 75 ACCEPTED 1 1
32 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00032 Ikram PROPEL 12-Dec-14 SR6 CIV Testing FDT of sub-grade Service Road 6 - Bus stop 3 13-Dec-14 15-Dec-14 9.00 am CLOSED 29-Dec-14 16 ACCEPTED 1 1
34 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00034 Ikram PROPEL 12-Dec-14 SR6 CIV Testing FDT of sub-grade Service Road 6 - Bus stop 1 13-Dec-14 15-Dec-14 9.00 am CLOSED 15-Dec-14 2 ACCEPTED 1 1
35 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00035 Ikram PROPEL 13-Dec-14 SR6 CIV Roadwork Joint dipping of sub-grade Service Road 6 - Bus 14-Dec-14 16-Dec-14 10.00 am CLOSED 29-Dec-14 15 ACCEPTED 1 1
stop 4
36 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00036 Ikram PROPEL 13-Dec-14 SR6 CIV Testing FDT of sub-grade Service Road 6 - Bus stop 4 14-Dec-14 16-Dec-14 10.00 am CLOSED 29-Dec-14 15 ACCEPTED 1 1
37 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00037 Ikram PROPEL 13-Dec-14 SR6 CIV Roadwork Laying subbase at Service Road 6 - Bus stop 4 15-Dec-14 17-Dec-14 9.00 am CLOSED 25-Feb-15 72 ACCEPTED 1 1
40 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00040 Ikram PROPEL 15-Dec-14 SR6 CIV Testing FDT of sub-grade Service Road 6 (CH1160- 16-Dec-14 18-Dec-14 9.00 am CLOSED 16-Dec-14 0 ACCEPTED 1 1
CH890)
45 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00045 Ikram PROPEL 17-Dec-14 SR6 CIV Roadwork Laying Roadbase at Service Road 6 - CH1160 TO 18-Dec-14 20-Dec-14 9.00 am CLOSED 23-Feb-15 67 ACCEPTED 1 1
CH890
47 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00047 Ikram PROPEL 17-Dec-14 SR6 CIV Testing FDT of sub-base Service Road 6 - Bus stop 3 18-Dec-14 20-Dec-14 9.00 am CLOSED 02-Nov-15 319 REJECTED 1 1
48 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00048 Ikram PROPEL 17-Dec-14 SR6 CIV Roadwork Laying Roadbase at Service Road 6 - Bus stop 3 18-Dec-14 20-Dec-14 9.00 am CLOSED 20-Dec-14 2 ACCEPTED 1 1
49 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00049 PROPEL 17-Dec-14 SR6 CIV Roadwork Rectification work for surveillance Report No 1 20-Dec-14 22-Dec-14 9.00 am CLOSED 10-Mar-15 80 ACCEPTED 1 1
50 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00050 PROPEL 18-Dec-14 SR6 CIV Testing FDT of sub-base Service Road 6 - Bus stop 4 19-Dec-14 21-Dec-14 10.00 am CLOSED 25-Dec-14 6 ACCEPTED 1 1
51 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00051 PROPEL 18-Dec-14 SR6 CIV Roadwork Laying Roadbase at Service Road 6 - Bus stop 4 19-Dec-14 21-Dec-14 1.00 pm CLOSED 25-Feb-15 68 ACCEPTED 1 1
55 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00055 Lian Fatt 19-Dec-14 SR6 CIV Survey Joint Survey for Drainage Work 20-Dec-14 22-Dec-14 2.00 pm CLOSED 20-Feb-15 62 ACCEPTED 1 1
56 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00056 PROPEL 23-Dec-14 SR6 CIV Roadwork Subgrade Preparation CH1200-CH600 24-Dec-14 26-Dec-14 10.00 am CLOSED 06-Mar-15 72 ACCEPTED 1 1
57 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00057 PROPEL 23-Dec-14 SR6 CIV Roadwork FDT for subgrade CH1200-CH600 24-Dec-14 26-Dec-14 11.00am CLOSED 16-Jan-15 23 ACCEPTED 1 1
58 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00058 Lian Fatt 23-Dec-14 SR6 CIV Survey Join Survey service road 6 for invert level 24-Dec-14 26-Dec-14 10.00am CLOSED 15-Jan-15 22 ACCEPTED CANCEL 1 1
60 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00060 PROPEL 19-Dec-14 SR6 CIV Roadwork FDT for Subbase at CH890-CH1160 20-Dec-14 22-Dec-14 2.00pm CLOSED 16-Jan-15 27 ACCEPTED 1 1
61 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00061 PROPEL 19-Dec-14 SR6 CIV Roadwork Joint Dipping for Subbase at CH890-CH1160 20-Dec-14 22-Dec-14 2.00pm CLOSED 30-Jan-15 41 ACCEPTED 1 1
65 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00065 PROPEL 26-Dec-14 SR6 CIV Roadwork Laying subbase at SR6 CH1200 to CH1600 28-Dec-14 30-Dec-14 10.00am CLOSED 25-Feb-15 59 ACCEPTED 1 1
67 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00067 PROPEL 26-Dec-14 SR6 CIV Roadwork FDT on subbase at SR6 CH1200 to CH1600 28-Dec-14 30-Dec-14 4.00pm CLOSED 06-Mar-15 68 ACCEPTED 1 1
70 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00070 PROPEL 26-Dec-14 SR6 CIV Road work Joint dipping on road base at Service Road 30-Dec-14 1-Jan-15 3.00pm CLOSED 30-Dec-14 0 REJECTED 1 1
6 CH1200 to CH1600
71 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00071 PROPEL 26-Dec-14 SR6 CIV Roadwork FDT on roadbase at SR6 CH1200 to CH1600 30-Dec-14 1-Jan-15 4.00pm CLOSED 02-Nov-15 307 ACCEPTED 1 1
74 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00074 PROPEL 26-Dec-14 SR6 CIV Roadwork FDT on roadbase at SR6 CH890 to CH1160 28-Dec-14 30-Dec-14 4.00pm CLOSED 02-Nov-15 309 ACCEPTED 1 1
79 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00079 PROPEL 1-Jan-15 SR6 CIV Roadwork Laying road base at service road 6 bus stop 4 3-Jan-15 5-Jan-15 9.00am CLOSED 17-Feb-15 45 ACCEPTED 1 1
80 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00080 PROPEL 2-Jan-15 SR6 CIV Roadwork Joint Dipping 3-Jan-15 5-Jan-15 10.00am CLOSED 05-Feb-15 33 ACCEPTED 1 1
81 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00081 PROPEL 2-Jan-15 SR6 CIV Roadwork Spray prime coat SR6 CH1030 to CH1160 4-Jan-15 6-Jan-15 10.00am CLOSED 25-Feb-15 52 CANCEL 1 1
82 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00082 PROPEL 2-Jan-15 SR6 CIV Roadwork Lay binder course SR6 CH1030 to CH1160 5-Jan-15 7-Jan-15 11.00am CLOSED 11-Mar-15 65 ACCEPTED 1 1
83 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00083 Lian Fatt 2-Jan-15 SR6 CIV Roadwork Installation works for U-drain 1500 X 1500 mm 5-Jan-15 7-Jan-15 2.30pm CLOSED 14-Feb-15 40 ACCEPTED 1 1
84 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00084 Lian Fatt 5-Jan-15 SR6 CIV Roadwork Receiving U-drain size 2100mm X 2100mm 6-Jan-15 8-Jan-15 9.00am CLOSED 23-Feb-15 48 ACCEPTED 1 1
85 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00085 PROPEL 6-Jan-15 SR6 CIV Roadwork Spray prime coat at SR6 CH1030 to CH1130 7-Jan-15 9-Jan-15 9.00am CLOSED 25-Feb-15 49 CANCEL 1 1
86 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00086 PROPEL 6-Jan-15 SR6 CIV Roadwork Premix works from CH1030 to CH1130 - ACB 28 8-Jan-15 10-Jan-15 10.00am CLOSED 12-Feb-15 35 ACCEPTED 1 1
88 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00088 Lian Fatt 7-Jan-15 SR6 CIV Survey Joint survey for 2100 X 2100 mm U-Drain 8-Jan-15 10-Jan-15 10.00am CLOSED CANCEL 1 1
89 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00089 Lian Fatt 7-Jan-15 SR6 CIV Roadwork Delivering box culvert size 2100mm X 1500mm 9-Jan-15 11-Jan-15 8.00am CLOSED 04-Feb-15 26 ACCEPTED 1 1
(with LID) - 18 nos
90 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00090 Lian Fatt 7-Jan-15 SR6 CIV Roadwork Installation works for U-drain 2100 X 2100 mm 9-Jan-15 11-Jan-15 8.00am CLOSED 15-Jan-15 6 REJECTED 1 1
95 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00095 Lian Fatt 12-Jan-15 SR6 CIV Drainage Receiving U-drain size 2100mm X 2100mm 13-Jan-15 15-Jan-15 10.00am CLOSED 23-Feb-15 41 ACCEPTED 1 1
104 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00104 PROPEL 12-Jan-15 SR6 CIV Roadwork Rectify premix at SR6 CH1030-CH1130 13-Jan-15 15-Jan-15 2.00pm CLOSED 15-Mar-15 61 ACCEPTED 1 1
107 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00107 PROPEL 14-Jan-15 SR6 CIV Roadwork Lay Road base from CH890-CH760 14-Jan-15 16-Jan-15 11.00am CLOSED 25-Feb-15 42 ACCEPTED 1 1
109 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00109 Syafiq 15-Jan-15 SR6 CIV Testing Coring ACB28 at service road 6 15-Jan-15 17-Jan-15 3.00pm CLOSED 16-Jan-15 1 ACCEPTED 1 1
111 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00111 PROPEL 21-Jan-15 SR6 CIV Survey Joint survey at SR6 CH650-CH1600 22-Jan-15 24-Jan-15 10.00am CLOSED 22-Jan-15 0 ACCEPTED 1 1
113 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00113 Hani Ent 4-Feb-15 SR6 CIV Interlocking Receiving Road Pavers from Sunway Pavers 4-Feb-15 6-Feb-15 09.00am CLOSED 23-Feb-15 19 ACCEPTED 1 1
114 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00114 Hani Ent 4-Feb-15 SR6 CIV Interlocking Sand delivery from Kota Tinggi for interlocking 4-Feb-15 6-Feb-15 09.00am CLOSED 26-Feb-15 22 ACCEPTED 1 1
Paver/ Road Paver
115 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00115 Hani Ent 9-Feb-15 SR6 CIV Interlocking Sand delivery from Kota Tinggi 9-Feb-15 11-Feb-15 02.00pm CLOSED 23-Feb-15 14 ACCEPTED 1 1
116 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00116 Hani Ent 10-Feb-15 SR6 CIV Interlocking Road Kerb delivery inspection. 11.2.2015 11-Feb-15 13-Feb-15 10.00am CLOSED 14-Mar-15 31 ACCEPTED 1 1
117 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00117 Hani Ent 12-Feb-15 SR6 CIV Interlocking Sand Bedding Installation of Interlocking Pavers 12-Feb-15 14-Feb-15 09.00am CLOSED 06-Mar-15 22 ACCEPTED 1 1
118 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00118 Zaki 12-Feb-15 SR6 CIV Drainage Installation Sheat Piles at CH 1690-CH1680 13-Feb-15 15-Feb-15 10.00am CLOSED CANCEL 1 1
120 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00120 Lian Fatt 23-Feb-15 SR6 CIV Drainage Delivery/Receiving udrain 24-Feb-15 26-Feb-15 10.00am CLOSED 14-Mar-15 18 ACCEPTED 1 1
122 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00122 Lian Fatt 26-Feb-15 SR6 CIV Drainage Receiving U-Drain Inspection 27-Feb-15 1-Mar-15 10.00am CLOSED 28-Mar-15 29 ACCEPTED 1 1
123 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00123 penegle 27-Feb-15 SR6 CIV Drainage inspection for mock up at bus stop 1 & 2 28-Feb-15 2-Mar-15 10.00am CLOSED 14-Mar-15 14 ACCEPTED 1 1
124 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00124 azlan 28-Feb-15 SR6 CIV Drainage MP test for U drain and Box Culvert at SR 6 2-Mar-15 4-Mar-15 9.00am CLOSED 06-Mar-15 4 ACCEPTED 1 1
125 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00125 Lian Fatt 2-Mar-15 SR6 CIV Drainage Receiving material inspection 3-Mar-15 5-Mar-15 9.00am CLOSED 05-Mar-15 2 ACCEPTED 1 1
126 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00126 Hani Ent 3-Mar-15 SR6 CIV Interlocking Block Interlocking Parvers material delivery 3-Mar-15 5-Mar-15 03.00pm CLOSED 05-Mar-15 2 ACCEPTED 1 1
inspection
128 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00128 Lian Fatt 5-Mar-15 SR6 CIV Drainage Revieving material inspection 6-Mar-15 8-Mar-15 10.00am CLOSED 07-Mar-15 1 ACCEPTED 1 1
130 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00130 Lian Fatt 7-Mar-15 SR6 CIV Drainage Receiving U-drain Inspection 9-Mar-15 11-Mar-15 10.00am CLOSED 10-Mar-15 1 ACCEPTED 1 1
138 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00138 Lian Fatt 12-Mar-15 SR6 CIV Drainage Receiving material U-Drain Inspection 12-Mar-15 14-Mar-15 10.00AM CLOSED 21-Mar-15 9 ACCEPTED 1 1
139 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00139 Lian Fatt 16-Mar-15 SR6 CIV Drainage Receiving material U-Drain Inspection 16-Mar-15 18-Mar-15 10.00AM CLOSED 21-Mar-15 5 ACCEPTED 1 1
140 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00140 Lian Fatt 18-Mar-15 SR6 CIV Drainage Receiving material U-Drain Inspection 19-Mar-15 21-Mar-15 10.00AM CLOSED 11-Jun-15 84 ACCEPTED 1 1
142 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00142 Lian Fatt 20-Mar-15 SR6 CIV Drainage U-drain receiving inspections (Speed) 24-Mar-15 26-Mar-15 10.00AM CLOSED 26-Mar-15 2 ACCEPTED 1 1
143 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00143 Lian Fatt 26-Mar-15 SR6 CIV Drainage Receiving U-Drain Inspection 27-Mar-15 29-Mar-15 11.00am CLOSED 04-Apr-15 8 ACCEPTED 1 1
145 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00145 Lian Fatt 30-Mar-15 SR6 CIV Drainage U-Udrain material inspection 30-Mar-15 1-Apr-15 10.00AM CLOSED 06-Apr-15 7 ACCEPTED 1 1
146 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00146 Hani Ent 30-Mar-15 SR6 CIV Drainage Receiving box culvert from API 31-Mar-15 2-Apr-15 03.00am CLOSED 31-Mar-15 0 ACCEPTED 1 1
147 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00147 Paneagle 30-Mar-15 SR6 CIV Drainage Laying kerb at bus stop 2 30-Mar-15 1-Apr-15 10.00AM CLOSED 18-Apr-15 19 ACCEPTED 1 1
148 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00148 Lian Fatt 1-Apr-15 SR6 CIV Drainage U-Udrain material inspection 1-Apr-15 3-Apr-15 10.00AM CLOSED 06-Apr-15 5 ACCEPTED 1 1
150 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00150 Lian Fatt 2-Apr-15 SR6 CIV Drainage Receiving u drain inspection 5-Apr-15 7-Apr-15 10.00AM CLOSED 05-Apr-15 0 ACCEPTED 1 1
152 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00152 Hani Ent 6-Apr-15 SR6 CIV Drainage Receiving box culvert from API 7-Apr-15 9-Apr-15 9.30AM CLOSED 16-Apr-15 9 ACCEPTED 1 1
153 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00153 Hani Ent 6-Apr-15 SR6 CIV Road Kerb Trial mix for road kerb grade 25 site mix 7-Apr-15 9-Apr-15 9.30AM CLOSED 15-Apr-15 8 ACCEPTED 1 1
155 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00155 Instant Optant 6-Apr-15 SR6 CIV Piping Lay 375mm RCP culvert for potable pipe crossing 7-Apr-15 9-Apr-15 2.30AM CLOSED 18-Apr-15 11 ACCEPTED 1 1
at CH750
156 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00156 Lian Fatt 7-Apr-15 SR6 CIV Drainage Receiving u drain inspections 8-Apr-15 10-Apr-15 10.00am CLOSED 10-Apr-15 2 ACCEPTED 1 1
157 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00157 Lian Fatt 9-Apr-15 SR6 CIV Drainage Receiving u drain inspection 11-Apr-15 13-Apr-15 11.00am CLOSED 11-Apr-15 0 REJECTED 1 1
159 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00159 Lian Fatt 10-Apr-15 SR6 CIV Drainage Concreting works for capping beams 11-Apr-15 13-Apr-15 10.00am CLOSED 16-Apr-15 5 ACCEPTED 1 1
160 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00160 Lian Fatt 10-Apr-15 SR6 CIV Drainage Post concreting work inspection for capping 12-Apr-15 14-Apr-15 10.00am CLOSED 16-Apr-15 4 ACCEPTED 1 1
beam as pe attached plan location.
161 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00161 Hani Ent 11-Apr-15 SR6 CIV Road Kerb Installation of Interlocking paver at Bus Stop 3 13-Apr-15 15-Apr-15 10.00am CLOSED 15-Apr-15 2 ACCEPTED 1 1
and 4
164 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00164 Lian Fatt 14-Apr-15 SR6 CIV Drainage Receiving U drain inspection 15-Apr-15 17-Apr-15 10.00am CLOSED 25-Apr-15 10 ACCEPTED 1 1
166 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00166 Lian Fatt 15-Apr-15 SR6 CIV Drainage Post concrete inspections for capping beam) 16-Apr-15 18-Apr-15 10.00am CLOSED 24-Apr-15 8 ACCEPTED 1 1
168 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00168 Lian Fatt 17-Apr-15 SR6 CIV Drainage Material receiving u drain inspection 18-Apr-15 20-Apr-15 10.00am CLOSED 11-Jun-15 54 ACCEPTED 1 1
169 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00169 Paneagle 18-Apr-15 SR6 CIV Road Kerb Inspection for trial Mix for road kerb grade 25 19-Apr-15 21-Apr-15 9.30am CLOSED 30-Apr-15 11 REJECTED 1 1
no activity
180 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00180 Paneagle 14-Apr-15 SR6 CIV Interlocking Inspection for mockup (interlocking block)at bus 15-Apr-15 17-Apr-15 8.00am CLOSED 16-Apr-15 1 ACCEPTED 1 1
stop 1&2
Setting out new allignment for interlocking block
181 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00181 Paneagle 14-Apr-15 SR6 CIV Interlocking lining.Reinstall interlocking block 80mm 15-Apr-15 17-Apr-15 8.30am CLOSED 16-Apr-15 1 ACCEPTED 1 1
black,grey and red colours
184 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00184 Lian Fatt 22-Apr-15 SR6 CIV Drainage U drain receiving inspection 23-Apr-15 25-Apr-15 10.00am CLOSED 11-Jun-15 49 ACCEPTED 1 1
193 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00193 Lian Fatt 21-Jan-15 SR6 CIV Drainage U drain 3600mmx2400mmx1m CW DWF & 24-Jan-15 26-Jan-15 10.00mm CLOSED 29-Jan-15 5 ACCEPTED 1 1
Starter Bar
U Drain
196 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00196 Lian Fatt 5-Feb-15 SR6 CIV Drainage 3600x2400mmx1m,1200mmx900mmx1m,2100m 7-Feb-15 9-Feb-15 10.00am CLOSED 11-Feb-15 4 ACCEPTED 1 1
mx2100mmx1m CW DWF & Starter Bar
197 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00197 Lian Fatt 9-Feb-15 SR6 CIV Drainage U drain 1200x900x1m cw DWF & Starter bar 10-Feb-15 12-Feb-15 10.00am CLOSED 15-Feb-15 5 ACCEPTED 1 1
U drain
(2100x2100x1m,1200x900x1m,3600mmx2400m
198 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00198 Lian Fatt 11-Feb-15 SR6 CIV Drainage mx1M,2100mmx1800mmx1m)c/w DWF & 13-Feb-15 15-Feb-15 10.00am CLOSED 15-Feb-15 2 ACCEPTED 1 1
Starter Bar
202 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00202 Lian Fatt 24-Apr-13 SR6 CIV Drainage Installation works for u drain size 1500x1200mm 24-Apr-15 26-Apr-15 11.00am CLOSED 30-Apr-15 6 ACCEPTED 1 1
x1M
203 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00203 Lian Fatt 25-Apr-13 SR6 CIV Drainage Excavation inspection and Concrete U drain 25-Apr-15 27-Apr-15 11.00am CLOSED 27-Apr-15 2 ACCEPTED 1 1
installation for size 1200mm x 1200mm x 1M
206 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00205b Lian Fatt 27-Apr-13 SR6 CIV Drainage Post concreting inspection for capping beam UD 30-Apr-15 2-May-15 10.00am CLOSED 30-Apr-15 0 ACCEPTED 1 1
2100mmx1800mm
209 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00208 Paneagle 27-Apr-15 SR6 CIV Interlocking Material receiving inspection for UPVC pipe class 28-Apr-15 30-Apr-15 8.00am CLOSED 28-Apr-15 0 ACCEPTED 1 1
B 150&200mm and PVC solvent cement
216 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00215 Lian Fatt 30-Apr-15 SR6 CIV Drainage Receiving inspection for U drain 5-May-15 7-May-15 10.00am CLOSED 11-Jun-15 37 ACCEPTED 1 1
219 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00218 Lian Fatt 5-May-15 SR6 CIV Drainage Post Concreting Inspection 7-May-15 9-May-15 10.00am CLOSED 07-May-15 0 ACCEPTED 1 1
221 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00220 Instant Optant 5-May-15 SR5 PIP Piping Excavation trench SR6 for HDPE CH 600- 1600 6-May-15 8-May-15 11.00am CLOSED 06-May-15 0 REJECTED 1 1
223 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00222 Lian Fatt 5-May-15 SR6 CIV Drainage Inspection for earthworks and u drain installation 6-May-15 8-May-15 10.00am CLOSED 08-May-15 2 ACCEPTED 1 1
size 1500x1200x1m
224 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00223 Syahir 6-May-15 SR6 CIV Road works FDT sub grade layer CH1550-CH1590 6-May-15 8-May-15 5.00pm CLOSED 05-May-15 -1 ACCEPTED 1 1
225 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00224 Azah 6-May-15 SR6 CIV Road works Inspection to close NCR no 005 7-May-15 9-May-15 9.30am CLOSED CANCEL 1 1
226 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00225 Paneagle 5-May-15 SR6 CIV Road kerb Kerb rectification works at bus stop 1 (BS1) 6-May-15 8-May-15 2.00pm CLOSED 09-May-15 3 REJECTED 1 1
227 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00226 Paneagle 6-May-15 SR6 CIV Interlocking Reinstall interlocking block with new alignment 7-May-15 9-May-15 2.00pm CLOSED 22-Apr-15 -15 REJECTED 1 1
228 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00227 Lian Fatt 7-May-15 SR6 CIV Drainage Receiving u-drain inspection 8-May-15 10-May-15 10.00am CLOSED 08-May-15 0 ACCEPTED 1 1
229 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00228 Instant Option 8-May-15 SR6 PIP Piping Request for survey pegging for Hydrant point, 9-May-15 11-May-15 10.00am CLOSED 09-May-15 0 ACCEPTED 1 1
Valve location and viking johnson compling SR6
235 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00234 Paneagle 9-May-15 SR6 CIV Interlocking Reinstall interlocking block with new alignment 11-May-15 13-May-15 2.00pm CLOSED 10-Jul-15 60 ACCEPTED 1 1
241 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00240 Paneagle 12-May-15 SR6 CIV Road Kerb Kerb rectification 14-May-15 16-May-15 2.00pm CLOSED 10-Jul-15 57 ACCEPTED 1 1
245 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00244 Aizat 15-May-15 SR6 CIV Road works FDT for sub base at SR6 CH 1530- CH 1590 15-May-15 17-May-15 3.00pm CLOSED 15-May-15 0 ACCEPTED 1 1
248 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00247 Paneagle 16-May-15 SR6 CIV Interlocking Kerb rectification works at Bus stop 9 18-May-15 20-May-15 3.00pm CLOSED CANCEL 1 1
251 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00250 Nizan 17-May-15 SR6 CIV Interlocking Inspection of work done (Heavy duty interlocking 18-May-15 20-May-15 11.00am CLOSED 18-May-15 0 ACCEPTED 1 1
paver block) for joint measurement sheet (JMS)
254 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00253 Lian Fatt 19-May-15 SR6 CIV Drainage Concreting work for capping beam UD1500x1500 20-May-15 22-May-15 11.00am CLOSED 21-May-15 1 ACCEPTED 1 1
256 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00255 Paneagle 21-May-15 SR6 CIV Road Kerb Road kerb rectification works at Bus stop 1 22-May-15 24-May-15 3.00pm CLOSED CANCEL 1 1
274 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00273 PSJV 29-May-15 SR6 ELE Electrical Sand bedding works for electrical Cable 30-May-15 1-Jun-15 10.00am CLOSED 07-Jul-15 38 ACCEPTED 1 1
installation at SR6 CH 700-CH1150 RHS
285 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00284 Lian Fatt 4-Jun-15 SR6 CIV Dranage Post concreting inspection for sump no 31 and 6-Jun-15 8-Jun-15 10.00am CLOSED 05-Jun-15 -1 ACCEPTED 1 1
35 Wall and capping beam UD3600mmx2400mm
287 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00286 Paneagle 4-Jun-15 SR6 CIV Dranage 600x600x1m perimeter drain installation work 5-Jun-15 7-Jun-15 4.00pm CLOSED 05-Jun-15 0 ACCEPTED 1 1
292 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00290 Paneagle 9-Jun-15 SR6 CIV Dranage Perimeter drain 600x600x1M installation 10-Jun-15 12-Jun-15 4.00pm CLOSED 05-Aug-15 56 ACCEPTED 1 1
296 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00294 Paneagle 12-Jun-15 SR6 CIV Interlocking Heavy duty interlocking block installation work. 15-Jun-15 17-Jun-15 10.00 am CLOSED 06-Aug-15 52 ACCEPTED 1 1
313 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00311 Paneagle 23-Jun-15 SR6 CIV Road works To close surveillance report (SR021) 24-Jun-15 26-Jun-15 3.00pm CLOSED CANCEL 1 1
323 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00321 Hani Ent 30-Jun-15 SR6 CIV Box culvert Installation of box culvert size 750 x 600 for 1-Jul-15 3-Jul-15 3.00pm CLOSED 10-Jul-15 9 ACCEPTED 1 1
connection to sump and outlet pipes
331 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00329 Opensis 2-Jul-15 SR6 ELE Backfill backfill work trench at SR 6 (2-3) CH (700-950) 3-Jul-15 5-Jul-15 11.00 am CLOSED 04-Aug-15 32 ACCEPTED 1 1
334 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00332 Paneagle 4-Jul-15 SR6 CIV Roadwork Interlocking block installation works at walkway 3-Jul-15 5-Jul-15 11.00 am CLOSED 05-Aug-15 33 ACCEPTED 1 1
area ( Light Duty area)
335 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00333 Instant Option 4-Jul-15 SR6 CIV Survey Survey setting out for drain alingement at 6-Jul-15 8-Jul-15 11.30am CLOSED 06-Jul-15 0 ACCEPTED 1 1
CH600-CH450 Udrain
343 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00341 Paneagle 8-Jul-15 SR6 CIV Oil interceptor Oil Interceptor installation work at Bus Stop 1 9-Jul-15 11-Jul-15 3.00pm CLOSED 10-Jul-15 1 REJECTED 1 1
349 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00347 Nizan 8-Jul-15 SR6 CIV Oil interceptor Oil interceptor (Excavation,Laying of 9-Jul-15 11-Jul-15 10.00am CLOSED 29-Oct-15 112 ACCEPTED 1 1
hardcore,lean concrete, rebar fixing) Bustop 1
356 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00354 Instant Option 11-Jul-15 SR6 CIV Dranage Excavation and Laying U/Drain 2.1 x 1.8 11-Jul-15 13-Jul-15 11.00am CLOSED 10-Sep-15 61 ACCEPTED 1 1
359 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00357 Paneagle 13-Jul-15 SR6 CIV Oil interceptor Inspection for oil interceptor installation work 14-Jul-15 16-Jul-15 3.00pm CLOSED 14-Jul-15 0 ACCEPTED 1 1
369 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00367 Instant Option 22-Jul-15 SR6 PIP Sand bedding Request for inspection of sand bedding at SR6 24-Jul-15 26-Jul-15 10.00am CLOSED 04-Aug-15 11 ACCEPTED 1 1
(HDPE) CH500-1200
371 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00369 Instant Option 22-Jul-15 SR6 PIP Excavation Excavation in SR6 from CH1200-1650 23-Jul-15 25-Jul-15 9.00am CLOSED 9-Oct-15 78 ACCEPTED 1 1
374 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00372 Opensis 24-Jul-15 SR6 ELE Excavation and Laying Excavation and laying of hdpe corrugated pipe 25-Jul-15 27-Jul-15 11.00am CLOSED 04-Sep-15 41 ACCEPTED 1 1
inside trench at SR6 CH650-1150
375 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00373 Opensis 25-Jul-15 SR6 ELE Backfill Backfill works trench at SR6 CH650-1150 25-Jul-15 27-Jul-15 11.00am CLOSED 04-Sep-15 41 ACCEPTED 1 1
382 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00380 UEMB QAQC KHAIRIL 28-Jul-15 SR6 CIV testing FDT test at Service road 6 28-Jul-15 30-Jul-15 2.00pm CLOSED 28-Jul-15 0 ACCEPTED 1 1
399 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00397 Lian Fatt 10-Aug-15 SR6 CIV Dranage works Post-Concreting inspection top cover sump no 8-Aug-15 10-Aug-15 10.00am CLOSED 27-Aug-15 19 ACCEPTED 1 1
26,27,28 at SR6
410 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00407A PPEC 11-Aug-15 SR6 CIV survey Joint Survey as Built Bus Stop 3 & $ 13-Aug-15 15-Aug-15 9.00am CLOSED CANCEL 1 1
411 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00408 Instant option 13-Aug-15 SR6 PIP testing Pressure & Leak test fire water 315 mm at SR6 13-Aug-15 15-Aug-15 11.00am CLOSED 08-Oct-15 56 ACCEPTED 1 1
CH700-1200)
417 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00414 UEMB CONST HADI 17-Aug-15 SR6 CIV concreting Inspection for rebar, formwork and concreting 17-Aug-15 19-Aug-15 9.30am CLOSED 20-Aug-15 3 ACCEPTED 1 1
works ( Top: sump 37)
421 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00418 Instant option 7-Apr-15 SR6 PIP Tie in Inspection for tie in at SR 6 CH 500- CH 1500 19-Aug-15 21-Aug-15 10.00am CLOSED 24-Jan-16 158 REJECTED 1 1
422 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00419 Lian Fatt 20-Aug-15 SR6 CIV Survey Survey report to close NCR No. 005 8-Apr-15 10-Apr-15 10.30am CLOSED 08-Apr-15 0 ACCEPTED 1 1
423 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00420 Instant Option 21-Aug-15 SR6 PIP RCP installation Inspection for RCP culvert installation at SR6. 21-Aug-15 23-Aug-15 8.00am CLOSED 30-Sep-15 40 ACCEPTED 1 1
CH500-CH650
Sand backfill and Sand backfill and UPVC slab installation for 11 KV
431 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00428 PSJV 24-Aug-15 SR6 ELE UPVC slab electrical cable installation at SR6 CH 1450- 1600 25-Aug-15 27-Aug-15 2.00pm CLOSED 04-Sep-15 10 ACCEPTED 1 1
LHS
435 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00432 PSJV 24-Aug-15 SR6 ELE Cable pulling Cable pulling works for loop 3,11,12,14 at SR 6 25-Aug-15 27-Aug-15 11.00am CLOSED 04-Sep-15 10 ACCEPTED 1 1
CH 1450-1600 RHS
Sand backfill and Sand backfill and UPVC slab installation for
436 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00433 PSJV 24-Aug-15 SR6 ELE UPVC slab electrical cable installation at SR6 (CH1450- 25-Aug-15 27-Aug-15 2.00am CLOSED 04-Sep-15 10 ACCEPTED 1 1
CH1600) RHS
444 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00441 Instant option 2-Sep-15 SR6 PIP Tie in installation Inspection for tie in installation at SR 6 CH 500- 3-Sep-15 5-Sep-15 10.00am CLOSED 08-Dec-15 96 REJECTED 1 1
CH 1600
450 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00447 Opensis 8-Sep-15 SR6 ELE Backfill Backfill works trench at SR6 (3-4) CH 1200- 9-Sep-15 11-Sep-15 11.00am CLOSED 22-Sep-15 13 ACCEPTED 1 1
1450,RHS
457 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00454 Lian Fatt 11-Sep-15 SR6 CIV Survey Joint survey As built SR6 ( Dranage) 12-Sep-15 14-Sep-15 9.00am CLOSED CANCEL 1 1
461 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00458 Paneagle 17-Sep-15 SR6 CIV Crossing bridge Inspection for concrete works for crossing bridge 17-Sep-15 19-Sep-15 10.00am CLOSED 18-Sep-15 1 ACCEPTED 1 1
at Bus stop 1 and 2
462 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00459 Instant Option 17-Sep-15 SR6 CIV Excavation and sand excavation and sand bedding at SR6/2 phase II 18-Sep-15 20-Sep-15 10.00am CLOSED 03-Oct-15 15 ACCEPTED 1 1
bedding CH0-CH600
471 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00468 Instant option 29-Sep-15 SR6 PIP Crossing bridge Installation for RCP cilvert at SR6 CH100-CH300 30-Sep-15 2-Oct-15 10.00am CLOSED 30-Oct-15 30 ACCEPTED 1 1
473 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00470 Instant Option 30-Sep-15 SR6 PIP testing Pressure & leak test potable water at SR6 CH100- 1-Oct-15 3-Oct-15 9.00am CLOSED 26-Oct-15 25 ACCEPTED 1 1
700 at Phase 2
476 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00473 Instant Option 2-Oct-15 SR6 PIP welding welding portable water HDPE pipe at SR6 phase 3-Oct-15 5-Oct-15 10.00am CLOSED 05-Nov-15 33 ACCEPTED 1 1
2 from CH 180 to 280
487 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00484 Instant Option 13-Oct-15 SR6 CIV Pre Concreting Inspection formwork and rebar for capping beam 20-Oct-15 22-Oct-15 10.30am CLOSED 20-Oct-15 0 ACCEPTED 1 1
at SR6 Phase 2 CH840-1000
488 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00485 Instant Option 13-Oct-15 SR6 CIV Concreting Concreting works for capping beam at SR6 Phase 20-Oct-15 22-Oct-15 2.30pm CLOSED 14-Dec-15 55 ACCEPTED 1 1
2 CH840-1000
Pressure and Leak Pressure and leak test for portable water
499 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00496 Instant Option 10-Aug-15 SR6 PIP test HDPE pipe at SR6. CH700-1200 11-Aug-15 13-Aug-15 9.00am CLOSED 11-Aug-15 0 CANCEL 1 1
508 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00505 PPEC 2-Nov-15 SR6 CIV Road works Inspection for formwork restrian beam concrete 3-Nov-15 5-Nov-15 9.00am CLOSED 11-Nov-15 8 ACCEPTED 1 1
bus stop 3&4
Sand backfill and sand backfill and UPVC slab installation for 11kV
514 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00511 PSJV 5-Nov-15 SR6 ELE UPVC slab installation electrical cable installation at SR6 CH0-600 RHS 6-Nov-15 8-Nov-15 9.00am CLOSED 9-Dec-15 33 ACCEPTED 1 1
519 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00516 Instant option 16-Nov-15 SR6 CIV Rebar inspection rebar for sump 13, CH SR 6 16-Nov-15 18-Nov-15 4.00pm CLOSED 27-Jan-16 72 ACCEPTED 1 1
520 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00517 Instant option 16-Nov-15 SR6 CIV concrete concrete work for base sump S9, S11, S13 at SR6 17-Nov-15 19-Nov-15 10.00am CLOSED 27-Jan-16 71 ACCEPTED 1 1
525 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00522 Instant option 17-Nov-15 SR6 PIP Tie in installation at tie in for fire water line at SR6 18-Nov-15 20-Nov-15 10.00am CLOSED 2-Dec-15 14 ACCEPTED 1 1
531 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00528 Instant option 25-Nov-15 SR6 CIV Road work FDT test for subgrade at SR6 CH600-CH430 25-Nov-15 27-Nov-15 10.00am CLOSED 2-Dec-15 7 ACCEPTED 1 1
537 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00534 Instant option 26-Nov-15 SR6 CIV Road work FDT test for subgrade at SR6 cH160-CH000 27-Nov-15 29-Nov-15 10.30AM CLOSED 27-Nov-15 0 ACCEPTED 1 1
547 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00544 Instant option 12-Dec-15 SR6 CIV Roadwork FDT for roadbase at SR6 phase 2 from CH 0 - 180 14-Dec-15 16-Dec-15 11.00am CLOSED 26-Jul-16 225 ACCEPTED 1 1
548 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00545 PPEC 14-Dec-15 SR6 CIV Drainage Installing box culvert 600 x 450 Bus stop 5 15-Dec-15 17-Dec-15 10.00am CLOSED 11-Apr-16 118 ACCEPTED 1 1
549 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00546 PPEC 14-Dec-15 SR6 CIV Material Inspection for laying of road kerbBus stop 5 15-Dec-15 17-Dec-15 10.00am CLOSED 11-Apr-16 118 ACCEPTED 1 1
552 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00549 Instant Option 21-Dec-15 SR6 CIV Roadwork Laying ACBC at SR6 from CH0-CH180 22-Dec-15 24-Dec-15 9.00am CLOSED 22-Dec-15 0 REJECTED 1 1
553 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00550 Instant Option 21-Dec-15 SR6 CIV Roadwork Laying ACBC at SR6 from CH0-CH200 22-Dec-15 24-Dec-15 9.00am CLOSED 1-Feb-16 41 ACCEPTED 1 1
554 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00551 Instant Option 23-Dec-15 SR6 CIV Roadwork Coring test for ACBC at SR6 from CH 0 - 180 24-Dec-15 26-Dec-15 10.00am CLOSED CANCEL 1 1
556 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00553 Instant Option 17-Nov-15 SR6 CIV Roadwork FDT for subbase at SR6 -SR2-Roundabout 3 18-Nov-15 20-Nov-15 10.00am CLOSED 28-Jan-16 71 REJECTED 1 1
557 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00554 Instant Option 18-Nov-15 SR6 CIV Roadwork FDT for roadbase at SR6 -SR2-Roundabout 3 19-Nov-15 21-Nov-15 4.00pm CLOSED 28-Jan-16 70 REJECTED 1 1
558 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00555 Instant Option 20-Nov-15 SR6 CIV Roadwork FDT for subbase at SR6 -ph2 at CH0-CH200 21-Nov-15 23-Nov-15 3.00pm CLOSED 21-Nov-15 0 ACCEPTED 1 1
559 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00556 Instant Option 23-Nov-15 SR6 CIV Roadwork FDT for subgrade at SR6 -ph2 at CH600-CH400 25-Nov-15 27-Nov-15 10.00am CLOSED 25-Nov-15 0 REJECTED 1 1
560 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00557 Instant Option 27-Nov-15 SR6 CIV Roadwork FDT for subbase at SR6 -ph2 at Ch400-CH600 28-Nov-15 30-Nov-15 4.00pm CLOSED 30-Nov-15 2 REJECTED 1 1
567 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00564 Instant Option 11/31/2015 SR6 CIV Roadwork S-bend installation at SR6,SR7,SR8 and SR1 2-Jan-16 4-Jan-16 2.00pm CLOSED 6-Jan-16 4 ACCEPTED 1 1
570 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00567 PPEC 8-Jan-16 SR6 CIV Roadwork Laying of heavy duty interlocking paverblock 9-Jan-16 11-Jan-16 2.00pm CLOSED 11-Apr-16 93 ACCEPTED 1 1
mainline at Bus stop 5 / Bus stop 6
571 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00568 PPEC 8-Jan-16 SR6 CIV Roadwork Laying of road kerb at Bus stop 5 and Bus stop 6 9-Jan-16 11-Jan-16 2.00pm CLOSED 11-Apr-16 93 ACCEPTED 1 1
577 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00574 PPEC 14-Jan-16 SR6 CIV Installation Installation box culvert (600x450) Bus stop 6 15-Jan-16 17-Jan-16 10.00am CLOSED 11-Apr-16 87 ACCEPTED 1 1
578 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00575 PPEC 14-Jan-16 SR6 CIV Installation Installation box culvert (750x600) bus stop 6 15-Jan-16 17-Jan-16 10.00am CLOSED 11-Apr-16 87 ACCEPTED 1 1
579 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00576 PPEC 14-Jan-16 SR6 CIV Installation Installation box culvert (750x600) bus stop 5 15-Jan-16 17-Jan-16 10.00am CLOSED 11-Apr-16 87 ACCEPTED 1 1
584 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00581 instant Option 16-Jan-16 SR6 CIV concreting Concreting works for sump strut beam at SR6 16-Jan-16 18-Jan-16 2.00pm CLOSED 26-Jan-16 10 ACCEPTED 1 1
(phase 2)
585 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00582 zulfaqar 19-Jan-16 SR6 CIV turfing Turfing at SR6 phase 2 20-Jan-16 22-Jan-16 3.00pm CLOSED 11-Apr-16 82 ACCEPTED 1 1
589 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00586 omitech 26-Jan-16 SR6 CIV road signages installation of road signages 26-Jan-16 28-Jan-16 12.00pm CLOSED 26-Jan-16 0 ACCEPTED 1 1
592 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00589 EN SHAMSUL 17-Feb-16 SR6 CIV Installation Installation of handrail Bus stop 5 and 6 18-Feb-16 20-Feb-16 2.30pm CLOSED 10-Mar-16 21 ACCEPTED 1 1
593 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00590 EN SHAMSUL 17-Feb-16 SR6 CIV Installation Installation of handrail Bus stop 7 and 8 18-Feb-16 20-Feb-16 2.30pm CLOSED 10-Mar-16 21 ACCEPTED 1 1
594 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00591 EN SHAMSUL 17-Feb-16 SR6 CIV Installation Installation of handrail Bus stop 9 and 10 18-Feb-16 20-Feb-16 2.30pm CLOSED 10-Mar-16 21 ACCEPTED 1 1
595 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00592 EN SHAMSUL 17-Feb-16 SR6 CIV Installation Installation of handrail Bus stop 10 18-Feb-16 20-Feb-16 2.30pm CLOSED 10-Mar-16 21 ACCEPTED 1 1
596 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00593 EN SHAMSUL 17-Feb-16 SR6 CIV Installation Installation of handrail Bus stop 7 18-Feb-16 20-Feb-16 2.30pm CLOSED 10-Mar-16 21 ACCEPTED 1 1
597 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00594 Instant Option 20-Feb-16 SR6 CIV drainage Laying u-drain at SR6 phase 2 22-Feb-16 24-Feb-16 10.00am CLOSED 11-Apr-16 49 ACCEPTED 1 1
no need to
Inspection for punchlist at Bus stop 3 & Bus stop submit RFIN for
600 RAPID-P20A1-UEMB-SR6-ELE-RFIN-00597 UEMB RIDWAN RATAG 6-Apr-16 SR6 ELE punchlist 4 for high mast lighting 6-Apr-16 8-Apr-16 3.30pm CLOSED 18-Jan-16 -79 CANCEL 1 1
punchlist
615 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00612 coremanpower 19-Apr-16 SR6 CIV sliding gate Installation of crossing steelbridge at SR6 1-Apr-16 3-Apr-16 11.00am CLOSED 20-Jun-16 80 ACCEPTED 1 1
616 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00613 aswad 8-Oct-15 SR6 CIV testing FDT (subgrade) at SR6 CH 1600 9-Oct-15 11-Oct-15 11.00am CLOSED 9-Oct-15 0 ACCEPTED 1 1
617 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00614 zulfaqar 19-Nov-15 SR6 CIV turfing Turfing work at SR6 20-Nov-15 22-Nov-15 10.00am CLOSED 20-Jun-16 213 ACCEPTED 1 1
619 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00616 aswad 13-Jan-15 SR6 CIV testing FDT (roadbase 1st layer) at SR 6 CH 750-850 13-Jan-15 15-Jan-15 9.00am CLOSED CANCEL 1 1
620 RAPID-P20A1-UEMB-SR6-PIP-RFIN-00617 Instant option 27-May-15 SR6 PIP welding welding on SR6 - portable water pipe 29-Jun-15 1-Jul-15 10.00am CLOSED 29-Jun-16 366 ACCEPTED 1 1
637 RAPID-P20A1-UEMB-SR6-CIV-RFIN-00634 MAZLAN 19-Jan-17 SR6 CIV Drainage Work Installation Of MS Grating Cover for sump at SR 6 20-Jan-17 22-Jan-17 9.00am CLOSED 20-Jan-17 0 ACCEPTED 1 1
637 637
205A/B
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(SERVICE ROAD 7)
1 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00001 PROPEL 6-Nov-14 SR7 CIV Survey Joint survey at CH700 - CH1020 7-Nov-14 9-Nov-14 10.00 am CLOSED 07-Nov-14 0 ACCEPTED 1 1
3 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00003 En Misbah 7-Oct-14 SR7 CIV Testing Hand Auger test at HA 36, 37, 38 8-Oct-14 10-Oct-14 8.00 am CLOSED 11-Oct-14 1 ACCEPTED 1 1
4 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00004 En Misbah 8-Oct-14 SR7 CIV Testing Mackintosh Probe testing (MP 43,44,45,46) 9-Oct-14 11-Oct-14 8.00 am CLOSED 10-Oct-14 1 ACCEPTED 1 1
6 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00006 PROPEL 28-Oct-14 SR7 CIV Roadwork Preparation of subgrade at Ch1200 - Ch1600 29-Oct-14 31-Oct-14 8.00 am CLOSED 30-Oct-14 1 ACCEPTED 1 1
7 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00007 PROPEL 10-Dec-14 SR7 CIV Testing FDT for sub-grade 11-Nov-14 13-Nov-14 3.00 pm CLOSED 03-Dec-14 22 ACCEPTED 1 1
8 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00008 PROPEL 15-Dec-14 SR7 CIV Testing FDT at Service Road 7 - subgrade level CH 880 - CH 17-Nov-14 19-Nov-14 11.00 am CLOSED 20-Nov-14 3 ACCEPTED 1 1
700 (2 points)
14 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00014 PROPEL 16-Dec-14 SR7 CIV Testing Trail lay for ACBC 28 at Service Road 7 (CH1040 to 19-Nov-14 21-Nov-14 11.00 am CLOSED 15-Dec-14 26 REJECTED 1 1
CH1140)
17 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00017 PROPEL 18-Dec-14 SR7 CIV Testing FDT at Service Road 7 - subbase level CH 860 - CH 19-Nov-14 21-Nov-14 10.00 am CLOSED 25-Dec-14 36 ACCEPTED 1 1
1040
18 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00018 PROPEL 18-Dec-14 SR7 CIV Roadwork Laying subbase at Service Road 7 - CH700 to CH890 19-Nov-14 21-Nov-14 10.00 am CLOSED 25-Feb-15 98 ACCEPTED 1 1
19 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00019 PROPEL 18-Dec-14 SR7 CIV Roadwork Joint dipping subbase at Service Road 7 - CH860 to 19-Nov-14 21-Nov-14 10.00 am CLOSED 16-Jan-15 58 ACCEPTED 1 1
CH700
23 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00023a PROPEL 20-Dec-14 SR7 CIV Roadwork Spray prime coat at final Lay area SR7 CH 1140-1040 22-Dec-14 24-Dec-14 10.00am CLOSED 25-Feb-15 65 ACCEPTED 1 1
24 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00023 PROPEL 23-Dec-14 SR7 CIV Roadwork Laying geotextile gx80/80 (Geogrid), laying 24-Dec-14 26-Dec-14 10.00am CLOSED 23-Feb-15 61 ACCEPTED 1 1
roadbase at CH1040-CH940 at Service Road 7
25 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00024 PROPEL 19-Dec-14 SR7 CIV Roadwork Preparation of Subgrade CH1200-CH1600 20-Dec-14 22-Dec-14 10.00am CLOSED 25-Feb-15 67 ACCEPTED 1 1
27 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00026 PROPEL 26-Dec-14 SR7 CIV Roadwork FDT on subgrade at SR7 CH1140 to CH1600 28-Dec-14 30-Dec-14 10.00am CLOSED 31-Dec-14 3 ACCEPTED 1 1
29 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00028 PROPEL 26-Dec-14 SR7 CIV Roadwork FDT on subbase at SR7 CH1140 to CH1600 30-Dec-14 1-Jan-15 10.00am CLOSED 28-Feb-15 60 REJECTED 1 1
30 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00029 PROPEL 26-Dec-14 SR7 CIV Roadwork Joint Dipping for Road base at SR7 CH1140-CH1600 30-Dec-14 1-Jan-15 10.00am CLOSED 30-Dec-14 0 ACCEPTED 1 1
33 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00032 PROPEL 28-Dec-14 SR7 CIV Roadwork Joint Dipping for Subgrade at SR7 CH1140-CH1600 28-Dec-14 30-Dec-14 10.00am CLOSED 30-Dec-14 2 ACCEPTED 1 1
36 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00035 PROPEL 1-Jan-15 SR7 CIV Roadwork 1) Laying geogrid gx 80/80 at SR7 CH700-CH820 2) 3-Jan-15 5-Jan-15 9.00am CLOSED 17-Mar-15 73 ACCEPTED 1 1
Laying road base at SR7 CH700-CH820
38 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00037 PROPEL 1-Jan-15 SR7 CIV Roadwork Laying at subbase service road 7 CH1200-CH1400 3-Jan-15 5-Jan-15 1.00pm CLOSED 27-Feb-15 55 ACCEPTED 1 1
52 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00051 PROPEL 12-Jan-15 SR7 CIV Roadwork 1) Joint Dipping for Road base at CH640-CH700 (2) 13-Jan-15 15-Jan-15 11.00am CLOSED 6-Feb-15 24 ACCEPTED 1 1
FDT for Road base at CH640-CH700
55 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00054 PROPEL 12-Jan-15 SR7 CIV Roadwork Rectify premix area at SR7 CH1040-CH1140 13-Jan-15 15-Jan-15 2.00pm CLOSED 28-Feb-15 46 ACCEPTED 1 1
57 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00056 Wee Guan 12-Jan-15 SR7 CIV Survey Labelling at SR7 12-Jan-15 14-Jan-15 08.00am CLOSED 25-Feb-15 44 ACCEPTED 1 1
60 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00059 PROPEL 14-Jan-15 SR7 CIV Roadwork 1) Joint dipping for subgrade from CH820-CH900 (2) 14-Jan-15 16-Jan-15 11.00am CLOSED 12-Feb-15 29 ACCEPTED 1 1
FDT for subgrade from CH820-CH900
1) Joint Dipping for subbase at CH820-CH900 (2)
61 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00060 PROPEL 14-Jan-15 SR7 CIV Roadwork 14-Jan-15 16-Jan-15 11.00am CLOSED 5-Feb-15 22 ACCEPTED 1 1
FDT for subbase from CH820-CH900
62 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00061 PROPEL 14-Jan-15 SR7 CIV Roadwork 1) Joint Dipping for Roadbase from CH820-CH900 14-Jan-15 16-Jan-15 11.00am CLOSED 2-Feb-15 19 ACCEPTED 1 1
(2) FDT for Roadbase from CH820-CH900
63 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00062 PROPEL 14-Jan-15 SR7 CIV Roadwork 1) Spray prime coat from CH820-CH900 (2) Lay 14-Jan-15 16-Jan-15 11.00am CLOSED 23-Feb-15 40 ACCEPTED 1 1
Binder course from CH820-CH900
64 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00063 Wee Guan 14-Jan-15 SR7 CIV Drainage 1) Excavation (2) Install U-Drain 900x900 (OKA) 15-Jan-15 17-Jan-15 08.00am CLOSED 23-Feb-15 39 ACCEPTED 1 1
66 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00065 Wee Guan 15-Jan-15 SR7 CIV Drainage Loading Box Culvert 1500x1200 (12) and U-Drain 16-Jan-15 18-Jan-15 10.00am CLOSED 30-Jan-15 14 ACCEPTED 1 1
1500x1200 (38)
67 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00066 Wee Guan 15-Jan-15 SR7 CIV Drainage Excavation and Install U-Drain 900x600 (OKA) 16-Jan-15 18-Jan-15 08.00am CLOSED 11-Feb-15 26 ACCEPTED 1 1
69 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00068 PROPEL 21-Jan-15 SR7 CIV Roadwork Joint survey at service road 7 from CH650-CH1580 22-Jan-15 24-Jan-15 10.00am CLOSED 22-Jan-15 0 ACCEPTED 1 1
71 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00070 Wee Guan 22-Jan-15 SR7 CIV Drainage Unloading U-Drain 900x900 OKA 120 Unit 26-Dec-14 28-Dec-14 08.00am CLOSED 23-Feb-15 59 ACCEPTED 1 1
72 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00071 Wee Guan 22-Jan-15 SR7 CIV Drainage Unloading U-Drain 1800x1500 OKA 47 Unit 22-Jan-15 24-Jan-15 08.00am CLOSED 7-Feb-15 16 ACCEPTED 1 1
73 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00072 Wee Guan 27-Jan-15 SR7 CIV Drainage Laying U-Drain 900x900 ch 1600-1680. UD Supply 28-Jan-15 30-Jan-15 08.00am CLOSED 8-Oct-15 253 ACCEPTED 1 1
by OKA
76 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00075 Wee Guan 31-Jan-15 SR7 CIV Drainage 1800x1500 U-Drain, Unloading Material 2-Feb-2015 4-Feb-15 09.00am CLOSED 26-Feb-15 24 ACCEPTED 1 1
77 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00076 Wee Guan 2-Feb-15 SR7 CIV Drainage Unloading U-Drain 1800x1200 3-Feb-15 5-Feb-15 09.00am CLOSED 23-Feb-15 20 ACCEPTED 1 1
79 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00078 Wee Guan 3-Feb-00 SR7 CIV Drainage laying 1800 x 1500 of drain at CH1150-CH930 5-Feb-15 7-Feb-15 08.00am CLOSED 20-Feb-15 15 ACCEPTED 1 1
80 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00079 Wee Guan 4-Feb-15 SR7 CIV Drainage unloading 1800 x 1500 of drain 5-Feb-15 7-Feb-15 09.00am CLOSED 23-Feb-15 18 ACCEPTED 1 1
87 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00086 UEMB ZAKI 12-Feb-15 SR7 CIV Drainage Installation Sheat Piles at CH1000-CH920 13-Feb-15 15-Feb-15 10.00am CLOSED CANCEL 1 1
91 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00090 Wee Guan 9-Feb-15 SR7 CIV Drainage Material Delivery inspection R6 1 ton, Y 10 2 Tons 10-Feb-15 12-Feb-15 02.00pm CLOSED 26-Feb-15 16 ACCEPTED Azmi 1 1
92 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00091 PROPEL 16-Feb-15 SR7 CIV Drainage 3 meter strignt edge test 17-Feb-15 19-Feb-15 2.00pm CLOSED 10-Mar-15 21 REJECTED 1 1
93 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00092 Wee Guan 23-Feb-15 SR7 CIV Drainage Box culvert and U drain from OKA. 24-Feb-15 26-Feb-15 8.00am CLOSED 6-Mar-15 10 ACCEPTED Belum masuk last 1 1
26/2
94 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00093 Wee Guan 26-Feb-15 SR7 CIV Drainage Box culvert and U drain from OKA. 27-Feb-15 1-Mar-15 8.00am CLOSED 18-Mar-15 19 ACCEPTED 1 1
95 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00094 Wee Guan 26-Feb-15 SR7 CIV Drainage T16 10 ton, T10 9 Ton, T12 1 Ton, for inspection 27-Feb-15 1-Mar-15 8.00am CLOSED 14-Mar-15 15 ACCEPTED 1 1
97 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00096 Wee Guan 4-Mar-15 SR7 CIV Drainage Delivery material inspection U-drain and Box culvert 5-Mar-15 7-Mar-15 8.00am CLOSED 5-Mar-15 0 ACCEPTED 1 1
100 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00099 Wee Guan 7-Mar-15 SR7 CIV Drainage Excavation for laying U drain and Box Culvert 9-Mar-15 11-Mar-15 7.30am CLOSED 20-Feb-15 -17 ACCEPTED 1 1
CH1100-CH930
101 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00100 Wee Guan 7-Mar-15 SR7 CIV Drainage Laying u drain & box culvertat CH1100-ch930 9-Mar-15 11-Mar-15 7.30am CLOSED 20-Feb-15 -17 ACCEPTED 1 1
102 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00101 Wee Guan 11-Mar-15 SR7 CIV Drainage Material delivery inspection u-drain and Box Culvert 12-Mar-15 14-Mar-15 9.30am CLOSED 14-Mar-15 2 ACCEPTED 1 1
103 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00102 Wee Guan 11-Mar-15 SR7 CIV Drainage Excauvation , Laying and Compact 12-Mar-15 14-Mar-15 9.30am CLOSED 8-Oct-15 210 ACCEPTED 1 1
117 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00116 Instant Option 26-Mar-15 SR7 CIV Piping Lay 450mm RCP culvert for pipe crossing at SR7 27-Mar-15 29-Mar-15 10.00am CLOSED 30-Apr-15 34 ACCEPTED 1 1
119 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00118 Wee Guan 26-Mar-15 SR7 CIV Drainage Excavation for laying U drain 1500x900, L shape size 27-Mar-15 29-Mar-15 8.00am CLOSED 30-Mar-15 3 ACCEPTED 1 1
2090x1950 and Box culvert 4500x1500
129 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00128 Wee Guan 1-Apr-15 SR7 CIV Drainage Caping beam inspection at CH 1100 rigt Site 2-Apr-15 4-Apr-15 10.00am CLOSED 6-Apr-15 4 ACCEPTED 1 1
130 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00129 Wee Guan 1-Apr-15 SR7 CIV Drainage Sump rebar inspection at CH1400 2-Apr-15 4-Apr-15 10.30am CLOSED 8-Oct-15 189 ACCEPTED 1 1
132 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00131 Wee Guan 1-Apr-15 SR7 CIV Drainage Excavation for L Shape 4500x1800 CH1450-CH1300 2-Apr-15 4-Apr-15 8.00am CLOSED 18-Apr-15 16 ACCEPTED 1 1
134 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00133 Wee Guan 1-Apr-15 SR7 CIV Drainage Laying L shape 4500x1800 at CH 1450-CH1300 2-Apr-15 4-Apr-15 1.00pm CLOSED 18-Apr-15 16 ACCEPTED 1 1
137 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00136 Wee Guan 1-Apr-15 SR7 CIV Drainage Laying Box Culvert 1500x1200 at CH800-CH780 3-Apr-15 5-Apr-15 11.00am CLOSED 18-Apr-15 15 ACCEPTED 1 1
139 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00138 Wee Guan 1-Apr-15 SR7 CIV Drainage Excavation for laying box culvert 1500x1200 at 3-Apr-15 5-Apr-15 08.00am CLOSED 18-Apr-15 15 ACCEPTED 1 1
CH800x780
141 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00140 Wee Guan 1-Apr-15 SR7 CIV Drainage Install whipehole after backfilling aand compact for 2-Apr-15 4-Apr-15 05.30pm CLOSED 18-Apr-15 16 ACCEPTED 1 1
u drain 1500 at CH750-650
144 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00143 Wee Guan 1-Apr-15 SR7 CIV Drainage Laying Crusher Run 0.15m and compact for laying u 2-Apr-15 4-Apr-15 9.30am CLOSED 18-Apr-15 16 ACCEPTED 1 1
drain 1500x900 at CH 750xCH650
146 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00145 Wee Guan 8-Apr-15 SR7 CIV Drainage Laying crusher run 0.15 and compact as per 9-Apr-15 11-Apr-15 10.00am CLOSED 13-Apr-15 4 ACCEPTED 1 1
drawing has been show. CH 1350 to CH 1300
153 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00152 Wee Guan 8-Apr-15 SR7 CIV Drainage Back filling and compaction every 300mm as 9-Apr-15 11-Apr-15 5.00pm CLOSED 20-Apr-15 11 ACCEPTED 1 1
required for udrain 1800x1200 at CH850-CH780
154 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00153 Wee Guan 8-Apr-15 SR7 CIV Drainage Install whipehole after backfilling has been compact 9-Apr-15 11-Apr-15 6.00pm CLOSED 20-Apr-15 11 ACCEPTED 1 1
for U drain 1800x 1200 at Ch850-Ch780
155 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00154 Wee Guan 8-Apr-15 SR7 CIV Drainage Laying U drain 1500 x1200 after crusher run has 9-Apr-15 11-Apr-15 2.00pm CLOSED 20-Apr-15 11 ACCEPTED 1 1
been compact at CH750-CH620
156 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00155 Wee Guan 8-Apr-15 SR7 CIV Drainage Backfilling after u drain has been install, 9-Apr-15 11-Apr-15 5.00pm CLOSED 20-Apr-15 11 ACCEPTED 1 1
compaction will be done every 300mm
161 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00160 Wee Guan 8-Apr-15 SR7 CIV Drainage Laying crusher run 0.15m and compact before lay 9-Apr-15 11-Apr-15 10.00am CLOSED 20-Apr-15 11 ACCEPTED 1 1
box culvert 1500x1200 at CH730-CH700
167 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00165 Wee Guan 10-Apr-15 SR7 CIV Drainage Material inspection T16 10 ton from amstell 11-Apr-15 13-Apr-15 10.00am CLOSED 16-Apr-15 5 ACCEPTED 1 1
169 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00167 taufiq 9-Apr-15 SR7 CIV Drainage Sump rebars inspection at CH 1400 sr 7 10-Apr-15 12-Apr-15 10.30am CLOSED 17-Apr-15 7 ACCEPTED 1 1
170 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00168 taufiq 12-Apr-15 SR7 CIV Drainage Backfill and compacti after installation u drain 13-Apr-15 15-Apr-15 11.00am CLOSED 16-Apr-15 3 ACCEPTED 1 1
1500x900 at CH 250- CH 270 RHS
171 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00169 Wee Guan 14-Apr-15 SR7 CIV Drainage Concrete G45 from Holcim for Sump 11 4 nos 15-Apr-15 17-Apr-15 10.00am CLOSED 16-Apr-15 1 ACCEPTED 1 1
( Slab) 6m.
172 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00170 Wee Guan 15-Apr-15 SR7 CIV Drainage Excavation for laying L shape 4500x1800 at CH 16-Apr-15 18-Apr-15 8.00am CLOSED 20-Apr-15 4 ACCEPTED 1 1
1400-CH1300
174 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00172 Wee Guan 15-Apr-15 SR7 CIV Drainage Laying L shape 4500x1800 at CH 1400 to CH 1300 16-Apr-15 18-Apr-15 2.00pm CLOSED 20-Apr-15 4 ACCEPTED 1 1
177 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00175 Wee Guan 15-Apr-15 SR7 CIV Drainage Material delivery inspection L shape size 4500x1800 16-Apr-15 18-Apr-15 3.00pm CLOSED 20-Apr-15 4 ACCEPTED 1 1
182 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00180 Wee Guan 18-Apr-15 SR7 CIV Drainage Laying Crusherun 0.15 and proper compaction for 20-Apr-15 22-Apr-15 10.00am CLOSED 30-Apr-15 10 ACCEPTED 1 1
laying L Shape 4500x1500 at CH 1300- CH 1200
183 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00181 Wee Guan 18-Apr-15 SR7 CIV Drainage Laying L Shape 4500-1800 at CH1300-CH1200 20-Apr-15 22-Apr-15 2.00pm CLOSED 30-Apr-15 10 ACCEPTED 1 1
188 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00186 Wee Guan 18-Apr-15 SR7 CIV Drainage Backfilling compaction every 300mm and install 20-Apr-15 22-Apr-15 5.00pm CLOSED 30-Apr-15 10 ACCEPTED 1 1
whipehole at CH1320-CH1300
190 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00188 Wee Guan 18-Apr-15 SR7 CIV Drainage Material delivery inspection T12 for sump 2 ton 20-Apr-15 22-Apr-15 11.00am CLOSED 25-Apr-15 5 ACCEPTED 1 1
from amsteel
205 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00203 Wee Guan 22-Apr-15 SR7 CIV Drainage Laying u drain 1800x1200 at CH860-CH800 24-Apr-15 26-Apr-15 2.00pm CLOSED 30-Apr-15 6 ACCEPTED 1 1
207 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00205 Wee Guan 24-Apr-15 SR7 CIV Drainage concrete sump base grade 45 Holcim 25-Apr-15 27-Apr-15 9.00am CLOSED 30-Apr-15 5 ACCEPTED 1 1
209 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00207 PPEC 25-Apr-15 SR7 CIV Drainage Laying of interlocking concrete paver for bus stop 7 26-Apr-15 28-Apr-15 8.00am CLOSED 28-Apr-15 2 ACCEPTED 1 1
212 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00210 Wee Guan 25-Apr-15 SR7 CIV Drainage Laying u drain 1800x1200 after crusher run have 26-Apr-15 28-Apr-15 2.00pm CLOSED 25-May-15 29 ACCEPTED 1 1
been install and compact at CH700-CH800
214 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00212 Wee Guan 25-Apr-15 SR7 CIV Drainage Excavation for laying L shape size 4500x1800 at CH 27-Apr-15 29-Apr-15 8.00am CLOSED 29-Apr-15 2 ACCEPTED 1 1
125-CH1100
216 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00214 Wee Guan 25-Apr-15 SR7 CIV Drainage Laying L shape 4500x1800 at CH 1200-CH1100 27-Apr-15 29-Apr-15 2.00pm CLOSED 29-Apr-15 2 ACCEPTED 1 1
225 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00223 Wee Guan 25-Apr-15 SR7 CIV Drainage Laying u drain 1500x900 at CH 1220-CH1200 28-Apr-15 30-Apr-15 2.00pm CLOSED 26-Jun-15 59 ACCEPTED 1 1
226 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00224 aizat 27-Apr-13 SR7 CIV testing FDT on subgrade & Sub baase Roundabout 8 29-Apr-15 1-May-15 9.00am CLOSED 10-Jun-15 42 REJECTED 1 1
229 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00227 Wee Guan 29-Apr-15 SR7 CIV Drainage concreting capping beam for u drain 1800x1500. 30-Apr-15 2-May-15 10.00am CLOSED 4-May-15 4 ACCEPTED 1 1
Grade 45 from HOLCIM
231 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00229 Wee Guan 29-Apr-15 SR7 CIV Drainage excavation for laying Box Culvert at CH1550 for 30-Apr-15 2-May-15 9.00am CLOSED 08-Oct-15 161 ACCEPTED 1 1
road crossing
237 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00235 Wee Guan 29-Apr-15 SR7 CIV Drainage Laying L shape 4500x1800 at CH1280-1890 30-Apr-15 2-May-15 2.00pm CLOSED 08-Oct-15 161 ACCEPTED 1 1
239 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00237 Instant Option 29-Apr-15 SR7 CIV Piping Inspection RC pipe culvert CH1400) fire s.w.p.w 30-Apr-15 2-May-15 11.00am CLOSED 10-Jun-15 41 REJECTED 1 1
241 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00239 PSJV 2-May-15 SR7 ELE Electrical Sand and soil backfilling works at SR7 CH650- 5-May-15 7-May-15 10.00am CLOSED 10-Jun-15 36 ACCEPTED 1 1
CH1150 LHS
242 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00240 Instant Option 6-May-15 SR7 CIV Piping Excavation trench SR7 for HDPE pipe CH600-CH1600 6-May-15 8-May-15 10.00am CLOSED 6-May-15 0 REJECTED 1 1
246 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00244 Syahir 5-May-15 SR7 CIV Testing FDT-Roadbasse layer at Roundabout 8 SR7 7-May-15 9-May-15 9.30am CLOSED 10-Jun-15 34 ACCEPTED 1 1
249 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00247 Wee Guan 7-May-15 SR7 CIV Drainage Sump 9 inspection Rebar at SR7 8-May-15 10-May-15 4.30pm CLOSED 8-May-15 0 ACCEPTED 1 1
254 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00252 PSJV 11-May-15 SR7 ELE Electrical Excavation works for 11kv electrical cable 12-May-15 14-May-15 9.00am CLOSED 10-Jun-15 29 ACCEPTED 1 1
installation at SR 7 CH1250-1600 RHS
260 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00258 Instant Option 12-May-15 SR7 CIV Roadwork Request for laying of road crossing for HDPE pipe 12-May-15 14-May-15 5.00pm CLOSED 15-May-15 3 ACCEPTED 1 1
and sand bedding ar SR 7 CH1580
261 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00259 Wee Guan 11-May-15 SR7 CIV Drainage Concreting sump 14 (Base) Gred 45 12-May-15 14-May-15 4.30pm CLOSED 12-May-15 0 ACCEPTED 1 1
262 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00260 Wee Guan 11-May-15 SR7 CIV Drainage Concreting sump 12 (Base) Gred 45 12-May-15 14-May-15 4.30pm CLOSED 16-May-15 4 ACCEPTED 1 1
263 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00261 Wee Guan 12-May-15 SR7 CIV Drainage Wall formwork and rebar inspection for Sump 9 . 13-May-15 15-May-15 8.30am CLOSED 19-May-15 6 ACCEPTED 1 1
264 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00262 Wee Guan 12-May-15 SR7 CIV Drainage Wall formwork and rebar inspection for Sump 11 . 13-May-15 15-May-15 8.30am CLOSED 13-May-15 0 ACCEPTED 1 1
265 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00263 Wee Guan 12-May-15 SR7 CIV Drainage Wall formwork and rebar inspection for Sump 21 . 13-May-15 15-May-15 8.30am CLOSED 13-May-15 0 ACCEPTED 1 1
266 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00264 Wee Guan 12-May-15 SR7 CIV Drainage Concrete wall for sump 9 (2M) 13-May-15 15-May-15 2.30pm CLOSED 15-May-15 2 ACCEPTED 1 1
267 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00265 Wee Guan 12-May-15 SR7 CIV Drainage Concrete wall for sump 11 (2M) 13-May-15 15-May-15 3.00pm CLOSED 13-May-15 0 ACCEPTED 1 1
268 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00266 Wee Guan 12-May-15 SR7 CIV Drainage Concrete wall for sump 21 (2M) 13-May-15 15-May-15 2.00pm CLOSED 16-May-15 3 ACCEPTED 1 1
270 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00268 Instant Option 13-May-15 SR7 CIV Piping Excavation work for HDPE pipe at SR7 CH600-800 13-May-15 15-May-15 5.00am CLOSED 15-May-15 2 ACCEPTED 1 1
278 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00276 Instant Option 16-May-15 SR7 CIV Piping Excavation works on SR7 CH1200-CH1600 for HDPE 16-May-15 18-May-15 2.00pm CLOSED 16-Oct-15 153 ACCEPTED 1 1
pipe
281 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00279 Instant Option 18-May-15 SR7 CIV Piping Sand bedding for HDPE pipe at SR7 CH1200-CH1600 18-May-15 20-May-15 11.00am CLOSED 20-May-15 2 ACCEPTED 1 1
282 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00280 Instant Option 18-May-15 SR7 CIV Piping Request for pipe laying work at SR7 CH 1200-1600 18-May-15 20-May-15 11.00am CLOSED 16-Oct-15 151 ACCEPTED 1 1
for HDPE pipe
283 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00281 Instant Option 18-May-15 SR7 CIV Piping Sand backfill and soil backfill at SR7 CH1200- 18-May-15 20-May-15 11.00am CLOSED 20-May-15 2 ACCEPTED 1 1
CH1600 for HDPE pipe
284 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00282 Instant Option 18-May-15 SR7 CIV Piping Request for installation of hydrant at SR7 CH1200- 18-May-15 20-May-15 11.00am CLOSED 10-Jun-15 23 REJECTED 1 1
CH1600 (HDPE pipe)
286 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00283 Wee Guan 20-May-15 SR7 CIV Drainage Rebar and formwork inspection for capping beam 21-May-15 23-May-15 1.00pm CLOSED 24-May-15 3 REJECTED 1 1
at CH1200-CH900
288 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00285 Wee Guan 20-May-15 SR7 CIV Drainage Rebar and formwork for sump 11. sump no 65. 21-May-15 23-May-15 5.00pm CLOSED 22-May-15 1 ACCEPTED 1 1
290 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00287 Wee Guan 20-May-15 SR7 CIV Drainage Rebar and formwork for sump 9. Sump no 68,69,70. 21-May-15 23-May-15 4.00pm CLOSED 21-May-15 0 ACCEPTED 1 1
293 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00290 Wee Guan 20-May-15 SR7 CIV Drainage Concrete sump 9 wall. Sump no 68,69,70. 21-May-15 23-May-15 2.00pm CLOSED 22-May-15 1 ACCEPTED 1 1
294 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00291 Wee Guan 20-May-15 SR7 CIV Drainage Concrete sump 11 wall sump 65. 21-May-15 23-May-15 11.00am CLOSED 22-May-15 1 ACCEPTED 1 1
295 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00292 Wee Guan 20-May-15 SR7 CIV Drainage Concrete sump 21 wall. Sump no 43 & 44 21-May-15 23-May-15 2.00pm CLOSED 22-May-15 1 ACCEPTED 1 1
305 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00302 Wee Guan 24-May-15 SR7 CIV Drainage Inspection reber and formwork for sump 16. Sump 25-May-15 27-May-15 10.00am CLOSED 25-May-15 0 ACCEPTED 1 1
no 56 ( Wall)
307 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00304 Wee Guan 24-May-15 SR7 CIV Drainage Inspection rebar and formwork for sump 9. sump 26-May-15 28-May-15 10.30am CLOSED 28-May-15 2 ACCEPTED 1 1
no 66,67,70,71. (wall)
309 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00306 Wee Guan 24-May-15 SR7 CIV Drainage Inspection for rebar and formwork for sump 27-May-15 29-May-15 10.30am CLOSED 28-May-15 1 ACCEPTED 1 1
12.sump no 42 (wall)
311 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00308 Wee Guan 24-May-15 SR7 CIV Drainage Concrete capping beam for u drain at CH1000 to 25-May-15 27-May-15 11.00am CLOSED 27-May-15 2 ACCEPTED 1 1
CH900.
312 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00309 Wee Guan 24-May-15 SR7 CIV Drainage Concrete sump 14 wall. Sump no 55. 25-May-15 27-May-15 10.00am CLOSED 28-May-15 3 REJECTED 1 1
313 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00310 Wee Guan 24-May-15 SR7 CIV Drainage Concrete sump 21 wall. Sump no 43,39,44. 25-May-15 27-May-15 10.30am CLOSED 8-Oct-15 136 ACCEPTED 1 1
314 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00311 Wee Guan 24-May-15 SR7 CIV Drainage Concrete sump 16 wall. Sump no 56. 25-May-15 27-May-15 11.00am CLOSED 25-May-15 0 ACCEPTED 1 1
315 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00312 Wee Guan 24-May-15 SR7 CIV Drainage Concrete sump 11. sump no 59,60,63,64. 26-May-15 28-May-15 10.00am CLOSED 27-May-15 1 ACCEPTED 1 1
316 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00313 Wee Guan 24-May-15 SR7 CIV Drainage Concrete sump 9 wall. Sump no 66,67,70,71. 26-May-15 28-May-15 2.00pm CLOSED 28-May-15 2 REJECTED 1 1
317 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00314 Wee Guan 24-May-15 SR7 CIV Drainage Concrete sump 12 wall. Sump no 42. 27-May-15 29-May-15 9.00am CLOSED 28-May-15 1 ACCEPTED 1 1
325 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00322 Wee Guan 29-May-15 SR7 CIV Drainage Inspection rebar and formwork for sump 21,sump 30-May-15 1-Jun-15 9.00am CLOSED 30-May-15 0 ACCEPTED 1 1
no 39
326 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00323 Wee Guan 29-May-15 SR7 CIV Drainage Concrete sump 21 wall. Sump no 39. 30-May-15 1-Jun-15 10.00am CLOSED 30-May-15 0 ACCEPTED 1 1
327 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00324 Wee Guan 29-May-15 SR7 CIV Drainage Concrete capping beam for U drain 1800x1500 at 30-May-15 1-Jun-15 10.30am CLOSED 30-May-15 0 ACCEPTED 1 1
CH900 to CH950
330 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00327 Wee Guan 2-Jun-15 SR7 CIV Drainage Inspection rebar and formwork for sump wall Sump 3-Jun-15 5-Jun-15 1.00pm CLOSED 3-Jun-15 0 ACCEPTED 1 1
no 70
332 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00329 Wee Guan 2-Jun-15 SR7 CIV Drainage Concrete Capping beam for shap drain at CH1200 3-Jun-15 5-Jun-15 3.00pm CLOSED 3-Jun-15 0 ACCEPTED 1 1
to CH1300 concrete grade 45 by holcom
334 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00331 Amin 4-Jun-15 SR7 ELE Road Crossing Reinforcement bar and concreting work for 33kv 5-Jun-15 7-Jun-15 10.00am CLOSED 18-Aug-15 74 ACCEPTED 1 1
duct bank (Road Crossing)
336 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00333 Wee Guan 5-Jun-15 SR7 CIV Drainage Inspection rebar and formwork for sump 71 (Wall) 8-Jun-15 10-Jun-15 10.00am CLOSED 9-Jun-15 1 ACCEPTED 1 1
342 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00339 Wee Guan 8-Jun-15 SR7 CIV Drainage Concreting strut beam for sump no 58 (Grade45) 9-Jun-15 11-Jun-15 2.00pm CLOSED 9-Jun-15 0 ACCEPTED 1 1
346 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00343 Opensis 15-Jun-15 SR7 ELE Electrical Backfill work trench at SR7 (2-3) CH700-1150 16-Jun-15 18-Jun-15 11.00am CLOSED 10-Dec-15 177 ACCEPTED 1 1
347 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00344 Opensis 15-Jun-15 SR7 ELE Electrical Excavation works and laying of HDPE corrugated 17-Jun-15 19-Jun-15 11.00am CLOSED 10-Jul-15 23 ACCEPTED 1 1
pipe inside trench at SR7 (3-4) CH1250-1550)
348 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00345 Opensis 15-Jun-15 SR7 ELE Electrical Backfill work trench at SR7 (3-4) CH1250-1550) 17-Jun-15 19-Jun-15 11.00am CLOSED 10-Dec-15 176 ACCEPTED 1 1
350 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00347 Liwo 15-Jun-15 SR7 CIV Compact substation Inspection of compection installation at SR 7 -1MVA 16-Jun-15 18-Jun-15 11.00am CLOSED 4-Aug-15 49 ACCEPTED 1 1
367 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00364 Instant Option 10-Jul-15 SR7 CIV Valve Chamber Request for inspection of installed valve chamber 11-Jul-15 13-Jul-15 10.00am CLOSED 4-Sep-15 55 REJECTED 1 1
370 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00367 Instant Option 13-Jul-15 SR7 PIP Anti Rust Request for inspection of anti rust and inspection of 14-Jul-15 16-Jul-15 9.30am CLOSED 31-Oct-15 109 ACCEPTED 1 1
S/Bend
386 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00383 PPEC 27-Jul-15 SR7 CIV survey Joint survey as built dranage SR7 CH30-CH500 28-Jul-15 30-Jul-15 9.30am CLOSED CANCEL 1 1
398 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00395 PSJV 1-Sep-15 SR7 ELE Excavation Excavation works for 11KV electrical cable 2-Sep-15 4-Sep-15 9.00am CLOSED 19-Sep-15 17 ACCEPTED 1 1
installation at SR7 CH0-500 RHS
399 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00396 PSJV 1-Sep-15 SR7 ELE Sand bedding works Sand bedding works for 11KV electrical cable 2-Sep-15 4-Sep-15 9.00am CLOSED 22-Sep-15 20 ACCEPTED 1 1
installation at sr 7 CH0-500 RHS
400 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00397 PSJV 1-Sep-15 SR7 ELE Cable pulling Cable pulling works for loop 14 at SR7 CH0-500 RHS 2-Sep-15 4-Sep-15 11.00am CLOSED 24-Sep-15 22 ACCEPTED 1 1
405 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00402 Instant Option 2-Sep-15 SR7 PIP Tie in installation Inspection for tie in installation at SR7 CH500- 3-Sep-15 5-Sep-15 10.00am CLOSED 08-Dec-15 96 REJECTED 1 1
CH1600
408 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00405 PSJV 4-Sep-15 SR7 ELE Cable pulling Cable pulling works for loop 13 at SR7 CH0-500 LHS 5-Sep-15 7-Sep-15 2.00pm CLOSED 24-Sep-15 19 ACCEPTED 1 1
Sand backfill and UPVC Sand backfill and UPVC slab installation works for
409 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00406 PSJV 4-Sep-15 SR7 ELE slab installation 11KV electrical cable installation at SR7 CH0-500 5-Sep-15 7-Sep-15 3.00pm CLOSED 24-Sep-15 19 ACCEPTED 1 1
LHS
Excavation and sand Excavation and sand bedding at SR7 Phase 2, from
412 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00409 Instant Option 9-Sep-15 SR7 PIP 10-Sep-15 12-Sep-15 10.00am CLOSED 17-Sep-15 7 ACCEPTED 1 1
bedding CH0-600
415 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00412 Instant Option 12-Sep-15 SR7 PIP Welding works welding HDPE sewerage water pipe at SR7 phse 2 14-Sep-15 16-Sep-15 10.00am CLOSED 10-Oct-15 26 ACCEPTED 1 1
from 100-600
417 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00414 Instant Option 12-Sep-15 SR7 PIP Welding Works welding HDPE Portable water pipe at SR7 phse 2 14-Sep-15 16-Sep-15 10.00am CLOSED 1-Oct-15 17 ACCEPTED 1 1
from 100-600
418 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00415 PSJV 15-Sep-15 SR7 ELE Cable ladder Cable lader installation for 11KV electrical Cable 17-Sep-15 19-Sep-15 10.00am CLOSED 26-Nov-15 70 ACCEPTED 1 1
installation installation at SR7 CH 700-1600 RHS & LHS
421 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00418 Instant Option 18-Sep-15 SR7 PIP backfilling backfilling at SR7 phase 2 from CH00-CH600 19-Sep-15 21-Sep-15 10.00am CLOSED 16-Oct-15 27 ACCEPTED 1 1
422 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00419 Instant Option 19-Sep-15 SR7 PIP 20-Sep-15 22-Sep-15 9.00am CLOSED 04-Oct-15 14 ACCEPTED 1 1
Pressure & leak test at SR7 CH100-600 phase 2) for
Testing HDPE potable water
423 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00420 Instant Option 19-Sep-15 SR7 ELE Excavation Excavation trench at SR8 CH500-600 for laying 20-Sep-15 22-Sep-15 9.00am CLOSED 12-Oct-15 22 ACCEPTED 1 1
HDPE corrugated pipe
424 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00421 Instant Option 19-Sep-15 SR7 ELE Backfilling 20-Sep-15 22-Sep-15 9.00am CLOSED 12-Oct-15 22 ACCEPTED 1 1
Backfilling trench along with sand bedding and
HDPE corrugated pip at SR8 CH 500-600
426 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00423 Instant Option 21-Sep-15 SR7 PIP Trust Block Inspection for thrust concreting at SR7 CH0-650 22-Sep-15 24-Sep-15 10.00am CLOSED 11-Nov-15 50 ACCEPTED 1 1
432 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00429 Instant Option 25-Sep-15 SR7 PIP Backfilling backfilling at SR7 Fire water tank 26-Sep-15 28-Sep-15 CLOSED 08-Dec-15 73 ACCEPTED 1 1
Welding HDPE portable water pipe at SR7 Fire
433 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00430 Instant Option 25-Sep-15 SR7 PIP welding 26-Sep-15 28-Sep-15 CLOSED 16-Oct-15 20 ACCEPTED 1 1
water tank
436 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00433 Instant Option 12-Oct-15 SR7 CIV Dranage Inspection formwork and rebar of sump at SR7 13-Oct-15 15-Oct-15 9.00am CLOSED 11-Nov-15 29 ACCEPTED 1 1
437 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00434 Instant Option 12-Oct-15 SR7 CIV Dranage Concreting works for sump at SR7 Phase 2 15-Oct-15 17-Oct-15 2.30am CLOSED 12-Nov-15 26 ACCEPTED 1 1
443 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00440 UEMB AMIN 29-Oct-15 SR7 CIV Road Works FDT test roadbase at Roundabout 8 SR7 30-Oct-15 1-Nov-15 10.00am CLOSED 05-Nov-15 6 ACCEPTED 1 1
refer to RAPID-P20A1-UEMB-SR4-CIV-RFIN-
446 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00443
00488 CLOSED CANCEL 1 1
448 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00445 PPEC 2-Nov-15 SR7 CIV Road work Inspection of FDT for subgrade CH0-400 3-Nov-15 5-Nov-15 11.00am CLOSED CANCEL 1 1
450 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00447 UEMB NIZAN 12-Nov-15 SR7 CIV Road work Verge filling works and turfing works 13-Nov-15 15-Nov-15 10.30am CLOSED CANCEL 1 1
installation of tie in points for sewerage water pipe
451 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00448 INSTANT OPTION 13-Nov-15 SR7 PIP piping 14-Nov-15 16-Nov-15 1.00pm CLOSED 02-Dec-15 18 ACCEPTED 1 1
line at SR7 phase 2
452 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00449 INSTANT OPTION 13-Nov-15 SR7 PIP piping installation of tie in points for firewater pipe line at 14-Nov-15 16-Nov-15 1.00pm CLOSED 02-Dec-15 18 ACCEPTED 1 1
SR7 phase 1
455 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00452 PPEC 21-Nov-15 SR7 CIV Road Works Inspection of sub base CH 0 - 600 22-Nov-15 24-Nov-15 10.00am CLOSED 26-Nov-15 4 ACCEPTED 1 1
457 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00454 AEIE 24-Nov-15 SR7 ELE pole installation Inspection 8m pole installation at SR7 18 nos 25-Nov-15 27-Nov-15 10.00am CLOSED 30-Nov-15 5 ACCEPTED 1 1
460 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00457 Lian Fatt 26-Nov-15 SR7 CIV Drainage work Post concreting inspection for sump no SR7-9-125 27-Nov-15 29-Nov-15 10.00am CLOSED 21-Dec-15 24 ACCEPTED 1 1
and SR7-9-126 slab at SR7
468 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00465 Instant Option 7-Dec-15 SR8 PIP Hose reel Testing for Hose reel (Hydrant) 8-Dec-15 10-Dec-15 9.00am CLOSED CANCEL 1
1
469 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00466 Instant Option 15-Aug-15 SR7 PIP Testing Pressure test for HDPE fire water pipe at SR7 16-Aug-15 18-Aug-15 11..00am CLOSED 30-May-16 288 ACCEPTED 1 1
(CH600-1600 & CH0-100) at Fire water pump house
Formwork and rebar inspection for concreting
470 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00467 Lian Fatt 12-Aug-15 SR7 CIV Drainage works sump top cover no SR7-9-125 and SR7-9-126 14-Aug-15 16-Aug-15 10.30am CLOSED 21-Dec-15 129 ACCEPTED 1 1
at SR7
471 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00468 Lian Fatt 12-Aug-15 SR7 CIV Drainage Post concreting work inspection for sump top cover 15-Aug-15 17-Aug-15 10.00am CLOSED 21-Dec-15 128 ACCEPTED 1 1
no SR7-9-125 and SR7-9-126 at SR7
474 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00471 PPEC 15-Dec-15 SR7 CIV Roadwork Inspection for laying of ACBC28 at CH0 to CH300 16-Dec-15 18-Dec-15 10.00am CLOSED 1-Apr-16 107 ACCEPTED 1 1
475 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00472 PPEC 17-Dec-15 SR7 CIV Roadwork Inspection for layiing of ACBC at CH300 to CH600 18-Dec-15 20-Dec-15 10.00am CLOSED 8-Apr-16 112 ACCEPTED 1 1
477 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00474 PPEC 30-Dec-15 SR7 CIV Roadwork Application of Prime coat at SR7 (crossing 31-Dec-15 2-Jan-16 8.00am CLOSED CANCEL 1 1
478 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00475 PPEC 30-Dec-15 SR9 CIV Roadwork Laying of ACBC28 at SR7 (crossing 31-Dec-15 2-Jan-16 10.00am CLOSED 29-Dec-15 -7 ACCEPTED 1 1
483 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00480 PPEC 12-Jan-16 SR7 CIV Roadwork Laying of ACBC28 at SR8 phase 2 CH1000-CH1200 12-Jan-16 14-Jan-16 4.00pm CLOSED 1-Apr-16 80 ACCEPTED 1 1
484 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00481 amman tech 18-Jan-16 SR7 CIV Roadwork Laying ACBC for plot access at SR7 18-Jan-16 20-Jan-16 4.00pm CLOSED CANCEL 1 1
485 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00482 amman tech 18-Jan-16 SR7 CIV Roadwork laying turfing work at SR7 19-Jan-16 21-Jan-16 3.00pm CLOSED 19-Jan-16 0 REJECTED 1 1
486 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00483 AEIE 18-Jan-16 SR7 ELE underground cable underground cable laying for street lighting 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3 ACCEPTED 1 1
4Cx16mm2 XLPE/SWA/PVC FP-S2 CIRCUIT 1
489 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00486 AEIE 18-Jan-16 SR7 ELE underground cable underground cable laying for street lighting 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3 ACCEPTED 1 1
4Cx16mm2 XLPE/SWA/PVC FP-S2 CIRCUIT 4
491 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00488 AEIE 18-Jan-16 SR7 ELE IR test Insulation resistance test for street lighting cable 20-Jan-16 22-Jan-16 11.00am CLOSED 3-Mar-16 43 ACCEPTED 1 1
circuit 1 to circuit 5 FP-S2
492 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00489 AEIE 18-Jan-16 SR7 ELE earthing test feeder pillar FP S2 earth resistance test 20-Jan-16 22-Jan-16 2.00pm CLOSED 13-Feb-16 24 ACCEPTED 1 1
494 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00491 AEIE 19-Jan-16 SR7 ELE Earthing installation earthing installation for feeder pillar S2 20-Jan-16 22-Jan-16 2.00pm CLOSED 23-Jan-16 3 ACCEPTED 1 1
495 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00492 Instant Option 19-Jan-16 SR7 PIP Installation Thrust block installation for S-bends at SR7 20-Jan-16 22-Jan-16 2.00pm CLOSED CANCEL 1 1
496 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00493 omitech 23-Jan-16 SR7 CIV road signages installation of road signages 23-Jan-16 25-Jan-16 2.00pm CLOSED 23-Jan-16 0 ACCEPTED 1 1
498 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00495 Zulfaqar 1-Feb-16 SR7 STR Rebar and formwork Inspection rebar and formwork for crossing slab at 2-Feb-16 4-Feb-16 8.30am CLOSED 10-Mar-16 37 ACCEPTED 1 1
CS-2mVA (LP14,SSO/2), CS-2MVA (LP13, SSM/1),
CS-2MVA (LP14,SSN/4) CS-2MVA(LP13,SSL/1), CS-
2MVA (LP14,SSN/1) and CS-2MVA (LP13,SSK/2)
500 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00497 Instant Option 1-Feb-16 SR7 CIV concreting works Concreting works for beam and wall sump at SR7 1-Feb-16 3-Feb-16 2.00pm CLOSED 1-Feb-16 0 ACCEPTED 1 1
502 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00499 Instant Option 10-Feb-16 SR7 CIV concreting works Concreting works for beam sump at SR7 (3nos) 10-Feb-16 12-Feb-16 2.00pm CLOSED 10-Feb-16 0 ACCEPTED 1 1
507 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00504 PPEC 30-Dec-15 SR7 CIV Roadwork Laying of ACBC at SR7, road excess 31-Dec-15 2-Jan-16 1.30pm CLOSED 20-Apr-16 111 ACCEPTED 1 1
509 RAPID-P20A1-UEMB-SR7-PIP-RFIN-00506 Instant Option 20-May-15 SR7 PIP installation WELDING HDPE sewerage water pipe at SR7 21-May-15 23-May-15 2.00pm CLOSED 21-May-15 0 ACCEPTED 1 1
510 RAPID-P20A1-UEMB-SR7-ELE-RFIN-00507 PSJV 6-May-15 SR7 ELE Cable pulling Cable pulling works at SR7 CH700-CH1150 RHS loop 6-May-15 8-May-15 5.00pm CLOSED 7-Jun-15 32 ACCEPTED 1 1
6&15
511 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00508 coremanpower 19-Apr-16 SR7 CIV sliding gate Installation of crossing steelbridge at SR7 5-Apr-16 7-Apr-16 10.00am CLOSED 20-Jun-16 76 ACCEPTED 1 1
513 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00510 aswad 4-Nov-15 SR7 CIV Testing FDT (Subgrade) at SR7 CH 520, 590 5-Nov-15 7-Nov-15 9.00am CLOSED 5-Nov-15 0 ACCEPTED 1 1
514 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00511 zulfaqar 29-Dec-15 SR7 CIV Turfing Turfing work at SR7 30-Dec-15 1-Jan-16 10.00am CLOSED 20-Jun-16 173 ACCEPTED 1 1
517 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00514 zulfaqar 19-Oct-15 SR7 CIV roadwork preparation of subgrade and dipping at 20-Oct-15 22-Oct-15 8.00am CLOSED 24-Aug-16 309 ACCEPTED 1 1
Roundabout 2
520 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00517 zulfaqar 8-Nov-14 SR7 CIV roadwork preparation of Roadbase and dipping at SR7 CH0 - 10-Nov-14 12-Nov-14 8.00am CLOSED 24-Aug-16 653 ACCEPTED 1 1
CH100
523 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00520 Amin 26-Aug-15 SR7 CIV installation installation of box culvert size 1800x1500mm 7-Aug-15 9-Aug-15 8.00am CLOSED 1-Sep-16 391 ACCEPTED 1 1
524 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00521 Amin 9-Mar-15 SR7 CIV installation installation of box culvert size 1800x1500mm 10-Mar-15 12-Mar-15 8.00am CLOSED 1-Sep-16 541 ACCEPTED 1 1
525 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00522 Amin 23-Mar-15 SR7 CIV installation installation of box culvert size 1800x1200mm 11-Mar-15 13-Mar-15 8.00am CLOSED 1-Sep-16 540 ACCEPTED 1 1
526 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00523 Amin 11-May-15 SR7 CIV installation installation of box culvert size 4500x2100mm 12-May-15 14-May-15 8.00am CLOSED 1-Sep-16 478 ACCEPTED 1 1
527 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00524 Amin 11-Jul-15 SR7 CIV installation installation of box culvert size 1500x1200mm 12-Jul-15 14-Jul-15 8.00am CLOSED 1-Sep-16 417 ACCEPTED 1 1
528 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00525 Amin 23-Mar-15 SR7 CIV installation installation of box culvert size 1500x1200mm 13-Jul-15 15-Jul-15 8.00am CLOSED 1-Sep-16 416 ACCEPTED 1 1
529 RAPID-P20A1-UEMB-SR7-CIV-RFIN-00526 MAZLAN 19-Jan-17 SR7 CIV Drainage Work Installation Of MS Grating Cover for sump at SR 7 20-Jan-17 22-Jan-17 9.00am CLOSED 20-Jan-17 0 ACCEPTED 1 1
529 529
12/26/2014
RAPID-P20A1-UEMB-SR8-CIV-RFIN-00321 PPEC 5-Oct-15 SR8 CIV Road work Inspection for preparation of subgrade at SR8 6-Oct-15 8-Oct-15 10.00am CLOSED 14-Dec-15 69 ACCEPTED
CH600-400
RAPID-P20A1-UEMB-SR8-CIV-RFIN-00322 PPEC 5-Oct-15 SR8 CIV Road work Inspection for FDT test for subgrade work at SR8 6-Oct-15 8-Oct-15 11.00am CLOSED 07-Oct-15 1 ACCEPTED
CH600-400
RAPID-P20A1-UEMB-SR8-CIV-RFIN-00325 PPEC 5-Oct-15 SR8 CIV Road work Inspection of preparation of Road base at SR8 6-Oct-15 8-Oct-15 10.00am CLOSED 14-Dec-15 69 ACCEPTED
CH600-400
6 RAPID-P20A1-UEMB-SR9-CIV-RFIN-00006 Instant Option 11-Feb-15 SR9 CIV Drainage Receiving U drain 900X750mm Api 12-Feb-15 14-Feb-15 11.00am CLOSED 11-Mar-15 27 ACCEPTED
8 RAPID-P20A1-UEMB-SR9-CIV-RFIN-00008 Propel 12-Mar-15 SR9 CIV surveyor As Built at CH 120 - 190 13-Mar-15 15-Mar-15 11.00am CLOSED 13-Mar-15 0 ACCEPTED
32 RAPID-P20A1-UEMB-SR9-CIV-RFIN-00032 Core manpower 15-Jan-16 SR9 CIV Roadwork laying ACBC28 at SR9-7meter 16-Jan-16 18-Jan-16 10.00am CLOSED 16-Jan-16 0 ACCEPTED
33 RAPID-P20A1-UEMB-SR9-CIV-RFIN-00033 coremanpower 19-Apr-16 SR9 CIV sliding gate Installation ofsliding gate 29-Mar-16 31-Mar-16 11.00am CLOSED 26-Jun-16 89 ACCEPTED
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
37 37
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(ZONE 3)
1 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00001 En. Misbah 3-Mar-15 ZN1 BLD Survey Checking Existing Ground Level at Common Facilities area 4-Mar-15 6-Mar-15 9.00am CLOSED 04-Mar-15 0 ACCEPTED 1 1
5 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00005 Infra Tech 20-Mar-15 ZN1 CIV BLD DCP Test Point for CF2/2 Dwg Attahced 21-Mar-15 23-Mar-15 10.00am CLOSED 25-Mar-15 4 ACCEPTED 1 1
6 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00006 Infra Tech 20-Mar-15 ZN1 CIV BLD Plate Bearing test at Common Facilities. 25-Mar-15 27-Mar-15 9.00am CLOSED 28-Mar-15 3 ACCEPTED 1 1
7 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00007 Infra Tech 20-Mar-15 ZN1 CIV BLD DCP test at Commmon Facillities 25-Mar-15 27-Mar-15 9.00am CLOSED 26-Mar-15 1 ACCEPTED 1 1
10 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00010 Zaki 27-Mar-15 ZN1 CIV BLD MP test for lifting pump at Common Facilities ( Zon 1) 28-Mar-15 30-Mar-15 12.00pm CLOSED 01-Apr-15 4 ACCEPTED 1 1
11 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00011 Infra Tech 1-Apr-15 ZN1 CIV BLD DCP test 2 point refer to attachment ( Common Facilities 2) 3-Apr-15 5-Apr-15 09.00am CLOSED 10-Apr-15 7 REJECTED 1 1
12 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00012 Infra Tech 1-Apr-15 ZN1 CIV BLD Common Facilities 1 - DCP test 6x points 3-Apr-15 5-Apr-15 04.45pm CLOSED 06-Apr-15 3 REJECTED 1 1
14 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00014 Infra Tech 1-Apr-15 ZN1 CIV BLD Prayer building- Conduit DCP test- reffer to attachment 3-Apr-15 5-Apr-15 09.00am CLOSED 30-Mar-15 -4 REJECTED 1 1
15 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00015 Infra Tech 31-Mar-15 ZN1 CIV BLD Common Facilities 2 - Plate bearing Test 1-Apr-15 3-Apr-15 09.00am CLOSED 02-Apr-15 1 ACCEPTED 1 1
16 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00016 Faizal 4-Apr-15 ZN1 CIV BLD Inspection for excavation works ( Ecumenical Prayer Room) 6-Apr-15 8-Apr-15 10.00am CLOSED 20-Jun-15 75 ACCEPTED 1 1
17 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00017 Nik 7-Apr-15 ZN1 CIV BLD Excavation wotks inspection (Ecumenical prayer room) 8-Apr-15 10-Apr-15 9.00am CLOSED 11-Jul-15 94 ACCEPTED 1 1
20 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00020 Infra Tech 8-Apr-15 ZN1 CIV Testing To carry out post Hiedyc DCP at CF/1 and CF2 9-Apr-15 11-Apr-15 09.30am CLOSED 18-Jun-15 70 ACCEPTED 1 1
21 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00021 Nik 10-Apr-15 ZN1 CIV BLD Excavation works inspection (EPR 3) 11-Apr-15 13-Apr-15 11.00am CLOSED 11-Apr-15 0 ACCEPTED 1 1
22 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00022 Nik 10-Apr-15 ZN1 CIV BLD Inspection for lean concrete raft Foundation ( EPR3) 11-Apr-15 13-Apr-15 1.00pm CLOSED 13-Apr-15 2 REJECTED 1 1
24 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00024 Fahmi 11-Apr-15 ZN1 ARC BLD Injection and spraying anti termite at slab area (EPR 2) 13-Apr-15 15-Apr-15 12.00pm CLOSED 14-Apr-15 1 ACCEPTED 1 1
25 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00025 Zulfaqar 14-Apr-15 ZN1 CIV Excavation Excavation works for pump station at RP4 15-Apr-15 17-Apr-15 9.00am CLOSED 28-Sep-15 166 REJECTED 1 1
27 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00027 Shariffuddin 15-Apr-15 ZN1 CIV BLD Inspection for lean concrete ( raft foundation) EPR 3 16-Apr-15 18-Apr-15 9.30am CLOSED 16-Apr-15 0 ACCEPTED 1 1
28 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00028 Shariffuddin 15-Apr-15 ZN1 CIV BLD Inspection for lean concrete ( raft foundation) EPR 4 16-Apr-15 18-Apr-15 9.30am CLOSED 28-Nov-15 226 REJECTED 1 1
33 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00034 Shariffuddin 20-Apr-15 ZN1 CIV BLD Inspection formwork,rebar,concreting (Raft Foundation) EPR3 21-Apr-15 23-Apr-15 9.00am CLOSED 23-Apr-15 2 ACCEPTED 1 1
34 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00035 Shariffuddin 20-Apr-15 ZN1 CIV BLD Inspection concreting work for lean con EPR4 21-Apr-15 23-Apr-15 5.00pmm CLOSED 28-Nov-15 221 REJECTED 1 1
35 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00036 Zulfaqar 21-Apr-15 ZN1 CIV BLD Excavation works at RP-4 22-Apr-15 24-Apr-15 8.00am CLOSED 03-Oct-15 164 ACCEPTED 1 1
36 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00037 Shariffuddin 21-Apr-15 ZN1 CIV BLD Excavation works EPR 5 22-Apr-15 24-Apr-15 8.00am CLOSED 28-Nov-15 220 REJECTED 1 1
37 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00038 Shariffuddin 22-Apr-15 ZN1 CIV BLD Inspection formwork,rebar,concreting stump EPR2 23-Apr-15 25-Apr-15 10.00am CLOSED 15-Jun-15 53 ACCEPTED 1 1
40 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00041 Uemb Hakimin 23-Apr-15 ZN1 CIV BLD Excavation works EPR4 24-Apr-15 26-Apr-15 5.00pm CLOSED 30-Nov-15 220 ACCEPTED 1 1
42 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00043 Zulfaqar 24-Apr-15 ZN1 CIV BLD Excavation works at pump station RP-3 25-Apr-15 27-Apr-15 8.00am CLOSED 30-Sep-15 158 ACCEPTED 1 1
43 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00044 Shariffuddin 25-Apr-15 ZN1 CIV BLD Inspection for lean conc EPR4 26-Apr-15 28-Apr-15 5.00pm CLOSED 30-Nov-15 218 ACCEPTED 1 1
44 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00045 Shariffuddin 25-Apr-15 ZN1 CIV BLD Excavation works EPR5 26-Apr-15 28-Apr-15 5.00pm CLOSED 28-Nov-15 216 REJECTED 1 1
45 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00046 Shariffuddin 25-Apr-15 ZN1 CIV BLD Joint survey as built stump EPR2 27-Apr-15 29-Apr-15 10.00am CLOSED 20-Aug-15 115 ACCEPTED 1 1
46 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00047 Shariffuddin 25-Apr-15 ZN1 CIV BLD Inspection formworks rebar and concreting stump EPR1 27-Apr-15 29-Apr-15 10.00am CLOSED 30-Apr-15 3 ACCEPTED 1 1
47 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00048 Shariffuddin 25-Apr-15 ZN1 CIV BLD Lean con EPR5 27-Apr-15 29-Apr-15 5.00pm CLOSED 23-Jun-15 57 ACCEPTED 1 1
48 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00049 Shariffuddin 25-Apr-15 ZN1 CIV BLD Excavation works at EPR6 27-Apr-15 29-Apr-15 5.00pm CLOSED 28-Nov-15 215 REJECTED 1 1
49 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00050 Shariffuddin 25-Apr-15 ZN1 CIV BLD Excavation wotrks EPR1 27-Apr-15 29-Apr-15 5.00pm CLOSED 30-Nov-15 217 ACCEPTED 1 1
50 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00051 Shariffuddin 25-Apr-15 ZN1 CIV Survey Joint survey as built stump EPR1 28-Apr-15 30-Apr-15 10.00pm CLOSED 20-Aug-15 114 ACCEPTED 1 1
51 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00052 Zulfaqar 27-Apr-15 ZN1 STR Structure Concreting precast sump base slab for pumpstation RP-3 27-Apr-15 29-Apr-15 4.00pm CLOSED 29-Apr-15 2 ACCEPTED 1 1
53 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00054 Shariffuddin 29-Apr-15 ZN1 CIV ARC Spray & drilling to insert anti-termite liquid to EPR 4 29-Apr-15 1-May-15 12.00pm CLOSED 10-Jun-15 42 ACCEPTED 1 1
54 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00055 Shariffuddin 29-Apr-15 ZN1 CIV ARC Spray & drilling to insert anti-termite liquid to EPR 5 29-Apr-15 1-May-15 12.00pm CLOSED 10-Jun-15 42 ACCEPTED 1 1
55 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00056 Shariffuddin 30-Apr-15 ZN1 CIV Structure Inspection for excavation works at EPR6 5-May-15 7-May-15 5.00pm CLOSED 15-Jun-15 41 ACCEPTED 1 1
56 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00057 Shariffuddin 30-Apr-15 ZN1 CIV Structure Inspection for excavation works at EPR5 5-May-15 7-May-15 5.00pm CLOSED 20-May-16 381 ACCEPTED 1 1
58 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00059 Zulfaqar 6-May-15 ZN1 M&E Structure Concreting waorks for precast wall for pump station RP3 7-May-15 9-May-15 4.00pm CLOSED 05-Aug-15 90 ACCEPTED 1 1
61 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00062 Rusydan 8-May-15 ZN1 ELE Electrical Installation of earthning works at EPR 3 9-May-15 11-May-15 3.00pm CLOSED 10-Jun-15 32 ACCEPTED 1 1
62 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00063 Shariffuddin 11-May-15 ZN1 CIV Structure Inspection for lean conc (EPR1) 12-May-15 14-May-15 5.00pm CLOSED 11-Jul-15 60 ACCEPTED 1 1
63 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00064 Shariffuddin 11-May-15 ZN1 CIV Structure Inspection for lean conc (EPR6) 12-May-15 14-May-15 5.00pm CLOSED 15-Jun-15 34 ACCEPTED 1 1
64 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00065 Taufiq 11-May-15 ZN1 STR Structure Inspection rebar and formwork for precast RP4 Slab 12-May-15 14-May-15 8.30.00am CLOSED 15-May-15 3 ACCEPTED 1 1
65 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00066 Taufiq 11-May-15 ZN1 STR Structure Concreting work for precast Stump Base Slab for RP4 12-May-15 14-May-15 2.00pm CLOSED 12-May-15 0 REJECTED 1 1
66 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00067 Infra Tech 13-Apr-15 ZN1 CIV Testing To carry out post Hiedyc DCP at prayer building 14-Apr-15 16-Apr-15 2.30pm CLOSED 14-Apr-15 0 ACCEPTED 1 1
67 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00068 Fahmi 12-May-15 ZN1 STR Structure Inspection for formwork rebar and concreting stump EPR4 13-May-15 15-May-15 3.00pm CLOSED 22-Jun-15 40 ACCEPTED 1 1
69 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00070 Taufiq 12-May-15 ZN1 STR Structure Dismental Formwork for precast Slab pump station RP3 13-May-15 15-May-15 10.00am CLOSED 22-Jun-15 40 ACCEPTED 1 1
71 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00072 Taufiq 14-May-15 ZN1 STR Structure Lay granite 6" - 9" 500mm at RP4 pump station 14-May-15 16-May-15 9.30am CLOSED 22-Jun-15 39 ACCEPTED 1 1
72 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00073 Taufiq 14-May-15 ZN1 STR Structure Excavation works 2m Depth for Phase 2. at RP 5pump station 15-May-15 17-May-15 8.30am CLOSED 20-Jun-15 36 ACCEPTED 1 1
73 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00074 Fahmi 14-May-15 ZN1 CIV BLD Inspection formworks rebar and concreting stump EPR5 16-May-15 18-May-15 3.00pm CLOSED 22-Jun-15 37 ACCEPTED 1 1
76 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00077 Taufiq 15-May-15 ZN1 STR Structure Install precast lifting sump for lifting station no RP3 19-May-15 21-May-15 6.00pm CLOSED 28-Nov-15 193 REJECTED 1 1
77 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00078 Taufiq 15-May-15 ZN1 STR Structure concrete works for slab RP 4 Pump station 16-May-15 18-May-15 6.30pm CLOSED 22-Jun-15 37 ACCEPTED 1 1
78 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00079 Fahmi 15-May-15 ZN1 CIV BLD Excavation works at Toilet and Changing room building 16-May-15 18-May-15 10.00am CLOSED 15-Jun-15 30 ACCEPTED 1 1
79 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00080 Fahmi 15-May-15 ZN1 CIV BLD Lean concrete at toiloet and changing room building 16-May-15 18-May-15 10.00am CLOSED 15-Jun-15 30 ACCEPTED 1 1
80 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00081 Taufiq 15-May-15 ZN1 STR Structure Inspection rebar and formwork for precast RP4 Slab 16-May-15 18-May-15 11.30am CLOSED 15-Jun-15 30 ACCEPTED 1 1
83 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00084 Hakimin 18-May-15 ZN1 CIV Survey Joint survey stump EPR4 19-May-15 21-May-15 9.00am CLOSED 19-May-15 0 ACCEPTED 1 1
84 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00085 Hakimin 18-May-15 ZN1 CIV Survey Joint survey stump EPR5 19-May-15 21-May-15 9.00am CLOSED 19-May-15 0 ACCEPTED 1 1
85 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00086 Hakimin 21-May-15 ZN1 CIV BLD Inspection for excavation works (Cinema 4) 22-May-15 24-May-15 9.00am CLOSED 15-Jun-15 24 ACCEPTED 1 1
87 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00088 Hakimin 21-May-15 ZN1 CIV BLD Inspection formwork,rebar & Concreting stump (EPR 6) 22-May-15 24-May-15 5.00pm CLOSED 20-Jun-15 29 ACCEPTED CANCEL 1 1
88 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00089 Hakimin 21-May-15 ZN1 CIV BLD Inspection for lean concrete at Cinema 4 22-May-15 24-May-15 3.00pm CLOSED 30-Nov-15 192 REJECTED No Activity 1 1
89 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00090 zulfaqar 21-May-15 ZN1 STR Structure Inspection rebar and formwork for slab at RP 5 pump station 22-May-15 24-May-15 11.00am CLOSED 22-May-15 0 ACCEPTED 1 1
90 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00091 Zulfaqar 21-May-15 ZN1 STR Structure Concreting works for slab at RP5 pump station 22-May-15 24-May-15 3.30pm CLOSED 15-Jun-15 24 ACCEPTED 1 1
95 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00095 Zulfaqar 24-May-15 ZN1 STR Structure Inspection rebar and formwork for wall RP 5 pump station 25-May-15 27-May-15 11.00am CLOSED 15-Jun-15 21 ACCEPTED 1 1
96 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00096 Zulfaqar 24-May-15 ZN1 STR Structure Concreting work precast sump for wall at RP 5 pump station 25-May-15 27-May-15 4.30pm CLOSED 23-Jun-15 29 ACCEPTED 1 1
97 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00097 Hakimin 24-May-15 ZN1 CIV BLD Inspection for lean conc ( Cinema 4) 25-May-15 27-May-15 3.00pm CLOSED 22-Jun-15 28 ACCEPTED 1 1
99 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00099 Fahmi 25-May-15 ZN1 CIV BLD Inspection for formwork,rebar and concreting stump at EPR 6. 25-May-15 27-May-15 3.00pm CLOSED 14-Jun-15 20 ACCEPTED 1 1
100 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00100 Fahmi 25-May-15 ZN1 CIV BLD Inspection for formwork,rebar and concreting stump at EPR 1 25-May-15 27-May-15 3.00pm CLOSED 11-Jul-15 47 ACCEPTED 1 1
101 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00101 Fahmi 25-May-15 ZN1 CIV BLD Excavation works ( Cinema 5) 26-May-15 28-May-15 3.00pm CLOSED 15-Jun-15 20 ACCEPTED 1 1
102 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00102 Fahmi 25-May-15 ZN1 CIV BLD Lean concrete at Cinema 5 26-May-15 28-May-15 3.00pm CLOSED 23-Jun-15 28 ACCEPTED 1 1
103 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00103 Hakimin 26-May-15 ZN1 CIV Survey Joint survey stump EPR 1 27-May-15 29-May-15 8.00am CLOSED 27-May-15 0 ACCEPTED 1 1
104 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00104 Hakimin 26-May-15 ZN1 CIV Survey Joint survey stump EPR 6 27-May-15 29-May-15 8.00am CLOSED 27-May-15 0 ACCEPTED 1 1
105 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00105 Fahmi 27-May-15 ZN1 CIV BLD Excavation works at Cinema 3 28-May-15 30-May-15 3.00pm CLOSED 30-Nov-15 186 ACCEPTED 1 1
106 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00106 Fahmi 27-May-15 ZN1 CIV BLD Inspection for lean concrete at cinema 3 28-May-15 30-May-15 3.00pm CLOSED 28-Nov-15 184 REJECTED 1 1
108 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00108 Fahmi 29-May-15 ZN1 CIV BLD Excavation works at Cinema 2 30-May-15 1-Jun-15 3.00pm CLOSED 15-Jun-15 16 ACCEPTED 1 1
109 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00109 Fahmi 29-May-15 ZN1 CIV BLD Lean concrete at cinema 2 30-May-15 1-Jun-15 3.00pm CLOSED 22-Jun-15 23 ACCEPTED 1 1
110 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00110 Fahmi 30-May-15 ZN1 CIV BLD Inspection formwork, rebar and concreting at Cinema 5 31-May-15 2-Jun-15 3.00pm CLOSED 28-Jun-15 28 REJECTED 1 1
111 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00111 Zulfaqar 1-Jun-15 ZN1 CIV Lifting works Lifting precast at RP5 2-Jun-15 4-Jun-15 9.00am CLOSED 05-Aug-15 64 REJECTED 1 1
112 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00112 Zulfaqar 1-Jun-15 ZN1 CIV Lifting works Lifting precast at RP3 3-Jun-15 5-Jun-15 10.00am CLOSED 28-Nov-15 178 REJECTED 1 1
113 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00113 hakimin 1-Jun-15 ZN1 CIV BLD Excavation work at cinema 1 2-Jun-15 4-Jun-15 5;00pm CLOSED 30-Nov-15 181 ACCEPTED 1 1
114 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00114 hakimin 1-Jun-15 ZN1 CIV BLD lean conc work at cinema 1 3-Jun-15 5-Jun-15 5;00pm CLOSED 12/1/2015 181 ACCEPTED 1 1
115 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00115 hakimin 1-Jun-15 ZN1 BLD Survey Joint Survey as built at toilet and changing room 2-Jun-15 4-Jun-15 9.00am CLOSED 02-Jun-15 0 ACCEPTED 1 1
116 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00116 hakimin 4-Jun-15 ZN1 BLD BLD concreting work at cinema 5 5-Jun-15 7-Jun-15 5.00pm CLOSED 28-Nov-15 176 REJECTED 1 1
117 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00117 Nadzrin 4-Jun-15 ZN1 BLD material Material Delivery High Yield Deformed bar GR500 5-Jun-15 7-Jun-15 10.30am CLOSED 05-Jun-15 0 ACCEPTED 1 1
118 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00118 Hakimin 5-Jun-15 ZN1 BLD Building Excavation & Lean Conc at Cinema 3 8-Jun-15 8-Jun-15 4.00pm CLOSED 30-Nov-15 175 ACCEPTED 1 1
121 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00121 Khairil 12-Jun-15 ZN1 CIV Testing FDT test at RP5 & RP4 13-Jun-15 15-Jun-15 11.00am CLOSED 13-Jun-15 0 ACCEPTED 1 1
128 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00128 Khidmat Hijau 19-Jun-15 ZN1 PIP Sewerage Laying underground piping fro cinema building 1. Zone 1 20-Jun-15 22-Jun-15 10.00am CLOSED 05-Aug-15 46 ACCEPTED 1 1
129 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00129 Khidmat Hijau 19-Jun-15 ZN1 PIP Sewerage Laying underground piping for cinema building 4. Zone 1 20-Jun-15 22-Jun-15 10.00am CLOSED 30-Jun-15 10 ACCEPTED 1 1
130 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00130 Khidmat Hijau 19-Jun-15 ZN1 PIP Sewerage laying underground piping for cinema building 5. zone 1 20-Jun-15 22-Jun-15 10.00am CLOSED 30-Jun-15 10 ACCEPTED 1 1
131 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00131 Khidmat Hijau 19-Jun-15 ZN1 PIP Sewerage Laying underground piping for cinema building 3. zone 1 20-Jun-15 22-Jun-15 10.00am CLOSED 05-Aug-15 46 ACCEPTED 1 1
132 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00132 Khidmat Hijau 19-Jun-15 ZN1 PIP Sewerage laying undeground piping for cinema bulding 2. zone 1 20-Jun-15 22-Jun-15 10.00am CLOSED 05-Aug-15 46 ACCEPTED 1 1
148 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00148 Dorce 27-Jun-15 ZN2 STR Chassis installation Building Chassis installation inspection AMR 2 29-Jun-15 1-Jul-15 2.00pm CLOSED 28-Sep-15 91 ACCEPTED 1 1
149 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00149 Dorce 27-Jun-15 ZN2 STR Panel installation Building panel installation inspection AMR2 29-Jun-15 1-Jul-15 2.00pm CLOSED 28-Sep-15 91 ACCEPTED 1 1
150 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00150 Dorce 27-Jun-15 ZN2 STR Roof installation Building roof installation inspection 29-Jun-15 1-Jul-15 2.00pm CLOSED 28-Sep-15 91 ACCEPTED 1 1
151 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00151 Hakimin 29-Jun-15 ZN1 BLD Concreting Excavation and lean concrete at supermarket 30-Jun-15 2-Jul-15 3.00pm CLOSED 13-Aug-15 44 ACCEPTED 1 1
152 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00152 Hakimin 3-Jul-15 ZN1 BLD lean conc Lean conc of supermarket 3-Jul-15 5-Jul-15 3.00pm CLOSED 30-Nov-15 150 ACCEPTED 1 1
153 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00153 Hakimin 3-Jul-15 ZN1 BLD lean conc Excavation Leanconc at Prayer Building 4-Jul-15 6-Jul-15 3.00pm CLOSED 11-Nov-15 130 ACCEPTED 1 1
154 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00154 Dorce 6-Jul-15 ZN1 STR Chassis installation Building chassis inspection installation AMR 3 7-Jul-15 9-Jul-15 10.00am CLOSED 17-Sep-15 72 ACCEPTED 1 1
155 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00155 Dorce 6-Jul-15 ZN1 ARC wall panel Building internal and external wall panel inspection AMR3 7-Jul-15 9-Jul-15 10.00am CLOSED 17-Sep-15 72 ACCEPTED 1 1
156 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00156 Dorce 6-Jul-15 ZN1 ARC wall roof Building internal and external wall foof inspection AMR 3 7-Jul-15 9-Jul-15 10.00am CLOSED 11-Nov-15 127 ACCEPTED 1 1
157 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00157 Hakimin 8-Jul-15 ZN1 BLD lean conc Lean conc work at Mosque 8-Jul-15 10-Jul-15 6.00pm CLOSED 21-Nov-15 136 ACCEPTED 1 1
158 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00158 Hakimin 8-Jul-15 ZN1 BLD Concreting Inspection for formwork,rebar and concreting at Sepermarket 9-Jul-15 11-Jul-15 3.00pm CLOSED 08-Aug-15 30 ACCEPTED 1 1
160 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00160 Zulfaqar 12-Jul-15 ZN1 STR Concreting Concreting works for 2nd slab and wall at RP 5 13-Jul-15 15-Jul-15 10.00am CLOSED 21-Nov-15 131 ACCEPTED 1 1
161 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00161 Zulfaqar 12-Jul-15 ZN1 STR Rebar and formwork Inspection rebar and formwork for 2nd slab and wall at RP 4 13-Jul-15 15-Jul-15 11.00am CLOSED 20-Aug-15 38 ACCEPTED 1 1
162 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00162 Zulfaqar 12-Jul-15 ZN1 STR Rebar and formwork Inspection rebar and formwork for 2nd slab and wall at RP5 13-Jul-15 15-Jul-15 2.00am CLOSED 20-Aug-15 38 ACCEPTED 1 1
163 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00163 Zulfaqar 12-Jul-15 ZN1 STR Concreting Concreting work for slab and wall at RP4 13-Jul-15 15-Jul-15 4.00am CLOSED 14-Jul-15 1 ACCEPTED 1 1
166 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00166 Khidmat Hijau 14-Jul-15 ZN1 MNE Sanitary Inspection of sanitary plumbing for toilet at Supermarket 15-Jul-15 17-Jul-15 10.00am CLOSED 22-Sep-15 69 ACCEPTED 1 1
167 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00167 Dorce 22-Jul-15 ZN1 ARC Assembling works Building roof inspection EPR3 23-Jul-15 25-Jul-15 3.00pm CLOSED 08-Oct-15 77 ACCEPTED 1 1
168 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00168 Dorce 22-Jul-15 ZN1 ARC Assembling works Building internal and external wall panel inspection EPR3 23-Jul-15 25-Jul-15 3.00pm CLOSED 05-Oct-15 74 ACCEPTED 1 1
169 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00169 Dorce 23-Jul-15 ZN1 MNE Leakage test Building UPVC pipes water leakage test inspection AMR2 24-Jul-15 26-Jul-15 9.00am CLOSED 17-Sep-15 55 ACCEPTED 1 1
170 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00170 Dorce 23-Jul-15 ZN1 MNE Leakage test Building UPVC pipes water leakage test inspection AMR3 24-Jul-15 26-Jul-15 9.00am CLOSED 17-Sep-15 55 ACCEPTED 1 1
Inspection rebar and formwork for wall,3rd slab and top lab at
171 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00171 Zulfaqar 26-Jul-15 ZN1 STR Rebar and formwork 27-Jul-15 29-Jul-15 3.00pm CLOSED 21-Nov-15 117 ACCEPTED 1 1
RP5
172 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00172 Zulfaqar 26-Jul-15 ZN1 STR Concreting Concreting work for wall,3rd slab and top slab at RP5 27-Jul-15 29-Jul-15 3.00pm CLOSED 27-Jul-15 0 ACCEPTED 1 1
zone
Building waterproofing membrane application installation
175 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00175 Dorce 28-Jul-15 ZN1 ARC Assembling works 29-Jul-15 31-Jul-15 2.00pm CLOSED 11-Nov-15 105 ACCEPTED 1 1
inspection at zone 1 for café building
187 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00187 Zulfaqar 4-Aug-15 ZN1 STR Lifting works Lifting precast pump station RP3 5-Aug-15 7-Aug-15 10.00am CLOSED 01-Sep-15 27 ACCEPTED 1 1
Dorce 6-Aug-15 ZN2 MNE Hydrotest Building PPRC pipe installation and hydeotest inspection 7-Aug-15 9-Aug-15 2.00pm
188 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00188
(EPR2) CLOSED CANCEL 1 1
192 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00192 Dorce 8-Aug-15 ZN1 ARC Floor covering Building PVC floor covering works installation inspection AMR2 10-Aug-15 12-Aug-15 9.00am CLOSED 11-Sep-15 32 ACCEPTED 1 1
193 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00193 Dorce 8-Aug-15 ZN1 ARC Floor covering Building PVC floor covering works installation inspection AMR3 10-Aug-15 12-Aug-15 9.00am CLOSED 11-Sep-15 32 ACCEPTED 1 1
194 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00194 Dorce 8-Aug-15 ZN1 ARC ceramic tile works Building ceramic tile works installation inspection AMR2 10-Aug-15 12-Aug-15 9.00am CLOSED 11-Sep-15 32 ACCEPTED 1 1
195 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00195 Dorce 8-Aug-15 ZN1 ARC ceramic tile works Building ceramic tile works installation inspection AMR3 10-Aug-15 12-Aug-15 9.00am CLOSED 11-Sep-15 32 ACCEPTED 1 1
196 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00196 Dorce 8-Aug-15 ZN1 ARC Screed works Building screed works installation inspection AMR 2 10-Aug-15 12-Aug-15 9.00am CLOSED 11-Sep-15 32 ACCEPTED 1 1
197 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00197 Dorce 8-Aug-15 ZN1 ARC Screed works Building screed works installation inspection AMR 3 10-Aug-15 12-Aug-15 9.00am CLOSED 11-Sep-15 32 ACCEPTED 1 1
198 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00198 Dorce 8-Aug-15 ZN1 ELE electrical works Building cable pulling installation inspection AMR2 10-Aug-15 12-Aug-15 9.00am CLOSED 08-Oct-15 59 ACCEPTED 1 1
199 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00199 Dorce 8-Aug-15 ZN1 ELE electrical works Building cable pulling installation inspection AMR3 10-Aug-15 12-Aug-15 9.00am CLOSED 09-Oct-15 60 ACCEPTED 1 1
Inspection rebar & formwork for wall 3RD slab and Top slab ar
200 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00200 Zulfaqar 8-Aug-15 ZN1 STR Rebar and formwork 14-Aug-15 16-Aug-15 9.00am CLOSED 21-Nov-15 99 ACCEPTED 1 1
RP4
201 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00201 Zulfaqar 8-Aug-15 ZN1 STR Concreting Concreting works for wall, 3rd slab and top slab at RP4 14-Aug-15 16-Aug-15 9.00am CLOSED 15-Aug-15 1 ACCEPTED 1 1
UEMB MUHAMMAD
205 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00205 11-Aug-15 ZN1 BLD Rectification Rectification crack for foundation (Prayer Room) 12-Aug-15 14-Aug-15 9.00am CLOSED 17-Aug-15 5 ACCEPTED 1 1
NADZRIN
206 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00206 UEMB Sadam 13-Aug-15 ZN1 ARC Furniture Architecture / ID area furniture Supply in the building AMR3 14-Aug-15 16-Aug-15 10.00am CLOSED 17-Aug-15 3 ACCEPTED 1 1
UEMB MUHAMMAD
208 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00208 14-Aug-15 ZN1 BLD Survey As Built for raft foundation (Super Market) 15-Aug-15 17-Aug-15 10.00am CLOSED 15-Aug-15 0 ACCEPTED 1 1
NADZRIN
210 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00210 UEMB KHAIRIL IZWAN 13-Aug-15 ZN1 CIV Testing FDT test for backfilling at RP3 14-Aug-15 16-Aug-15 10.00am CLOSED 11-Nov-15 89 ACCEPTED 1 1
Pegging point for CLA3, CA1 and five side football at small
212 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00212 KFK 20-Aug-15 ZN1 CIV Survey 21-Aug-15 23-Aug-15 8.00am CLOSED CANCEL 1 1
package area
215 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00215 UEM AZIZUDIN 20-Aug-15 ZN1 STR Rebar and formwork Inspection rebar & formwork for wall 3rd at RP3 21-Aug-15 23-Aug-15 10.00am CLOSED 22-Sep-15 32 ACCEPTED 1 1
216 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00216 Zulfaqar 20-Aug-15 ZN1 STR Concreting Concreting works for wall and 3rd slab at RP3 21-Aug-15 23-Aug-15 11.00am CLOSED 21-Nov-15 92 ACCEPTED 1 1
220 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00220 Zulfaqar 22-Aug-15 ZN1 STR Pre concreting Inspection rebar and formwork for wall and top slab at RP3 24-Aug-15 22-Aug-15 11.00am CLOSED 24-Aug-15 0 ACCEPTED 1 1
221 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00221 Zulfaqar 22-Aug-15 ZN1 STR Concreting works Concreting works for wall and top slab at RP3 24-Aug-15 23-Aug-15 11.00am CLOSED 24-Aug-15 0 ACCEPTED 1 1
222 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00222 Dorce 20-Aug-15 ZN1 STR Entrnce Staircase Building reinforced concrete inspection EPR1 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
223 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00223 Dorce 20-Aug-15 ZN1 STR Entrnce Staircase Building reinforced concrete inspection EPR2 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
224 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00224 Dorce 20-Aug-15 ZN1 STR Entrnce Staircase Building reinforced concrete inspection EPR3 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
225 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00225 Dorce 20-Aug-15 ZN1 STR Entrnce Staircase Building reinforced concrete inspection EPR4 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
226 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00226 Dorce 20-Aug-15 ZN1 STR Entrnce Staircase Building reinforced concrete inspection EPR5 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
227 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00227 Dorce 20-Aug-15 ZN1 STR Entrnce Staircase Building reinforced concrete inspection EPR6 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
Dorce 18-Aug-15 ZN1 STR Assembling Works Building chassis sattlement and installation inspection 25-Aug-15 27-Aug-15 3.00pm 27-Aug-15
228 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00228
AMR4
CLOSED 2 ACCEPTED 1 1
230 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00230 Dorce 18-Aug-15 ZN1 STR Assembling Works Building roof installation inspection AMR4 25-Aug-15 27-Aug-15 3.00pm CLOSED 27-Aug-15 2 ACCEPTED 1 1
233 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00233 Dorce 18-Aug-15 ZN1 STR Assembling Works Building roof installation inspection AMR5 25-Aug-15 27-Aug-15 3.00pm CLOSED 27-Aug-15 2 ACCEPTED 1 1
236 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00236 Dorce 18-Aug-15 ZN1 STR Assembling Works Building roof installation inspection AMR6 25-Aug-15 27-Aug-15 3.00pm CLOSED 17-Sep-15 23 ACCEPTED 1 1
Dorce 18-Aug-15 ZN1 STR Assembling Works Building chassis sattlement and installation inspection 25-Aug-15 27-Aug-15 3.00pm 25-Aug-15
237 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00237
Toilet and changing room
CLOSED 0 ACCEPTED 1 1
Dorce 18-Aug-15 ZN1 STR Assembling Works Building internal and external wall panel installation 25-Aug-15 27-Aug-15 3.00pm 17-Sep-15
238 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00238
inspection Toilet and changing room
CLOSED 23 ACCEPTED 1 1
Dorce 18-Aug-15 ZN1 STR Assembling Works Building roof installation inspection Toilet and changing 25-Aug-15 27-Aug-15 3.00pm 25-Aug-15
239 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00239
room
CLOSED 0 ACCEPTED 1 1
243 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00243 I-Gen 29-Aug-15 ZN1 MNE Fier Protection To inspect fire protection equipments at EPR2 1-Sep-15 3-Sep-15 9.00am CLOSED 29-Sep-15 28 ACCEPTED 1 1
244 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00244 I-Gen 29-Aug-15 ZN1 MNE Fier Protection To inspect fire protection equipments at EPR3 1-Sep-15 3-Sep-15 9.00am CLOSED 29-Sep-15 28 ACCEPTED 1 1
245 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00245 Dorce 29-Aug-15 ZN1 ELE Electrical works Building electrical panel buard installation AMR2 1-Sep-15 3-Sep-15 9.00am CLOSED 04-Oct-15 33 ACCEPTED 1 1
246 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00246 Dorce 29-Aug-15 ZN1 ELE Electrical works Building electrical panel buard installation AMR3 1-Sep-15 3-Sep-15 9.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
248 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00248 Dorce 29-Aug-15 ZN1 BLD Final inspection Building final inspection at AMR 2 30-Aug-15 1-Sep-15 10.00am CLOSED CANCEL 1 1
249 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00249 Dorce 29-Aug-15 ZN1 BLD Final inspection Building final inspection at AMR 3 30-Aug-15 1-Sep-15 10.00am CLOSED CANCEL 1 1
250 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00250 UEMB QAQC KHAIRIL 1-Sep-15 ZN1 CIV Testing Coring test at prayer room (Mosque) floor slab 2-Sep-15 4-Sep-15 11.00am CLOSED 29-Sep-15 27 ACCEPTED CANCEL 1 1
251 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00251 Shinryo 1-Sep-15 ZN1 MNE ACSU & Fan installation Installation of ACSU and ventilation fan at EPR1 1-Sep-15 3-Sep-15 3.00pm CLOSED 19-Nov-15 79 ACCEPTED 1 1
254 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00254 Dorce 1-Sep-15 ZN1 ELE Installation Installation of electrical inspection (MP2) 4-Sep-15 6-Sep-15 2.30pm CLOSED 19-Nov-15 76 ACCEPTED 1 1
257 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00257 Dorce 3-Sep-15 ZN1 ELE electrical works Building cable insulation test inspection AMR3 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
259 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00259 UEM ZUL FAQAR 7-Sep-15 ZN1 STR Concreting Concreting works for PC Cover Slab RP1 and RP1A 8-Sep-15 10-Sep-15 10.00am CLOSED 10-Oct-15 32 ACCEPTED 1 1
266 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00266 I-GEN 13-Oct-15 ZN1 MNE Test Testing and commissioning for hose reel pressure test at EPR3 13-Oct-15 15-Oct-15 10.00am CLOSED 13-Oct-15 0 ACCEPTED 1 1
267 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00267 I-GEN 24-Nov-15 ZN1 MNE Test Testing and commissioning for hose reel pressure test at EPR2 25-Nov-15 27-Nov-15 6.00pm CLOSED 25-Nov-15 0 ACCEPTED 1 1
268 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00268 I-GEN 9-Sep-15 ZN1 MNE Test Testing and commissioning for fire alarm system at EPR2 10-Sep-15 12-Sep-15 3.00pm CLOSED 09-Oct-15 29 ACCEPTED 1 1
269 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00269 I-GEN 9-Sep-15 ZN1 MNE Test Testing and commissioning for fire alam system at EPR3 11-Sep-15 13-Sep-15 10.00am CLOSED 12-Sep-15 1 ACCEPTED 1 1
270 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00270 ISDA 5-Sep-15 ZN1 ELE Floop test for ICT Floop test for ICT (Telephone and data countinity at EPR2 7-Sep-15 9-Sep-15 8.00am CLOSED 22-Sep-15 15 ACCEPTED 1 1
271 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00271 ISDA 5-Sep-15 ZN1 ELE Floop test for ICT Floop test for ICT (Telephone and data countinity at EPR3 7-Sep-15 9-Sep-15 8.00am CLOSED 22-Sep-15 15 ACCEPTED 1 1
273 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00273 Zulfaqar 10-Sep-15 ZN1 STR Concreting Concreting works for PC cover SLAB RP2and RP2A,RP3 11-Sep-15 13-Sep-15 3.00am CLOSED 13-Sep-15 2 ACCEPTED 1 1
274 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00274 Dorce 11-Sep-15 ZN1 BLD Final inspection Building final inspection at AMR2 12-Sep-15 14-Sep-15 10.00am CLOSED CANCEL 1 1
275 RAPID-P20A1-UEMB-ZN1-BLD-RFIN-00275 Dorce 11-Sep-15 ZN1 BLD Final inspection Building final inspection at 12-Sep-15 14-Sep-15 10.00am CLOSED CANCEL 1 1
279 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00279 Zulfaqar 14-Sep-15 ZN1 STR Rebar and formwork Inspection rebar and formwork for PC cover slab PR4,RP5 15-Sep-15 17-Sep-15 11.00am CLOSED 03-Oct-15 18 REJECTED 1 1
280 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00280 Zulfaqar 14-Sep-15 ZN1 STR concrete Concreteing works for PC cover slab RP4,RP5 15-Sep-15 17-Sep-15 4.00pm CLOSED 19-Sep-15 4 REJECTED 1 1
282 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00282 UEMB ZULFAQAR 20-Sep-15 ZN1 STR Rebar and formwork Inspection rebar and formwork for PC cover Slab RP4,RP5 21-Sep-15 23-Sep-15 11.00am CLOSED 03-Oct-15 12 ACCEPTED 1 1
283 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00283 UEMB ZULFAQAR 20-Sep-15 ZN1 STR concrete Concreting works for PC cover slab RP4,RP5 21-Sep-15 23-Sep-15 3.00pm CLOSED 23-Sep-15 2 ACCEPTED 1 1
285 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00285 Shinryo 26-Sep-15 ZN1 MNE Testing Testing for ACSU at EPR2 29-Sep-15 1-Oct-15 3.00pm CLOSED 12-Oct-15 13 ACCEPTED 1 1
286 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00286 Shinryo 28-Sep-15 ZN1 MNE Testing Testing for exhoust fan EPR2 29-Sep-15 1-Oct-15 11.00am CLOSED 05-Nov-15 37 ACCEPTED 1 1
287 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00287 Shinryo 22-Sep-15 ZN1 MNE Testing Testing for exhoust fan EPR3 23-Sep-15 25-Sep-15 11.00am CLOSED 31-Oct-15 38 ACCEPTED 1 1
288 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00288 Shinryo 22-Sep-15 ZN1 MNE Testing Testing for ACSU at EPR3 23-Sep-15 25-Sep-15 11.00am CLOSED 12-Oct-15 19 ACCEPTED 1 1
289 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00289 UEMB Ramesh 19-Sep-15 ZN1 MNE TNC Functionality test at Ecumenical prayer room 2 21-Sep-15 23-Sep-15 2.00pm CLOSED 22-Sep-15 1 ACCEPTED 1 1
290 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00290 UEMB Ramesh 19-Sep-15 ZN1 MNE TNC Functionality test at Ecumenical prayer room 3 21-Sep-15 23-Sep-15 2.00pm CLOSED 22-Sep-15 1 ACCEPTED 1 1
291 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00291 Samion 1-Oct-15 ZN1 CIV Survey Joint survey for position column at Cinema 1 2-Oct-15 4-Oct-15 9.00am CLOSED 02-Oct-15 0 ACCEPTED 1 1
292 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00292 Ocned Water 1-Oct-15 ZN1 MNE Equipment Request inspection for mechanical installation at RP3 2-Oct-15 4-Oct-15 4.30pm CLOSED 2-Oct-15 0 REJECTED 1 1
293 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00292A Ocned Water 1-Oct-15 ZN1 ELE Testing Request inspection for megger test and continuity test at RP3 2-Oct-15 4-Oct-15 5.00pm CLOSED 05-Dec-15 64 ACCEPTED 1 1
294 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00293 Ocned Water 1-Oct-15 ZN1 ELE Equipment Request inspection for electrical installation at RP3 2-Oct-15 4-Oct-15 4.00pm CLOSED 08-Dec-15 67 ACCEPTED 1 1
Samion 5-Oct-15 ZN1 CIV Test Pull out test for bolt on cinema 1, Loading testing 20 @ 5-Oct-15 7-Oct-15 10.00am CANCEL
298 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00297
25 KN CLOSED 1 1
299 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00298 Samion 5-Oct-15 ZN1 CIV drilling Installation bilth and drilling on cinema 1 5-Oct-15 7-Oct-15 10.00am CLOSED CANCEL 1 1
300 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00299 Gapura 5-Oct-15 ZN1 CIV Test Pull out test for bolt on open cinema 5-Oct-15 7-Oct-15 10.00am CLOSED 16-Nov-15 42 ACCEPTED 1 1
304 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00303 UEMB faliq 8-Oct-15 ZN1 ELE testing Polarity test for Ecumenical prayer room 3( MP3) 7-Oct-15 9-Oct-15 10.00am CLOSED 8-Oct-15 1 ACCEPTED 1 1
305 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00304 UEMB faliq 6-Oct-15 zN1 ELE poarity test Polarity test for Ecumenical prayer room 2( MP2) 6-Oct-15 8-Oct-15 10.00am CLOSED 18-Oct-15 12 ACCEPTED 1 1
317 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00316 UEMB QAQC KHAIRIL 13-Oct-15 ZN1 STR Testing Rebound Hammer at Prayer room (Mosque) 14-Oct-15 16-Oct-15 9.00am CLOSED 16-Nov-15 33 ACCEPTED 1 1
AEIE 17-Oct-15 ZN1 ELE Underground Cable Inspection for underground cable laying from main 17-Oct-15 19-Oct-15 3.00pm 19-Mar-16
322 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00321
feeder piller FPC5 to FPCL5
CLOSED 154 ACCEPTED 1 1
AEIE 17-Oct-15 ZN1 ELE Underground Cable Inspection for underground cable laying from main 17-Oct-15 19-Oct-15 3.00pm
325 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00324
feeder piller to cinema CLOSED CANCEL 1 1
AEIE 17-Oct-15 ZN1 ELE Underground Cable Inspection for underground cable laying from compact 17-Oct-15 19-Oct-15 3.00pm 3-Mar-16
327 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00326
sub LP2SSCF/1 to FP C8
CLOSED 138 ACCEPTED 1 1
AEIE 17-Oct-15 ZN1 ELE Underground Cable Inspection for underground cable laying from Compact 17-Oct-15 19-Oct-15 3.00pm 3-Mar-16
328 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00327
Sub LP2SSCF/1 to FP HM
CLOSED 138 ACCEPTED 1 1
AEIE 17-Oct-15 ZN1 ELE Underground Cable Inspection for Underground cable laying from Main 18-Oct-15 20-Oct-15 3.00pm 19-Mar-16
330 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00329
feeder piller FPC5 to FPHM8
CLOSED 153 ACCEPTED 1 1
Inspection for FDT test for Sub grade works at Light duty
331 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00330 Core manpower 17-Oct-15 ZN1 CIV Road works parking Common Facilities 18-Oct-15 20-Oct-15 10.00am CLOSED 16-Nov-15 29 ACCEPTED 1 1
Inspection for FDT test for Sub base works at Light duty
333 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00332 Core manpower 17-Oct-15 ZN1 CIV Road works 18-Oct-15 20-Oct-15 10.00am CLOSED 02-Nov-15 15 ACCEPTED 1 1
parking Common Facilities
Inspection for FDT test for Road base works at Light duty
335 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00334 Core manpower 17-Oct-15 ZN1 CIV Road works 18-Oct-15 20-Oct-15 10.00am CLOSED 11-Nov-15 24 ACCEPTED 1 1
parking Common Facilities
Inspection for FDT test for Sub base works at heavy duty
339 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00338 Core manpower 20-Oct-15 ZN1 CIV Road works 21-Oct-15 23-Oct-15 10.00am CLOSED 11-Nov-15 21 ACCEPTED 1 1
parking Common Facilities
340 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00339 Ocned Water 20-Oct-15 ZN1 ELE Migger test Miggering test at Pump Station RP3 and Continuity test 21-Oct-15 23-Oct-15 10.30am CLOSED 29-Oct-15 8 ACCEPTED 1 1
341 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00340 Ocned Water 20-Oct-15 ZN1 ELE Migger test Miggering test at Pump Station RP5 and Continuity test 21-Oct-15 23-Oct-15 10.30am CLOSED 29-Oct-15 8 ACCEPTED 1 1
342 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00341 Ocned Water 20-Oct-15 ZN1 ELE Migger test megger and continuity test at RP4 21-Oct-15 23-Oct-15 10.30am CLOSED 13-Aug-16 297 ACCEPTED 1 1
343 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00342 Gapura 20-Oct-15 ZN1 STR Material Material receiving on site 20-Oct-15 22-Oct-15 11.00am CLOSED 26-Nov-15 37 ACCEPTED 1 1
Under ground cable Inspection of underground submain cable laying from sub
345 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00344 AEIE 22-Oct-15 ZN1 ELE 23-Oct-15 25-Oct-15 11.00am CLOSED 16-Dec-15 54 ACCEPTED 1 1
Installation compact LP2SSCF1 TO FP4
Inspection for FDT test for road base at Heavy duty parking -
351 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00350 Core manpower 23-Oct-15 ZN1 CIV Road works 24-Oct-15 26-Oct-15 3.00pm CLOSED 16-Nov-15 23 ACCEPTED 1 1
common facilities
inspection for verify welding joint number for fire water pipe
352 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00351 Khidmat Hijau 23-Oct-15 ZN1 PIP HDPE welding 23-Oct-15 25-Oct-15 9.00am CLOSED 30-Oct-15 7 ACCEPTED 1 1
at common facilities area
Paneagle 26-Oct-15 ZN1 ARC Screeding works Screeding works at Prayer Building / Mosque (Prayer Hall 27-Oct-15 29-Oct-15 4.00pm
358 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00357
Portion first stage) CLOSED CANCEL 1 1
364 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00363 Dorce 28-Oct-15 ZN1 STR Torque test Building Torque wrench test at Prayer room / mosque 29-Oct-15 31-Oct-15 9.00am CLOSED CANCEL 1 1
365 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00364 UEMB Sadam 27-Oct-15 ZN1 ARC Furniture Architecural / ID area furniture supply in the building AMR2 28-Oct-15 30-Oct-15 2.00pm CLOSED 30-Oct-15 2 ACCEPTED 1 1
Excavation and laying 100mm & 50mm poly pipe and gate
366 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00365 Khidmat Hijau 29-Oct-15 ZN1 PIP Potable Water valve c/w fittings for potable water at common facilities 30-Oct-15 1-Nov-15 10.00am CLOSED 04-Dec-15 35 ACCEPTED 1 1
Excavation and laying 50mm poly pipe and gate valve c/w
367 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00366 Khidmat Hijau 29-Oct-15 ZN1 PIP Fire Water fittings for fire water at common facilities 30-Oct-15 1-Nov-15 10.00am CLOSED 04-Dec-15 35 ACCEPTED 1 1
377 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00376 I-GEN 4-Sep-15 ZN1 MNE Testing Testing of fire alarm system at MP3 4-Sep-15 6-Sep-15 2.00pm CLOSED 02-Nov-15 59 ACCEPTED 1 1
378 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00377 Shinryo 1-Sep-15 ZN1 MNE Fan installation Installation of ventilation MP3 1-Sep-15 3-Sep-15 3.00pm CLOSED CANCEL 1 1
381 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00380 Paneagle 2-Nov-15 ZN1 CIV Screeding works Screeding works at Prayer Hall Portion ( Stage 2) Mosque 3-Nov-15 5-Nov-15 11.00am CLOSED CANCEL 1 1
382 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00381 AEIE 4-Nov-15 ZN1 ELE Earthing installation Earthing installation for Feeder pillar FP-4 5-Nov-15 7-Nov-15 3.30pm CLOSED 8-Dec-15 33 ACCEPTED 1 1
383 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00382 AEIE 4-Nov-15 ZN1 ELE Earthing installation Inspection cable termination in Feeder pillar FP-C4 5-Nov-15 7-Nov-15 3.30pm CLOSED 8-Dec-15 33 ACCEPTED 1 1
384 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00383 Gapura 6-Oct-15 ZN1 STR Survey Inspection surveyor works at Cinema 5 (Bolt and Column) 7-Oct-15 9-Oct-15 11.00am CLOSED 07-Oct-15 0 ACCEPTED 1 1
385 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00384 Gapura 28-Oct-15 ZN1 STR Steel Structure Installation steel structure at Cinema 5 29-Oct-15 31-Oct-15 11.00am CLOSED 07-Dec-15 39 REJECTED 1 1
386 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00385 Gapura 28-Oct-15 ZN1 STR Steel Structure Leveling & Grouting job on Cinema 5 29-Oct-15 31-Oct-15 11.00am CLOSED 7-Dec-15 39 REJECTED 1 1
Core manpower 6-Nov-15 ZN1 CIV Inspection for FDT test for subbase at 3 meter width road 7-Nov-15 9-Nov-15 9.00am
392 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00391 Testing at Common Facilities refer drawing CLOSED CANCEL 1 1
397 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00396 HIKMAH Oil & GAS 11-Nov-15 ZN3 STR Structure Survey inspection for marking putting 12-Nov-15 14-Nov-15 8.00am CLOSED 12-Nov-15 0 ACCEPTED 1 1
398 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00397 Gapura 13-Nov-15 ZN3 STR Structure Material receiving on site 13-Nov-15 15-Nov-15 9.00am CLOSED 26-Nov-15 13 ACCEPTED 1 1
399 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00398 zulfaqar 19-Aug-15 ZN3 STR Structure Inspection concreting works for wall and 2nd slab at RP3 20-Aug-15 22-Aug-15 11.00am CLOSED 21-Nov-15 93 ACCEPTED 1 1
sand bedding coarse sand 50mm depth at tri court (five a side
400 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00399 seribu bio 16-Nov-15 ZN3 CIV sand bedding 18-Nov-15 20-Nov-15 10.00am CLOSED 01-Dec-15 13 ACCEPTED 1 1
common facilities
Excavation and laying of Excavation and laying at HDPE corrugated pipe inside trench
407 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00406 Opensis 12-Oct-15 ZN1 ELE 13-Oct-15 15-Oct-15 11.00am CLOSED 13-Oct-15 0 ACCEPTED 1 1
HDPE corrugated pipe at common facilities 330m
408 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00407 Opensis 12-Oct-15 ZN1 ELE Backfill trench works backfill trench work of common facilities area, 330meter 13-Oct-15 15-Oct-15 11.00am CLOSED 14-Oct-15 1 ACCEPTED 1 1
409 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00408 Gapura 20-Nov-15 ZN1 STR Material receiving material receiving on site 20-Nov-15 22-Nov-15 10.30am CLOSED 26-Nov-15 6 ACCEPTED 1 1
410 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00409 Gapura 20-Nov-15 ZN1 STR welding MPI visual inspection to painting 20-Nov-15 22-Nov-15 11.30am CLOSED CANCEL 1 1
417 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00416 seribu bio 21-Nov-15 ZN1 CIV Material turfing works at common facilities at FB3, FB4, FB5 23-Nov-15 25-Nov-15 10.00am CLOSED 28-Nov-15 5 ACCEPTED 1 1
Install U-drain size 600 x 600, 600 x 300 and 750 x 600 bat
419 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00418 Core manpower 24-Nov-15 ZN1 CIV Drainage common facilities (football field). Backfilling with compaction 25-Nov-15 27-Nov-15 11.00am CLOSED 01-Sep-16 281 ACCEPTED 1 1
after installation done
install u-drain size 750 x 600, 600 x 600 and 450 x 300 at
421 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00420 Core manpower 24-Nov-15 ZN1 CIV Drainage common facilities (fottball field). Backfilling with compaction 25-Nov-15 27-Nov-15 2.00pm CLOSED 01-Sep-16 281 ACCEPTED 1 1
after installation done.
424 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00423 Khidmat Hijau 25-Nov-15 ZN1 PIP sanitary plumbing Inspection for sanitary plumbing at masjid Prayer room 26-Nov-15 28-Nov-15 4.00pm CLOSED 26-Nov-15 0 REJECTED 1 1
426 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00425 Ocned water 30-Nov-15 ZN1 ELE earthing test Earthing test at RP5 1-Dec-15 3-Dec-15 9.00am CLOSED 21-Dec-15 20 ACCEPTED 1 1
427 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00426 Ocned water 30-Nov-15 ZN1 ELE earthing test Earthing test at RP3 1-Dec-15 3-Dec-15 9.00am CLOSED 21-Dec-15 20 ACCEPTED 1 1
428 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00427 Ocned water 30-Nov-15 ZN1 ELE earthing test Earthing test at RP4 1-Dec-15 3-Dec-15 9.00am CLOSED 21-Dec-15 20 ACCEPTED 1 1
443 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00442 shinryo 15-Sep-15 ZN1 MNE Installation installation for exhaust fan MP2 15-Sep-15 17-Sep-15 3.00PM CLOSED 8-Dec-15 84 ACCEPTED 1 1
444 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00443 shinryo 15-Sep-15 ZN1 MNE Installation installation for exhaust fan MP3 15-Sep-15 17-Sep-15 3.00PM CLOSED 8-Dec-15 84 ACCEPTED 1 1
447 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00446 AEIE 2-Nov-15 ZN1 ELE Earthing test Earthing test for Feeder pillar C4 3-Nov-15 5-Nov-15 11.00am CLOSED 12-Dec-15 39 ACCEPTED 1 1
454 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00453 UEMB QAQC KHAIRIL 30-Oct-15 ZN1 CIV Test Windsor probe test at Mosque (Raft foundation slab) 30-Oct-15 1-Nov-15 3.00pm CLOSED 30-Oct-15 0 ACCEPTED 1 1
Inspection for makrking point H.D bolts GL1-5, A-G for Open
459 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00458 AME Eng sdn bhd 10-Dec-15 ZN1 STR Marking point H.D bolts 11-Dec-15 9.00am 10.00am CLOSED 9-Jan-16 29 REJECTED 1 1
air cinema 4
461 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00460 Gapura 12-Dec-15 ZN1 STR Material Material receiving on uem site, refer material delivery No 11 11-Dec-15 9.00am 9.00am CLOSED 15-Dec-15 4 ACCEPTED 1 1
Excavation at cricket area for laying u-drain size 600 x 600 and
463 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00462 UEMB Amin 26-Jun-15 ZN1 CIV Drainage 27-Jun-15 29-Jun-15 10.00am CLOSED 20-Jan-16 207 ACCEPTED 1 1
600 x 450 for laying u-drain. Laying bedding material
464 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00463 AME Eng sdn bhd 16-Dec-15 ZN1 STR material inspection for material receiving at open air cinema 2 17-Dec-15 19-Dec-15 10.00am CLOSED 26-Dec-15 9 ACCEPTED 1 1
466 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00465 Dorce 17-Dec-15 ZN1 STR Assembling works Building M20-M16 bolts torque wrench test(supermarket) 17-Dec-15 19-Dec-15 11.00am CLOSED CANCEL 1 1
469 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00468 Ocned water 2-Nov-15 ZN1 ELE Installation Request inspection for electrical installation at RP4 3-Nov-15 5-Nov-15 3.00pm CLOSED 21-Dec-15 48 ACCEPTED 1 1
470 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00469 Ocned water 2-Nov-15 ZN1 ELE Installation Request inspection for electrical installation at RP5 3-Nov-15 5-Nov-15 3.00pm CLOSED 21-Dec-15 48 ACCEPTED 1 1
477 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00476 amman tech 17-Dec-15 ZN1 CIV Road works Subgrade for FDT test for Common prayer building 18-Dec-15 20-Dec-15 3.00pm CLOSED 29-Jul-16 224 ACCEPTED 1 1
478 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00477 amman tech 17-Dec-15 ZN1 CIV Road works Dipping for subbase at Common Prayer building 18-Dec-15 20-Dec-15 10.00am CLOSED CANCEL 1 1
479 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00478 amman tech 17-Dec-15 ZN1 CIV Road works FDT test for Subbase at Common Prayer building 18-Dec-15 20-Dec-15 5.00pm CLOSED 21-Dec-15 3 ACCEPTED 1 1
480 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00479 amman tech 18-Dec-15 ZN1 CIV Road works FDT test for Roadbase at Common Prayer building 19-Dec-15 21-Dec-15 5.00pm CLOSED 21-Apr-16 124 ACCEPTED 1 1
482 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00481 yuzuki 22-Dec-15 ZN1 CIV fencing Excavation, install and concreting post at RP5 22-Dec-15 24-Dec-15 9.30am CLOSED 1-Feb-16 41 ACCEPTED 1 1
483 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00482 yuzuki 22-Dec-15 ZN1 CIV fencing Excavation, install and concreting post at RP3 22-Dec-15 24-Dec-15 2.30pm CLOSED 22-Dec-15 0 ACCEPTED 1 1
484 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00483 AME Eng sdn bhd 22-Dec-15 ZN1 STR testing Pull out test on Bolt at Open air cinema 2 23-Dec-15 25-Dec-15 2.30pm CLOSED 26-Jan-16 34 ACCEPTED 1 1
485 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00484 AME Eng sdn bhd 22-Dec-15 ZN1 STR material Material receiving inspection at Open air cinema 2 23-Dec-15 25-Dec-15 2.30pm CLOSED 26-Jan-16 34 ACCEPTED 1 1
486 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00485 Core manpower 22-Dec-15 ZN1 CIV Road works Laying ACBC 28 at Heavy duty parking- Common facilities 22-Dec-15 24-Dec-15 2.30pm CLOSED 10-Mar-16 79 ACCEPTED 1 1
487 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00486 Core manpower 22-Dec-15 ZN1 CIV Road works Laying ACBC 28 at Light duty parking- Common facilities 22-Dec-15 24-Dec-15 4.00pm CLOSED 11-Mar-16 80 ACCEPTED 1 1
496 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00495 AME Eng sdn bhd 23-Dec-15 ZN1 STR Erection Inspection for erection material 28-Dec-15 30-Dec-15 10.30am CLOSED 26-Jan-16 29 ACCEPTED 1 1
501 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00500 amman tech 24-Dec-15 ZN1 CIV Road works Tray test for prime coat at Common prayer building 25-Dec-15 27-Dec-15 3.00pm CLOSED CANCEL 1 1
502 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00501 amman tech 25-Dec-15 ZN1 CIV Road works Pavement laying record at Common prayer building 26-Dec-15 28-Dec-15 10.00am CLOSED 16-Feb-16 52 ACCEPTED 1 1
503 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00502 yuzuki 28-Dec-15 ZN1 CIV fencing Excavation install and concreting post at RP4 29-Dec-15 31-Dec-15 3.30pm CLOSED 8-Apr-16 101 ACCEPTED 1 1
504 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00503 Gapura 28-Dec-15 ZN1 STR material Material delivery on site (Cinema 5) for steel structures 29-Dec-15 31-Dec-15 10.00pm CLOSED 16-Jan-16 18 ACCEPTED 1 1
506 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00505 amman tech 19-Dec-15 ZN1 CIV Road works Dipping for subgrade at Common Prayer building car park 20-Dec-15 22-Dec-15 3.00pm CLOSED CANCEL 1 1
507 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00506 amman tech 22-Dec-15 ZN1 CIV Road works FDT test for subgrade at Common prayer building car park 29-Dec-15 31-Dec-15 3.00pm CLOSED 29-Jul-16 213 ACCEPTED 1 1
508 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00507 amman tech 24-Dec-15 ZN1 CIV Road works Dipping for subbase at Common Prayer building car park 25-Dec-15 27-Dec-15 10.00am CLOSED 25-Dec-15 0 ACCEPTED 1 1
509 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00508 amman tech 25-Dec-15 ZN1 CIV Road works FDT test for subbase at Common prayer building car park 5-Jan-16 7-Jan-16 9.30am CLOSED 29-Jul-16 206 ACCEPTED 1 1
511 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00510 amman tech 4-Jan-16 ZN1 CIV Road works FDT test for roadbase at Common prayer building car park 6-Jan-16 8-Jan-16 10.00am CLOSED 7-Jan-16 1 ACCEPTED 1 1
512 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00511 AME Eng sdn bhd 5-Jan-16 ZN1 STR material Material receiving inpection at Site for Open air cinema 4 6-Jan-16 8-Jan-16 10.00am CLOSED 16-Jan-16 10 ACCEPTED 1 1
513 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00512 AME Eng sdn bhd 5-Jan-16 ZN1 STR Installation Marking & installation for Hilti H.D bolts Open air cinema 4 6-Jan-16 8-Jan-16 10.00am CLOSED 16-Jan-16 10 ACCEPTED 1 1
514 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00513 Core manpower 1-Jan-16 ZN1 CIV Road works Laying ACBC 29 at Light duty parking-Common Facility 2-Jan-16 4-Jan-16 9.00am CLOSED 7-Jan-16 1 ACCEPTED 1 1
519 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00518 seribu bio 8-Jan-16 ZN1 CIV Pre concreting Footing for 8m light pole at Five a side football (FB-7) 9-Jan-16 11-Jan-16 11.00am CLOSED 19-May-16 131 REJECTED 1 1
520 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00519 seribu bio 8-Jan-16 ZN1 CIV Pre concreting Footing for 8m light pole at Five a side football (FB3,FB4,FB5) 9-Jan-16 11-Jan-16 11.00am CLOSED CANCEL 1 1
523 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00522 seribu bio 11-Jan-16 ZN1 CIV concreting Concreting for game post pole 11-Jan-16 13-Jan-16 3.00pm CLOSED 18-Aug-16 220 ACCEPTED 1 1
524 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00523 AME Eng sdn bhd 12-Jan-16 ZN1 STR material Material receiving inpection at Site for Open air cinema 4 12-Jan-16 14-Jan-16 5.00pm CLOSED 12-Jan-16 0 ACCEPTED 1 1
525 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00524 Ocned water 23-Nov-15 ZN1 MNE Equipment Request inspection for mechanical installation of RP5 24-Nov-15 26-Nov-15 3.00pm CLOSED 24-Nov-15 0 ACCEPTED 1 1
526 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00525 Ocned water 24-Nov-15 ZN1 MNE Equipment Request inspection for mechanical installation at RP3 24-Nov-15 26-Nov-15 3.00pm CLOSED 24-Nov-15 0 ACCEPTED 1 1
527 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00526 Ocned water 25-Nov-15 ZN1 MNE Equipment Request inspection for mechanical installation at RP4 25-Nov-15 27-Nov-15 2.00pm CLOSED 25-Nov-15 0 ACCEPTED 1 1
528 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00527 samion 14-Jan-16 ZN1 CIV bolt and nut Intall bolt & nut Cinema 1 14-Jan-16 16-Jan-16 9.00am CLOSED 21-Jan-16 7 ACCEPTED 1 1
531 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00530 Dorce 11-Jan-16 ZN1 ELE Electrical work Building cable insulation test Ecumunical praying room 1 12-Jan-16 14-Jan-16 9.00am CLOSED 20-Jan-16 8 ACCEPTED 1 1
532 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00531 Dorce 12-Jan-16 ZN1 ELE Electrical work Building cable insulation test MUltipurpose praying room 4 13-Jan-16 15-Jan-16 9.30am CLOSED 20-Jan-16 7 ACCEPTED 1 1
533 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00532 Dorce 12-Jan-16 ZN1 ELE Electrical work Building cable insulation test MUltipurpose praying room 5 13-Jan-16 15-Jan-16 9.30am CLOSED 20-Jan-16 7 ACCEPTED 1 1
534 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00533 Dorce 12-Jan-16 ZN1 ELE Electrical work Building cable insulation test MUltipurpose praying room 6 13-Jan-16 15-Jan-16 9.30am CLOSED 20-Jan-16 7 ACCEPTED 1 1
535 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00534 Dorce 12-Jan-16 ZN1 ELE Electrical work Building cable insulation test Toilet & changing room 13-Jan-16 15-Jan-16 10.30am CLOSED CANCEL 1 1
536 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00535 Dorce 12-Jan-16 ZN1 ELE Electrical work Building cable pulling inspection at Multipurpose building 1 13-Jan-16 15-Jan-16 9.30am CLOSED CANCEL 1 1
537 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00536 Dorce 12-Jan-16 ZN1 ELE Electrical work Building cable pulling inspection at Multipurpose building 6 13-Jan-16 15-Jan-16 9.30am CLOSED CANCEL 1 1
538 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00537 Dorce 12-Jan-16 ZN1 ELE Electrical work Building cable pulling inspection at Multipurpose building 4 13-Jan-16 15-Jan-16 9.30am CLOSED CANCEL 1 1
539 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00538 Dorce 12-Jan-16 ZN1 ELE Electrical work Building cable pulling inspection at Multipurpose building 5 13-Jan-16 15-Jan-16 9.30am CLOSED 21-Jan-16 8 ACCEPTED 1 1
We carry out work for laying ACBC for payer building car
540 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00539 amman tech 8-Jan-16 ZN1 CIV Road works 14-Jan-16 16-Jan-16 9.30am CLOSED 17-Feb-16 34 ACCEPTED 1 1
parking area
547 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00546 AEIE 15-Jan-16 ZN1 ELE earthing test Earth resistant test for Ecumenical 1 (DB) 16-Jan-16 18-Jan-16 2.00pm CLOSED 16-Jan-16 0 ACCEPTED 1 1
548 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00547 AEIE 15-Jan-16 ZN1 ELE earthing test Earth resistant test for Ecumenical 5 (DB) 16-Jan-16 18-Jan-16 2.00pm CLOSED 16-Jan-16 0 ACCEPTED 1 1
549 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00548 AEIE 15-Jan-16 ZN1 ELE earthing test Earth resistant test for Ecumenical 4 (DB) 16-Jan-16 18-Jan-16 2.00pm CLOSED 16-Jan-16 0 ACCEPTED 1 1
553 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00552 Core manpower 14-Jan-16 ZN1 CIV Road works Laying ACBC28 at 3meter width road -Common facilities 14-Jan-16 16-Jan-16 10.00am CLOSED 14-Jan-16 0 ACCEPTED 1 1
555 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00554 AME Eng sdn bhd 15-Jan-16 ZN1 STR fit up inspection Fit up inspection for Open air cinema 1 16-Jan-16 18-Jan-16 9.30am CLOSED CANCEL 1 1
557 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00556 Dorce 14-Jan-16 ZN1 ELE electrical works Building cable insulation test at Prayer room(mosque) 15-Jan-16 17-Jan-16 5.00pm CLOSED 21-Jan-16 6 ACCEPTED 1 1
558 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00557 AME Eng sdn bhd 18-Jan-16 ZN1 STR testing Pull out test on Hilti bolt at Open air cinema 2 19-Jan-16 21-Jan-16 10.00am CLOSED 28-Jan-16 9 ACCEPTED 1 1
559 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00558 AME Eng sdn bhd 18-Jan-16 ZN1 STR testing Pull out test on Hilti bolt at Open air cinema 4 19-Jan-16 21-Jan-16 10.00am CLOSED 28-Jan-16 9 ACCEPTED 1 1
568 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00567 seribu bio 21-Jan-16 ZN1 CIV material Installation and testing of sprinkler at Football 7 (FB-7) 22-Jan-16 24-Jan-16 11.30am CLOSED 2-Mar-16 40 ACCEPTED 1 1
569 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00568 seribu bio 21-Jan-16 ZN1 CIV material Goal post installation at Tri court (FB-3, FB-4, FB-5) 22-Jan-16 24-Jan-16 3.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
570 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00569 seribu bio 21-Jan-16 ZN1 CIV material Goal post installation at Five a side football 7(FB-7) 22-Jan-16 24-Jan-16 11.30am CLOSED 19-Feb-16 28 ACCEPTED 1 1
571 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00570 seribu bio 21-Jan-16 ZN1 CIV Installation Netting installation at Tri court (FB-3,FB-4,FB-5) 22-Jan-16 24-Jan-16 3.00pm CLOSED 27-Apr-16 96 ACCEPTED 1 1
572 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00571 seribu bio 21-Jan-16 ZN1 CIV Installation Installation of netting on bracing at Five a side fotball (FB-7) 22-Jan-16 24-Jan-16 11.30am CLOSED 25-Feb-16 34 ACCEPTED 1 1
573 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00572 seribu bio 21-Jan-16 ZN1 CIV testing FDT for Cricket strip at Cricket 3 (CR-3) 22-Jan-16 24-Jan-16 11.00am CLOSED 26-May-16 125 ACCEPTED 1 1
574 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00573 seribu bio 21-Jan-16 ZN1 CIV cable routing Cable routing at Cricket field (CR-3) 22-Jan-16 24-Jan-16 11.00am CLOSED 19-Feb-16 28 ACCEPTED 1 1
575 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00574 seribu bio 21-Jan-16 ZN1 CIV turfing Turfing at Cricket 3 (CR-3). 22-Jan-16 24-Jan-16 11.00am CLOSED 8-Mar-16 46 ACCEPTED 1 1
577 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00576 I-GEN 18-Jan-16 ZN1 MNE hose reel Hose reel pressure test at Ecumenical prayer room 5(EPR5) 22-Jan-16 24-Jan-16 11.00am CLOSED 27-Jan-16 5 ACCEPTED 1 1
578 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00577 I-GEN 18-Jan-16 ZN1 MNE hose reel Hose reel pressure test at Ecumenical prayer room 6(EPR6) 22-Jan-16 24-Jan-16 5.30pm CLOSED 22-Jan-16 0 ACCEPTED 1 1
579 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00578 I-GEN 18-Jan-16 ZN1 MNE hose reel Hose reel pressure test at Ecumenical prayer room 4(EPR4) 19-Jan-16 21-Jan-16 4.30pm CLOSED 19-Jan-16 0 ACCEPTED 1 1
580 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00579 I-GEN 18-Jan-16 ZN1 MNE hose reel Hose reel pressure test at Ecumenical prayer room 1(EPR1) 19-Jan-16 21-Jan-16 4.00pm CLOSED 19-Jan-16 0 ACCEPTED 1 1
581 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00580 I-GEN 20-Jan-16 ZN1 MNE hose reel Hose reel pressure test at Supermarket 21-Jan-16 23-Jan-16 3.30pm CLOSED 21-Jan-16 0 ACCEPTED 1 1
582 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00581 I-GEN 20-Jan-16 ZN1 MNE hose reel Hose reel pressure test at Mosque building (prayer building) 21-Jan-16 23-Jan-16 3.30pm CLOSED 21-Jan-16 0 ACCEPTED 1 1
588 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00587 AEIE 22-Jan-16 ZN4 ELE Installation Installation main feeder pillar C3 at Comon facilities 22-Jan-16 24-Jan-16 2.00pm CLOSED 15-Feb-16 24 ACCEPTED 1 1
592 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00591 iszda 20-Jan-16 ZN1 ELE Installation Inspecion of installation ICT at Ecumenical 1 (MP1) 23-Jan-16 25-Jan-16 9.30am CLOSED 28-Jan-16 5 ACCEPTED 1 1
593 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00592 iszda 20-Jan-16 ZN1 ELE Installation Inspecion of installation ICT at Ecumenical 4 (MP4) 23-Jan-16 25-Jan-16 9.30am CLOSED 28-Jan-16 5 ACCEPTED 1 1
594 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00593 iszda 20-Jan-16 ZN1 ELE Installation Inspecion of installation ICT at Ecumenical 5 (MP5) 23-Jan-16 25-Jan-16 9.30am CLOSED 28-Jan-16 5 ACCEPTED 1 1
595 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00594 iszda 20-Jan-16 ZN1 ELE Installation Inspecion of installation ICT at Ecumenical 6 (MP6) 23-Jan-16 25-Jan-16 9.30am CLOSED 28-Jan-16 5 ACCEPTED 1 1
596 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00595 iszda 20-Jan-16 ZN1 ELE testing Inspection of Fluke test cable analyzer at Ecumenical 1 (MP1) 23-Jan-16 25-Jan-16 9.30am CLOSED 28-Jan-16 5 ACCEPTED 1 1
597 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00596 iszda 20-Jan-16 ZN1 ELE testing Inspection of Fluke test cable analyzer at Ecumenical 4 (MP4) 23-Jan-16 25-Jan-16 9.30am CLOSED 28-Jan-16 5 ACCEPTED 1 1
598 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00597 iszda 20-Jan-16 ZN1 ELE testing Inspection of Fluke test cable analyzer at Ecumenical 5 (MP5) 23-Jan-16 25-Jan-16 9.30am CLOSED 28-Jan-16 5 ACCEPTED 1 1
599 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00598 iszda 20-Jan-16 ZN1 ELE testing Inspection of Fluke test cable analyzer at Ecumenical 6(MP6) 23-Jan-16 25-Jan-16 9.30am CLOSED 28-Jan-16 5 ACCEPTED 1 1
601 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00600 Dorce 21-Jan-16 ZN1 ELE electrical works Building electrical functionality test at Multipurpose 1 22-Jan-16 24-Jan-16 5.00pm CLOSED 28-Jan-16 6 ACCEPTED 1 1
602 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00601 Dorce 21-Jan-16 ZN1 ELE electrical works Building electrical functionality test at Multipurpose 4 22-Jan-16 24-Jan-16 4.30pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
603 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00602 Dorce 21-Jan-16 ZN1 ELE electrical works Building electrical functionality test at Multipurpose 5 22-Jan-16 24-Jan-16 4.45pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
604 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00603 Dorce 21-Jan-16 ZN1 ELE electrical works Building polarity test at Multipurpose 1 23-Jan-16 25-Jan-16 11.30am CLOSED 29-Jan-16 6 ACCEPTED 1 1
605 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00604 Dorce 21-Jan-16 ZN1 ELE electrical works Building polarity test at Multipurpose 4 24-Jan-16 26-Jan-16 4.30pm CLOSED 30-Jan-16 6 ACCEPTED 1 1
606 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00605 Dorce 21-Jan-16 ZN1 ELE electrical works Building polarity test at Multipurpose 5 25-Jan-16 27-Jan-16 4.15pm CLOSED 30-Jan-16 5 ACCEPTED 1 1
607 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00606 AME Eng sdn bhd 25-Jan-16 ZN1 STR testing Bolt tightening inspection at Open air cinema 2 26-Jan-16 28-Jan-16 10.00am CLOSED 23-Feb-16 28 ACCEPTED 1 1
608 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00607 AME Eng sdn bhd 25-Jan-16 ZN1 STR Material material revceiving inspection at site Open air cinema 4 26-Jan-16 28-Jan-16 9.00am CLOSED 20-May-16 115 ACCEPTED 1 1
609 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00608 AME Eng sdn bhd 25-Jan-16 ZN1 ARC Painting final inspection on painting at site at open air cnema 2 26-Jan-16 28-Jan-16 10.30am CLOSED 3-Mar-16 37 ACCEPTED 1 1
610 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00609 AME Eng sdn bhd 25-Jan-16 ZN1 STR Material FINAL INSPECTION FOR ROOF AND RWDP 1,2,3,4 26-Jan-16 28-Jan-16 11.30am CLOSED 3-Mar-16 37 ACCEPTED 1 1
611 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00610 AME Eng sdn bhd 25-Jan-16 ZN1 STR Steel Structure Final inspection complete at open air cinema 2 26-Jan-16 28-Jan-16 10.00am CLOSED 20-May-16 115 ACCEPTED 1 1
613 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00612 AME Eng sdn bhd 25-Jan-16 ZN1 STR Steel Structure Inspection of erection material 27-Jan-16 29-Jan-16 11.00am CLOSED 23-Feb-16 27 ACCEPTED 1 1
618 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00617 AEIE 26-Jan-16 ZN1 ELE earthing test Earthing test for DB at Multipurpose/ Ecumenical 6 27-Jan-16 29-Jan-16 2.00pm CLOSED 27-Jan-16 0 ACCEPTED 1 1
620 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00619 AEIE 26-Jan-16 ZN1 ELE IR test (migger I.R test for outgoing cable FPC4 at Common facilities 26-Jan-16 28-Jan-16 2.00pm CLOSED 15-Feb-16 20 ACCEPTED 1 1
621 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00620 omitech 27-Jan-16 ZN1 CIV road marking line Road line marking at Masjid (parking area) 27-Jan-16 29-Jan-16 9.00am CLOSED CANCEL 1 1
622 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00621 seribu bio 27-Jan-16 ZN1 CIV testing FDT for 30m mast pole footing 27-Jan-16 29-Jan-16 2.00pm CLOSED CANCEL 1 1
623 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00622 Dorce 27-Jan-16 ZN1 STR Assembling works Buildiing roof installation inspection at Supermarket 29-Jan-16 31-Jan-16 9.30am CLOSED 29-Jan-16 0 ACCEPTED 1 1
624 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00623 Dorce 27-Jan-16 ZN1 STR Assembling works Buildiing wall panel installatiion at Supermarket 29-Jan-16 31-Jan-16 8.30am CLOSED 29-Jan-16 0 ACCEPTED 1 1
625 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00624 Dorce 27-Jan-16 ZN1 STR Assembling works Buildiing wall panel installatiion at prayer building 29-Jan-16 31-Jan-16 1030am CLOSED 29-Jan-16 0 ACCEPTED 1 1
626 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00625 Dorce 27-Jan-16 ZN1 STR Assembling works Buildiing roof installation inspection at Prayer building 29-Jan-16 31-Jan-16 2.00pm CLOSED 29-Jan-16 0 ACCEPTED 1 1
633 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00632 Dorce 25-Jan-16 ZN1 ELE testing Building cable insulation test at Supermarket 26-Jan-16 28-Jan-16 2.00pm CLOSED CANCEL 1 1
637 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00636 AEIE 30-Jan-16 ZN1 ELE Testing Earthing test of Lightning protection system at Supermarket 31-Jan-16 2-Feb-16 2.00pm CLOSED 15-Mar-16 44 ACCEPTED 1 1
638 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00637 AEIE 30-Jan-16 ZN1 ELE Testing Earthing test for DB at Toilet and changing building 30-Jan-16 1-Feb-16 2.00pm CLOSED 20-Feb-16 21 ACCEPTED 1 1
640 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00639 Gapura 19-Nov-15 ZN1 STR material Material receiving on site (D/O: dmsb/do/gp/010) at Cinema 5 20-Nov-16 22-Nov-16 3.00pm CLOSED 24-Nov-16 4 ACCEPTED 1 1
641 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00640 Gapura 23-Dec-15 ZN1 STR material Material receiving on site (D/O: dmsb/do/gp/012) at Cinema 5 24-Dec-16 26-Dec-16 2.00pm CLOSED 27-Dec-16 3 ACCEPTED 1 1
642 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00641 Gapura 23-Dec-15 ZN1 STR material Material receiving on site (D/O: dmsb/do/gp/011) at Cinema 5 24-Dec-16 26-Dec-16 2.00pm CLOSED 27-Dec-16 3 ACCEPTED 1 1
643 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00642 Gapura 30-Dec-15 ZN1 STR material Material receiving on site (D/O: dmsb/do/gp/013) at Cinema 5 25-Dec-16 27-Dec-16 2.00pm CLOSED 29-Dec-16 4 ACCEPTED 1 1
644 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00643 AEIE 23-Nov-15 ZN1 ELE installation Lightning protection system installation at supermarket 1-Feb-16 3-Feb-16 2.00pm CLOSED 15-Mar-16 43 ACCEPTED 1 1
645 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00644 Ocned water 29-Jan-16 ZN1 MNE testing functional test for 2 nos submersible raw sewage pump at RP3 30-Jan-16 1-Feb-16 8.00am CLOSED 13-Aug-16 196 ACCEPTED 1 1
646 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00645 Ocned water 29-Jan-16 ZN1 MNE testing functional test for 2 nos submersible raw sewage pump at RP4 31-Jan-16 2-Feb-16 9.00am CLOSED 13-Aug-16 195 ACCEPTED 1 1
647 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00646 Ocned water 29-Jan-16 ZN1 MNE testing functional test for 2 nos submersible raw sewage pump at RP5 1-Feb-16 3-Feb-16 9.00am CLOSED 13-Aug-16 194 ACCEPTED 1 1
652 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00651 AEIE 30-Jan-16 ZN1 ELE Earthing installation Lighning protection ystem installation at Changing room 1-Feb-16 3-Feb-16 2.00pm CLOSED 18-Mar-16 46 ACCEPTED 1 1
653 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00652 AEIE 30-Jan-16 ZN1 ELE Earthing installation Lighning protection ystem installation at Prayer room 1-Feb-16 3-Feb-16 2.00pm CLOSED 15-Mar-16 43 ACCEPTED 1 1
660 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00659 Dorce 26-Jan-16 ZN1 ELE electrical works Building polarity test at Multipurpose building 6 27-Jan-16 29-Jan-16 11.30am CLOSED 17-Feb-16 21 ACCEPTED 1 1
663 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00662 seribu bio 2-Feb-16 ZN1 CIV concreting works Concreting at highmast grade 45 concrete at Football 6 (FB6) 3-Feb-16 5-Feb-16 2.00pm CLOSED 19-May-16 106 REJECTED 1 1
670 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00669 shinryo 31-Jan-16 ZN1 MNE Installation Installation Exhaust Fan (MP4) 1-Feb-16 3-Feb-16 10.00am CLOSED CANCEL 1 1
671 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00670 shinryo 31-Jan-16 ZN1 MNE Installation Installation Exhaust Fan (MP5) 1-Feb-16 3-Feb-16 10.00am CLOSED CANCEL 1 1
672 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00671 shinryo 1-Feb-16 ZN1 MNE Testing Testing Exhaust Fan (MP5) 2-Feb-16 4-Feb-16 9.30am CLOSED CANCEL 1 1
673 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00672 shinryo 1-Feb-16 ZN1 MNE Testing Testing Exhaust Fan (MP4) 2-Feb-16 4-Feb-16 9.30am CLOSED CANCEL 1 1
674 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00673 shinryo 1-Feb-16 ZN1 MNE installation Installation Exhaust Fan (MP1) 2-Feb-16 4-Feb-16 9.30am CLOSED CANCEL 1 1
675 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00674 shinryo 1-Feb-16 ZN1 MNE Testing Testing Exhaust Fan (MP6) 2-Feb-16 4-Feb-16 9.30am CLOSED CANCEL 1 1
676 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00675 shinryo 1-Feb-16 ZN1 MNE Testing Testing Exhaust Fan (MP1) 2-Feb-16 4-Feb-16 9.30am CLOSED CANCEL 1 1
677 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00676 shinryo 1-Feb-16 ZN1 MNE installation Installation Exhaust Fan (MP6) 2-Feb-16 4-Feb-16 9.30am CLOSED CANCEL 1 1
679 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00678 I-GEN 30-Jan-16 ZN1 MNE Installation Installation of exhaust fan at Toilet and changing 6-Feb-16 8-Feb-16 10.00am CLOSED 6-Feb-16 0 ACCEPTED 1 1
680 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00679 I-GEN 30-Jan-16 ZN1 MNE testing testing of exhaust fan 6-Feb-16 8-Feb-16 10.00am CLOSED CANCEL 1 1
681 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00680 AEIE 29-Jan-16 ZN1 ELE testing Earthing test of DB at Supermarket 31-Jan-16 2-Feb-16 2.00pm CLOSED 31-Jan-16 0 ACCEPTED 1 1
682 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00681 shinryo 1-Feb-16 ZN1 MNE testing Testing ACSU at Ecumenical 1(EPR1) 2-Feb-16 4-Feb-16 9.30am CLOSED 3-Feb-16 1 ACCEPTED 1 1
683 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00682 shinryo 1-Feb-16 ZN1 MNE testing Testing ACSU at Ecumenical 4(EPR4) 2-Feb-16 4-Feb-16 9.30am CLOSED 2-Feb-16 0 ACCEPTED 1 1
684 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00683 shinryo 1-Feb-16 ZN1 MNE testing Testing ACSU at Ecumenical 5(EPR5) 2-Feb-16 4-Feb-16 9.30am CLOSED 2-Feb-16 0 ACCEPTED 1 1
685 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00684 shinryo 1-Feb-16 ZN1 MNE testing Testing ACSU at Ecumenical 6(EPR6) 2-Feb-16 4-Feb-16 9.30am CLOSED 2-Feb-16 0 ACCEPTED 1 1
686 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00685 seribu bio 12-Feb-16 ZN1 CIV Concreting works Concreting aHighmast footing at Football 6 (FB6)x3nos 29-Jan-16 31-Jan-16 10.00am CLOSED 25-Feb-16 27 ACCEPTED 1 1
687 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00686 seribu bio 4-Feb-16 ZN1 CIV Concreting works Concreting aHighmast footing at Crcket 3 (CR-3) 5-Feb-16 7-Feb-16 10.00am CLOSED 25-Feb-16 20 ACCEPTED 1 1
688 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00687 seribu bio 11-Feb-16 ZN1 CIV Concreting works Concreting aHighmast footing at Crcket 3 (CR-3)x2nos 11-Feb-16 13-Feb-16 10.00am CLOSED 25-Feb-16 14 ACCEPTED 1 1
689 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00688 seribu bio 12-Feb-16 ZN1 ELE Cable laying Cable routing and cable laying at Football 6 (FB6) 13-Feb-16 15-Feb-16 10.00am CLOSED 2-Mar-16 18 ACCEPTED 1 1
690 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00689 seribu bio 12-Feb-16 ZN1 CIV Concreting works Concreting highmast footing at Football 6 (FB6) 5-Feb-16 7-Feb-16 10.00am CLOSED 25-Feb-16 20 ACCEPTED 1 1
691 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00690 shinryo 29-Jan-16 ZN1 MNE Installation Installation of ACSU at Ecumenical 5 (EPR5) 30-Jan-16 1-Feb-16 10.00am CLOSED CANCEL 1 1
692 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00691 shinryo 29-Jan-16 ZN1 MNE Installation Installation of ACSU at Ecumenical 6 (EPR6) 30-Jan-16 1-Feb-16 10.00am CLOSED CANCEL 1 1
693 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00692 shinryo 29-Jan-16 ZN1 MNE Installation Installation of ACSU at Ecumenical 1 (EPR1) 30-Jan-16 1-Feb-16 10.00am CLOSED CANCEL 1 1
694 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00693 shinryo 29-Jan-16 ZN1 MNE Installation Installation of ACSU at Ecumenical 4 (EPR4) 30-Jan-16 1-Feb-16 10.00am CLOSED 30-Jan-16 0 ACCEPTED 1 1
695 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00694 I-GEN 2-Feb-16 ZN1 MNE testing Hose reel pressure test at Toilet and changing building 4-Feb-16 6-Feb-16 3.00pm CLOSED CANCEL 1 1
696 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00695 AME Eng sdn bhd 16-Feb-16 ZN1 STR bolt and nut Bolt tightening inspection at Open air cinema 4 17-Feb-16 19-Feb-16 10.30am CLOSED 20-May-16 93 ACCEPTED 1 1
700 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00699 Dorce 3-Feb-16 ZN1 ELE electrical works Building functionality test at Supermarket 4-Feb-16 6-Feb-16 2.00pm CLOSED 3-Mar-16 28 ACCEPTED 1 1
702 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00701 seribu bio 18-Feb-16 ZN1 STR installation Installation of 8m lightpoles (4nos) at FB7 18-Feb-16 20-Feb-16 9.00am CLOSED 2-Mar-16 13 ACCEPTED 1 1
705 RAPID-P20A1-UEMB-ZN1-LNDS-RFIN-00704 Ming Landscape 18-Feb-16 ZN1 LNDS material Site preparation and planting works at area prayer building 19-Feb-16 21-Feb-16 3.00pm CLOSED 26-Feb-16 7 ACCEPTED 1 1
706 RAPID-P20A1-UEMB-ZN1-LNDS-RFIN-00705 Ming Landscape 18-Feb-16 ZN1 LNDS material Supply trees for area prayer building -stock pile 19-Feb-16 21-Feb-16 9.00am CLOSED 26-Feb-16 7 ACCEPTED 1 1
707 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00706 yuzuki 23-Dec-15 ZN1 CIV fencing Install chainlink,barbed wire and straining wire at location RP3 24-Dec-15 26-Dec-15 11.00am CLOSED 24-Mar-16 91 ACCEPTED 1 1
708 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00707 yuzuki 23-Dec-15 ZN1 CIV fencing Install chainlink,barbed wire and straining wire at location RP4 24-Dec-15 26-Dec-15 11.00am CLOSED 24-Mar-16 91 ACCEPTED 1 1
709 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00708 yuzuki 23-Dec-15 ZN1 CIV fencing Install chainlink,barbed wire and straining wire at location RP5 24-Dec-15 26-Dec-15 11.00am CLOSED 24-Mar-16 91 ACCEPTED 1 1
710 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00709 Gapura 22-Feb-16 ZN1 STR installation Final inspection at Cinema 5 (structure) 23-Feb-16 25-Feb-16 10.00am CLOSED CANCEL 1 1
711 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00710 Gapura 22-Feb-16 ZN1 STR installation Final inspection at Cinema 5 (roofing) 23-Feb-16 25-Feb-16 11.00am CLOSED CANCEL 1 1
712 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00711 Gapura 22-Feb-16 ZN1 STR installation Final inspection at Cinema 5 (seating) 23-Feb-16 25-Feb-16 11.00am CLOSED CANCEL 1 1
713 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00712 Dorce 22-Feb-16 ZN1 ARC Painting Building painting work inspection at multipurpose 1 (EPR1) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
715 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00714 Dorce 22-Feb-16 ZN1 ARC ceramic tiles Building ceramic tileswork inspection at multipurpose 1 (EPR1) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
717 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00716 Dorce 22-Feb-16 ZN1 ARC Screeding works BuildingScreeding works inspection at multipurpose 1 (EPR1) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
718 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00717 Dorce 22-Feb-16 ZN1 ARC Painting Building painting work inspection at multipurpose 4 (EPR4) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
720 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00719 Dorce 22-Feb-16 ZN1 ARC ceramic tiles Building ceramic tileswork inspection at multipurpose 4 (EPR4) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
723 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00722 Dorce 22-Feb-16 ZN1 ARC Painting Building painting work inspection at multipurpose 5 (EPR5) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
725 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00724 Dorce 22-Feb-16 ZN1 ARC ceramic tiles Building ceramic tileswork inspection at multipurpose 5 (EPR5) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
727 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00726 Dorce 22-Feb-16 ZN1 ARC Screeding works BuildingScreeding works inspection at multipurpose 5 (EPR5) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
728 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00727 Dorce 22-Feb-16 ZN1 ARC Painting Building painting work inspection at multipurpose 6 (EPR6) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
730 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00729 Dorce 22-Feb-16 ZN1 ARC ceramic tiles Building ceramic tileswork inspection at multipurpose 6 (EPR6) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
732 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00731 Dorce 22-Feb-16 ZN1 ARC Screeding works BuildingScreeding works inspection at multipurpose 6 (EPR6) 24-Feb-16 26-Feb-16 3.00pm CLOSED 24-Feb-16 0 ACCEPTED 1 1
733 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00732 Dorce 22-Feb-16 ZN1 ARC ceramic tiles Building ceramic tileswork inspection at Supermarket 24-Feb-16 26-Feb-16 9.00am CLOSED 12-Apr-16 48 ACCEPTED 1 1
734 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00733 Dorce 11-Apr-16 ZN1 ARC PVC Covering Building PVC Coveringwork inspection at supermarket 13-Apr-16 15-Apr-16 10.00am CLOSED 13-Apr-16 0 ACCEPTED 1 1
735 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00734 Dorce 4-Jan-16 ZN1 ELE Electrical works Building cable pulling inspection at supermarket 5-Jan-16 7-Jan-16 9.00am CLOSED 24-Mar-16 79 ACCEPTED 1 1
737 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00736 Dorce 11-Feb-16 ZN1 ELE Electrical works Building cable pulling inspection at Prayer room 12-Feb-16 14-Feb-16 9.00am CLOSED 26-Feb-16 14 ACCEPTED CANCEL 1 1
Site Preparation
Hasbullah
742 RAPID-P20A1-UEMB-ZN1-LNDS-RFIN-00741 (landscape) 1-Mar-16 ZN1 LNDS landscape Excavation work to installl interlocking paver 2-Mar-16 4-Mar-16 10.00am CLOSED 11-Jun-16 101 ACCEPTED 1 1
to lay crusher run 75mm thk and sand bedding 30mm thk
743 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00742 I-GEN 25-Feb-16 ZN1 MNE testing Testing of fire alarm at Mosque building 29-Feb-16 2-Mar-16 4.30pm CLOSED 29-Feb-16 0 ACCEPTED 1 1
744 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00743 seribu bio 4-Mar-16 ZN1 CIV Material Turfing at Football 7 (after heeling process) (FB7) 4-Mar-16 6-Mar-16 3.00pm CLOSED CANCEL 1 1
Turnstile Slab Installation of BRC and formwork for walkway slab and
745 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00744 UEMB Aswad 4-Mar-16 ZN1 CIV 4-Mar-16 6-Mar-16 2.00pm CLOSED CANCEL 1 1
Foundation concreting work (near MP4 & MP6)
749 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00748 AEIE 4-Mar-16 ZN1 ELE testing Earthing test for DB prayer building 5-Mar-16 7-Mar-16 2.00pm CLOSED 18-Mar-16 13 ACCEPTED 1 1
750 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00749 AEIE 4-Mar-16 ZN1 ELE Installation Earthing DB installation at prayer building 5-Mar-16 7-Mar-16 2.00pm CLOSED 19-Mar-16 14 ACCEPTED 1 1
752 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00751 AEIE 4-Mar-16 ZN1 ELE Installation Internal cable installation from main DB to Aircon panel 2 5-Mar-16 7-Mar-16 4.00pm CLOSED 15-Mar-16 10 ACCEPTED 1 1
no need to submit
760 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00759 Gapura 9-Mar-16 ZN1 STR site visit Punchlist for Cinema 5 9-Mar-16 11-Mar-16 2.00pm CLOSED 11-Apr-16 33 CANCEL RFIN for punchlist 1 1
761 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00760 UEMB AZRI 9-Mar-16 ZN1 ARC Furniture Furniture supply for Multipurpose 1 (AMR1) 11-Mar-16 13-Mar-16 9.00am CLOSED 11-Mar-16 0 ACCEPTED 1 1
762 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00761 UEMB AZRI 9-Mar-16 ZN1 ARC Furniture Furniture supply for Multipurpose 4(AMR4) 11-Mar-16 13-Mar-16 9.00am CLOSED 11-Mar-16 0 ACCEPTED 1 1
763 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00762 UEMB AZRI 9-Mar-16 ZN1 ARC Furniture Furniture supply for Multipurpose 5(AMR5) 11-Mar-16 13-Mar-16 9.00am CLOSED 11-Mar-16 0 ACCEPTED 1 1
764 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00763 UEMB AZRI 9-Mar-16 ZN1 ARC Furniture Furniture supply for Multipurpose 6(AMR6) 11-Mar-16 13-Mar-16 9.00am CLOSED 11-Mar-16 0 ACCEPTED 1 1
765 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00764 AME Eng sdn bhd 25-Feb-16 ZN1 STR Material Material receiving inspection at Open air cinema 1 26-Feb-16 28-Feb-16 10.00am CLOSED 20-May-16 84 ACCEPTED 1 1
768 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00767 AME Eng sdn bhd 10-Mar-16 ZN1 STR testing Pullout test at HD bolts at Multipurpose court (MC3,4,5,6) 11-Mar-16 13-Mar-16 9.00am CLOSED 20-May-16 70 ACCEPTED 1 1
769 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00768 AME Eng sdn bhd 10-Mar-16 ZN1 STR Material Verticality inspection at Open cinema 1 11-Mar-16 13-Mar-16 9.00am CLOSED 28-Jul-16 139 CANCEL 1 1
777 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00776 Dorce 2-Mar-16 ZN1 ELE electrical works Building lightning protection inspection at Supermarket 3-Mar-16 5-Mar-16 10.00am CLOSED 24-Mar-16 21 ACCEPTED 1 1
778 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00777 iszda 2-Mar-16 ZN1 ELE electrical works Inspection Installation ICT at Mosque(prayer room) 4-Mar-16 6-Mar-16 10.00am CLOSED 24-Mar-16 20 ACCEPTED 1 1
779 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00778 iszda 2-Mar-16 ZN1 ELE electrical works Inspection Installation PA system at Mosque (prayer room) 4-Mar-16 6-Mar-16 10.00am CLOSED 24-Mar-16 20 ACCEPTED 1 1
780 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00779 iszda 2-Mar-16 ZN1 ELE electrical works Inspectin of material (ICT equipment) at Mosque (prayer room) 4-Mar-16 6-Mar-16 10.00am CLOSED 24-Mar-16 20 ACCEPTED 1 1
781 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00780 Dorce 6-Mar-16 ZN1 ELE electrical works Building polarity test at Prayer room 7-Mar-16 9-Mar-16 2.30pm CLOSED 24-Mar-16 17 ACCEPTED 1 1
785 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00784 AME Eng sdn bhd 14-Jan-16 ZN1 STR bolt and nut Bolt tightening inspection on Open air cinema 1 15-Jan-16 17-Jan-16 10:30am CLOSED 20-May-16 126 ACCEPTED 1 1
786 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00785 AME Eng sdn bhd 14-Jan-16 ZN1 STR final visual Final visual inspection on painting at Open air cinema1 15-Jan-16 17-Jan-16 10:30am CLOSED 20-May-16 126 ACCEPTED 1 1
787 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00786 AME Eng sdn bhd 14-Jan-16 ZN1 STR final visual Final complete inspection at Open air cinema 1 15-Jan-16 17-Jan-16 10:30am CLOSED CANCEL 1 1
789 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00788 iszda 2-Jan-16 ZN1 ELE Testing Inspection of cable analyzer at Supermarket 5-Jan-16 7-Jan-16 3.00pm CLOSED 24-Mar-16 79 ACCEPTED 1 1
790 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00789 iszda 20-Jan-16 ZN1 ELE installation Installation of ICT at Supermarket 25-Jan-16 27-Jan-16 3.00pm CLOSED 24-Mar-16 59 ACCEPTED 1 1
792 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00791 Dorce 21-Feb-16 ZN1 ELE electrical works Building polarity test at Supermarket 22-Feb-16 24-Feb-16 10.00am CLOSED 24-Mar-16 31 ACCEPTED 1 1
793 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00792 shinryo 2-Mar-16 ZN1 MNE installation installation wall fan at Mosque (prayer room) 9-Mar-16 11-Mar-16 2.00pm CLOSED CANCEL 1 1
794 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00793 shinryo 2-Mar-16 ZN1 MNE installation installation ACSU at Mosque (prayer room) 9-Mar-16 11-Mar-16 2.00pm CLOSED CANCEL 1 1
795 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00794 shinryo 2-Mar-16 ZN1 MNE installation installation water heater at Mosque (prayer room) 9-Mar-16 11-Mar-16 2.00pm CLOSED 22-Mar-16 13 ACCEPTED 1 1
796 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00795 shinryo 2-Mar-16 ZN1 MNE installation installation exhaust fan at Mosque (prayer room) 9-Mar-16 11-Mar-16 2.00pm CLOSED 22-Mar-16 13 ACCEPTED 1 1
797 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00796 iszda 3-Mar-16 ZN1 ELE installation Installation of ICT at Changing room 4-Mar-16 6-Mar-16 10.00am CLOSED 25-Mar-16 21 ACCEPTED 1 1
798 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00797 iszda 5-Mar-16 ZN1 ELE Testing Inspection of cable analyzer at Mosque (prayer room) 5-Mar-16 7-Mar-16 10.00am CLOSED 25-Mar-16 20 ACCEPTED 1 1
799 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00798 shinryo 14-Mar-16 ZN1 MNE installation installation ACSU at Supermarket 15-Mar-16 17-Mar-16 10.00am CLOSED CANCEL 1 1
800 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00799 shinryo 14-Mar-16 ZN1 MNE installation installation exhaust fan at Supermarket 15-Mar-16 17-Mar-16 10.00am CLOSED 22-Mar-16 7 ACCEPTED 1 1
801 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00800 shinryo 15-Mar-16 ZN1 MNE Testing Testing of exhaust fan at Supermarket 16-Mar-16 18-Mar-16 2.00pm CLOSED CANCEL 1 1
802 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00801 Dorce 4-Mar-16 ZN1 ELE electrical works Building functionality test at Prayer room (Mosque) 4-Mar-16 6-Mar-16 10.00am CLOSED 25-Mar-16 21 ACCEPTED 1 1
803 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00802 shinryo 4-Mar-16 ZN1 MNE testing Testing of exhaust fan at Mosque (prayer room) 10-Mar-16 12-Mar-16 2.00pm CLOSED CANCEL 1 1
804 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00803 shinryo 4-Mar-16 ZN1 MNE testing Testing of wall fan at Mosque (prayer room) 10-Mar-16 12-Mar-16 2.00pm CLOSED 22-Mar-16 12 ACCEPTED 1 1
805 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00804 shinryo 9-Mar-16 ZN1 MNE testing Testing of water heater at Mosque (prayer room) 10-Mar-16 12-Mar-16 2.00pm CLOSED 22-Mar-16 12 ACCEPTED 1 1
806 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00805 shinryo 4-Mar-16 ZN1 MNE testing Testing of ACSU at Mosque (prayer room) 10-Mar-16 12-Mar-16 2.00pm CLOSED 21-Mar-16 11 ACCEPTED 1 1
807 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00806 shinryo 16-Mar-16 ZN1 MNE testing Testing of ACSU at Supermarket 17-Mar-16 19-Mar-16 3.30pm CLOSED 21-Mar-16 4 ACCEPTED 1 1
809 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00808 AME Eng sdn bhd 22-Mar-16 ZN1 STR bolt and nut Bolt tightnening inspection at site Multipurpose court 4,5,6 24-Mar-16 26-Mar-16 10.30am CLOSED 20-May-16 57 ACCEPTED 1 1
810 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00809 AME Eng sdn bhd 22-Mar-16 ZN1 STR Painting Final visual inspection on painting at Multipurpose court 4,5,6 24-Mar-16 26-Mar-16 10.30am CLOSED 20-May-16 57 ACCEPTED 1 1
811 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00810 I-GEN 25-Feb-16 ZN1 MNE Painting Testing of fire alarm system at Supermarket building 29-Feb-16 2-Mar-16 3.30pm CLOSED 29-Feb-16 0 ACCEPTED 1 1
812 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00811 I-GEN 23-Feb-16 ZN1 MNE Painting Installation of fire fighting equipment at Supermarket building 25-Feb-16 27-Feb-16 9.00am CLOSED 1-Mar-16 5 ACCEPTED 1 1
813 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00812 iszda 25-Mar-16 ZN1 ELE Testing Inspection of testing ICT at Changing room 9-Mar-16 11-Mar-16 10.00am OPEN PENDING 1
814 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00813 seribu bio 18-Mar-16 ZN1 ELE Testing Insulation test (megger test) at Cricket 3 (CR-3) 19-Mar-16 21-Mar-16 3.00pm CLOSED 30-Mar-16 11 ACCEPTED 1 1
815 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00814 seribu bio 18-Mar-16 ZN1 ELE Testing Insulation test (megger test) at Football 3 (fb-6) 19-Mar-16 21-Mar-16 3.00pm CLOSED 30-Mar-16 11 ACCEPTED 1 1
816 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00815 seribu bio 25-Mar-16 ZN1 ELE Testing earthing test at Football (FB-6) 26-Mar-16 28-Mar-16 4.00pm CLOSED 30-Mar-16 4 ACCEPTED 1 1
817 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00816 seribu bio 28-Mar-16 ZN1 ELE Testing earthing test at Football (CR-3) 30-Mar-16 1-Apr-16 10.00am CLOSED 5-Apr-16 6 ACCEPTED 1 1
818 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00817 seribu bio 29-Mar-16 ZN1 ELE installation Installation of control panel at Cricket 3(CR-3) 30-Mar-16 1-Apr-16 10.00am CLOSED 11-Apr-16 12 ACCEPTED 1 1
819 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00818 seribu bio 29-Mar-16 ZN1 ELE installation Installation of control panel at Football 6(FB-6) 30-Mar-16 1-Apr-16 10.00am CLOSED 11-Apr-16 12 ACCEPTED 1 1
820 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00819 seribu bio 29-Mar-16 ZN1 ELE installation Installation of control panel at Football 7(FB-7) 30-Mar-16 1-Apr-16 10.00am CLOSED 11-Apr-16 12 ACCEPTED 1 1
822 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00821 seribu bio 29-Mar-16 ZN1 MNE installation Sprinkler installation at Football 6 (FB-6) 30-Mar-16 1-Apr-16 10.00am CLOSED 20-Apr-16 21 ACCEPTED 1 1
823 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00822 seribu bio 29-Mar-16 ZN1 MNE installation Sprinkler installation at Cricket 3 (CR-3) 30-Mar-16 1-Apr-16 10.00am CLOSED 20-Apr-16 21 ACCEPTED 1 1
824 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00823 seribu bio 29-Mar-16 ZN1 CIV turfing Turfing works at Cricket 3 (CR-3) 30-Mar-16 1-Apr-16 10.00am CLOSED 20-Apr-16 21 ACCEPTED 1 1
826 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00825 HIKMAH Oil & GAS 30-Mar-16 ZN1 ELE inspection Final inspection for Open Air Cinema building unit 3 31-Mar-16 2-Apr-16 11.00am CLOSED 3-Apr-16 3 CANCEL 1 1
827 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00826 AEIE 31-Mar-16 ZN1 ELE Installation FPC8 Installation and termination 1-Apr-16 3-Apr-16 4.00pm CLOSED 2-Apr-16 1 ACCEPTED 1 1
828 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00827 Khidmat Hijau 31-Mar-16 ZN1 PIP Cold water plumbing Inspection for cold water plumbing at Prayer building 14-Feb-16 16-Feb-16 10.00am CLOSED 20-May-16 96 ACCEPTED 1 1
829 RAPID-P20A1-UEMB-ZN1-LND-RFIN-00828 Ming Landscape 5-Apr-16 ZN1 LNDS material Supply trees for area prayer building -stock pile 1-Mar-16 3-Mar-16 3.00pm CLOSED 17-Apr-16 47 ACCEPTED 1 1
830 RAPID-P20A1-UEMB-ZN1-LND-RFIN-00829 Hasbullah landscape 5-Apr-16 ZN1 LNDS site measurement Site preparation and planting works at area prayer building 7-Mar-16 9-Mar-16 3.00pm CLOSED 16-Apr-16 40 ACCEPTED 1 1
833 RAPID-P20A1-UEMB-ZN1-LND-RFIN-00832 Hasbullah landscape 5-Apr-16 ZN1 LNDS site measurement Turfing works forPrayer building -courtyard area 24-Mar-16 26-Mar-16 3.00pm CLOSED 8-Apr-16 15 ACCEPTED 1 1
no need to submit
841 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00840 HIKMAH Oil & GAS 5-Apr-16 ZN1 STR punchlist Inspection punchlist for Open Air Cinema building unit 3 6-Apr-16 8-Apr-16 1.30pm CLOSED 16-Apr-16 10 CANCEL 1 1
RFIN for punchlist
842 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00841 UEMB AZRI 6-Apr-16 ZN1 ARC Furniture Furniture supply for supermarket 8-Apr-16 10-Apr-16 3.00pm CLOSED 13-Apr-16 5 ACCEPTED 1 1
843 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00842 UEMB AZRI 6-Apr-16 ZN1 ARC Furniture Furniture supply for Prayer building (mosque) 8-Apr-16 10-Apr-16 3.00pm CLOSED 20-Jul-16 103 ACCEPTED 1 1
853 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00852 seribu bio 9-Apr-16 ZN1 CIV Irrigation works Irrifgation works for Cricket 3 (CR-3) -sprinkler and pipes 11-Apr-16 13-Apr-16 10.00am CLOSED 28-May-16 47 ACCEPTED 1 1
854 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00853 seribu bio 9-Apr-16 ZN1 CIV turfing Turfing works at Cricket 3 (CR-3) 11-Apr-16 13-Apr-16 10.00am CLOSED 27-Apr-16 16 ACCEPTED 1 1
855 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00854 seribu bio 9-Apr-16 ZN1 ELE installation 30m light pole installation -control panel 11-Apr-16 13-Apr-16 10.00am CLOSED 19-Apr-16 8 ACCEPTED 1 1
856 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00855 seribu bio 9-Apr-16 ZN1 MNE Irrigation works Irrigation works for Football 6 (FB-6) -sprinkler installation 11-Apr-16 13-Apr-16 10.00am CLOSED 26-May-16 45 ACCEPTED 1 1
857 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00856 seribu bio 9-Apr-16 ZN1 CIV turfing Turfing works atFootball 6 (FB-6) 11-Apr-16 13-Apr-16 10.00am CLOSED 27-Apr-16 15-Jan-00 ACCEPTED 1 1
858 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00857 Dorce 11-Apr-16 ZN1 ARC Painting Building painting works at Prayer room (mosque) 13-Apr-16 15-Apr-16 10.00am CLOSED 13-Apr-16 0 ACCEPTED 1 1
859 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00858 Dorce 11-Apr-16 ZN1 ARC ceramic tiles Building ceramic works at Prayer room (mosque) 13-Apr-16 15-Apr-16 10.00am CLOSED 13-Apr-16 0 ACCEPTED 1 1
860 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00859 Dorce 11-Apr-16 ZN1 ARC carpet covering works Buidling carpet covering inspection at Prayer room (mosque) 13-Apr-16 15-Apr-16 10.00am CLOSED 13-Apr-16 0 ACCEPTED 1 1
861 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00860 Dorce 11-Apr-16 ZN1 ARC Painting Buidling painting works at Toilet and changing room 13-Apr-16 15-Apr-16 10.00am CLOSED 13-Apr-16 0 ACCEPTED 1 1
862 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00861 Dorce 11-Apr-16 ZN1 ARC ceramic tiles Buidling ceramic works at Toilet and changing room 13-Apr-16 15-Apr-16 10.00am CLOSED 13-Apr-16 0 ACCEPTED 1 1
863 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00862 Dorce 11-Apr-16 ZN1 ARC PVC Covering Buidling painting works at Supermarket 13-Apr-16 15-Apr-16 10.00am CLOSED 13-Apr-16 0 ACCEPTED 1 1
864 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00863 seribu bio 12-Apr-16 ZN1 ELE Material Inspection for material at Multipurpose court 12-Apr-16 14-Apr-16 3.00pm CLOSED 19-Apr-16 7 ACCEPTED 1 1
865 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00864 seribu bio 12-Apr-16 ZN1 ELE installation Installation of condui at Mutipurpose court -common facilities 12-Apr-16 14-Apr-16 3.00pm CLOSED 19-Apr-16 7 ACCEPTED 1 1
879 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00878 AEIE 19-Apr-16 ZN1 ELE installation FP-HM8 installation and termination (road lighting) 21-Apr-16 23-Apr-16 9.30am CLOSED 29-Apr-16 8 ACCEPTED 1 1
880 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00879 AEIE 19-Apr-16 ZN1 ELE installation FP-HM5 installation and termination (road lighting) 21-Apr-16 23-Apr-16 10.00am CLOSED 29-Apr-16 8 ACCEPTED 1 1
881 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00880 AEIE 20-Apr-16 ZN1 ELE installation FP-CL5 installation and termination 21-Apr-16 23-Apr-16 2.30pm CLOSED 29-Apr-16 8 ACCEPTED 1 1
882 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00881 AEIE 20-Apr-16 ZN1 ELE installation FP-CL4 installation and termination 21-Apr-16 23-Apr-16 2.45pm CLOSED 29-Apr-16 8 ACCEPTED 1 1
883 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00882 AEIE 20-Apr-16 ZN1 ELE installation FP-CL3A installation and termination 21-Apr-16 23-Apr-16 3.30pm CLOSED 29-Apr-16 8 ACCEPTED 1 1
884 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00883 AEIE 20-Apr-16 ZN1 ELE installation FP-CL3 installation and termination 21-Apr-16 23-Apr-16 2.45pm CLOSED 29-Apr-16 8 ACCEPTED 1 1
885 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00884 Khidmat Hijau 21-Apr-16 ZN1 MNE installation Flowtest for sanitary plumbing at Cinema 2 21-Apr-16 23-Apr-16 10.00pm CLOSED 9-Jun-16 49 ACCEPTED 1 1
886 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00885 AEIE 21-Apr-16 ZN1 ELE installation Earthing DB installation for Cinema 2 22-Apr-16 24-Apr-16 9.00am CLOSED 11-May-16 19 ACCEPTED 1 1
887 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00886 AEIE 21-Apr-16 ZN1 ELE earthing test inpection for earthing resistance test for FP-C5 22-Apr-16 24-Apr-16 2.00pm CLOSED 22-Apr-16 0 ACCEPTED 1 1
891 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00890 AEIE 24-Apr-16 ZN1 ELE installation FP-HM1 installation and terminations (area lighting) 25-Apr-16 27-Apr-16 8.00am CLOSED 11-May-16 16 ACCEPTED 1 1
892 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00891 AEIE 24-Apr-16 ZN1 ELE installation FP-HM2 installation and terminations (area lighting) 25-Apr-16 27-Apr-16 8.15am CLOSED 11-May-16 16 ACCEPTED 1 1
893 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00892 AEIE 24-Apr-16 ZN1 ELE installation FP-HM3 installation and terminations (area lighting) 25-Apr-16 27-Apr-16 9.00am CLOSED 11-May-16 16 ACCEPTED 1 1
894 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00893 AEIE 24-Apr-16 ZN1 ELE installation FP-HM5 installation and terminations (area lighting) 25-Apr-16 27-Apr-16 9.15am CLOSED 11-May-16 16 ACCEPTED 1 1
895 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00894 AEIE 24-Apr-16 ZN1 ELE installation FP-HM8 installation and terminations (area lighting) 25-Apr-16 27-Apr-16 1.00pm CLOSED 25-Apr-16 0 ACCEPTED 1 1
896 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00895 AME Eng sdn bhd 26-Apr-16 ZN1 STR installation Verticality inspection at multipurpose court 3,4,5,6 6-Apr-16 8-Apr-16 10.30am CLOSED 20-May-16 44 ACCEPTED 1 1
903 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00902 seribu bio 27-Apr-16 ZN1 ELE cable laying Cable laying for multipurpose cable routing 28-Apr-16 30-Apr-16 10.00am CLOSED CANCEL 1 1
904 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00903 seribu bio 27-Apr-16 ZN1 ELE megger test Megger test at multipurpose 3,4,5,6 12-Apr-16 14-Apr-16 10.00am CLOSED 27-Apr-16 15 ACCEPTED 1 1
905 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00904 seribu bio 27-Apr-16 ZN1 ELE megger test Earthing test for Multipurpose 3,4,5,6 25-Apr-16 27-Apr-16 10.00am CLOSED 27-Apr-16 2 ACCEPTED 1 1
906 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00905 Khidmat Hijau 27-Apr-16 ZN1 PIP cold water plumbing Inspection for cold water plumbing at Cinema 1 28-Apr-16 30-Apr-16 10.00am CLOSED 28-Apr-16 0 ACCEPTED 1 1
907 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00906 Khidmat Hijau 27-Apr-16 ZN1 PIP cold water plumbing Inspection for cold water plumbing at Cinema 2 28-Apr-16 30-Apr-16 10.00am CLOSED 28-Apr-16 0 ACCEPTED 1 1
908 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00907 Khidmat Hijau 27-Apr-16 ZN1 PIP cold water plumbing Inspection for cold water plumbing at Cinema 3 28-Apr-16 30-Apr-16 10.00am CLOSED 28-Apr-16 0 ACCEPTED 1 1
909 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00908 Khidmat Hijau 27-Apr-16 ZN1 PIP cold water plumbing Inspection for cold water plumbing at Cinema 4 28-Apr-16 30-Apr-16 10.00am CLOSED 28-Apr-16 0 ACCEPTED 1 1
910 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00909 Khidmat Hijau 27-Apr-16 ZN1 PIP cold water plumbing Inspection for cold water plumbing at Cinema 5 28-Apr-16 30-Apr-16 10.00am CLOSED 28-Apr-16 0 ACCEPTED 1 1
Inspection of pressure test & leak test for internal cold water
912 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00911 Khidmat Hijau 4-May-16 ZN1 PIP sewerage plumbing for Cinema 2 (toilet area) 21-Apr-16 23-Apr-16 10.30am CLOSED 13-Jun-16 53 ACCEPTED 1 1
Inspection of pressure test & leak test for internal cold water
913 RAPID-P20A1-UEMB-ZN1-PIP-RFIN-00912 Khidmat Hijau 4-May-16 ZN1 PIP sewerage plumbing for Cinema 4 (toilet area) 27-Apr-16 29-Apr-16 10.30am CLOSED 27-Apr-16 0 ACCEPTED 1 1
914 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-00913 Taufiq 25-May-15 ZN1 CIV post concreting Inspection for rebar and formwork for precast wall PR 4 pump 25-May-15 27-May-15 10.00am CLOSED 29-Jun-15 35 ACCEPTED 1 1
915 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00914 integrated audio visual 23-Apr-16 ZN1 ELE installation Trunking and cabling installation works at Cinema 1 25-Apr-16 27-Apr-16 10.00am CLOSED 9-Jun-16 45 ACCEPTED 1 1
916 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00915 integrated audio visual 23-Apr-16 ZN1 ELE installation Trunking and cabling installation works at Cinema 2 25-Apr-16 27-Apr-16 10.00am CLOSED CANCEL 1 1
917 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00916 integrated audio visual 23-Apr-16 ZN1 ELE installation Trunking and cabling installation works at Cinema 3 25-Apr-16 27-Apr-16 10.00am CLOSED 20-May-16 25 ACCEPTED 1 1
918 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00917 integrated audio visual 23-Apr-16 ZN1 ELE installation Trunking and cabling installation works at Cinema 4 25-Apr-16 27-Apr-16 10.00am CLOSED 9-Jun-16 45 ACCEPTED 1 1
919 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00918 integrated audio visual 23-Apr-16 ZN1 ELE installation Trunking and cabling installation works at Cinema 5 25-Apr-16 27-Apr-16 10.00am CLOSED 9-Jun-16 45 ACCEPTED 1 1
920 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00919 I-GEN 21-Apr-16 ZN1 MNE testing Fire alarm test at Cinema 2 5-May-16 7-May-16 10.00am CLOSED 24-May-16 19 ACCEPTED 1 1
SUPERCEDED WITH
921 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00920 I-GEN 21-Apr-16 ZN1 MNE testing Installation of fire protection/fighting system at cinema 2 6-May-16 8-May-16 3.00pm CLOSED 25-May-16 19 REJECTED RFIN 01133 1 1
922 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00921 iszda 2-May-16 ZN1 ELE installation Lighning protection installation work at Cinema 2 2-May-16 4-May-16 10.00am CLOSED 19-May-16 17 ACCEPTED 1 1
923 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00922 iszda 2-May-16 ZN1 ELE installation Light fitting and switches installation work at Cinema 2 3-May-16 5-May-16 2.30pm CLOSED 9-Jun-16 37 ACCEPTED 1 1
924 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00923 iszda 2-May-16 ZN1 ELE installation earthing installation work at Cinema 2 3-May-16 5-May-16 2.30pm CLOSED 20-May-16 17 ACCEPTED 1 1
925 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00924 iszda 2-May-16 ZN1 ELE cable pulling Cable pulling work on conduit and trunking at Cinema 2 3-May-16 5-May-16 2.30pm CLOSED 27-May-16 24 ACCEPTED 1 1
927 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00926 iszda 2-May-16 ZN1 ELE testing earth resistance test at Cinema 2 5-May-16 7-May-16 4.00pm CLOSED 9-Jun-16 35 ACCEPTED 1 1
928 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00927 iszda 2-May-16 ZN1 ELE installation Distribution board installation work at Cinema 2 5-May-16 7-May-16 9.00am CLOSED 6/10/2016 36 ACCEPTED 1 1
929 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00928 iszda 2-May-16 ZN1 ELE testing Insulation test at Cinema 2 5-May-16 7-May-16 9.30am CLOSED 5-May-16 0 ACCEPTED 1 1
930 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00929 iszda 2-May-16 ZN1 ELE testing Electrical functional test for Cinema 2 5-May-16 7-May-16 3.00pm CLOSED 19-May-16 14 ACCEPTED 1 1
931 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00930 iszda 2-May-16 ZN1 ELE installation Inspection of installation cable and conduit at Cinema 2 6-May-16 8-May-16 4.30pm CLOSED 19-May-16 13 ACCEPTED 1 1
932 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00931 iszda 2-May-16 ZN1 ELE installation Inspection of installation cable and conduit at Cinema 5 6-May-16 8-May-16 4.30pm CLOSED 19-May-16 13 ACCEPTED 1 1
933 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00932 iszda 2-May-16 ZN1 ELE installation Inspection of installation cable and conduit at Cinema 4 6-May-16 8-May-16 4.30pm CLOSED 20-May-16 14 ACCEPTED 1 1
936 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00935 I-GEN 21-Apr-16 ZN1 MNE testing Hose reel pressure test at Cinema 4 5-May-16 7-May-16 3.30pm CLOSED 19-May-16 14 ACCEPTED 1 1
938 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00937 iszda 6-May-16 ZN1 ELE fluke test Inspection cable analyzer for ICT at Cinema 2 10-May-16 12-May-16 2.30pm CLOSED 19-May-16 9 ACCEPTED 1 1
939 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00938 iszda 6-May-16 ZN1 ELE fluke test Inspection cable analyzer for ICT at Cinema 4 10-May-16 12-May-16 2.30pm CLOSED 20-May-16 10 ACCEPTED 1 1
940 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00939 iszda 6-May-16 ZN1 ELE fluke test Inspection cable analyzer for ICT at Cinema 5 10-May-16 12-May-16 2.30pm CLOSED 20-May-16 10 ACCEPTED 1 1
941 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00940 I-GEN 25-Apr-16 ZN1 MNE testing Fire alarm test at Cinema 4 12-May-16 14-May-16 10.00am CLOSED 19-May-16 7 ACCEPTED 1 1
942 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00941 shinryo 5-May-16 ZN1 MNE Installation AC unit installation at Cinema 2 6-May-16 8-May-16 10.00am CLOSED 23-May-16 17 ACCEPTED 1 1
943 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-00942 shinryo 6-May-16 ZN1 MNE testing AC unit testing at Cinema 2 13-May-16 15-May-16 2.30pm CLOSED 27-May-16 14 ACCEPTED 1 1
955 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00954 Iszda 17-May-16 ZN1 ELE installation Distribution board installation work at Cinema 4 10-May-16 12-May-16 10.00am CLOSED 20-May-16 10 ACCEPTED 1 1
956 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00955 Iszda 17-May-16 ZN1 ELE installation earthing installation work at cinema 4 11-May-16 13-May-16 10.00am CLOSED 20-May-16 9 ACCEPTED 1 1
957 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00956 Iszda 17-May-16 ZN1 ELE installation Lightning installation work at cinema 4 11-May-16 13-May-16 10.00am CLOSED 20-May-16 9 ACCEPTED 1 1
958 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00957 Iszda 17-May-16 ZN1 ELE installation Insulation test at cinema 4 12-May-16 14-May-16 10.00am CLOSED 20-May-16 8 ACCEPTED 1 1
959 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00958 Iszda 17-May-16 ZN1 ELE installation earthing test at cinema 4 13-May-16 15-May-16 10.00am CLOSED 20-May-16 7 ACCEPTED 1 1
960 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00959 Iszda 17-May-16 ZN1 ELE installation Insulation test at cinema 5 16-May-16 18-May-16 2.30pm CLOSED 15-Jul-16 60 ACCEPTED 1 1
961 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00960 Iszda 17-May-16 ZN1 ELE installation Electrical installation works at Prayer building 17-May-16 19-May-16 10.00am CLOSED 21-Jun-16 35 ACCEPTED 1 1
962 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00961 Dorce 20-Jan-16 ZN1 ELE installation Building electrical installation inspection at Multipurpose 1 21-Jan-16 23-Jan-16 10.00am CLOSED 26-May-16 126 ACCEPTED 1 1
963 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00962 Dorce 20-Jan-16 ZN1 ELE installation Building electrical installation inspection at Multipurpose 5 21-Jan-16 23-Jan-16 10.00am CLOSED 26-May-16 126 ACCEPTED 1 1
964 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00963 Dorce 20-Jan-16 ZN1 ELE installation Building electrical installation inspection at Multipurpose 6 21-Jan-16 23-Jan-16 10.00am CLOSED 26-May-16 126 ACCEPTED 1 1
965 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00964 Dorce 19-May-16 ZN1 ELE installation Building electrical installation inspection at Multipurpose 4 20-May-16 22-May-16 10.00am CLOSED 20-May-16 0 ACCEPTED 1 1
966 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00965 AEIE 24-May-16 ZN1 ELE installation Earthing DB installation at Cinema 1 25-May-16 27-May-16 11.45am CLOSED 30-Jun-16 36 ACCEPTED 1 1
967 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00966 AEIE 24-May-16 ZN1 ELE installation Earthing DB installation at Cinema 3 25-May-16 27-May-16 12.00pm CLOSED 30-Jun-16 36 ACCEPTED 1 1
968 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00967 AEIE 24-May-16 ZN1 ELE installation Earthing DB installation at Cinema 4 25-May-16 27-May-16 11.15am CLOSED 30-Jun-16 36 ACCEPTED 1 1
969 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00968 AEIE 24-May-16 ZN1 ELE installation Earthing DB installation at Cinema 5 25-May-16 27-May-16 11.00am CLOSED 28-Jun-16 34 ACCEPTED 1 1
970 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00969 AEIE 24-May-16 ZN1 ELE Testing Earthing Test DB at Cinema 1 25-May-16 27-May-16 2.00pm CLOSED 28-Jun-16 34 ACCEPTED 1 1
971 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00970 AEIE 24-May-16 ZN1 ELE Testing Earthing Test DB at Cinema 3 25-May-16 27-May-16 4.00pm CLOSED 28-Jun-16 34 ACCEPTED 1 1
972 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00971 AEIE 24-May-16 ZN1 ELE Testing Earthing Test DB at Cinema 4 26-May-16 28-May-16 12.15pm CLOSED 28-Jun-16 33 ACCEPTED 1 1
973 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00972 AEIE 24-May-16 ZN1 ELE Testing Earthing Test DB at Cinema 5 26-May-16 28-May-16 1.00pm CLOSED 9-Jun-16 14 ACCEPTED 1 1
989 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00988 m.sofian 24-May-15 ZN1 ELE installation Light fitting and switches installation work at Cinema 5 25-May-16 27-May-16 2.30pm CLOSED 30-Jun-16 36 ACCEPTED 1 1
990 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00989 FARHANA 25-May-16 ZN1 ELE testing Electrical functional test for Cinema 4 27-May-16 29-May-16 10.30am CLOSED 27-Jun-16 31 ACCEPTED 1 1
991 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00990 FARHANA 25-May-16 ZN1 ELE testing Electrical function test for cinema 5 27-May-16 29-May-16 11.00am CLOSED 28-Jun-16 32 ACCEPTED 1 1
992 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00991 iszda 17-May-16 ZN1 ELE installation Light fitting and switches installation work at Cinema 4 18-May-16 20-May-16 10.00am CLOSED 30-Jun-16 43 ACCEPTED 1 1
993 RAPID-P20A1-UEMB-ZN1-STR-RFIN-00992 UEMB ZAKI 8-Jun-16 ZN1 CIV Grouting Grouting between plate column and slab at column 9-Jun-16 11-Jun-16 10.00am CLOSED 20-Jun-16 11 ACCEPTED 1 1
994 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00993 Dorce 6-Jan-16 ZN1 ARC Screeding works Building screeding works inspection 10-Jun-16 12-Jun-16 10.00am CLOSED CANCEL 1 1
995 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-00994 Dorce 6-Jan-16 ZN1 ARC Waterproofing works Building Waterproofing membrane works 6-Jan-16 8-Jan-16 10.00am CLOSED CANCEL 1 1
997 RAPID-P20A1-UEMB-ZN1-LND-RFIN-00996 Ming Landscape 10-Jun-16 ZN1 LNDS material 11-Jun-16 13-Jun-16 10.00am CLOSED 20-Jul-16 39 ACCEPTED 1 1
supply tree and palm for common facilities - stock pile
999 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00998 integrated audio visual 26-May-16 ZN1 ELE testing Audio visual testing and commisioning at Cinema 4 31-May-16 2-Jun-16 7.30pm CLOSED 15-Jul-16 45 ACCEPTED 1 1
1000 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-00999 integrated audio visual 26-May-16 ZN1 ELE testing Audio visual testing and commisioning at Cinema 5 31-May-16 2-Jun-16 7.30pm CLOSED 07/15/2016 45 ACCEPTED 1 1
1001 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01000 integrated audio visual 1-Jun-16 ZN1 ELE testing Audio visual testing and commisioning at Cinema 1 1-Jun-16 3-Jun-16 7.30pm CLOSED 15-Jul-16 44 ACCEPTED 1 1
1002 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01001 integrated audio visual 30-Jun-16 ZN1 ELE testing Audio visual testing and commisioning at Cinema 3 1-Jun-16 3-Jun-16 7.30pm CLOSED 1-Jun-16 0 ACCEPTED 1 1
1003 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01002 integrated audio visual 26-May-16 ZN1 ELE equipment audio visual equipment installation 27-May-16 29-May-16 10.00am CLOSED 1-Jul-16 35 ACCEPTED 1 1
1004 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01003 integrated audio visual 29-Apr-16 ZN1 ELE installation installation of loud speaker 29-Apr-16 1-May-16 10.00am CLOSED 1-Jul-16 63 ACCEPTED 1 1
1005 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01004 integrated audio visual 26-May-16 ZN1 ELE installation audio visual equipment installation 27-May-16 29-May-16 10.00am CLOSED 13-Jul-16 47 ACCEPTED 1 1
1006 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01005 integrated audio visual 25-May-16 ZN1 ELE installation audio visual equipment installation at cinema 4 26-May-16 28-May-16 10.00am CLOSED 27-Jun-16 32 ACCEPTED 1 1
1007 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01006 integrated audio visual 25-May-16 ZN1 ELE installation audio visual equipment installation at cinema 5 26-May-16 28-May-16 10.00am CLOSED 27-Jun-16 32 ACCEPTED 1 1
1008 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01007 integrated audio visual 29-Apr-16 ZN1 ELE testing T&C for sound and visual system at Cinema 2 9-May-16 11-May-16 7.00pm CLOSED 15-Jul-16 67 ACCEPTED 1 1
1010 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01009 integrated audio visual 17-May-16 ZN1 ELE Earth test Earth Resistance test at Cinema 5 18-May-16 20-May-16 10.00am CLOSED 9-Jun-16 22 ACCEPTED 1 1
1011 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01010 isdza 16-May-16 ZN1 ELE cable pulling Cable pulling work on conduit and trunking at Cinema 4 19-May-16 21-May-16 10.00am CLOSED 10-Jun-16 22 ACCEPTED 1 1
1012 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01011 isdza 14-May-16 ZN1 ELE cable pulling Cable pulling work on conduit and trunking at Cinema 5 14-May-16 16-May-16 10.00am CLOSED 14-May-16 0 ACCEPTED 1 1
installation of synthetic grass for central strips of cricket-CR3
1013 RAPID-P20A1-UEMB-ZN1-CIV-RFIN-01012 seribu bio 26-May-16 ZN1 CIV installation 26-May-16 28-May-16 10.00am CLOSED 18-Aug-16 84 ACCEPTED 1 1
at common facilities
1014 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01013 isdza 30-May-16 ZN1 ELE Testing Earth resistance test at Cinema 1 27-May-16 29-May-16 10.00am CLOSED 1-Jul-16 35 ACCEPTED 1 1
1015 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01013A isdza 25-May-16 ZN1 ELE installation earth installation work at Cinema 1 27-May-16 29-May-16 10.00am CLOSED 2-Jul-16 36 ACCEPTED 1 1
1016 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01014 isdza 31-May-16 ZN1 ELE testing electrical functional test for Cinema 1 3-Jun-16 5-Jun-16 10.00am CLOSED 1-Jul-16 28 ACCEPTED 1 1
1017 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01015 isdza 31-May-16 ZN1 ELE polarity general switch socket outlet testing at Cinema 1 3-Jun-16 5-Jun-16 10.00am CLOSED 2-Jul-16 29 ACCEPTED 1 1
1018 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01016 isdza 24-May-16 ZN1 ELE cable pulling Cable pulling on conduit and trunking at Cinema 1 26-May-16 28-May-16 10.00am CLOSED 2-Jul-16 37 ACCEPTED 1 1
1019 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01017 isdza 25-May-16 ZN1 ELE installation Light fitting and switches installation work at Cinema 1 27-May-16 29-May-16 10.00am CLOSED 30-Jun-16 34 ACCEPTED 1 1
1020 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01018 isdza 25-May-16 ZN1 ELE installation Lighting protection installation work at Cinema 1 27-May-16 29-May-16 10.00am CLOSED 30-Jun-16 34 REJECTED 1 1
1021 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01019 isdza 25-May-16 ZN1 ELE installation Distribution board installation work at Cinema 1 27-May-16 29-May-16 10.00am CLOSED 1-Jul-16 35 ACCEPTED 1 1
1022 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01020 isdza 27-May-16 ZN1 ELE polarity General switch socket outlet testing commisioning at Cinema 3 1-Jun-16 3-Jun-16 10.00am CLOSED 2-Jul-16 31 ACCEPTED 1 1
1023 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01021 isdza 26-May-16 ZN1 ELE installation Earthing installation work at Cinema 3 27-May-16 29-May-16 10.00am CLOSED 1-Jul-16 35 ACCEPTED 1 1
1024 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01022 isdza 28-May-16 ZN1 ELE testing Earth resistance test at Cinema 3 28-May-16 30-May-16 10.00am CLOSED 1-Jul-16 34 ACCEPTED 1 1
1025 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01023 isdza 26-May-16 ZN1 ELE installation Lighting protection installation work at Cinema 3 27-May-16 29-May-16 10.00am CLOSED 2-Jul-16 36 REJECTED 1 1
1026 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01024 isdza 27-May-16 ZN1 ELE testing Electrical functional test for Cinema 3 3-Jun-16 5-Jun-16 10.00am CLOSED 24-Jun-16 21 ACCEPTED 1 1
1027 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01025 isdza 30-May-16 ZN1 ELE installation light fitting and switches installation work at Cinema 3 2-May-16 4-May-16 10.00am CLOSED 25-Jun-16 54 ACCEPTED 1 1
1028 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01026 isdza 23-May-16 ZN1 ELE installation Distribution board installation work at Cinema 3 24-May-16 26-May-16 10.00am CLOSED 1-Jul-16 38 ACCEPTED 1 1
1029 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01027 isdza 30-May-16 ZN1 ELE cable pulling Cable pulliing work on conduit and trunking at Cinema 3 30-May-16 1-Jun-16 10.00am CLOSED 2-Jul-16 33 ACCEPTED 1 1
1030 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01028 ridhwan 30-May-16 ZN1 MNE installation Air conditioning installation inspection at Cinema 1 30-May-16 1-Jun-16 10.00am CLOSED 2-Jul-16 33 ACCEPTED 1 1
1031 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01029 shinryo 30-May-16 ZN1 MNE installation AC installation inspection at Cinema 3 30-May-16 1-Jun-16 10.00am CLOSED 27-Jun-16 28 ACCEPTED 1 1
1032 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01030 ridhwan 27-May-16 ZN1 MNE installation AC installation inspection at Cinema 5 30-May-16 1-Jun-16 10.00am CLOSED 2-Jul-16 33 ACCEPTED 1 1
1039 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01037 ridhwan 31-May-16 ZN1 MNE testing AC testing at Cinema 3 2-Jun-16 4-Jun-16 10.00am CLOSED 1-Jul-16 29 ACCEPTED 1 1
1040 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01038 ridhwan 31-May-16 ZN1 MNE testing AC testing at Cinema 5 2-Jun-16 4-Jun-16 9.30am CLOSED 1-Jul-16 29 ACCEPTED 1 1
1041 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01039 ridhwan 31-May-16 ZN1 MNE testing Air Conditioning testing at Cinema 1 2-Jun-16 4-Jun-16 10.00am CLOSED 1-Jul-16 29 ACCEPTED 1 1
1042 RAPID-P20A1-UEMB-ZN1-STR-RFIN-01040 zulfaqar 27-May-15 ZN1 STR Concreting works Concreting works for precast wall at RP4 27-May-15 29-May-15 10.00am CLOSED 15-Jun-16 385 ACCEPTED 1 1
1043 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01041 m.sofian 26-May-16 ZN1 ELE polarity General switch socket outlet testing commisioning at Cinema 5 27-May-15 29-May-15 9.30am CLOSED 27-Jun-16 397 ACCEPTED 1 1
1044 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01042 m.sofian 13-May-16 ZN1 ELE installation Distribution board installation work at Cinema 5 16-May-16 18-May-16 10.00am CLOSED 15-Jul-16 60 ACCEPTED 1 1
1045 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01043 m.sofian 18-May-16 ZN1 ELE installation Earthing installation work at Cinema 5 18-May-15 20-May-15 10.00am CLOSED 1-Jul-16 410 ACCEPTED 1 1
1046 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01044 m.sofian 18-May-16 ZN1 ELE installation Lighting protection installation work at Cinema 5 18-May-16 20-May-16 10.00am CLOSED 20-Jun-16 33 REJECTED 1 1
1055 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01053 isdza 26-May-16 ZN1 ELE testing Installation test at Cinema 3 1-Jun-16 3-Jun-16 9.30am CLOSED 1-Jul-16 30 ACCEPTED 1 1
1057 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01055 AEIE 21-Jun-16 ZN1 ELE installation FP-C11 installation and terminations 23-Jun-16 25-Jun-16 11.00am CLOSED 14-Jul-16 21 ACCEPTED 1 1
1058 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01056 AEIE 21-Jun-16 ZN1 ELE IR test (migger) feeder pillar cable ir test/megger from LP2, SSCF/1 to FP-C3 23-Jun-16 25-Jun-16 10.00am CLOSED 27-Jul-16 34 ACCEPTED 1 1
1059 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01057 AEIE 21-Jun-16 ZN1 ELE Earth test Eathing test for Feeder Pillar - C3 (FP-C3) 23-Jun-16 25-Jun-16 9.00am CLOSED 14-Jul-16 21 ACCEPTED 1 1
1060 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01058 AEIE 21-Jun-16 ZN1 ELE installation Earthing installation at FP-C3 23-Jun-16 25-Jun-16 8.00am CLOSED 14-Jul-16 21 ACCEPTED 1 1
Screeding work at screen area and below the seat area for
1061 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01059 AZRI 23-May-16 ZN1 ARC Screeding works 24-May-16 26-May-16 3.00pm CLOSED 29-Jun-16 36 ACCEPTED 1 1
inspection at Cinema 1
1064 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01062 AZRI 30-May-16 ZN1 ARC cinema seating supply and install cinema seating for cinema 1 31-May-16 2-Jun-16 3.00pm CLOSED 29-Jun-16 29 ACCEPTED 1 1
1074 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01072 AZRI 13-Jun-16 ZN1 ARC painiting works wall painting work for inspection at Cinema 1 14-Jun-16 16-Jun-16 9.00am CLOSED 29-Jun-16 15 ACCEPTED 1 1
screeding works at screen area and below the seat area for
1076 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01074 AZRI 23-May-16 ZN1 ARC Screeding works 24-May-16 26-May-16 3.00pm CLOSED 1-Jul-16 38 ACCEPTED 1 1
inspection at Cinema 3
1078 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01076 AZRI 30-May-16 ZN1 ARC cinema seating supply and install cinema seating for cinema 3 31-May-16 2-Jun-16 3.00pm CLOSED 1-Jul-16 31 ACCEPTED 1 1
1082 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01080 AZRI 7-Jun-16 ZN1 ARC doors and windows doors and windows installation for inspection at Cinema 3 8-Jun-16 10-Jun-16 9.00am CLOSED 1-Jul-16 23 ACCEPTED 1 1
1083 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01081 AZRI 7-Jun-16 ZN1 ARC tiling works tiling works at male and female toilet for inspection at Cinema 8-Jun-16 10-Jun-16 9.00am CLOSED 1-Jul-16 23 ACCEPTED 1 1
3
toilet fixtures installation at male and female toilet for
1084 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01082 AZRI 9-Jun-16 ZN1 ARC toilet fixtures 10-Jun-16 12-Jun-16 9.00am CLOSED 1-Jul-16 21 ACCEPTED 1 1
inspection at Cinema 3
1088 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01086 AZRI 13-Jun-16 ZN1 ARC painting works wall painting work for inspection at Cinema 3 14-Jun-16 16-Jun-16 9.00am CLOSED 1-Jul-16 17 ACCEPTED 1 1
screeding works at screen area and below the seat area for
1089 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01087 AZRI 5-May-16 ZN1 ARC Screeding works inspection at Cinema 2 6-May-16 8-May-16 9.00am CLOSED 29-Jun-16 54 ACCEPTED 1 1
1093 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01091 AZRI 9-May-16 ZN1 ARC cinema seating supply and install cinema seating at Cinema 2 10-May-16 12-May-16 9.00am CLOSED 27-Jun-16 48 ACCEPTED 1 1
1094 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01092 AZRI 12-May-16 ZN1 ARC doors and windows doors and windows installation for inspection at Cinema 2 13-May-16 15-May-16 9.00am CLOSED 27-Jun-16 45 ACCEPTED 1 1
1097 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01095 AZRI 13-May-16 ZN1 ARC tiling works tiling work at male and female toilet for inspection at Cinema 2 14-May-16 16-May-16 9.00am CLOSED 27-Jun-16 44 ACCEPTED 1 1
1101 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01099 AZRI 14-May-16 ZN1 ARC floor finishing vynil floor installation at AV room for inspection at Cinema 2 19-May-16 21-May-16 9.00am CLOSED 27-Jun-16 39 ACCEPTED 1 1
1102 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01100 AZRI 18-May-16 ZN1 ARC painting works wall painting work for inspection at Cinema 2 19-May-16 21-May-16 9.00am CLOSED 27-Jun-16 39 ACCEPTED 1 1
screeding work at cinema screen area and below the seat area
1103 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01101 SADAM 16-May-16 ZN1 ARC Screeding works 17-May-16 19-May-16 9.00am CLOSED 12-Jul-16 56 ACCEPTED 1 1
for inspection at Cinema 4
1107 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01105 SADAM 19-May-16 ZN1 ARC cinema sealing supply of install cinema sealing at Cinema 4 20-May-16 22-May-16 9.00am CLOSED 12-Jul-16 53 ACCEPTED 1 1
1108 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01106 SADAM 19-May-16 ZN1 ARC doors and windows doors and windows installation for inspection at Cinema 4 20-May-16 22-May-16 9.00am CLOSED 12-Jul-16 53 ACCEPTED 1 1
1115 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01113 SADAM 30-May-16 ZN1 ARC floor finishing vynil floor installation at AV room for inspection at Cinema 4 31-May-16 2-Jun-16 9.00am CLOSED 12-Jul-16 42 ACCEPTED 1 1
1116 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01114 SADAM 30-May-16 ZN1 ARC painiting works wall painting for inspection at Cinema 4 31-May-16 2-Jun-16 9.00am CLOSED 12-Jul-16 42 ACCEPTED 1 1
Screeding work at screen area and below the seat area for
1117 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01115 SADAM 17-May-16 ZN1 ARC Screeding works 17-May-16 19-May-16 9.00am CLOSED 28-Jun-16 42 ACCEPTED 1 1
inspection at Cinema 5
1121 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01119 SADAM 19-May-16 ZN1 ARC cinema seating supply and install cinema seating at Cinema 5 20-May-16 22-May-16 9.00am CLOSED 28-Jun-16 39 ACCEPTED 1 1
1122 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01120 SADAM 19-May-16 ZN1 ARC doors and windows doors and windows installation for inspection at Cinema 5 20-May-16 22-May-16 9.00am CLOSED 28-Jun-16 39 ACCEPTED 1 1
1129 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01127 SADAM 27-May-16 ZN1 ARC painting works wall painting for inspection at Cinema 5 31-May-16 2-Jun-16 9.00am CLOSED 28-Jun-16 28 ACCEPTED 1 1
1130 RAPID-P20A1-UEMB-ZN1-ARC-RFIN-01128 SADAM 30-May-16 ZN1 ARC floor finishing vynil floor installation at AV room for inspection at Cinema 5 31-May-16 2-Jun-16 9.00am CLOSED 28-Jun-16 28 ACCEPTED 1 1
1136 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01134 shinryo 20-Jun-16 ZN1 MNE testing exhaust fan testing at Cinema 5 21-Jun-16 23-Jun-16 9.00am CLOSED 13-Jul-16 22 ACCEPTED 1 1
1137 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01135 shinryo 20-Jun-16 ZN1 MNE testing exhaust fan testing at Cinema 4 21-Jun-16 23-Jun-16 9.00am CLOSED 13-Jul-16 22 ACCEPTED 1 1
1138 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01136 shinryo 20-Jun-16 ZN1 MNE testing exhaust fan testing at Cinema 1 21-Jun-16 23-Jun-16 9.00am CLOSED 13-Jul-16 22 ACCEPTED 1 1
1139 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01137 shinryo 20-Jun-16 ZN1 MNE testing exhaust fan testing at Cinema 3 21-Jun-16 23-Jun-16 9.00am CLOSED 13-Jul-16 22 ACCEPTED 1 1
1140 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01138 shinryo 20-Jun-16 ZN1 MNE testing exhaust fan testing at Cinema 2 21-Jun-16 23-Jun-16 9.00am CLOSED 13-Jul-16 22 ACCEPTED 1 1
1141 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01139 shinryo 18-Jun-16 ZN1 MNE installation exhaust fan installation inspection at Cinema 5 20-Jun-16 22-Jun-16 9.00am CLOSED 13-Jul-16 23 ACCEPTED 1 1
1142 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01140 shinryo 18-Jun-16 ZN1 MNE installation exhaust fan installation inspection at Cinema 4 20-Jun-16 22-Jun-16 9.00am CLOSED 13-Jul-16 23 ACCEPTED 1 1
1143 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01141 shinryo 18-Jun-16 ZN1 MNE installation exhaust fan installation inspection at Cinema 3 20-Jun-16 22-Jun-16 9.00am CLOSED 13-Jul-16 23 ACCEPTED 1 1
1144 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01142 shinryo 18-Jun-16 ZN1 MNE installation exhaust fan installation inspection at Cinema 2 20-Jun-16 22-Jun-16 9.00am CLOSED 13-Jul-16 23 ACCEPTED 1 1
1145 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01143 shinryo 18-Jun-16 ZN1 MNE installation exhaust fan installation insection at Cinema 1 20-Jun-16 22-Jun-16 9.00am CLOSED 13-Jul-16 23 ACCEPTED 1 1
1146 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01144 iszda 17-Jun-16 ZN1 ELE fluke test inspection of cable test at Cinema 1 23-Jun-16 25-Jun-16 10.00am CLOSED 13-Jul-16 20 ACCEPTED 1 1
1147 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01145 iszda 19-May-16 ZN1 ELE installation inspection of installation conduit and cable at Cinema 1 23-May-16 25-May-16 10.00am CLOSED 3-Aug-16 72 ACCEPTED 1 1
1148 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01146 iszda 17-Jun-16 ZN1 ELE fluke test inspection of cable analyzer for ICT at Cinema 3 23-Jun-16 25-Jun-16 10.00am CLOSED 3-Aug-16 41 ACCEPTED 1 1
1149 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01147 I-GEN 18-Jun-16 ZN1 MNE testing Fire alarm test for Cinema 1 20-Jun-16 22-Jun-16 10.00am CLOSED 3-Aug-16 44 ACCEPTED 1 1
1150 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01148 I-GEN 18-Jun-16 ZN1 MNE testing Fire alarm test for Cinema 3 20-Jun-16 22-Jun-16 10.00am CLOSED 3-Aug-16 44 ACCEPTED 1 1
1151 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01149 I-GEN 18-Jun-16 ZN1 MNE testing Fire alarm test for Cinema 5 20-Jun-16 22-Jun-16 10.00am CLOSED 3-Aug-16 44 ACCEPTED 1 1
1152 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01150 I-GEN 18-Jun-16 ZN1 MNE testing Hose reel test for Cinema 1 20-Jun-16 22-Jun-16 10.00am CLOSED 3-Aug-16 44 ACCEPTED 1 1
1153 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01151 I-GEN 18-Jun-16 ZN1 MNE testing Hose reel test for Cinema 3 20-Jun-16 22-Jun-16 10.00am CLOSED 3-Aug-16 44 ACCEPTED 1 1
1154 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01152 I-GEN 18-Jun-16 ZN1 MNE testing Hose reel test for Cinema 5 20-Jun-16 22-Jun-16 10.00am CLOSED 3-Aug-16 44 ACCEPTED 1 1
1155 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01153 AEIE 28-Jul-16 ZN1 ELE testing Earthing DB test for Cinema 2 29-Jul-16 31-Jul-16 10.00am CLOSED 3-Aug-16 5 ACCEPTED 1 1
1156 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01154 AEIE 28-Jul-16 ZN1 ELE installation Earthing DB installation for Cinema 2 29-Jul-16 31-Jul-16 10.00am CLOSED 3-Aug-16 5 ACCEPTED 1 1
1157 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01155 AEIE 29-Jul-16 ZN1 ELE testing Air Conditioning testing at Cinema 4 29-Jul-16 31-Jul-16 10.00am CLOSED 3-Aug-16 5 ACCEPTED 1 1
1158 RAPID-P20A1-UEMB-ZN1-MNE-RFIN-01156 shinryo 27-May-16 ZN1 ELE installation Installation Air Conditioning at Cinema 4 30-Jul-16 1-Aug-16 10.00am CLOSED 3-Aug-16 4 ACCEPTED 1 1
1160 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01158 AEIE 19-Aug-16 ZN1 ELE testing earthing test for DB Changing Room at Common Facilities 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
1161 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01159 AEIE 19-Aug-16 ZN1 ELE testing earthing test for DB - MPR 4 at Common Facilities 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
1162 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01160 AEIE 19-Aug-16 ZN1 ELE testing earthing test for DB - MPR 1 at Common Facilities 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
1163 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01161 AEIE 19-Aug-16 ZN1 ELE testing earthing test for FP-CL 3 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
1164 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01162 AEIE 19-Aug-16 ZN1 ELE testing earthing test for FP-CL 5 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
1165 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01163 AEIE 19-Aug-16 ZN1 ELE testing earthing test for FP-CL 3A 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
1166 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01164 AEIE 19-Aug-16 ZN1 ELE testing earthing test for FP-CL 4 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
1174 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01172 seribu bio 9-Apr-16 ZN1 ELE testing lux test for 5 side football court 10-Apr-16 12-Apr-16 9.00am CLOSED 26-Aug-16 138 ACCEPTED 1 1
1175 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01173 seribu bio 10-Apr-16 ZN1 ELE testing lux test for football court abd cricket court 15-May-16 17-May-16 9.00am CLOSED 26-Aug-16 103 ACCEPTED 1 1
1176 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01174 seribu bio 21-Jun-16 ZN1 ELE testing lux test for multi purpose court MC1, 2,3,4,5,6 22-Jun-16 24-Jun-16 9.00am CLOSED 25-Aug-16 64 ACCEPTED 1 1
1189 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01187 AEIE 26-Aug-16 ZN1 ELE installation Earthing installation at FP-CL3 27-Aug-16 29-Aug-16 10.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
1190 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01188 AEIE 26-Aug-16 ZN1 ELE installation Earthing installation at FP-CL3A 27-Aug-16 29-Aug-16 10.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
1191 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01189 AEIE 26-Aug-16 ZN1 ELE installation Earthing installation at FP-CL4 27-Aug-16 29-Aug-16 10.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
1192 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01190 AEIE 26-Aug-16 ZN1 ELE installation Earthing installation at FP-CL5 27-Aug-16 29-Aug-16 10.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
1193 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01191 AEIE 26-Aug-16 ZN1 ELE installation Earthing installation at DB Changing room 27-Aug-16 29-Aug-16 10.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
1194 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01192 AEIE 26-Aug-16 ZN1 ELE installation Earthing installation at MPR 1 27-Aug-16 29-Aug-16 10.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
1195 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01193 AEIE 26-Aug-16 ZN1 ELE installation Earthing installation at MPR 4 27-Aug-16 29-Aug-16 10.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
1196 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01194 AEIE 1-Aug-16 ZN1 ELE installation Installation of PA System and siren system at Prayer Building 1-Aug-16 3-Aug-16 10.00am CLOSED 7-Oct-16 67 ACCEPTED 1 1
1197 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01195 AEIE 3-Aug-16 ZN1 ELE installation Installation of PA System and siren system at Supermarket 3-Aug-16 5-Aug-16 10.00am CLOSED 17-Oct-16 75 ACCEPTED 1 1
1198 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01196 AEIE 5-Aug-16 ZN1 ELE installation Installation of PA System and siren system at Cinema building 5-Aug-16 7-Aug-16 10.00am CLOSED 17-Oct-16 73 ACCEPTED 1 1
1203 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01201 iszda 3-Dec-16 ZN1 ELE testing Testing of PA System and siren system at Super Market 7-Dec-16 9-Dec-16 2.30pm CLOSED 4-Jan-17 28 ACCEPTED 1 1
1205 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01203 iszda 3-Dec-16 ZN1 ELE testing Commissioning of PA System and siren system at Super Market 7-Dec-16 9-Dec-16 2.30pm CLOSED 15-Jan-17 39 ACCEPTED 1 1
1206 RAPID-P20A1-UEMB-ZN1-ELE-RFIN-01204 iszda 3-Dec-16 ZN1 ELE testing Testing of PA System and siren system at Cinema Building 7-Dec-16 9-Dec-16 2.30pm CLOSED 4-Jan-17 28 ACCEPTED 1 1
1208 1206
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(ZONE 2)
Section/Area Discipline Inspection Inspection Date closed KPI (days) Remarks NEW STATUS
RFI No. Requested by Submission Date Description of Works Status TOTAL RFIN CLOSED RFIN
Activities Date Time
1 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00001 Abd Halim 7-Jan-15 ZN2 BLD Building Trial pit at area supervisory accomodations (1 point) and 8-Jan-15 10-Jan-15 10.00am CLOSED 21-Jan-15 13 ACCEPTED 1 1
Labour Accommodations (1 point)
2 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00002 Peck Chew 12-Jan-15 ZN2 BLD Building 1) Material Delivery (Spun Pile) (2) Inspection Piling Rig (3) 13-Jan-15 15-Jan-15 10.00am CLOSED 22-Jan-15 9 ACCEPTED 1 1
Piling Work Commence
3 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00003 Misbah 14-Jan-15 ZN2 BLD Survey Joint Survey Inspection 14-Jan-15 16-Jan-15 4.00pm CLOSED 15-Jan-15 1 ACCEPTED 1 1
4 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00004 Nik 15-Jan-15 ZN2 BLD Building Inspection for PDA Test Equipment for SA3 prelim A1/8-9 17-Jan-15 19-Jan-15 9.00am CLOSED 22-Jan-15 5 ACCEPTED 1 1
5 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00005 Nik 17-Jan-15 ZN2 BLD Building Material Delivery Spun Pile 19-Jan-15 21-Jan-15 10.00am CLOSED 07-Feb-15 19 ACCEPTED 1 1
6 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00006 Faizal 20-Jan-15 ZN2 BLD Building Piling works at management accomodation 21-Jan-15 23-Jan-15 08.00am CLOSED 07-Feb-15 17 ACCEPTED 1 1
7 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00007 Faizal 21-Jan-15 ZN2 BLD Building Maintain Load Test for Test Pile 22-Jan-15 24-Jan-15 08.00am CLOSED 23-Jan-15 1 REJECTED 1 1
8 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00008 Misbah 21-Jan-15 ZN2 BLD Survey Joint Survey Pilling Point ( MA4) 22-Jan-15 24-Jan-15 09.00am CLOSED 22-Jan-15 0 ACCEPTED 1 1
9 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00009 Faizal 21-Jan-15 ZN2 BLD Building Material Delivery Spun Pile 300mm radius 22-Jan-15 24-Jan-15 08.00am CLOSED 30-Jan-15 8 ACCEPTED 1 1
10 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00010 Nik 24-Jan-15 ZN2 BLD Building Piling Works (Result of Blow) 24-Jan-15 26-Jan-15 10.00am CLOSED 02-Feb-15 9 ACCEPTED 1 1
11 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00011 Nik 24-Jan-15 ZN2 MNE Building Maintain Load Test 26-Jan-15 28-Jan-15 08.00am CLOSED 02-Feb-15 7 ACCEPTED 1 1
12 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00012 Nik 26-Jan-15 ZN2 BLD Building Material Delivery (Spun Pile) - 300mm dia. 26-Jan-15 28-Jan-15 08.00am CLOSED 07-Feb-15 12 ACCEPTED 1 1
13 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00013 NIk 26-Jan-15 ZN2 BLD Building Piling Works (Result of Blow) 27-Jan-15 29-Jan-15 08.00am CLOSED 06-Feb-15 10 ACCEPTED 1 1
14 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00014 Nik 28-Jan-15 ZN2 BLD Building Material Delivery (Spun Pile) - 300mm dia. 29-Jan-15 31-Jan-15 08.00am CLOSED 23-Feb-15 25 ACCEPTED 1 1
15 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00015 Nik 28-Jan-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) 30-Jan-15 1-Feb-15 08.00am CLOSED 11-Feb-15 12 ACCEPTED 1 1
16 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00016 NIk 28-Jan-15 ZN2 BLD Building Maintain Load Test (MLT) 29-Jan-15 31-Jan-15 08.00am CLOSED 06-Feb-15 8 ACCEPTED 1 1
(SA3) prelim A1/8-9
17 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00017 Faizal 31-Jan-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) 2-Feb-15 4-Feb-15 08.00am CLOSED 11-Feb-15 9 ACCEPTED 1 1
18 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00018 Faizal 2-Feb-15 ZN2 BLD Building Material Delivery (Spun Pile) - 300mm dia. 4-Feb-15 6-Feb-15 08.00am CLOSED 23-Feb-15 19 ACCEPTED 1 1
19 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00019 Faizal 4-Feb-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) - 300 mm dia. ( MA4) 5-Feb-15 7-Feb-15 08.00am CLOSED 11-Feb-15 6 ACCEPTED 1 1
20 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00019A Nik 5-Feb-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) - 300 mm dia. ( SA3) 6-Feb-15 8-Feb-15 08.00am CLOSED 11-Feb-15 5 ACCEPTED 1 1
21 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00020 Faizal 5-Feb-15 ZN2 BLD Building PDA Test for 6-Feb-15 6-Feb-15 08.00am CLOSED 27-Feb-15 21 ACCEPTED 1 1
MA4 A1/10-18,C1/7-54
22 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00020A Nik 5-Feb-15 ZN2 BLD Building Driven spun pile-300mm dia (LA3) 6-Feb-15 6-Feb-15 08.00am CLOSED 12-Feb-15 6 ACCEPTED 1 1
23 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00021 Faizal 6-Feb-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) MA4 8-Feb-15 10-Feb-15 08.00am CLOSED 03-Mar-15 23 ACCEPTED 1 1
27 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00025 Faizal 10-Feb-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) - 300 mm dia. 11-Feb-15 13-Feb-15 08.00am CLOSED 28-Feb-15 17 ACCEPTED 1 1
( Management Acc. 3)
28 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00026 Faizal 10-Feb-15 ZN2 BLD Building Material Delivery (Spun Pile) - 300mm dia. 11-Feb-15 13-Feb-15 08.00am CLOSED 26-Feb-15 15 ACCEPTED 1 1
30 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00028 Nik 12-Feb-15 ZN2 BLD Building Maintain Load Test (MLT) 13-Feb-15 15-Feb-15 08.00am CLOSED 28-Feb-15 15 ACCEPTED 1 1
(SA3) B/5-36
Installation Pile plug and Pour Concrete for Pile Plug &
31 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00029 Nik 14-Feb-15 ZN2 BLD Building 16-Feb-15 18-Feb-15 08.00am CLOSED 11-Mar-15 23 ACCEPTED 1 1
Lean Concrete
32 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00030 Nik 14-Feb-15 ZN2 BLD Building Joint Survay for Built Drawing ( Pile position before cut) 16-Feb-15 18-Feb-15 08.00am CLOSED 16-Feb-15 0 ACCEPTED 1 1
33 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00030a Faizal 23-Feb-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) - 300 mm dia. ( MA 2) 24-Feb-15 26-Feb-15 08.00am CLOSED 13-Jun-15 109 ACCEPTED 1 1
34 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00031 Faizal 24-Feb-15 ZN2 BLD Building Inspection for formwork,rebar and concreting works (Pile 24-Feb-15 26-Feb-15 08.00am CLOSED 14-Mar-15 18 ACCEPTED 1 1
cap)
36 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00033 Faizal 24-Feb-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) - 300 mm dia. 25-Feb-15 27-Feb-15 08.00am CLOSED 14-Mar-15 17 ACCEPTED Iwan 1 1
( Management Acc. 2 & 3)
37 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00034 Faizal 25-Feb-15 ZN2 BLD Building Material delivery inspection (spun pile 300mm) 26-Feb-15 28-Feb-15 08.00am CLOSED 11-Mar-15 13 ACCEPTED faizal 1 1
Inspection PDA test (pile head broken) at
38 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00035a Faizal 24-Feb-15 ZN2 BLD Building MA4; C/13-49 & C/10-46 24-Feb-15 26-Feb-15 03.30Pm CLOSED 14-Mar-15 18 ACCEPTED 1 1
MA2; D/2-60 & B/13-34
39 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00035b Nik 26-Feb-15 ZN2 BLD Survey Join Survey with IPMT for as Built (MA2) 27-Feb-15 1-Mar-15 08.00am CLOSED 27-Feb-15 0 ACCEPTED 1 1
40 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00036 Faizal 26-Feb-15 ZN2 BLD Building Inspection for concreting works. Lean conc and pile plug- 27-Feb-15 1-Mar-15 08.00am CLOSED 11-Mar-15 12 ACCEPTED belum sempat keyin pd nik 1 1
Grid line 7-14
41 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00037 Faizal 27-Feb-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) - 300 mm dia. ( MA 3,1) 28-Feb-15 2-Mar-15 08.00am CLOSED 05-Mar-15 5 ACCEPTED 1 1
42 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00037A Faizal 27-Feb-15 ZN2 BLD Building Driven Spun Pile (No. of Blows) - 300 mm dia. ( MA4) 28-Feb-15 2-Mar-15 08.00am CLOSED 13-Jun-15 105 ACCEPTED 1 1
43 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00038 Faizal 27-Feb-15 ZN2 BLD Building Inspection for concreting works. Lean conc and pile plug- 28-Feb-15 2-Mar-15 08.00am CLOSED 18-Mar-15 18 ACCEPTED 1 1
Grid line 7-14
45 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00040 Faizal 27-Feb-15 ZN2 BLD Building Inspection for formwork,rebar and concreting works (Pile 28-Feb-15 2-Mar-15 08.00am CLOSED 03-Mar-15 3 ACCEPTED 1 1
cap)
46 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00040A Nik 1-Mar-15 ZN2 BLD Building Driven spun pile 300 Dia SA3 2-Mar-15 4-Mar-15 08.00am CLOSED 25-Apr-15 54 ACCEPTED 1 1
47 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00041 nik 28-Feb-15 ZN2 BLD Building Concreting lean concrete for ground beam,concreting pile 2-Mar-15 4-Mar-15 08.00am CLOSED 18-Mar-15 16 ACCEPTED 1 1
cap, inspection pile cap, formwork,rebar
49 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00043 Faizal 2-Mar-15 ZN2 BLD Building Inspection for formwork,rebar and concreting works (Pile 3-Mar-15 5-Mar-15 08.00am CLOSED 06-Apr-15 34 ACCEPTED 1 1
cap & Beam)
PDA Test at
50 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00044 Uem Faizal 2-Mar-15 ZN2 BLD Building MA1 ; A/3-3 & D/6-64 3-Mar-15 5-Mar-15 08.00am CLOSED 11-Mar-15 8 ACCEPTED 1 1
M.A 3 : D/10-68 & B/2-23
SA 3; C/16-68
51 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00045 Nik 2-Mar-15 ZN2 BLD Building Material deliveri inspection (Spun Pile 300mm diameter) 3-Mar-15 5-Mar-15 08.00am CLOSED 11-Mar-15 8 ACCEPTED 1 1
53 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00047 Faizal 3-Mar-15 ZN2 BLD Building Inspection for concreting lean con ground beam ( MA2) 4-Mar-15 6-Mar-15 08.00am CLOSED 16-Jun-15 104 ACCEPTED 1 1
54 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00048 Nik 3-Mar-15 ZN2 BLD Building Inspection Formwork, rebar, concreting at MA4 ( Ground 4-Mar-15 6-Mar-15 08.00am CLOSED 06-Jun-15 94 ACCEPTED 1 1
beam
55 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00048A Nik 3-Mar-15 ZN2 BLD Building Driven spun pile -300 dia SA3 4-Mar-15 6-Mar-15 08.00am CLOSED 25-Apr-15 52 ACCEPTED 1 1
56 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00049 Nik 5-Mar-15 ZN2 BLD Building Inspection Formwork, rebar, concreting at MA2 ( Ground 6-Mar-15 8-Mar-15 08.00am CLOSED 17-Mar-15 11 ACCEPTED 1 1
beam
57 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00050 Nik 5-Mar-15 ZN2 BLD Building Inspection Formwork, rebar, concreting at MA2 ( Pile Cap) 6-Mar-15 8-Mar-15 08.00am CLOSED 18-Mar-15 12 REJECTED 1 1
58 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00051 Nik 28-Feb-15 ZN2 BLD Building Inspection Formwork, rebar, concreting at MA4 ( Pile Cap) 2-Mar-15 4-Mar-15 08.00am CLOSED 16-Jun-15 106 ACCEPTED 1 1
59 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00052 Nik 5-Mar-15 ZN2 BLD Building Inspection Formwork, rebar, concreting at MA4 ( Stump) 6-Mar-15 8-Mar-15 08.00am CLOSED 08-Mar-15 2 ACCEPTED 1 1
60 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00053 Uem Nik 5-Mar-15 ZN2 BLD Building Material Delivery Inspection (Dorce) 6-Mar-15 8-Mar-15 08.00am CLOSED CANCEL 1 1
61 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00054 Nik 5-Mar-15 ZN2 BLD Building Material delivery (Spun Pile)-300mm dia (SA4) 6-Mar-15 8-Mar-15 08.00am CLOSED 14-Mar-15 8 ACCEPTED 1 1
62 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00055 Nik 5-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (SA3) 6-Mar-15 8-Mar-15 08.00am CLOSED 28-Mar-15 22 ACCEPTED 1 1
63 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00056 Nik 5-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (MA3) 6-Mar-15 8-Mar-15 08.00am CLOSED 09-Mar-15 3 ACCEPTED 1 1
64 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00057 Faizal 6-Mar-15 ZN2 BLD Survey joint survey for as-built level at MA1 6-Mar-15 8-Mar-15 08.00am CLOSED 07-Mar-15 1 ACCEPTED 1 1
65 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00058 Faizal 6-Mar-15 ZN2 BLD Building maintain load test MA3 6-Mar-15 8-Mar-15 08.00am CLOSED 20-Mar-15 14 ACCEPTED 1 1
66 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00059 Faizal 6-Mar-15 ZN2 BLD Building Cube testing - pile plug (MA2) 6-Mar-15 8-Mar-15 08.00am CLOSED 10-Mar-15 4 REJECTED 1 1
67 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00060 Faizal 6-Mar-15 ZN2 BLD Building Inspection for cutting of pile (cut of level) 6-Mar-15 8-Mar-15 08.00am CLOSED 19-Mar-15 13 ACCEPTED 1 1
68 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00061 Faizal 6-Mar-15 ZN2 BLD Building Inspection for concreting works. Lean conc and pile plug- 6-Mar-15 8-Mar-15 08.00am CLOSED 09-Mar-15 3 ACCEPTED 1 1
M.A.1
69 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00062 Uem Nik 7-Mar-15 ZN2 BLD Building Inspection for cutting of pile (MA1) - Cut of Level 7-Mar-15 9-Mar-15 9.40am CLOSED 10-Mar-15 3 ACCEPTED 1 1
70 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00062A Uem Nik 7-Mar-15 ZN2 BLD Building Inspection of excavation SA3 8-Mar-15 10-Mar-15 9.40am CLOSED 11-Nov-15 248 ACCEPTED 1 1
71 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00063 Nik 7-Mar-15 ZN2 BLD Building Inspection for concreting works (MA1) - Lean Con & Pile 9-Mar-15 11-Mar-15 9.00am CLOSED 12-Mar-15 3 ACCEPTED 1 1
Plug
73 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00065 Nik 7-Mar-15 ZN2 BLD Building Inspection Formwork, Rebar Concreting ( MA2)- Sump 9-Mar-15 11-Mar-15 CLOSED 10-Mar-15 1 ACCEPTED 1 1
74 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00066 Nik 7-Mar-15 ZN2 BLD Building Inspection Formwork, Rebar Concreting ( MA4)- Sump 9-Mar-15 11-Mar-15 CLOSED 09-Mar-15 0 REJECTED 1 1
75 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00067 Uem Nik 7-Mar-15 ZN2 BLD Building Inspection anti Termite ( MA4) 7-Mar-15 9-Mar-15 9.30am CLOSED 14-Mar-15 7 REJECTED 1 1
76 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00068 Nik 7-Mar-15 ZN2 BLD Survey joint survey for as-built level at MA3 9-Mar-15 11-Mar-15 CLOSED 09-Mar-15 0 ACCEPTED REFER SAMSER 1 1
77 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00069 Nik 11-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (SA2) 12-Mar-15 14-Mar-15 CLOSED 27-Mar-15 15 ACCEPTED 1 1
78 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00070 Nik 7-Mar-15 ZN2 BLD Building Driven Spun Pile -300mm dia (SA4) 9-Mar-15 11-Mar-15 CLOSED 25-Mar-15 16 ACCEPTED 1 1
79 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00071 Nik 7-Mar-15 ZN2 BLD Building Driven Spun Pile -300mm dia (SA3) 9-Mar-15 11-Mar-15 CLOSED 26-Mar-15 17 ACCEPTED 1 1
80 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00072 Nik 7-Mar-15 ZN2 BLD Building Material Delivering ( Spun Pile) 300mm Dia 9-Mar-15 11-Mar-15 CLOSED 20-Mar-15 11 ACCEPTED 1 1
81 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00073 Nik 7-Mar-15 ZN2 BLD Building Maintain Load Test (MLT) ( MA3) 9-Mar-15 11-Mar-15 CLOSED 13-Apr-15 35 ACCEPTED 1 1
B/11-32
82 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00074 Samshear 7-Mar-15 ZN2 ARC BLD Anti Termite, Injection 4 Cornes of the pilecap 9-Mar-15 11-Mar-15 11.00am CLOSED 18-Mar-15 9 ACCEPTED 1 1
83 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00075 Faizal 9-Mar-15 ZN2 BLD Building inspection for cutting of pile (M.A.3) 10-Mar-15 12-Mar-15 08.30am CLOSED 26-Mar-15 16 ACCEPTED 1 1
84 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00076 Faizal 9-Mar-15 ZN2 BLD Building Inspection for concreting works. (Lean conc. & pile plug) - 10-Mar-15 12-Mar-15 08.30am CLOSED 12-Mar-15 2 REJECTED 1 1
(M.A.3)
85 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00077 Faizal 9-Mar-15 ZN2 BLD Building Inspection for formwork, rebar & concreting - (M.A.3) 10-Mar-15 12-Mar-15 08.30am CLOSED 18-May-15 69 ACCEPTED 1 1
86 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00078 Faizal 9-Mar-15 ZN2 BLD Building Inspection for concreting works. (Lean conc. & pile plug) - 12-Mar-15 14-Mar-15 08.30am CLOSED 12-Mar-15 0 ACCEPTED 1 1
(M.A.1)
88 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00080 Nik 9-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (SA1) 10-Mar-15 12-Mar-15 7.30AM CLOSED 28-Apr-15 49 ACCEPTED 1 1
PDA Test at
89 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00081 Nik 9-Mar-15 ZN2 BLD Building SA2 ; A/1-1, 10-Mar-15 12-Mar-15 02.00AM CLOSED 18-Mar-15 8 ACCEPTED 1 1
SA3 ; D/10-91
SA4 ; B/1-32
90 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00082 Nik 10-Mar-15 ZN2 BLD Survey Joint Survey For As- Built Stump (MA4) 11-Mar-15 13-Mar-15 10.00AM CLOSED 11-Mar-15 0 ACCEPTED 1 1
91 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00083 Nik 10-Mar-15 ZN2 BLD Survey Joint Survey For As- Built Stump (MA2) 11-Mar-15 13-Mar-15 11.00AM CLOSED 11-Mar-15 0 ACCEPTED 1 1
92 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00084 Faizal 11-Mar-15 ZN2 BLD Building Material delivery - spun pile 300mm 12-Mar-15 14-Mar-15 08.00AM CLOSED 20-Mar-15 8 ACCEPTED 1 1
93 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00085 Faizal 11-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (SA4) 12-Mar-15 14-Mar-15 08.00AM CLOSED 25-Mar-15 13 ACCEPTED 1 1
94 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00086 Faizal 11-Mar-15 ZN2 BLD Survey Joint Survey For As- Built Piling Poin (SA3) 12-Mar-15 14-Mar-15 10.00AM CLOSED 13-Mar-15 1 ACCEPTED 1 1
95 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00087 Faizal 11-Mar-15 ZN2 BLD Building Inspection for Excavation - SA3 12-Mar-15 14-Mar-15 08.00AM CLOSED 22-Jun-15 102 ACCEPTED 1 1
96 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00088 Faizal 11-Mar-15 ZN2 BLD Building Inspection of cutting of pile (cut of level) - SA3 12-Mar-15 14-Mar-15 09.00AM CLOSED 30-Mar-15 18 ACCEPTED 1 1
97 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00089 Faizal 11-Mar-15 ZN2 BLD Building Inspection for concreting (lean conc. And pile plug) at SA3 12-Mar-15 14-Mar-15 02.00PM CLOSED 14-Mar-15 2 ACCEPTED 1 1
99 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00091 Faizal 11-Mar-15 ZN2 BLD Building Inspection for concreting works. Lean conc g/beam) - 12-Mar-15 14-Mar-15 10.00AM CLOSED 18-Mar-15 6 ACCEPTED 1 1
(M.A.3) grid line 1'-7
100 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00092 Faizal 11-Mar-15 ZN2 BLD Building Inspection for backfilling works at MA1 12-Mar-15 14-Mar-15 08.00AM CLOSED 13-Jul-15 123 ACCEPTED 1 1
101 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00092A Uem Nik 11-Mar-15 ZN2 BLD Lean Con Concreting lean concrete for ground beam at MA1 12-Mar-15 14-Mar-15 2.00pm CLOSED 21-Nov-15 254 ACCEPTED 1 1
102 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00093 Faizal 11-Mar-15 ZN2 BLD Building Inspection for backfilling works at MA2 12-Mar-15 14-Mar-15 08.00AM CLOSED 31-Mar-15 19 ACCEPTED 1 1
103 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00094 Faizal 11-Mar-15 ZN2 BLD Building Inspection for backfilling works at MA4 12-Mar-15 14-Mar-15 08.00AM CLOSED 15-Mar-15 3 ACCEPTED 1 1
104 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00095 Faizal 12-Mar-15 ZN2 BLD Building Inspection for backfilling works at MA3 13-Mar-15 15-Mar-15 08.00AM CLOSED 22-Jun-15 101 ACCEPTED 1 1
105 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00096 Syafiq 13-Mar-15 ZN2 CIV Testing Close out NCR PMC 001, Perform FDT at MA4 and MA2 on 14-Mar-15 16-Mar-15 9.00am CLOSED 27-Mar-15 13 ACCEPTED 1 1
subgrade
106 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00097 Nik 14-Mar-15 ZN2 BLD Building Inspection of excavation ( SA3) 15-Mar-15 17-Mar-15 08.00AM CLOSED 15-Mar-15 0 ACCEPTED 1 1
107 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00098 Nik 14-Mar-15 ZN2 BLD Building Maintain Load Test (MLT) (MA3) 15-Mar-15 17-Mar-15 10.00AM CLOSED 21-Mar-15 6 ACCEPTED 1 1
D/14-72
108 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00099 Nik 14-Mar-15 ZN2 BLD Building Inspection of cutting of pile (cut of level) - SA3 15-Mar-15 17-Mar-15 10.00AM CLOSED 10-Apr-15 26 ACCEPTED 1 1
110 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00101 Nik 14-Mar-15 ZN2 BLD Building Driven Spun Pile -300mm dia (SA4) 16-Mar-15 18-Mar-15 07.30am CLOSED 25-Mar-15 9 ACCEPTED 1 1
111 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00101A Nik 14-Mar-15 ZN2 BLD Building Driven Spun Pile -300mm dia (SA4) 15-Mar-15 17-Mar-15 8.00am CLOSED 25-Mar-15 10 ACCEPTED 1 1
112 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00102 Nik 14-Mar-15 ZN2 BLD Building Driven Spun Pile -300mm dia ( SA2) 16-Mar-15 18-Mar-15 07.30am CLOSED 28-Apr-15 43 ACCEPTED 1 1
113 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00103 Nik 14-Mar-15 ZN2 BLD Building Driven Spun Pile -300mm dia ( SA1) 16-Mar-15 18-Mar-15 07.30am CLOSED 28-Apr-15 43 ACCEPTED 1 1
114 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00104 Nik 14-Mar-15 ZN2 BLD Building Material Delivery (Spun Pile)-300mm dia) 16-Mar-15 18-Mar-15 09.00am CLOSED 16-Mar-15 0 ACCEPTED 1 1
115 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00105 Nik 14-Mar-15 ZN2 BLD Building Inspection for Concreting work - Lean conc ground beam 16-Mar-15 18-Mar-15 10.00am CLOSED 18-Mar-15 2 REJECTED 1 1
(MA3)
116 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00106 Nik 14-Mar-15 ZN2 BLD Building Inspection Formwork, Rebar, Concreting - Ground beam 16-Mar-15 18-Mar-15 10.00am CLOSED 17-Mar-15 1 REJECTED 1 1
( MA3)
117 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00107 Nik 14-Mar-15 ZN2 BLD Building Excavation work (MA3) 16-Mar-15 18-Mar-15 08.00am CLOSED 30-Mar-15 14 ACCEPTED 1 1
118 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00108 Nik 14-Mar-15 ZN2 BLD Building Cutting of pile works- Cut off level ( MA3) 16-Mar-15 18-Mar-15 09.00am CLOSED 20-Mar-15 4 ACCEPTED 1 1
119 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00109 Nik 14-Mar-15 ZN2 BLD Building Inspection for concreting work for lean con and pile plug 16-Mar-15 18-Mar-15 01.00Pm CLOSED 18-Mar-15 2 REJECTED 1 1
( MA3)
120 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00110 Nik 14-Mar-15 ZN2 BLD Building Inspection formwok, rebar concreting (Stump) - (MA1) 16-Mar-15 18-Mar-15 04.00Pm CLOSED 19-Mar-15 3 ACCEPTED 1 1
121 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00111 Nik 14-Mar-15 ZN2 BLD Building Inspection of concreting work for lean conc and pile plug 16-Mar-15 18-Mar-15 03.00pm CLOSED 18-Mar-15 2 REJECTED 1 1
( SA3)
123 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00112A Nik 16-Mar-15 ZN2 BLD Building Driven spun pile LA6 300mm 17-Mar-15 19-Mar-15 5.30Am CLOSED 25-Apr-15 39 ACCEPTED 1 1
124 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00112B Nik 16-Mar-15 ZN2 BLD Building Driven spun pile -300mm dia (LA5) 17-Mar-15 19-Mar-15 5.30Am CLOSED 17-Mar-15 0 ACCEPTED 1 1
125 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00113 Faizal 17-Mar-15 ZN2 BLD Building Excavation work (MA3) 19-Mar-15 21-Mar-15 08.30am CLOSED 25-Mar-15 6 ACCEPTED 1 1
126 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00114 Faizal 17-Mar-15 ZN2 BLD Building Cutting of pile works- Cut of level ( MA3) 19-Mar-15 21-Mar-15 09.00AM CLOSED 20-Mar-15 1 ACCEPTED 1 1
127 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00115 Faizal 17-Mar-15 ZN2 BLD Building Inspection for concreting works. Lean Conc and Pile plug) 19-Mar-15 21-Mar-15 2.00pm CLOSED 26-Mar-15 7 ACCEPTED 1 1
MA3
128 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00116 Faizal 17-Mar-15 ZN2 BLD Building Inspection Formwork, Rebar and Concreting ( Pile Cap) 19-Mar-15 21-Mar-15 03.00pm CLOSED 05-Aug-15 139 REJECTED 1 1
MA3
129 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00117 Faizal 17-Mar-15 ZN2 BLD Building Backfilling works (MA3) 19-Mar-15 21-Mar-15 08.30am CLOSED 30-Mar-15 11 ACCEPTED 1 1
131 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00119 Faizal 17-Mar-15 ZN2 BLD Building Inspection Formwork, Rebar and concreting ( Pile Cap)- 19-Mar-15 21-Mar-15 02.00Pm CLOSED 22-Jun-15 95 ACCEPTED 1 1
MA3
132 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00120 Faizal 17-Mar-15 ZN2 BLD Building Inspection for Formwork, Rebar and Concreting 19-Mar-15 21-Mar-15 09.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
(Pile cap) SA3
133 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00121 Faizal 17-Mar-15 ZN2 BLD Building Excavation work (SA3) 19-Mar-15 21-Mar-15 08.00am CLOSED 30-Mar-15 11 ACCEPTED 1 1
134 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00122 Faizal 17-Mar-15 ZN2 BLD Building Cutting of pile ( Cut of Level) SA3 18-Mar-15 20-Mar-15 08.00am CLOSED 30-Mar-15 12 ACCEPTED 1 1
136 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00124 Faizal 17-Mar-15 ZN2 BLD Building Inspection formwork, Rebar and concreting (pile Cap) SA3) 18-Mar-15 20-Mar-15 09.00am CLOSED 18-Mar-15 0 ACCEPTED 1 1
137 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00125 Faizal 17-Mar-15 ZN2 BLD Building Backfilling works (SA3) 18-Mar-15 20-Mar-15 08.00am CLOSED 30-Mar-15 12 ACCEPTED 1 1
138 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00126 Faizal 17-Mar-15 ZN2 BLD Building Inspection for concreting works ( Lean Conc Ground Beam) 18-Mar-15 20-Mar-15 09.00am CLOSED 18-Mar-15 0 ACCEPTED 1 1
140 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00128 Faizal 17-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (SA1) 19-Mar-15 21-Mar-15 08.30am CLOSED 20-Mar-15 1 ACCEPTED 1 1
141 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00129 Faizal 17-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (SA2) 19-Mar-15 21-Mar-15 08.30am CLOSED 28-Apr-15 40 ACCEPTED 1 1
142 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00130 Faizal 17-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (SA4) 19-Mar-15 21-Mar-15 08.30am CLOSED 25-Mar-15 6 ACCEPTED 1 1
143 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00131 Faizal 17-Mar-15 ZN2 BLD Building Driven Spun Pile-300mm dia (SA5) 19-Mar-15 21-Mar-15 08.30am CLOSED 25-Mar-15 6 ACCEPTED 1 1
144 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00132 Faizal 17-Mar-15 ZN2 BLD Building Inspection for lean concrete and pile plug (SA2) 18-Mar-15 20-Mar-15 09.00am CLOSED 19-Mar-15 1 ACCEPTED 1 1
145 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00132A NIK 17-Mar-15 ZN2 BLD Building Excavation works SA4 (8-9/CA-D) and (10-20/C-D) 18-Mar-15 20-Mar-15 09.00am CLOSED 11-Nov-15 238 ACCEPTED 1 1
147 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00134 Samshear 18-Mar-15 ZN2 BLD Building Injection & spray the pile cap and stump at MA1) for anti 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
termite
148 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00135 Faizal 18-Mar-15 ZN2 BLD Building Material Delivery (Spun Pile)-300mm dia) 19-Mar-15 21-Mar-15 10.00am CLOSED 04-Apr-15 16 ACCEPTED 1 1
149 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00135A Nik 18-Mar-15 ZN2 BLD Building Driven spun pile (LA6) 19-Mar-15 21-Mar-15 10.00am CLOSED 25-Apr-15 37 ACCEPTED 1 1
150 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00136 Nik 19-Mar-15 ZN2 BLD Survey Joint survey piling point (SA2) 20-Mar-15 22-Mar-15 09.00am CLOSED 20-Mar-15 0 ACCEPTED 1 1
151 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00137 Nik 19-Mar-15 ZN2 BLD Survey Joint survey piling point (MA3) Row 11-14 19-Mar-15 21-Mar-15 10.00am CLOSED 20-Mar-15 1 ACCEPTED 1 1
153 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00138A Nik 19-Mar-15 ZN2 BLD Building Driven spun pile 300 dia LA2 19-Mar-15 21-Mar-15 10.00am CLOSED 27-Mar-15 8 ACCEPTED 1 1
154 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00138B Nik 19-Mar-15 ZN2 BLD Building Driven spun pile 300 dia LA5 19-Mar-15 21-Mar-15 10.00am CLOSED 30-Mar-15 11 ACCEPTED 1 1
RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00139 UEMB QAQC 20-Mar-15 ZN2 BLD Building Perform FDT on backfilling at Management 21-Mar-15 23-Mar-15 10.00am
155
SYAFIQ Accomodation 1 CLOSED CANCEL 1 1
156 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00140 Norhazah 19-Mar-15 ZN2 BLD Building Cube test for pilecap G/L A-D/1-6 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
157 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00141 Nik 21-Mar-15 ZN2 BLD Building Inspection for concreting works for lean con and pile plug ( 20-Mar-15 22-Mar-15 5.00pm CLOSED 21-Mar-15 1 ACCEPTED 1 1
Cutting off level) SA2
158 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00141A UEMB BSP NIK 21-Mar-15 ZN2 BLD Building Driven spun pile 300 dia LA3 20-Mar-15 22-Mar-15 5.00pm CLOSED 27-Mar-15 7 ACCEPTED 1 1
HELMI
159 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00142 Nik 21-Mar-15 ZN2 BLD Building Inspection for concreting works for lean conc ground 21-Mar-15 23-Mar-15 06.00pm CLOSED 21-Mar-15 0 ACCEPTED 1 1
beam SA2
160 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00143 Nik 21-Mar-15 ZN2 BLD Survey Joint survey ( STUMP) AS Built (MA1) 24-Mar-15 26-Mar-15 10.00am CLOSED 24-Mar-15 0 ACCEPTED 1 1
161 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00144 Nik 21-Mar-15 ZN2 BLD Survey Joint survey ( Piling Pointa) AS Built (SA4) 24-Mar-15 26-Mar-15 2.00PM CLOSED 24-Mar-15 0 ACCEPTED 1 1
162 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00145 Nik 21-Mar-15 ZN2 BLD Building Driven spun pile - 300mm dia (SA1) 24-Mar-15 26-Mar-15 07.30am CLOSED 28-Mar-15 4 ACCEPTED 1 1
163 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00146 Nik 21-Mar-15 ZN2 BLD Building Driven spun pile - 300mm dia (SA2) 22-Mar-15 24-Mar-15 07.30am CLOSED 25-Apr-15 34 ACCEPTED 1 1
164 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00147 Nik 21-Mar-15 ZN2 BLD Building Driven spun pile - 300mm dia (LA3) 22-Mar-15 24-Mar-15 07.30am CLOSED 25-Apr-15 34 ACCEPTED 1 1
165 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00148 Nik 21-Mar-15 ZN2 BLD Building Driven spun pile - 300mm dia (LA5) 22-Mar-15 24-Mar-15 07.30am CLOSED 21-Apr-15 30 ACCEPTED 1 1
166 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00149 Nik 21-Mar-15 ZN2 BLD Building Driven spun pile - 300mm dia (LA6) 22-Mar-15 24-Mar-15 07.30am CLOSED 28-Apr-15 37 ACCEPTED 1 1
167 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00149A Nik 23-Mar-15 ZN2 BLD Building Driven spun pile - 300mm dia (LA1) 22-Mar-15 24-Mar-15 07.30am CLOSED 24-Mar-15 2 ACCEPTED 1 1
168 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00150 Nik 21-Mar-15 ZN2 BLD Building Material delivery ( Spun Pile ) 300mm dia 24-Mar-15 26-Mar-15 08.00am CLOSED 10-Jun-15 78 ACCEPTED 1 1
169 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00151 Nik 21-Mar-15 ZN2 BLD Building Inspection formwork, rebar, Concreting ( Stump)-MA3 24-Mar-15 26-Mar-15 10.00am CLOSED 30-Mar-15 6 ACCEPTED 1 1
170 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00152 Nik 21-Mar-15 ZN2 BLD Building Inspection formwork, rebar, Concreting ( Ground beam)- 24-Mar-15 26-Mar-15 09.00am CLOSED 24-Mar-15 0 ACCEPTED 1 1
MA3
171 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00153 Nik 21-Mar-15 ZN2 BLD Building Backfilling works ( MA3) 24-Mar-15 26-Mar-15 10.00am CLOSED 30-Mar-15 6 ACCEPTED 1 1
172 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00154 Nik 21-Mar-15 ZN2 BLD Building Inspection formwork, rebar, concreting ( Pile cap) SA2 24-Mar-15 26-Mar-15 10.00am CLOSED 01-Apr-15 8 ACCEPTED 1 1
173 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00155 Nik 21-Mar-15 ZN2 BLD Building Backfilling works SA2 24-Mar-15 26-Mar-15 9.00am CLOSED 30-Mar-15 6 ACCEPTED 1 1
175 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00157 Nik 21-Mar-15 ZN2 BLD Building Inspection formwork, rebar, concreting (Ground beam) 24-Mar-15 26-Mar-15 9.00am CLOSED 25-Mar-15 1 ACCEPTED 1 1
SA2
176 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00158 Nik 21-Mar-15 ZN2 BLD Building backfilling works ( SA3) 24-Mar-15 26-Mar-15 9.00am CLOSED 30-Mar-15 6 ACCEPTED 1 1
177 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00159 Nik 21-Mar-15 ZN2 BLD Building Inspection for concreting works, (Lean conc ground beam) 24-Mar-15 26-Mar-15 9.00am CLOSED 25-Mar-15 1 ACCEPTED 1 1
SR3
179 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00161 Nik 21-Mar-15 ZN2 BLD Building excavation works SA4 22-Mar-15 24-Mar-15 08.00am CLOSED 18-Apr-15 27 ACCEPTED 1 1
180 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00162 Nik 21-Mar-15 ZN2 BLD Building Cutting of pile works ( Cut of level) SR4 24-Mar-15 26-Mar-15 08.00am CLOSED 26-Mar-15 2 ACCEPTED 1 1
181 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00163 Nik 21-Mar-15 ZN2 BLD Building Inspection for concreting works for lean con and pile plug 24-Mar-15 26-Mar-15 08.00am CLOSED 26-Mar-15 2 ACCEPTED 1 1
(SA4)
Inspection for concreting works for lean xon and pile plug
182 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00163A Nik 22-Mar-15 ZN2 BLD Building 23-Mar-15 25-Mar-15 08.00am CLOSED 11-Sep-15 172 ACCEPTED 1 1
(Cut of level) SA4
183 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00164 Dorce 24-Mar-15 ZN2 BLD Building Incoming material of Dorce. 25-Mar-15 27-Mar-15 11.00am CLOSED 30-Mar-15 5 ACCEPTED 1 1
184 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00165 Dorce 24-Mar-15 ZN2 BLD Building Installation of chassis visual check and their connections 25-Mar-15 27-Mar-15 11.00am CLOSED 25-Mar-15 0 ACCEPTED 1 1
(MA4) ground floor
185 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00166 Dorce 24-Mar-15 ZN2 BLD Building Chassis visual check and their connections (MA2) 25-Mar-15 27-Mar-15 11.00am CLOSED 25-Mar-15 0 ACCEPTED 1 1
186 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00167 Dorce 24-Mar-15 ZN2 BLD Building building ground floor wall panel inspection (MA2) 24-Mar-15 26-Mar-15 11.00am CLOSED 25-Mar-15 1 ACCEPTED 1 1
187 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00168 Nik 24-Mar-15 ZN2 BLD Survey Joint Survey ( Piling Points) SA1 25-Mar-15 27-Mar-15 11.00am CLOSED 25-Mar-15 0 ACCEPTED 1 1
188 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00169 Nik 24-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA 1 25-Mar-15 27-Mar-15 07.30 am CLOSED 25-Apr-15 31 ACCEPTED 1 1
189 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00170 Nik 24-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA2 25-Mar-15 27-Mar-15 07.30 am CLOSED 28-Apr-15 34 ACCEPTED 1 1
190 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00171 Nik 24-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA3 25-Mar-15 27-Mar-15 07.30 am CLOSED 28-Apr-15 34 ACCEPTED 1 1
191 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00172 Nik 24-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA5 25-Mar-15 27-Mar-15 07.30 am CLOSED 03-Apr-15 9 ACCEPTED 1 1
192 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00173 Nik 24-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA6 25-Mar-15 27-Mar-15 07.30 am CLOSED 28-Apr-15 34 ACCEPTED 1 1
196 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00177 Dorce 25-Mar-15 ZN2 BLD Building Visual Check for incoming material ( Truck 15-18-12-19) 26-Mar-15 28-Mar-15 10.00am CLOSED 27-Mar-15 1 ACCEPTED 1 1
197 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00178 Dorce 26-Mar-15 ZN2 BLD Building Building ground floor panels and walls settlement 27-Mar-15 29-Mar-15 15.00pm CLOSED 28-Mar-15 1 ACCEPTED 1 1
inspection CMA1
198 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00179 Qamarul 26-Mar-15 ZN2 BLD Building Inspection for concreting works ( Lean Con ground beam) 27-Mar-15 29-Mar-15 10.00am CLOSED 29-Mar-15 2 REJECTED 1 1
SA4
199 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00180 Qamarul 26-Mar-15 ZN2 BLD Building Backfilling works 27-Mar-15 29-Mar-15 10.00am CLOSED 18-Apr-15 22 ACCEPTED 1 1
200 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00180A Nik 26-Mar-15 ZN2 BLD Building Driven spun pile 300mm dia LA4 27-Mar-15 29-Mar-15 8.00am CLOSED 30-Apr-15 34 ACCEPTED 1 1
201 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00181 Qamarul 26-Mar-15 ZN2 BLD Building Inspection form work, rebar, concreting ( Pile Cap) 27-Mar-15 29-Mar-15 10.00am CLOSED 04-Apr-15 8 ACCEPTED 1 1
Inspection for concreting works for lean con and pile plug-
202 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00182 Qamarul 26-Mar-15 ZN2 BLD Building 27-Mar-15 29-Mar-15 10.00am CLOSED 29-Mar-15 2 ACCEPTED 1 1
( Cut of pile)
203 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00183 Qamarul 26-Mar-15 ZN2 BLD Building Material delivery- Spun pile 300mm dia 27-Mar-15 29-Mar-15 10.00am CLOSED 04-Apr-15 8 ACCEPTED 1 1
204 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00184 Qamarul 26-Mar-15 ZN2 BLD Survey JointSurvey for stump ( MA3) 27-Mar-15 29-Mar-15 10.00am CLOSED 27-Mar-15 0 ACCEPTED 1 1
205 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00185 Qamarul 26-Mar-15 ZN2 BLD Building Backfilling works MA3 27-Mar-15 29-Mar-15 10.00am CLOSED 30-Mar-15 3 ACCEPTED 1 1
206 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00186 Qamarul 26-Mar-15 ZN2 BLD Building Excavation works - Cut of pile level SA1 27-Mar-15 29-Mar-15 10.00am CLOSED 18-Apr-15 22 ACCEPTED 1 1
207 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00187 Qamarul 26-Mar-15 ZN2 BLD Building Cutting of pile works- Cut of level SA1 27-Mar-15 29-Mar-15 10.00am CLOSED 30-Mar-15 3 ACCEPTED 1 1
Inspection for concreting works for lean con and pile plug
208 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00188 Qamarul 26-Mar-15 ZN2 BLD Building 27-Mar-15 29-Mar-15 10.00am CLOSED 27-Mar-15 0 ACCEPTED 1 1
SA1 ( Cut of level
209 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00189 Qamarul 26-Mar-15 ZN2 BLD Building Inspection formwork,rebar,concreting Pile Cap SA1 27-Mar-15 29-Mar-15 10.00am CLOSED 04-Apr-15 8 ACCEPTED 1 1
210 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00190 Qamarul 26-Mar-15 ZN2 BLD Building Inspection formwork, rebar concreting ( Groind beam) SA2 27-Mar-15 29-Mar-15 10.00am CLOSED 04-Apr-15 8 ACCEPTED 1 1
211 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00191 Qamarul 26-Mar-15 ZN2 BLD Building Inspection formwork, rebar concreting Stump ( SA2) 27-Mar-15 29-Mar-15 10.00am CLOSED 30-Mar-15 3 REJECTED 1 1
212 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00192 Qamarul 26-Mar-15 ZN2 BLD Building Inspection formwork, rebar concreting Stump ( SA3) 27-Mar-15 29-Mar-15 10.00am CLOSED 04-Apr-15 8 ACCEPTED 1 1
213 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00193 Qamarul 26-Mar-15 ZN2 BLD Building Backfill works SA1 28-Mar-15 30-Mar-15 10.00am CLOSED 30-Mar-15 2 ACCEPTED 1 1
214 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00194 Qamarul 26-Mar-15 ZN2 BLD Building Inspection for concreting works ( Lean Con concrete) 28-Mar-15 30-Mar-15 10.00am CLOSED 30-Mar-15 2 ACCEPTED 1 1
Ground Beam- SA1
216 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00196 Nik 27-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA 1 28-Mar-15 30-Mar-15 7.30am CLOSED 06-Apr-15 9 ACCEPTED 1 1
217 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00197 Nik 27-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA2 28-Mar-15 30-Mar-15 7.30am CLOSED 28-Apr-15 31 ACCEPTED 1 1
218 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00198 Nik 27-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA3 28-Mar-15 30-Mar-15 7.30am CLOSED 28-Apr-15 31 ACCEPTED 1 1
219 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00199 Nik 27-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA4 28-Mar-15 30-Mar-15 7.30am CLOSED 28-Apr-15 31 ACCEPTED 1 1
220 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00200 Nik 27-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA5 28-Mar-15 30-Mar-15 7.30am CLOSED 03-Apr-15 6 ACCEPTED 1 1
221 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00201 Nik 27-Mar-15 ZN2 BLD Building Driven Spun pile 300mm LA6 28-Mar-15 30-Mar-15 7.30am CLOSED 28-Apr-15 31 ACCEPTED 1 1
222 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00202 Nik 27-Mar-15 ZN2 BLD Building Excavation works ( SA4) 28-Mar-15 30-Mar-15 9.00am CLOSED 18-Apr-15 21 ACCEPTED 1 1
223 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00203 Nik 27-Mar-15 ZN2 BLD Building Cutting of pile works ( Cut of level ( SA4) 28-Mar-15 30-Mar-15 9.00am CLOSED 18-Apr-15 21 ACCEPTED 1 1
224 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00204 uem Azah 27-Mar-15 ZN2 CIV Testing PRE-DCP TEST ( 13 point) 28-Mar-15 30-Mar-15 10.00am CLOSED 29-Mar-15 1 ACCEPTED 1 1
225 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00205 Samshear 27-Mar-15 ZN2 ARC BLD Injextion & spray of Anti termite to the pile cap and stump 28-Mar-15 30-Mar-15 10.00am CLOSED 28-Mar-15 0 ACCEPTED 1 1
at MA3
226 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00206 Zaki 27-Mar-15 ZN2 CIV Testing MP test for lifting at small pakage building ( ZN2) 28-Mar-15 30-Mar-15 10.00am CLOSED 01-Apr-15 4 ACCEPTED 1 1
227 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00207 nik 28-Mar-15 ZN2 CIV Building Backfilling works ( MA3) 30-Mar-15 1-Apr-15 08.00am CLOSED 18-Apr-15 19 ACCEPTED 1 1
229 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00209 nik 28-Mar-15 ZN2 CIV Building Inspection formwork, rebar, concreting-pile cap (SA1) 30-Mar-15 1-Apr-15 02.00pm CLOSED 04-Apr-15 5 ACCEPTED 1 1
231 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00211 nik 28-Mar-15 ZN2 CIV Building Inspection formwork, rebar, concreting- Stump (SA2) 30-Mar-15 1-Apr-15 3.00pm CLOSED 05-Apr-15 6 REJECTED 1 1
232 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00212 nik 28-Mar-15 ZN2 CIV Building Inspection formwork, rebar, concreting- Stump (SA3) 30-Mar-15 1-Apr-15 9.00am CLOSED 01-Apr-15 2 REJECTED 1 1
233 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00213 nik 28-Mar-15 ZN2 CIV Survey Joint survey- Stump ( SA3) 30-Mar-15 1-Apr-15 10.00am CLOSED 30-Mar-15 0 ACCEPTED 1 1
235 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00215 nik 28-Mar-15 ZN2 CIV Building Inspection for concreting work-Lean Con and Pile cap 30-Mar-15 1-Apr-15 10.00am CLOSED 04-Apr-15 5 ACCEPTED 1 1
( SA4)
236 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00216 nik 28-Mar-15 ZN2 CIV Building Backfilling works ( SA4) 30-Mar-15 1-Apr-15 2.00pm CLOSED 18-Apr-15 19 ACCEPTED 1 1
237 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00217 nik 28-Mar-15 ZN2 CIV Building Inspection for concreting works- Lean con ground beam 30-Mar-15 1-Apr-15 4.00pm CLOSED 04-Apr-15 5 REJECTED 1 1
( SA4)
238 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00218 nik 28-Mar-15 ZN2 CIV Building Material delivery- Spun pile 300mm dia 30-Mar-15 1-Apr-15 9.00am CLOSED 04-Apr-15 5 ACCEPTED 1 1
Injection and spray at pile cap and stump for anti termite.
239 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00219 Fahmi 30-Mar-15 ZN2 ARC BLD 1. to inject 4 holes near pile cap and pour liquid. 2) to 31-Mar-15 2-Apr-15 12.00pm CLOSED 31-Mar-15 0 ACCEPTED 1 1
spray the stamp and exposed pile cap
240 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00220 Azah 30-Mar-15 ZN2 CIV Building Plate bearing test at Zone 2 (Small Pakage area) 31-Mar-15 2-Apr-15 10.00am CLOSED 01-Apr-15 1 ACCEPTED 1 1
241 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00221 Nik 30-Mar-15 ZN2 CIV Building Backfilling works for ground beam ( SA1) 31-Mar-15 2-Apr-15 10.00am CLOSED 18-Apr-15 18 ACCEPTED 1 1
242 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00222 Nik 30-Mar-15 ZN2 CIV Building Inspection for concreting works ( SA1) 31-Mar-15 2-Apr-15 10.00am CLOSED 23-Jun-15 84 ACCEPTED 1 1
243 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00223 Nik 30-Mar-15 ZN2 CIV Building Backfilling works for beam ( SA2) 31-Mar-15 2-Apr-15 9.00am CLOSED 18-Apr-15 18 ACCEPTED 1 1
244 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00224 Nik 30-Mar-15 ZN2 CIV Building Backfilling works for ground beam ( SA3) 31-Mar-15 2-Apr-15 9.00am CLOSED 18-Apr-15 18 ACCEPTED 1 1
245 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00225 Nik 30-Mar-15 ZN2 CIV Building Inspection formwork,rebar,concreting ( SA4) 31-Mar-15 2-Apr-15 10.00am CLOSED 31-Mar-15 0 ACCEPTED 1 1
246 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00226 Nik 30-Mar-15 ZN2 CIV Building Driven spun pile ( 300mm) LA1 31-Mar-15 2-Apr-15 10.00am CLOSED 07-Apr-15 7 ACCEPTED 1 1
247 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00227 Nik 30-Mar-15 ZN2 CIV Building Driven spun pile ( 300mm) LA2 31-Mar-15 2-Apr-15 7.30am CLOSED 28-Apr-15 28 ACCEPTED 1 1
248 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00228 Nik 30-Mar-15 ZN2 CIV Building Driven spun pile ( 300mm) LA3 31-Mar-15 2-Apr-15 7.30am CLOSED 28-Apr-15 28 ACCEPTED 1 1
249 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00229 Nik 30-Mar-15 ZN2 CIV Building Driven spun pile ( 300mm) LA4 31-Mar-15 2-Apr-15 7.30am CLOSED 28-Apr-15 28 ACCEPTED 1 1
250 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00230 Nik 30-Mar-15 ZN2 CIV Building Driven spun pile ( 300mm) LA5 31-Mar-15 2-Apr-15 7.30am CLOSED 16-Apr-15 16 ACCEPTED 1 1
251 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00231 Nik 30-Mar-15 ZN2 CIV Building Driven spun pile ( 300mm) LA6 31-Mar-15 2-Apr-15 7.30am CLOSED 28-Apr-15 28 ACCEPTED 1 1
255 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00235 Dorce 31-Mar-15 ZN2 STR Building Manager Accommodation 4 first floors chassis settlement- 1-Apr-15 3-Apr-15 03.00pm CLOSED 10-Apr-15 9 ACCEPTED 1 1
Installation and visual check inspection
257 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00237 Dorce 31-Mar-15 ZN2 STR Building Manager accomadation 3 ground floor chassis settlement- 1-Apr-15 3-Apr-15 4.00pm CLOSED 10-Apr-15 9 ACCEPTED 1 1
installation and visual check inspection
258 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00237A Nik 31-Mar-15 ZN2 BLD Building Cutting of pile works ( Cut of level) SA4 31-Mar-15 2-Apr-15 9.00am CLOSED 11-Sep-15 164 ACCEPTED 1 1
259 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00237B Nik 31-Mar-15 ZN2 BLD Building Inspection formwork rebar and concreting for Ground 31-Mar-15 2-Apr-15 9.00am CLOSED 11-Sep-15 164 ACCEPTED 1 1
beam SA4
261 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00239 Nik 1-Apr-15 ZN2 CIV Building Inspection formwork, rebar, concreting for ground Stump ( 2-Apr-15 4-Apr-15 03.00pm CLOSED 16-Apr-15 14 ACCEPTED 1 1
SA1)
262 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00240 Nik 1-Apr-15 ZN2 CIV Building Backfilling works for ground beam SA2 2-Apr-15 4-Apr-15 08.00am CLOSED 18-Apr-15 16 ACCEPTED 1 1
263 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00241 Nik 1-Apr-15 ZN2 CIV Building Inspection formwork, rebar, concreting for ground Stump ( 2-Apr-15 4-Apr-15 02.00pm CLOSED 02-Apr-15 0 ACCEPTED 1 1
SA2)
264 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00242 Nik 1-Apr-15 ZN2 CIV Survey Joint Survey for stump (SA2) 2-Apr-15 4-Apr-15 10.00am CLOSED 03-Apr-15 1 ACCEPTED 1 1
265 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00243 Nik 1-Apr-15 ZN2 CIV Building Backfilling works ground beam ( SA4) 2-Apr-15 4-Apr-15 08.00am CLOSED 18-Apr-15 16 ACCEPTED 1 1
266 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00244 Nik 1-Apr-15 ZN2 CIV Building Inspection for concreting works ( Leam Con Ground beam) 2-Apr-15 4-Apr-15 11.00am CLOSED 03-Apr-15 1 ACCEPTED 1 1
(SA4)
267 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00245 Nik 1-Apr-15 ZN2 CIV Building Inspection formwork, rebar,concreting ( Stump) SA4) 2-Apr-15 4-Apr-15 4.oopm CLOSED 10-Jun-15 69 REJECTED 1 1
268 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00246 Nik 1-Apr-15 ZN2 CIV Survey Joint survey-piling point (L.A5) 2-Apr-15 4-Apr-15 9.00am CLOSED 02-Apr-15 0 ACCEPTED 1 1
269 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00247 Nik 1-Apr-15 ZN2 CIV Building Excavation works ( Cut of Pile) LA5) 2-Apr-15 4-Apr-15 10.00am CLOSED 18-Apr-15 16 ACCEPTED 1 1
270 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00248 Nik 1-Apr-15 ZN2 CIV Building Cutting of pile works (Cut of pile) LA5 2-Apr-15 4-Apr-15 11.00am CLOSED 18-Apr-15 16 ACCEPTED 1 1
271 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00249 Nik 1-Apr-15 ZN2 CIV Building Inspection for concrete works for lean con and pile plug, 2-Apr-15 4-Apr-15 3.00pm CLOSED 22-Jun-15 81 ACCEPTED 1 1
cut of level) LA5
272 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00250 Nik 1-Apr-15 ZN2 CIV Survey Joint survey- piling point ( LA2) 2-Apr-15 4-Apr-15 08.00am CLOSED 02-Apr-15 0 ACCEPTED 1 1
273 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00251 Nik 1-Apr-15 ZN2 CIV Building Excavation works-( cut of level) LA3 2-Apr-15 4-Apr-15 09.00am CLOSED 22-Jun-15 81 ACCEPTED 1 1
274 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00252 Nik 1-Apr-15 ZN2 CIV Building Cutting of pile works ( Cut of pile) LA3) 2-Apr-15 4-Apr-15 10.00am CLOSED 10-Jun-15 69 REJECTED 1 1
275 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00253 Nik 1-Apr-15 ZN2 CIV Building Inspection for concreting works for lean con and pile plug - 2-Apr-15 4-Apr-15 2.00pm CLOSED 10-Jun-15 69 REJECTED 1 1
Cut of level ( LA3)
276 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00254 Adzim 1-Apr-15 ZN2 CIV Testing FDT at MA3-2points, SA2-2points and SA3 2 points. 2-Apr-15 4-Apr-15 10.00am CLOSED 10-Jun-15 69 ACCEPTED 1 1
277 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00255 Nik 2-Apr-15 ZN2 BLD Building Inspection formwork,rebar, concreting for ground beam 3-Apr-15 5-Apr-15 09.00am CLOSED 06-Apr-15 3 ACCEPTED 1 1
278 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00256 Nik 2-Apr-15 ZN2 CIV Building Driven spun pile (LA1) 3-Apr-15 5-Apr-15 7.30am CLOSED 09-Apr-15 6 ACCEPTED 1 1
279 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00257 Nik 2-Apr-15 ZN2 CIV Building Driven spun pile (LA3) 3-Apr-15 5-Apr-15 7.30am CLOSED 28-Apr-15 25 ACCEPTED 1 1
280 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00258 Nik 2-Apr-15 ZN2 CIV Building Driven spun pile (LA4) 3-Apr-15 5-Apr-15 7.30am CLOSED 28-Apr-15 25 ACCEPTED 1 1
281 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00259 Nik 2-Apr-15 ZN2 CIV Building Driven spun pile (LA6) 3-Apr-15 5-Apr-15 7.30am CLOSED 28-Apr-15 25 ACCEPTED 1 1
283 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00261 Dorce 3-Apr-15 ZN2 STR Building Wall panel have been exposed to equmilated rain water 3-Apr-15 5-Apr-15 10.00am CLOSED 03-Apr-15 0 ACCEPTED 1 1
on the ground due to heavy rain.
284 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00262 Nik 4-Apr-15 ZN2 CIV Building Inspection formwork, rebar, concreting ( Ground beam ) 5-Apr-15 7-Apr-15 08.00am CLOSED 06-Apr-15 1 ACCEPTED 1 1
SA4
285 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00263 Nik 4-Apr-15 ZN2 CIV Building Inspection formwork, rebar, concreting ( Stump) SA4 5-Apr-15 7-Apr-15 08.00am CLOSED 07-Apr-15 2 ACCEPTED 1 1
286 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00264 Nik 4-Apr-15 ZN2 CIV Building Inspection formwork, rebar, concreting ( Stump) SA1 5-Apr-15 7-Apr-15 09.00am CLOSED 10-Apr-15 5 ACCEPTED 1 1
287 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00265 Nik 4-Apr-15 ZN2 CIV Building Backfilling works for ground beam ( SA1) 5-Apr-15 7-Apr-15 09.00am CLOSED 18-Apr-15 13 ACCEPTED 1 1
288 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00266 Nik 4-Apr-15 ZN2 CIV Building Excavation works-(Cut of level) (LA3) 5-Apr-15 7-Apr-15 10.00am CLOSED 23-Jun-15 79 ACCEPTED 1 1
289 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00267 Nik 4-Apr-15 ZN2 CIV Building Cutting of pile works ( Cut of pile) LA3) 5-Apr-15 7-Apr-15 10.00am CLOSED 23-Jun-15 79 ACCEPTED 1 1
290 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00268 Nik 4-Apr-15 ZN2 CIV Building Inspection for concreting works for lean con and pile plug- 5-Apr-15 7-Apr-15 10.00am CLOSED 10-Apr-15 5 ACCEPTED 1 1
( Cut of level) LA3
291 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00269 Nik 4-Apr-15 ZN2 CIV Building Driven spun pile ( LA1) 6-Apr-15 8-Apr-15 07.30am CLOSED 10-Apr-15 4 ACCEPTED 1 1
292 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00270 Nik 4-Apr-15 ZN2 CIV Survey Joint Survey-Piling point ( LA1) 6-Apr-15 8-Apr-15 07.30am CLOSED 06-Apr-15 0 ACCEPTED 1 1
293 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00271 Nik 4-Apr-15 ZN2 CIV Building Driven spun pile - 300mm diameter ( LA3) 6-Apr-15 8-Apr-15 07.30am CLOSED 28-Apr-15 22 ACCEPTED 1 1
294 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00272 Nik 4-Apr-15 ZN2 CIV Survey Joint survey piling point ( LA3) 6-Apr-15 8-Apr-15 07.30am CLOSED 06-Apr-15 0 ACCEPTED 1 1
295 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00273 Nik 4-Apr-15 ZN2 CIV Building Driven spun pile - 300mm diameter ( LA4) 6-Apr-15 8-Apr-15 07.30am CLOSED 28-Apr-15 22 ACCEPTED 1 1
296 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00274 Nik 4-Apr-15 ZN2 CIV Survey Joint survey piling point ( LA4) 6-Apr-15 8-Apr-15 07.30am CLOSED 06-Apr-15 0 ACCEPTED 1 1
297 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00275 Fahmi 4-Apr-15 ZN2 ARC BLD Anti-termites injection and spraying at stump and pile cap 6-Apr-15 8-Apr-15 12.00pm CLOSED 06-Apr-15 0 ACCEPTED 1 1
at supervisory Accommodation 2 ( SA2)
298 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00276 Dorce 6-Apr-15 ZN2 STR Structure Building first floor chassis settlement and installation 7-Apr-15 9-Apr-15 11.00am CLOSED 09-Apr-15 2 ACCEPTED 1 1
inspection
300 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00278 Dorce 6-Apr-15 ZN2 STR Structure Building ground floor internal and external wall settlement 7-Apr-15 9-Apr-15 02.00pm CLOSED 10-Apr-15 3 ACCEPTED 1 1
inspection
301 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00279 Nik 6-Apr-15 ZN2 CIV Building Excavation works (Cut of level ) LA3 7-Apr-15 9-Apr-15 08.00am CLOSED 22-Jun-15 76 ACCEPTED 1 1
302 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00280 Nik 6-Apr-15 ZN2 CIV Survey Join Survey As Built for stump ( SA1) 7-Apr-15 9-Apr-15 9.00am CLOSED 07-Apr-15 0 ACCEPTED 1 1
303 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00281 Nik 6-Apr-15 ZN2 CIV Building Backfilling works for ground beam (2nd layer) SA1 7-Apr-15 9-Apr-15 8.00am CLOSED 22-Jun-15 76 ACCEPTED 1 1
304 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00282 Nik 6-Apr-15 ZN2 CIV Building Backfilling works for ground beam (Second Layer) SA4 7-Apr-15 9-Apr-15 10.00am CLOSED 18-Apr-15 11 ACCEPTED 1 1
305 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00282A Nik 6-Apr-15 ZN2 CIV Building Driven spun pile 300 dia LA6 7-Apr-15 9-Apr-15 10.00am CLOSED 18-Apr-15 11 ACCEPTED 1 1
306 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00283 Nik 6-Apr-15 ZN2 CIV Building Inspection formwork,rebar,concreting for stump (SA4) 7-Apr-15 9-Apr-15 02.30pm CLOSED 08-Apr-15 1 ACCEPTED 1 1
307 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00284 Nik 6-Apr-15 ZN2 CIV Building Cutting of pile works (cut of level) SA3 7-Apr-15 9-Apr-15 11.00am CLOSED 23-Jun-15 77 ACCEPTED 1 1
Inspection for concreting works for lean con and pile plug (
308 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00285 Nik 6-Apr-15 ZN2 CIV Building 7-Apr-15 9-Apr-15 4.00pm CLOSED 09-Apr-15 2 ACCEPTED 1 1
Cut of level) LA3
309 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00286 Nik 6-Apr-15 ZN2 CIV Building Inspection formwork, rebar, concreting ( Pile cap) LA3 7-Apr-15 9-Apr-15 04.00pm CLOSED 08-Apr-15 1 ACCEPTED 1 1
310 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00287 Dorce 6-Apr-15 ZN2 STR Structure Building first floor external and internal panell wall 7-Apr-15 9-Apr-15 03.00pm CLOSED 10-Apr-15 3 ACCEPTED 1 1
settlement inspection
311 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00288 Nik 8-Apr-15 ZN2 CIV Building Maintain Load test ( LA1) 9-Apr-15 11-Apr-15 9.00am CLOSED 28-Apr-15 19 ACCEPTED 1 1
312 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00289 Nik 8-Apr-15 ZN2 CIV Building Inspection form work, rebar, concreting for pile cap ( LA5) 9-Apr-15 11-Apr-15 10.00am CLOSED 22-Jun-15 74 ACCEPTED 1 1
314 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00291 Adzim 9-Apr-15 ZN2 STR Testing FDT at SA1 and SA4 10-Apr-15 12-Apr-15 10.00am CLOSED 10-Jun-15 61 ACCEPTED 1 1
315 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00292 Dorce 9-Apr-15 ZN2 STR Structure Building first floor ( Internal and walls) settlement 10-Apr-15 12-Apr-15 10.00am CLOSED 25-Apr-15 15 ACCEPTED 1 1
inspection CMA2
316 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00293 Dorce 9-Apr-15 ZN2 STR Structure Building second floors chassis settlement and installation 10-Apr-15 12-Apr-15 11.00am CLOSED 25-Apr-15 15 ACCEPTED 1 1
inspection
317 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00294 Dorce 9-Apr-15 ZN2 STR Structure Visual check for incoming material (Truck no 82-85-75-86) 10-Apr-15 12-Apr-15 10.30am CLOSED 15-Apr-15 5 ACCEPTED 1 1
318 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00295 Dorce 9-Apr-15 ZN2 STR Structure Building first floor ( Internal and external walls) settlement 10-Apr-15 12-Apr-15 4.00pm CLOSED 25-Apr-15 15 ACCEPTED 1 1
inspection
319 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00296 Nik 9-Apr-15 ZN2 CIV Survey Joint Survey as built stump (SA4) 10-Apr-15 12-Apr-15 8.00am CLOSED 10-Apr-15 0 ACCEPTED 1 1
320 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00297 Nik 9-Apr-15 ZN2 CIV Building Backfilling works for ground beam second layer SA4 10-Apr-15 12-Apr-15 9.00am CLOSED 23-Jun-15 74 ACCEPTED 1 1
Inspection for concreteing works for lean con and pile plug
321 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00298 Nik 9-Apr-15 ZN2 CIV Building 10-Apr-15 12-Apr-15 10.00am CLOSED 10-Apr-15 0 REJECTED 1 1
( Cut of level) LA3
322 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00299 Nik 9-Apr-15 ZN2 CIV Building Inspection formworki, rebar, concreting pile cap (LA3) 10-Apr-15 12-Apr-15 11.00am CLOSED 10-Apr-15 0 ACCEPTED 1 1
323 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00300 Nik 9-Apr-15 ZN2 CIV Building Backfilling works for Pile Cap ( First Layer) LA3 10-Apr-15 12-Apr-15 11.00am CLOSED 15-Apr-15 5 ACCEPTED 1 1
324 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00301 Nik 9-Apr-15 ZN2 CIV Building Inspection for concreting works ( Lean con ground beam) 10-Apr-15 12-Apr-15 2.00pm CLOSED 10-Apr-15 0 ACCEPTED 1 1
LA3
325 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00302 Nik 9-Apr-15 ZN2 CIV Building Excavation works LA2 10-Apr-15 12-Apr-15 2.00pm CLOSED 22-Jun-15 73 ACCEPTED 1 1
328 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00305 Dorce 10-Apr-15 ZN2 STR Structure Building ground floor chassis settlement and installation 11-Apr-15 13-Apr-15 4.30pm CLOSED 25-Apr-15 14 ACCEPTED 1 1
inspection (MA3)
330 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00307 nik 10-Apr-15 ZN2 CIV Building Reinforcement Steel Bar (Delivery on site) supplier :Ann 11-Apr-15 13-Apr-15 8.30am CLOSED 11-Apr-15 0 ACCEPTED 1 1
Joo
331 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00308 Fahmi 10-Apr-15 ZN2 ARC BLD Injection and spraying anti termites for Stump at 11-Apr-15 13-Apr-15 12.00pm CLOSED 11-Apr-15 0 ACCEPTED 1 1
supervisory accommondation 1 SA1
332 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00309 nik 10-Apr-15 ZN2 CIV Building Backfilling works for ground beam ( 1 st layer) LA5 11-Apr-15 13-Apr-15 9.00am CLOSED 22-Jun-15 72 ACCEPTED 1 1
333 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00310 nik 10-Apr-15 ZN2 CIV Building Excavation works ( Cut of level) LA6 11-Apr-15 13-Apr-15 10.00am CLOSED 23-Jun-15 73 ACCEPTED 1 1
334 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00311 Fahmi 11-Apr-15 ZN2 ARC BLD Injection and spray ing anti termite for stump and pile cap 13-Apr-15 15-Apr-15 12.00pm CLOSED 13-Apr-15 0 ACCEPTED 1 1
at SA4
335 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00312 Nik 9-Apr-15 ZN2 CIV Building Inspection for concreting works. ( Lean Con ground beam 10-Apr-15 12-Apr-15 6.00pm CLOSED 14-Apr-15 4 ACCEPTED 1 1
(LA5)
336 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00313 Nik 11-Apr-15 ZN2 CIV Building Cutting of pile works ( Cut of level) LA6 13-Apr-15 15-Apr-15 08.00am CLOSED 22-Jun-15 70 ACCEPTED 1 1
337 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00314 Nik 11-Apr-15 ZN2 CIV Building Inspection for concreting works (Lean conx\crete ground 13-Apr-15 15-Apr-15 11.15am CLOSED 13-Apr-15 0 ACCEPTED 1 1
beam) LA5
339 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00316 Nik 11-Apr-15 ZN2 CIV Building Inspection formworks , rebar, concreting ground beam 13-Apr-15 15-Apr-15 3.00pm CLOSED 13-Apr-15 0 ACCEPTED 1 1
LA5
340 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00317 Nik 11-Apr-15 ZN2 CIV Building Inspection for concreting works ( Lean con Ground beam) 13-Apr-15 15-Apr-15 3.30pm CLOSED 13-Apr-15 0 ACCEPTED 1 1
LA3
341 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00318 Nik 11-Apr-15 ZN2 CIV Building Inspection for concreting works for lean con and pile plug ( 13-Apr-15 15-Apr-15 4.00pm CLOSED 20-Jun-15 68 ACCEPTED 1 1
Cut of level ( LA6)
342 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00319 Nik 13-Apr-15 ZN2 CIV Building Excavation works ( Cut of Level) LA2 14-Apr-15 16-Apr-15 7.30am CLOSED 23-Jun-15 70 ACCEPTED 1 1
343 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00320 Nik 13-Apr-15 ZN2 CIV Building Cutting of pile works ( Cut of level) LA2 14-Apr-15 16-Apr-15 2.30pm CLOSED 23-Jun-15 70 ACCEPTED 1 1
344 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00321 Nik 13-Apr-15 ZN2 CIV Building Inspection formwork, rebar, concreting pile cap ( LA2) 14-Apr-15 16-Apr-15 3.00pm CLOSED 15-Apr-15 1 ACCEPTED 1 1
Inspection for concreting works for lean con and pile plug (
345 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00322 Nik 13-Apr-15 ZN2 CIV Building 14-Apr-15 16-Apr-15 6.00pm CLOSED 15-Apr-15 1 ACCEPTED 1 1
Cut of level) LA2)
346 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00323 Dorce 13-Apr-15 ZN2 STR Structure Visual check for incoming materials ( Truck no: 14-Apr-15 16-Apr-15 10.00am CLOSED 15-Apr-15 1 ACCEPTED 1 1
96,97,94,93,81,73,72,74,77,98,93,87,80,95,76,79)
347 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00324 Nik 14-Apr-15 ZN2 CIV Building Excavation works- Depth cut of level=3.87mm (LA1) 15-Apr-15 17-Apr-15 08.00am CLOSED 10-Jun-15 56 REJECTED 1 1
348 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00325 Nik 14-Apr-15 ZN2 CIV Building Excavation works- Depth cut of level=3.87mm (LA2) 15-Apr-15 17-Apr-15 08.00am CLOSED 23-Jun-15 69 ACCEPTED 1 1
349 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00326 Dorce 15-Apr-15 ZN2 STR Structure Building second floor chassis installation and settlement 16-Apr-15 18-Apr-15 08.00am CLOSED 25-Apr-15 9 ACCEPTED 1 1
( MA1)
350 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00327 Dorce 15-Apr-15 ZN2 STR Structure Building second floor chassis installation and settlement 16-Apr-15 18-Apr-15 8.30am CLOSED 25-Apr-15 9 ACCEPTED 1 1
( MA2)
352 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00329 Dorce 15-Apr-15 ZN2 STR Structure Building second floor internal and external wall panels 16-Apr-15 18-Apr-15 9.30am CLOSED 25-Apr-15 9 ACCEPTED 1 1
installation ( MA4)
353 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00330 Dorce 15-Apr-15 ZN2 STR Structure Building fround floor chassis installation and settlement 16-Apr-15 18-Apr-15 10.00am CLOSED 25-Apr-15 9 ACCEPTED 1 1
(MA4)
354 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00331 Dorce 15-Apr-15 ZN2 STR Structure Building second floor internal and external wall panel 16-Apr-15 18-Apr-15 4.00pm CLOSED 25-Apr-15 9 ACCEPTED 1 1
installation inspection ( MA1)
355 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00332 Dorce 15-Apr-15 ZN2 STR Structure Building ground floor chassis installation and settlement 16-Apr-15 18-Apr-15 10.45am CLOSED 25-Apr-15 9 ACCEPTED 1 1
(SA2)
357 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00334 Dorce 15-Apr-15 ZN2 STR Structure Visual check for incoming material ( Truck 16-Apr-15 18-Apr-15 11.00am CLOSED 18-Apr-15 2 ACCEPTED 1 1
no:83,91,90,84,80,78,89,92,)
358 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00335 Nik 8-Apr-15 ZN2 CIV Survey Joint survey asbuilt piling point LA6 9-Apr-15 11-Apr-15 9.00am CLOSED 09-Apr-15 0 ACCEPTED 1 1
359 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00336 Nik 15-Apr-15 ZN2 CIV Building Backfilling works for ground beam (Second Layer) LA3 16-Apr-15 18-Apr-15 3.30pm CLOSED 20-Apr-15 4 ACCEPTED 1 1
360 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00337 Nik 15-Apr-15 ZN2 CIV Building inspection fromwork,rebar,concreting for sump ( LA5) 16-Apr-15 18-Apr-15 3.30pm CLOSED 11-Sep-15 148 ACCEPTED 1 1
361 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00338 Nik 15-Apr-15 ZN2 CIV Building inspection fromwork,rebar,concreting for Ground beam 16-Apr-15 18-Apr-15 4.00pm CLOSED 30-Apr-15 14 ACCEPTED 1 1
( LA3)
362 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00339 Nik 15-Apr-15 ZN2 CIV Building inspection fromwork,rebar,concreting for stump ( LA3) 16-Apr-15 18-Apr-15 4.00pm CLOSED 30-Apr-15 14 ACCEPTED 1 1
363 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00340 Nik 15-Apr-15 ZN2 CIV Building inspection fromwork,rebar,concreting for pile cap ( LA3) 16-Apr-15 18-Apr-15 5.00pm CLOSED 22-Jun-15 67 ACCEPTED 1 1
364 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00341 Nik 15-Apr-15 ZN2 CIV Building Backfilling works for ground beam (1st Layer)( LA2) 17-Apr-15 19-Apr-15 9.00am CLOSED 19-Jun-15 63 ACCEPTED 1 1
365 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00342 Nik 15-Apr-15 ZN2 CIV Building Backfilling works for ground beam (second Layer) LA5 17-Apr-15 19-Apr-15 10.00am CLOSED 23-Jun-15 67 ACCEPTED 1 1
366 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00343 Nik 13-Apr-15 ZN2 CIV Building Inspection formwork,rebar, concreting pile cap (LA6) 14-Apr-15 16-Apr-15 4.30pm CLOSED 22-Jun-15 69 ACCEPTED 1 1
367 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00344 Nik 15-Apr-15 ZN2 CIV Building Inspection formwork,rebar, concreting pile cap (LA6) 17-Apr-15 19-Apr-15 5.00pm CLOSED 22-Jun-15 66 ACCEPTED 1 1
368 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00345 Nik 16-Apr-15 ZN2 CIV Building Cutting of pile works (Cul of level) LA6 17-Apr-15 19-Apr-15 9.00am CLOSED 23-Jun-15 67 ACCEPTED 1 1
Inspection for concreting works lean con and pile plug (Cut
369 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00346 Nik 16-Apr-15 ZN2 CIV Building 17-Apr-15 19-Apr-15 11.00am CLOSED 10-Jun-15 54 REJECTED 1 1
of level) LA4
370 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00347 Nik 16-Apr-15 ZN2 CIV Building Backfilling works for ground beam 1st layer LA6 17-Apr-15 19-Apr-15 11.00am CLOSED 22-Jun-15 66 ACCEPTED 1 1
372 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00349 Nik 17-Apr-15 ZN2 CIV Building Inspection for concreting works lean con Ground beam 18-Apr-15 20-Apr-15 11.00am CLOSED 23-Jun-15 66 ACCEPTED 1 1
LA2
373 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00350 Nik 18-Apr-15 ZN2 CIV Building Excavation works - Cut of level ( LA4) 19-Apr-15 21-Apr-15 8.00am CLOSED 22-Jun-15 64 ACCEPTED 1 1
374 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00351 Nik 18-Apr-15 ZN2 CIV Building Excavation works - Cut of level ( LA1) 19-Apr-15 21-Apr-15 8.00am CLOSED 21-Apr-15 2 ACCEPTED 1 1
375 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00352 Nik 18-Apr-15 ZN2 CIV Building Inspection formworks,rebar,concreting (Ground Beam) 19-Apr-15 21-Apr-15 10.00am CLOSED 23-Jun-15 65 ACCEPTED 1 1
LA6
376 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00353 Nik 18-Apr-15 ZN2 CIV Building Cutting of pile works ( Cut of level) LA4 19-Apr-15 21-Apr-15 2.00pm CLOSED 21-Apr-15 2 ACCEPTED 1 1
377 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00354 Nik 18-Apr-15 ZN2 CIV Survey Joint Survey as built stump (LA3) 20-Apr-15 22-Apr-15 8.00am CLOSED 20-Apr-15 0 ACCEPTED 1 1
378 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00355 Nik 18-Apr-15 ZN2 CIV Building Inspection formwork,rebar,concreting(Ground beam)LA2 20-Apr-15 22-Apr-15 9.00am CLOSED 22-Jun-15 63 ACCEPTED 1 1
379 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00356 Nik 18-Apr-15 ZN2 CIV Building Cutting of pile works (Cut of level)LA1 20-Apr-15 22-Apr-15 9.00am CLOSED 20-Apr-15 0 ACCEPTED 1 1
380 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00357 Nik 18-Apr-15 ZN2 CIV Survey Joint survey As Built Stump (LA5) 20-Apr-15 22-Apr-15 2.00pm CLOSED 20-Apr-15 0 CANCEL 1 1
381 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00358 Nik 18-Apr-15 ZN2 CIV Building Inspection for concreting works for lean con and pile plug 20-Apr-15 22-Apr-15 4.00pm CLOSED 13-Jul-15 84 ACCEPTED 1 1
(Cut of level) LA4(CLA5)
382 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00359 Nik 18-Apr-15 ZN2 CIV Building Inspection formwork,rebar,concreting stump (LA6) 20-Apr-15 22-Apr-15 3.00pm CLOSED 10-Jun-15 51 REJECTED 1 1
383 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00360 Nik 18-Apr-15 ZN2 CIV Building Inspection for concreting works for lean con and pile cap 20-Apr-15 22-Apr-15 5.00pm CLOSED 22-Jun-15 63 ACCEPTED 1 1
(Cut of level) LA1
384 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00361 Nik 18-Apr-15 ZN2 CIV Building Backfilling works for G.Beam (2nd layer) LA5 20-Apr-15 22-Apr-15 8.30am CLOSED 23-Jun-15 64 ACCEPTED 1 1
385 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00362 Nik 18-Apr-15 ZN2 CIV Building Backfilling works for G.beam (1st Layer)LA2 20-Apr-15 22-Apr-15 9.00am CLOSED 10-Jun-15 51 REJECTED 1 1
386 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00363 Nik 18-Apr-15 ZN2 CIV Building Backfilling works for G.beam(2nd layer)LA3 20-Apr-15 22-Apr-15 10.00am CLOSED 20-Apr-15 0 ACCEPTED 1 1
387 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00364 Nik 18-Apr-15 ZN2 CIV Building Inspection formwork,rebar,concreting (stump)LA3 20-Apr-15 22-Apr-15 2.00pm CLOSED 20-Apr-15 0 ACCEPTED 1 1
388 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00365 Nik 18-Apr-15 ZN2 CIV Building Inspection for concreting works (Lean Con Ground beam) 20-Apr-15 22-Apr-15 2.30pm CLOSED 23-Jun-15 64 ACCEPTED 1 1
LA6
389 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00366 Dorce 20-Apr-15 ZN2 STR Building Building Third floor chassis installation and settlement 21-Apr-15 23-Apr-15 9.00am CLOSED 22-Jun-15 62 ACCEPTED 1 1
(MA1)
391 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00368 Dorce 20-Apr-15 ZN2 STR Building Building third floor internal and external walls settlement 21-Apr-15 23-Apr-15 10.00am CLOSED 22-Jun-15 62 ACCEPTED 1 1
inspection
392 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00369 Dorce 20-Apr-15 ZN2 STR Building Building second floor chassis settlement and installation 21-Apr-15 23-Apr-15 10.30am CLOSED 22-Jun-15 62 ACCEPTED 1 1
inspection MA3
393 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00370 Dorce 20-Apr-15 ZN2 STR Building Building third floor chassis settlement and installation 21-Apr-15 23-Apr-15 11.00am CLOSED 22-Jun-15 62 ACCEPTED 1 1
inspection MA4
394 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00371 Dorce 20-Apr-15 ZN2 STR Building Building Third floor internal and external panel watts 21-Apr-15 23-Apr-15 11.30am CLOSED 22-Jun-15 62 ACCEPTED 1 1
installation inspection
396 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00373 Dorce 20-Apr-15 ZN2 STR Structure Building connection of bolts terque wrench tightness 21-Apr-15 23-Apr-15 12.00pm CLOSED 22-Aug-15 123 ACCEPTED 1 1
inspection (All Buildings)
397 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00374 Nik 21-Apr-15 ZN2 CIV Building Cutting of pilr works (Cut of level) LA4 22-Apr-15 24-Apr-15 10.00am CLOSED 27-Apr-15 5 ACCEPTED 1 1
398 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00375 Nik 21-Apr-15 ZN2 CIV Building Excavation works -Cut of level (LA1) 22-Apr-15 24-Apr-15 11.00am CLOSED 13-Jul-15 82 ACCEPTED 1 1
399 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00376 Nik 21-Apr-15 ZN2 CIV Building Inspection formwork,rebar,concreting Ground Beam LA6 22-Apr-15 24-Apr-15 5.00pm CLOSED 23-Jun-15 62 ACCEPTED 1 1
400 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00377 Nik 21-Apr-15 ZN2 CIV Building Inspection formwork,concreting ground beam LA2 23-Apr-15 25-Apr-15 5.00pm CLOSED 22-Jun-15 60 ACCEPTED 1 1
401 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00378 Fahmi 21-Apr-15 ZN2 ARC Building Drilling and spray anti termites at pile cap and Stump CLA1 21-Apr-15 23-Apr-15 12.00pm CLOSED 10-Jun-15 50 ACCEPTED 1 1
402 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00379 Fahmi 21-Apr-15 ZN2 ARC Building Drilling and spray anti termites at pile cap and Stump CLA2 21-Apr-15 23-Apr-15 12.00pm CLOSED 10-Jun-15 50 ACCEPTED 1 1
403 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00380 Fahmi 21-Apr-15 ZN2 ARC Building Drilling and spray anti termites at pile cap and Stump CLA3 21-Apr-15 23-Apr-15 12.00pm CLOSED 10-Jun-15 50 ACCEPTED 1 1
404 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00381 Fahmi 21-Apr-15 ZN2 ARC Building Drilling and spray anti termites at pile cap and Stump CLA4 21-Apr-15 23-Apr-15 12.00pm CLOSED 10-Jun-15 50 ACCEPTED 1 1
405 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00382 Aizat 21-Apr-15 ZN2 CIV Testing FDT test at Labour Accomodation 5-2 point 22-Apr-15 24-Apr-15 9.00am CLOSED 10-Jun-15 49 ACCEPTED 1 1
406 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00383 Aizat 21-Apr-15 ZN2 CIV Testing FDT test at Labour Accomodation 3-2 point 22-Apr-15 24-Apr-15 11.00am CLOSED 10-Jun-15 49 ACCEPTED 1 1
407 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00384 En Mokhtar 22-Apr-15 ZN2 CIV Building Joint inspection work done for Management 23-Apr-15 25-Apr-15 2.00pm CLOSED 23-Apr-15 0 ACCEPTED 1 1
Accommadation Buildings (MA1-MA4)
410 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00387 Nik 22-Apr-15 ZN2 CIV Building Backfilling for ground beam (Second Layer LA6 23-Apr-15 25-Apr-15 9.00pm CLOSED 13-Jul-15 81 ACCEPTED 1 1
411 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00388 Nik 22-Apr-15 ZN2 CIV Building Inspection for concreting works Pile cap (Cut of level) LA1 23-Apr-15 25-Apr-15 4.00pm CLOSED 22-Jun-15 60 ACCEPTED 1 1
412 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00389 Nik 22-Apr-15 ZN2 CIV Building Inspection formwork,rebar,concreting (pile cap) LA4 23-Apr-15 25-Apr-15 4.00pm CLOSED 22-Jun-15 60 ACCEPTED 1 1
413 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00390 Nik 22-Apr-15 ZN2 CIV Building Inspection formwork,rebar,concreting stump (LA6) 23-Apr-15 25-Apr-15 6.15pm CLOSED 13-Jul-15 81 ACCEPTED 1 1
414 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00391 Dorce 22-Apr-15 ZN2 STR Structure Dorce incoming material visual inspection (Construction 23-Apr-15 25-Apr-15 9.00am CLOSED 26-Aug-15 125 ACCEPTED 1 1
material) Rruc No 114-112-110-118-109-117-116-119
415 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00392 Dorce 22-Apr-15 ZN2 STR Structure Building internal and external wall panel inspection 23-Apr-15 25-Apr-15 9.30am CLOSED 22-Jun-15 60 ACCEPTED 1 1
(Ground Floor)CSA4
417 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00394 Dorce 22-Apr-15 ZN2 STR Structure Building ground floor internal and external panel walls 23-Apr-15 25-Apr-15 10.30am CLOSED 22-Jun-15 60 ACCEPTED 1 1
inspection CSA2
418 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00395 Dorce 22-Apr-15 ZN2 STR Structure Building truss check inspection CMA2 23-Apr-15 25-Apr-15 1.00pm CLOSED 22-Jun-15 60 ACCEPTED 1 1
419 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00396 Dorce 22-Apr-15 ZN2 STR Structure Building second floor internal and external walls 23-Apr-15 25-Apr-15 1.30pm CLOSED 22-Jun-15 60 ACCEPTED 1 1
inspection CMA3
420 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00397 Nik 22-Apr-15 ZN2 CIV Building Cutting of pile works (Cut of level)LA1 23-Apr-15 25-Apr-15 9.00am CLOSED 21-Nov-15 210 ACCEPTED 1 1
Inspection for concreting works for lean con and pile plug
421 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00398 Nik 22-Apr-15 ZN2 CIV Building 23-Apr-15 25-Apr-15 2.00pm CLOSED 10-Jun-15 48 REJECTED 1 1
(Cut of level) LA1
422 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00399 Nik 23-Apr-15 ZN2 CIV Building Backfilling works for ground beam 2nd Layer LA2 24-Apr-15 26-Apr-15 11.00am CLOSED 22-Jun-15 59 ACCEPTED 1 1
423 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00400 Nik 23-Apr-15 ZN2 CIV Building Backfilling works for ground beam 1st Layer LA4 24-Apr-15 26-Apr-15 11.30am CLOSED 22-Jun-15 59 ACCEPTED 1 1
424 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00401 Nik 23-Apr-15 ZN2 CIV Building Backfilling works for ground beam 1st layer LA1 25-Apr-15 27-Apr-15 8.00am CLOSED 26-Apr-15 1 ACCEPTED 1 1
425 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00402 Zulfaqar 23-Apr-15 ZN2 CIV BLD Excavation works at Pump station RP-1 24-Apr-15 26-Apr-15 8.00am CLOSED 30-Sep-15 159 ACCEPTED 1 1
426 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00403 Nik 24-Apr-15 ZN2 CIV Building Inspection Formwork, Rebar, Concreting (Stump) LA2 25-Apr-15 27-Apr-15 5.00pm CLOSED 22-Jun-15 58 ACCEPTED 1 1
427 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00404 Nik 24-Apr-15 ZN2 CIV Building Inspection for concreting works (Lean Con ground beam) 25-Apr-15 27-Apr-15 5.00pm CLOSED 21-Nov-15 210 ACCEPTED 1 1
LA4(CLA5)
428 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00405 Nik 25-Apr-15 ZN2 CIV Building Joint survey As Built Stump (LA6) 27-Apr-15 29-Apr-15 8.00am CLOSED 27-Apr-15 0 ACCEPTED 1 1
430 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00407 Nik 25-Apr-15 ZN2 CIV Building Joint survey As Built Stump (LA2) 27-Apr-15 29-Apr-15 2.00pm CLOSED 27-Apr-15 0 ACCEPTED 1 1
431 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00408 Nik 27-Apr-15 ZN2 CIV Building Excavation Works (Dojo) 28-Apr-15 30-Apr-15 10.00am CLOSED 22-Jun-15 55 ACCEPTED 1 1
432 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00409 Nik 27-Apr-15 ZN2 CIV Building Inspection formworks,rebar,concreting (Ground Beam) 28-Apr-15 30-Apr-15 6.00pm CLOSED 04-Sep-15 129 ACCEPTED 1 1
LA4 (CLA5)
433 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00410 Nik 27-Apr-15 ZN2 CIV Building Inspection formworks,rebar,concreting (Ground Beam) LA 28-Apr-15 30-Apr-15 6.00pm CLOSED 22-Jun-15 55 ACCEPTED 1 1
435 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00412 Dorce 27-Apr-15 ZN2 STR Structure Modular bulding roff installation inspection (CMA1) 28-Apr-15 30-Apr-15 9.15am CLOSED 22-Jun-15 55 ACCEPTED 1 1
436 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00413 Dorce 27-Apr-15 ZN2 STR Structure Building third floor chassis installation inspection CMA3 28-Apr-15 30-Apr-15 9.30am CLOSED 22-Jun-15 55 ACCEPTED 1 1
437 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00414 Dorce 27-Apr-15 ZN2 STR Structure Building internal and external wall panel s installation 28-Apr-15 30-Apr-15 9.45am CLOSED 22-Jun-15 55 ACCEPTED 1 1
inspection CMA3 (Third Floor)
438 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00415 Dorce 27-Apr-15 ZN2 STR Structure Building roof installation inspection 28-Apr-15 30-Apr-15 10.30am CLOSED 22-Jun-15 55 ACCEPTED 1 1
439 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00416a Dorce 27-Apr-15 ZN2 STR Structure Building ground floor internal and external wall installation 28-Apr-15 30-Apr-15 10.30am CLOSED 22-Jun-15 55 ACCEPTED 1 1
inspection (CSA2)
440 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00416b Dorce 27-Apr-15 ZN2 STR Structure Building first floor chassis installation inspection 28-Apr-15 30-Apr-15 11.00am CLOSED 22-Jun-15 55 ACCEPTED 1 1
441 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00416 Dorce 27-Apr-15 ZN2 STR Structure Visual check for incoming material. Truck 28-Apr-15 30-Apr-15 9.00am CLOSED 01-May-15 3 ACCEPTED 1 1
Number:125,124,123,127,129,122.
443 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00418 Zulfaqar 27-Apr-15 ZN2 CIV Structure Concreting precast sump base slab for pumpstation RP-1 28-Apr-15 30-Apr-15 9.00am CLOSED 05-Aug-15 99 REJECTED 1 1
444 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00419 Dorce 28-Apr-15 ZN2 STR Structure Building ground floor chasis to stump connection 29-Apr-15 1-May-15 8.00am CLOSED 22-Jun-15 54 ACCEPTED 1 1
inspection (installation)
445 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00420 Nik 28-Apr-15 ZN2 CIV Building Inspection For Lean Con Raft Foundation (Dojo) 29-Apr-15 1-May-15 2.00pm CLOSED 29-Apr-15 0 ACCEPTED 1 1
446 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00421 Nik 29-Apr-15 ZN2 CIV Building Inspection Formwork, Rebar, Concreting Stump (LA4) 30-Apr-15 2-May-15 4.30pm CLOSED 02-May-15 2 ACCEPTED 1 1
447 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00422 Nik 29-Apr-15 ZN2 CIV Building Inspection Formwork, Rebar, Concreting Stump (LA1) 30-Apr-15 2-May-15 6.00pm CLOSED 22-Jun-15 53 ACCEPTED 1 1
448 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00423 Nik 29-Apr-15 ZN2 CIV Building Excavation Works (Grocery) 30-Apr-15 2-May-15 10.00am CLOSED 02-May-15 2 ACCEPTED 1 1
449 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00424 Nik 30-Apr-15 ZN2 CIV Building Inspection For Lean Con Raft Foundation (Grocery) 2-May-15 4-May-15 11.00am CLOSED 05-May-15 3 ACCEPTED 1 1
450 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00425 Nik 30-Apr-15 ZN2 CIV Building Backfilling works for ground beam 2nd Layer LA4 2-May-15 4-May-15 10.00am CLOSED 22-Jun-15 51 ACCEPTED 1 1
451 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00426 Nik 30-Apr-15 ZN2 CIV Building Backfilling works for ground beam 2nd Layer LA1 2-May-15 4-May-15 10.00am CLOSED 22-Jun-15 51 ACCEPTED 1 1
452 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00427 Nik 30-Apr-15 ZN2 CIV Building Joint Survey as buitl Stump LA4 4-May-15 4-May-15 10.00am CLOSED 04-May-15 0 ACCEPTED 1 1
453 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00428 Nik 30-Apr-15 ZN2 CIV Building Joint Survey as buitl Stump LA1 4-May-15 4-May-15 10.00am CLOSED 04-May-15 0 ACCEPTED 1 1
454 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00429 Zulfaqar 30-Apr-15 ZN2 CIV Building concreting works for precast sump base slab pumpstation 2-May-15 5-May-15 8.00 am CLOSED 05-May-15 3 ACCEPTED 1 1
RP-1
456 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00431 Zulfaqar 5-May-15 ZN2 CIV Structure Inspection rebar and formwork for precast sump base slab 5-May-15 6-May-15 10.00am CLOSED 20-Aug-15 107 ACCEPTED 1 1
RP-1a
457 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00432 Zulfaqar 5-May-15 ZN2 CIV Structure Concreting works for Sump base slab RP-1a 5-May-15 6-May-15 2.00pm CLOSED 07-May-15 2 ACCEPTED 1 1
458 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00433 Zulfaqar 5-May-15 ZN2 CIV Structure Inspection rebar and formwork for precast wall RP-1 6-May-15 7-May-15 11.00am CLOSED 05-Aug-15 91 ACCEPTED 1 1
459 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00434 Zulfaqar 5-May-15 ZN2 CIV Structure Concreting works for precast wall RP-1 6-May-15 7-May-15 4.00pm CLOSED 07-May-15 1 ACCEPTED 1 1
461 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00436 Dorce 4-May-15 ZN2 STR Structure Building section floor chassis installation inspection (CSA1) 5-May-15 7-May-15 3.00pm CLOSED 22-Jun-15 48 ACCEPTED 1 1
463 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00438 Dorce 4-May-15 ZN2 STR Structure Building first floor chassis installation inspection (CSA1) 5-May-15 7-May-15 2.30pm CLOSED 22-Jun-15 48 ACCEPTED 1 1
464 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00439 Dorce 4-May-15 ZN2 STR Structure Building second floor chassis installation inspection (CSA4) 5-May-15 7-May-15 2.00pm CLOSED 22-Jun-15 48 ACCEPTED 1 1
465 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00440 Dorce 4-May-15 ZN2 STR Structure Building second floor chassis installation inspection CSA2 5-May-15 7-May-15 2.00pm CLOSED 22-Jun-15 48 ACCEPTED 1 1
466 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00441 Dorce 4-May-15 ZN2 STR Structure Building first floor internal and external panell walls 5-May-15 7-May-15 10.30am CLOSED 22-Jun-15 48 ACCEPTED 1 1
installation CSA4
467 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00442 Dorce 4-May-15 ZN2 STR Structure Building first floor chassis installation inspection CSA4 5-May-15 7-May-15 10.30am CLOSED 22-Jun-15 48 ACCEPTED 1 1
468 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00443 Dorce 4-May-15 ZN2 STR Structure Building first floor chassis installation inspection CSA3 5-May-15 7-May-15 10.00am CLOSED 22-Jun-15 48 ACCEPTED 1 1
469 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00444 Dorce 4-May-15 ZN2 STR Structure Building first floor internal and external wall panelsls 5-May-15 7-May-15 10.00am CLOSED 22-Jun-15 48 ACCEPTED 1 1
installation CSA2
470 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00445 Dorce 4-May-15 ZN2 STR Structure Building first floor chassis installation inspection CSA2 5-May-15 7-May-15 10.00am CLOSED 22-Jun-15 48 ACCEPTED 1 1
471 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00446 Dorce 4-May-15 ZN2 STR Structure Building ground floor internal and external wall installation 5-May-15 7-May-15 10.00am CLOSED 22-Jun-15 48 ACCEPTED 1 1
CSA1
472 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00447 Dorce 4-May-15 ZN2 STR Structure Building roof installation inspection 5-May-15 7-May-15 10.00am CLOSED 22-Jun-15 48 ACCEPTED 1 1
473 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00448 Aizat 6-May-15 ZN2 CIV Building FDT at Laboury Accomodation (LA1,LA2,LA4,LA6) 7-May-15 9-May-15 9.00am CLOSED 10-Jun-15 34 ACCEPTED 1 1
474 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00449 Nik 7-May-15 ZN2 CIV Building Excavation Works (Barber) 8-May-15 10-May-15 10.00am CLOSED 22-Aug-15 106 ACCEPTED 1 1
475 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00450 Nik 8-May-15 ZN2 CIV Building Excavation Works (Internet Cafe) 9-May-15 11-May-15 2.00pm CLOSED 10-May-15 1 ACCEPTED 1 1
476 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00451 Nik 8-May-15 ZN2 CIV Building Concreting works for lean con raft foundation (Barber) 9-May-15 11-May-15 5.00pm CLOSED 20-May-15 11 ACCEPTED 1 1
478 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00453 Zulfaqar 9-May-15 ZN2 CIV Building Inspection for rebar and formwork for precast wall RP1a 9-May-15 11-May-15 4.00pm CLOSED 09-May-15 0 ACCEPTED 1 1
479 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00454 Zulfaqar 9-May-15 ZN2 CIV Building Concreting works for precast sump base slab RP2 9-May-15 11-May-15 5.00pm CLOSED 11-May-15 2 ACCEPTED 1 1
480 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00455 Zulfaqar 9-May-15 ZN2 CIV Building Concreting works for precast wall RP1a 10-May-15 12-May-15 10.00am CLOSED 10-May-15 0 ACCEPTED 1 1
481 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00456 Rusydan 9-May-15 ZN2 ELE Electrical Installation of earthing works at Dojo 10-May-15 12-May-15 10.00am CLOSED 10-Jul-15 61 ACCEPTED 1 1
482 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00457 Nik 9-May-15 ZN2 CIV Building Excavation Works (Office for catering and maintenance) 11-May-15 13-May-15 11.00am CLOSED 11-May-15 0 ACCEPTED 1 1
483 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00458 Nik 9-May-15 ZN2 CIV Building Concreting works for lean con raft foundation (Internet 11-May-15 13-May-15 5.00pm CLOSED 12-May-15 1 ACCEPTED 1 1
Cafe)
484 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00459 Nik 11-May-15 ZN2 CIV Building Concreting works for lean con raft foundation (Office For 12-May-15 14-May-15 4.00pm CLOSED 13-May-15 1 ACCEPTED 1 1
Catering And Maintenance)
485 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00460 Nik 11-May-15 ZN2 CIV Building Inspection formwork, rebar, concreting raft foundation 12-May-15 14-May-15 6.00pm CLOSED 22-Jun-15 41 ACCEPTED 1 1
(Grocery)
487 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00462 Dorce 11-May-15 ZN2 STR Structure Building third floor chassis installation inspection CSA1 12-May-15 14-May-15 10.00am CLOSED 22-Jun-15 41 ACCEPTED 1 1
488 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00463 Dorce 11-May-15 ZN2 STR Structure Building third floor chassis installation inspection CSA2 12-May-15 14-May-15 10.00am CLOSED 22-Jun-15 41 ACCEPTED 1 1
489 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00464 Dorce 11-May-15 ZN2 STR Structure Building second floor internal and external walls 12-May-15 14-May-15 10.15am CLOSED 22-Jun-15 41 ACCEPTED 1 1
settlement inspection CSA2
491 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00466 Dorce 11-May-15 ZN2 STR Structure Building third floor Chassis installation inspection CSA3 12-May-15 14-May-15 10.45am CLOSED 22-Jun-15 41 ACCEPTED 1 1
492 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00467 Dorce 11-May-15 ZN2 STR Structure Building second floor chasis installation inspection CSA4 12-May-15 14-May-15 10.45am CLOSED 22-Jun-15 41 ACCEPTED 1 1
493 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00468 Dorce 11-May-15 ZN2 STR Structure Building second floor internal and external wall panels 12-May-15 14-May-15 11.00am CLOSED 22-Jun-15 41 ACCEPTED 1 1
settlement inspection CSA4
494 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00469 Dorce 11-May-15 ZN2 STR Structure Building third floor chassis installation inspection CSA4 12-May-15 14-May-15 11.15am CLOSED 22-Jun-15 41 ACCEPTED 1 1
495 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00470 Dorce 11-May-15 ZN2 STR Structure Building second floor chassis installation inspection 12-May-15 14-May-15 11.30am CLOSED 22-Jun-15 41 ACCEPTED 1 1
CSA3+B472:O481
496 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00471 Nik 12-May-15 ZN2 CIV Structure Inspection Formwork, Rebar, Concreting Stump (Dojo) 13-May-15 15-May-15 4.30pm CLOSED 22-Jun-15 40 ACCEPTED 1 1
497 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00472 Nik 12-May-15 ZN2 CIV Structure Excavation works (Laundry) 13-May-15 15-May-15 10.00am CLOSED 20-Jun-15 38 ACCEPTED 1 1
498 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00473 Rusydan 12-May-15 ZN2 ELE Electrical Installation bpx sub at raft foundation for earthning 13-May-15 15-May-15 10.00am CLOSED 10-Jun-15 28 ACCEPTED 1 1
chamber
499 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00474 Nik 13-May-15 ZN2 CIV ARC Spraying and injection of anti termite at Pilecap & 13-May-15 15-May-15 12.00pm CLOSED 13-May-15 0 REJECTED 1 1
Stump (Barber Shop)
500 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00475 Nik 13-May-15 ZN2 CIV ARC Spraying and injection of anti termite at Pilecap & 13-May-15 15-May-15 12.00pm CLOSED 13-May-15 0 REJECTED 1 1
Stump (Internet Cafe)
502 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00477 Dorce 13-May-15 ZN2 STR Structure Building Ground floor Chassis to stump connection 14-May-15 16-May-15 10.00am CLOSED 22-Jun-15 39 ACCEPTED 1 1
inspection (MA3)
504 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00479 Nik 14-May-15 ZN2 CIV Building Inspection formwork, rebar, concreting raft foundation 15-May-15 17-May-15 4.30PM CLOSED 22-Jun-15 38 ACCEPTED 1 1
(Barber)
508 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00483 Nik 15-May-15 ZN2 CIV Building Inspection formwork, rebar, concreting stump (Grocery) 16-May-15 18-May-15 5.00pm CLOSED 19-Jun-15 34 ACCEPTED 1 1
509 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00484 Nik 15-May-15 ZN2 CIV Building Concreting work for Lean con Raft Foundation (Laundry) 16-May-15 18-May-15 5.30pm CLOSED 22-Jun-15 37 ACCEPTED 1 1
510 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00485 Taufiq 15-May-15 ZN2 CIV Structure Installation precast lifting sump for lifting station no RP1 19-May-15 21-May-15 8.30am CLOSED 01-Sep-15 105 ACCEPTED 1 1
511 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00486 Taufiq 15-May-15 ZN2 CIV Structure Installation precast lifting sump for lifting station no RP1 A 19-May-15 21-May-15 10.30am CLOSED 05-Aug-15 78 REJECTED 1 1
513 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00488 Faliq 16-May-15 ZN2 ELE Electrical Installation of box sub and pipe sleeve ducting at raft 18-May-15 20-May-15 9.00am CLOSED 10-Jul-15 53 ACCEPTED 1 1
foundation for earthing chamber. ( Internet Café)
515 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00490 Nik 18-May-15 ZN2 CIV Building Inspection for concreting work (Stump) Internet café 19-May-15 21-May-15 3.15pm CLOSED 22-Jun-15 34 ACCEPTED 1 1
517 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00492 Nik 18-May-15 ZN2 CIV Building Inspection for concreting works (Raft Foundation) Laundry 19-May-15 21-May-15 3.00pm CLOSED 11-Jul-15 53 REJECTED 1 1
518 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00493 Nik 18-May-15 ZN2 CIV Building Inspection for Joint survey ( Stump (barber) 19-May-15 21-May-15 10.00am CLOSED 19-May-15 0 ACCEPTED 1 1
519 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00494 Nik 18-May-15 ZN2 CIV Building Inspection for joint survey (Stump)- Grocery 19-May-15 21-May-15 10.30am CLOSED 19-May-15 0 ACCEPTED 1 1
521 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00496 Dorce 19-May-15 ZN2 STR Structure Building third floor internal and external wall panel 20-May-15 22-May-15 10.00am CLOSED 22-Jun-15 33 ACCEPTED 1 1
installation CSA1
522 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00497 Dorce 19-May-15 ZN2 STR Structure Building third floor internal and external wall panel 20-May-15 22-May-15 10.00am CLOSED 22-Jun-15 33 ACCEPTED 1 1
installation CSA2
523 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00498 Dorce 19-May-15 ZN2 STR Structure Building third floor internal and external wall panel 20-May-15 22-May-15 10.00am CLOSED 22-Jun-15 33 ACCEPTED 1 1
installation CSA3
524 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00499 Dorce 19-May-15 ZN2 STR Structure Building internal and external wall panels installation CSA4 20-May-15 22-May-15 10.00am CLOSED 22-Jun-15 33 ACCEPTED 1 1
third floor
525 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00500 Dorce 19-May-15 ZN2 STR Structure Building roof installation inspection CSA1 20-May-15 22-May-15 11.00am CLOSED 22-Jun-15 33 ACCEPTED 1 1
526 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00501 Dorce 19-May-15 ZN2 STR Structure Building roof installation inspection ( Truss check CSA2) 20-May-15 22-May-15 11.00am CLOSED 22-Jun-15 33 ACCEPTED 1 1
527 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00502 Dorce 19-May-15 ZN2 STR Structure Building roof installation inspection ( Truss check CSA3) 20-May-15 22-May-15 11.00am CLOSED 22-Jun-15 33 ACCEPTED 1 1
528 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00503 Dorce 19-May-15 ZN2 STR Structure Building roof installation (Truss check CSA4) 20-May-15 22-May-15 11.00am CLOSED 22-Jun-15 33 ACCEPTED 1 1
529 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00504 Dorce 19-May-15 ZN2 STR Structure Building roof installation material inspection (CMA1) 20-May-15 22-May-15 11.30am CLOSED 10-Jun-15 21 REJECTED 1 1
530 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00505 Dorce 19-May-15 ZN2 STR Structure Building roof installation material inspection (CMA2) 20-May-15 22-May-15 11.30am CLOSED 20-May-15 0 ACCEPTED 1 1
533 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00508 Zul akmal 20-May-15 ZN2 CIV Building Concreting works for lean con raft foundation (Cafe) 21-May-15 23-May-15 4.30pm CLOSED 22-Jun-15 32 ACCEPTED 1 1
534 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00509 Zul akmal 20-May-15 ZN2 CIV Building Inspection formwork, rebar, concreting raft foundation 21-May-15 24-May-15 5.00pm CLOSED 19-Jun-15 29 ACCEPTED 1 1
(Guard House 2) gh2
535 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00510 Faliq 21-May-15 ZN2 ELE Electrical Installation of box-sub and pipe sleeve at raft foundation 19-May-15 21-May-15 4.00pm CLOSED 10-Jun-15 22 ACCEPTED 1 1
for earthning chamber. (Guard House)
536 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00511 Zul akmal 21-May-15 ZN2 CIV Building Inspection for joint survey (Stump)- Internet Café 22-May-15 24-May-15 11.00pm CLOSED 22-May-15 0 ACCEPTED 1 1
537 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-00512 Khidmat Hijau 21-May-15 ZN2 CIV Piping Sewer pipe for small package area as per attached DO 22-May-15 24-May-15 11.30pm CLOSED 10-Jun-15 19 REJECTED 1 1
538 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00513 Nik 21-May-15 ZN2 CIV Survey Joint survey (Stump)- Internet Café 22-May-15 24-May-15 11.00am CLOSED 22-May-15 0 ACCEPTED 1 1
539 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00514 Afiq 22-May-15 ZN2 CIV Building Inspection formwork,rebar,concreting (Stump) Office for 23-May-15 25-May-15 4.30pm CLOSED 19-Jun-15 27 ACCEPTED 1 1
catering & Maintance)
540 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00515 Afiq 22-May-15 ZN2 CIV Building Excavation works (Club Horse) 23-May-15 25-May-15 10.00am CLOSED 10-Jun-15 18 REJECTED 1 1
541 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00516 Dorce 19-May-15 ZN2 STR Structure Building ground floor chassis to stump connection 23-May-15 25-May-15 10.00am CLOSED 22-Jun-15 30 ACCEPTED 1 1
inspection ( Installation) CSA4
543 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00518 Dorce 19-May-15 ZN2 STR Structure Building ground floor chassis to stump connection 23-May-15 25-May-15 10.00am CLOSED 22-Jun-15 30 ACCEPTED 1 1
inspection ( Installation) CSA2
544 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00519 Dorce 19-May-15 ZN2 STR Structure Building ground floor chassis to stump connection 23-May-15 25-May-15 10.00am CLOSED 22-Jun-15 30 ACCEPTED 1 1
inspection ( Installation) CSA3
Inspection for concreting work (Stump) Guard House 2
545 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00520 Zul akmal 23-May-15 ZN2 CIV Building 24-May-15 26-May-15 10.30am CLOSED 19-Jun-15 26 ACCEPTED 1 1
(GH2)
547 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00522 Nik 5-May-15 ZN2 ARC Building Spray & injection of ati termite at pilecap and stumps 5-May-15 7-May-15 12.00pm CLOSED 10-Jun-15 36 ACCEPTED 1 1
(CLA6)
549 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00524 Nik 5-May-15 ZN2 ARC Building To spray ground slab & drilling 450mm parameter building 5-May-15 7-May-15 12.00pm CLOSED 10-Jun-15 36 ACCEPTED CANCEL 1 1
interval (Dojo)
551 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00526 Nik 14-May-15 ZN2 ARC Building Spray & injection of ati termite at pilecap and stumps 14-May-15 16-May-15 12.00pm CLOSED 10-Jun-15 27 ACCEPTED 1 1
(Offices for catering & maintenance)
553 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00528 Nik 19-May-15 ZN2 ARC Building Spray & injection of ati termite at pilecap and stumps 19-May-15 21-May-15 12.00pm CLOSED 10-Jun-15 22 ACCEPTED 1 1
(Guard House 1)
554 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00529 Dorce 25-May-15 ZN2 STR Structure Building ground floor chassis installation and settlement 26-May-15 28-May-15 8.00am CLOSED 22-Jun-15 27 ACCEPTED 1 1
(CLA1)
555 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00530 Dorce 25-May-15 ZN2 STR Structure Building ground floor chassis installation and settlement 26-May-15 28-May-15 8.00am CLOSED 22-Jun-15 27 ACCEPTED 1 1
(CLA2)
556 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00531 Dorce 25-May-15 ZN2 STR Structure Building ground floor chassis installation and settlement 26-May-15 28-May-15 8.00am CLOSED 22-Jun-15 27 ACCEPTED 1 1
(CLA3)
560 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00535 Dorce 25-May-15 ZN2 STR Structure Visual check for incoming material 26-May-15 28-May-15 8.00am CLOSED 10-Jun-15 15 ACCEPTED 1 1
561 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00536 Dorce 25-May-15 ZN2 STR Structure Building ground floor internal and externall panel walls 27-May-15 29-May-15 3.00pm CLOSED 22-Jun-15 26 ACCEPTED 1 1
installation (CLA1)
562 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00537 Dorce 25-May-15 ZN2 STR Structure Building ground floor internal and externall panel walls 27-May-15 29-May-15 3.00pm CLOSED 22-Jun-15 26 ACCEPTED 1 1
installation (CLA3)
563 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00538 Dorce 25-May-15 ZN2 STR Structure Building ground floor internal and external panel walls 27-May-15 29-May-15 3.00pm CLOSED 22-Jun-15 26 ACCEPTED 1 1
installation (CLA5)
564 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00539 Dorce 25-May-15 ZN2 STR Structure Building ground-first-second and third floor chassis steel 26-May-15 28-May-15 9.00am CLOSED 22-Jun-15 27 ACCEPTED 1 1
and insulation materials installation inspection CMA1
565 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00540 Dorce 25-May-15 ZN2 STR Structure Building ground-first-second and third floor chassis steel 27-May-15 29-May-15 9.00am CLOSED 22-Jun-15 26 ACCEPTED 1 1
and insulation materials installation inspection CMA2
566 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00541 Dorce 25-May-15 ZN2 STR Structure Building ground-first-second and third floor chassis steel 27-May-15 29-May-15 9.00am CLOSED 22-Jun-15 26 ACCEPTED 1 1
and insulation materials installation inspection CMA3
567 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00542 Dorce 25-May-15 ZN2 STR Structure Building ground-first-second and third floor chassis steel 27-May-15 29-May-15 9.00am CLOSED 22-Jun-15 26 ACCEPTED 1 1
and insulation materials installation inspection CMA4
568 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00543 Zul akmal 25-May-15 ZN2 CIV Building Inspection formwork, rebar, concreting raft foundation 26-May-15 28-May-15 4.30pm CLOSED 19-Jun-15 24 ACCEPTED 1 1
(Cafe)
569 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00544 Zul akmal 25-May-15 ZN2 CIV Building Inspection for Joint survey as built ( Stump (Guard House 26-May-15 28-May-15 8.00am CLOSED 28-May-15 2 ACCEPTED 1 1
3) (GH3)
573 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00548 Zul akmal 26-May-15 ZN2 CIV Building Concreting works for lean con raft foundation (Club 27-May-15 29-May-15 4.30pm CLOSED 13-Jul-15 47 ACCEPTED 1 1
House)
574 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00549 Faliq 26-May-15 ZN2 ELE Electrical Installation of box-sub and pipe sleeve at raft foundation 27-May-15 29-May-15 9.00am CLOSED 10-Jun-15 14 ACCEPTED 1 1
for earthning chamber
575 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00550 Azah 26-May-15 ZN2 CIV Testing MP test at small package area/ Guard house 27-May-15 29-May-15 9.00am CLOSED 29-May-15 2 ACCEPTED 1 1
Dorce 27-May-15 ZN2 CIV Structure Building windows and ventilation Lid installation 28-May-15 30-May-15 10.00AM 14-Jul-16
576 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00551
inspection (CMA3) CLOSED 413 ACCEPTED 1 1
Dorce 27-May-15 ZN2 CIV Structure Building windows and ventilation Lid installation 28-May-15 30-May-15 10.00AM 28-May-15
577 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00552
inspection (CMA2) CLOSED 0 ACCEPTED 1 1
Dorce 27-May-15 ZN2 CIV Structure Building windows and ventilation Lid installation 28-May-15 30-May-15 10.00AM 14-Jul-16
578 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00553
inspection (CMA1) CLOSED 413 ACCEPTED 1 1
Dorce 27-May-15 ZN2 CIV Structure Building windows and ventilation Lid installation 28-May-15 30-May-15 10.00AM
579 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00554
inspection (CMA4) CLOSED CANCEL 1 1
581 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00556 Zul akmal 28-May-15 ZN2 CIV Building Excavation Works (Mess Hall And Kitchen) 29-May-15 31-May-15 9.00am CLOSED 19-Jun-15 21 ACCEPTED 1 1
582 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00557 Zul akmal 28-May-15 ZN2 CIV Building Inspection Formwork, Rebar, Concreting Stump (Café) 29-May-15 31-May-15 10.00am CLOSED 22-Jun-15 24 ACCEPTED 1 1
583 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00558 Zul akmal 28-May-15 ZN2 CIV material Material delivery (High Yield Deformed Bar G500) 29-May-15 31-May-15 10.00am CLOSED 10-Jun-15 12 ACCEPTED 1 1
584 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-00559 Khidmat Hijau 29-May-15 ZN2 PiP Piping Material incoming inspection for chamber ring and IC for 30-May-15 1-Jun-15 10.00AM CLOSED 10-Jun-15 11 ACCEPTED 1 1
small package area.
585 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00560 Zul akmal 29-May-15 ZN2 CIV Building Joint Survey As Built Stump (Café) 30-May-15 1-Jun-15 10.00am CLOSED 30-May-15 0 ACCEPTED 1 1
586 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00561 Zul akmal 29-May-15 ZN2 CIV Building Concrete work for lean con raft foundation (Mess hall & 30-May-15 1-Jun-15 11.00am CLOSED 19-Jun-15 20 ACCEPTED 1 1
Kitchen)
587 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00562 Zul akmal 29-May-15 ZN2 CIV Building Inspection formwork, rebar, concreting raft foundation 1-Jun-15 3-Jun-15 4.30pm CLOSED 08-Aug-15 68 ACCEPTED 1 1
( Club House)
588 RAPID-P20A1-UEMB-ZN2-ELE--RFIN-00563 AEIE 29-May-15 ZN2 ELE Electrical Inspection for material on site 4c-16mm 30-May-15 1-Jun-15 10.00am CLOSED 23-Jun-15 24 ACCEPTED 1 1
XLPE/SWA/PVC/as cable 3drum x 1000m=3000m
589 RAPID-P20A1-UEMB-ZN2-ELE--RFIN-00564 Rusydan 30-May-15 ZN2 ELE Electrical Installation of Box sub and pipe sleeve at raft foundation 1-Jun-15 3-Jun-15 9.00am CLOSED 10-Jul-15 39 ACCEPTED 1 1
for earthning chamber at Club House
590 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00565 Zulfaqar 1-Jun-15 ZN2 CIV Lifting works Lifting precast at RP1a 2-Jun-15 4-Jun-15 2.00pm CLOSED 05-Aug-15 64 REJECTED 1 1
591 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-00566 Khidmat Hijau 1-Jun-15 ZN2 PiP Piping Request for inspection at Small Package area CMA1 for 2-Jun-15 4-Jun-15 9.00am CLOSED 30-Jun-15 28 ACCEPTED 1 1
setting out,excavation, Laying pipe and backfill
592 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00567 Zul akmal 30-May-15 ZN2 CIV Building Excavation Works (Gymnasium) 1-Jun-15 3-Jun-15 10.00am CLOSED 19-Jun-15 18 ACCEPTED 1 1
593 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00568 Zul akmal 1-Jun-15 ZN2 CIV Building Concrete work for lean con raft foundation (Mess hall & 2-Jun-15 4-Jun-15 4.30pm CLOSED 06-Aug-15 65 ACCEPTED 1 1
Kitchen)
594 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00569 Zul akmal 1-Jun-15 ZN2 CIV Building Concrete work for lean con raft foundation (Gymnasium) 2-Jun-15 4-Jun-15 5.00pm CLOSED 19-Jun-15 17 ACCEPTED 1 1
595 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00570 Zul akmal 2-Jun-15 ZN2 CIV Building Inspection Formwork, Rebar, Concreting Stump (Club 3-Jun-15 5-Jun-15 4.30pm CLOSED 30-Jun-15 27 ACCEPTED 1 1
House)
596 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00571 Khairil 2-Jun-15 ZN2 CIV Testing MP test at small package area and guard house 3-Jun-15 5-Jun-15 9.00am CLOSED 05-Jun-15 2 ACCEPTED 1 1
597 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-00572 Khidmat Hijau 2-Jun-15 ZN2 PiP Piping Laying sewer pipe and install IC for Management 3-Jun-15 5-Jun-15 3.00pm CLOSED 30-Jun-15 27 REJECTED 1 1
accommodation Building
598 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00573 Khairil 3-Jun-15 ZN2 CIV Testing FDT test backfill at RP1 4-Jun-15 6-Jun-15 9.00am CLOSED 04-Jun-15 0 ACCEPTED 1 1
599 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00574 Zul akmal 3-Jun-15 ZN2 CIV Building Excavation Works (Maintenance Workshop and storage) 4-Jun-15 6-Jun-15 10.00am CLOSED 30-Nov-15 179 ACCEPTED 1 1
600 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00575 Zul akmal 3-Jun-15 ZN2 CIV Building Material delivery (High Yield Deformed Bar G500) 4-Jun-15 6-Jun-15 4.30pm CLOSED 05-Jun-15 1 ACCEPTED 1 1
601 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00576 Zul akmal 4-Jun-15 ZN2 CIV Building Joint Survey As Built Stump (Club House) 5-Jun-15 7-Jun-15 8.00am CLOSED 05-Jun-15 0 ACCEPTED 1 1
602 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00577 Zul akmal 4-Jun-15 ZN2 CIV Building Concrete work for lean con raft foundation (Maintenance 5-Jun-15 7-Jun-15 9.00am CLOSED 30-Jun-15 25 ACCEPTED 1 1
Workshop and storage)
608 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00583 Zulfaqar 4-Jun-15 ZN2 STR Structure Inspection formwork and rebar for RP-1 (2nd slab) 8-Jun-15 10-Jun-15 9.30am CLOSED 30-Jun-15 22 ACCEPTED 1 1
609 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00584 Zulfaqar 4-Jun-15 ZN2 STR Structure Concreting works for RP1 (2nd slab) 8-Jun-15 10-Jun-15 9.30am CLOSED 09-Jun-15 1 ACCEPTED 1 1
610 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00585 Khidmat Hijau 5-Jun-15 ZN2 CIV Concreting Rebar,Formwork and Casting work for mainhole base slab 5-Jun-15 7-Jun-15 9.30am CLOSED 09-Sep-15 96 ACCEPTED 1 1
612 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00587 Zulakmal 6-May-15 ZN2 CIV Building Inspection formwork , rebar, concreteing raft foundation 9-Jun-15 11-Jun-15 5.00pm CLOSED 29-Jun-15 20 ACCEPTED 1 1
(maintenance workshop and storage)
613 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00588 Azah 8-May-15 ZN2 CIV Testing FDT at management accomodation and Club House 8-Jun-15 10-Jun-15 5.00pm CLOSED 10-Jun-15 2 ACCEPTED 1 1
614 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00589 Dorce 5-Jun-15 ZN2 ARC Inspection Building first floor chasis installation and settlement 8-Jun-15 10-Jun-15 10:00 AM CLOSED 27-Sep-15 111 ACCEPTED 1 1
inspection (CLA1)
615 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00590 Dorce 5-Jun-15 ZN2 ARC Inspection Building first floor chasis installation and settlement 8-Jun-15 10-Jun-15 10:00 AM CLOSED 27-Sep-15 111 ACCEPTED 1 1
inspection (CLA3)
617 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00592 Dorce 5-Jun-15 ZN2 ARC Inspection Building ground floor painted walls inspections. (Painting 8-Jun-15 10-Jun-15 10:00 AM CLOSED 01-Sep-15 85 ACCEPTED 1 1
inspection) (EMAZ)
619 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00594 Dorce 5-Jun-15 ZN2 ARC Inspection Building second floor painting works of the walls 8-Jun-15 10-Jun-15 10:00 AM CLOSED 01-Sep-15 85 ACCEPTED 1 1
inspection (EMAZ)
621 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00596 Dorce 5-Jun-15 ZN2 STR Inspection Dorce incoming material visual inspection 8-Jun-15 10-Jun-15 11:00 AM CLOSED 12-Jun-15 4 ACCEPTED 1 1
622 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00596a Zulakmal 8-Jun-15 ZN2 CIV Building Excavation works (Guard House 2) 9-Jun-15 11-Jun-15 11.00am CLOSED 30-Jun-15 21 ACCEPTED 1 1
623 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00596b Zulakmal 9-Jun-15 ZN2 CIV Building Concrete works for lean con raft foundation ( Guard House 11-Jun-15 13-Jun-15 4.00pm CLOSED 30-Jun-15 19 ACCEPTED 1 1
2)
624 RAPID-P20A1-UEMB-ZN2-BLD--RFIN-00597 Zulakmal 10-Jun-15 ZN2 CIV Survey Joint survey as built stump Gymnasium 11-Jun-15 13-Jun-15 8.00am CLOSED 11-Jun-15 0 ACCEPTED 1 1
625 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00598 Zulfaqar 10-Jun-15 ZN2 CIV Lifting works Lifting precast at RP1A 11-Jun-15 8-Jun-15 10.00am CLOSED 01-Sep-15 82 ACCEPTED 1 1
626 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00599 Khairil 11-Jun-15 ZN2 CIV Testing FDT for subbase layer at MA4 12-Jun-15 14-Jun-15 9.00 am CLOSED 12-Jun-15 0 ACCEPTED 1 1
627 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00599a Khairil 11-Jun-15 ZN2 CIV Testing FDT for road at MA4 (Roadbase) 12-Jun-15 14-Jun-15 9.00 am CLOSED 13-Jun-15 1 ACCEPTED 1 1
629 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00601 Khairil 11-Jun-15 ZN2 CIV Testing FDT test at RP1A 12-Jun-15 14-Jun-15 10:00 AM CLOSED 13-Jun-15 1 ACCEPTED 1 1
630 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00602 Zulfaqar 12-Jun-15 ZN2 CIV Inspection Inspection rebar and formwork for 2nd wall and 3rd slab 15-Jun-15 17-Jun-15 7.30 am CLOSED 20-Aug-15 66 ACCEPTED 1 1
wall at RP1
631 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00603 Zulfaqar 12-Jun-15 ZN2 CIV Inspection Concreting works for 2nd wall and 3rd slab, wall at RP1 15-Jun-15 17-Jun-15 9.00 am CLOSED 17-Aug-15 63 ACCEPTED 1 1
632 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00604 Amin 10-Jun-15 ZN2 CIV Testing Preparing subgrade AND JOINT DIPPING ( CH10 - CH 60) 11-Jun-15 13-Jun-15 10:00 AM CLOSED 03-Nov-15 145 ACCEPTED 1 1
634 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00606 Zulakmal 12-Jun-15 ZN2 CIV Building Excavation works ( Post office and ATM) 15-Jun-15 17-Jun-15 4.00pm CLOSED 05-Aug-15 51 ACCEPTED 1 1
635 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00607 Zulakmal 12-Jun-15 ZN2 CIV Building Concrete works for leancon raftfoundation (Post office and 13-Jun-15 15-Jun-15 10.00pm CLOSED 21-Nov-15 161 ACCEPTED 1 1
ATM)
636 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00608 Dorce 12-Jun-15 ZN2 ARC Building Building windows and installation location and material 13-Jun-15 15-Jun-15 10.00pm CLOSED 05-Oct-15 114 ACCEPTED 1 1
inspection (Window and ventilation Lids) SA4
638 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00610 Dorce 12-Jun-15 ZN2 ARC Building Building windows and installation location and material 13-Jun-15 15-Jun-15 10.00pm CLOSED 05-Oct-15 114 ACCEPTED 1 1
inspection (Window and ventilation Lids) SA3
639 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00611 Dorce 12-Jun-15 ZN2 ARC Building Building windows and installation location and material 13-Jun-15 15-Jun-15 10.00pm CLOSED 06-Oct-15 115 ACCEPTED 1 1
inspection (Window and ventilation Lids) SA4
640 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00612 Dorce 12-Jun-15 ZN2 STR Building Building first floor chassis installation and settlement 13-Jun-15 15-Jun-15 10.00pm CLOSED 28-Sep-15 107 ACCEPTED 1 1
inspection LA6
641 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00613 Dorce 12-Jun-15 ZN2 STR Building Building first floor chassis installation and settlement 13-Jun-15 15-Jun-15 10.00pm CLOSED 28-Sep-15 107 ACCEPTED 1 1
inspection LA5
643 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00615 Dorce 12-Jun-15 ZN2 STR Building Building first floor internal and external wall panels 13-Jun-15 15-Jun-15 10.00pm CLOSED 28-Sep-15 107 ACCEPTED 1 1
installation inspection (LA6)
645 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00617 Dorce 12-Jun-15 ZN2 STR Building Building first floor internal and external wall panels 13-Jun-15 15-Jun-15 10.00pm CLOSED 29-Sep-15 108 ACCEPTED 1 1
installation inspection (LA4)
646 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00618 Dorce 12-Jun-15 ZN2 STR Building Building second floor chassis installation inspection LA6 13-Jun-15 15-Jun-15 10.00pm CLOSED 28-Sep-15 107 ACCEPTED 1 1
647 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00619 Dorce 12-Jun-15 ZN2 STR Building Building second floor chassis installation inspection LA5 13-Jun-15 15-Jun-15 10.00pm CLOSED 28-Sep-15 107 ACCEPTED 1 1
648 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00620 Dorce 12-Jun-15 ZN2 STR Building Building second floor chassis installation inspection LA4 13-Jun-15 15-Jun-15 10.00pm CLOSED 29-Sep-15 108 ACCEPTED 1 1
649 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00621 Dorce 12-Jun-15 ZN2 STR Building Incoming material visual inspection 13-Jun-15 15-Jun-15 11.00am CLOSED 20-Jun-15 7 ACCEPTED 1 1
Truck:196,214,217,203,200,205,192,208,207,209
651 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00623 Dorce 12-Jun-15 ZN2 ARC Painting Building ground floor painting works inspection MA4 13-Jun-15 15-Jun-15 3.00pm CLOSED 27-Sep-15 106 ACCEPTED 1 1
652 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00624 Dorce 12-Jun-15 ZN2 ARC Painting Building First floor painting works inspection MA4 13-Jun-15 15-Jun-15 3.00pm CLOSED 27-Sep-15 106 ACCEPTED 1 1
653 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00625 Dorce 12-Jun-15 ZN2 ARC Painting Building Second floor painting works inspection MA4 13-Jun-15 15-Jun-15 3.00pm CLOSED 27-Sep-15 106 ACCEPTED 1 1
654 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00626 Dorce 12-Jun-15 ZN2 ARC Painting Building third floor painting works inspection MA1 13-Jun-15 15-Jun-15 3.00pm CLOSED 29-Sep-15 108 ACCEPTED 1 1
655 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00627 Amin 13-Jun-15 ZN2 CIV Drainage install precast U-Drain 450x300 at MA4 (Internal works) 14-Jun-15 16-Jun-15 10.00pm CLOSED 03-Nov-15 142 ACCEPTED 1 1
656 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00628 Hikmat Hijau 13-Jun-15 ZN2 CIV rebar&formwork Rebar, formwork and concreting work for 2 NOS manhole 14-Jun-15 16-Jun-15 10.00pm CLOSED 09-Sep-15 87 ACCEPTED 1 1
baseslab at small package area zone 2
660 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00632 Zulakmal 15-Jun-15 ZN2 BLD Concreting Inspection formwork,rebar,concreting raft foundation 16-Jun-15 18-Jun-15 4.30pm CLOSED 30-Jun-15 14 ACCEPTED 1 1
(Guard House
666 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00638 Amin 15-Jun-15 ZN2 CIV Road work Lay ACBC for 6m road & 3m road near MA1 & MA2 small 16-Jun-15 18-Jun-15 10.00pm CLOSED 03-Nov-15 140 ACCEPTED 1 1
package area
667 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00639 Rusydan 15-Jun-15 ZN2 ELE Earthning Installation of Box sub and pipe sleeve at raft foundation 16-Jun-15 18-Jun-15 3.00pm CLOSED 30-Jun-15 14 CANCEL 1 1
for earthning chamber at Guard House
671 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00643 Dorce 18-Jun-15 ZN2 STR material Incoming material visual inspection (Truck no:227-193- 19-Jun-15 21-Jun-15 9.00am CLOSED 25-Jun-15 6 ACCEPTED 1 1
198-218-228)
672 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00644 Dorce 18-Jun-15 ZN2 STR Building Building 3rd Floor chassis install stire inspection 1 (CLA6) 19-Jun-15 21-Jun-15 9.00am CLOSED 28-Sep-15 101 ACCEPTED 1 1
673 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00645 Dorce 18-Jun-15 ZN2 STR Building Building Third floor chassis installation inspection (CLA5) 19-Jun-15 21-Jun-15 9.00am CLOSED 28-Sep-15 101 ACCEPTED 1 1
674 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00646 Dorce 18-Jun-15 ZN2 STR Building Building 3rd Floor Chassis install store inspection (CLA4) 19-Jun-15 21-Jun-15 9.00am CLOSED 28-Sep-15 101 ACCEPTED 1 1
675 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00647 Dorce 18-Jun-15 ZN2 ARC Painting Building ground floor painting works inspection (CSA3) 19-Jun-15 21-Jun-15 9.00am CLOSED 01-Sep-15 74 ACCEPTED 1 1
676 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00648 Dorce 18-Jun-15 ZN2 ARC Painting Building 1st floor painting works inspection (CSA3) 19-Jun-15 21-Jun-15 9.00am CLOSED 01-Sep-15 74 ACCEPTED 1 1
677 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00649 Dorce 18-Jun-15 ZN2 ARC Painting Building 2nd floor painting works inspection (CSA3) 19-Jun-15 21-Jun-15 9.00am CLOSED 01-Sep-15 74 ACCEPTED 1 1
678 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00650 Dorce 18-Jun-15 ZN2 ARC Painting Building 3rd floor painting works inspection (CSA3) 19-Jun-15 21-Jun-15 9.00am CLOSED 01-Sep-15 74 ACCEPTED 1 1
679 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00651 Dorce 18-Jun-15 ZN2 ARC Painting Building 3rd floor painting works inspection (CSA2) 19-Jun-15 21-Jun-15 9.00am CLOSED 01-Sep-15 74 ACCEPTED 1 1
680 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00652 Dorce 18-Jun-15 ZN2 ARC Painting Building 1st floor painting works inspection (CSA2) 19-Jun-15 21-Jun-15 9.00am CLOSED 16-Sep-15 89 ACCEPTED 1 1
681 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00653 Dorce 18-Jun-15 ZN2 ARC Painting Building 2nd floor painting works inspection (CSA2) 19-Jun-15 21-Jun-15 9.00am CLOSED 01-Sep-15 74 ACCEPTED 1 1
682 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00654 Dorce 18-Jun-15 ZN2 ARC Painting Building 3rd floor painting works inspection (CSA2) 19-Jun-15 21-Jun-15 9.00am CLOSED 01-Sep-15 74 ACCEPTED 1 1
684 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00656 Dorce 18-Jun-15 ZN2 MNE Testing Building ground floor waste water pipe water leakage test 19-Jun-15 21-Jun-15 9.00am CLOSED 24-Jun-15 5 REJECTED 1 1
inspection (CMA2)
685 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00657 Dorce 18-Jun-15 ZN2 MNE Testing Building ground floor waste water pipe water leakage test 19-Jun-15 21-Jun-15 9.00am CLOSED 24-Jun-15 5 REJECTED 1 1
inspection (CMA2)
686 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00658 Dorce 18-Jun-15 ZN2 MNE Testing Building ground floor waste water pipe water leakage test 19-Jun-15 21-Jun-15 9.00am CLOSED 24-Jun-15 5 REJECTED 1 1
inspection (CMA2)
687 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00659 Azrul MNE 19-Jun-15 ZN2 ELE Material Inspection of LV Cables (Material receiving) 20-Jun-15 22-Jun-15 10.00am CLOSED 24-Aug-15 65 ACCEPTED 1 1
688 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00660 Amin 20-Jun-15 ZN2 CIV Drainage Installation U drain 450-300 (MA4), and jointing with 21-Jun-15 23-Jun-15 10.00am CLOSED 1-Feb-16 225 ACCEPTED 1 1
cement mortar
689 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00661 Zulakmal 20-Jun-15 ZN2 CIV Building Joint survey as built stump Guard House 2 22-Jun-15 24-Jun-15 8.00am CLOSED 20-Aug-15 59 ACCEPTED 1 1
690 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00662 Zulakmal 20-Jun-15 ZN2 CIV Building Inspection formwork, rebar, concreting raft foundation 22-Jun-15 24-Jun-15 9.00am CLOSED 05-Aug-15 44 ACCEPTED 1 1
Post office and ATM
691 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00663 Rusydan 21-Jun-15 ZN2 ELE Earthning Installation of box sub and pipe sleeve at raft foundation 22-Jun-15 24-Jun-15 10.00am CLOSED 30-Jun-15 8 ACCEPTED 1 1
for earthning chamber ( Post Office)
692 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00664 Dorce 22-Jun-15 ZN2 STR Material Dorce incoming material inspection (Truck no: 247-245- 23-Jun-15 25-Jun-15 10.00am CLOSED 10-Aug-15 48 ACCEPTED 1 1
238-253-250-244-243-257-246)
693 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00665 Dorce 22-Jun-15 ZN2 ARC Painting Building ground floor painting works inspection (CSA3) 23-Jun-15 25-Jun-15 3.00 pm CLOSED 01-Sep-15 70 ACCEPTED 1 1
Zone 2
694 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00666 Dorce 22-Jun-15 ZN2 ARC Painting Building 1st floor painting works inspection (CSA3) zone 2 23-Jun-15 25-Jun-15 8.00 am CLOSED 01-Sep-15 70 ACCEPTED 1 1
695 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00667 Dorce 22-Jun-15 ZN2 ARC Painting Building 2nd floor painting works inspection (CSA3) zone 2 23-Jun-15 25-Jun-15 3.00 pm CLOSED 01-Sep-15 70 ACCEPTED 1 1
696 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00668 Dorce 22-Jun-15 ZN2 ARC Painting Building 3rd floor painting works inspection (CSA3) zone 2 23-Jun-15 25-Jun-15 3.00 pm CLOSED 01-Sep-15 70 ACCEPTED 1 1
697 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00669 Dorce 22-Jun-15 ZN2 ARC Covering Building PVC covering works inspection of ground floor 23-Jun-15 25-Jun-15 10.00 am CLOSED 01-Sep-15 70 ACCEPTED 1 1
(CMA2)
698 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00670 Dorce 22-Jun-15 ZN2 ARC Covering Building 1st floor PVC covering inspection (CMA2) zone 2 23-Jun-15 25-Jun-15 10.00 am CLOSED 01-Sep-15 70 ACCEPTED 1 1
699 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00671 Dorce 22-Jun-15 ZN2 ARC Covering Building 2nd floor PVC covering inspection (CMA2) zone 2 23-Jun-15 25-Jun-15 10.00 am CLOSED 27-Sep-15 96 ACCEPTED 1 1
700 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00672 Dorce 22-Jun-15 ZN2 ARC Covering Building 3rd floor PVC covering inspection (CMA2) zone 2 23-Jun-15 25-Jun-15 10.00 am CLOSED 27-Sep-15 96 ACCEPTED 1 1
701 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00673 Dorce 22-Jun-15 ZN2 ARC Waterproof Building ground floor waterproof membrace insulation 24-Jun-15 26-Jun-15 2.00 pm CLOSED 29-Sep-15 97 ACCEPTED 1 1
inspection and test (CMA4) zone 2
703 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00675 Dorce 22-Jun-15 ZN2 ARC Waterproof Building 2nd floor waterproof membranwe insulation 24-Jun-15 26-Jun-15 2.00 pm CLOSED 29-Sep-15 97 ACCEPTED 1 1
inspection and test (CMA4) zone 2
704 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00676 Dorce 22-Jun-15 ZN2 ARC Waterproof Building 3rd floor waterproof membranwe insulation 24-Jun-15 26-Jun-15 2.00 pm CLOSED 29-Sep-15 97 ACCEPTED 1 1
inspection and test (CMA4) zone 2
705 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00677 Dorce 22-Jun-15 ZN2 ARC Screed works Building ground floor screed works inspection (CMA2) 23-Jun-15 25-Jun-15 2.00 pm CLOSED 01-Sep-15 70 ACCEPTED 1 1
706 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00678 Dorce 22-Jun-15 ZN2 ARC Screed works Building 1st floor screed works inspection (CMA2) 23-Jun-15 25-Jun-15 2.00 pm CLOSED 01-Sep-15 70 ACCEPTED 1 1
707 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00679 Dorce 22-Jun-15 ZN2 ARC Screed works Building 2nd floor screed works inspection (CMA2) 23-Jun-15 25-Jun-15 2.00 pm CLOSED 01-Sep-15 70 ACCEPTED 1 1
708 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00680 Dorce 22-Jun-15 ZN2 ARC Screed works Building 3rd floor screed works inspection (CMA2) 23-Jun-15 25-Jun-15 2.00 pm CLOSED 01-Sep-15 70 ACCEPTED 1 1
709 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00681 Dorce 22-Jun-15 ZN2 STR Roof Covering Building roof installation inspection CLA1 25-Jun-15 27-Jun-15 5.00 pm CLOSED 28-Sep-15 95 ACCEPTED 1 1
710 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00682 Dorce 22-Jun-15 ZN2 STR Roof Covering Building roof installation inspection CLA3 25-Jun-15 27-Jun-15 5.00 pm CLOSED 28-Sep-15 95 ACCEPTED 1 1
711 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00683 Dorce 22-Jun-15 ZN2 STR Roof Covering Building roof installation inspection CLA5 25-Jun-15 27-Jun-15 5.00 pm CLOSED 28-Sep-15 95 ACCEPTED 1 1
712 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00684 Zulakmal 23-Jun-15 ZN2 BLD Concreting Inspection formwork, rebar and concreting (Post Office & 24-Jun-15 26-Jun-15 11.00am CLOSED 05-Aug-15 42 ACCEPTED 1 1
ATM)
713 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00685 Dorce 24-Jun-15 ZN2 MNE upvc piping Building ground floor waste water pipes 9 upvc pipes) 25-Jun-15 27-Jun-15 2.00pm CLOSED 17-Sep-15 84 ACCEPTED 1 1
installation and leakage test inspection CMA2
Building 1st floor waste water pipes 9 upvc pipes)
714 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00686 Dorce 24-Jun-15 ZN2 MNE upvc piping 25-Jun-15 27-Jun-15 2.00pm CLOSED 17-Sep-15 84 ACCEPTED 1 1
installation and leakage test inspection CMA3
717 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-00689 Khitmat Hijau 24-Jun-15 ZN2 PiP Piping Laying sewer pipe and install IC for Supervisory 25-Jun-15 27-Jun-15 10.00am CLOSED 25-Aug-15 61 ACCEPTED 1 1
accommodation Building
720 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00692 Afiq 25-Jun-15 ZN2 ARC Drilling Drilling and spraying anti termites at foundation with 25-Jun-15 27-Jun-15 1.00pm CLOSED 05-Aug-15 41 ACCEPTED 1 1
parameter 450mm interval. ZN 2
722 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00694 Zulfaqar 25-Jun-15 ZN2 STR rebar&formwork Inspection rebar and formwork for 2nd slab at RP1A. ZN 2 26-Jun-15 28-Jun-15 3.00pm CLOSED 26-Jun-15 0 ACCEPTED 1 1
723 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00695 Zulfaqar 26-Jun-15 ZN2 STR Concreting Concreting works for 2NP slab at RP1A 26-Jun-15 28-Jun-15 6.00pm CLOSED 26-Jun-15 0 ACCEPTED 1 1
728 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00700 Dorce 27-Jun-15 ZN2 ARC Waterproof Building 1st floor waterproof application inspection CMA4 28-Jun-15 30-Jun-15 10.00am CLOSED 29-Sep-15 93 ACCEPTED 1 1
729 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00701 Dorce 27-Jun-15 ZN2 ARC Waterproof Building 2nd floor waterproof application inspection CMA4 28-Jun-15 30-Jun-15 10.00am CLOSED 29-Sep-15 93 ACCEPTED 1 1
730 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00702 Dorce 27-Jun-15 ZN2 ARC Waterproof Building ground floor waterproof application inspection 28-Jun-15 30-Jun-15 10.00am CLOSED 16-Sep-15 80 ACCEPTED 1 1
CMA4
731 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00703 Dorce 27-Jun-15 ZN2 ARC Roof Covering Building roof inspection CMA1 29-Jun-15 1-Jul-15 10.00am CLOSED 29-Sep-15 92 ACCEPTED 1 1
732 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00704 Dorce 27-Jun-15 ZN2 STR Chassis installation Building first floor chassis installation inspection CLA2 29-Jun-15 1-Jul-15 2.00pm CLOSED 29-Sep-15 92 ACCEPTED 1 1
733 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00705 Dorce 27-Jun-15 ZN2 STR Chassis installation Building first floor chassis installation inspection CLA1 29-Jun-15 1-Jul-15 2.00pm CLOSED 29-Sep-15 92 ACCEPTED 1 1
735 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00707 Dorce 27-Jun-15 ZN2 STR Panel Installation Building first floor internal and external panel installation 29-Jun-15 1-Jul-15 2.00pm CLOSED 29-Sep-15 92 ACCEPTED 1 1
CLA2
737 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00709 Dorce 27-Jun-15 ZN2 STR Chassis installation Building first floor chassis installation inspection CLA3 29-Jun-15 1-Jul-15 2.00pm CLOSED 29-Sep-15 92 ACCEPTED 1 1
738 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00710 Dorce 29-Jun-15 ZN2 ELE Cable pulling Building ground floor cable pulling inspection CMA1 30-Jun-15 2-Jul-15 10.00am CLOSED CANCEL 1 1
739 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00711 Dorce 29-Jun-15 ZN2 ELE Cable pulling Building 1st floor cable pulling inspection CMA1 30-Jun-15 2-Jul-15 10.00am CLOSED CANCEL 1 1
740 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00712 Dorce 29-Jun-15 ZN2 ELE Cable pulling Building 2nd floor cable pulling inspection CMA1 30-Jun-15 2-Jul-15 10.00am CLOSED CANCEL 1 1
741 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00713 Dorce 29-Jun-15 ZN2 ELE Cable pulling Building 3rd floor cable pulling inspection CMA1 30-Jun-15 2-Jul-15 10.00am CLOSED CANCEL 1 1
742 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00714 Dorce 29-Jun-15 ZN2 ELE Cable pulling Building ground floor cable pulling inspection CMA2 30-Jun-15 2-Jul-15 10.00am CLOSED 10-Oct-15 102 ACCEPTED 1 1
743 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00715 Dorce 29-Jun-15 ZN2 ELE Cable pulling Building 1st floor cable pulling inspection CMA2 30-Jun-15 2-Jul-15 10.00am CLOSED 09-Oct-15 101 ACCEPTED 1 1
744 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00716 Dorce 29-Jun-15 ZN2 ELE Cable pulling Building 2nd floor cable pulling inspection CMA2 30-Jun-15 2-Jul-15 10.00am CLOSED 09-Oct-15 101 ACCEPTED 1 1
745 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00717 Dorce 29-Jun-15 ZN2 ELE Cable pulling Building 3rd floor cable pulling inspection CMA2 30-Jun-15 2-Jul-15 10.00am CLOSED 09-Oct-15 101 ACCEPTED 1 1
746 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00718 Faizal 29-Jun-15 ZN2 STR Dismantling Inspection for dismantling formwork at RP1 Zone 2 29-Jun-15 1-Jul-15 3.00pm CLOSED 20-Aug-15 52 ACCEPTED 1 1
747 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00719 Faizal 29-Jun-15 ZN2 STR rebar&formwork Inspection for rebar and formwork wall at RP1A 30-Jun-15 2-Jul-15 9.00am CLOSED 20-Aug-15 51 ACCEPTED 1 1
748 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00720 Afiq 29-Jun-15 ZN2 BLD Survey Joint survey asbuilt sump (Post Office) 30-Jun-15 2-Jul-15 9.00am CLOSED 20-Aug-15 51 ACCEPTED 1 1
749 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00721 Zulakmal 30-Jun-15 ZN2 BLD Concrete works Inspection formwork,rebar, concreting wall for oil 1-Jul-15 3-Jul-15 8.00am CLOSED 05-Aug-15 35 ACCEPTED 1 1
interceptor sess hall and kitchen
750 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00722 zulfaqar 1-Jul-15 ZN2 STR rebar&formwork inspection for formwork and rebar at 3rd slab, top slab 2-Jul-15 4-Jul-15 9.00am CLOSED 05-Aug-15 34 ACCEPTED 1 1
and wall at RP1A
751 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00723 Faizal 1-Jul-15 ZN2 STR Concrete works Concreting works for top slab & wallat RP1A 2-Jul-15 4-Jul-15 3.00pm CLOSED 03-Jul-15 1 ACCEPTED 1 1
752 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-00724 Khitmat Hijau 1-Jul-15 ZN2 PiP material Incoming material inspection for sewerage at Small 2-Jul-15 4-Jul-15 10.00am CLOSED 27-Aug-15 56 ACCEPTED 1 1
package Area ( Ic and Pipe)
754 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00726 Dorce 1-Jul-15 ZN2 ELE Testing Building ground floor cables insulation test inspection 2-Jul-15 4-Jul-15 3.00pm CLOSED 08-Oct-15 98 ACCEPTED 1 1
(CMA2)
755 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00727 Dorce 1-Jul-15 ZN2 ELE Testing Building first floor cables insulation test inspection (CMA2) 2-Jul-15 4-Jul-15 3.00pm CLOSED 08-Oct-15 98 ACCEPTED 1 1
756 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00728 Dorce 1-Jul-15 ZN2 ELE Testing Building second floor cables insulation test inspection 2-Jul-15 4-Jul-15 3.00pm CLOSED 08-Oct-15 98 ACCEPTED 1 1
(CMA2)
757 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00729 AEIE 3-Jul-15 ZN2 ELE Installation 5M compound Lighting installation 4-Jul-15 6-Jul-15 9.00am CLOSED CANCEL 1 1
Dorce 4-Jul-15 ZN2 MNE Testing Building ground floor pipes leakage control 6-Jul-15 8-Jul-15 8.00am
758 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00730
(Hydrotest) CMA1 CLOSED CANCEL 1 1
Dorce 4-Jul-15 ZN2 MNE Testing Building first floor pipes leakage control (Hydrotest) 6-Jul-15 8-Jul-15 8.00am
759 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00731
CMA1 CLOSED CANCEL 1 1
Dorce 4-Jul-15 ZN2 MNE Testing Building 3rd floor pipes leakage control (Hydrotest) 6-Jul-15 8-Jul-15 8.00am
761 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00733
CMA1 CLOSED CANCEL 1 1
762 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00734 Dorce 4-Jul-15 ZN2 MNE Testing Building ground floor waste water UPVC pipes leakage test 6-Jul-15 8-Jul-15 10.00am CLOSED 18-Oct-15 104 ACCEPTED 1 1
(CMA1)
763 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00735 Dorce 4-Jul-15 ZN2 MNE Testing Building first floor waste water UPVC pipes leakage test 6-Jul-15 8-Jul-15 10.00am CLOSED 18-Oct-15 104 ACCEPTED 1 1
(CMA1)
Building 2nd floor waste water UPVC pipes leakage test
764 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00736 Dorce 4-Jul-15 ZN2 MNE Testing 6-Jul-15 8-Jul-15 10.00am CLOSED 18-Oct-15 104 ACCEPTED 1 1
(CMA1)
767 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00739 Dorce 4-Jul-15 ZN2 MNE Testing Building first floor PPRC pipe leakage control ( Hydrotest) 6-Jul-15 8-Jul-15 2.00pm CLOSED 06-Jul-15 0 ACCEPTED 1 1
CMA2
770 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00742 Zulakmal 4-Jul-15 ZN2 BLD Concreting Inspection formwork,rebar, concreting raft foundation 6-Jul-15 8-Jul-15 10.00am CLOSED 06-Aug-15 31 ACCEPTED 1 1
(Mess Hall and Kitchen) Part 1
771 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00743 Dorce 4-Jul-15 ZN2 ELE Testing Building third floor cable insulation test 7-Jul-15 9-Jul-15 2.00pm CLOSED 08-Oct-15 93 ACCEPTED 1 1
772 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00744 Dorce 6-Jul-15 ZN2 ARC Chassis Building chassis installation inspection ( Café Building) 7-Jul-15 9-Jul-15 10.00am CLOSED 17-Sep-15 72 ACCEPTED 1 1
773 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00745 Dorce 6-Jul-15 ZN2 ARC Panel Building internal and external wall panel inspection ( Café 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
building)
775 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00747 Dorce 6-Jul-15 ZN2 ARC Panel Building third floor internal and external wall panel 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
inspection CLA3
779 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00751 Dorce 6-Jul-15 ZN2 ARC Panel Building third floor internal and external wall panel 7-Jul-15 9-Jul-15 10.00am CLOSED 11-Nov-15 127 ACCEPTED 1 1
inspection CLA3
780 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00752 Dorce 6-Jul-15 ZN2 ARC Panel Building Second floor internal and external wall panel 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
inspection CLA6
781 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00753 Dorce 6-Jul-15 ZN2 ARC Panel Building Second floor internal and external wall panel 7-Jul-15 9-Jul-15 10.00am CLOSED 22-Sep-15 77 ACCEPTED 1 1
inspection CLA3
782 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00754 Dorce 6-Jul-15 ZN2 ARC Panel Building Second floor internal and external wall panel 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
inspection CLA5
784 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00756 Dorce 6-Jul-15 ZN2 ARC Panel Building Second floor internal and external wall panel 7-Jul-15 9-Jul-15 10.00am CLOSED 22-Sep-15 77 ACCEPTED 1 1
inspection CLA1
786 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00758 Dorce 6-Jul-15 ZN2 ARC Chassis Building 3rd floor chassis installation inspection CLA3 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
787 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00759 Dorce 6-Jul-15 ZN2 ARC Chassis Building 3rd floor chassis installation inspection CLA2 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
788 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00760 Dorce 6-Jul-15 ZN2 ARC Chassis Building 3rd floor chassis installation inspection CLA1 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
789 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00761 Dorce 6-Jul-15 ZN2 ARC Chassis Building chassis to stump commection inspection (Ancher 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
bolth with brocket) CLA6
790 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00762 Dorce 6-Jul-15 ZN2 ARC Chassis Building chassis to stump commection inspection (Ancher 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
bolth with brocket) CLA5
792 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00764 Dorce 6-Jul-15 ZN2 ARC Chassis Building second floor chassis installation inspection CLA3 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
793 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00765 Dorce 6-Jul-15 ZN2 ARC Chassis Building second floor chassis installation inspection CLA2 7-Jul-15 9-Jul-15 10.00am CLOSED 18-Sep-15 73 ACCEPTED 1 1
794 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00766 Dorce 6-Jul-15 ZN2 ARC Chassis Building second floor chassis installation inspection CLA6 7-Jul-15 9-Jul-15 10.00am CLOSED 07-Oct-15 92 ACCEPTED Same RFIN with 00860 1 1
795 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00767 Dorce 6-Jul-15 ZN2 ARC Roof Covering Building roof installation inspection café BUILDING 7-Jul-15 9-Jul-15 10.00am CLOSED 17-Sep-15 72 ACCEPTED 1 1
798 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00770 Amin 7-Jul-15 ZN2 CIV Road work Preparation subgrade ( MA4), Manager Access, 8-Jul-15 10-Jul-15 9.00am CLOSED 03-Nov-15 118 ACCEPTED 1 1
Administration 61 parking lot
UEMB QAQC FDT for subgrade layer at Parking area for small package
800 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00772 7-Jul-15 ZN2 CIV Testing 8-Jul-15 10-Jul-15 8.00am CLOSED 08-Jul-15 0 ACCEPTED 1 1
KHAIRIL camp
801 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00773 UEMB QAQC 7-Jul-15 ZN2 CIV Testing FDT for subbase layer at Parking area for small package 8-Jul-15 10-Jul-15 4.00pm CLOSED 09-Jul-15 1 ACCEPTED 1 1
KHAIRIL camp
802 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00774 Amin 7-Jul-15 ZN2 CIV Road work Preparation Road Base ( MA4), Manager Access, 9-Jul-15 11-Jul-15 2.00pm CLOSED 03-Nov-15 117 ACCEPTED 1 1
Administration 61 parking lot
803 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00775 AEIE 7-Jul-15 ZN2 ELE Excavation Excavation of cable trench for Compound Lighting,Pole to 9-Jul-15 11-Jul-15 9.00am CLOSED 11-Jul-15 2 REJECTED 1 1
pole looping at MA3&MA4
804 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00776 AEIE 7-Jul-15 ZN2 ELE Cable laying Cable Laying for pole to pole looping at MA3&MA4 9-Jul-15 11-Jul-15 9.00am CLOSED 11-Jul-15 2 REJECTED 1 1
805 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00777 AEIE 7-Jul-15 ZN2 ELE Backfill Backfill for cable trench srounding MA3&MA4 9-Jul-15 11-Jul-15 9.00am CLOSED 11-Jul-15 0 REJECTED 1 1
806 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00778 Zulakmal 8-Jul-15 ZN2 BLD Concreting Inspection Formwork, Rebar, Concreting Raft Foundation 9-Jul-15 11-Jul-15 10.00am CLOSED 11-Sep-15 64 ACCEPTED 1 1
(Mess Hall And Kitchen) Part 3
809 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00781 Dorce 9-Jul-15 ZN2 MNE Leakage test Building 2nd floor waste water pipes UPVC leankage test 10-Jul-15 12-Jul-15 10.00am CLOSED 10-Jul-15 0 ACCEPTED 1 1
CSA4
810 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00782 Dorce 9-Jul-15 ZN2 MNE Leakage test Building 3rd floor waste water pipes UPVC leakage test 10-Jul-15 12-Jul-15 10.00am CLOSED 10-Jul-15 0 ACCEPTED 1 1
CSA4
811 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00783 Dorce 9-Jul-15 ZN2 MNE Leakage test Building ground floor waste water pipes UPVC leakage test 10-Jul-15 12-Jul-15 11.00am CLOSED 26-Oct-15 108 ACCEPTED 1 1
CSA3
813 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00785 Dorce 9-Jul-15 ZN2 MNE Leakage test Building 2nd floor waste water pipes UPVC leakage test 10-Jul-15 12-Jul-15 1.00pm CLOSED 26-Oct-15 108 ACCEPTED 1 1
CSA3
814 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00786 Dorce 9-Jul-15 ZN2 MNE Leakage test Building 3rd floor waste water pipes UPVC leakage test 10-Jul-15 12-Jul-15 1.00pm CLOSED 26-Oct-15 108 ACCEPTED 1 1
CSA3
815 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00787 Khairil 10-Jul-15 ZN2 CIV Testing FDT for road base layer at Parking area for small package 11-Jul-15 13-Jul-15 8.30am CLOSED 13-Jul-15 2 ACCEPTED 1 1
816 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00788 Amin 11-Jul-15 ZN2 CIV Road work Lay ACBC at MA4 12-Jul-15 14-Jul-15 9.00am CLOSED 03-Nov-15 114 REJECTED 1 1
817 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00789 Dorce 11-Jul-15 ZN2 ARC Floor covering works Building ground floor PVC floor covering works inspection 13-Jul-15 15-Jul-15 5.00pm CLOSED 14-Sep-15 63 ACCEPTED 1 1
(CSA1) at Zone 2.
818 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00790 Dorce 11-Jul-15 ZN2 ARC Floor covering works Building first floor PVC floor covering works inspection 13-Jul-15 15-Jul-15 5.00pm CLOSED 20-Aug-15 38 ACCEPTED 1 1
(CSA1) at Zone 2.
819 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00791 Dorce 11-Jul-15 ZN2 ARC Floor covering works Building second floor PVC floor covering works inspection 13-Jul-15 15-Jul-15 5.00pm CLOSED 14-Sep-15 63 ACCEPTED 1 1
(CSA1) at Zone 2.
820 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00792 Dorce 11-Jul-15 ZN2 ARC Floor covering works Building third floor PVC floor covering works inspection 13-Jul-15 15-Jul-15 5.00pm CLOSED 14-Sep-15 63 ACCEPTED 1 1
(CSA1) at Zone 2.
Dorce 11-Jul-15 ZN2 ELE Electrical works Building ground floor cable pulling inspection for CMA 13-Jul-15 15-Jul-15 2.00pm
821 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00793
1 at Zone 2. CLOSED CANCEL 1 1
Dorce 11-Jul-15 ZN2 ELE Electrical works Building first floor cable pulling inspection for CMA 1 13-Jul-15 15-Jul-15 2.00pm
822 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00794
at Zone 2. CLOSED CANCEL 1 1
Dorce 11-Jul-15 ZN2 ELE Electrical works Building second floor cable pulling inspection for 13-Jul-15 15-Jul-15 2.00pm
823 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00795
CMA 1 at Zone 2. CLOSED CANCEL 1 1
Dorce 11-Jul-15 ZN2 ELE Electrical works Building third floor cable pulling inspection for CMA 1 13-Jul-15 15-Jul-15 2.00pm
824 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00796
at Zone 2. CLOSED CANCEL 1 1
826 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00798 Dorce 11-Jul-15 ZN2 ARC screed works Building ground floor screed works inspection for CMA 4 13-Jul-15 15-Jul-15 3.00pm CLOSED 11-Nov-15 121 ACCEPTED 1 1
at Zone 2.
827 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00799 Dorce 11-Jul-15 ZN2 ARC screed works Building first floor screed works inspection for CMA 4 at 13-Jul-15 15-Jul-15 3.00pm CLOSED 18-Sep-15 67 ACCEPTED 1 1
Zone 2.
828 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00800 Dorce 11-Jul-15 ZN2 ARC screed works Building second floor screed works inspection for CMA 4 13-Jul-15 15-Jul-15 3.00pm CLOSED 18-Sep-15 67 ACCEPTED 1 1
at Zone 2.
830 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00802 Dorce 11-Jul-15 ZN2 ELE Electrical works Building Ground floor electrical panel board installation 13-Jul-15 15-Jul-15 4.00pm CLOSED 17-Sep-15 66 ACCEPTED 1 1
inspection (Distribution panel board) for CMA2 at Zone 2.
832 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00804 Dorce 11-Jul-15 ZN2 ELE Electrical works Building first floor installation electrical inspection for 13-Jul-15 15-Jul-15 3.00pm CLOSED 29-Aug-15 47 ACCEPTED 1 1
CMA2 at Zone 2.
834 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00806 Dorce 11-Jul-15 ZN2 ELE Electrical works Building third floor installation electrical inspection for 13-Jul-15 15-Jul-15 3.00pm CLOSED 29-Aug-15 47 ACCEPTED 1 1
CMA2 at Zone 2.
836 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00808 Dorce 11-Jul-15 ZN2 ARC ceramics works Building first floor ceramic tiles installation inspection for 13-Jul-15 15-Jul-15 3.00pm CLOSED 27-Aug-15 45 ACCEPTED 1 1
CMA2 at Zone 2.
838 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00810 Dorce 11-Jul-15 ZN2 ARC ceramics works Building third floor ceramic tiles installation inspection for 13-Jul-15 15-Jul-15 3.00pm CLOSED 27-Aug-15 45 ACCEPTED 1 1
CMA2 at Zone 2.
840 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00812 Dorce 11-Jul-15 ZN2 ARC membrane application Building firts floor water proof membrane application 13-Jul-15 15-Jul-15 11.30 am CLOSED 14-Sep-15 63 ACCEPTED 1 1
works inspection for CMA2 at Zone 2.
841 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00813 Dorce 11-Jul-15 ZN2 ARC membrane application Building second floor water proof membrane application 13-Jul-15 15-Jul-15 11.30 am CLOSED 14-Sep-15 63 ACCEPTED 1 1
works inspection for CMA2 at Zone 2.
843 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00815 Dorce 11-Jul-15 ZN2 ARC membrane application Building ground floor water proof membrane application 13-Jul-15 15-Jul-15 11.00 am CLOSED 20-Aug-15 38 ACCEPTED 1 1
works inspection for CSA3 at Zone 2.
844 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00816 Dorce 11-Jul-15 ZN2 ARC membrane application Building first floor water proof membrane application 13-Jul-15 15-Jul-15 11.00 am CLOSED 27-Aug-15 45 ACCEPTED 1 1
works inspection for CSA3 at Zone 2.
845 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00817 Dorce 11-Jul-15 ZN2 ARC membrane application Buildingsecond floor water proof membrane application 13-Jul-15 15-Jul-15 11.00 am CLOSED 28-Sep-15 77 ACCEPTED 1 1
works inspection for CSA3 at Zone 2.
846 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00818 Dorce 11-Jul-15 ZN2 ARC membrane application Building third floor water proof membrane application 13-Jul-15 15-Jul-15 11.00 am CLOSED 27-Aug-15 45 ACCEPTED 1 1
works inspection for CSA3 at Zone 2.
849 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00821 Khidmat Hijau 14-Jul-15 ZN2 MNE Sanitary Inspection of installation sanitary plumbing for kitchen , 15-Jul-15 17-Jul-15 10.00am CLOSED 20-Jul-15 5 ACCEPTED 1 1
sink & toilet at masshall
850 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00822 Amin 14-Jul-15 ZN2 CIV Road work Lay ACBC at MA2 15-Jul-15 17-Jul-15 9.00am CLOSED 11-Nov-15 119 ACCEPTED 1 1
851 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00823 Dorce 22-Jul-15 ZN2 ARC screed works Building ground floor screed works inspection CLA6 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 REJECTED CANCEL 1 1
852 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00824 Dorce 22-Jul-15 ZN2 ARC screed works Building 1st floor screed works inspection CLA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
853 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00825 Dorce 22-Jul-15 ZN2 ARC screed works Building 2nd floor screed works inspection CLA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
854 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00826 Dorce 22-Jul-15 ZN2 ARC screed works Building 3rd floor screed works inspection CLA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
855 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00827 Dorce 22-Jul-15 ZN2 ARC screed works Building ground floor screed works inspection CMA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 19-Sep-15 58 ACCEPTED 1 1
856 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00828 Dorce 22-Jul-15 ZN2 ARC screed works Building 1st floor screed works inspection CMA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 19-Sep-15 58 ACCEPTED 1 1
857 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00829 Dorce 22-Jul-15 ZN2 ARC screed works Building 2nd floor screed works inspection CMA1 23-Jul-15 25-Jul-15 1.00pm CLOSED CANCEL 1 1
858 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00830 Dorce 22-Jul-15 ZN2 ARC screed works Building 3rd floor screed works inspection CMA5 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED Same RFIN with 00801 1 1
859 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00831 Dorce 22-Jul-15 ZN2 ARC screed works Building ground floor screed works installation inspection 23-Jul-15 25-Jul-15 1.00pm CLOSED 22-Sep-15 61 ACCEPTED 1 1
CLA5
860 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00832 Dorce 22-Jul-15 ZN2 ARC screed works Building 1st floor screed works installation inspection CLA5 23-Jul-15 25-Jul-15 1.00pm CLOSED 22-Sep-15 61 ACCEPTED 1 1
861 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00833 Dorce 22-Jul-15 ZN2 ARC screed works Building 2nd floor screed works installation inspection 23-Jul-15 25-Jul-15 1.00pm CLOSED 22-Sep-15 61 ACCEPTED 1 1
CLA5
863 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00835 Dorce 22-Jul-15 ZN2 ARC Painting Building ground floor painting works inspection CMA6 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
864 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00836 Dorce 22-Jul-15 ZN2 ARC Painting Building 1st floor painting works inspection CMA6 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
865 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00837 Dorce 22-Jul-15 ZN2 ARC Painting Building 2nd floor painting works inspection CMA6 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
866 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00838 Dorce 22-Jul-15 ZN2 ARC Painting Building 3rd floor painting works inspection CMA6 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
867 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00839 Dorce 22-Jul-15 ZN2 ARC Painting Building ground floor painting works inspection CLA3 23-Jul-15 25-Jul-15 1.00pm CLOSED CANCEL 1 1
868 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00840 Dorce 22-Jul-15 ZN2 ARC Painting Building 1st floor painting works inspection CLA5 23-Jul-15 25-Jul-15 1.00pm CLOSED 29-Sep-15 68 ACCEPTED 1 1
869 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00841 Dorce 22-Jul-15 ZN2 ARC Painting Building 2nd floor painting works inspection CLA5 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
870 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00842 Dorce 22-Jul-15 ZN2 ARC Painting Building 3rd floor painting works inspection CLA5 23-Jul-15 25-Jul-15 1.00pm CLOSED 27-Sep-15 66 ACCEPTED 1 1
871 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00843 Dorce 22-Jul-15 ZN2 ARC Painting Building ground floor painting works inspection CSA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 29-Sep-15 68 ACCEPTED 1 1
872 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00844 Dorce 22-Jul-15 ZN2 ARC Painting Building 1st floor painting works inspection CSA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 29-Sep-15 68 ACCEPTED 1 1
873 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00845 Dorce 22-Jul-15 ZN2 ARC Painting Building 2nd floor painting works inspection CSA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 29-Sep-15 68 ACCEPTED 1 1
874 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00846 Dorce 22-Jul-15 ZN2 ARC Painting Building 3rd floor painting works inspection CSA1 23-Jul-15 25-Jul-15 1.00pm CLOSED 29-Sep-15 68 ACCEPTED 1 1
875 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00847 Dorce 22-Jul-15 ZN2 ARC Painting Building ground floor painting works inspection CMA4 23-Jul-15 25-Jul-15 1.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
876 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00848 Dorce 22-Jul-15 ZN2 ARC Painting Building 1st floor painting works inspection CMA4 23-Jul-15 25-Jul-15 1.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
877 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00849 Dorce 22-Jul-15 ZN2 ARC Painting Building 2nd floor painting works inspection CMA4 23-Jul-15 25-Jul-15 1.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
878 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00850 Dorce 22-Jul-15 ZN2 ARC Painting Building 3rd floor painting works inspection CMA4 23-Jul-15 25-Jul-15 1.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
879 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00851 Dorce 22-Jul-15 ZN2 ARC Assembling works Building ground floor internal and external wall panel 23-Jul-15 25-Jul-15 3.00pm CLOSED 22-Sep-15 61 ACCEPTED 1 1
inspection CLA3
880 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00852 Dorce 22-Jul-15 ZN2 ARC Assembling works Building second floor internal and external wall panel 23-Jul-15 25-Jul-15 3.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
inspection CLA6
882 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00854 Dorce 22-Jul-15 ZN2 ARC Assembling works Builing third floor internal and external wall panel 23-Jul-15 25-Jul-15 3.00pm CLOSED 22-Sep-15 61 ACCEPTED 1 1
inspection CLA3
883 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00855 Dorce 22-Jul-15 ZN2 ARC Assembling works Building second floor internal and external wall panel 23-Jul-15 25-Jul-15 3.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
inspection CLA3
884 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00856 Dorce 22-Jul-15 ZN2 ARC Assembling works Building second floor internal and external wall panel 23-Jul-15 25-Jul-15 3.00pm CLOSED CANCEL 1 1
inspection CLA6
885 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00857 Dorce 22-Jul-15 ZN2 ARC Assembling works Building ground floor internal and external wall panel 23-Jul-15 25-Jul-15 3.00pm CLOSED 22-Sep-15 61 ACCEPTED 1 1
inspection CLA1
887 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00859 Dorce 22-Jul-15 ZN2 ARC Assembling works Building 3rd floor internal and external wall panel 23-Jul-15 25-Jul-15 3.00pm CLOSED 22-Sep-15 61 ACCEPTED 1 1
inspection CLA2
888 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00860 Dorce 22-Jul-15 ZN2 ARC Assembling works Building second floor chassis installation inspection CLA1 23-Jul-15 25-Jul-15 3.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
889 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00861 Dorce 22-Jul-15 ZN2 ARC Assembling works Building roof inspection CLA3 23-Jul-15 25-Jul-15 3.00pm CLOSED 28-Sep-15 67 ACCEPTED 1 1
890 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00862 Dorce 22-Jul-15 ZN2 ARC Assembling works Building roof inspection CLA4 23-Jul-15 25-Jul-15 3.00pm CLOSED 28-Sep-15 67 ACCEPTED 1 1
891 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00863 Dorce 22-Jul-15 ZN2 ARC Assembling works Building roof inspection CLA1 23-Jul-15 25-Jul-15 3.00pm CLOSED 28-Sep-15 67 ACCEPTED 1 1
892 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00864 Dorce 22-Jul-15 ZN2 ARC Assembling works Building roof assembly inspection Guard House 23-Jul-15 25-Jul-15 3.00pm CLOSED 22-Sep-15 61 ACCEPTED 1 1
893 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00865 Dorce 22-Jul-15 ZN2 ARC ceramics works Building ground floor ceramic tiles installation inspection 23-Jul-15 25-Jul-15 3.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
for CMA4
895 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00867 Dorce 22-Jul-15 ZN2 ARC ceramics works Building second floor ceramic tiles installation inspection 23-Jul-15 25-Jul-15 3.00pm CLOSED 18-Sep-15 57 ACCEPTED 1 1
for CMA4
897 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00869 Dorce 22-Jul-15 ZN2 ELE Electrical works Building ground floor cable pulling installation inspection 23-Jul-15 25-Jul-15 3.00pm CLOSED 10-Oct-15 79 ACCEPTED 1 1
CMA4
898 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00870 Dorce 22-Jul-15 ZN2 ELE Electrical works Building 1st floor cable pulling installation inspection 23-Jul-15 25-Jul-15 3.00pm CLOSED 10-Oct-15 79 ACCEPTED 1 1
CMA4
900 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00872 Dorce 22-Jul-15 ZN2 ELE Electrical works Building 3rd floor cable pulling installation inspection 23-Jul-15 25-Jul-15 3.00pm CLOSED 10-Oct-15 79 ACCEPTED 1 1
CMA4
902 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00874 Dorce 22-Jul-15 ZN2 ELE Electrical works Building 1st floor Electrical works installation inspection 23-Jul-15 25-Jul-15 3.00pm CLOSED 29-Aug-15 37 ACCEPTED 1 1
CMA1
904 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00876 Dorce 22-Jul-15 ZN2 ELE Electrical works Building 3rd floor Electrical works installation inspection 23-Jul-15 25-Jul-15 3.00pm CLOSED 29-Aug-15 37 ACCEPTED 1 1
CMA1
905 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00877 Zulakmal 22-Jul-15 ZN2 BLD Concereting Inspection formwork,rebar, concreting raft foundation 25-Jul-15 27-Jul-15 4.00pm CLOSED 13-Aug-15 19 ACCEPTED 1 1
Laundry
906 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00878 Dorce 22-Jul-15 ZN2 ARC distribution panel Building distribution panel board installation inspection 23-Jul-15 25-Jul-15 1.00pm CLOSED 28-Aug-15 36 ACCEPTED 1 1
board (CMA1)
907 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-00879 23-Jul-15 ZN2 BLD Punch list Inspection for punch list for handing over 24-Jul-15 26-Jul-15 3.00pm CLOSED 28-Aug-15 35 CANCEL 1 1
908 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00880 Dorce 23-Jul-15 ZN2 ARC waterproofing Building ground floor waterproofing membrane 24-Jul-15 26-Jul-15 3.00pm CLOSED 22-Sep-15 60 ACCEPTED 1 1
membrane application application and water leakage test inspection CSA4
909 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00881 Dorce 23-Jul-15 ZN2 ARC waterproofing Building 1st floor waterproofing membrane application 24-Jul-15 26-Jul-15 3.00pm CLOSED 05-Oct-15 73 ACCEPTED 1 1
membrane application and water leakage test inspection CSA4
910 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00882 Dorce 23-Jul-15 ZN2 ARC waterproofing Building 2nd floor waterproofing membrane application 24-Jul-15 26-Jul-15 3.00pm CLOSED 22-Sep-15 60 ACCEPTED 1 1
membrane application and water leakage test inspection CSA4
911 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00883 Dorce 23-Jul-15 ZN2 ARC waterproofing Building 3rd floor waterproofing membrane application 24-Jul-15 26-Jul-15 3.00pm CLOSED 22-Sep-15 60 ACCEPTED 1 1
membrane application and water leakage test inspection CSA4
914 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00886 Dorce 23-Jul-15 ZN2 MNE Leakage test Building second floor UPVC pipes water leakage test 24-Jul-15 26-Jul-15 3.00pm CLOSED 30-Sep-15 68 ACCEPTED 1 1
inspection CMA1
915 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00887 Dorce 23-Jul-15 ZN2 MNE Leakage test Building third floor UPVC pipe water leakage test 24-Jul-15 26-Jul-15 3.00pm CLOSED 30-Sep-15 68 ACCEPTED 1 1
inspection CMA1
920 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00892 Khidmat Hijau 24-Jul-15 ZN2 MNE Sanitary Installation of pipe sleeve at raft foundation for sanitary 25-Jul-15 27-Jul-15 10.00am CLOSED 14-Nov-15 112 ACCEPTED 1 1
921 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00893 Aqmal Hisyam 24-Jul-15 ZN2 ELE Earthning Installation of box sub and pipe sleeve at Raft Foundation 25-Jul-15 27-Jul-15 10.00am CLOSED 14-Nov-15 112 ACCEPTED 1 1
for earthning chamber
923 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00895 UEMB QAQC 24-Jul-15 ZN2 CIV Testing Coring ACBC 28 at Parking area and Road (MA1) 25-Jul-15 27-Jul-15 10.00am CLOSED 25-Jul-15 0 ACCEPTED 1 1
KHAIRIL
924 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00896 Rusydan 26-Jul-15 ZN2 ELE sanitary Installation of pipe sleeve at raft foundation for floor trap 27-Jul-15 29-Jul-15 10.00am CLOSED 14-Nov-15 110 ACCEPTED 1 1
at Reffuse Chamber
RAPID-P20A1-UEMB-ZN2-CIV-RFIN- Amin 26-Jul-15 ZN2 CIV Preparation of subgrade 27-Jul-15 29-Jul-15 9.00am
925 Road work CLOSED CANCEL 1 1
00897
926
RAPID-P20A1-UEMB-ZN2-CIV-RFIN- Amin 26-Jul-15 ZN2 CIV Road work Preparation of subbase 27-Jul-15 29-Jul-15 2.00pm CLOSED CANCEL 1 1
00898
928 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00900 UEMB QAQC 26-Jul-15 ZN2 CIV Testing FDT for subgrade at manager access road 27-Jul-15 29-Jul-15 9.30 am CLOSED 27-Jul-15 0 ACCEPTED 1 1
KHAIRIL
UEMB QAQC
929 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00901 26-Jul-15 ZN2 CIV Testing FDT for subbase at manager access road 27-Jul-15 29-Jul-15 3.00pm CLOSED 28-Jul-15 1 ACCEPTED 1 1
KHAIRIL
UEMB KHAIRIL 27-Jul-15 ZN2 CIV FDT for roadbase at manager access road 28-Jul-15 30-Jul-15 3.30pm CLOSED
930 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00902
IZWAN Testing CANCEL 1 1
RAPID-P20A1-UEMB-ZN2-CIV-RFIN-
931
00903 Amin 27-Jul-15 ZN2 CIV Road work Prepare roadbase 100m at Zone 2 28-Jul-15 30-Jul-15 2.00pm CLOSED 13-Aug-15 16 ACCEPTED 1 1
932
RAPID-P20A1-UEMB-ZN2-CIV-RFIN- Amin 28-Jul-15 ZN2 CIV Road work Laying ACBC 100m at zone 2 29-Jul-15 31-Jul-15 10.00am CLOSED CANCEL 1 1
00904
933 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00905 UEMB QAQC 28-Jul-15 ZN2 CIV Testing Spray test prime at manager access zone 2 28-Jul-15 30-Jul-15 5.00pm CLOSED 29-Jul-15 1 ACCEPTED 1 1
KHAIRIL
934 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00906 UEMB QAQC 28-Jul-15 ZN2 CIV Road work Sampling and testing premix ACBC 28 for manager access 28-Jul-15 30-Jul-15 5.30pm CLOSED 07-Oct-15 71 ACCEPTED 1 1
KHAIRIL at zone 2
935 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00907 Dorce 28-Jul-15 ZN2 STR Completion work Building final inspection (CMA2) at zone 2 30-Jul-15 1-Aug-15 4.00pm CLOSED 01-Oct-15 63 ACCEPTED 1 1
936 RAPID-P20A1-UEMB-ZN2-STR-RFIN-00908 Dorce 28-Jul-15 ZN2 STR Completion work Building final inspection (CMA1) at zone 2 30-Jul-15 1-Aug-15 4.00pm CLOSED 01-Oct-15 63 ACCEPTED 1 1
938 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00910 Dorce 28-Jul-15 ZN2 ARC Ceramic tile works Building ground floor ceramic tiles works installation 29-Jul-15 31-Jul-15 2.00pm CLOSED 17-Sep-15 50 ACCEPTED 1 1
inspection (CSA3) at zone 2
940 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00912 Dorce 28-Jul-15 ZN2 ARC Ceramic tile works Building second floor ceramic tiles works installation 29-Jul-15 31-Jul-15 2.00pm CLOSED 28-Aug-15 30 ACCEPTED 1 1
inspection (CSA3) at zone 2
942 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00914 Dorce 29-Jul-15 ZN2 ARC Assembling Works Building roof installation inspection (CLA6) at zone 2 29-Jul-15 31-Jul-15 2.00pm CLOSED 20-Aug-15 22 ACCEPTED 1 1
946 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00918 UEMB QAQC 30-Jul-15 ZN2 CIV Road work Premix coring at Manager Access for ACBC 28 31-Jul-15 2-Aug-15 8.00am CLOSED 01-Aug-15 1 ACCEPTED 1 1
KHAIRIL
947 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00919 UEM NIZAN 28-Jul-15 ZN2 CIV Road work Installation of rebar and formwork,Concreting 29-Jul-15 31-Jul-15 2.00pm CLOSED 02-Nov-15 96 ACCEPTED 1 1
works
949 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00921 Dorce 1-Aug-15 ZN2 MNE Hydrotest Building first floor PPR Piping installation and hydrotest 3-Aug-15 5-Aug-15 3.00pm CLOSED 29-Aug-15 26 ACCEPTED 1 1
inspection (CSA1)
950 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00922 Dorce 1-Aug-15 ZN2 MNE Hydrotest Building Second floor PPR Piping installation and hydrotest 3-Aug-15 5-Aug-15 3.00pm CLOSED 04-Sep-15 32 ACCEPTED 1 1
inspection (CSA1)
953 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00925 Dorce 1-Aug-15 ZN2 MNE Hydrotest Building first floor PPR Piping installation and hydrotest 3-Aug-15 5-Aug-15 2.00pm CLOSED 29-Aug-15 26 ACCEPTED 1 1
inspection (CSA3)
954 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00926 Dorce 1-Aug-15 ZN2 MNE Hydrotest Building Second floor PPR Piping installation and hydrotest 3-Aug-15 5-Aug-15 2.00pm CLOSED 29-Aug-15 26 ACCEPTED 1 1
inspection (CSA3)
955 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00927 Dorce 1-Aug-15 ZN2 MNE Hydrotest Building third floor PPR Piping installation and hydrotest 3-Aug-15 5-Aug-15 2.00pm CLOSED 29-Aug-15 26 ACCEPTED 1 1
inspection (CSA3)
956 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00928 Shinryo 5-Aug-15 ZN2 MNE Equipment Water heater installation test at ground floor level (MA2) 6-Aug-15 8-Aug-15 9.00am CLOSED 19-Sep-15 44 ACCEPTED 1 1
957 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00929 Shinryo 5-Aug-15 ZN2 MNE Equipment Water heater installation test punction at First floor level 6-Aug-15 8-Aug-15 9.00am CLOSED 19-Sep-15 44 ACCEPTED 1 1
(MA2)
Shinryo 5-Aug-15 ZN2 MNE Equipment Air Cooled split unit installation and function test at 6-Aug-15 8-Aug-15 9.00am
960 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00932
ground floor level (MA 2) CLOSED CANCEL 1 1
Shinryo 5-Aug-15 ZN2 MNE Equipment Air Cooled split unit installation and function test at 6-Aug-15 8-Aug-15 9.00am
961 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00933
first floor level (MA2) CLOSED CANCEL 1 1
963 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00935 Shinryo 5-Aug-15 ZN2 MNE Equipment Air Cooled split unit installation and function test at third 6-Aug-15 8-Aug-15 9.00am CLOSED 03-Oct-15 58 ACCEPTED 1 1
floor level (MA2)
964 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00936 Shinryo 5-Aug-15 ZN2 MNE Equipment Toilet exhoust fan installation and function test at Ground 6-Aug-15 8-Aug-15 9.00am CLOSED 15-Sep-15 40 ACCEPTED 1 1
floor level (MA2)
966 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00938 Shinryo 5-Aug-15 ZN2 MNE Equipment Toilet exhoust fan installation and function test at second 6-Aug-15 8-Aug-15 9.00am CLOSED 15-Sep-15 40 ACCEPTED 1 1
floor level (MA2)
967 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00939 Shinryo 5-Aug-15 ZN2 MNE Equipment Toilet exhoust fan installation and function test at third 6-Aug-15 8-Aug-15 9.00am CLOSED 15-Sep-15 40 ACCEPTED 1 1
floor level (MA2)
969 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00941 Shinryo 5-Aug-15 ZN2 MNE Equipment Ceiling fan installation and function test at first floor level 6-Aug-15 8-Aug-15 9.00am CLOSED 15-Sep-15 40 ACCEPTED 1 1
(MA2)
970 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00942 Shinryo 5-Aug-15 ZN2 MNE Equipment Ceiling fan installation and function test at second floor 6-Aug-15 8-Aug-15 9.00am CLOSED 15-Sep-15 40 ACCEPTED 1 1
level (MA2)
971 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-00943 Shinryo 5-Aug-15 ZN2 MNE Equipment Ceiling fan installation and function test at third floor level 6-Aug-15 8-Aug-15 9.00am CLOSED 15-Sep-15 40 ACCEPTED 1 1
(MA2)
972 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00944 Zulakmal 6-Aug-15 ZN2 BLD Concreting Inspection formwork, rebar, concreting roof beam refuse 8-Aug-15 10-Aug-15 11.00am CLOSED 10-Aug-15 2 ACCEPTED 1 1
chamber and installation of M12 Hold Down Bolts
Cable laying for Out going from Feeder piller
973 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00945 AEIE 7-Aug-15 ZN2 ELE Feeder pillar (MA1,MA2,MA3,MA4,Club House,Mass Hall kitchen,Dojo, 8-Aug-15 10-Aug-15 10.00am CLOSED 08-Nov-15 92 REJECTED 1 1
Groceries
974 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00946 Dorce 8-Aug-15 ZN2 ARC Assembling Works Building roof installation inspection at Club House 10-Aug-15 12-Aug-15 9.00am CLOSED 17-Sep-15 38 ACCEPTED 1 1
975 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00947 Dorce 8-Aug-15 ZN2 ARC Assembling Works Building roof installation inspection at Internet Café 10-Aug-15 12-Aug-15 9.00am CLOSED 06-Oct-15 57 ACCEPTED 1 1
976 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00948 Dorce 8-Aug-15 ZN2 ARC Assembling Works Building roof installation inspection at Barber 10-Aug-15 12-Aug-15 9.00am CLOSED 06-Oct-15 57 ACCEPTED 1 1
Dorce 8-Aug-15 ZN2 ARC Floor covering works Building Ground floor PVC floor covering works 10-Aug-15 12-Aug-15 9.00am
977 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00949
inspection (CSA1) CLOSED CANCEL 1 1
978 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00950 Dorce 8-Aug-15 ZN2 ARC Ceramic tile works Building ground floor tiles works installation inspection 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
CSA1
979 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00951 Dorce 8-Aug-15 ZN2 ARC Ceramic tile works Building 1st floor tiles works installation inspection CSA1 10-Aug-15 12-Aug-15 9.00am CLOSED 22-Sep-15 43 ACCEPTED 1 1
980 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00952 Dorce 8-Aug-15 ZN2 ARC Ceramic tile works Building 2nd floor tiles works installation inspection CSA1 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
981 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00953 Dorce 8-Aug-15 ZN2 ARC Ceramic tile works Building 3rd floor tiles works installation inspection CSA1 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
982 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00954 Dorce 8-Aug-15 ZN2 ARC Screeding works Building ground floor screeding works inspection CSA 1 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
983 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00955 Dorce 8-Aug-15 ZN2 ARC Screeding works Building 1st floor screeding works inspection CSA 1 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
984 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00956 Dorce 8-Aug-15 ZN2 ARC Screeding works Building 2nd floor screeding works inspection CSA 1 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
985 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00957 Dorce 8-Aug-15 ZN2 ARC Screeding works Building 3rd floor screeding works inspection CSA 1 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
986 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00958 Dorce 8-Aug-15 ZN2 ARC Screeding works Building ground floor screeding works inspection CSA3 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
987 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00959 Dorce 8-Aug-15 ZN2 ARC Screeding works Building 1st floor screeding works inspection CSA3 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
988 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00960 Dorce 8-Aug-15 ZN2 ARC Screeding works Building 2nd floor screeding works inspection CSA3 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
989 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00961 Dorce 8-Aug-15 ZN2 ARC Screeding works Building 3rd floor screeding works inspection CSA3 10-Aug-15 12-Aug-15 9.00am CLOSED 14-Sep-15 35 ACCEPTED 1 1
990 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00962 Dorce 8-Aug-15 ZN2 ARC Assembling Works Building internal and external wall panel installation 10-Aug-15 12-Aug-15 9.00am CLOSED 17-Sep-15 38 ACCEPTED 1 1
inspection at Club House
991 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00963 Dorce 8-Aug-15 ZN2 ARC Assembling Works Building internal and external wall panel installation 10-Aug-15 12-Aug-15 9.00am CLOSED 27-Aug-15 17 ACCEPTED 1 1
inspection at Internet Café
993 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00965 Dorce 8-Aug-15 ZN2 ARC Assembling Works Building chassis installation inspection Club House 10-Aug-15 12-Aug-15 9.00am CLOSED 17-Sep-15 38 ACCEPTED 1 1
994 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00966 Dorce 8-Aug-15 ZN2 ARC Assembling Works Building chassis installation inspection Internet Café 10-Aug-15 12-Aug-15 9.00am CLOSED 27-Aug-15 17 ACCEPTED 1 1
995 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00967 Dorce 8-Aug-15 ZN2 ARC Assembling Works Building chassis installation inspection at Barber 10-Aug-15 12-Aug-15 9.00am CLOSED 27-Aug-15 17 ACCEPTED 1 1
997 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00969 Dorce 8-Aug-15 ZN2 ELE Electrical works Building ground floor cable pulling installation inspection 10-Aug-15 12-Aug-15 9.00am CLOSED 09-Oct-15 60 ACCEPTED 1 1
at CSA3
998 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00970 Dorce 8-Aug-15 ZN2 ELE Electrical works Building 1st floor cable pulling installation inspection at 10-Aug-15 12-Aug-15 9.00am CLOSED 09-Oct-15 60 ACCEPTED 1 1
CSA3
999 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00971 Dorce 8-Aug-15 ZN2 ELE Electrical works Building 2nd floor cable pulling installation inspection at 10-Aug-15 12-Aug-15 9.00am CLOSED 09-Oct-15 60 ACCEPTED 1 1
CSA3
1001 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00973 Dorce 8-Aug-15 ZN2 ELE Electrical works Building ground floor cable pulling installation inspection 10-Aug-15 12-Aug-15 9.00am CLOSED 09-Oct-15 60 ACCEPTED 1 1
at CSA4
1002 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00974 Dorce 8-Aug-15 ZN2 ELE Electrical works Building 1st floor cable pulling installation inspection at 10-Aug-15 12-Aug-15 9.00am CLOSED 09-Oct-15 60 ACCEPTED 1 1
CSA4
1003 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00975 Dorce 8-Aug-15 ZN2 ELE Electrical works Building 2nd floor cable pulling installation inspection at 10-Aug-15 12-Aug-15 9.00am CLOSED 09-Oct-15 60 ACCEPTED 1 1
CSA4
1004 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00976 Dorce 8-Aug-15 ZN2 ELE Electrical works Building 3rd floor cable pulling installation inspection at 10-Aug-15 12-Aug-15 9.00am CLOSED 09-Oct-15 60 ACCEPTED 1 1
CSA4
1006 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-00978 Khidmat Hijau 10-Aug-15 ZN2 PIP material Material inspection for plumbing works (Chamber Ring 11-Aug-15 13-Aug-15 10.30am CLOSED 25-Aug-15 14 ACCEPTED 1 1
and cover slab)
1008 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-00980 Khidmat Hijau 10-Aug-15 ZN2 PIP material Material inspection for plumbing works (Pipe Fitting) 11-Aug-15 13-Aug-15 10.30am CLOSED 25-Aug-15 14 ACCEPTED 1 1
1009 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-00981 UEMB Aswad 11-Aug-15 ZN2 CIV Drainage Precast U-Drain installation (450x300) at SA1 12-Aug-15 14-Aug-15 10.00am CLOSED CANCEL 1 1
1010 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00982 UEMB Sadam 13-Aug-15 ZN2 ARC Furniture Architecture / ID area furniture arrangement in the 14-Aug-15 16-Aug-15 10.00am CLOSED 17-Aug-15 3 ACCEPTED 1 1
building CMA1
1011 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00983 UEMB Sadam 13-Aug-15 ZN2 ARC Furniture Architecture / ID area furniture arrangement in the 14-Aug-15 16-Aug-15 10.00am CLOSED 17-Aug-15 3 ACCEPTED 1 1
building CMA2
1013 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-00985 UEMB Sadam 13-Aug-15 ZN2 ARC Furniture Architecture / ID area furniture arrangement in the 14-Aug-15 16-Aug-15 10.00am CLOSED 17-Aug-15 3 ACCEPTED 1 1
building CSA3
1014 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00986 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at SA1 Ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Aug-15 14 ACCEPTED 1 1
1015 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00987 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at SA1 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Aug-15 14 ACCEPTED 1 1
1016 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00988 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at SA1 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Aug-15 14 ACCEPTED 1 1
1017 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00989 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at SA1 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Aug-15 14 ACCEPTED 1 1
1018 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00990 Shinryo 14-Aug-15 ZN2 ELE water heater Water heater installation inspection at SA1 Ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
water heater
1019 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00991 Shinryo 14-Aug-15 ZN2 ELE Water heater installation inspection at SA1 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1020 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00992 Shinryo 14-Aug-15 ZN2 ELE water heater Water heater installation inspection at SA4 Second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1021 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00993 Shinryo 14-Aug-15 ZN2 ELE water heater Water heater installation inspection at SA4 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1022 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00994 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at SA1 ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
1023 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00995 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at SA4 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1024 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00996 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at SA1 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1025 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00997 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at SA1 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1026 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00998 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan Ventilation fan installation inspection at SA1 ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 24-Sep-15 40 ACCEPTED 1 1
installation
1027 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-00999 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan Ventilation fan installation inspection at SA1 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 22-Sep-15 38 ACCEPTED 1 1
installation
Ventilation fan
1028 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01000 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan installation inspection at SA1 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 22-Sep-15 38 ACCEPTED 1 1
installation
1029 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01001 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan Ventilation fan installation inspection at SA1 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 22-Sep-15 38 ACCEPTED 1 1
installation
1030 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01002 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at SA3 Ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1031 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01003 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at SA3 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1032 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01004 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at SA3 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1033 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01005 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at SA3 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1034 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01006 Shinryo 14-Aug-15 ZN2 ELE water heater Water heater installation inspection at SA3 Ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1035 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01007 Shinryo 14-Aug-15 ZN2 ELE water heater Water heater installation inspection at SA3 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
water heater
1036 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01008 Shinryo 14-Aug-15 ZN2 ELE Water heater installation inspection at SA3 Second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1037 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01009 Shinryo 14-Aug-15 ZN2 ELE water heater Water heater installation inspection at SA3 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1038 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01010 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at SA3 ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1039 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01011 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at SA3 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1040 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01012 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at SA3 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1041 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01013 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at SA3 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
Ventilation fan
1042 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01014 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan installation inspection at SA3 ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 22-Sep-15 38 ACCEPTED 1 1
installation
1043 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01015 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan Ventilation fan installation inspection at SA3 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 22-Sep-15 38 ACCEPTED 1 1
installation
1044 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01016 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan Ventilation fan installation inspection at SA3 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 24-Sep-15 40 ACCEPTED 1 1
installation
Ventilation fan
1045 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01017 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan installation inspection at SA3 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 22-Sep-15 38 ACCEPTED 1 1
installation
1046 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01018 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at MA4 Ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1047 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01019 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at MA4 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1048 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01020 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at MA4 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 29-Sep-15 45 ACCEPTED 1 1
1049 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01021 Shinryo 14-Aug-15 ZN2 ELE AC Unit Installation AC unit installation inspection at MA4 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED CANCEL 1 1
water heater
1050 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01022 Shinryo 14-Aug-15 ZN2 ELE Water heater installation inspection at MA4 Ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1051 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01023 Shinryo 14-Aug-15 ZN2 ELE water heater Water heater installation inspection at MA4 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1052 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01024 Shinryo 14-Aug-15 ZN2 ELE water heater Water heater installation inspection at MA4 Second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
water heater
1053 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01025 Shinryo 14-Aug-15 ZN2 ELE Water heater installation inspection at MA4 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 19-Sep-15 35 ACCEPTED 1 1
installation
1054 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01026 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at MA4 ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 17-Sep-15 33 ACCEPTED 1 1
1055 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01027 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at MA4 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 17-Sep-15 33 ACCEPTED 1 1
1056 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01028 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at MA4 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 17-Sep-15 33 ACCEPTED 1 1
1057 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01029 Shinryo 14-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at MA4 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 17-Sep-15 33 ACCEPTED 1 1
1058 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01030 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan Ventilation fan installation inspection at MA4 ground floor 15-Aug-15 17-Aug-15 10.00am CLOSED 17-Sep-15 33 ACCEPTED 1 1
installation
Ventilation fan
1059 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01031 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan installation inspection at MA4 first floor 15-Aug-15 17-Aug-15 10.00am CLOSED 17-Sep-15 33 ACCEPTED 1 1
installation
1060 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01032 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan Ventilation fan installation inspection at MA4 second floor 15-Aug-15 17-Aug-15 10.00am CLOSED 17-Sep-15 33 ACCEPTED 1 1
installation
1061 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01033 Shinryo 14-Aug-15 ZN2 ELE Ventilation fan Ventilation fan installation inspection at MA4 third floor 15-Aug-15 17-Aug-15 10.00am CLOSED 17-Sep-15 33 ACCEPTED 1 1
installation
1062 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01034 Shinryo 15-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at LA1 ground floor 17-Aug-15 19-Aug-15 10.00am CLOSED 19-Sep-15 33 ACCEPTED 1 1
1063 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01035 Shinryo 15-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at LA6 first floor 17-Aug-15 19-Aug-15 10.00am CLOSED 19-Sep-15 33 ACCEPTED 1 1
1064 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01036 Shinryo 15-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at LA6 second floor 17-Aug-15 19-Aug-15 10.00am CLOSED 19-Sep-15 33 ACCEPTED 1 1
1065 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01037 Shinryo 15-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at LA6 third floor 17-Aug-15 19-Aug-15 10.00am CLOSED 19-Sep-15 33 ACCEPTED 1 1
1066 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01038 Shinryo 15-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at LA5 ground floor 17-Aug-15 19-Aug-15 10.00am CLOSED 29-Sep-15 43 ACCEPTED 1 1
1067 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01039 Shinryo 15-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at LA5 first floor 17-Aug-15 19-Aug-15 10.00am CLOSED 29-Sep-15 43 ACCEPTED 1 1
1068 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01040 Shinryo 15-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at LA5 second floor 17-Aug-15 19-Aug-15 10.00am CLOSED 29-Sep-15 43 ACCEPTED 1 1
1069 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01041 Shinryo 15-Aug-15 ZN2 ELE Ceiling fan installation Ceiling fan installation inspection at LA5 third floor 17-Aug-15 19-Aug-15 10.00am CLOSED 29-Sep-15 43 ACCEPTED 1 1
1070 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01042 Khidmat Hijau 15-Aug-15 ZN2 PIP Sewerage Sewarage discharge pumping pipe- welding report 17-Aug-15 19-Aug-15 10.00am CLOSED 20-Aug-15 3 ACCEPTED 1 1
(200mm dia HDPE PN16)
1071 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01043 Dorce 15-Aug-15 ZN2 MNE Hydro test Inspection for Hydro Test on Café Building for potable 17-Aug-15 19-Aug-15 10.00am CLOSED 30-Sep-15 44 ACCEPTED 1 1
water (PPRC)
1072 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01044 Dorce 15-Aug-15 ZN2 MNE Hydro test Inspection for Hydro Test on Guard House for potable 17-Aug-15 19-Aug-15 10.00am CLOSED 30-Sep-15 44 ACCEPTED 1 1
water (PPRC)
1074 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01046 KFK 17-Aug-15 ZN2 CIV Dranage works Laying U drain size 450x450 and 450x300 and installation 18-Aug-15 20-Aug-15 8.00am CLOSED 30-Oct-15 73 ACCEPTED 1 1
at multipurpuse area and secondry road
KFK 17-Aug-15 ZN2 CIV survey Pegging for udrain at multipurpose area and secondry 18-Aug-15 20-Aug-15 8.00am
1075 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01047
road (UD 450x450 and 450x300) CLOSED CANCEL 1 1
1076 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01048 AEIE 17-Aug-15 ZN2 ELE Megger test To do megger test after cable laying between compact sub 18-Aug-15 20-Aug-15 8.00am CLOSED 21-Aug-15 3 REJECTED 1 1
(CS-2MVA)(LP10,sssP/3) to fider piller (FP-C7)
1077 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01049 Khidmat Hijau 17-Aug-15 ZN2 PIP Welding works inspection for verify welding joint number for fire water 18-Aug-15 20-Aug-15 8.00am CLOSED 10-Sep-15 23 ACCEPTED 1 1
pipe at small package area
1079 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01051 UEMB KHAIRIL 19-Aug-15 ZN2 CIV Testing FDT for subgrade for road at small package camp (MA) 19-Aug-15 21-Aug-15 1.00pm CLOSED 19-Sep-15 31 ACCEPTED 1 1
1080 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01052 UEMB KHAIRIL 19-Aug-15 ZN2 CIV Testing FDT for sub base for road at small package camp (MA) 20-Aug-15 22-Aug-15 1.00pm CLOSED 20-Aug-15 0 ACCEPTED 1 1
AEIE 20-Aug-15 ZN2 ELE Excavate Excavate 1.2m trench for submain cable from Feeder 20-Aug-15 22-Aug-15 3.00pm
1081 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01053
pillar C7 to compact substation (LP10,SSSP/3) CLOSED CANCEL 1 1
1083 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01055 AEIE 20-Aug-15 ZN2 ELE Backfill Backfilling and compacting from feeder pillar C7 to 20-Aug-15 22-Aug-15 3.00pm CLOSED 25-Aug-15 5 REJECTED 1 1
compact sub (LP10, SSSP/3)
1084 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01056 UEMB KHAIRIL 19-Aug-15 ZN2 CIV Testing FDT for roadbase for road at small package camp (MA) 20-Aug-15 22-Aug-15 5.00pm CLOSED 20-Aug-15 0 ACCEPTED 1 1
Dorce 24-Aug-15 ZN2 ARC Leakage test Building second floor waste water leakage test 25-Aug-15 27-Aug-15 10.00am
1086 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01058
inspection CMA4 CLOSED CANCEL 1 1
Dorce 24-Aug-15 ZN2 ARC Leakage test Building ground floor waste water leakage test 25-Aug-15 27-Aug-15 10.00am
1088 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01060
inspection CMA4 CLOSED CANCEL 1 1
1089 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01061 I-Gen 24-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at 3Rd floor MA2 25-Aug-15 27-Aug-15 2.00pm CLOSED 4-Sep-15 8 ACCEPTED 1 1
1090 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01062 I-Gen 24-Aug-15 ZN2 MNE Fire fighting To inspect fire fighting equipments at 2nd floor MA2 25-Aug-15 27-Aug-15 2.00pm CLOSED 4-Sep-15 8 ACCEPTED 1 1
1091 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01063 I-Gen 24-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at first floor MA2 25-Aug-15 27-Aug-15 2.00pm CLOSED 4-Sep-15 8 ACCEPTED 1 1
1092 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01064 I-Gen 24-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at ground floor MA2 25-Aug-15 27-Aug-15 2.00pm CLOSED 12-Sep-15 16 ACCEPTED 1 1
1093 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01065 I-Gen 24-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at 3Rd floor MA4 25-Aug-15 27-Aug-15 2.00pm CLOSED 12-Sep-15 16 ACCEPTED 1 1
1094 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01066 I-Gen 24-Aug-15 ZN2 MNE Fier Protection To inspect fire fighting equipments at 2nd floor MA4 25-Aug-15 27-Aug-15 2.00pm CLOSED 12-Sep-15 16 ACCEPTED 1 1
1095 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01067 I-Gen 24-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at first floor MA4 25-Aug-15 27-Aug-15 2.00pm CLOSED 12-Sep-15 16 ACCEPTED 1 1
1096 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01068 I-Gen 24-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at ground floor MA4 25-Aug-15 27-Aug-15 2.00pm CLOSED 4-Sep-15 8 ACCEPTED 1 1
1097 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01069 ISDA 24-Aug-15 ZN2 ELE ICT/SMATV Installation for trunking, Conduit and cable at MA4 25-Aug-15 27-Aug-15 2.30pm CLOSED 1-Oct-15 35 ACCEPTED 1 1
1098 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01070 ISDA 24-Aug-15 ZN2 ELE ICT/SMATV Installation for trunking, Conduit and cable at MA2 25-Aug-15 27-Aug-15 2.30pm CLOSED 1-Oct-15 35 ACCEPTED 1 1
1099 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01071 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CLA1 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1100 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01072 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CLA2 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1101 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01073 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CLA3 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1102 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01074 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CLA4 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1103 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01075 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CLA5 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1104 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01076 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CLA6 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1105 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01077 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CMA1 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1106 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01078 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CMA2 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1107 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01079 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CMA3 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1108 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01080 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CMA4 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1109 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01081 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CMA5 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1110 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01082 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CMA6 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1111 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01083 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CSA3 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1112 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01084 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CSA4 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1113 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01085 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection Café Building 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1114 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01086 Dorce 20-Aug-15 ZN2 STR Entrnce Staircase Building reinforced concrete inspection CSA6 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1115 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01087 Dorce 18-Aug-15 ZN2 STR Assembling Works Building chassis sattlement and installation inspection 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
(Grocery)
Dorce 18-Aug-15 ZN2 STR Assembling Works Building internal and external wall panel installation 25-Aug-15 27-Aug-15 3.00pm
1116 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01088
inspection (Grocery) CLOSED CANCEL 1 1
1117 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01089 Dorce 18-Aug-15 ZN2 STR Assembling Works Building roof installation inspection (Grocery) 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1118 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01090 Dorce 18-Aug-15 ZN2 STR Assembling Works Building chassis sattlement and installation inspection 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
(Gymnasium)
Dorce 18-Aug-15 ZN2 STR Assembling Works Building internal and external wall panel installation 25-Aug-15 27-Aug-15 3.00pm
1119 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01091
inspection (Gymnasium) CLOSED CANCEL 1 1
1120 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01092 Dorce 18-Aug-15 ZN2 STR Assembling Works Building roof installation inspection (Gymnasium) 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
Building chassis sattlement and installation inspection
1121 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01093 Dorce 18-Aug-15 ZN2 STR Assembling Works (Office for Catering) 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
Dorce 18-Aug-15 ZN2 STR Assembling Works Building internal and external wall panel installation 25-Aug-15 27-Aug-15 3.00pm
1122 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01094
inspection (Office for Catering) CLOSED CANCEL 1 1
Dorce 18-Aug-15 ZN2 STR Assembling Works Building roof installation inspection (Office for 25-Aug-15 27-Aug-15 3.00pm
1123 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01095
Catering) CLOSED CANCEL 1 1
Dorce 18-Aug-15 ZN2 STR Assembling Works Building internal and external wall panel installation 25-Aug-15 27-Aug-15 3.00pm
1124 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01096
inspection (Laundry) CLOSED CANCEL 1 1
1125 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01097 Dorce 18-Aug-15 ZN2 STR Assembling Works Building roof installation inspection (Laundry) 25-Aug-15 27-Aug-15 3.00pm CLOSED CANCEL 1 1
1128 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01100 Dorce 20-Aug-15 ZN2 MNE membrane application Building 2nd floor waterproofing membrane application 25-Aug-15 27-Aug-15 3.00pm CLOSED 30-Sep-15 36 ACCEPTED 1 1
works and water leakage test inspection CLA1
1129 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01101 Dorce 20-Aug-15 ZN2 MNE membrane application Building 3rd floor waterproofing membrane application 25-Aug-15 27-Aug-15 3.00pm CLOSED 28-Sep-15 34 ACCEPTED 1 1
works and water leakage test inspection CLA6
1130 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01102 Dorce 20-Aug-15 ZN2 MNE membrane application Building ground floor waterproofing membrane 25-Aug-15 27-Aug-15 3.00pm CLOSED 28-Sep-15 34 ACCEPTED 1 1
works application and water leakage test inspection CLA5
1131 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01103 Dorce 20-Aug-15 ZN2 MNE membrane application Building 1st floor waterproofing membrane application 25-Aug-15 27-Aug-15 3.00pm CLOSED 28-Sep-15 34 ACCEPTED 1 1
works and water leakage test inspection CLA5
1136 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01108 Dorce 26-Aug-15 ZN2 MNE PPR piping Hydrotest Building ground floor PPR piping installation and hydrotest 27-Aug-15 29-Aug-15 2.00pm CLOSED 29-Aug-15 2 ACCEPTED 1 1
inspection CMA1
1137 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01109 Dorce 26-Aug-15 ZN2 MNE PPR piping Hydrotest Building first floor PPR piping installation and hydrotest 27-Aug-15 29-Aug-15 2.00pm CLOSED 29-Aug-15 2 ACCEPTED 1 1
inspection CMA1
1138 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01110 Dorce 26-Aug-15 ZN2 MNE PPR piping Hydrotest Building second floor PPR piping installation and hydrotest 27-Aug-15 29-Aug-15 2.00pm CLOSED 29-Aug-15 2 ACCEPTED 1 1
inspection CMA1
1139 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01111 Dorce 26-Aug-15 ZN2 MNE PPR piping Hydrotest Building third floor PPR piping installation and hydrotest 27-Aug-15 29-Aug-15 2.00pm CLOSED 29-Aug-15 2 ACCEPTED 1 1
inspection CMA1
1142 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01114 KFK 28-Aug-15 ZN2 CIV Dranage works Excavation at multipurpose area and patrol road for laying 29-Aug-15 31-Aug-15 8.00am CLOSED 03-Oct-15 35 ACCEPTED 1 1
UD size 600x600,600x450,450x350
1144 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01116 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at Café Block 1-Sep-15 3-Sep-15 9.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1145 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01117 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at SA3 Ground Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 23-Oct-15 52 ACCEPTED 1 1
1146 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01118 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at SA3 First Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 23-Oct-15 52 ACCEPTED 1 1
1147 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01119 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at SA3 Second Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 23-Oct-15 52 ACCEPTED 1 1
1148 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01120 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at SA3 Third Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 23-Oct-15 52 ACCEPTED 1 1
1149 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01121 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at SA4 Ground Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 23-Oct-15 52 ACCEPTED 1 1
1150 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01122 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at SA4 First Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 24-Oct-15 53 ACCEPTED 1 1
1151 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01123 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at SA4 Second Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 24-Oct-15 53 ACCEPTED 1 1
1152 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01124 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at SA4 Third Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 24-Oct-15 53 ACCEPTED 1 1
1153 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01125 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at LA4 Ground Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 17-Nov-15 77 ACCEPTED 1 1
1154 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01126 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at LA4 First Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 17-Nov-15 77 ACCEPTED 1 1
1155 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01127 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at LA4 Second Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 17-Nov-15 77 ACCEPTED 1 1
1156 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01128 I-Gen 29-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at LA4 Third Floor 1-Sep-15 3-Sep-15 9.00am CLOSED 17-Nov-15 77 ACCEPTED 1 1
1159 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01131 I-Gen 21-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at LA5 Second 21-Aug-15 23-Aug-15 2.00pm CLOSED 02-Nov-15 73 ACCEPTED 1 1
Floor(CLA3)
1160 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01132 I-Gen 21-Aug-15 ZN2 MNE Fier Protection To inspect fire protection equipments at LA3 Third 21-Aug-15 23-Aug-15 2.00pm CLOSED 02-Nov-15 73 ACCEPTED 1 1
Floor(CLA3)
1161 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01133 ISDA 29-Aug-15 ZN2 ELE ICT/SMATV Installation Trunking,Conduit,Internal Cable and ICT 2-Sep-15 4-Sep-15 11.00am CLOSED 01-Oct-15 29 ACCEPTED 1 1
Material SMATV at SA3
1162 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01134 ISDA 29-Aug-15 ZN2 ELE ICT/SMATV Installation Trunking,Conduit,Internal Cable and ICT 2-Sep-15 4-Sep-15 11.00am CLOSED 01-Oct-15 29 ACCEPTED 1 1
Material SMATV at SA4
1167 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01139 ISDA 28-Aug-15 ZN2 ELE ICT Installation Conduit,internal cable and ICT Material at 2-Sep-15 4-Sep-15 11.00am CLOSED 01-Oct-15 29 ACCEPTED 1 1
Guard House
1168 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01140 ISDA 28-Aug-15 ZN2 ELE ICT Installation Conduit,internal cable and ICT Material at Café 2-Sep-15 4-Sep-15 11.00am CLOSED 01-Oct-15 29 ACCEPTED 1 1
1169 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01141 PPEC 1-Sep-15 ZN2 STR Screeding works Inspection for roughling and screeding messhall floor and 2-Sep-15 4-Sep-15 9.00am CLOSED 09-Oct-15 37 ACCEPTED 1 1
inspection rebar
1170 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01142 Dorce 29-Aug-15 ZN2 ARC Assembling Works Building internal and external wall panel inspection at 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
Dojo
1171 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01143 Dorce 29-Aug-15 ZN2 ARC Assembling Works Building chassis installation inspection at Dojo 1-Sep-15 3-Sep-15 10.00am CLOSED 22-Sep-15 21 ACCEPTED 1 1
1172 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01144 Dorce 29-Aug-15 ZN2 ARC Assembling Works Building ground floor covering works installation 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
inspection at CMA3
1173 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01145 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building first floor covering works installation inspection at 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
CMA3
1174 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01146 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building second floor covering works installation 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
inspection at CMA3
1175 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01147 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building third floor covering works installation inspection 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
at CMA3
1178 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01150 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building second floor PVC covering works installation 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
inspection CSA3
1179 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01151 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building third floor PVC covering works installation 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
inspection CSA3
1180 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01152 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building PVC covering works installation inspection Guard 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
House
1181 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01153 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building PVC covering works installation inspection Café 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1182 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01154 Dorce 29-Aug-15 ZN2 ARC Ceramic works Building ceramic tile installation inspection at Guard house 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1183 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01155 Dorce 29-Aug-15 ZN2 ARC Ceramic works Building ceramic tile installation inspection at Café 1-Sep-15 3-Sep-15 10.00am CLOSED 22-Sep-15 21 ACCEPTED 1 1
1184 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01156 Dorce 29-Aug-15 ZN2 ARC Screed works Building ground floor screed works inspection at CMA3 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1185 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01157 Dorce 29-Aug-15 ZN2 ARC Screed works Building first floor screed works inspection at CMA3 1-Sep-15 3-Sep-15 10.00am CLOSED 08-Oct-15 37 REJECTED 1 1
1186 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01158 Dorce 29-Aug-15 ZN2 ARC Screed works Building second floor screed works inspection at CMA3 1-Sep-15 3-Sep-15 10.00am CLOSED 08-Oct-15 37 REJECTED 1 1
1187 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01159 Dorce 29-Aug-15 ZN2 ARC Screed works Building third floor screed works inspection at CMA3 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1188 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01160 Dorce 29-Aug-15 ZN2 ARC Screed works Building ground floor screed works inspection at CMA4 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1189 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01161 Dorce 29-Aug-15 ZN2 ARC Screed works Building first floor screed works inspection at CMA4 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1190 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01162 Dorce 29-Aug-15 ZN2 ARC Screed works Building second floor screed works inspection at CMA4 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1191 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01163 Dorce 29-Aug-15 ZN2 ARC Screed works Building third floor screed works inspection at CMA4 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1192 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01164 Dorce 29-Aug-15 ZN2 ARC Painting Building painting works inspection at Guard house 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1193 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01165 Dorce 29-Aug-15 ZN2 ARC Painting Building ground floor painting works inspection at CSA2 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1194 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01166 Dorce 29-Aug-15 ZN2 ARC Painting Building first floor painting works inspection at CSA2 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1195 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01167 Dorce 29-Aug-15 ZN2 ARC Painting Building second floor painting works inspection at CSA2 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1196 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01168 Dorce 29-Aug-15 ZN2 ARC Painting Building third floor painting works inspection at CSA2 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1197 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01169 Dorce 29-Aug-15 ZN2 ARC Painting Building ground floor painting works inspection at CMA4 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1198 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01170 Dorce 29-Aug-15 ZN2 ARC Painting Building first floor painting works inspection at CMA4 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 REJECTED 1 1
1199 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01171 Dorce 29-Aug-15 ZN2 ARC Painting Building second floor painting works inspection at CMA4 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1200 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01172 Dorce 29-Aug-15 ZN2 ARC Painting Building third floor painting works inspection at CMA4 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1201 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01173 Dorce 29-Aug-15 ZN2 ARC Painting Building ground floor painting works inspection at CMA3 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1202 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01174 Dorce 29-Aug-15 ZN2 ARC Painting Building first floor painting works inspection at CMA3 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1203 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01175 Dorce 29-Aug-15 ZN2 ARC Painting Building second floor painting works inspection at CMA3 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1204 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01176 Dorce 29-Aug-15 ZN2 ARC Painting Building third floor painting works inspection at CMA3 1-Sep-15 3-Sep-15 10.00am CLOSED 01-Oct-15 30 ACCEPTED 1 1
1205 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01177 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building first floor covering works installation inspection at 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
CLA1
1206 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01178 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building second floor covering works installation 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
inspection at CLA1
1209 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01181 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building first floor covering works installation inspection at 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
CLA3
1210 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01182 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building second floor covering works installation 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
inspection at CLA3
1211 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01183 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building third floor covering works installation inspection 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
at CLA3
1212 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01184 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building ground floor PVC covering works installation 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
inspection CLA3
1213 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01185 Dorce 29-Aug-15 ZN2 ARC Painting Building painting works inspection at Dojo 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1214 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01186 Dorce 29-Aug-15 ZN2 ARC PVC covering works Building PVC covering works installation inspection at Dojo 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1216 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01188 Dorce 29-Aug-15 ZN2 ARC Ceramic works Building first floor ceramic tiles installation inspection 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
CLA1
1217 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01189 Dorce 29-Aug-15 ZN2 ARC Ceramic works Building second floor ceramic tiles installation inspection 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
CLA1
1218 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01190 Dorce 29-Aug-15 ZN2 ARC Ceramic works Building third floor ceramic tiles installation inspection 1-Sep-15 3-Sep-15 10.00am CLOSED 30-Sep-15 29 ACCEPTED 1 1
CLA1
1219 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01191 Dorce 29-Aug-15 ZN2 ARC Ceramic works Building roof installation inspection at Dojo 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
1221 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01193 Dorce 29-Aug-15 ZN2 ELE Electrical works Building First floor electrical panel board installation at 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
CLA3
1222 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01194 Dorce 29-Aug-15 ZN2 ELE Electrical works Building second floor electrical panel board installation at 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
CLA3
1223 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01195 Dorce 29-Aug-15 ZN2 ELE Electrical works Building third floor electrical panel board installation at 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
CLA3
1224 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01196 Dorce 29-Aug-15 ZN2 ELE Electrical works Building lightning protection system installation at CSA1 1-Sep-15 3-Sep-15 10.00am CLOSED 03-Dec-15 93 ACCEPTED 1 1
1225 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01197 Dorce 29-Aug-15 ZN2 ELE Electrical works Building protection system installation at CSA3 1-Sep-15 3-Sep-15 10.00am CLOSED 03-Dec-15 93 ACCEPTED 1 1
1226 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01198 Dorce 29-Aug-15 ZN2 ELE Electrical works Building ground floor cable pulling inspection at CLA6 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1227 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01199 Dorce 29-Aug-15 ZN2 ELE Electrical works Building first floor cable pulling inspection at CLA6 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1228 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01200 Dorce 29-Aug-15 ZN2 ELE Electrical works Building second floor cable pulling inspection at CLA6 1-Sep-15 3-Sep-15 10.00am CLOSED 29-Sep-15 28 ACCEPTED 1 1
1229 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01201 Dorce 29-Aug-15 ZN2 ELE Electrical works Building third floor cable pulling inspection at CLA6 1-Sep-15 3-Sep-15 10.00am CLOSED 29-Sep-15 28 ACCEPTED 1 1
1230 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01202 Dorce 29-Aug-15 ZN2 ELE Electrical works Building ground floor cable pulling inspection at CLA3 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1231 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01203 Dorce 29-Aug-15 ZN2 ELE Electrical works Building first floor cable pulling inspection at CLA3 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1232 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01204 Dorce 29-Aug-15 ZN2 ELE Electrical works Building second floor cable pulling inspection at CLA3 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1233 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01205 Dorce 29-Aug-15 ZN2 ELE Electrical works Building third floor cable pulling inspection at CLA3 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1234 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01206 Dorce 29-Aug-15 ZN2 ARC membrane application Building waterproofing membrane application and water 1-Sep-15 3-Sep-15 10.00am CLOSED 14-Sep-15 13 ACCEPTED 1 1
works test inspection an guard house
1235 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01207 Dorce 29-Aug-15 ZN2 BLD Final inspection Building final inspection for café 30-Aug-15 1-Sep-15 10.00am CLOSED CANCEL 1 1
1236 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01208 Dorce 29-Aug-15 ZN2 BLD Final inspection Building final inspection for guard house 30-Aug-15 1-Sep-15 10.00am CLOSED CANCEL 1 1
1237 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01209 Dorce 29-Aug-15 ZN2 ELE Electrical works Buildidng protection system installation CMA1 1-Sep-15 3-Sep-15 10.00am CLOSED 03-Dec-15 93 ACCEPTED 1 1
1238 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01210 Dorce 29-Aug-15 ZN2 ELE Electrical works Buildidng protection system installation CMA2 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1239 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01211 Dorce 29-Aug-15 ZN2 ELE Electrical works Building electrical panel board installation at Café 1-Sep-15 3-Sep-15 10.00am CLOSED 08-Oct-15 37 ACCEPTED 1 1
1241 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01213 Dorce 29-Aug-15 ZN2 ELE Electrical works Building first floor electrical panel board installation CLA1 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1242 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01214 Dorce 29-Aug-15 ZN2 ELE Electrical works Building second floor electrical panel board installation 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
CLA1
1243 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01215 Dorce 29-Aug-15 ZN2 ELE Electrical works Building third floor electrical panel board installation CLA1 1-Sep-15 3-Sep-15 10.00am CLOSED 09-Oct-15 38 ACCEPTED 1 1
1245 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01217 Dorce 2-Sep-15 ZN2 MNE PPRC Hydrotest Building first floor pipes instalation and Hydrotest CMA3 3-Sep-15 5-Sep-15 2.00pm CLOSED 04-Sep-15 1 ACCEPTED 1 1
1246 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01218 Dorce 2-Sep-15 ZN2 MNE PPRC Hydrotest Building second floor pipes instalation and Hydrotest 3-Sep-15 5-Sep-15 2.00pm CLOSED 04-Sep-15 1 ACCEPTED 1 1
CMA3
1247 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01219 Dorce 2-Sep-15 ZN2 MNE PPRC Hydrotest Building third floor pipes instalation and Hydrotest CMA3 3-Sep-15 5-Sep-15 2.00pm CLOSED 04-Sep-15 1 ACCEPTED 1 1
UPVC testing water Building ground floor UPVC pipes installation and lenkage
1248 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01220 Dorce 2-Sep-15 ZN2 MNE 3-Sep-15 5-Sep-15 2.00pm CLOSED 30-Sep-15 27 ACCEPTED 1 1
floortest test water floor test (CLA5)
UPVC testing water Building first floor UPVC pipes installation and lenkage test
1249 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01221 Dorce 2-Sep-15 ZN2 MNE 3-Sep-15 5-Sep-15 2.00pm CLOSED 30-Sep-15 27 ACCEPTED 1 1
floortest water floor test (CLA5)
1250 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01222 Dorce 2-Sep-15 ZN2 MNE UPVC testing water Building second floor UPVC pipes installation and lenkage 3-Sep-15 5-Sep-15 2.00pm CLOSED 30-Sep-15 27 ACCEPTED 1 1
floortest test water floor test (CLA5)
1251 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01223 Dorce 2-Sep-15 ZN2 MNE UPVC testing water Building third floor UPVC pipes installation and lenkage 3-Sep-15 5-Sep-15 2.00pm CLOSED 30-Sep-15 27 ACCEPTED 1 1
floortest test water floor test (CLA5)
1252 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01224 Dorce 2-Sep-15 ZN2 MNE UPVC testing water Building ground floor UPVC pipes installation and lenkage 3-Sep-15 5-Sep-15 2.00pm CLOSED 30-Sep-15 27 ACCEPTED 1 1
floortest test water floor test (CLA6)
1253 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01225 Dorce 2-Sep-15 ZN2 MNE UPVC testing water Building first floor UPVC pipes installation and lenkage test 3-Sep-15 5-Sep-15 2.00pm CLOSED 30-Sep-15 27 ACCEPTED 1 1
floortest water floor test (CLA6)
UPVC testing water Building second floor UPVC pipes installation and lenkage
1254 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01226 Dorce 2-Sep-15 ZN2 MNE 3-Sep-15 5-Sep-15 2.00pm CLOSED 30-Sep-15 27 ACCEPTED 1 1
floortest test water floor test (CLA6)
UPVC testing water Building third floor UPVC pipes installation and lenkage
1255 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01227 Dorce 2-Sep-15 ZN2 MNE 3-Sep-15 5-Sep-15 2.00pm CLOSED 30-Sep-15 27 ACCEPTED 1 1
floortest test water floor test (CLA6)
1256 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01228 Dorce 2-Sep-15 ZN2 MNE UPVC testing water Building UPVC pipe installation and leakage test water 3-Sep-15 5-Sep-15 2.00pm CLOSED 12-Nov-15 70 ACCEPTED 1 1
floortest floor test at Dojo
1257 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01229 Dorce 3-Sep-15 ZN2 ELE Electrical works Building ground ffloor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 10-Oct-15 36 ACCEPTED 1 1
CSA1
1258 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01230 Dorce 3-Sep-15 ZN2 ELE Electrical works Building first ffloor cable insulation test inspection at CSA1 4-Sep-15 6-Sep-15 10.00am CLOSED 12-Oct-15 38 ACCEPTED 1 1
1259 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01231 Dorce 3-Sep-15 ZN2 ELE Electrical works Building second floor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 12-Oct-15 38 ACCEPTED 1 1
CSA1
1261 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01233 Dorce 3-Sep-15 ZN2 ELE Electrical works Building ground ffloor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
CSA3
1262 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01234 Dorce 3-Sep-15 ZN2 ELE Electrical works Building first ffloor cable insulation test inspection at CSA3 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
1263 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01235 Dorce 3-Sep-15 ZN2 ELE Electrical works Building second ffloor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
CSA3
1264 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01236 Dorce 3-Sep-15 ZN2 ELE Electrical works Building third ffloor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
CSA3
1267 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01239 Dorce 3-Sep-15 ZN2 ELE Electrical works Building second ffloor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 08-Oct-15 34 ACCEPTED 1 1
CMA1
1268 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01240 Dorce 3-Sep-15 ZN2 ELE Electrical works Building third ffloor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 08-Oct-15 34 ACCEPTED 1 1
CMA1
1269 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01241 Dorce 3-Sep-15 ZN2 ELE Electrical works Building ground ffloor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
CLA3
1270 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01242 Dorce 3-Sep-15 ZN2 ELE Electrical works Building first ffloor cable insulation test inspection at CLA3 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
1272 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01244 Dorce 3-Sep-15 ZN2 ELE Electrical works Building third ffloor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
CLA3
1273 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01245 Dorce 3-Sep-15 ZN2 ELE Electrical works Building ground floor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
CLA1
1274 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01246 Dorce 3-Sep-15 ZN2 ELE Electrical works Building first ffloor cable insulation test inspection at CLA6 4-Sep-15 6-Sep-15 10.00am CLOSED 18-Oct-15 44 ACCEPTED 1 1
1275 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01247 Dorce 3-Sep-15 ZN2 ELE Electrical works Building second floor cable insulation test inspection at 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
CLA1
1277 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01249 Dorce 3-Sep-15 ZN2 ELE Electrical works Building cable insulation test inspection at Guard house 4-Sep-15 6-Sep-15 10.00am CLOSED 09-Oct-15 35 ACCEPTED 1 1
1278 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01250 Dorce 3-Sep-15 ZN2 ELE Electrical works Building cable insulation test inspection at Café 4-Sep-15 6-Sep-15 10.00am CLOSED 10-Aug-15 -25 ACCEPTED 1 1
1281 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01253 I-GEN 4-Sep-15 ZN2 MNE testing Testing and commisioning for alarm panel and horse reel 4-Sep-15 6-Sep-15 4.30pm CLOSED 05-Nov-15 62 ACCEPTED 1 1
at MA2
1291 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01263 Seribu Bio 5-Sep-15 ZN2 CIV survey Survey works at Five A side football 1 (small package) 6-Sep-15 8-Sep-15 11.00am CLOSED 06-Sep-15 0 ACCEPTED 1 1
1292 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01264 Seribu Bio 5-Sep-15 ZN2 CIV survey Survey works at Five A side football 2 (small package) 7-Sep-15 9-Sep-15 11.00am CLOSED 26-Apr-16 232 REJECTED 1 1
1293 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01265 Seribu Bio 5-Sep-15 ZN2 CIV survey Survey works atmini cricket 1 (small package) 6-Sep-15 8-Sep-15 11.00am CLOSED 06-Sep-15 0 ACCEPTED 1 1
1294 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01266 Seribu Bio 5-Sep-15 ZN2 CIV survey Survey works atmini cricket 2 (small package) 6-Sep-15 8-Sep-15 11.00am CLOSED 06-Sep-15 0 ACCEPTED 1 1
UEMB QAQC
1296 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01268 2-Sep-15 ZN2 CIV Testing FDT for roadbase at MA (6m width road) 3-Sep-15 5-Sep-15 10.00am CLOSED 07-Sep-15 4 ACCEPTED 1 1
KHAIRIL
1297 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01269 UEMB QAQC 2-Sep-15 ZN2 CIV Testing FDT for subgrade at LA (3m width road) 3-Sep-15 5-Sep-15 10.00am CLOSED 03-Sep-15 0 ACCEPTED 1 1
KHAIRIL
1298 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01270 UEMB QAQC 7-Sep-15 ZN2 CIV Testing FDT at Small Package for subgrade (Road between LA and 7-Sep-15 9-Sep-15 9.30am CLOSED 07-Sep-15 0 ACCEPTED 1 1
KHAIRIL RP2a)
1303 RAPID-P20A1-UEMB-ZN2-CPC-RFIN-01275 UEMB TNC 7-Sep-15 ZN2 CPC Visual Inspection Inspection for issuance of certificate of practical 8-Sep-15 10-Sep-15 11.30am CLOSED 28-Sep-15 20 REJECTED 1 1
ANDREW completion (CPC) for Supervisory Accommodation 3 (SA3)
1306 RAPID-P20A1-UEMB-ZN2-CPC-RFIN-01278 UEMB TNC 7-Sep-15 ZN2 CPC Visual Inspection Inspection for issuance of certificate of practical 8-Sep-15 10-Sep-15 11.30am CLOSED 28-Sep-15 20 REJECTED 1 1
ANDREW completion (CPC) for MA2
1308 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01280 AEIE 8-Sep-15 ZN2 ELE testing Test & Commissioning Grounding system for management 9-Sep-15 11-Sep-15 8.00am CLOSED 09-Oct-15 30 ACCEPTED 1 1
Accommodation 2 at Small Package area (MA2)
1311 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01283 AEIE 2-Oct-15 ZN2 ELE testing Test & Commissioning Grounding system for Labour 5-Oct-15 7-Oct-15 8.00am CLOSED 06-Oct-15 1 ACCEPTED 1 1
Accomodation 6 at Small Package area (LA6)
1322 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01294 AEIE 8-Sep-15 ZN2 ELE testing Test & Commissioning Grounding system for Labour 9-Sep-15 11-Sep-15 8.00am CLOSED CANCEL 1 1
Accomodation 5 at Small Package area (SA4)
1323 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01295 Dorce 9-Sep-15 ZN2 MNE water flow and Building ground floor UPVC piping installation and water 10-Sep-15 12-Sep-15 5.45pm CLOSED 11-Sep-15 1 ACCEPTED 1 1
leakage test flow leakage test at CLA5
1324 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01296 Dorce 9-Sep-15 ZN2 MNE water flow and Building first floor UPVC piping installation and water flow 10-Sep-15 12-Sep-15 CLOSED 10-Sep-15 0 ACCEPTED 1 1
leakage test leakage test at CLA5
1325 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01297 Dorce 9-Sep-15 ZN2 MNE water flow and Building second floor UPVC piping installation and water 10-Sep-15 12-Sep-15 5.45pm CLOSED 10-Sep-15 0 ACCEPTED 1 1
leakage test flow leakage test at CLA5
water flow and Building third floor UPVC piping installation and water flow
1326 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01298 Dorce 9-Sep-15 ZN2 MNE 10-Sep-15 12-Sep-15 5.45pm CLOSED 09-Sep-15 -1 ACCEPTED 1 1
leakage test leakage test at CLA5
1327 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01299 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building ground floor sanitary fixtures commisioning and 9-Sep-15 11-Sep-15 CLOSED 01-Dec-15 83 REJECTED 1 1
final inspection CMA1
1331 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01303 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building ground floor sanitary fixtures commisioning and 9-Sep-15 11-Sep-15 CLOSED 01-Dec-15 83 REJECTED 1 1
final inspection CMA2
1333 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01305 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building second floor sanitary fixtures commisioning and 9-Sep-15 11-Sep-15 CLOSED 01-Dec-15 83 REJECTED 1 1
final inspection CMA2
1336 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01308 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building sanitary fixtures commisioning and final 9-Sep-15 11-Sep-15 CLOSED 1-Dec-15 83 REJECTED 1 1
inspection at Café
1338 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01310 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building first floor sanitary fixtures commisioning and final 9-Sep-15 11-Sep-15 CLOSED 1-Dec-15 83 REJECTED 1 1
inspection CSA1
1339 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01311 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building second floor sanitary fixtures commisioning and 9-Sep-15 11-Sep-15 CLOSED 1-Dec-15 83 REJECTED 1 1
final inspection CSA1
1340 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01312 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building third floor sanitary fixtures commisioning and 9-Sep-15 11-Sep-15 CLOSED 1-Dec-15 83 REJECTED 1 1
final inspection CSA1
1341 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01313 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building ground floor sanitary fixtures commisioning and 9-Sep-15 11-Sep-15 CLOSED 01-Dec-15 83 REJECTED 1 1
final inspection CSA3
1343 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01315 Dorce 9-Sep-15 ZN2 MNE Commisioning test Building second floor sanitary fixtures commisioning and 9-Sep-15 11-Sep-15 CLOSED 01-Dec-15 83 REJECTED 1 1
final inspection CSA3
1345 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01317 ISDA 9-Sep-15 ZN2 ELE material Inspection material for SMATV and ICT at Storage Iszda 9-Sep-15 11-Sep-15 10.00am CLOSED 09-Oct-15 30 ACCEPTED 1 1
1346 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01318 ISDA 9-Sep-15 ZN2 ELE Floop test Flood test for ICT (Telephone and data continuity) at SA3 18-Sep-15 20-Sep-15 11.45am CLOSED 22-Sep-15 4 ACCEPTED 1 1
1347 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01319 ISDA 9-Sep-15 ZN2 ELE Test ICT Flood test for ICT (Telephone and data continuity) at SA4 15-Sep-15 17-Sep-15 8.00am CLOSED 22-Sep-15 7 ACCEPTED 1 1
1348 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01320 ISDA 9-Sep-15 ZN2 ELE Test ICT Flood test for ICT (Telephone and data continuity) at LA5 15-Sep-15 17-Sep-15 1.10pm CLOSED 22-Sep-15 7 ACCEPTED 1 1
1349 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01321 ISDA 9-Sep-15 ZN2 ELE Test ICT Flood test for ICT (Telephone and data continuity) at LA6 15-Sep-15 17-Sep-15 1.10pm CLOSED 22-Sep-15 7 ACCEPTED 1 1
1350 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01322 Shinryo 27-Sep-15 ZN2 MNE Testing Testing of ACSU,water heater,oscillation fa and toilet 28-Sep-15 30-Sep-15 9.30am CLOSED 28-Sep-15 0 REJECTED 1 1
exhaust fan for MA4
1351 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01323 Shinryo 20-Sep-15 ZN2 MNE Testing Testing of Exhaust fan SA3 21-Sep-15 23-Sep-15 2.00pm CLOSED 4-Nov-15 44 ACCEPTED 1 1
1352 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01324 Shinryo 30-Sep-15 ZN2 MNE Testing Testing for Exhaust Fan SA1 6-Oct-15 8-Oct-15 10.30am CLOSED 4-Nov-15 29 ACCEPTED 1 1
1353 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01325 Shinryo 4-Oct-15 ZN2 MNE Testing Testing for Ceiling Fan at SA1 5-Oct-15 7-Oct-15 10.30am CLOSED 26-Oct-15 21 ACCEPTED 1 1
1355 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01327 I-GEN 20-Nov-15 ZN2 MNE Test Testing for hose reel pressure test at SA4 21-Nov-15 23-Nov-15 4.00am CLOSED 21-Nov-15 0 ACCEPTED 1 1
1356 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01328 I-GEN 13-Oct-15 ZN2 MNE testing Testing for hose reel pressure test at LA5(CLA3) 31-Oct-15 2-Nov-15 2.00pm CLOSED 01-Nov-15 1 ACCEPTED 1 1
I-GEN ZN2 MNE Test Testing and commissioning for hose reel pressure test
1357 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01329
at LA6 CLOSED CANCEL 1 1
1359 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01331 I-GEN 14-Nov-15 ZN2 MNE Test Testing and commissioning for hose reel pressure test at 15-Nov-15 17-Nov-15 3.00pm CLOSED 16-Nov-15 1 ACCEPTED 1 1
Guard House 2
1360 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01332 I-GEN 4-Sep-15 ZN2 MNE Test Testing and commissioning for fire alam system at SA3 4-Sep-15 6-Sep-15 2..00pm CLOSED 05-Nov-15 62 ACCEPTED 1 1
1361 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01333 I-GEN 10-Oct-15 ZN2 MNE Test Testing and commissioning for fire alam system at SA4 13-Oct-15 15-Oct-15 4.30pm CLOSED 18-Oct-15 5 ACCEPTED 1 1
1362 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01334 I-GEN 13-Oct-15 ZN2 MNE testing Testing and commissioning for fire alam system at 14-Oct-15 16-Oct-15 4.00am CLOSED 26-Oct-15 12 ACCEPTED 1 1
LA5(CLA3)
1363 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01335 I-GEN 13-Oct-15 ZN2 MNE Test Testing and commissioning for fire alam system at LA6 14-Oct-15 16-Oct-15 4.00am CLOSED 26-Oct-15 12 ACCEPTED 1 1
1364 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01336 I-GEN 10-Sep-15 ZN2 MNE Test Testing and commissioning for fire alam system at Café 11-Sep-15 13-Sep-15 3.00pm CLOSED 10-Oct-15 29 ACCEPTED 1 1
1365 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01337 I-GEN 10-Sep-15 ZN2 MNE Test Testing and commissioning for fire alam system at Guard 11-Sep-15 13-Sep-15 3.00pm CLOSED 10-Oct-15 29 ACCEPTED 1 1
House
AEIE 10-Sep-15 ZN2 ELE Installation Installation ground system for management
1367 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01339
Grounding accommodation2 at small package area MA2 CLOSED CANCEL 1 1
AEIE 10-Sep-15 ZN2 ELE Earthing Grounding Installing earthing ground system for Labour
1368 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01340
Accomodation 5 at Small pacakage area LA5 CLOSED CANCEL 1 1
AEIE 7-Sep-15 ZN2 ELE Cable insulation Test and commisioning cable from main feeder pillar
1375 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01347
C7 to Guard House CLOSED CANCEL 1 1
1377 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01349 PPEC 10-Sep-15 ZN2 BLD Screeding works Inspection for Rocghening- Laundry,Inspection and 11-Sep-15 13-Sep-15 9.00am CLOSED 08-Oct-15 27 ACCEPTED 1 1
concreting
1378 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01350 ISDA 1-Sep-15 ZN2 ELE Test Management 2 test result for ICT at MA2 Data (Countinity 7-Sep-15 9-Sep-15 11.00am CLOSED 29-Sep-15 22 ACCEPTED 1 1
and telephone)
1381 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01353 ISDA 5-Sep-15 ZN2 ELE Floop test for ICT Floop test for ICT (Telephone and data countinity at Café 7-Sep-15 9-Sep-15 8.00am CLOSED 29-Sep-15 22 ACCEPTED 1 1
1383 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01355 Shinryo 4-Nov-15 ZN2 MNE Testing Installation for exhaust fan at Guard House 2 4-Nov-15 6-Nov-15 10.00am CLOSED 04-Nov-15 0 ACCEPTED 1 1
Mechanical
1384 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01356 Ocned Water 10-Sep-15 ZN2 MNE Mechanical installation works ar RP1 11-Sep-15 13-Sep-15 9.00am CLOSED 24-Nov-15 74 ACCEPTED 1 1
installation
1385 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01357 Ocned Water 10-Sep-15 ZN2 MNE Mechanical Mechanical installation works ar RP1A 11-Sep-15 13-Sep-15 9.30am CLOSED 24-Sep-15 13 ACCEPTED 1 1
installation
1386 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01358 Ocned Water 10-Sep-15 ZN2 ELE Migger test Migger test and Continuinity Test at RP1A 11-Sep-15 13-Sep-15 9.30am CLOSED 26-Nov-15 76 ACCEPTED 1 1
1388 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01360 Ocned Water 10-Sep-15 ZN2 ELE Electrical works Request inspection for electrical installation for pump 11-Sep-15 13-Sep-15 9.30am CLOSED 26-Nov-15 76 ACCEPTED 1 1
station RP1A
1389 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01361 Ocned Water 10-Sep-15 ZN2 ELE Migger test Migger test and Continuinity Test at RP1 11-Sep-15 13-Sep-15 9.30am CLOSED 11-Sep-15 0 ACCEPTED 1 1
1390 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01362 Dorce 11-Sep-15 ZN2 BLD Final inspection Building final inspection at Guard House 12-Sep-15 14-Sep-15 10.00am CLOSED CANCEL 1 1
1391 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01363 Dorce 11-Sep-15 ZN2 BLD Final inspection Building final inspection at Café 12-Sep-15 14-Sep-15 10.00am CLOSED CANCEL 1 1
1392 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01364 Dorce 11-Sep-15 ZN2 BLD Final inspection Building final inspection at CSA1 12-Sep-15 14-Sep-15 10.00am CLOSED CANCEL 1 1
1393 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01365 Dorce 11-Sep-15 ZN2 BLD Final inspection Building final inspection at CSA3 12-Sep-15 14-Sep-15 10.00am CLOSED CANCEL 1 1
1394 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01366 Dorce 11-Sep-15 ZN2 BLD Final inspection Building final inspection at CLA1 12-Sep-15 14-Sep-15 10.00am CLOSED CANCEL 1 1
1395 RAPID-P20A1-UEMB-ZN2-BLD-RFIN-01367 Dorce 11-Sep-15 ZN2 BLD Final inspection Building final inspection at CLA3 12-Sep-15 14-Sep-15 10.00am CLOSED CANCEL 1 1
1396 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01368 ISDA 9-Oct-15 ZN2 ELE Electrical works Installation inspection for electrical low volt,SMATV and 13-Oct-15 15-Oct-15 10.00am CLOSED 20-Nov-15 38 ACCEPTED 1 1
ICT at MA1 (CMA3)
1397 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01369 ISDA 9-Oct-15 ZN2 ELE Electrical works Installation inspection for,SMATV and ICT at MA3 13-Oct-15 15-Oct-15 10.00am CLOSED 17-Nov-15 35 ACCEPTED 1 1
1398 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01370 ISDA 16-Sep-15 ZN2 ELE Testing Testing SMATV at MA2 17-Sep-15 19-Sep-15 10.00am CLOSED 12-Oct-15 25 ACCEPTED 1 1
1399 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01371 ISDA 17-Sep-15 ZN2 ELE Testing Testing SMATV at MA4 18-Sep-15 20-Sep-15 2.00pm CLOSED 30-Sep-15 12 ACCEPTED 1 1
1400 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01372 ISDA 15-Sep-15 ZN2 ELE Testing Testing SMATV at LA5 15-Sep-15 17-Sep-15 9.00am CLOSED 12-Oct-15 27 ACCEPTED 1 1
1401 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01373 ISDA 15-Sep-15 ZN2 ELE Testing Testing SMATV at LA6 15-Sep-15 17-Sep-15 9.00am CLOSED 12-Oct-15 27 ACCEPTED 1 1
1402 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01374 ISDA 17-Sep-15 ZN2 ELE Testing Testing SMATV at SA3 18-Sep-15 20-Sep-15 9.00am CLOSED 12-Oct-15 24 ACCEPTED 1 1
1403 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01375 ISDA 16-Sep-15 ZN2 ELE Testing Testing SMATV at SA4 17-Sep-15 19-Sep-15 2.00pm CLOSED 30-Sep-15 13 ACCEPTED 1 1
UEMB QAQC
1404 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01376 KHAIRIL 11-Sep-15 ZN2 CIV Test FDT for subgrade for road at small package camp 11-Sep-15 13-Sep-15 3.00pm CLOSED 12-Sep-15 1 ACCEPTED 1 1
1406 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01378 Seribu Bio 14-Sep-15 ZN2 CIV Excavation works Excavation for subsoil trenches at small package- FF1 15-Sep-15 17-Sep-15 10.00am CLOSED 30-Oct-15 45 REJECTED 1 1
Depth of 500mm
1408 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01380 Seribu Bio 14-Sep-15 ZN2 CIV Excavation works Excavation for subsoil trenches at small package- MC1 15-Sep-15 17-Sep-15 10.00am CLOSED 30-Oct-15 45 REJECTED 1 1
Depth of 500mm
1409 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01381 Seribu Bio 14-Sep-15 ZN2 CIV Excavation works Excavation for subsoil trenches at small package- MC2 15-Sep-15 17-Sep-15 10.00am CLOSED 30-Oct-15 45 REJECTED 1 1
Depth of 500mm
1410 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01382 Seribu Bio 14-Sep-15 ZN2 CIV Excavation works Excavation of soil for cable routing at small package FF1. 15-Sep-15 17-Sep-15 10.00am CLOSED 29-Sep-15 14 ACCEPTED 1 1
Depth of 1.2M (Fire Aside football 1
1411 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01383 Seribu Bio 14-Sep-15 ZN2 CIV Excavation works Excavation of soil for cable rauting at small package FF2. 15-Sep-15 17-Sep-15 10.00am CLOSED 29-Sep-15 14 ACCEPTED 1 1
Depth of 1.2M (Fire Aside football 2)
1413 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01385 Seribu Bio 14-Sep-15 ZN2 CIV Excavation works Excavation of soil for cable rauting at small package MC2 15-Sep-15 17-Sep-15 10.00am CLOSED 29-Sep-15 14 ACCEPTED 1 1
depth of 1.2 M ( MC2 ( Mini cricet 2)
1415 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01387 Dorce 11-Sep-15 ZN2 ARC Assembling Works Building roof installation at mess hall and kitchen 12-Sep-15 14-Sep-15 3.00pm CLOSED CANCEL 1 1
1416 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01388 Dorce 11-Sep-15 ZN2 ARC Screed works Building screed works inspection at café 12-Sep-15 14-Sep-15 3.00pm CLOSED 30-Sep-15 18 ACCEPTED 1 1
1418 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01390 Dorce 11-Sep-15 ZN2 ARC Assembling Works Building roof installation at maintanance workshop 12-Sep-15 14-Sep-15 3.00pm CLOSED 28-Nov-15 77 ACCEPTED 1 1
1419 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01391 Dorce 11-Sep-15 ZN2 ARC Screed works Building screed works inspection at Guard house 12-Sep-15 14-Sep-15 3.00pm CLOSED 30-Sep-15 18 ACCEPTED 1 1
1420 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01392 Shinryo 14-Sep-15 ZN2 MNE Testing Testing of ceiling fan 15-Sep-15 17-Sep-15 10.00am CLOSED 1-Oct-15 14 ACCEPTED 1 1
1421 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01393 PPEC 15-Sep-15 ZN2 CIV Road works Inspection for lay of Binder Corse - 3 M width, 15-Sep-15 17-Sep-15 2.00pm CLOSED 15-Sep-15 0 ACCEPTED 1 1
Inspetion for laying Binser Corse- 6M width
1422 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01394 Shinryo 14-Sep-15 ZN2 MNE Installation Installation of air cooled split unit at Café 15-Sep-15 17-Sep-15 10.00am CLOSED CANCEL 1 1
1423 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01395 Shinryo 14-Sep-15 ZN2 MNE Installation Installation of heat water heater at café 15-Sep-15 17-Sep-15 10.00am CLOSED 22-Sep-15 7 ACCEPTED 1 1
1424 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01396 Shinryo 14-Sep-15 ZN2 MNE Installation Installation of ventilation fan at (café) 15-Sep-15 17-Sep-15 10.00am CLOSED 1-Oct-15 14 ACCEPTED 1 1
1425 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01397 Shinryo 14-Sep-15 ZN2 MNE Installation Installation of flexible rigd duct at (Cafe) 15-Sep-15 17-Sep-15 10.00am CLOSED 15-Sep-15 -2 ACCEPTED 1 1
1426 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01398 Shinryo 14-Sep-15 ZN2 MNE TNC Teting of exhoust fan at MA2 (Air Flow Test) 15-Sep-15 17-Sep-15 10.00am CLOSED 18-Oct-15 31 ACCEPTED 1 1
1427 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01399 Shinryo 14-Sep-15 ZN2 MNE TNC Teting of exhoust fan at MA1(Air Flow Test) 15-Sep-15 17-Sep-15 10.00am CLOSED 18-Oct-15 31 ACCEPTED 1 1
1428 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01400 Dorce 11-Sep-15 ZN2 ELE Electrical works Building ground floor installation electrical inspection for 12-Sep-15 14-Sep-15 3.00pm CLOSED 31-Oct-15 47 ACCEPTED 1 1
CSA3
1429 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01401 Dorce 11-Sep-15 ZN2 ELE Electrical works Building first floor installation electrical inspection for 12-Sep-15 14-Sep-15 3.00pm CLOSED 31-Oct-15 47 ACCEPTED 1 1
CSA3
1430 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01402 Dorce 11-Sep-15 ZN2 ELE Electrical works Building second floor installation electrical inspection for 12-Sep-15 14-Sep-15 3.00pm CLOSED 31-Oct-15 47 ACCEPTED 1 1
CSA3
1431 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01403 Dorce 11-Sep-15 ZN2 ELE Electrical works Building third floor installation electrical inspection for 12-Sep-15 14-Sep-15 3.00pm CLOSED 31-Oct-15 47 ACCEPTED 1 1
CSA3
1433 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01405 Dorce 11-Sep-15 ZN2 ELE Electrical works Building first floor installation electrical inspection for 12-Sep-15 14-Sep-15 3.00pm CLOSED 31-Oct-15 47 ACCEPTED 1 1
CSA4
1436 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01408 AEIE 17-Sep-15 ZN2 ELE Installation Inspection of underground cable installation (1x4C 16mm 18-Sep-15 20-Sep-15 11.00am CLOSED 03-Oct-15 15 ACCEPTED 1 1
2XLPE/SWA/PVC) from FP-C7 to compund ligthing
1438 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01410 AEIE 17-Sep-15 ZN2 ELE Installation Inspection of underground cable installation (1x4C 16mm2 18-Sep-15 20-Sep-15 11.00am CLOSED 29-Sep-15 11 ACCEPTED 1 1
XLPE/SWA/PVC) from FP-C7 to compund ligthing (FP-HM6)
1439 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01411 AEIE 17-Sep-15 ZN2 ELE Installation Inspection of underground cable installation (1x4C 16mm2 18-Sep-15 20-Sep-15 11.00am CLOSED 29-Sep-15 11 ACCEPTED 1 1
XLPE/SWA/PVC) from FP-C7 to guard house
Inspection of underground cable installation (1x2C 25mm
1440 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01412 AEIE 17-Sep-15 ZN2 ELE Installation XLPE/SWA/PVC) from main fedeer pillar FP-C7 to refuse 18-Sep-15 20-Sep-15 11.00am CLOSED 29-Sep-15 11 ACCEPTED 1 1
chamber
1454 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01426 Shinryo 16-Sep-15 ZN2 MNE Testing Testing for Exhoust fan (Air Flow test) at Café 17-Sep-15 19-Sep-15 2.30pm CLOSED 18-Oct-15 31 ACCEPTED 1 1
1455 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01427 Shinryo 16-Sep-15 ZN2 MNE Testing Testing for ACSU(café) 17-Sep-15 19-Sep-15 2.30pm CLOSED 19-Sep-15 2 ACCEPTED 1 1
1458 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01430 UEM ZUBIR 18-Sep-15 ZN2 MNE testing Functional test for 2 nos submersible raw sewage Pump 19-Sep-15 21-Sep-15 9.00am CLOSED 19-Sep-15 0 ACCEPTED 1 1
26L/S @ 15m head Each at Pump SUMP RP1a
1459 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01431 Dorce 11-Sep-15 ZN2 ELE Electrical works Building ground floor electrical panel board installation 12-Sep-15 14-Sep-15 9.00am CLOSED 09-Oct-15 27 ACCEPTED 1 1
inspection CSA4
1460 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01432 Dorce 11-Sep-15 ZN2 ELE Electrical works Building first floor electrical panel board installation 12-Sep-15 14-Sep-15 9.00am CLOSED 09-Oct-15 27 ACCEPTED 1 1
inspection CSA4
1461 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01433 Dorce 11-Sep-15 ZN2 ELE Electrical works Building second floor electrical panel board installation 12-Sep-15 14-Sep-15 9.00am CLOSED 09-Oct-15 27 ACCEPTED 1 1
inspection CSA4
1463 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01435 Dorce 11-Sep-15 ZN2 ELE Electrical works Building ground floor electrical panel board installation 12-Sep-15 14-Sep-15 9.00am CLOSED 09-Oct-15 27 ACCEPTED 1 1
inspection CSA3
1466 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01438 Dorce 11-Sep-15 ZN2 ELE Electrical works Building third floor electrical panel board installation 12-Sep-15 14-Sep-15 9.00am CLOSED 09-Oct-15 27 ACCEPTED 1 1
inspection CSA3
1468 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01440 Core mainpower 21-Sep-15 ZN2 CIV Dranage works Install UD size 600x450,600x300, and 450x300. Backfill 22-Sep-15 24-Sep-15 2.30pm CLOSED 03-Nov-15 42 ACCEPTED 1 1
with compaction after installation done. At Supermarket
1469 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01441 PPEC 21-Sep-15 ZN2 CIV Road works Preparation sub base for small package area internal road 21-Sep-15 23-Sep-15 12.00am CLOSED 03-Nov-15 43 ACCEPTED 1 1
1470 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01442 PPEC 21-Sep-15 ZN2 CIV Road works Preparation road base for small package area internal road 22-Sep-15 24-Sep-15 8.00am CLOSED 03-Nov-15 42 ACCEPTED 1 1
PPEC 21-Sep-15 ZN2 CIV Inspection for FDT test 3m road width at small 22-Sep-15 24-Sep-15 10.00am CLOSED 6-Nov-15 45
1475 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01447 Testing package for subgrade (backdated)
ACCEPTED 1 1
1476 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01448 PPEC 23-Sep-15 ZN2 CIV Road works Preparation of road base for small package 24-Sep-15 26-Sep-15 8.00am CLOSED 02-Nov-15 39 ACCEPTED 1 1
area internal road
PPEC 23-Sep-15 ZN2 CIV Inspection for FDT test 3m road width at small 25-Sep-15 27-Sep-15 5.00pm CLOSED 25-Nov-15 61
1477 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01449 Testing package for road base
ACCEPTED 1 1
1478 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01450 PPEC 22-Sep-15 ZN2 CIV Road works Preparation of subbase for small package area 23-Sep-15 25-Sep-15 8.00am CLOSED 02-Nov-15 40 ACCEPTED 1 1
internal road (backdated)
PPEC 22-Sep-15 ZN2 CIV Inspection for FDT test 3m road width at small 23-Sep-15 25-Sep-15 5.00pm CLOSED 23-Nov-15 61
1479 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01451 Testing package for subbase
ACCEPTED 1 1
1480 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01452 PPEC 21-Sep-15 ZN2 CIV Road works Preparation of subgrade for small package 22-Sep-15 24-Sep-15 8.00am CLOSED 02-Nov-15 41 ACCEPTED 1 1
area internal road (backdated)
1481 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01453 SHINRYO 3-Sep-15 ZN2 MNE testing testing ACSU(MA 2) 4-Sep-15 6-Sep-15 2.30pm CLOSED 5-Sep-15 1 ACCEPTED 1 1
1482 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01454 SHINRYO 3-Sep-15 ZN2 MNE testing testing of ceiling fan 4-Sep-15 6-Sep-15 2.30pm CLOSED 01-Oct-15 27 ACCEPTED 1 1
1483 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01455 SHINRYO 3-Sep-15 ZN2 MNE testing testing of ceiling fan 4-Sep-15 6-Sep-15 2.30pm CLOSED 01-Oct-15 27 ACCEPTED 1 1
1484 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01456 SHINRYO 19-Sep-15 ZN2 MNE testing testing ACSU 20-Sep-15 22-Sep-15 2.30pm CLOSED 12-Oct-15 20 ACCEPTED 1 1
UPVC Piping and floor Building first floor UPVC piping installation and flow rate
1487 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01459 Dorce 22-Sep-15 ZN2 MNE 23-Sep-15 25-Sep-15 10.00am CLOSED 25-Sep-15 2 ACCEPTED 1 1
rate-leakage test leakage test CSA4
UPVC Piping and Building second floor UPVC piping installation and
1488 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01460 Dorce 22-Sep-15 ZN2 MNE floor rate-leakage flow rate leakage test CSA4 23-Sep-15 25-Sep-15 10.00am CLOSED CANCEL 1 1
test
1489 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01461 Dorce 22-Sep-15 ZN2 MNE UPVC Piping and floor Building third floor UPVC piping installation and flow rate 23-Sep-15 25-Sep-15 10.00am CLOSED 25-Sep-15 2 ACCEPTED 1 1
rate-leakage test leakage test CSA4
1490 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01462 Dorce 22-Sep-15 ZN2 MNE Hydro test Building ground floor PPRC piping installation and 23-Sep-15 25-Sep-15 10.00am CLOSED 25-Sep-15 2 ACCEPTED 1 1
hydrotest SA4
1491 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01463 Dorce 22-Sep-15 ZN2 MNE Hydro test Building first floor PPRC piping installation and 23-Sep-15 25-Sep-15 10.00am CLOSED 23-Sep-15 0 ACCEPTED 1 1
hydrotest CSA4
1492 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01464 Dorce 22-Sep-15 ZN2 MNE Hydro test Building second floor PPRC piping installation and 23-Sep-15 25-Sep-15 10.00am CLOSED 23-Sep-15 0 ACCEPTED 1 1
hydrotest CSA4
UPVC Piping and floor Building UPVC piping installation and flow rate leakage
1494 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01466 Dorce 22-Sep-15 ZN2 MNE rate-leakage test test at catering 23-Sep-15 25-Sep-15 10.00am CLOSED 23-Sep-15 0 ACCEPTED 1 1
1495 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01467 UEM SYAHIR 25-Sep-15 ZN2 CIV Concreting Installation rebar and formwork for concreting walkway 26-Sep-15 28-Sep-15 4.00am CLOSED 02-Dec-15 67 ACCEPTED 1 1
and concreting work for warkway area at small package
1496
RAPID-P20A1-UEMB-ZN2-CIV-RFIN- PPEC 26-Sep-15 ZN2 CIV Testing
Inspection for FDT test for subgrade at Small package 28-Sep-15 30-Sep-15 9.00am CLOSED 16-Oct-15 18 ACCEPTED 1 1
01468 area
1498 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01470 PPEC 27-Sep-15 ZN2 CIV Road works Inspection for preparation of sub grade at small package 29-Sep-15 1-Oct-15 10.00am CLOSED 02-Nov-15 34 ACCEPTED 1 1
area
1500
RAPID-P20A1-UEMB-ZN2-CIV-RFIN- PPEC 29-Sep-15 ZN2 CIV Road works Inspection preparation of road base at small 30-Sep-15 2-Oct-15 10.00am CLOSED 02-Nov-15 33 ACCEPTED 1 1
01472 package area
RAPID-P20A1-UEMB-ZN2-CIV-RFIN- PPEC 29-Sep-15 ZN2 CIV Inspection for FDT test for road base at small package 30-Sep-15 2-Oct-15 12.00am CLOSED 11-Apr-16 194
1501 Testing ACCEPTED 1 1
01473 area
1502 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01474 Dorce 29-Sep-15 ZN2 MNE Hydro test Building PPRC piping installation and hydrotest at DOJO 30-Sep-15 2-Oct-15 10.00am CLOSED 4-Dec-15 65 ACCEPTED 1 1
UPVC Piping and Building third floor UPVC piping installation and water
1506 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01478 Dorce 29-Sep-15 ZN2 MNE floor rate-leakage flow and leakage test at CLA2 30-Sep-15 2-Oct-15 10.00am CLOSED 30-Sep-15 0 ACCEPTED 1 1
test
UPVC Piping and floor Building ground floor UPVC piping installation and water
1507 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01479 Dorce 29-Sep-15 ZN2 MNE rate-leakage test flow and leakage test at CLA4 30-Sep-15 2-Oct-15 10.00am CLOSED 2-Oct-15 2 ACCEPTED 1 1
1508 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01480 Dorce 29-Sep-15 ZN2 MNE UPVC Piping and floor Building first floor UPVC piping installation and water flow 30-Sep-15 2-Oct-15 10.00am CLOSED 2-Oct-15 2 ACCEPTED 1 1
rate-leakage test and leakage test at CLA4
1509 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01481 Dorce 29-Sep-15 ZN2 MNE UPVC Piping and floor Building second floor UPVC piping installation and water 30-Sep-15 2-Oct-15 10.00am CLOSED 2-Oct-15 2 ACCEPTED 1 1
rate-leakage test flow and leakage test at CLA4
1510 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01482 Dorce 29-Sep-15 ZN2 MNE UPVC Piping and floor Building third floor UPVC piping installation and water flow 30-Sep-15 2-Oct-15 10.00am CLOSED 2-Oct-15 2 ACCEPTED 1 1
rate-leakage test and leakage test at CLA4
Wiremesh fencing installation inspection at Management
1511 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01483 Gapura 29-Sep-15 ZN2 ARC Wiremash fencing 29-Sep-15 1-Oct-15 10.00am CLOSED 04-Nov-15 36 REJECTED 1 1
Accommodation 1
1514 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01486 Gapura 29-Sep-15 ZN2 ARC Wiremash fencing Wiremesh fencing installation inspection at Management 29-Sep-15 1-Oct-15 10.00am CLOSED 31-Oct-15 32 REJECTED 1 1
Accommodation 4
1515 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01487 UEMB Amin 29-Sep-15 ZN2 CIV Road works Preparing sub base and joint dipping at Parking Lot 30-Sep-15 2-Oct-15 10.00am CLOSED 19-Nov-15 50 ACCEPTED 1 1
Mass Hall Small Package
1517 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01489 UEMB Amin 29-Sep-15 ZN2 CIV Road works Preparing Road base and joint dipping at Parking Lot 30-Sep-15 2-Oct-15 10.00am CLOSED 25-Nov-15 56 ACCEPTED 1 1
Mass Hall Small Package
1519 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01491 PPEC 29-Sep-15 ZN2 CIV Road works Inspection for laying of ACBC 28 at Small package area 30-Sep-15 2-Oct-15 10.00am CLOSED 03-Nov-15 34 ACCEPTED 1 1
1520 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01492 Shinryo 28-Sep-15 ZN2 MNE Testing testing of oscillation fan LA3 29-Sep-15 1-Oct-15 9.30am CLOSED 29/9/2015 #VALUE! ACCEPTED 1 1
1521 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01493 Dorce 28-Sep-15 ZN2 ELE Electrical works Building MDB panel board installation inspection CLA1 29-Sep-15 1-Oct-15 9.30am CLOSED 09-Oct-15 10 ACCEPTED 1 1
Dorce 28-Sep-15 ZN2 ELE Electrical works Building MDB panel board installation inspection 29-Sep-15 1-Oct-15 9.30am
1522 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01494
CLA3 CLOSED CANCEL 1 1
1523 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01495 Dorce 28-Sep-15 ZN2 ELE Electrical works Building MDB panel bord installation inspection CMA1 29-Sep-15 1-Oct-15 9.30am CLOSED 09-Oct-15 10 ACCEPTED 1 1
1524 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01496 Dorce 28-Sep-15 ZN2 ELE Electrical works building Ground floor SDB panel board installation 29-Sep-15 1-Oct-15 9.30am CLOSED 08-Oct-15 9 ACCEPTED 1 1
inspection CMA1
1525 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01497 Dorce 28-Sep-15 ZN2 ELE Electrical works building first floor SDB panel board installation inspection 29-Sep-15 1-Oct-15 9.30am CLOSED 08-Oct-15 9 ACCEPTED 1 1
CMA1
1526 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01498 Dorce 28-Sep-15 ZN2 ELE Electrical works building second floor SDB panel board installation 29-Sep-15 1-Oct-15 9.30am CLOSED 08-Oct-15 9 ACCEPTED 1 1
inspection CMA1
1528 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01500 Dorce 28-Sep-15 ZN2 ELE Electrical works Building MDB panel bord installation inspection CMA2 29-Sep-15 1-Oct-15 9.30am CLOSED 09-Oct-15 10 ACCEPTED 1 1
1530 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01502 Dorce 28-Sep-15 ZN2 ELE Electrical works building first floor SDB panel board installation inspection 29-Sep-15 1-Oct-15 9.30am CLOSED 09-Oct-15 10 ACCEPTED 1 1
CMA2
building second floor SDB panel board installation
1531 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01503 Dorce 28-Sep-15 ZN2 ELE Electrical works 29-Sep-15 1-Oct-15 9.30am CLOSED 09-Oct-15 10 ACCEPTED 1 1
inspection CMA2
1534 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01506 UEMB Ramesh 12-Sep-15 ZN2 MNE TNC Functionality test MA2-Ground floor 14-Sep-15 16-Sep-15 2.00pm CLOSED 17-Sep-15 3 ACCEPTED 1 1
1535 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01507 UEMB Ramesh 12-Sep-15 ZN2 MNE TNC Functionality test MA2- First floor 14-Sep-15 16-Sep-15 2.00pm CLOSED 17-Sep-15 3 ACCEPTED 1 1
1536 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01508 UEMB Ramesh 12-Sep-15 ZN2 MNE TNC Functionality test MA2-Second floor 14-Sep-15 16-Sep-15 2.00pm CLOSED 17-Sep-15 3 ACCEPTED 1 1
1537 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01509 UEMB Ramesh 12-Sep-15 ZN2 MNE TNC Functionality test MA2-Third floor 14-Sep-15 16-Sep-15 2.00pm CLOSED 17-Sep-15 3 ACCEPTED 1 1
1538 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01510 UEMB Ramesh 14-Sep-15 ZN2 MNE TNC Functionality test MA4-Ground floor 15-Sep-15 17-Sep-15 2.00pm CLOSED 17-Sep-15 2 ACCEPTED 1 1
1539 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01511 UEMB Ramesh 14-Sep-15 ZN2 MNE TNC Functionality test MA4- First floor 15-Sep-15 17-Sep-15 2.00pm CLOSED 17-Sep-15 2 ACCEPTED 1 1
1540 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01512 UEMB Ramesh 14-Sep-15 ZN2 MNE TNC Functionality test MA4-Second floor 15-Sep-15 17-Sep-15 2.00pm CLOSED 17-Sep-15 2 ACCEPTED 1 1
1541 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01513 UEMB Ramesh 14-Sep-15 ZN2 MNE TNC Functionality test MA4-Third floor 15-Sep-15 17-Sep-15 2.00pm CLOSED 17-Sep-15 2 ACCEPTED 1 1
1542 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01514 UEMB Ramesh 16-Sep-15 ZN2 MNE TNC Functionality test SA3-Ground floor 17-Sep-15 19-Sep-15 2.00pm CLOSED 17-Sep-15 0 ACCEPTED 1 1
1543 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01515 UEMB Ramesh 16-Sep-15 ZN2 MNE TNC Functionality test SA3- First floor 17-Sep-15 19-Sep-15 2.00pm CLOSED 19-Sep-15 2 ACCEPTED 1 1
1544 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01516 UEMB Ramesh 16-Sep-15 ZN2 MNE TNC Functionality test SA3-Second floor 17-Sep-15 19-Sep-15 2.00pm CLOSED 17-Sep-15 0 ACCEPTED 1 1
1545 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01517 UEMB Ramesh 16-Sep-15 ZN2 MNE TNC Functionality test SA3-Third floor 17-Sep-15 19-Sep-15 2.00pm CLOSED 17-Sep-15 0 ACCEPTED 1 1
1546 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01518 UEMB Ramesh 15-Sep-15 ZN2 MNE TNC Functionality test SA4-Ground floor 16-Sep-15 18-Sep-15 2.00pm CLOSED 17-Sep-15 1 ACCEPTED 1 1
1547 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01519 UEMB Ramesh 15-Sep-15 ZN2 MNE TNC Functionality test SA4- First floor 16-Sep-15 18-Sep-15 2.00pm CLOSED 17-Sep-15 1 ACCEPTED 1 1
1548 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01520 UEMB Ramesh 15-Sep-15 ZN2 MNE TNC Functionality test SA4-Second floor 16-Sep-15 18-Sep-15 2.00pm CLOSED 17-Sep-15 1 ACCEPTED 1 1
1549 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01521 UEMB Ramesh 15-Sep-15 ZN2 MNE TNC Functionality test SA4-Third floor 16-Sep-15 18-Sep-15 2.00pm CLOSED 17-Sep-15 1 ACCEPTED 1 1
1550 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01522 UEMB Ramesh 19-Sep-15 ZN2 MNE TNC Functionality test Guard House (GH2) 21-Sep-15 23-Sep-15 2.00pm CLOSED 25-Sep-15 4 ACCEPTED 1 1
1551 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01523 UEMB Ramesh 21-Sep-15 ZN2 MNE TNC Functionality test Café (CF1) 22-Sep-15 24-Sep-15 2.00pm CLOSED 25-Sep-15 3 ACCEPTED 1 1
1554 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01526 UEMB Amin 1-Oct-15 ZN2 CIV Drainage Works Excavation and lay bedding material prior installation 2-Oct-15 4-Oct-15 11.00am CLOSED 03-Nov-15 32 ACCEPTED 1 1
laying U-drain 450 x 300, 450 x 450 at mess hall
1556 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01528 UEMB Amin 1-Oct-15 ZN2 CIV Drainage Works Installation works of U-drain size 450 x 300, 450 x 450 at 2-Oct-15 4-Oct-15 4.00pm CLOSED 14-Nov-15 43 ACCEPTED 1 1
mess hall
1557 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01529 AEIE 2-Oct-15 ZN2 ELE earthing test Testing commisioning of lighting protection systrem 3-Oct-15 5-Oct-15 4.00pm CLOSED 12-Oct-15 7 ACCEPTED 1 1
earthing test at SA3
1560 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01532 Dorce 29-Sep-15 ZN2 MNE Hydro test Building first floor PPRC piping installation and hydrotest 30-Sep-15 2-Oct-15 8.00am CLOSED 16-Oct-15 16 ACCEPTED 1 1
CLA1
1561 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01533 Dorce 29-Sep-15 ZN2 MNE Hydro test Building second floor PPRC piping installation and 30-Sep-15 2-Oct-15 8.00am CLOSED 16-Oct-15 16 ACCEPTED 1 1
hydrotest CLA1
1564 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01536 Dorce 29-Sep-15 ZN2 MNE Hydro test Building first floor PPRC piping installation and hydrotest 30-Sep-15 2-Oct-15 8.00am CLOSED 26-Oct-15 26 ACCEPTED 1 1
CLA3
1565 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01537 Dorce 29-Sep-15 ZN2 MNE Hydro test Building second floor PPRC piping installation and 30-Sep-15 2-Oct-15 8.00am CLOSED 16-Oct-15 16 ACCEPTED 1 1
hydrotest CLA3
1568 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01540 Seribu Bio 2-Oct-15 ZN2 CIV Sand leveling Levelling of coarse sand at fire aside football2 small 2-Oct-15 4-Oct-15 2.00pm CLOSED 3-Oct-15 1 ACCEPTED 1 1
inspection package at a thickness of 't'-50mm
1569 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01541 AEIE 2-Oct-15 ZN2 ELE Underground cable Laying under ground submain cable from FPc6 to SA4 3-Oct-15 5-Oct-15 10.00am CLOSED 12-Oct-15 7 ACCEPTED 1 1
cable 4C x 240mm x XLPE / SWA/PVC
1570 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01542 AEIE 2-Oct-15 ZN2 ELE Underground cable Laying underground submain cable from FPc6 to FP-HM4 3-Oct-15 5-Oct-15 10.00am CLOSED 12-Oct-15 7 ACCEPTED 1 1
Cable 4c x 16mm XLPE/SWA/PVC
1571 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01543 AEIE 2-Oct-15 ZN2 ELE Underground cable Laying submain cable from FP-c6 10 SA6 cable 4c x 70mm 3-Oct-15 5-Oct-15 10.00am CLOSED 12-Oct-15 7 ACCEPTED 1 1
XLPE/SWA/PVC
1572 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01544 AEIE 2-Oct-15 ZN2 ELE Underground cable Laying underground submain cable from FPC6 to SA2 3-Oct-15 5-Oct-15 10.00am CLOSED 12-Oct-15 7 ACCEPTED 1 1
1x4CX240MM XLPE/SWA/PVC
1575 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01547 AEIE 2-Oct-15 ZN2 ELE Underground cable Laying submain cable underground from FPC6 to LA2 3-Oct-15 5-Oct-15 10.00am CLOSED 12-Oct-15 7 ACCEPTED 1 1
Cable 4Cx70mm XLPE/SWA/PVC
1576 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01548 AEIE 2-Oct-15 ZN2 ELE Underground cable Inspection for lighting protection,commissioning at LA3 3-Oct-15 5-Oct-15 10.00am CLOSED 12-Oct-15 7 ACCEPTED 1 1
1587 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01559 UEMB SYAHIR 7-Oct-15 ZN2 CIV Concrete walkway 1) install rebar and formwork for concrete walkway at 7-Oct-15 9-Oct-15 4.00pm CLOSED 12-Nov-15 34 ACCEPTED 1 1
MA4 and club house 2) concrete work
1589 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01561 PPEC 7-Oct-15 ZN2 CIV Testing Inspection of FDT test for the preparation of Subgrade at 8-Oct-15 10-Oct-15 10.00am CLOSED 8-Oct-15 0 ACCEPTED 1 1
Small package area (SR6 SPG)
1590 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01562 PPEC 7-Oct-15 ZN2 CIV Road works Inspection for the preparation of Subbase at Small 8-Oct-15 10-Oct-15 12.00pm CLOSED 02-Nov-15 25 ACCEPTED 1 1
Pacakage area
1591 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01563 PPEC 7-Oct-15 ZN2 CIV Testing Inspection of FDT test for the preparation of Subbase at 8-Oct-15 10-Oct-15 6.00pm CLOSED 8-Oct-15 0 ACCEPTED 1 1
Small package area (SR6 SPG)
1593 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01565 PPEC 7-Oct-15 ZN2 CIV Testing Inspection of FDT test for the preparation of Road base at 10-Oct-15 12-Oct-15 5.00pm CLOSED 13-Oct-15 3 ACCEPTED 1 1
Small package area (SR6 SPG)
1594 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01566 UEMB AMIN 7-Oct-15 ZN2 CIV Road works Preparation subbase for 6M road base near 8-Oct-15 10-Oct-15 6.00pm CLOSED 3-Nov-15 24 ACCEPTED 1 1
MW1,RP1,CM1,RC1 & MK1 building at Small Package
1596 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01568 UEMB AMIN 7-Oct-15 ZN2 CIV Road works Preparation Road Base for 6M road base near 8-Oct-15 10-Oct-15 6.00pm CLOSED 3-Nov-15 24 ACCEPTED 1 1
MW1,RP1,CM1,RC1 & MK1 building at Small Package
1597 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01569 AEIE 8-Oct-15 ZN2 ELE Earthing Test Inspection for lighting protection and grounding, 9-Oct-15 11-Oct-15 10.00am CLOSED 24-Oct-15 15 ACCEPTED 1 1
Commissioning at Café building
1598 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01570 UEMB Syamer 4-Oct-15 ZN2 ELE TNC Polarity Test for MA2 Third Floor 5-Oct-15 7-Oct-15 9.30am CLOSED 08-Oct-15 3 ACCEPTED 1 1
1599 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01571 UEMB Syamer 4-Oct-15 ZN2 ELE TNC Polarity Test for MA2 Second floor Floor 5-Oct-15 7-Oct-15 9.30am CLOSED 08-Oct-15 3 ACCEPTED 1 1
1600 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01572 UEMB Syamer 4-Oct-15 ZN2 ELE TNC Polarity Test for MA2 First floor Floor 5-Oct-15 7-Oct-15 9.30am CLOSED 08-Oct-15 3 ACCEPTED 1 1
1601 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01573 UEMB Syamer 4-Oct-15 ZN2 ELE TNC Polarity Test for MA2 Ground floor Floor 5-Oct-15 7-Oct-15 9.30am CLOSED 08-Oct-15 3 ACCEPTED 1 1
1602 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01574 UEMB Syamer 5-Oct-15 ZN2 ELE TNC Polarity Test for MA1 Ground floor Floor 5-Oct-15 7-Oct-15 9.30am CLOSED 10-Oct-15 5 ACCEPTED 1 1
1603 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01575 UEMB Syamer 5-Oct-15 ZN2 ELE TNC Polarity Test for MA1 First floor Floor 5-Oct-15 7-Oct-15 9.30am CLOSED 10-Oct-15 5 ACCEPTED 1 1
1604 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01576 UEMB Syamer 5-Oct-15 ZN2 ELE TNC Polarity Test for MA1 Second floor Floor 5-Oct-15 7-Oct-15 9.30am CLOSED 10-Oct-15 5 ACCEPTED 1 1
1605 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01577 UEMB Syamer 5-Oct-15 ZN2 ELE TNC Polarity Test for MA1 Third Floor 5-Oct-15 7-Oct-15 9.30am CLOSED 10-Oct-15 5 ACCEPTED 1 1
AEIE 8-Oct-15 ZN2 ELE Cable Termination Cable dressing termination at FP-C7 Mock Up 9-Oct-15 11-Oct-15 10.00am 12-Oct-15
1606 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01578
mock up CLOSED 3 ACCEPTED 1 1
1607 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01579 Shinryo 5-Oct-15 ZN2 MNE Testing Test for ACSU SA1 6-Oct-15 8-Oct-15 10.30am CLOSED 26-Nov-15 51 ACCEPTED 1 1
1608 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01580 UEMB Rusydan 5-Oct-15 ZN2 ELE TNC Polarity Test for SA3 Ground floor Floor 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1609 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01581 UEMB Rusydan 5-Oct-15 ZN2 ELE TNC Polarity Test for SA3 First floor Floor 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1610 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01582 UEMB Rusydan 5-Oct-15 ZN2 ELE TNC Polarity Test for SA3 Second floor Floor 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1611 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01583 UEMB Rusydan 5-Oct-15 ZN2 ELE TNC Polarity Test for SA3 Third Floor 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1612 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01584 UEMB Rusydan 5-Oct-15 ZN2 ELE TNC Polarity Test for SA1 Ground floor Floor 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1613 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01585 UEMB Syamer 5-Oct-15 ZN2 ELE TNC Polarity Test for SA1 First floor Floor 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1614 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01586 UEMB Syamer 5-Oct-15 ZN2 ELE TNC Polarity Test for SA1 Second floor Floor 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1615 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01587 UEMB Syamer 5-Oct-15 ZN2 ELE TNC Polarity Test for SA1 Third Floor 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1616 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01588 UEMB Faliq 5-Oct-15 ZN2 ELE TNC Polarity Test for Café 1 6-Oct-15 8-Oct-15 9.00am CLOSED 10-Oct-15 4 ACCEPTED 1 1
1617 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01589 UEMB Faliq 6-Oct-15 ZN2 ELE TNC Polarity Test for Guard House 2 7-Oct-15 9-Oct-15 11.00am CLOSED 07-Oct-15 0 ACCEPTED 1 1
1618 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01590 Shinryo 4-Oct-15 ZN2 MNE TNC Testing of aoscillation fan LA1 5-Oct-15 7-Oct-15 9.00am CLOSED 26-Oct-15 21 ACCEPTED 1 1
1620 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01592 UEMB AMIN 7-Oct-15 ZN2 CIV Testing FDT for sub base layer at 6M road near 8-Oct-15 10-Oct-15 2.00pm CLOSED 10-Oct-15 2 ACCEPTED 1 1
MW1,RP1,CM1,RC1 and MK1 building small package
1622 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01594 UEMB Syamer 6-Oct-15 ZN2 ELE TNC Polarity Test for LA3 Ground floor Floor 7-Oct-15 9-Oct-15 9.00am CLOSED 07-Oct-15 0 ACCEPTED 1 1
1623 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01595 UEMB Muazzam 6-Oct-15 ZN2 ELE TNC Polarity Test for LA3 First floor Floor 7-Oct-15 9-Oct-15 2.00pm CLOSED 07-Oct-15 0 ACCEPTED 1 1
1624 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01596 UEMB Muazzam 6-Oct-15 ZN2 ELE TNC Polarity Test for LA3 Second floor Floor 7-Oct-15 9-Oct-15 2.00pm CLOSED 07-Oct-15 0 ACCEPTED 1 1
1625 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01597 UEMB Muazzam 6-Oct-15 ZN2 ELE TNC Polarity Test for LA3 Third Floor 7-Oct-15 9-Oct-15 2.00pm CLOSED 07-Oct-15 0 ACCEPTED 1 1
1626 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01598 UEMB Syamer 6-Oct-15 ZN2 ELE TNC Polarity Test for LA1 Ground floor Floor 7-Oct-15 9-Oct-15 9.00am CLOSED 10-Oct-15 3 ACCEPTED 1 1
1627 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01599 UEMB Syamer 6-Oct-15 ZN2 ELE TNC Polarity Test for LA1 First floor Floor 7-Oct-15 9-Oct-15 9.00am CLOSED 10-Oct-15 3 ACCEPTED 1 1
1628 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01600 UEMB Syamer 6-Oct-15 ZN2 ELE TNC Polarity Test for LA1 Second floor Floor 7-Oct-15 9-Oct-15 9.00am CLOSED 10-Oct-15 3 ACCEPTED 1 1
1629 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01601 UEMB Syamer 6-Oct-15 ZN2 ELE TNC Polarity Test for LA1 Third Floor 7-Oct-15 9-Oct-15 9.00am CLOSED 10-Oct-15 3 ACCEPTED 1 1
1630 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-01602 Hasbullah 9-Oct-15 ZN2 LNDS Material Supply and plant at RP1a Lifting lif area 10-Oct-15 12-Oct-15 9.30am CLOSED 31-Oct-15 21 ACCEPTED 1 1
( Landscape
1632 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01604 Shinryo 4-Oct-15 ZN2 MNE Testing Testing for exhaust fan at LA 1 (N) 5-Oct-15 7-Oct-15 10.00am CLOSED 18-Oct-15 13 ACCEPTED 1 1
1633 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01605 Shinryo 4-Oct-15 ZN2 MNE Installation Installation of wall mounted Exhaust fan at Toilet Labour 5-Oct-15 7-Oct-15 10.00am CLOSED 18-Oct-15 13 ACCEPTED 1 1
Accomodation 3 (LA3) N
1634 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01606 Shinryo 4-Oct-15 ZN2 MNE Testing Testing for exhaust fan at LA3 (N) 5-Oct-15 7-Oct-15 10.00am CLOSED 18-Oct-15 13 ACCEPTED 1 1
1635 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01607 Dorce 11-Sep-15 ZN2 ELE Electrical works Building cable pulling installation inspection at Guard 12-Sep-15 14-Sep-15 10.00am CLOSED 24-Oct-15 42 ACCEPTED 1 1
House
1636 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01608 Dorce 11-Sep-15 ZN2 ELE Electrical works Building Electrical panel board installation at Guard House 12-Sep-15 14-Sep-15 10.00am CLOSED 26-Oct-15 44 ACCEPTED 1 1
1637 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01609 UEMB ZUBIR 9-Oct-15 ZN2 MNE TNC To redo functional test for 2 Nos submersible raw sewage 9-Oct-15 11-Oct-15 3.00pm CLOSED 09-Oct-15 0 ACCEPTED 1 1
rump 26 c/s @ 6M head each pump at RP1a
1638 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01610 Shinryo 8-Oct-15 ZN2 MNE TNC Testing for ACSU at Guard house 8-Oct-15 10-Oct-15 11.00am CLOSED 31-Oct-15 23 ACCEPTED 1 1
1639 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01611 Shinryo 8-Oct-15 ZN2 MNE TNC Testing for exhaust fan Guard House 8-Oct-15 10-Oct-15 11.00am CLOSED 18-Oct-15 10 ACCEPTED 1 1
1645 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01617 Seribu Bio 12-Oct-15 ZN2 CIV Survey Survey works atMini Cricket 1 13-Oct-15 15-Oct-15 11.00am CLOSED 13-Oct-15 0 ACCEPTED 1 1
UPVC piping water Building UPVC piping installation and water leakage and
1647 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01619 Dorce 12-Oct-15 ZN2 MNE leakage and water 13-Oct-15 15-Oct-15 11.00am CLOSED 13-Oct-15 0 ACCEPTED 1 1
flow test water flow test inspection at Gymnasium
1648 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01620 Dorce 11-Sep-15 ZN2 ELE Electrical works Building installation of electrical works inspection at Guard 12-Sep-15 14-Sep-15 10.00am CLOSED 31-Oct-15 49 ACCEPTED 1 1
House
1650 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01622 Seribu Bio 13-Oct-15 ZN2 CIV Slit drain Excavation of slit up to 75-100mm in depth and backfill 15-Sep-15 17-Sep-15 10.00am CLOSED 30-Oct-15 45 ACCEPTED 1 1
with 100mm size chipping stone at Cricket 1
1651 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01623 Dorce 11-Sep-15 ZN2 ELE Electrical works Building ground floor installation of electrical inspection 12-Oct-15 14-Oct-15 10.00am CLOSED 31-Oct-15 19 ACCEPTED 1 1
CLA1
1652 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01624 Dorce 11-Sep-15 ZN2 ELE Electrical works Building first floor installation electrical inspection CLA1 12-Oct-15 14-Oct-15 10.00am CLOSED 31-Oct-15 19 ACCEPTED 1 1
1653 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01625 Dorce 11-Sep-15 ZN2 ELE Electrical works Building Second floor installation of electrical inspection 12-Oct-15 14-Oct-15 10.00am CLOSED 31-Oct-15 19 ACCEPTED 1 1
CLA1
1654 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01626 Dorce 11-Sep-15 ZN2 ELE Electrical works Building third floor installation electrical inspection CLA1 12-Oct-15 14-Oct-15 10.00am CLOSED 31-Oct-15 19 ACCEPTED 1 1
1655 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01627 Dorce 11-Sep-15 ZN2 ELE Electrical works Building ground floor installation of electrical inspection 12-Oct-15 14-Oct-15 10.00am CLOSED 31-Oct-15 19 ACCEPTED 1 1
CLA3
1656 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01628 Dorce 11-Sep-15 ZN2 ELE Electrical works Building first floor installation electrical inspection CLA3 12-Oct-15 14-Oct-15 10.00am CLOSED 31-Oct-15 17 ACCEPTED 1 1
1657 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01629 Dorce 11-Sep-15 ZN2 ELE Electrical works Building Second floor installation of electrical inspection 12-Oct-15 14-Oct-15 10.00am CLOSED 31-Oct-15 17 ACCEPTED 1 1
CLA3
1658 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01630 Dorce 11-Sep-15 ZN2 ELE Electrical works Building third floor installation electrical inspection CLA3 12-Oct-15 14-Oct-15 10.00am CLOSED 31-Oct-15 17 ACCEPTED 1 1
1659 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01631 KFK 14-Sep-15 ZN2 CIV Dranage works Built sump for small drain by brick at all sump location at 15-Oct-15 17-Oct-15 10.00am CLOSED 3-Nov-15 17 ACCEPTED 1 1
Small Package area
1660 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01632 KFK 14-Sep-15 ZN2 CIV Dranage works Inspection rebar and foamwork for cover slab at road 15-Oct-15 17-Oct-15 10.00am CLOSED 3-Nov-15 17 ACCEPTED 1 1
crossing in small package area
KFK 14-Sep-15 ZN2 CIV Drainage Concrete cover slab at crossing in small package area 15-Sep-15 17-Sep-15 3.00pm
1661 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01633
with grade 45 Holcim CLOSED CANCEL 1 1
1662 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01634 Dorce 10-Oct-15 ZN2 ARC Screed works Building screed works installation inspection at Dojo 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
Building ceramix and this works installation inspection at
1663 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01635 Dorce 10-Oct-15 ZN2 ARC Ceramix and tile works 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
Dojo
1666 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01638 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building PVC covering works installation inspection at 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
Barber
1667 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01639 Dorce 10-Oct-15 ZN2 ARC Painting works Building painting works installation inspection at Barber 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
1668 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01640 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building PVC covering works installation inspection at post 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
office
1669 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01641 Dorce 10-Oct-15 ZN2 ARC Painting works Building painting works installation inspection at Post 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
office
1670 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01642 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building PVC covering works installation inspection at 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
Internet Café
1675 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01647 Dorce 10-Oct-15 ZN2 ARC Ceramic and tile works Building first floor ceramic and tile works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
inspection CLA4
1676 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01648 Dorce 10-Oct-15 ZN2 ARC Ceramic and tile works Building second floor ceramic and tile works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
inspection CLA4
1677 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01649 Dorce 10-Oct-15 ZN2 ARC Ceramic and tile works Building third floor ceramic and tile works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
inspection CLA4
1679 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01651 Dorce 10-Oct-15 ZN2 ARC Painting works Building first floor painting works installation inspection at 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
CLA4
1680 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01652 Dorce 10-Oct-15 ZN2 ARC Painting works Building second floor painting works installation inspection 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
at CLA4
1681 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01653 Dorce 10-Oct-15 ZN2 ARC Painting works Building third floor painting works installation inspection 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
at CLA4
1682 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01654 Dorce 10-Oct-15 ZN2 ARC Screed works Building ground floor works installation inspection CLA4 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 ACCEPTED 1 1
1683 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01655 Dorce 10-Oct-15 ZN2 ARC Screed works Building first floor works installation inspection CLA4 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
1684 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01656 Dorce 10-Oct-15 ZN2 ARC Screed works Building second floor works installation inspection CLA4 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
1685 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01657 Dorce 10-Oct-15 ZN2 ARC Screed works Building third floor works installation inspection CLA4 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
1686 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01658 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building ground floor PVC covering works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
inspection CLA4
1687 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01659 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building first floor PVC covering works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
inspection CLA4
1688 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01660 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building second floor PVC covering works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
inspection CLA4
1689 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01661 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building Third floor PVC covering works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
inspection CLA4
1690 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01662 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building ground floor PVC covering works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 8-Jan-16 88 ACCEPTED 1 1
inspection CSA2
1691 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01663 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building first floor PVC covering works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 20-Oct-15 8 ACCEPTED 1 1
inspection CSA2
1692 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01664 Dorce 10-Oct-15 ZN2 ARC PVC Covering works Building second floor PVC covering works installation 12-Oct-15 14-Oct-15 10.00am CLOSED 20-Oct-15 8 ACCEPTED 1 1
inspection CSA2
1697 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01669 Dorce 10-Oct-15 ZN2 ARC membrane application Building third floor water proofing and membrane 12-Oct-15 14-Oct-15 10.00am CLOSED 30-Oct-15 18 REJECTED 1 1
works application inspection CLA4
1698 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01670 Dorce 10-Oct-15 ZN2 ARC membrane application Building ground floor water proofing and membrane 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
works application inspection CMA3
1700 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01672 Dorce 10-Oct-15 ZN2 ARC membrane application Building second floor water proofing and membrane 12-Oct-15 14-Oct-15 10.00am CLOSED 28-Oct-15 16 ACCEPTED 1 1
works application inspection CMA3
1702 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01674 Dorce 11-Sep-15 ZN2 ELE Electrical works Building MDB panel board installation inspection CSA3 14-Sep-15 16-Sep-15 10.00am CLOSED 26-Oct-15 42 ACCEPTED 1 1
1703 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01675 Dorce 11-Sep-15 ZN2 ELE Electrical works Building MDB panel board installation inspection CSA1 14-Sep-15 16-Sep-15 10.00am CLOSED 12-Nov-15 59 ACCEPTED 1 1
1704 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01676 Dorce 10-Oct-15 ZN2 MNE UPVC piping and water Building ground floor UPVC piping installation and water 12-Oct-15 14-Oct-15 10.00am CLOSED 12-Oct-15 0 ACCEPTED 1 1
leakage test leakage and water flow test CLA6
UPVC piping and water Building first floor UPVC piping installation and water
1705 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01677 Dorce 10-Oct-15 ZN2 MNE 12-Oct-15 14-Oct-15 10.00am CLOSED 12-Oct-15 0 ACCEPTED 1 1
leakage test leakage and water flow test CLA6
1706 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01678 Dorce 10-Oct-15 ZN2 MNE UPVC piping and water Building second floor UPVC piping installation and water 12-Oct-15 14-Oct-15 10.00am CLOSED 12-Oct-15 0 ACCEPTED 1 1
leakage test leakage and water flow test CLA6
UPVC piping and water Building third floor UPVC piping installation and water
1707 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01679 Dorce 10-Oct-15 ZN2 MNE 12-Oct-15 14-Oct-15 10.00am CLOSED 12-Oct-15 0 ACCEPTED 1 1
leakage test leakage and water flow test CLA6
1710 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01682 Dorce 22-Jul-15 ZN2 ARC Assembling works Building chassis assembly installation inspection guard 23-Jul-15 25-Jul-15 3.00pm CLOSED 17-Sep-15 56 ACCEPTED 1 1
house
Water flow and Building ground floor UPVC pipes installation and
1712 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01684 Dorce 15-Oct-15 ZN2 MNE leakage test UPVC 16-Oct-15 18-Oct-15 10.00am CLOSED 16-Oct-15 0 ACCEPTED 1 1
water flow and leakage test inspection CSA2
pipe installation
Water flow and Building Second floor UPVC pipes installation and
1714 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01686 Dorce 15-Oct-15 ZN2 MNE leakage test UPVC 16-Oct-15 18-Oct-15 10.00am CLOSED 16-Oct-15 0 ACCEPTED 1 1
water flow and leakage test inspection CSA2
pipe installation
1716 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01688 Dorce 8-Oct-15 ZN2 MNE TNC Testing of water heater at SA3 9-Oct-15 11-Oct-15 2.30pm CLOSED 26-Oct-15 17 ACCEPTED 1 1
1717 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01689 Dorce 9-Oct-15 ZN2 MNE TNC Testing of water heater at SA1 11-Oct-15 13-Oct-15 11.00am CLOSED 26-Oct-15 15 ACCEPTED 1 1
1718 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01690 Dorce 13-Oct-15 ZN2 MNE TNC Testing of water heater at Café 14-Oct-15 16-Oct-15 9.00am CLOSED 23-Oct-15 9 ACCEPTED 1 1
1719 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01691 Dorce 13-Oct-15 ZN2 MNE installation Installation of water heater at Guard House 14-Oct-15 16-Oct-15 2.30pm CLOSED 24-Oct-15 10 ACCEPTED 1 1
1720 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01692 Dorce 13-Oct-15 ZN2 MNE TNC Testing of water heater at Guard House 14-Oct-15 16-Oct-15 3.00pm CLOSED 31-Oct-15 17 ACCEPTED 1 1
RAPID-P20A1-UEMB-ZN2-CIV-RFIN- PPEC 16-Oct-15 ZN2 CIV Inspection for application of prime coat for small 17-Oct-15 19-Oct-15 10.00am 17-Oct-15
1724 Road work CLOSED 0 ACCEPTED 1 1
01696 package area
1725 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01697 PPEC 16-Oct-15 ZN2 CIV Road works Inspection for laying of ACBC 28 at Small package area 17-Oct-15 19-Oct-15 10.00am CLOSED 02-Nov-15 16 ACCEPTED 1 1
1726 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01698 UEMB AMIN 15-Oct-15 ZN2 CIV Road works Preparation works of Subgrade near LA6,LA5 & CR2 at 16-Oct-15 18-Oct-15 9.00am CLOSED 03-Nov-15 18 ACCEPTED 1 1
Small package for 6m Road. Joint dipping
1728 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01700 UEMB AMIN 16-Oct-15 ZN2 CIV Road works Preparation works of Road base near LA6,LA5 & CR2 at 17-Oct-15 19-Oct-15 3.00pm CLOSED 03-Nov-15 17 ACCEPTED 1 1
Small package for 6m Road. Joint dipping
1729 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01701 Khidmat Hijau 17-Oct-15 ZN2 PIP Sewerage Flow test for sewerage line at small package area 17-Oct-15 19-Oct-15 3.00pm CLOSED 01-Dec-15 45 ACCEPTED 1 1
1732 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01703 UEMB SYAHIR 19-Oct-15 ZN2 CIV Concreting walkway Install rebar and formwork for concrete walkway. 20-Oct-15 22-Oct-15 11.00am CLOSED 02-Nov-15 13 ACCEPTED 1 1
Concrete work for walkway at mess hall and Dojo area
1733 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01704 Shinryo 30-Sep-15 ZN2 CIV TNC Testing water heater at MA1 5-Oct-15 7-Oct-15 10.00am CLOSED 04-Nov-15 30 ACCEPTED 1 1
1734 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01705 Shinryo 30-Sep-15 ZN2 CIV TNC Testing water heater at MA2 5-Oct-15 7-Oct-15 2.30pm CLOSED 04-Nov-15 30 ACCEPTED 1 1
1736 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01707 AEIE 19-Oct-15 ZN2 ELE Cable installation Inspection installation Sub Main Cable (1 x 4c 25mm 20-Oct-15 22-Oct-15 2.30pm CLOSED 08-Dec-15 49 ACCEPTED 1 1
XLPE/SWA/PVC) from main fedeer pillar FP-C6 to Café
1737 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01708 AEIE 19-Oct-15 ZN2 ELE Cable installation Inspection installation Sub Main Cable (1 x 4c 35mm 20-Oct-15 22-Oct-15 2.30pm CLOSED 08-Dec-15 49 ACCEPTED 1 1
XLPE/SWA/PVC) from main fedeer pillar FP-C6 to Barber
1738 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01709 AEIE 19-Oct-15 ZN2 ELE Cable installation Inspection installation Sub Main Cable (1 x 4c 240mm 20-Oct-15 22-Oct-15 2.30pm CLOSED 08-Dec-15 49 ACCEPTED 1 1
XLPE/SWA/PVC) from main fedeer pillar FP-C6 to SA3
1739 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01710 AEIE 19-Oct-15 ZN2 ELE Cable installation Inspection installation Sub Main Cable (1 x 4c 70mm 20-Oct-15 22-Oct-15 2.30pm CLOSED 08-Dec-15 49 ACCEPTED 1 1
XLPE/SWA/PVC) from main fedeer pillar FP-C6 to LA3
1740 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01711 AEIE 19-Oct-15 ZN2 ELE Cable installation Inspection installation Sub Main Cable (1 x 4c 70mm 20-Oct-15 22-Oct-15 2.30pm CLOSED 08-Dec-15 49 ACCEPTED 1 1
XLPE/SWA/PVC) from main fedeer pillar FP-C6 to LA5
1741 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01712 AEIE 19-Oct-15 ZN2 ELE Cable installation Inspection installation Sub Main Cable (1 x 4c 25mm 20-Oct-15 22-Oct-15 2.30pm CLOSED 08-Dec-15 49 ACCEPTED 1 1
XLPE/SWA/PVC) from main fedeer pillar FP-C6 to SA4
1742 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01713 AEIE 19-Oct-15 ZN2 ELE Cable installation Inspection installation Sub Main Cable (1 x 4c 70mm 20-Oct-15 22-Oct-15 2.30pm CLOSED 08-Dec-15 49 ACCEPTED 1 1
XLPE/SWA/PVC) from main fedeer pillar FP-C6 to LA6
PPEC 22-Oct-15 ZN2 CIV Inspection for Application of prime coat at Small 23-Oct-15 25-Oct-15 8.00am 23-Oct-15
1744 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01715 Road work package area CLOSED 0 CANCEL 1 1
1745 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01716 PPEC 22-Oct-15 ZN2 CIV Road works Inspection for laying of ACBC 28 at Small package area 23-Oct-15 25-Oct-15 5.00pm CLOSED 02-Nov-15 10 ACCEPTED 1 1
1749 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01720 Khidmat Hijau 24-Oct-15 ZN2 PIP welding inspection for verify welding joint number for potable 23-Oct-15 25-Oct-15 10.00am CLOSED 30-Oct-15 7 ACCEPTED 1 1
water pipe at small packages area
1751 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01722 UEMB Shahir 26-Oct-15 ZN2 CIV CONCRETE WALKWAY 1)install BRC and formwork for concrete walkway 2) 26-Oct-15 28-Oct-15 2.00pm CLOSED 02-Nov-15 7 ACCEPTED 1 1
concrete work for concrete walkway
1753 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01724 UEMB AMIN 29-Sep-15 ZN2 CIV testing FDT test for roadbase 3-Oct-15 5-Oct-15 3.00pm CLOSED 25-Oct-15 22 REJECTED 1 1
1754 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01725 UEMB AMIN 29-Sep-15 ZN2 CIV testing FDT test for subbase 3-Oct-15 5-Oct-15 3.00pm CLOSED 25-Oct-15 22 REJECTED 1 1
1755 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01726 Dorce 26-Oct-15 ZN2 STR Assembling works Building ground floor wall panel and column installation 27-Oct-15 29-Oct-15 10.00am CLOSED 30-Oct-15 1 ACCEPTED 1 1
CSA3
1756 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01727 Dorce 26-Oct-15 ZN2 STR Assembling works Building Chassis to stump connection at Café 27-Oct-15 29-Oct-15 10.00am CLOSED 30-Oct-15 1 ACCEPTED 1 1
1757 RAPID-P20A1-UEMB-ZN2-STR-RFIN-01728 Dorce 26-Oct-15 ZN2 STR Assembling works Building Chassis to stump connection at Guard House 2 27-Oct-15 29-Oct-15 10.00am CLOSED 30-Oct-15 1 ACCEPTED 1 1
1758 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01729 PPEC 26-Oct-15 ZN2 CIV Road works Inspection for Application of prime coat at Small package 27-Oct-15 29-Oct-15 9.00am CLOSED 1-Feb-16 97 ACCEPTED 1 1
area- Mess hall parking area
1759 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01730 PPEC 26-Oct-15 ZN2 CIV Road works Inspection for laying of ACBC 28 at Small package area 27-Oct-15 29-Oct-15 2.00pm CLOSED 02-Nov-15 6 ACCEPTED 1 1
Mess hall Parking area
1760 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01731 Dorce 11-Sep-15 ZN2 MNE Electrical works Building installation of electrical works inspection at Dojo 12-Sep-15 14-Sep-15 10.00am CLOSED 12-Nov-15 61 ACCEPTED 1 1
1762 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01733 Dorce 23-Oct-15 ZN2 ELE Migger test Building cable insullation installation inspection at Dojo 26-Oct-15 28-Oct-15 9.00am CLOSED 12-Nov-15 17 ACCEPTED 1 1
1763 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01734 Dorce 23-Oct-15 ZN2 ELE Migger test Building cable insullation installation inspection at Barber 26-Oct-15 28-Oct-15 10.00am CLOSED 12-Nov-15 17 ACCEPTED 1 1
1766 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01737 Dorce 23-Oct-15 ZN2 ELE Migger test Building cable insullation installation inspection at 26-Oct-15 28-Oct-15 2.30pm CLOSED 12-Nov-15 17 ACCEPTED 1 1
Gymnasium
1767 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01738 Dorce 23-Oct-15 ZN2 ELE Migger test Building cable insullation installation inspection at Grocery 26-Oct-15 28-Oct-15 2.30pm CLOSED 12-Nov-15 17 ACCEPTED 1 1
1768 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01739 Dorce 23-Oct-15 ZN2 ELE Migger test Building cable insullation installation inspection at Club 26-Oct-15 28-Oct-15 3.oopm CLOSED 12-Nov-15 17 ACCEPTED 1 1
House
1769 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01740 Dorce 23-Oct-15 ZN2 ELE Migger test Building cable insullation installation inspection at 26-Oct-15 28-Oct-15 3.30pm CLOSED 12-Nov-15 17 ACCEPTED 1 1
Mantenance workshop
1770 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01741 AEIE 25-Oct-15 ZN2 ELE Electrical Testing Feeder pillar cable 1R test from HP10,SSSP/1 to FP-C6 26-Oct-15 28-Oct-15 9.30am CLOSED 11-Dec-15 46 ACCEPTED 1 1
1771 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01742 AEIE 25-Oct-15 ZN2 ELE Electrical Testing Feeder pillar cable 1R test from LP10,SSSP/3 to FP-C7 26-Oct-15 28-Oct-15 9.00am CLOSED 30-Nov-15 35 ACCEPTED 1 1
1772 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01743 Khidmat Hijau 27-Oct-15 ZN2 PIP Sewerage Inspection of pressure test & leak Test for Sewerage 27-Oct-15 29-Oct-15 9.00am CLOSED 19-Dec-15 53 ACCEPTED 1 1
pressure pipe at RP 1
1773 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01744 Khidmat Hijau 27-Oct-15 ZN2 PIP Sewerage Inspection of pressure test & leak Test for Sewerage 27-Oct-15 29-Oct-15 9.00am CLOSED 24-Nov-15 28 ACCEPTED 1 1
pressure pipe at RP 1A
1774 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01745 Seribu Bio 27-Oct-15 ZN2 CIV material Receiving material inspection for rootzone admix 28-Oct-15 30-Oct-15 10.00am CLOSED 05-Nov-15 8 ACCEPTED 1 1
(Cocopeat) at Small Package area (FF2 and FF1)
1775 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01746 Seribu Bio 27-Oct-15 ZN2 CIV material Receiving material inspection for grass (Natural turfed) at 28-Oct-15 30-Oct-15 2.00pm CLOSED 05-Nov-15 8 ACCEPTED 1 1
small package (FF1 and FF2 and mock-up
Dorce 3-Oct-15 ZN2 MNE Hydro test Building First floor PPRC piping installation and 3-Oct-15 5-Oct-15 9.00am 3-Oct-15
1777 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01748
hydrotest CSA2 CLOSED 0 ACCEPTED 1 1
Dorce 3-Oct-15 ZN2 MNE Hydro test Building second floor PPRC piping installation and 3-Oct-15 5-Oct-15 9.00am 3-Oct-15
1778 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01749
hydrotest CSA2 CLOSED 0 ACCEPTED 1 1
1779 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01750 Dorce 3-Oct-15 ZN2 MNE Hydro test Building third floor PPRC piping installation and 3-Oct-15 5-Oct-15 9.00am CLOSED 3-Oct-15 0 ACCEPTED 1 1
hydrotest CSA2
1780 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01751 UEMB Syahir 28-Oct-15 ZN2 CIV Road works Installation of BRC and formwork for concreting walkway 29-Oct-15 31-Oct-15 11.00am CLOSED 02-Nov-15 4 ACCEPTED 1 1
at Glocery,LA5,SA2 and MA1
1781 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01752 Dorce 28-Oct-15 ZN2 ARC Screed works Building screed works install inspection at Club House 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
1783 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01754 Dorce 28-Oct-15 ZN2 ARC Screed works Building first floor screed works installation inspection at 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
CLA5
1784 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01755 Dorce 28-Oct-15 ZN2 ARC Screed works Building second floor screed works installation inspection 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
at CLA5
1787 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01758 Dorce 28-Oct-15 ZN2 ARC membrane application Building ground floor water proofing membrane 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
works application inspection LA5
1788 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01759 Dorce 28-Oct-15 ZN2 ARC membrane application Building first floor water proofing membrane application 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
works inspection LA5
1789 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01760 Dorce 28-Oct-15 ZN2 ARC membrane application Building Second floor water proofing membrane 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
works application inspection LA5
1790 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01761 Dorce 28-Oct-15 ZN2 ARC membrane application Building third floor water proofing membrane application 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
works inspection LA5
1792 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01763 Dorce 28-Oct-15 ZN2 ARC Ceramic and tile works Building first floor ceramic tile works installation 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
inspection (CLA5)
1793 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01764 Dorce 28-Oct-15 ZN2 ARC Ceramic and tile works Building second floor ceramic tile works installation 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
inspection (CLA5)
1794 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01765 Dorce 28-Oct-15 ZN2 ARC Ceramic and tile works Building third floor ceramic tile works installation 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
inspection (CLA5)
1795 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01766 Dorce 28-Oct-15 ZN2 ARC membrane application Building water proofing membrane application inspection 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
works Office for catering
1798 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01769 Dorce 28-Oct-15 ZN2 ARC Ceramic and tile works Building ceramic tile works installation inspection Club 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
House
1799 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01770 Dorce 28-Oct-15 ZN2 ARC Ceramic and tile works Building ceramic tile works installation inspection Laundry 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
1800 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01771 Dorce 28-Oct-15 ZN2 ARC PVC Floor Covering Building PVC floor covering works inspection at Laundry 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
works
1801 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01772 Dorce 28-Oct-15 ZN2 ARC PVC Floor Covering Building PVC floor covering works inspection at 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
works Gymnasium
PVC Floor Covering Building PVC floor covering works inspection at Office for
1802 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01773 Dorce 28-Oct-15 ZN2 ARC 29-Oct-15 31-Oct-15 11.00am CLOSED 31-Oct-15 0 ACCEPTED 1 1
works Catering
1803 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01774 ISDA 26-Oct-15 ZN2 ELE SMATV Inspection of installation SMATV and ICT at SA4 27-Oct-15 29-Oct-15 3.00pm CLOSED 8-Dec-15 42 ACCEPTED 1 1
1804 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01775 ISDA 26-Oct-15 ZN2 ELE SMATV Inspection of installation SMATV and ICT at SA2 27-Oct-15 29-Oct-15 3.00pm CLOSED 20-Nov-15 24 ACCEPTED 1 1
1805 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01776 Dorce 10-Oct-15 ZN2 MNE UPVC piping Building UPVC piping installation and water leakage and 12-Oct-15 14-Oct-15 3.00pm CLOSED 12-Oct-15 -2 ACCEPTED 1 1
water flow test Barber
1806 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01777 Dorce 8-Oct-15 ZN2 MNE UPVC piping Building UPVC piping installation inspection and flow rate 12-Oct-15 14-Oct-15 3.00pm CLOSED 19-Oct-15 5 ACCEPTED 1 1
and leakage test at Club House
1808 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01779 Dorce 10-Oct-15 ZN2 ELE Electrical works Building cable pulling installation inspection at Post office 12-Oct-15 14-Oct-15 3.00pm CLOSED 10-Dec-15 57 ACCEPTED 1 1
1809 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01780 Dorce 10-Oct-15 ZN2 ELE Electrical works Building cable pulling installation inspection at Club House 12-Oct-15 14-Oct-15 3.00pm CLOSED 17-Nov-15 34 ACCEPTED 1 1
1810 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01781 UEMB SADDAM 27-Oct-15 ZN2 ARC Furniture Architecture/ID area furniture supply in the building CSA3 28-Oct-15 30-Oct-15 2.00pm CLOSED 30-Oct-15 2 ACCEPTED 1 1
1811 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01782 UEMB SADDAM 27-Oct-15 ZN2 ARC Furniture Architecture/ID area furniture supply in the building CSA1 28-Oct-15 30-Oct-15 2.00pm CLOSED 30-Oct-15 2 ACCEPTED 1 1
1812 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01783 UEMB SADDAM 27-Oct-15 ZN2 ARC Furniture Architecture/ID area furniture supply in the building CLA3 28-Oct-15 30-Oct-15 2.00pm CLOSED 30-Oct-15 2 ACCEPTED 1 1
1813 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01784 UEMB SADDAM 27-Oct-15 ZN2 ARC Furniture Architecture/ID area furniture supply in the building Café 28-Oct-15 30-Oct-15 2.00pm CLOSED 30-Oct-15 2 ACCEPTED 1 1
1814 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01785 UEMB SADDAM 27-Oct-15 ZN2 ARC Furniture Architecture/ID area furniture supply in the building AGH1 28-Oct-15 30-Oct-15 2.00pm CLOSED 30-Oct-15 2 ACCEPTED 1 1
1815 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01786 Khidmat Hijau 29-Oct-15 ZN2 PIP Sewerage Excavation and laying 50mm poly pipe and gate valve c/w 30-Oct-15 1-Nov-15 10.00am CLOSED 25-Nov-15 26 ACCEPTED 1 1
fittings for fire water at small package area
1816 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01787 Khidmat Hijau 29-Oct-15 ZN2 PIP Sewerage Excavation and laying 100mm & 50mm poly pipe and gate 30-Oct-15 1-Nov-15 10.00am CLOSED 25-Nov-15 26 ACCEPTED 1 1
valve c/w fittings for fire water at small package area
1817 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01788 Dorce 28-Oct-15 ZN2 ARC Painting works Painting works inspection internal wall at Café 29-Oct-15 31-Oct-15 10.00am CLOSED 02-Nov-15 4 ACCEPTED 1 1
1818 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01789 Dorce 28-Oct-15 ZN2 ARC Tile installation Building ground floor tiles installation inspection CLA3 29-Oct-15 31-Oct-15 10.00am CLOSED 02-Nov-15 4 ACCEPTED 1 1
1819 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01790 Dorce 28-Oct-15 ZN2 ARC Tile installation Building first floor tiles installation inspection CLA3 29-Oct-15 31-Oct-15 10.00am CLOSED 06-Nov-15 8 ACCEPTED 1 1
1820 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01791 Dorce 28-Oct-15 ZN2 ARC Tile installation Building second floor tiles installation inspection CLA3 29-Oct-15 31-Oct-15 10.00am CLOSED 02-Nov-15 4 ACCEPTED 1 1
1821 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01792 Dorce 28-Oct-15 ZN2 ARC Tile installation Building third floor tiles installation inspection CLA3 29-Oct-15 31-Oct-15 10.00am CLOSED 02-Nov-15 4 ACCEPTED 1 1
1822 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01793 Seribu Bio 30-Oct-15 ZN2 CIV Turfing works Turfing cow grass at FF2 at small package area 31-Oct-15 2-Nov-15 3.00pm CLOSED 04-Nov-15 4 ACCEPTED 1 1
1824 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01795 Seribu Bio 30-Oct-15 ZN2 CIV laying sand Lay of fire sand bedding of 50mm at small package 31-Oct-15 2-Nov-15 3.00pm CLOSED 04-Nov-15 4 ACCEPTED 1 1
1825 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01796 Seribu Bio 30-Oct-15 ZN2 CIV rootzone Fire grading of sand FF2 31-Oct-15 2-Nov-15 3.00pm CLOSED 04-Nov-15 4 ACCEPTED 1 1
1826 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01797 UEMB Faliq 29-Oct-15 ZN2 ELE TNC Functionality test for LA3- Ground Floor 30-Oct-15 1-Nov-15 9.00am CLOSED 02-Nov-15 3 ACCEPTED 1 1
1827 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01798 UEMB Faliq 29-Oct-15 ZN2 ELE TNC Functionality test for LA3- first Floor 30-Oct-15 1-Nov-15 9.00am CLOSED 2-Nov-15 3 ACCEPTED 1 1
1828 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01799 UEMB Faliq 29-Oct-15 ZN2 ELE TNC Functionality test for LA3- second Floor 30-Oct-15 1-Nov-15 9.00am CLOSED 02-Nov-15 3 ACCEPTED 1 1
1829 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01800 UEMB Faliq 29-Oct-15 ZN2 ELE TNC Functionality test for LA3- third Floor 30-Oct-15 1-Nov-15 9.00am CLOSED 02-Nov-15 3 ACCEPTED 1 1
1830 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01801 UEMB Faliq 29-Oct-15 ZN2 ELE TNC Functionality test for LA1- Ground Floor 30-Oct-15 1-Nov-15 9.00am CLOSED 03-Nov-15 4 ACCEPTED 1 1
1831 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01802 UEMB Faliq 29-Oct-15 ZN2 ELE TNC Functionality test for LA1- first Floor 30-Oct-15 1-Nov-15 9.00am CLOSED 04-Nov-15 5 ACCEPTED 1 1
1832 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01803 UEMB Faliq 29-Oct-15 ZN2 ELE TNC Functionality test for LA1- second Floor 30-Oct-15 1-Nov-15 9.00am CLOSED 04-Nov-15 5 ACCEPTED 1 1
1833 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01804 UEMB Faliq 29-Oct-15 ZN2 ELE TNC Functionality test for LA1- third Floor 30-Oct-15 1-Nov-15 9.00am CLOSED 03-Nov-15 4 ACCEPTED 1 1
Hasbullah Supply free and shrub for club house, grocery and main
1834 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-01805 30-Oct-15 ZN2 LNDS material 31-Oct-15 2-Nov-15 4.00pm CLOSED 31-Oct-15 0 ACCEPTED 1 1
( Landscape road
1835 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01806 AEIE 28-Oct-15 ZN2 ELE Testing Inspection for testing and commisioning at FP-C6 29-Oct-15 31-Oct-15 9.00am CLOSED 21-Jan-16 84 REJECTED 1 1
Underground submain cable from FP-C6 to LA1 4C x
1836 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01807 AEIE 28-Oct-15 ZN2 ELE Underground cable 70mm XLPE/ SWA/ PVC 29-Oct-15 31-Oct-15 9.00am CLOSED 8-Dec-15 40 ACCEPTED 1 1
1839 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01810 AEIE 28-Oct-15 ZN2 ELE Underground cable Underground submain cable from FP-C6 to SA1 4C x 29-Oct-15 31-Oct-15 9.00am CLOSED 08-Dec-15 40 ACCEPTED 1 1
70mm XLPE/ SWA/ PVC
1840 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01811 AEIE 28-Oct-15 ZN2 ELE Underground cable Underground submain cable from FP-C6 to SA2 4C x 29-Oct-15 31-Oct-15 9.00am CLOSED 08-Dec-15 40 ACCEPTED 1 1
70mm XLPE/ SWA/ PVC
1841 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01812 AEIE 28-Oct-15 ZN2 ELE Underground cable Underground submain cable laying 4Cx16mm 29-Oct-15 31-Oct-15 9.00am CLOSED 8-Dec-15 40 ACCEPTED 1 1
XLPE/SWA/PVC from FP-^ to FP HM4
AEIE 28-Oct-15 ZN2 ELE IR test Insulation resisytance test for outgoing submain cable 29-Oct-15 31-Oct-15 9.00am 5-Dec-15
1842 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01813
from feeder pillar FP C7 CLOSED 37 ACCEPTED 1 1
1843 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01814 AEIE 28-Oct-15 ZN2 ELE Earthing test Earthing test for feeder pillar FP-C7 29-Oct-15 31-Oct-15 9.00am CLOSED 13-Jan-16 76 REJECTED 1 1
1844 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01815 AEIE 28-Oct-15 ZN2 ELE Earthing Installation Earthing Installation for feeder pillar FP-C7 29-Oct-15 31-Oct-15 9.00am CLOSED 10-Dec-15 42 ACCEPTED 1 1
1847 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01818 AEIE 28-Oct-15 ZN2 ELE Underground cable Cable laying from feeder pillar FP-7 to Post office 4C 29-Oct-15 31-Oct-15 9.00am CLOSED 03-Nov-15 5 ACCEPTED 1 1
16MM XLPE/SWA/P-VC 138M
1848 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01819 AEIE 28-Oct-15 ZN2 ELE Underground cable Submain Cable laying from feeder pillar FP-C7 to Club 29-Oct-15 31-Oct-15 9.00am CLOSED 03-Nov-15 5 ACCEPTED 1 1
House Cable 4C x 25mm X XLPE/SWA/PVC (117M)
1849 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01820 AEIE 28-Oct-15 ZN2 ELE testing Inspection for testing and commisioning at FP-C7 29-Oct-15 31-Oct-15 9.00am CLOSED 21-Jan-16 84 REJECTED 1 1
1850 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01821 AEIE 31-Oct-15 ZN2 ELE testing Earthing test distribution board for café 31-Oct-15 2-Nov-15 3.00pm CLOSED 31-Oct-15 0 ACCEPTED 1 1
1852 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01823 AEIE 31-Oct-15 ZN2 ELE testing Inspection earthing test for Distribution Board at SA1 and 31-Oct-15 2-Nov-15 3.00pm CLOSED 31-Oct-15 0 ACCEPTED 1 1
SA3
1853 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01824 AEIE 31-Oct-15 ZN2 ELE testing Inspection earthing test for Distribution Boad at MA1 and 31-Oct-15 2-Nov-15 3.00pm CLOSED 31-Oct-15 0 ACCEPTED 1 1
MA2
1854 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01825 AEIE 31-Oct-15 ZN2 ELE testing Earthing test Distribution board for Guard House 1 31-Oct-15 2-Nov-15 3.00pm CLOSED 31-Oct-15 0 ACCEPTED 1 1
1855 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01826 AEIE 1-Nov-15 ZN2 ELE Feeder pillar Installation of feeder pillar FP-C6 Cable termination and 2-Nov-15 4-Nov-15 9.00pm CLOSED 8-Dec-15 36 ACCEPTED 1 1
dressing
1856 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01827 AEIE 1-Nov-15 ZN2 ELE Earthing Installation Earthing installation for feeder pillar FP-C6 2-Nov-15 4-Nov-15 9.00pm CLOSED 8-Dec-15 36 ACCEPTED 1 1
AEIE 1-Nov-15 ZN2 ELE IR test Insulation resisytance test for outgoing submain cable 2-Nov-15 4-Nov-15 9.00pm 11-Dec-15
1857 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01828
from feeder pillar FP C6 CLOSED 39 ACCEPTED 1 1
AEIE 1-Nov-15 ZN2 ELE IR test Insullation resistance test for submain cable from 2-Nov-15 4-Nov-15 9.00pm 5-Dec-15
1858 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01829
LP10 SSSp/1 to FRC6 CLOSED 33 ACCEPTED 1 1
1859 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01830 AEIE 1-Nov-15 ZN2 ELE Testing Earth resistance test for feeder pillar FP-C6 2-Nov-15 4-Nov-15 9.00pm CLOSED 8-Dec-15 36 ACCEPTED 1 1
PPEC 1-Nov-15 ZN2 CIV Screeding works Inspection for formwork & Roughing works for 2-Nov-15 4-Nov-15 9.00pm
1860 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01831
screeding works at mess hall outside delivery area CLOSED CANCEL 1 1
Laying of root zone admix and mixing with fine fraded fine
1862 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01833 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area 1-Nov-15 3-Nov-15 3.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
sand
1864 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01835 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area Laying and installing poly pipe for irrigation at FF-1 ( Small 1-Nov-15 3-Nov-15 3.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
Package) 63mm and 50mm(sprinkler pipe)
1865 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01836 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area Laying of coanse sand at thickness of 50mm at FF-1 (small 1-Nov-15 3-Nov-15 3.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
Package)
1868 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01839 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area Laying of fine sand at a Thickness of 50mm and fine 1-Nov-15 3-Nov-15 3.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
grading at mini cricket ( Small Package)
1869 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01840 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area Spraeding of roat zone at mini cricket 1 ( Small Package 1-Nov-15 3-Nov-15 3.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
and fine grading
1872 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01843 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area Laying of rine sand thickness of 50mm at mini cricket 2 1-Nov-15 3-Nov-15 1.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
( Small Package)
1873 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01844 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area Laying of 90mm pipe at a total lenth of 30m at mini criket 1-Nov-15 3-Nov-15 1.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
2 ( Small package)-for water supply
Fine grading of fine sand , root zone and mixing with fine
1874 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01845 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area 1-Nov-15 3-Nov-15 1.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
sand
Fine grading the mix of root zone admix and fine sand
1875 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01846 Seribu Bio 31-Oct-15 ZN2 CIV Infra building area laying of machine cut plastic base, pure cow gas 1-Nov-15 3-Nov-15 1.00pm CLOSED 04-Nov-15 3 ACCEPTED 1 1
( Axonopus compress) of MC-2 ( Small Package
1876 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01847 UEMB SYahir 2-Nov-15 ZN2 CIV Road works Concreting works for concreting walkway at GM1,CM1 and 2-Nov-15 4-Nov-15 2.00pm CLOSED 19-Nov-15 17 ACCEPTED 1 1
LA5
1877 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01848 AEIE 2-Nov-15 ZN2 ELE Earthing test Building earthing test for lightning protection system SA1 2-Nov-15 4-Nov-15 3.30pm CLOSED 25-Nov-15 23 ACCEPTED 1 1
1878 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01849 AEIE 2-Nov-15 ZN2 ELE Earthing Installation Building earthing installation
system SA2
for lightning protection 2-Nov-15 4-Nov-15 3.30pm CLOSED CANCEL 1 1
1879 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01850 AEIE 2-Nov-15 ZN2 ELE Earthing Installation Building earthing installation for lightning protection 2-Nov-15 4-Nov-15 3.30pm CLOSED CANCEL 1 1
system LA1
1880 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01851 AEIE 2-Nov-15 ZN2 ELE Earthing Installation Building earthing installation for lightning protection 2-Nov-15 4-Nov-15 3.30pm CLOSED CANCEL 1 1
system LA3
1882 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01853 AEIE 2-Nov-15 ZN2 ELE Earthing Installation Building earthing installation
system MA2
for lightning protection 2-Nov-15 4-Nov-15 3.30pm CLOSED CANCEL 1 1
1883 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01854 AEIE 2-Nov-15 ZN2 ELE Earthing Installation Building earthing installation for lightning protection 2-Nov-15 4-Nov-15 3.30pm CLOSED CANCEL 1 1
system Guard house
1884 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01855 DORCE 10-Oct-15 ZN2 ELE Cable pulling building cable pulling installation inspection Internet Café 12-Oct-15 14-Oct-15 9.30am CLOSED 04-Nov-15 23 ACCEPTED 1 1
panel board
1885 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01856 DORCE 10-Oct-15 ZN2 ELE installation Buildingelectrical panel board installation Internet Café 12-Oct-15 14-Oct-15 3.30pm CLOSED 04-Nov-15 23 ACCEPTED 1 1
DORCE 6-Nov-15 ZN2 ELE panel board Building electrical panel board installation inspection 6-Nov-15 8-Nov-15 3.30pm
1887 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01858
installation CLOSED CANCEL 1 1
1888 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01859 DORCE 10-Oct-15 ZN2 ELE panel board Building electrical panel board installation inspection 12-Oct-15 14-Oct-15 3.30pm CLOSED 04-Nov-15 23 ACCEPTED 1 1
installation Barber
1889 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01860 DORCE 10-Oct-15 ZN2 ELE cable pulling building cable pulling installation inspection Barber 12-Oct-15 14-Oct-15 3.30pm CLOSED 04-Nov-15 23 ACCEPTED 1 1
1890 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01861 DORCE 12-Sep-15 ZN2 ELE cable pulling building cable pulling installation inspection Dojo 12-Sep-15 14-Sep-15 3.30pm CLOSED 04-Nov-15 53 ACCEPTED 1 1
1891 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-01862 Hasbullah 3-Nov-15 ZN2 LNDS Planting Site preparation and planting works area 1 at Small 4-Nov-15 6-Nov-15 2.30pm CLOSED 1-Dec-15 27 ACCEPTED 1 1
( Landscape package
1892 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-01863 Hasbullah 3-Nov-15 ZN2 LNDS Planting Site preparation and planting works area 2 at Small 4-Nov-15 6-Nov-15 2.30pm CLOSED 13-Nov-15 9 ACCEPTED 1 1
( Landscape package
1895 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-01866 Hasbullah 3-Nov-15 ZN2 LNDS Planting Site preparation and planting works area for parimeter / 4-Nov-15 6-Nov-15 2.30pm CLOSED 19-Nov-15 15 ACCEPTED 1 1
( Landscape slope at Small package
1896 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01867 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation ACSU for Guard House 2 4-Nov-15 6-Nov-15 2.30pm CLOSED CANCEL 1 1
1898 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01869 ISDA 23-Oct-15 ZN2 ELE Electrical works Inspection of installation ICT at Barber 3-Nov-15 5-Nov-15 10.00am CLOSED 14-Nov-15 11 ACCEPTED 1 1
1899 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01870 ISDA 23-Oct-15 ZN2 ELE Electrical works Inspection of installation ICT at Laundry 3-Nov-15 5-Nov-15 10.00am CLOSED 14-Nov-15 11 ACCEPTED 1 1
1900 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01871 ISDA 23-Oct-15 ZN2 ELE Electrical works Inspection of installation ICT at Maintenance workshop 3-Nov-15 5-Nov-15 10.00am CLOSED 14-Nov-15 11 ACCEPTED 1 1
1901 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01872 ISDA 23-Oct-15 ZN2 ELE Electrical works Inspection of installation ICT at Dojo Building 3-Nov-15 5-Nov-15 10.00am CLOSED 14-Nov-15 11 ACCEPTED 1 1
1902 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01873 Dorce 23-Oct-15 ZN2 ELE Insulation test Building ground floor cable insulation inspection at MA 3 2-Nov-15 4-Nov-15 10.00am CLOSED 20-Nov-15 18 ACCEPTED 1 1
1903 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01874 Dorce 23-Oct-15 ZN2 ELE Insulation test Building first floor cable insulation inspection at MA 3 2-Nov-15 4-Nov-15 10.00am CLOSED 20-Nov-15 18 ACCEPTED 1 1
1904 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01875 Dorce 23-Oct-15 ZN2 ELE Insulation test Building second floor cable insulation inspection at MA 3 2-Nov-15 4-Nov-15 10.00am CLOSED 20-Nov-15 18 ACCEPTED 1 1
1905 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01876 Dorce 23-Oct-15 ZN2 ELE Insulation test Building third floor cable insulation inspection at MA 3 2-Nov-15 4-Nov-15 10.00am CLOSED 20-Nov-15 18 ACCEPTED 1 1
1908 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01879 I-GEN 13-Oct-15 ZN2 MNE Fire protection To inspect fire protection installation at Café 13-Oct-15 15-Oct-15 2.00pm CLOSED 04-Nov-15 22 ACCEPTED 1 1
1909 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01880 I-GEN 13-Oct-15 ZN2 MNE Fire protection To inspect fire protection installation at Guard House 13-Oct-15 15-Oct-15 2.00pm CLOSED 04-Nov-15 22 ACCEPTED 1 1
1910 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01881 ISDA 26-Oct-15 ZN2 ELE ICT Works Inspection of installation ICT at Mess Hall 27-Oct-15 29-Oct-15 10.00am CLOSED 14-Nov-15 18 ACCEPTED 1 1
1911 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01882 ISDA 26-Oct-15 ZN2 ELE ICT Works Inspection of installation ICT at Office for Catering 27-Oct-15 29-Oct-15 10.00am CLOSED 13-Nov-15 17 ACCEPTED 1 1
1912 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01883 ISDA 26-Oct-15 ZN2 ELE ICT Works Inspection of installation ICT at Gymnasium 27-Oct-15 29-Oct-15 10.00am CLOSED 17-Nov-15 21 ACCEPTED 1 1
1913 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01884 ISDA 26-Oct-15 ZN2 ELE ICT Works Inspection of installation ICT at Club House 27-Oct-15 29-Oct-15 10.00am CLOSED 17-Nov-15 21 ACCEPTED 1 1
1914 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01885 ISDA 26-Oct-15 ZN2 ELE ICT Works Inspection of installation ICT at Guard House 27-Oct-15 29-Oct-15 10.00am CLOSED 20-Nov-15 24 ACCEPTED 1 1
1915 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01886 ISDA 26-Oct-15 ZN2 ELE ICT Works Inspection of installation ICT at Grocery 27-Oct-15 29-Oct-15 10.00am CLOSED 14-Nov-15 18 ACCEPTED 1 1
1917 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01888 Dorce 23-Oct-15 ZN2 ELE Electrical works Building cable pulling installation inspection at 24-Oct-15 26-Oct-15 1.30pm CLOSED 17-Nov-15 24 ACCEPTED 1 1
Gymnasium
1918 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01889 Dorce 23-Oct-15 ZN2 ELE Electrical works Building cable pulling installation inspection at Office for 24-Oct-15 26-Oct-15 9.00pm CLOSED 12-Nov-15 19 ACCEPTED 1 1
Catering
1920 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01891 Dorce 24-Oct-15 ZN2 ELE Electrical works Building first floor cable pulling installation inspection at 25-Oct-15 27-Oct-15 9.00pm CLOSED 29-Dec-15 65 ACCEPTED 1 1
CMA3
1921 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01892 Dorce 24-Oct-15 ZN2 ELE Electrical works Building second floor cable pulling installation inspection 25-Oct-15 27-Oct-15 9.00pm CLOSED 29-Dec-15 65 ACCEPTED 1 1
at CMA3
1922 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01893 Dorce 24-Oct-15 ZN2 ELE Electrical works Building third floor cable pulling installation inspection at 25-Oct-15 27-Oct-15 9.00pm CLOSED 2-Jan-16 69 ACCEPTED 1 1
CMA3
1923 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01894 Dorce 23-Oct-15 ZN2 ELE Electrical works Building ground floor cable pulling installation inspection 24-Oct-15 26-Oct-15 11.00am CLOSED 19-Nov-15 26 ACCEPTED 1 1
at CMA4
1925 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01896 Dorce 23-Oct-15 ZN2 ELE Electrical works Building second floor cable pulling installation inspection 24-Oct-15 26-Oct-15 11.00am CLOSED 19-Nov-15 26 ACCEPTED 1 1
at CMA4
1926 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01897 Dorce 23-Oct-15 ZN2 ELE Electrical works Building third floor cable pulling installation inspection at 24-Oct-15 26-Oct-15 11.00am CLOSED 19-Nov-15 26 ACCEPTED 1 1
CMA4
1928 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01899 Dorce 5-Nov-15 ZN2 ARC Screed works Building screed works installation inspection at 6-Nov-15 8-Nov-15 11.00am CLOSED 06-Nov-15 0 ACCEPTED 1 1
Gymnasium
1929 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01900 Dorce 5-Nov-15 ZN2 ARC Ceramic tiles works Building ceramic tile works installation inspection at 6-Nov-15 8-Nov-15 11.00am CLOSED 06-Nov-15 0 ACCEPTED 1 1
Gymnasium
1932 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01903 Dorce 5-Nov-15 ZN2 ARC Screed works Building screed works installation inspection at Barber 6-Nov-15 8-Nov-15 11.00am CLOSED 06-Nov-15 0 ACCEPTED 1 1
1933 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01904 Dorce 5-Nov-15 ZN2 ARC Ceramic tiles works Building ceramic tile works installation inspection at 6-Nov-15 8-Nov-15 11.00am CLOSED 06-Nov-15 0 ACCEPTED 1 1
Barber
1934 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01905 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at Mess Hall 5-Nov-15 7-Nov-15 10.00am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1935 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01906 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at Gymnasium 5-Nov-15 7-Nov-15 9.45am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1936 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01907 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at Dojo 5-Nov-15 7-Nov-15 10.15am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1937 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01908 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at Club at House 5-Nov-15 7-Nov-15 9.30am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1938 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01909 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at Barber 5-Nov-15 7-Nov-15 11.00am CLOSED 18-Nov-15 13 ACCEPTED 1 1
1939 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01910 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at internet Café 5-Nov-15 7-Nov-15 11.30am CLOSED 18-Nov-15 13 ACCEPTED 1 1
1940 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01911 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at Grocery 5-Nov-15 7-Nov-15 9.55am CLOSED 18-Nov-15 13 ACCEPTED 1 1
1941 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01912 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at Post Office 5-Nov-15 7-Nov-15 10.45am CLOSED 18-Nov-15 13 ACCEPTED 1 1
1942 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01913 Shinryo 4-Nov-15 ZN2 MNE ACSU installation Installation of ACSU at ATM 5-Nov-15 7-Nov-15 10.30am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1943 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01914 Shinryo 4-Nov-15 ZN2 MNE Exhaust fan Installation of exhaust fan at barber 5-Nov-15 7-Nov-15 11.00am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1944 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01915 Shinryo 4-Nov-15 ZN2 MNE Exhaust fan Installation of exhaust fean at Dojo 5-Nov-15 7-Nov-15 10.15am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1945 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01916 Shinryo 4-Nov-15 ZN2 MNE Exhaust fan Installation of exhaust fean at Gymnasium 5-Nov-15 7-Nov-15 9.45am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1946 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01917 Shinryo 4-Nov-15 ZN2 MNE Exhaust fan Installation of exhaust fan at Club House 5-Nov-15 7-Nov-15 9.30am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1947 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01918 Shinryo 4-Nov-15 ZN2 MNE Exhaust fan Installation of exhaust fean at Grocery 5-Nov-15 7-Nov-15 9.55am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1948 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01919 Shinryo 4-Nov-15 ZN2 MNE Exhaust fan Installation of exhaust fean at Mess Hall 5-Nov-15 7-Nov-15 10.00am CLOSED 17-Nov-15 12 ACCEPTED 1 1
1949 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01920 AMIN 25-Oct-15 ZN2 CIV Testing FDT test for road base at Mess Hall road 26-Oct-15 28-Oct-15 10.00am CLOSED 17-Nov-15 22 ACCEPTED 1 1
1950 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01921 ISDA 24-Nov-15 ZN2 ELE Installation Inspection of installation SMATV and ICT at internet café 24-Nov-15 26-Nov-15 2.30pm CLOSED 10-Dec-15 16 ACCEPTED 1 1
1951 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01922 Dorce 7-Nov-15 ZN2 ARC ceremic tiles Building ground floor ceremic tiles works installation 9-Nov-15 11-Nov-15 9.00am CLOSED 12-Nov-15 3 ACCEPTED 1 1
inspection (CMA3)
1952 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01923 Dorce 7-Nov-15 ZN2 ARC ceremic tiles Building third floor ceremic tiles works installation 9-Nov-15 11-Nov-15 9.00am CLOSED 12-Nov-15 3 ACCEPTED 1 1
inspection (CMA3)
1953 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01924 Dorce 7-Nov-15 ZN2 ARC membrane application Building ground floor waterproof membrane application 9-Nov-15 11-Nov-15 9.00am CLOSED 12-Nov-15 3 ACCEPTED 1 1
inspection (CMA4)
1955 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01926 Dorce 7-Nov-15 ZN2 ARC membrane application Building second floor waterproof membrane application 9-Nov-15 11-Nov-15 9.00am CLOSED 12-Nov-15 3 ACCEPTED 1 1
inspection (CMA4)
1956 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01927 Dorce 7-Nov-15 ZN2 ARC membrane application Building third floor waterproof membrane application 9-Nov-15 11-Nov-15 9.00am CLOSED 12-Nov-15 3 ACCEPTED 1 1
inspection (CMA4)
1958 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01929 Dorce 7-Nov-15 ZN2 ARC ceremic tiles Building first floor ceremic tiles works installation 9-Nov-15 11-Nov-15 9.00am CLOSED 13-Nov-15 4 ACCEPTED 1 1
inspection (CMA4)
1959 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01930 Dorce 7-Nov-15 ZN2 ARC ceremic tiles Building second floor ceremic tiles works installation 9-Nov-15 11-Nov-15 9.00am CLOSED 13-Nov-15 4 ACCEPTED 1 1
inspection (CMA4)
PVC Floor Covering building ground floor pvc floor covering works inspection
1961 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01932 Dorce 7-Nov-15 ZN2 ARC 9-Nov-15 11-Nov-15 9.00am CLOSED 13-Nov-15 4 ACCEPTED 1 1
works (CMA4)
1962 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01933 Dorce 7-Nov-15 ZN2 ARC PVC Floor Covering building first floor pvc floor covering works inspection 9-Nov-15 11-Nov-15 9.00am CLOSED 13-Nov-15 4 ACCEPTED 1 1
works (CMA4)
1963 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01934 Dorce 7-Nov-15 ZN2 ARC PVC Floor Covering building second floor pvc floor covering works inspection 9-Nov-15 11-Nov-15 9.00am CLOSED 13-Nov-15 4 ACCEPTED 1 1
works (CMA4)
PVC Floor Covering building third floor pvc floor covering works inspection
1964 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01935 Dorce 7-Nov-15 ZN2 ARC 9-Nov-15 11-Nov-15 9.00am CLOSED 13-Nov-15 4 ACCEPTED 1 1
works (CMA4)
1965 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01936 Dorce 7-Nov-15 ZN2 ARC screed works building second floor screed works inspection (CLA2) 9-Nov-15 11-Nov-15 9.00am CLOSED 13-Nov-15 4 ACCEPTED 1 1
1966 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01937 UEM SYAHIR 1-Nov-15 ZN2 CIV Walkway Concreting works for walkway structure at MC1, CH1 12-Nov-15 14-Nov-15 10.30am CLOSED 19-Nov-15 7 ACCEPTED 1 1
1967 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01938 Ocned Water 11-Nov-15 ZN2 ELE TNC Testing and commissioning for Bio Filter ar RP1a 12-Nov-15 14-Nov-15 4.00pm CLOSED 12-Nov-15 0 ACCEPTED 1 1
DORCE 27-Oct-15 ZN2 MNE Hydro Test Building PPRC piping installation and hydro test at 29-Oct-15 31-Oct-15 9.00am
1968 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01939
Office for Catering CLOSED CANCEL 1 1
1969 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01940 Ocned Water 12-Nov-15 ZN2 MNE Installation Installation for Odorizer at Small Package RP1a 13-Nov-15 15-Nov-15 4.00pm CLOSED 13-Nov-15 0 ACCEPTED 1 1
1970 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01941 DORCE 10-Oct-15 ZN2 ELE Electrical works Building electrical panel board installation 12-Oct-15 14-Oct-15 10.00am CLOSED 02-Dec-15 51 ACCEPTED 1 1
inspection(laundry)
1971 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-01942 DORCE 10-Oct-15 ZN2 ELE Electrical works Building cable pulling installation inspection (laundry) 12-Oct-15 14-Oct-15 10.00am CLOSED 02-Dec-15 51 ACCEPTED 1 1
1972 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01943 Shinryo 12-Oct-15 ZN2 MNE water Heater Installation of Hot water heater MA3 Ground floor 16-Oct-15 18-Oct-15 10.00am CLOSED 10-Dec-15 55 ACCEPTED 1 1
1973 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01944 Shinryo 12-Oct-15 ZN2 MNE water Heater Installation of Hot water heater MA3 first floor 16-Oct-15 18-Oct-15 10.00am CLOSED 10-Dec-15 55 ACCEPTED 1 1
1974 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01945 Shinryo 12-Oct-15 ZN2 MNE water Heater Installation of Hot water heater MA3 second floor 16-Oct-15 18-Oct-15 10.00am CLOSED 10-Dec-15 55 ACCEPTED 1 1
1975 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01946 Shinryo 12-Oct-15 ZN2 MNE water Heater Installation of Hot water heater MA3 third floor 16-Oct-15 18-Oct-15 10.00am CLOSED 10-Dec-15 55 ACCEPTED 1 1
1976 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01947 Shinryo 12-Oct-15 ZN2 MNE water Heater Installation of Hot water heater MA4 Ground floor 16-Oct-15 18-Oct-15 8.00am CLOSED 10-Dec-15 55 ACCEPTED 1 1
1977 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01948 Shinryo 12-Oct-15 ZN2 MNE water Heater Installation of Hot water heater MA4 first floor 16-Oct-15 18-Oct-15 8.00am CLOSED 10-Dec-15 55 ACCEPTED 1 1
1978 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01949 Shinryo 12-Oct-15 ZN2 MNE water Heater Installation of Hot water heater MA4 second floor 16-Oct-15 18-Oct-15 8.00am CLOSED 10-Dec-15 55 ACCEPTED 1 1
1979 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01950 Shinryo 12-Oct-15 ZN2 MNE water Heater Installation of Hot water heater MA4 third floor 16-Oct-15 18-Oct-15 8.00am CLOSED 10-Dec-15 55 ACCEPTED 1 1
1980 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01951 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU MA3 Ground floor 16-Oct-15 18-Oct-15 10.30am CLOSED 1-Dec-15 46 ACCEPTED 1 1
1981 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01952 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU MA3 first floor 16-Oct-15 18-Oct-15 10.30am CLOSED 1-Dec-15 46 ACCEPTED 1 1
1982 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01953 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU MA3 Second floor 16-Oct-15 18-Oct-15 10.30am CLOSED 1-Dec-15 46 ACCEPTED 1 1
1983 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01954 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU MA3 third floor 16-Oct-15 18-Oct-15 10.30am CLOSED 1-Dec-15 46 ACCEPTED 1 1
1984 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01955 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU MA4 Ground floor 16-Oct-15 18-Oct-15 9.30am CLOSED 1-Dec-15 46 ACCEPTED 1 1
1985 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01956 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU MA4 first floor 16-Oct-15 18-Oct-15 9.30am CLOSED 1-Dec-15 46 ACCEPTED 1 1
1986 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01957 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU MA4 Second floor 16-Oct-15 18-Oct-15 9.30am CLOSED 1-Dec-15 46 ACCEPTED 1 1
1987 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01958 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU MA4 third floor 16-Oct-15 18-Oct-15 9.30am CLOSED 1-Dec-15 46 ACCEPTED 1 1
1988 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01959 Shinryo 12-Oct-15 ZN2 MNE Ventilation fan Installation of ventilation fan MA3 Ground floor 16-Oct-15 18-Oct-15 9.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1989 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01960 Shinryo 12-Oct-15 ZN2 MNE Ventilation fan Installation of ventilation fan MA3 First floor 16-Oct-15 18-Oct-15 9.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1990 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01961 Shinryo 12-Oct-15 ZN2 MNE Ventilation fan Installation of ventilation fan MA3 second floor 16-Oct-15 18-Oct-15 9.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1991 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01962 Shinryo 12-Oct-15 ZN2 MNE Ventilation fan Installation of ventilation fan MA3 third floor 16-Oct-15 18-Oct-15 9.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1992 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01963 Shinryo 12-Oct-15 ZN2 MNE Ventilation fan Installation of ventilation fan MA4 Ground floor 16-Oct-15 18-Oct-15 9.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1993 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01964 Shinryo 12-Oct-15 ZN2 MNE Ventilation fan Installation of ventilation fan MA4 First floor 16-Oct-15 18-Oct-15 9.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1994 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01965 Shinryo 12-Oct-15 ZN2 MNE Ventilation fan Installation of ventilation fan MA4 second floor 16-Oct-15 18-Oct-15 9.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1995 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01966 Shinryo 12-Oct-15 ZN2 MNE Ventilation fan Installation of ventilation fan MA4 third floor 16-Oct-15 18-Oct-15 9.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1996 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01967 Shinryo 12-Oct-15 ZN2 MNE Oscillation fan Installation of oscillation fan MA3 Ground floor 16-Oct-15 18-Oct-15 11.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1997 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01968 Shinryo 12-Oct-15 ZN2 MNE Oscillation fan Installation of oscillation fan MA3 first floor 16-Oct-15 18-Oct-15 11.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1998 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01969 Shinryo 12-Oct-15 ZN2 MNE Oscillation fan Installation of oscillation fan MA3 second floor 16-Oct-15 18-Oct-15 11.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
1999 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01970 Shinryo 12-Oct-15 ZN2 MNE Oscillation fan Installation of oscillation fan MA3 third floor 16-Oct-15 18-Oct-15 11.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
2000 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01971 Shinryo 12-Oct-15 ZN2 MNE Oscillation fan Installation of oscillation fan MA4 Ground floor 16-Oct-15 18-Oct-15 8.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
2001 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01972 Shinryo 12-Oct-15 ZN2 MNE Oscillation fan Installation of oscillation fan MA4 first floor 16-Oct-15 18-Oct-15 8.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
2002 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01973 Shinryo 12-Oct-15 ZN2 MNE Oscillation fan Installation of oscillation fan MA4 second floor 16-Oct-15 18-Oct-15 8.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
2003 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01974 Shinryo 12-Oct-15 ZN2 MNE Oscillation fan Installation of oscillation fan MA4 third floor 16-Oct-15 18-Oct-15 8.30am CLOSED 2-Dec-15 47 ACCEPTED 1 1
2004 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01975 Shinryo 12-Oct-15 ZN2 MNE Exhaust fan Installation of exhaust fan at Laundry 17-Oct-15 19-Oct-15 8.30am CLOSED 2-Dec-15 46 ACCEPTED 1 1
2005 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01976 Shinryo 12-Oct-15 ZN2 MNE ACSU installation Installation of ACSU at Laundry 18-Oct-15 20-Oct-15 8.30am CLOSED 01-Dec-15 44 ACCEPTED 1 1
2006 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01977 UEMB NURUL 14-Nov-15 ZN2 CIV Testing Water sampling test at SA1 14-Nov-15 16-Nov-15 12.30pm CLOSED CANCEL 1 1
2007 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-01978 UEMB NURUL 14-Nov-15 ZN2 CIV Testing Water sampling test at LA1 14-Nov-15 16-Nov-15 1.00pm CLOSED CANCEL 1 1
2008 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-01979 Hasbullah 14-Nov-15 ZN2 LNDS Material Supply trees for area SA<LA<MA and Primeter & slope 14-Nov-15 16-Nov-15 1.00pm CLOSED 1-Dec-15 17 ACCEPTED 1 1
( Landscape (Stock pile area
2010 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01981 URMB SYAHIR 14-Nov-15 ZN2 CIV Walkway install BR card formwork for concrete walkway, concreting 16-Nov-15 18-Nov-15 10.30am CLOSED 26-Nov-15 10 ACCEPTED 1 1
work for concrete walkway, beside LA5
2011 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01982 PPEC 16-Nov-15 ZN2 CIV Road work Inspection for applying prime coat 16-Nov-15 18-Nov-15 12.30pm CLOSED CANCEL 1 1
2012 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01983 PPEC 16-Nov-15 ZN2 CIV Roadwork inspection for layibng of ACBC at small package and Laying 17-Nov-15 19-Nov-15 11.00am CLOSED 14-Dec-15 27 ACCEPTED 1 1
ACBC at Small Package 6m road and 3m road
2013 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01984 Gapura 11-Nov-15 ZN2 ARC Wiremash wiremash fencing installation inspection at management 12-Oct-15 14-Oct-15 2.00pm CLOSED 16-Nov-15 35 REJECTED 1 1
accomodation 4 (CMA4)
2015 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01986 Dorce 14-Oct-15 ZN2 ARC Covering works Building PVC floor covering works inspection at 15-Oct-15 17-Oct-15 2.00pm CLOSED 12-Nov-15 28 ACCEPTED 1 1
maintenance workshop
2016 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01987 Dorce 14-Oct-15 ZN2 ARC screeding works Building screeding work inspection at kitchen and mess 15-Oct-15 17-Oct-15 2.00pm CLOSED 21-Nov-15 37 ACCEPTED 1 1
hall
2018 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01989 Dorce 14-Oct-15 ZN2 ARC acreeding works building screeding works inspection at guard house 2 15-Oct-15 17-Oct-15 2.00pm CLOSED 03-Dec-15 49 ACCEPTED 1 1
2019 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01990 Dorce 14-Oct-15 ZN2 ARC water proofing works Building water proofing membrane application inspection 15-Oct-15 17-Oct-15 2.00pm CLOSED 03-Dec-15 49 ACCEPTED 1 1
guard house 2
2020 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01991 Dorce 14-Oct-15 ZN2 ARC screed works Building ground floor screed works inspection at CLA2 15-Oct-15 17-Oct-15 2.00pm CLOSED 21-Nov-15 37 ACCEPTED 1 1
2022 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01993 Dorce 14-Oct-15 ZN2 ARC Painting works Building painting works inspection at Gymnasium 15-Oct-15 17-Oct-15 2.00pm CLOSED 02-Dec-15 48 ACCEPTED 1 1
2023 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01994 Paneagle 17-Oct-15 ZN2 CIV Fencing work Inspection for concrete footing of fence post at small 17-Nov-15 19-Nov-15 4.00pm CLOSED 19-Nov-15 2 ACCEPTED 1 1
package area
2024 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01995 Shinryo 17-Oct-15 ZN2 MNE testing TESTING OF EXhaust fan at club house 19-Nov-15 21-Nov-15 9.30am CLOSED 05-Dec-15 16 ACCEPTED 1 1
2025 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-01996 Shinryo 17-Oct-15 ZN2 MNE testing Testing of ACSU at club house 19-Nov-15 21-Nov-15 9.30am CLOSED 10-Dec-15 21 ACCEPTED 1 1
2026 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-01997 UEM SYAHIR 19-Oct-15 ZN2 CIV Walkway Install BRC and formwork for concrete walkway and 19-Nov-15 21-Nov-15 10.30am CLOSED 14-Dec-15 25 ACCEPTED 1 1
concreting works nearby MC2 LA4,LA5 and GH1
2027 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01998 Gapura 11-Nov-15 ZN2 ARC Wiremash fencing Wiremesh fencing installation inspection at Management 12-Nov-15 14-Nov-15 2.00pm CLOSED 16-Nov-15 4 ACCEPTED 1 1
Accommodation 1
2028 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-01999 Gapura 11-Nov-15 ZN2 ARC Wiremash fencing Wiremesh fencing installation inspection at Management 12-Nov-15 14-Nov-15 2.00pm CLOSED 16-Nov-15 4 ACCEPTED 1 1
Accommodation 2
2031 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02002 opensis 21-Sep-15 ZN2 ELE Backfill trench works backfill trench work of small package area, 1250meter 23-Sep-15 25-Sep-15 11.00am CLOSED 12-Oct-15 19 ACCEPTED 1 1
2033 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02004 Seribu Bio 21-Sep-15 ZN2 CIV testing FDT test at multipurpose court at zone 2 on crusher run 24-Sep-15 26-Sep-15 1.00pm CLOSED 26-Apr-16 215 REJECTED 1 1
2034 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02005 Seribu Bio 21-Sep-15 ZN2 CIV Crusher run laying of crusher run at depth of 250mm and well 25-Sep-15 27-Sep-15 1.00pm CLOSED 28-Nov-15 64 ACCEPTED 1 1
compacted
2035 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02006 ISDA 16-Sep-15 ZN2 ELE Installation Inspection of installation SMATV and ICT at LA 2 17-Sep-15 19-Sep-15 10.0am CLOSED 28-Jan-16 133 ACCEPTED 1 1
2036 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02007 ISDA 16-Sep-15 ZN2 ELE Installation Inspection of installation SMATV and ICT at LA 6 17-Sep-15 19-Sep-15 10.0am CLOSED 29-Sep-15 12 ACCEPTED 1 1
2037 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02008 ISDA 16-Sep-15 ZN2 ELE Installation Inspection of installation SMATV and ICT at LA 5 17-Sep-15 19-Sep-15 10.0am CLOSED 10-Dec-15 84 ACCEPTED 1 1
2038 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02009 ISDA 16-Sep-15 ZN2 ELE Installation Inspection of installation SMATV and ICT at LA 4 17-Sep-15 19-Sep-15 10.0am CLOSED 28-Jan-16 133 ACCEPTED 1 1
2039 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02010 UEMB AMIN 25-Oct-15 ZN2 CIV testing FDT test for road base at Mess Hall road 26-Oct-15 28-Oct-15 10.00am CLOSED 17-Nov-15 22 ACCEPTED 01920 - 02010 1 1
2040 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02011 UEMB SYahir 6-Nov-15 ZN2 CIV Road works Install BRC and formwork for concrete walkway nearby 7-Nov-15 9-Nov-15 9.00am CLOSED 19-Nov-15 12 ACCEPTED 1 1
MC1. Concreting works for concreting walkway 01921 - 02011
2041 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02012 ISDA 16-Nov-15 ZN2 ELE Installation building cable insulation test at Mess Hall and Kitchen 18-Nov-15 20-Nov-15 10.00am CLOSED 29-Dec-15 41 ACCEPTED 1 1
building chassis to stump connection inspection post
2042 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02013 Dorce 24-Nov-15 ZN2 STR Assembling works
office / atm
25-Nov-15 27-Nov-15 9.00am CLOSED CANCEL 1 1
2043 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02014 Dorce 24-Nov-15 ZN2 STR Assembling works building chassis to stump connection inspection at grocery 25-Nov-15 27-Nov-15 9.15am CLOSED CANCEL 1 1
2044 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02015 Dorce 24-Nov-15 ZN2 STR Assembling works building chassis to stump connection inspection at dojo 25-Nov-15 27-Nov-15 9.30am CLOSED CANCEL 1 1
2047 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02018 Dorce 24-Nov-15 ZN2 STR Assembling works building chassis to stump connection inspection at barber 25-Nov-15 27-Nov-15 10.15am CLOSED CANCEL 1 1
2048 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02019 Dorce 24-Nov-15 ZN2 STR Assembling works building chassis installation inspection GH2 25-Nov-15 27-Nov-15 2.00pm CLOSED CANCEL 1 1
2049 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02020 Dorce 24-Nov-15 ZN2 STR Assembling works building chassis to stump connection inspection GH2 25-Nov-15 27-Nov-15 2.15pm CLOSED 28-Nov-15 3 ACCEPTED 1 1
2050 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02021 Dorce 24-Nov-15 ZN2 STR Assembling works building roof installation inspection at GH2 25-Nov-15 27-Nov-15 2.30pm CLOSED CANCEL 1 1
2054 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02025 I-GEN 16-Nov-15 ZN2 MNE TNC pressure test for Hose Reel at MA1 17-Nov-15 19-Nov-15 10.00am CLOSED 17-Nov-15 0 ACCEPTED 1 1
2055 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02026 I-GEN 16-Nov-15 ZN2 MNE TNC pressure test for Hose Reel at MA2 17-Nov-15 19-Nov-15 10.00am CLOSED 17-Nov-15 0 ACCEPTED 1 1
2056 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02027 I-GEN 17-Nov-15 ZN2 MNE TNC pressure test for Hose Reel at Café 18-Nov-15 20-Nov-15 10.00am CLOSED 18-Nov-15 0 ACCEPTED 1 1
2057 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02028 I-GEN 19-Nov-15 ZN2 MNE TNC pressure test for Hose Reel at LA1 20-Nov-15 22-Nov-15 10.00am CLOSED 20-Nov-15 0 ACCEPTED 1 1
2058 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02029 I-GEN 19-Nov-15 ZN2 MNE TNC pressure test for Hose Reel at SA3 20-Nov-15 22-Nov-15 11.00am CLOSED 24-Nov-15 4 ACCEPTED 1 1
2060 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02031 Khidmat Hijau 25-Nov-15 ZN2 PIP Sanitary plumbing Inspection for sanitary plumbing at laundry 26-Nov-15 28-Nov-15 10.00am CLOSED 24-Jan-16 59 REJECTED 1 1
2061 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02032 Khidmat Hijau 25-Nov-15 ZN2 PIP Sanitary plumbing Inspection for sanitary plumbing at mass hall 26-Nov-15 28-Nov-15 10.00am CLOSED 24-Jan-16 59 REJECTED 1 1
2062 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02033 Shinryo 26-Nov-15 ZN2 MNE testing testing of exhaust fan (mess hall) 26-Nov-15 28-Nov-15 3.00pm CLOSED 05-Dec-15 9 ACCEPTED 1 1
2063 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02034 Shinryo 26-Nov-15 ZN2 MNE testing testing of ACSU (mess hall) 26-Nov-15 28-Nov-15 3.00pm CLOSED 26-Nov-15 0 ACCEPTED 1 1
2065 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02036 PPEC 26-Nov-15 ZN2 CIV Roadwork Inspection for laying of ACBC at Small Package area 27-Nov-15 29-Nov-15 10.00am CLOSED 14-Dec-15 17 ACCEPTED 1 1
2066 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02037 Paneagle 26-Nov-15 ZN2 CIV Fencing work Inspection for concrete footing of fence pot at small 26-Nov-15 28-Nov-15 3.30pm CLOSED 17-Dec-15 21 ACCEPTED 1 1
package area, (68nos)
Hasbullah Supply shrubs for area 1 (near Bustop), area 2 (Mess hall)
2067 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-02038 26-Nov-15 ZN2 LNDS Material 27-Nov-15 29-Nov-15 10.00am CLOSED 1-Dec-15 4 ACCEPTED 1 1
( Landscape and area 5 (Post office,internet café, barber)
2071 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-02042 Hasbullah 26-Nov-15 ZN2 LNDS landscape works Site preparation and planting work for area 1 -Near bus 27-Nov-15 29-Nov-15 10.00am CLOSED 1-Dec-15 4 ACCEPTED 1 1
( Landscape stop
2074 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02045 Dorce 27-Nov-15 ZN2 ARC Painting works Building painting works inspection at office for catering 28-Nov-15 30-Nov-15 9.00am CLOSED 2-Dec-15 4 ACCEPTED 1 1
2075 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02046 Dorce 27-Nov-15 ZN2 ARC Ceramic tile works Building ceramic tiles works installation inspection kitchen 28-Nov-15 30-Nov-15 9.00am CLOSED 3-Dec-15 5 ACCEPTED 1 1
and mess hall
Pre floor covering Building PVC floor covering works inspection at Kitchen
2076 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02047 Dorce 27-Nov-15 ZN2 ARC 28-Nov-15 30-Nov-15 9.00am CLOSED 3-Dec-15 5 ACCEPTED 1 1
works and mess hall
2078 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02049 Dorce 27-Nov-15 ZN2 ARC Ceramic tile works Building second floor ceramic tiles works installation 28-Nov-15 30-Nov-15 9.00am CLOSED 2-Dec-15 4 ACCEPTED 1 1
inspection CMA3
2079 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02050 Dorce 27-Nov-15 ZN2 ARC Painting works Building ground floor painting works inspection at CLA5 28-Nov-15 30-Nov-15 9.00am CLOSED 3-Dec-15 5 ACCEPTED 1 1
2080 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02051 Dorce 27-Nov-15 ZN2 ARC Painting works Building first floor painting works inspection at CLA5 28-Nov-15 30-Nov-15 9.00am CLOSED 3-Dec-15 5 ACCEPTED 1 1
2081 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02052 Dorce 27-Nov-15 ZN2 ARC Painting works Building second floor painting works inspection at CLA5 28-Nov-15 30-Nov-15 9.00am CLOSED 3-Dec-15 5 ACCEPTED 1 1
2082 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02053 Dorce 27-Nov-15 ZN2 ARC Painting works Building third floor painting works inspection at CLA5 28-Nov-15 30-Nov-15 9.00am CLOSED 3-Dec-15 5 ACCEPTED 1 1
2084 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02055 Intanco eng 27-Nov-15 ZN2 PIP testing PRESSURE TEST 28-Nov-15 30-Nov-15 10:00 CLOSED CANCEL 1 1
2086 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02057 Dorce 18-Nov-15 ZN2 MNE Hydro Test Building first floor PPRC piping installation inspection and 19-Nov-15 21-Nov-15 2.00pm CLOSED 19-Nov-15 0 ACCEPTED aimi register 1 1
hydro test(CLA5)
2088 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02059 Dorce 18-Nov-15 ZN2 MNE Hydro Test Building second floor PPRC piping installation inspection 19-Nov-15 21-Nov-15 2.00pm CLOSED 19-Nov-15 0 ACCEPTED 1 1
and hydro test(CLA5)
2091 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02062 Dorce 28-Oct-15 ZN2 STR Aseembling works Building chassis installation inspection(GH3) 30-Nov-15 2-Dec-15 9.00am CLOSED CANCEL 1 1
2092 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02063 Dorce 28-Oct-15 ZN2 STR Aseembling works Building wall installation inspection(Post office) 30-Nov-15 2-Dec-15 9.30am CLOSED CANCEL 1 1
2094 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02065 Dorce 28-Oct-15 ZN2 STR Aseembling works Building roof installation inspection (post office) 30-Nov-15 2-Dec-15 2.30pm CLOSED CANCEL 1 1
2095 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02066 Dorce 28-Oct-15 ZN2 STR Aseembling works Building chassis installation inspection(post office) 30-Nov-15 2-Dec-15 10.30am CLOSED CANCEL 1 1
2097 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02068 Dorce 29-Aug-15 ZN2 STR Aseembling works Building roof installation inspection(dojo)-reissue 30-Nov-15 2-Dec-15 10.30am CLOSED CANCEL 1 1
2098 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02069 Ocned Water 30-Nov-15 ZN2 ELE eathing test Earthing test at RP1 1-Dec-15 3-Dec-15 9.00am CLOSED 16-Dec-15 15 ACCEPTED 1 1
2099 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02070 Ocned Water 30-Nov-15 ZN2 ELE eathing test Earthing test at RP1a 1-Dec-15 3-Dec-15 9.00am CLOSED 16-Dec-15 15 ACCEPTED 1 1
2100 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02071 Dorce 10-Oct-15 ZN2 ELE Hydro Test BuildingPPRC piping installation and hydrotest (Barber) 12-Oct-15 14-Oct-15 2.00pm CLOSED 4-Dec-15 53 ACCEPTED 1 1
2101 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02072 Dorce 27-Oct-15 ZN2 ELE Hydro Test BuildingPPRC piping installation and hydrotest (Laundry) 12-Oct-15 14-Oct-15 9.00am CLOSED 2-Jan-16 82 ACCEPTED 1 1
2102 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02073 Dorce 14-Nov-15 ZN2 ELE cable pulling Building cable pulling works inspection(Grocery) 15-Nov-15 17-Nov-15 9.30pm CLOSED 12-Dec-15 27 ACCEPTED 1 1
2103 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02074 Dorce 14-Nov-15 ZN2 ELE cable pulling Building PPRC piping installation and hydrotest inspection 13-Nov-15 15-Nov-15 9.30pm CLOSED 13-Nov-15 0 ACCEPTED 1 1
(GUARD HOUSE 2)-GH3
2104 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02075 Dorce 14-Nov-15 ZN2 MNE cable pulling Building PPRC piping installation hydrotest inspection 16-Nov-15 18-Nov-15 9.30pm CLOSED 4-Dec-15 18 ACCEPTED 1 1
(Gymnasium)
2105 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02076 Samir 24-Nov-15 ZN2 ELE Polarity test Polarity test for Club House 26-Nov-15 28-Nov-15 10.00pm CLOSED 11-Dec-15 15 ACCEPTED 1 1
2106 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02077 shinryo 30-Nov-15 ZN2 MNE testing testing exhaust fan grocery 30-Nov-15 2-Dec-15 3.00pm CLOSED 05-Dec-15 5 ACCEPTED 1 1
2107 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02078 shinryo 30-Nov-15 ZN2 MNE testing testing exhaust fan dojo 30-Nov-15 2-Dec-15 3.00pm CLOSED 05-Dec-15 5 ACCEPTED 1 1
2108 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02079 shinryo 30-Nov-15 ZN2 MNE testing testing exhaust fan laundry 30-Nov-15 2-Dec-15 3.00pm CLOSED 05-Dec-15 5 ACCEPTED 1 1
2109 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02080 shinryo 30-Nov-15 ZN2 MNE testing testing exhaust fan gymnasium 30-Nov-15 2-Dec-15 3.00pm CLOSED 05-Dec-15 5 ACCEPTED 1 1
2110 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02081 shinryo 30-Nov-15 ZN2 MNE testing testing exhaust fan barber 30-Nov-15 2-Dec-15 3.00pm CLOSED 05-Dec-15 5 ACCEPTED 1 1
2111 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02082 shinryo 30-Nov-15 ZN2 MNE Installation installation exhaust fan office for catering 30-Nov-15 2-Dec-15 3.00pm CLOSED 16-Dec-15 16 ACCEPTED 1 1
2112 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02083 shinryo 30-Nov-15 ZN2 MNE Installation installation ACSU office for catering 30-Nov-15 2-Dec-15 3.00pm CLOSED 30-Nov-15 0 ACCEPTED 1 1
2113 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02084 shinryo 30-Nov-15 ZN2 MNE Installation installation ACSU maintenance workshop 30-Nov-15 2-Dec-15 3.00pm CLOSED 01-Dec-15 1 ACCEPTED 1 1
2114 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02085 shinryo 30-Nov-15 ZN2 MNE testing testing exhaust fan office for catering 30-Nov-15 2-Dec-15 3.00pm CLOSED 05-Dec-15 5 ACCEPTED 1 1
2115 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02086 shinryo 30-Nov-15 ZN2 MNE testing testing ACSU at office for catering 30-Nov-15 2-Dec-15 3.00pm CLOSED 10-Dec-15 10 ACCEPTED 1 1
2116 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02087 shinryo 30-Nov-15 ZN2 MNE testing testing ACSU at maintenance workshop 30-Nov-15 2-Dec-15 3.00pm CLOSED 10-Dec-15 10 ACCEPTED 1 1
2117 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02088 shinryo 30-Nov-15 ZN2 MNE testing testing of ACSU laundry 30-Nov-15 2-Dec-15 3.00pm CLOSED 10-Dec-15 10 ACCEPTED 1 1
2118 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02089 shinryo 30-Nov-15 ZN2 MNE testing testing of ACSU gymnasium 30-Nov-15 2-Dec-15 3.00pm CLOSED 04-Dec-15 4 ACCEPTED 1 1
2119 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02090 shinryo 30-Nov-15 ZN2 MNE testing testing of ACSU post office/bank atm 30-Nov-15 2-Dec-15 3.00pm CLOSED 04-Dec-15 4 ACCEPTED 1 1
2120 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02091 shinryo 30-Nov-15 ZN2 MNE testing testing of ACSU internet café 30-Nov-15 2-Dec-15 3.00pm CLOSED 04-Dec-15 4 ACCEPTED 1 1
2121 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02092 shinryo 30-Nov-15 ZN2 MNE testing testing of ACSU grocery 30-Nov-15 2-Dec-15 3.00pm CLOSED 04-Dec-15 4 ACCEPTED 1 1
2122 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02093 shinryo 30-Nov-15 ZN2 MNE testing testing of ACSU barber 30-Nov-15 2-Dec-15 3.00pm CLOSED 04-Dec-15 4 ACCEPTED 1 1
2123 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02094 shinryo 30-Nov-15 ZN2 MNE testing testing of ACSU dojo 30-Nov-15 2-Dec-15 3.00pm CLOSED 04-Dec-15 4 ACCEPTED 1 1
2124 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02095 Dorce 14-Nov-15 ZN2 ELE electrical pabel board Building electrical panel board installation 14-Nov-15 16-Nov-15 3.30pm CLOSED 12-Dec-15 28 ACCEPTED 1 1
inspection(grocery)
2125 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02096 PPEC 1-Dec-15 ZN2 CIV Roadwork Inspection for laying of ACBC 28 at Small Package area 2-Dec-15 4-Dec-15 2.00pm CLOSED 14-Dec-15 12 ACCEPTED 1 1
2128 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02099 Seribu Bio 2-Dec-15 ZN2 CIV irrigation & sprinkler Inspection of sprinkler function(6nos) sprinkler(small 2-Dec-15 4-Dec-15 11.30am CLOSED 22-Dec-15 20 ACCEPTED 1 1
packages)-five a side football 1
2129 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02100 Seribu Bio 2-Dec-15 ZN2 CIV Fencing work Base and foundation works for fence bracing and bracing 2-Dec-15 4-Dec-15 11.00am CLOSED 22-Dec-15 20 ACCEPTED 1 1
installed(small packages)-five a side football 2
2131 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02102 Seribu Bio 2-Dec-15 ZN2 CIV Fencing work Base and foundation works for fence bracing and bracing 2-Dec-15 4-Dec-15 11.00am CLOSED 22-Dec-15 20 ACCEPTED 1 1
installed(small packages)-mini cricket 2
2132 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02103 Seribu Bio 2-Dec-15 ZN2 CIV Fencing work Base and foundation works for fence bracing and bracing 2-Dec-15 4-Dec-15 11.00am CLOSED 22-Dec-15 20 ACCEPTED 1 1
installed(small packages)-mini cricket 1
2134 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02105 Seribu Bio 2-Dec-15 ZN2 CIV irrigation & sprinkler Irrigation and sprinkler function inspection 6nos of 2-Dec-15 4-Dec-15 11.00am CLOSED 22-Dec-15 20 ACCEPTED 1 1
sprinkler(mini cricket 2)
2135 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02106 Seribu Bio 2-Dec-15 ZN2 CIV lightpole foundation foundation for 8m high light pole at Mini cricket 2 2-Dec-15 4-Dec-15 11.00am CLOSED 22-Dec-15 20 REJECTED 1 1
2136 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02107 Seribu Bio 2-Dec-15 ZN2 CIV lightpole foundation foundation for 8m high light pole at Mini cricket 1 2-Dec-15 4-Dec-15 11.00am CLOSED 22-Dec-15 20 REJECTED 1 1
2137 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02108 Seribu Bio 2-Dec-15 ZN2 CIV lightpole foundation foundation for 8m high light pole at Five a side football 1 x 2-Dec-15 4-Dec-15 11.00am CLOSED 22-Dec-15 20 REJECTED 1 1
4nos
2138 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02109 Seribu Bio 2-Dec-15 ZN2 CIV lightpole foundation foundation for 8m high light pole at Five a side football 2 x 2-Dec-15 4-Dec-15 11.00am CLOSED 22-Dec-15 20 REJECTED 1 1
4nos
Inspection ICT for cable analyzer and test result( office for
2140 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02111 ISDA 26-Nov-15 ZN2 MNE Fluke test 27-Nov-15 29-Nov-15 10.30am CLOSED 10-Dec-15 13 ACCEPTED 1 1
catering & maintenance)
2141 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02112 ISDA 26-Nov-15 ZN2 MNE Fluke test Inspection ICT for cable analyzer and test result(messhall 27-Nov-15 29-Nov-15 10.30am CLOSED 10-Dec-15 13 ACCEPTED 1 1
building & kitchen)
2145 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02116 ISDA 26-Nov-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and test result( MA 4) 27-Nov-15 29-Nov-15 10.30am CLOSED 16-Dec-15 19 ACCEPTED 1 1
2146 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02117 ISDA 26-Nov-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and test result(BARBER) 27-Nov-15 29-Nov-15 10.30am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2147 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02118 ISDA 26-Nov-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and test result(DOJO) 27-Nov-15 29-Nov-15 10.30am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2149 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02120 ISDA 26-Nov-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and test result(internet 27-Nov-15 29-Nov-15 10.30am CLOSED 04-Dec-15 7 ACCEPTED 1 1
café)
2150 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02121 ISDA 26-Nov-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and test result(Laundry) 27-Nov-15 29-Nov-15 10.30am CLOSED 16-Dec-15 19 ACCEPTED 1 1
2152 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02123 syahir 2-Dec-15 ZN2 CIV testing Inspection plate bearing test for turnstile foundation area 3-Dec-15 5-Dec-15 9.30am CLOSED 3-Dec-15 0 ACCEPTED 1 1
at Assembly area
2155 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02126 Khidmat Hijau 2-Dec-15 ZN2 PIP flow test Flow test for sanitary plumbing at Messhall small package 3-Dec-15 5-Dec-15 10.00am CLOSED 10-Dec-15 7 ACCEPTED 1 1
area
2157 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02128 AEIE 2-Dec-15 ZN2 ELE Street light Inspection installation of 8m street lighting pole 9 nos at 2-Dec-15 4-Dec-15 3.00pm CLOSED 21-Dec-15 19 ACCEPTED 1 1
small package area
2158 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02129 Shinryo 1-Dec-15 ZN2 MNE Installation Ceiling fan Installation at Ground Floor (CLA5) 2-Dec-15 4-Dec-15 3.00pm CLOSED 2-Dec-15 0 ACCEPTED 1 1
2159 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02130 Shinryo 1-Dec-15 ZN2 MNE Installation Ceiling fan Installation at FirstFloor (CLA5) 2-Dec-15 4-Dec-15 3.00pm CLOSED 2-Dec-15 0 ACCEPTED 1 1
2160 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02131 Shinryo 1-Dec-15 ZN2 MNE Installation Ceiling fan Installation at Second Floor (CLA5) 2-Dec-15 4-Dec-15 3.00pm CLOSED 2-Dec-15 0 ACCEPTED 1 1
2161 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02132 Shinryo 1-Dec-15 ZN2 MNE Installation Ceiling fan Installation at Third Floor (CLA5) 2-Dec-15 4-Dec-15 3.00pm CLOSED 2-Dec-15 0 ACCEPTED 1 1
2162 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02133 Shinryo 1-Dec-15 ZN2 MNE Installation Exhaust fan Installation at Ground Floor (CLA5) 2-Dec-15 4-Dec-15 3.00pm CLOSED 29-Dec-15 27 ACCEPTED 1 1
2163 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02134 Shinryo 1-Dec-15 ZN2 MNE Installation Exhaust fan Installation at First Floor (CLA5) 2-Dec-15 4-Dec-15 3.00pm CLOSED 29-Dec-15 27 ACCEPTED 1 1
2164 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02135 Shinryo 1-Dec-15 ZN2 MNE Installation Exhaust fan Installation at second Floor (CLA5) 2-Dec-15 4-Dec-15 3.00pm CLOSED 29-Dec-15 27 ACCEPTED 1 1
2165 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02136 Shinryo 1-Dec-15 ZN2 MNE Installation Exhaust fan Installation at third Floor (CLA5) 2-Dec-15 4-Dec-15 3.00pm CLOSED 29-Dec-15 27 ACCEPTED 1 1
2166 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02137 dorce 1-Dec-15 ZN2 ELE Testing Building cable insulation test (catering ) 1-Dec-15 3-Dec-15 3.00pm CLOSED CANCEL 1 1
2167 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02138 dorce 16-Nov-15 ZN2 ELE Testing Building cable insulation test (Laundry ) 21-Nov-15 23-Nov-15 10.00am CLOSED 29-Dec-15 38 ACCEPTED 1 1
2168 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02139 dorce 16-Nov-15 ZN2 ELE Testing Building ground floor cable insulation test(MA4) 17-Nov-15 19-Nov-15 9.30am CLOSED 29-Dec-15 42 ACCEPTED 1 1
2169 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02140 dorce 16-Nov-15 ZN2 ELE Testing Building first floor cable insulation test(MA4) 17-Nov-15 19-Nov-15 9.30am CLOSED 29-Dec-15 42 ACCEPTED 1 1
2170 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02141 dorce 16-Nov-15 ZN2 ELE Testing Building second floor cable insulation test(MA4) 17-Nov-15 19-Nov-15 10.00am CLOSED 29-Dec-15 42 ACCEPTED 1 1
2171 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02142 dorce 16-Nov-15 ZN2 ELE Testing Building third floor cable insulation test(MA4) 17-Nov-15 19-Nov-15 11.00am CLOSED 29-Dec-15 42 ACCEPTED 1 1
2172 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02143 Uemb aswad 3-Dec-15 ZN2 CIV Walkway -Installation of BRC and formwork 3-Dec-15 5-Dec-15 3.00pm CLOSED 1-Feb-16 60 ACCEPTED 1 1
-Concrete walkway
2173 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02144 Dorce 1-Dec-15 ZN2 ELE electrical work Building lightning rod installation (cafe) 2-Dec-15 4-Dec-15 3.00pm CLOSED 03-Dec-15 1 ACCEPTED 1 1
2174 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02145 Dorce 1-Dec-15 ZN2 ELE electrical work Building lightning rod installation (Guard house 2) 2-Dec-15 4-Dec-15 3.00pm CLOSED 03-Dec-15 1 ACCEPTED 1 1
2175 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02146 Dorce 11-Sep-15 ZN2 ELE electrical work Building lightning rod installation (LA3) 12-Sep-15 14-Sep-15 10.00am CLOSED 03-Dec-15 82 ACCEPTED 1 1
2176 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02147 Dorce 11-Sep-15 ZN2 ELE electrical work Building lightning rod installation (LA1) 12-Sep-15 14-Sep-15 10.00am CLOSED 03-Dec-15 82 ACCEPTED 1 1
2177 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02148 Dorce 27-Aug-15 ZN2 MNE Hydro Test Building ground floor PPRC piping installation inspection 28-Aug-15 30-Aug-15 9.00am CLOSED 2-Dec-15 96 ACCEPTED 1 1
and hydrotest (MA4)
2180 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02151 Dorce 27-Aug-15 ZN2 MNE Hydro Test Building third floor PPRC piping installation inspection and 28-Aug-15 30-Aug-15 9.00am CLOSED 2-Dec-15 96 ACCEPTED 1 1
hydrotest (MA4)
2181 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02152 Dorce 14-Nov-15 ZN2 ELE electrical works Building ground floor installlation of electrical inspection 19-Nov-15 21-Nov-15 10.00am CLOSED 29-Nov-15 10 ACCEPTED 1 1
(MA4)
2182 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02153 Dorce 14-Nov-15 ZN2 ELE electrical works Building first floor installlation of electrical inspection 19-Nov-15 21-Nov-15 10.00am CLOSED 29-Nov-15 10 ACCEPTED 1 1
(MA4)
2183 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02154 Dorce 14-Nov-15 ZN2 ELE electrical works Building second floor installlation of electrical inspection 19-Nov-15 21-Nov-15 10.00am CLOSED 29-Nov-15 10 ACCEPTED 1 1
MA4)
2184 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02155 Dorce 20-Nov-15 ZN2 ELE electrical works Building third floor installlation of electrical 21-Nov-15 23-Nov-15 10.00am CLOSED 7-Jan-16 47 ACCEPTED 1 1
inspection(MA3)
2186 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02157 Dorce 20-Nov-15 ZN2 ELE electrical works Building first floor installlation of electrical 21-Nov-15 23-Nov-15 2.30pm CLOSED 6-Jan-16 46 ACCEPTED 1 1
inspection(MA3)
2187 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02158 Dorce 20-Nov-15 ZN2 ELE electrical works Building second floor installlation of electrical 21-Nov-15 23-Nov-15 2.30pm CLOSED 7-Jan-16 47 ACCEPTED 1 1
inspection(MA3)
2188 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02159 Dorce 2-Dec-15 ZN2 ELE electrical works Building electrical r installlation inspection(Club house) 2-Dec-15 4-Dec-15 10.00am CLOSED 7-Jan-16 36 ACCEPTED 1 1
2189 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02160 Dorce 1-Dec-15 ZN2 ELE electrical works Building electrical r installlation inspection(Catering) 2-Dec-15 4-Dec-15 10.00am CLOSED 29-Dec-15 27 ACCEPTED 1 1
2190 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02161 Dorce 1-Dec-15 ZN2 ELE electrical works Building electrical r installlation inspection(post 2-Dec-15 4-Dec-15 10.00am CLOSED 6-Jan-16 35 ACCEPTED 1 1
office/atm)
2191 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02162 Dorce 2-Dec-15 ZN2 ELE electrical works Building electrical r installlation inspection(guard house 3) 2-Dec-15 4-Dec-15 10.00am CLOSED 2-Jan-16 31 ACCEPTED 1 1
2193 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02164 Dorce 1-Dec-15 ZN2 ELE electrical works Building electrical r installlation inspection(Internet cafe) 2-Dec-15 4-Dec-15 10.00am CLOSED 29-Dec-15 27 ACCEPTED 1 1
2194 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02165 Dorce 1-Dec-15 ZN2 ELE electrical works Building electrical r installlation inspection(Barber) 2-Dec-15 4-Dec-15 10.00am CLOSED 2-Jan-16 31 ACCEPTED 1 1
2195 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02166 Dorce 1-Dec-15 ZN2 ELE electrical works Building electrical r installlation inspection(Laundry) 2-Dec-15 4-Dec-15 10.00am CLOSED 2-Jan-16 31 ACCEPTED 1 1
2196 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02167 Dorce 1-Dec-15 ZN2 ELE electrical works Building electrical r installlation inspection(Gynasium) 2-Dec-15 4-Dec-15 10.00am CLOSED 29-Dec-15 27 ACCEPTED 1 1
2197 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02168 I-GEN 26-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Barber 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2198 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02169 I-GEN 26-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Grocery 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2199 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02170 I-GEN 26-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Dojo 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2200 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02171 I-GEN 27-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Club house 28-Nov-15 30-Nov-15 10.00am CLOSED 28-Nov-15 0 ACCEPTED 1 1
2201 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02172 I-GEN 27-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Workshop for 28-Nov-15 30-Nov-15 10.00am CLOSED 28-Nov-15 0 ACCEPTED 1 1
maintanence
2202 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02173 I-GEN 27-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Internet café 28-Nov-15 30-Nov-15 10.00am CLOSED 04-Dec-15 6 ACCEPTED 1 1
2203 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02174 I-GEN 29-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Post office/ATM 30-Nov-15 2-Dec-15 10.00am CLOSED 04-Dec-15 4 ACCEPTED 1 1
2204 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02175 I-GEN 29-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Laundry 30-Nov-15 2-Dec-15 10.00am CLOSED 30-Nov-15 0 ACCEPTED 1 1
2205 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02176 I-GEN 29-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Gymnasium 30-Nov-15 2-Dec-15 10.00am CLOSED 04-Dec-15 4 ACCEPTED 1 1
2206 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02177 I-GEN 30-Nov-15 ZN2 PIP testing Pressure test for hose reel system at Messhall 1-Dec-15 3-Dec-15 10.00am CLOSED 01-Dec-15 0 ACCEPTED 1 1
2209 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02180 Dorce 26-Nov-15 ZN2 ELE Polarity test Polarity test for post office 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2210 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02181 Dorce 26-Nov-15 ZN2 ELE Polarity test Polarity test for Grocery 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2211 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02182 Dorce 26-Nov-15 ZN2 ELE Polarity test Polarity test for internet café 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2212 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02183 Dorce 26-Nov-15 ZN2 ELE Polarity test Polarity test for dojo 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2213 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02184 Dorce 26-Nov-15 ZN2 ELE Polarity test Polarity test for gymnasium 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2214 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02185 Dorce 26-Nov-15 ZN2 ELE Polarity test Polarity test for barber 27-Nov-15 29-Nov-15 10.00am CLOSED 04-Dec-15 7 ACCEPTED 1 1
2215 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02186 I-GEN 26-Nov-15 ZN2 MNE testing Tesing for Fire Alarm System at Grocery 27-Nov-15 29-Nov-15 3.00pm CLOSED 5-Dec-15 8 ACCEPTED 1 1
2216 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02187 I-GEN 26-Nov-15 ZN2 MNE testing Tesing for Fire Alarm System at Barber 27-Nov-15 29-Nov-15 3.00pm CLOSED 5-Dec-15 8 ACCEPTED 1 1
Tesing and commissioning for Fire Alarm System at
2217 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02188 I-GEN 26-Nov-15 ZN2 MNE testing 27-Nov-15 29-Nov-15 3.00pm CLOSED 18-Dec-15 21 ACCEPTED 1 1
Laundry
2218 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02189 I-GEN 26-Nov-15 ZN2 MNE testing Tesing and commissioning for Fire Alarm System at Dojo 27-Nov-15 29-Nov-15 3.00pm CLOSED 5-Dec-15 8 ACCEPTED 1 1
2222 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02193 dorce 26-Nov-15 ZN2 ELE Polarity test Polarity test for Office for Catering 27-Nov-15 29-Nov-15 10.00am CLOSED 11-Dec-15 14 ACCEPTED 1 1
2223 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02194 dorce 27-Nov-15 ZN2 ELE Polarity test Polarity test for Maintenance and workshop 28-Nov-15 30-Nov-15 10.00am CLOSED 12-Dec-15 14 ACCEPTED 1 1
2224 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02195 Paneagle 5-Dec-15 ZN2 CIV Fencing work Concreting work: footing for fence post 6-Dec-15 8-Dec-15 9.00am CLOSED 04-Jan-16 29 ACCEPTED 1 1
2225 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02196 I-GEN 3-Dec-15 ZN2 PIP testing Pressure test for Hose reel system at MA3 4-Dec-15 6-Dec-15 3.00pm CLOSED 07-Dec-15 3 ACCEPTED 1 1
2226 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02197 dorce 24-Nov-15 ZN2 ELE Polarity test Polarity test for Mess hall and Kitchen building 26-Nov-15 28-Nov-15 3.00pm CLOSED 12-Dec-15 16 ACCEPTED 1 1
2228 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02199 dorce 30-Nov-15 ZN2 ELE Electrical works Building fixtures functionality test(Grocery) 1-Dec-15 3-Dec-15 9.00am CLOSED 17-Dec-15 16 ACCEPTED 1 1
2229 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02200 dorce 30-Nov-15 ZN2 ELE Electrical works Building fixtures functionality test(Post office/ATM) 1-Dec-15 3-Dec-15 9.00am CLOSED 17-Dec-15 16 ACCEPTED 1 1
2230 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02201 dorce 30-Nov-15 ZN2 ELE Electrical works Building fixtures functionality test(Barber) 1-Dec-15 3-Dec-15 9.00am CLOSED 17-Dec-15 16 ACCEPTED 1 1
2231 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02202 dorce 30-Nov-15 ZN2 ELE Electrical works Building fixtures functionality test(Internet café) 1-Dec-15 3-Dec-15 9.00am CLOSED 20-Dec-15 19 ACCEPTED 1 1
2232 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02203 dorce 30-Nov-15 ZN2 ELE Electrical works Building fixtures functionality test(Dojo) 1-Dec-15 3-Dec-15 9.00am CLOSED 21-Dec-15 20 ACCEPTED 1 1
2233 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02204 dorce 30-Nov-15 ZN2 ELE Electrical works Building fixtures functionality test(Gymnasium) 1-Dec-15 3-Dec-15 9.00am CLOSED 22-Dec-15 21 ACCEPTED 1 1
2235 RAPID-P20A1-UEMB-ZN2-LNDS-RFIN-02206 Hasbullah 8-Dec-15 ZN2 LNDS landscape works Supply shrubs for area Small packaage, area (Mess hall) 9-Dec-15 11-Dec-15 11.00am CLOSED 21-Dec-15 12 ACCEPTED 1 1
( Landscape and aCommon buiding area
2236 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02207 AEIE 8-Dec-15 ZN2 ELE eathing test Inspection for earth resistance test at Distribution 9-Dec-15 11-Dec-15 2.00pm CLOSED 14-Dec-15 5 ACCEPTED 1 1
Bosrd(DB) club house
2237 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02208 AEIE 8-Dec-15 ZN2 ELE eathing test Inspection for earth resistance test at Distribution 9-Dec-15 11-Dec-15 10.00am CLOSED 14-Dec-15 5 ACCEPTED 1 1
Board(DB) Grocery
2238 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02209 AEIE 8-Dec-15 ZN2 ELE eathing test Inspection for earth resistance test at Main Distribution 9-Dec-15 11-Dec-15 2.00pm CLOSED 14-Dec-15 5 ACCEPTED 1 1
Bosrd(MDB) Mess hall
2241 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02212 AEIE 8-Dec-15 ZN2 ELE eathing test Inspection for earth resistance test main distribution 8-Dec-15 10-Dec-15 2.00pm CLOSED 14-Dec-15 6 ACCEPTED 1 1
board (MDB) at Laundry
2242 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02213 AEIE 8-Dec-15 ZN2 ELE eathing test Inspection for earth resistance test main distribution 10-Dec-15 12-Dec-15 2.00pm CLOSED 14-Dec-15 4 ACCEPTED 1 1
board (MDB) at Barber
2244 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02215 AEIE 8-Dec-15 ZN2 ELE eathing test Inspection for earth resistance test main distribution 10-Dec-15 12-Dec-15 2.00pm CLOSED 14-Dec-15 4 ACCEPTED 1 1
board (MDB) at Post office building
2249 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02220 AEIE 29-Nov-15 ZN2 ELE Underground cable Inspection of undeground cable installation for 1x4C 29-Nov-15 1-Dec-15 2.00pm CLOSED 26-Jan-16 58 ACCEPTED 1 1
150mm2 CLPE/SWA/PVC from FP-C7 to Laundry
2250 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02221 AEIE 29-Nov-15 ZN2 ELE Underground cable Inspection of undeground cable installation for 1x4C 29-Dec-15 31-Dec-15 2.00pm CLOSED 16-Feb-16 49 ACCEPTED 1 1
16mm2 CLPE/SWA/PVC from FP-C7 to Internet café
2253 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02224 AEIE 29-Nov-15 ZN2 ELE Underground cable Inspection of underground cable installation for 1x4C 18-Jan-15 20-Jan-15 2.00pm CLOSED 26-Jan-16 373 ACCEPTED 1 1
16mm2 CLPE/SWA/PVC from FP-C7 to Pos office
2254 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02225 ISDA 4-Dec-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and data result (CLA2) 5-Dec-15 7-Dec-15 2.00pm CLOSED 29-Dec-15 24 ACCEPTED 1 1
2255 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02226 ISDA 4-Dec-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and data result (CLA4) 5-Dec-15 7-Dec-15 1.30pm CLOSED 29-Dec-15 24 ACCEPTED 1 1
2256 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02227 ISDA 4-Dec-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and data result (CLA5) 5-Dec-15 7-Dec-15 10.50am CLOSED 29-Dec-15 24 ACCEPTED 1 1
2257 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02228 ISDA 4-Dec-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and data result (CLA6) 5-Dec-15 7-Dec-15 10.30am CLOSED 29-Dec-15 24 ACCEPTED 1 1
2258 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02229 ISDA 4-Dec-15 ZN2 ELE Fluke test Inspection ICT for cable analyzer and data result (CMA3) 5-Dec-15 7-Dec-15 2.30pm CLOSED 16-Dec-15 11 ACCEPTED 1 1
2259 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02230 AEIE 8-Dec-15 ZN2 ELE Earth test (DB) Earth Resistance test at DB MA3 9-Dec-15 11-Dec-15 2.00pm CLOSED 14-Dec-15 5 ACCEPTED 1 1
2260 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02231 AEIE 8-Dec-15 ZN2 ELE Earth test (DB) Earth Resistance test at DB MA4 9-Dec-15 11-Dec-15 2.00pm CLOSED 14-Dec-15 5 ACCEPTED 1 1
2263 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02234 Paneagle 9-Dec-15 ZN2 CIV LPG Plinth Inspection of plinth for concreting works 10-Dec-15 12-Dec-15 11.00am CLOSED 5-Jan-16 26 ACCEPTED 1 1
2264 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02235 dorce 24-Nov-15 ZN2 ELE Testing Polarity test for laundry 26-Nov-15 28-Nov-15 11.00am CLOSED 26-Nov-15 0 ACCEPTED 1 1
2265 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02236 Shinryo 6-Dec-15 ZN2 MNE Testing Testinf of exhaust fan MA3 (GF) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2266 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02237 Shinryo 6-Dec-15 ZN2 MNE Testing Testinf of exhaust fan MA3 (1st F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2267 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02238 Shinryo 6-Dec-15 ZN2 MNE Testing Testinf of exhaust fan MA3 (2nd F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2268 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02239 Shinryo 6-Dec-15 ZN2 MNE Testing Testinf of exhaust fan MA3 (3rd F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2269 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02240 Shinryo 6-Dec-15 ZN2 MNE Testing Testinf of exhaust fan MA4 (GF) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2270 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02241 Shinryo 6-Dec-15 ZN2 MNE Testing Testinf of exhaust fan MA4 (1st F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2271 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02242 Shinryo 6-Dec-15 ZN2 MNE Testing Testinf of exhaust fan MA4 (2nd F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2272 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02243 Shinryo 6-Dec-15 ZN2 MNE Testing Testinf of exhaust fan MA4 (3rd F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2273 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02244 Shinryo 6-Dec-15 ZN2 MNE Testing Testing for ceiling fan at MA4 (Ground floor) 7-Dec-15 9-Dec-15 9.30am CLOSED 16-Dec-15 9 ACCEPTED 1 1
2274 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02245 Shinryo 6-Dec-15 ZN2 MNE Testing Testing for ceiling fan at MA4 (1st ) 7-Dec-15 9-Dec-15 9.30am CLOSED 16-Dec-15 9 ACCEPTED 1 1
2275 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02246 Shinryo 6-Dec-15 ZN2 MNE Testing Testing for ceiling fan at MA4 (2nd floor) 7-Dec-15 9-Dec-15 9.30am CLOSED 16-Dec-15 9 ACCEPTED 1 1
2276 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02247 Shinryo 6-Dec-15 ZN2 MNE Testing Testing for ceiling fan at MA4 (3rd floor) 7-Dec-15 9-Dec-15 9.30am CLOSED 16-Dec-15 9 ACCEPTED 1 1
2277 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02248 Shinryo 6-Dec-15 ZN2 MNE Testing Testing of ocillation fan MA3 (GF) 7-Dec-15 9-Dec-15 9.30am CLOSED 16-Dec-15 9 ACCEPTED 1 1
2278 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02249 Shinryo 6-Dec-15 ZN2 MNE Testing Testing of ocillation fan MA3 (1st F) 7-Dec-15 9-Dec-15 9.30am CLOSED 16-Dec-15 9 ACCEPTED 1 1
2279 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02250 Shinryo 6-Dec-15 ZN2 MNE Testing Testing of ocillation fan MA3 (2nd F) 7-Dec-15 9-Dec-15 9.30am CLOSED 16-Dec-15 9 ACCEPTED 1 1
2280 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02251 Shinryo 6-Dec-15 ZN2 MNE Testing Testing of ocillation fan MA3 (3rd F) 7-Dec-15 9-Dec-15 9.30am CLOSED 16-Dec-15 9 ACCEPTED 1 1
2281 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02252 Shinryo 6-Dec-15 ZN2 MNE Testing Testing of water heater at MA4 (GF) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2282 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02253 Shinryo 6-Dec-15 ZN2 MNE Testing Testing of water heater at MA4 (1st F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2283 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02254 Shinryo 6-Dec-15 ZN2 MNE Testing Testing of water heater at MA4 (2nd F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2284 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02255 Shinryo 6-Dec-15 ZN2 MNE Testing Testing of water heater at MA4 (3rd F) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2285 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02256 Shinryo 6-Dec-15 ZN2 MNE Testing Testing for ACSU at MA4 (Ground floor) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2286 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02257 Shinryo 6-Dec-15 ZN2 MNE Testing Testing for ACSU at MA4 (1st floor) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2287 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02258 Shinryo 6-Dec-15 ZN2 MNE Testing Testing for ACSU at MA4 (2nd floor) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2288 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02259 Shinryo 6-Dec-15 ZN2 MNE Testing Testing for ACSU at MA4 (3rd floor) 7-Dec-15 9-Dec-15 9.30am CLOSED 07-Dec-15 0 ACCEPTED 1 1
2289 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02260 Paneagle 9-Dec-15 ZN2 CIV Fencing work Inspection for concreting footing of fence post at Small 9-Dec-15 11-Dec-15 9.30am CLOSED 05-Jan-16 27 ACCEPTED 1 1
Package
2290 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02261 AEIE 10-Dec-15 ZN2 ELE earthing test Lightning protection system for gymnasium 11-Dec-15 13-Dec-15 11.00am CLOSED 14-Dec-15 3 ACCEPTED 1 1
2291 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02262 AEIE 10-Dec-15 ZN2 ELE earthing test Lightning protection system for Laundry 11-Dec-15 13-Dec-15 11.00am CLOSED 14-Dec-15 3 ACCEPTED 1 1
2292 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02263 AEIE 10-Dec-15 ZN2 ELE earthing test Lightning protection system for Post office 11-Dec-15 13-Dec-15 11.00am CLOSED 14-Dec-15 3 ACCEPTED 1 1
2293 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02264 AEIE 10-Dec-15 ZN2 ELE earthing test Lightning protection system for Internet café 11-Dec-15 13-Dec-15 11.00am CLOSED 14-Dec-15 5 ACCEPTED 1 1
2294 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02265 Dorce 8-Dec-15 ZN2 ELE cable pulling Bulding ground floor cable pulling installation 9-Dec-15 11-Dec-15 11.00am CLOSED 12-Dec-15 3 ACCEPTED 1 1
inspection(LA5)
2295 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02266 Dorce 8-Dec-15 ZN2 ELE cable pulling Bulding first floor cable pulling installation inspection(LA5) 9-Dec-15 11-Dec-15 11.00am CLOSED 13-Dec-15 4 ACCEPTED 1 1
2296 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02267 Dorce 8-Dec-15 ZN2 ELE cable pulling Bulding second floor cable pulling installation 9-Dec-15 11-Dec-15 11.00am CLOSED 14-Dec-15 5 ACCEPTED 1 1
inspection(LA5)
2297 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02268 Dorce 8-Dec-15 ZN2 ELE cable pulling Bulding third floor cable pulling installation 9-Dec-15 11-Dec-15 11.00am CLOSED 15-Dec-15 6 ACCEPTED 1 1
inspection(LA5)
2298 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02269 Dorce 8-Dec-15 ZN2 ELE electrical works Building ground floor installation electrical inspection(LA5) 9-Dec-15 11-Dec-15 10.00am CLOSED 29-Dec-15 20 ACCEPTED 1 1
2299 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02270 Dorce 8-Dec-15 ZN2 ELE electrical works Building first floor installation electrical inspection(LA5) 9-Dec-15 11-Dec-15 10.00am CLOSED 12-Dec-15 3 ACCEPTED 1 1
2300 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02271 Dorce 8-Dec-15 ZN2 ELE electrical works Building second floor installation electrical inspection(LA5) 9-Dec-15 11-Dec-15 10.00am CLOSED 29-Dec-15 20 ACCEPTED 1 1
2301 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02272 Dorce 8-Dec-15 ZN2 ELE electrical works Building third floor installation electrical inspection(LA5) 9-Dec-15 11-Dec-15 10.00am CLOSED 29-Dec-15 20 ACCEPTED 1 1
2302 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02273 Shinryo 6-Dec-15 ZN2 MNE testing Testing of water heater at MA3(ground floor) 8-Dec-15 10-Dec-15 10.00am CLOSED 08-Dec-15 0 ACCEPTED 1 1
2303 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02274 Shinryo 6-Dec-15 ZN2 MNE testing Testing of water heater at MA3(first floor) 8-Dec-15 10-Dec-15 10.00am CLOSED 08-Dec-15 0 ACCEPTED 1 1
2304 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02275 Shinryo 6-Dec-15 ZN2 MNE testing Testing of water heater at MA3(Second floor) 8-Dec-15 10-Dec-15 10.00am CLOSED 08-Dec-15 0 ACCEPTED 1 1
2305 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02276 Shinryo 6-Dec-15 ZN2 MNE testing Testing of water heater at MA3 (Third floor) 8-Dec-15 10-Dec-15 10.00am CLOSED 08-Dec-15 0 ACCEPTED 1 1
2306 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02277 Dorce 7-Dec-15 ZN2 ELE Electrical works Building MDB electrical panael board installation 9-Dec-15 11-Dec-15 10.00am CLOSED 29-Dec-15 20 ACCEPTED 1 1
inspection(MA4)
2307 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02278 Dorce 7-Dec-15 ZN2 ELE Electrical works Building ground floor SDB electrical panael board 9-Dec-15 11-Dec-15 10.00am CLOSED 29-Dec-15 20 ACCEPTED 1 1
installation inspection(MA4)
2311 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02282 Dorce 8-Dec-15 ZN2 ELE Electrical works Building MDB electrical panael board installation 10-Dec-15 12-Dec-15 10.00am CLOSED 2-Jan-16 23 ACCEPTED 1 1
inspection(MA3)
2313 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02284 Dorce 8-Dec-15 ZN2 ELE Electrical works Building first floor SDB electrical panael board installation 12-Dec-15 14-Dec-15 10.00am CLOSED 29-Dec-15 17 ACCEPTED 1 1
inspection(MA3)
2315 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02286 Dorce 8-Dec-15 ZN2 ELE Electrical works Building third floor SDB electrical panael board installation 14-Dec-15 16-Dec-15 10.00am CLOSED 29-Dec-15 15 ACCEPTED 1 1
inspection(MA3)
2316 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02287 Dorce 18-Nov-15 ZN2 ELE Electrical works Building third floor installation of electrical inspection 19-Dec-15 21-Dec-15 10.00am CLOSED 29-Dec-15 10 ACCEPTED 1 1
(MA4)
2326 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02297 UEMB Amin 3-Jul-15 ZN2 CIV Drainage works installaion of u-drain size 450 x 300 near administration 61 4-Jul-15 6-Jul-15 10.00am CLOSED 1-Feb-16 212 ACCEPTED 1
parking lot at small package. Jointing with cement mortar..
installaion of u-drain size 450 x 300 & 450 x 450 near MA2
2328 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02299 UEMB Amin 11-Jul-15 ZN2 CIV Drainage works
& MA# at small package. Jointing with cement mortar.
8-Sep-15 10-Sep-15 10.00am CLOSED 8-Sep-15 0 ACCEPTED 1 1
2329 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02300 Seribu Bio 11-Dec-15 ZN2 CIV BRC installation BRC installation at multipurpose court at small package 12-Dec-15 14-Dec-15 2.00pm CLOSED 22-Dec-15 10 REJECTED 1 1
2330 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02301 Uemb aswad 14-Dec-15 ZN2 CIV Walkway Installation of BRC and formwork for walkway at Labour 14-Dec-15 16-Dec-15 11.00am CLOSED 1-Feb-16 53 ACCEPTED 1 1
Accomodations (LA6,LA4,LA2) and concreting works
2331 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02302 Shinryo 9-Dec-15 ZN2 MNE Installation Installation of water heater at Gymnasium 10-Dec-15 12-Dec-15 4.00pm CLOSED 10-Dec-15 0 ACCEPTED 1 1
2332 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02303 Shinryo 9-Dec-15 ZN2 MNE Testing Testing of water heater at Gymnasium 10-Dec-15 12-Dec-15 4.00pm CLOSED 10-Dec-15 0 ACCEPTED 1 1
2334 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02305 ISDA 11-Dec-15 ZN2 ELE Testing Testing of SMATV at MA3 12-Dec-15 14-Dec-15 10.30am CLOSED 29-Dec-15 17 ACCEPTED 1 1
2335 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02306 ISDA 11-Dec-15 ZN2 ELE Testing Testing of SMATV at LA2 12-Dec-15 14-Dec-15 10.30am CLOSED 27-Jan-16 46 ACCEPTED 1
1
2336 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02307 ISDA 11-Dec-15 ZN2 ELE Testing Testing of SMATV at LA4 12-Dec-15 14-Dec-15 10.30am CLOSED 27-Jan-16 46 ACCEPTED 1 1
2337 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02308 ISDA 11-Dec-15 ZN2 ELE Testing Testing of SMATV at LA5 12-Dec-15 14-Dec-15 10.30am CLOSED 7-Jan-15 -339 ACCEPTED 1 1
2338 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02309 ISDA 11-Dec-15 ZN2 ELE Testing Testing of SMATV at LA6 12-Dec-15 14-Dec-15 10.30am CLOSED 1-Feb-16 51 ACCEPTED 1 1
2339 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02310 ISDA 11-Dec-15 ZN2 ELE Testing Testing of SMATV at MA4 12-Dec-15 14-Dec-15 10.30am CLOSED 29-Dec-15 17 ACCEPTED 1 1
2342 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02313 dorce 1-Dec-15 ZN2 ELE Testing Building fixtures functionility test laundry at zone 2 2-Dec-15 4-Dec-15 10.00am CLOSED CANCEL 1 1
2343 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02314 dorce 1-Dec-15 ZN2 ELE Testing Building fixtures functionility test club house at zone 2 2-Dec-15 4-Dec-15 10.00am CLOSED 31-Dec-15 27 ACCEPTED 1
1
Building ground floor fixtures functionility test MA4 at
2344 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02315 dorce 3-Dec-15 ZN2 ELE Testing zone 2 4-Dec-15 6-Dec-15 9.30am CLOSED 31-Dec-15 27 ACCEPTED 1 1
2345 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02316 dorce 3-Dec-15 ZN2 ELE Testing Building first floor fixtures functionility test MA4 at zone 2 4-Dec-15 6-Dec-15 9.30am CLOSED 31-Dec-15 27 ACCEPTED 1 1
2346 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02317 dorce 3-Dec-15 ZN2 ELE Testing Building secondd floor fixtures functionility test MA4 at 4-Dec-15 6-Dec-15 9.30am CLOSED 31-Dec-15 27 ACCEPTED 1 1
zone 2
2347 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02318 dorce 3-Dec-15 ZN2 ELE Testing Building third floor fixtures functionility test MA4 at zone 2 4-Dec-15 6-Dec-15 9.30am CLOSED 31-Dec-15 27 ACCEPTED 1 1
2351 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02322 dorce 2-Dec-15 ZN2 ELE Testing Building third floor fixtures functionility test MA3 at zone 2 3-Dec-15 5-Dec-15 9.30am CLOSED 29-Dec-15 26 ACCEPTED 1 1
2352 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02323 dorce 2-Dec-15 ZN2 ELE Installation Building MDB electrical panel board installation inspection 9-Dec-15 11-Dec-15 10.00am CLOSED 2-Jan-16 24 ACCEPTED 1 1
LA5
2353 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02324 dorce 2-Dec-15 ZN2 ELE Installation Building ground floor SDB electrical panel board 9-Dec-15 11-Dec-15 10.00am CLOSED 2-Jan-16 24 ACCEPTED 1 1
installation inspection at LA5
2357 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02328 dorce 30-Nov-15 ZN2 ELE Testing Building ground floor cable insulation test at LA5 14-Dec-15 16-Dec-15 9.00am CLOSED 29-Dec-15 15 ACCEPTED 1 1
2358 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02329 dorce 30-Nov-15 ZN2 ELE Testing Building first floor cable insulation test at LA5 14-Dec-15 16-Dec-15 9.00am CLOSED 29-Dec-15 15 ACCEPTED 1 1
2359 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02330 dorce 30-Nov-15 ZN2 ELE Testing Building second floor cable insulation test at LA5 14-Dec-15 16-Dec-15 9.00am CLOSED 29-Dec-15 15 ACCEPTED 1 1
2360 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02331 dorce 30-Nov-15 ZN2 ELE Testing Building third floor cable insulation test at LA5 14-Dec-15 16-Dec-15 9.00am CLOSED 29-Dec-15 15 ACCEPTED 1 1
2361 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02332 dorce 5-Dec-15 ZN2 MNE Testing Pressure test for hose reel at LA5 ZN2 7-Dec-15 9-Dec-15 3.00pm CLOSED 19-Dec-15 12 ACCEPTED 1 1
2362 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02333 dorce 9-Dec-15 ZN2 MNE Testing Pressure test for hose reel at SA2 ZN2 10-Dec-15 12-Dec-15 9.00am CLOSED 10-Dec-15 0 ACCEPTED 1 1
2363 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02334 dorce 9-Dec-15 ZN2 MNE Testing Pressure test for hose reel at SA4 ZN2 10-Dec-15 12-Dec-15 9.00am CLOSED 10-Dec-15 0 ACCEPTED 1 1
2364 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02335 dorce 11-Dec-15 ZN2 MNE Testing Pressure test for hose reel at MA4 ZN3 14-Dec-15 16-Dec-15 3.00pm CLOSED 14-Dec-15 0 ACCEPTED 1 1
2365 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02336 dorce 16-Dec-15 ZN2 ARC Ceramic tiles works Building ceramic tiles works inspection (Security gate 19-Dec-15 21-Dec-15 9.00am CLOSED 21-Dec-15 2 ACCEPTED 1 1
building)
2366 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02337 dorce 16-Dec-15 ZN2 ARC screeding works Building screeding works inspection at Security gate 19-Dec-15 21-Dec-15 9.00am CLOSED 21-Dec-15 2 ACCEPTED 1 1
building
2368 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02339 dorce 16-Dec-15 ZN2 ARC Covering works Building PVC floor covering works inspection at Fire station 19-Dec-15 21-Dec-15 9.00am CLOSED 4-Jan-16 16 ACCEPTED 1 1
2369 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02340 dorce 16-Dec-15 ZN2 ARC screeding works Building first floor screed works inspection (CLA2) 19-Dec-15 21-Dec-15 9.00am CLOSED 21-Dec-15 2 ACCEPTED 1 1
2370 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02341 dorce 16-Dec-15 ZN2 ARC screeding works Building third floor screed works inspection (CLA2) 19-Dec-15 21-Dec-15 9.00am CLOSED 21-Dec-15 2 ACCEPTED 1 1
2378 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02349 AEIE 10-Dec-15 ZN2 ELE Earthing test Lightning protection system for Grocery (earthing test) 14-Dec-15 16-Dec-15 9.00am CLOSED 14-Dec-15 0 ACCEPTED 1 1
2379 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02350 AEIE 10-Dec-15 ZN2 ELE Earthing test Lightning protection system for Dojo (earthing test) 14-Dec-15 16-Dec-15 9.00am CLOSED 14-Dec-15 0 ACCEPTED 1 1
2380 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02351 AEIE 10-Dec-15 ZN2 ELE Earthing test Lightning protection system for Barber (earthing test) 14-Dec-15 16-Dec-15 9.00am CLOSED 14-Dec-15 0 ACCEPTED 1 1
2381 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02352 yuzuki 16-Dec-15 ZN2 CIV Fencing work Excavation, install and concreting post at RP1 17-Dec-15 19-Dec-15 3.30pm CLOSED 7-Jan-16 21 ACCEPTED 1 1
2382 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02353 Seribu Bio 17-Dec-15 ZN2 CIV lightpole foundation Foundation for 8m high light pole at Mini cricket 1 (CR-1) 18-Dec-15 20-Dec-15 3.00pm CLOSED 18-Dec-15 0 ACCEPTED 1 1
2386 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02357 Paneagle 17-Dec-15 ZN2 CIV Fencing work Inspection for fencing work installation prior to concrete 18-Dec-15 20-Dec-15 9.00am CLOSED 1-Feb-16 44 ACCEPTED 1 1
footing (fence post)
2387 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02358 Dorce 17-Dec-15 ZN2 ARC Ceramic and tile works Buildiing first floor cramic and tiles works installation 19-Dec-15 21-Dec-15 9.00am CLOSED 19-Dec-15 0 ACCEPTED 1 1
inspection (CLA4)
2390 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02361 Dorce 17-Dec-15 ZN2 ARC screeding works Building first floor screed works installation inspection at 19-Dec-15 21-Dec-15 9.00am CLOSED 19-Dec-15 0 ACCEPTED 1 1
CLA4
2391 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02362 Dorce 17-Dec-15 ZN2 ARC membrane application Building second floor water proofing and membrane 19-Dec-15 21-Dec-15 9.00am CLOSED 19-Dec-15 0 ACCEPTED 1 1
application inspection (CLA4)
2392 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02363 Dorce 17-Dec-15 ZN2 ARC membrane application Building third floor water proofing and membrane 19-Dec-15 21-Dec-15 9.00am CLOSED 21-Dec-15 2 ACCEPTED 1 1
application inspection (CLA4)
2393 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02364 Dorce 11-Dec-15 ZN2 ELE Electrical works Building cable insulation test at Guard house (GH 3) 12-Dec-15 14-Dec-15 9.00am CLOSED 22-Feb-16 72 ACCEPTED 1 1
2394 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02365 Dorce 11-Dec-15 ZN2 ELE Electrical works Building cable pulling installaton inspection at Guard 12-Dec-15 14-Dec-15 11.00am CLOSED 13-Jan-16 32 ACCEPTED 1 1
house (GH 3)
2395 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02366 intanco eng 14-Dec-15 ZN2 MNE testing Pressure test for hose reel at CLA4 15-Dec-15 17-Dec-15 10.30am CLOSED 15-Dec-15 0 ACCEPTED 1 1
2396 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02367 intanco eng 14-Dec-15 ZN2 MNE testing Pressure test for hose reel at CLA2 15-Dec-15 17-Dec-15 10.30am CLOSED 16-Dec-15 1 ACCEPTED 1 1
2397 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02368 intanco eng 14-Dec-15 ZN2 MNE testing Pressure test for hose reel at CLA6 15-Dec-15 17-Dec-15 10.30am CLOSED 19-Dec-15 4 ACCEPTED 1 1
concreting for light Concreting for light pile footing x 4nos at Five as side
2398 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02369 Seribu Bio 18-Dec-15 ZN2 CIV 19-Dec-15 21-Dec-15 3.00pm CLOSED 7-Jan-16 19 ACCEPTED 1 1
pole football (FB-1) small package
2399 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02370 Seribu Bio 18-Dec-15 ZN2 CIV concreting for light Concreting for light POLE footing x 4nos at Five as side 19-Dec-15 21-Dec-15 3.00pm CLOSED 7-Jan-16 19 ACCEPTED 1 1
pole football (FB-2) small package
2400 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02371 Seribu Bio 18-Dec-15 ZN2 CIV concreting for light Concreting for light pile footing x 2nos at Mini cricket (CR- 19-Dec-15 21-Dec-15 3.00pm CLOSED 7-Jan-16 19 ACCEPTED 1 1
pole 1) small package
2401 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02372 Seribu Bio 18-Dec-15 ZN2 CIV concreting for light Concreting for light pile footing x 2nos at Mini cricket (CR- 19-Dec-15 21-Dec-15 3.00pm CLOSED 7-Jan-16 19 ACCEPTED 1 1
pole 2) small package
2402 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02373 Dorce 18-Dec-15 ZN2 ARC Painting works Buildiing painting works inspetion at Laundry 19-Dec-15 21-Dec-15 9.00am CLOSED 6-Jan-16 18 ACCEPTED 1 1
2403 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02374 Dorce 18-Dec-15 ZN2 ARC Painting works Buildiing painting works inspection at Guard house 3 (GH3) 19-Dec-15 21-Dec-15 9.00am CLOSED 6-Jan-16 18 ACCEPTED 1 1
2405 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02376 UEMB Ridwan 10-Dec-15 ZN2 ELE testing Lighting protection system test for Workshop 14-Dec-15 16-Dec-15 2.30pm CLOSED CANCEL 1 1
2406 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02377 I-GEN 17-Dec-15 ZN2 MNE testing Testing for Fire Alarm System at Maintenance workshop 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
and store
2407 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02378 I-GEN 17-Dec-15 ZN2 MNE testing Testing for Fire Alarm System at Office for Catering and 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
Maintenance
2411 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02382 UEMB SADAM 3-Dec-15 ZN2 ARC furniture Architecture / ID area furniture supply in the building 4-Dec-15 6-Dec-15 2.00pm CLOSED 18-Dec-15 14 ACCEPTED 1 1
Internet Café
2412 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02383 UEMB SADAM 3-Dec-15 ZN2 ARC furniture Architecture / ID area furniture supply in the building Dojo 4-Dec-15 6-Dec-15 2.00pm CLOSED 18-Dec-15 14 ACCEPTED 1 1
& Sanitary fixtures
2413 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02384 UEMB SADAM 3-Dec-15 ZN2 ARC furniture Architecture / ID area furniture supply in the building 4-Dec-15 6-Dec-15 2.00pm CLOSED 18-Dec-15 14 ACCEPTED 1 1
Gymnasium & Sanitary fixtures
2414 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02385 I-GEN 25-Nov-15 ZN2 MNE Fire alarm test Testing for Fire Alarm system at Mess hall building and 26-Nov-15 28-Nov-15 10.00am CLOSED 29-Dec-15 33 ACCEPTED 1 1
Kitchen
2415 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02386 I-GEN 25-Nov-15 ZN2 MNE Fire alarm test Testing for Fire Alarm system atClub house 26-Nov-15 28-Nov-15 10.00am CLOSED 26-Nov-15 0 ACCEPTED 1 1
2418 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02389 Shinryo 17-Dec-15 ZN2 MNE Testing Testing of exhaust fan (LA5)-Ground floor 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
2419 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02390 Shinryo 17-Dec-15 ZN2 MNE Testing Testing of exhaust fan (LA5)-First floor 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
2420 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02391 Shinryo 17-Dec-15 ZN2 MNE Testing Testing of exhaust fan (LA5)-Second floor 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
2421 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02392 Shinryo 17-Dec-15 ZN2 MNE Testing Testing of exhaust fan (LA5)-Third floor 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
2422 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02393 Shinryo 17-Dec-15 ZN2 MNE Testing Testing of oscillation fan (LA5)- Ground floor 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
2423 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02394 Shinryo 17-Dec-15 ZN2 MNE Testing Testing of oscillation fan (LA5)- First floor 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
2424 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02395 Shinryo 17-Dec-15 ZN2 MNE Testing Testing of oscillation fan (LA5)- Second floor 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
2425 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02396 Shinryo 17-Dec-15 ZN2 MNE Testing Testing of oscillation fan (LA5)- Third floor 18-Dec-15 20-Dec-15 10.00am CLOSED 18-Dec-15 0 ACCEPTED 1 1
2429 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02400 I-GEN 29-Nov-15 ZN2 MNE Installation Installation of Fire protection system at Guard House 3 30-Nov-15 2-Dec-15 4.00pm CLOSED 9-Jan-16 40 ACCEPTED 1 1
(GH3)
2430 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02401 I-GEN 25-Nov-15 ZN2 MNE Installation Installation of Fire protection system at Club House 26-Nov-15 28-Nov-15 10.00am CLOSED 9-Jan-16 44 ACCEPTED 1 1
2431 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02402 I-GEN 25-Nov-15 ZN2 MNE Installation Installation of Fire protection system at Barber 26-Nov-15 28-Nov-15 2.30pm CLOSED 9-Jan-16 44 ACCEPTED 1 1
2432 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02403 I-GEN 25-Nov-15 ZN2 MNE Installation Installation of Fire protection system at Gymnasium 26-Nov-15 28-Nov-15 10.00am CLOSED 9-Jan-16 44 ACCEPTED 1 1
2433 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02404 I-GEN 25-Nov-15 ZN2 MNE Installation Installation of Fire protection system at Laundry 26-Nov-15 28-Nov-15 10.00am CLOSED 9-Jan-16 44 ACCEPTED 1 1
2436 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02407 I-GEN 25-Nov-15 ZN2 MNE Installation Installation of Fire Alarm system at Internet cafe 26-Nov-15 28-Nov-15 10.00am CLOSED 6-Jan-16 41 ACCEPTED 1 1
2437 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02408 I-GEN 25-Nov-15 ZN2 MNE Installation Installation of Fire protection equipment at Grocery 26-Nov-15 28-Nov-15 10.00am CLOSED 6-Jan-16 41 ACCEPTED 1 1
2438 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02409 I-GEN 26-Nov-15 ZN2 MNE Installation To inspect fire protection equipments at Post Office/ATM 27-Nov-15 29-Nov-15 10.00am CLOSED 13-Jan-16 47 ACCEPTED 1 1
building
2439 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02410 I-GEN 26-Nov-15 ZN2 MNE Installation To inspect fire protection equipments at Dojo building 27-Nov-15 29-Nov-15 10.00am CLOSED 13-Jan-16 44 ACCEPTED 1 1
2440 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02411 I-GEN 29-Nov-15 ZN2 MNE Installation Installation of Fire Alarm system at Management 30-Nov-15 2-Dec-15 4.00pm CLOSED 8-Jan-16 39 ACCEPTED 1 1
accomodation (MA3)- Ground floor
2442 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02413 I-GEN 29-Nov-15 ZN2 MNE Installation Installation of Fire Alarm system at Management 30-Nov-15 2-Dec-15 4.00pm CLOSED 8-Jan-16 39 ACCEPTED 1 1
accomodation (MA3)- Second floor
2443 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02414 I-GEN 29-Nov-15 ZN2 MNE Installation Installation of Fire Alarm system at Management 30-Nov-15 2-Dec-15 4.00pm CLOSED 8-Jan-16 39 ACCEPTED 1 1
accomodation (MA3)- Third floor
2445 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02416 I-GEN 29-Nov-15 ZN2 MNE Installation Installation of Fire Alarm system at Management 30-Nov-15 2-Dec-15 4.00pm CLOSED 8-Jan-16 39 ACCEPTED 1 1
accomodation (MA4)- First floor
2447 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02418 I-GEN 29-Nov-15 ZN2 MNE Installation Installation of Fire Alarm system at Management 30-Nov-15 2-Dec-15 4.00pm CLOSED 7-Jan-16 38 ACCEPTED 1 1
accomodation (MA4)- Third floor
2449 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02420 I-GEN 29-Nov-15 ZN2 MNE Installation Installation of Fire Alarm system at Management 30-Nov-15 2-Dec-15 4.00pm CLOSED 07-Jan-16 38 ACCEPTED 1 1
accomodation (LA5)- First floor
2451 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02422 I-GEN 29-Nov-15 ZN2 MNE Installation Installation of Fire Alarm system at Labour accomodation 30-Nov-15 2-Dec-15 4.00pm CLOSED 4-Jan-16 35 ACCEPTED 1 1
(LA5)- Third floor
2453 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02424 dorce 28-Dec-15 ZN2 ELE Electrical works Building lightning protection system inspection at 29-Dec-15 31-Dec-15 9.30am CLOSED 3-Feb-16 36 ACCEPTED RAPID-P20A1-UEMB-ZN2-CIV- 1 1
Gymnasium RFIN-02399
RAPID-P20A1-UEMB-ZN2-CIV-
2454 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02425 PPEC 29-Dec-15 ZN2 CIV Roadwork Application of prime coat at Small package area 30-Dec-15 1-Jan-16 8.00am CLOSED CANCEL RFIN-02400
1 1
2455 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02426 dorce 28-Dec-15 ZN2 ELE Electrical works Building lightning protection system inspection at Office 29-Dec-15 31-Dec-15 9.30am CLOSED 3-Feb-16 36 ACCEPTED RAPID-P20A1-UEMB-ZN2-CIV- 1 1
for catering RFIN-02401
2456 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02427 dorce 28-Dec-15 ZN2 ELE Electrical works Building lightning protection system inspection at Grocery 29-Dec-15 31-Dec-15 9.30am CLOSED 3-Feb-16 36 ACCEPTED RAPID-P20A1-UEMB-ZN2-ELE- 1 1
RFIN-02402
2457 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02428 dorce 28-Dec-15 ZN2 ELE Electrical works Building lightning protection system inspection at Barber 29-Dec-15 31-Dec-15 9.30am CLOSED 3-Feb-16 36 ACCEPTED RAPID-P20A1-UEMB-ZN2-ELE- 1 1
RFIN-02403
2458 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02429 dorce 28-Dec-15 ZN2 ELE Electrical works Building lightning protection system inspection at Dojo 29-Dec-15 31-Dec-15 9.30am CLOSED 3-Feb-16 36 ACCEPTED RAPID-P20A1-UEMB-ZN2-ELE- 1 1
RFIN-02404
RAPID-P20A1-UEMB-ZN2-ELE-
2460 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02431 AEIE 29-Dec-15 ZN2 ELE testing Earthing test for lightning protection system at club house 30-Dec-15 1-Jan-16 4.00pm CLOSED 2-Jan-16 3 ACCEPTED 1 1
RFIN-02406
2464 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02435 AEIE 29-Dec-15 ZN2 ELE testing Earthing test for lightning protection system at Supervisor 30-Dec-15 1-Jan-16 4.00pm CLOSED 30-Dec-15 0 REJECTED RAPID-P20A1-UEMB-ZN2-ELE- 1 1
accomodation 3 (CSA3) RFIN-02410
2468 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02439 dorce 13-Nov-15 ZN2 ELE Electrical works Buildinginstallation of electrical inspection at Grocery 14-Nov-16 16-Nov-16 3.00pm CLOSED 29-Dec-16 45 ACCEPTED RAPID-P20A1-UEMB-ZN2- 1 1
MNE-RFIN-02414
2469 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02440 Dorce 22-Dec-15 ZN2 MNE Installation Building internal PPR piping installation at Mess hall and 23-Dec-15 25-Dec-15 9.00am CLOSED 9-Jan-16 23 REJECTED RAPID-P20A1-UEMB-ZN2- 1 1
Kitchen bulding MNE-RFIN-02415
2470 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02441 Dorce 16-Dec-15 ZN2 ELE Electrical works Building ground floor fixtures functionality test at Labour 17-Dec-15 19-Dec-15 10.00am CLOSED 9-Jan-16 23 ACCEPTED RAPID-P20A1-UEMB-ZN2-ELE- 1 1
accomodation 5 (CLA5) RFIN-02416
2471 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02442 Dorce 16-Dec-15 ZN2 ELE Electrical works Building first floor fixtures functionality test at Labour 17-Dec-15 19-Dec-15 10.00am CLOSED 9-Jan-16 23 ACCEPTED RAPID-P20A1-UEMB-ZN2-ELE- 1 1
accomodation 5 (CLA5) RFIN-02417
2474 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02445 Shinryo 7-Dec-15 ZN2 MNE testing Testing of ACSU at Management accomodation (MA3)- 8-Dec-15 10-Dec-15 10.00am CLOSED 29-Dec-15 21 ACCEPTED RAPID-P20A1-UEMB-ZN2- 1 1
ground floor MNE-RFIN-02420
2476 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02447 Shinryo 7-Dec-15 ZN2 MNE testing Testing of ACSU at Management accomodation (MA3)- 8-Dec-15 10-Dec-15 10.00am CLOSED 29-Dec-15 21 ACCEPTED RAPID-P20A1-UEMB-ZN2- 1 1
second floor MNE-RFIN-02422
RAPID-P20A1-UEMB-ZN2-ELE-
2479 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02450 dorce 28-Dec-15 ZN2 ELE Electrical works Building lightning protection system inspection at Laundry 29-Dec-15 31-Dec-15 9.30am CLOSED CANCEL RFIN-02425
1 1
RAPID-P20A1-UEMB-ZN2-ELE-
2480 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02451 PPEC 29-Dec-15 ZN2 CIV Roadwork Laying of ACBC 28 at Small Package area (patching works) 30-Dec-15 1-Jan-16 10.00am CLOSED CANCEL RFIN-02426
1 1
XSMPT NK TUKAR
XSMPT NK TUKAR
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2493 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02464 I-GEN 28-Dec-15 ZN2 MNE testing Testing for fire alarm system at Guard House 3 (GH3) 29-Dec-15 31-Dec-15 10.00am CLOSED 29-Dec-15 0 ACCEPTED RFIN-02439 1 1
RAPID-P20A1-UEMB-ZN2-ELE-
2494 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02465 dorce 28-Dec-15 ZN2 ELE testing Polarity test for MA4-Ground floor 29-Dec-15 31-Dec-15 6.00pm CLOSED 29-Dec-15 0 ACCEPTED
RFIN-02440
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2495 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02466 dorce 28-Dec-15 ZN2 ELE testing Polarity test for MA4-First floor 29-Dec-15 31-Dec-15 6.00pm CLOSED 29-Dec-15 0 ACCEPTED
RFIN-02441
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2496 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02467 dorce 28-Dec-15 ZN2 ELE testing Polarity test for MA4-Second floor 29-Dec-15 31-Dec-15 6.00pm CLOSED 29-Dec-15 0 ACCEPTED
RFIN-02442
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2497 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02468 dorce 28-Dec-15 ZN2 ELE testing Polarity test for MA4-Third floor 29-Dec-15 31-Dec-15 6.00pm CLOSED 29-Dec-15 0 ACCEPTED
RFIN-02443
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2498 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02469 dorce 28-Dec-15 ZN2 ELE testing Polarity test for MA3-Ground floor 29-Dec-15 31-Dec-15 6.00pm CLOSED 29-Dec-15 0 ACCEPTED
RFIN-02444
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2499 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02470 dorce 28-Dec-15 ZN2 ELE testing Polarity test for MA3-First floor 29-Dec-15 31-Dec-15 6.00pm CLOSED 29-Dec-15 0 ACCEPTED
RFIN-02445
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2500 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02471 dorce 28-Dec-15 ZN2 ELE testing Polarity test for MA3-Second floor 29-Dec-15 31-Dec-15 6.00pm CLOSED 29-Dec-15 0 ACCEPTED
RFIN-02446
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2501 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02472 dorce 28-Dec-15 ZN2 ELE testing Polarity test for MA3-Third floor 29-Dec-15 31-Dec-15 6.00pm CLOSED 29-Dec-15 0 ACCEPTED
RFIN-02447
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2502 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02473 dorce 29-Dec-15 ZN2 ELE testing Polarity test for LA5-Ground floor 30-Dec-15 1-Jan-16 10.00am CLOSED 30-Dec-15 0 ACCEPTED
RFIN-02448
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2503 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02474 dorce 29-Dec-15 ZN2 ELE testing Polarity test for LA5-First floor 31-Dec-15 2-Jan-16 10.00am CLOSED 31-Dec-15 0 ACCEPTED RFIN-02449 1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2504 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02475 dorce 29-Dec-15 ZN2 ELE testing Polarity test for LA5-Second floor 1-Jan-16 3-Jan-16 10.00am CLOSED 1-Jan-16 ACCEPTED
RFIN-02450
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2505 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02476 dorce 29-Dec-15 ZN2 ELE testing Polarity test for LA5-Third floor 2-Jan-16 4-Jan-16 10.00am CLOSED 2-Jan-16 0 ACCEPTED
RFIN-02451
1 1
XSMPT NK TUKAR
RAPID-P20A1-UEMB-ZN2-ELE-
2506 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02477 dorce 24-Nov-15 ZN2 ELE testing Polarity test for laundry 26-Nov-15 28-Nov-15 3.00pm CLOSED CANCEL RFIN-02452
1 1
RAPID-P20A1-UEMB-ZN2-ELE-
2507 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02478 AEIE 31-Dec-15 ZN2 ELE Earthing test Testing for earthing for DB protection at LA5 31-Dec-15 2-Jan-16 2.00pm CLOSED CANCEL RFIN-02453
1 1
2510 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02481 saddam 3-Dec-15 ZN2 ARC furniture Architecture / ID area furniture supply in the Post Office 4-Dec-15 6-Dec-15 2.00pm CLOSED 18-Dec-16 380 ACCEPTED RAPID-P20A1-UEMB-ZN2-ARC- 1 1
RFIN-02456
2512 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02483 Dorce 4-Jan-16 ZN2 ARC membrane application Building first floor water proofing membrane aplication 5-Jan-16 7-Jan-16 9.00am CLOSED 5-Jan-16 0 ACCEPTED 1 1
inspection (SA2)-all toilets
2513 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02484 Dorce 4-Jan-16 ZN2 ARC membrane application Building second floor water proofing membrane aplication 6-Jan-16 8-Jan-16 9.00am CLOSED 8-Jan-16 2 ACCEPTED 1 1
inspection (SA2)-all toilets
2514 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02485 Dorce 4-Jan-16 ZN2 ARC membrane application Building third floor water proofing membrane aplication 6-Jan-16 8-Jan-16 9.00am CLOSED 8-Jan-16 2 ACCEPTED 1 1
inspection (SA2)-all toilets
2515 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02486 Dorce 4-Jan-16 ZN2 ARC screeding works Building ground floor screed works inspection (SA2)(all 5-Jan-16 7-Jan-16 9.00am CLOSED 5-Jan-16 0 ACCEPTED 1 1
toilet)
2516 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02487 Dorce 4-Jan-16 ZN2 ARC screeding works Building first floor screed works inspection (SA2) 5-Jan-16 7-Jan-16 9.00am CLOSED 5-Jan-16 0 ACCEPTED 1 1
2517 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02488 Dorce 4-Jan-16 ZN2 ARC screeding works Building second floor screed works inspection (SA2)-all 6-Jan-16 8-Jan-16 9.00am CLOSED 8-Jan-16 2 ACCEPTED 1 1
toilet
2519 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02490 Dorce 4-Jan-16 ZN2 ARC screeding works Building ground floor ceramic tiles works inspection (SA2)- 5-Jan-16 7-Jan-16 9.00am CLOSED 5-Jan-16 0 ACCEPTED 1 1
all toilet
2520 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02491 Dorce 4-Jan-16 ZN2 ARC screeding works Building first floor ceramic tiles works inspection (SA2) 6-Jan-16 8-Jan-16 9.00am CLOSED 12-Apr-16 97 ACCEPTED 1 1
2526 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02497 intanco eng 30-Dec-15 ZN2 PIP Installation Request for inspection of installation piping and hose reel 31-Dec-15 2-Jan-16 2.30pm CLOSED 31-Dec-15 0 ACCEPTED 1 1
for fire fighting system at LA5
2527 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02498 intanco eng 30-Dec-15 ZN2 PIP Installation Request for inspection of installation piping and hose reel 31-Dec-15 2-Jan-16 2.30pm CLOSED 31-Dec-15 0 ACCEPTED 1 1
for fire fighting system at LA6
2528 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02499 intanco eng 30-Dec-15 ZN2 PIP Installation Request for inspection of installation piping and hose reel 31-Dec-15 2-Jan-16 2.30pm CLOSED 31-Dec-15 0 ACCEPTED 1 1
for fire fighting system at SA4
2529 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-02500 intanco eng 30-Dec-15 ZN2 PIP Installation Request for inspection of installation piping and hose reel 31-Dec-15 2-Jan-16 2.30pm CLOSED 31-Dec-15 1 ACCEPTED 1 1
for fire fighting system at SA2
2530 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02501 Dorce 23-Dec-15 ZN2 ELE ELEctrical works Building electrical fixtures functionalty test Mess hall and 30-Dec-15 1-Jan-16 9.15am CLOSED 7-Jan-16 8 ACCEPTED 1 1
Kitchen
2531 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02502 saddam 6-Jan-16 ZN2 ARC furniture Furniture arrangement at Mess hall for inspection 6-Jan-16 8-Jan-16 2.00pm CLOSED 15-Jan-16 9 ACCEPTED PTOD 1 1
2532 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02503 saddam 6-Jan-16 ZN2 ARC furniture Furniture arrangement at Mess hall for inspection 6-Jan-16 8-Jan-16 2.00pm CLOSED CANCEL CANCEL 1 1
2534 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02505 saddam 6-Jan-16 ZN2 ARC furniture Furniture arrangement and supply in the Office for 6-Jan-16 8-Jan-16 2.00pm CLOSED 15-Jan-16 9 ACCEPTED 1 1
Maintenance to inspection
2536 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02507 saddam 6-Jan-16 ZN2 ARC furniture Furniture arrangement and supply in the Management 6-Jan-16 8-Jan-16 2.00pm CLOSED 15-Jan-16 9 ACCEPTED 1 1
Accomodation 3 (CMA3) to inspection
2539 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02510 dorce 30-Dec-15 ZN2 MNE Hydro Test Building first floor PPRC piping installation inspection and 30-Dec-15 1-Jan-16 10.00am CLOSED 13-Jan-16 14 ACCEPTED 1 1
hydrotest (LA2)
2540 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02511 dorce 30-Dec-15 ZN2 MNE Hydro Test Building second floor PPRC piping installation inspection 30-Dec-15 1-Jan-16 10.00am CLOSED 13-Jan-16 14 ACCEPTED 1 1
and hydrotest (LA2)
2544 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02515 dorce 30-Dec-15 ZN2 MNE Hydro Test Building second floor PPRC piping installation inspection 30-Dec-15 1-Jan-16 10.00am CLOSED 30-Dec-15 0 ACCEPTED 1 1
and hydrotest (LA4)
2545 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02516 dorce 30-Dec-15 ZN2 MNE Hydro Test Building third floor PPRC piping installation inspection and 30-Dec-15 1-Jan-16 10.00am CLOSED 30-Dec-15 0 ACCEPTED 1 1
hydrotest (LA4)
2547 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02518 saddam 13-Dec-15 ZN2 ARC furniture Architecture/ ID area furniture supply in the building 4-Dec-15 6-Dec-15 2.00pm CLOSED 18-Dec-15 14 ACCEPTED 1 1
Barber
2548 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02519 dorce 7-Jan-16 ZN2 ELE Electrical works Building ground floor cable insulation test (SA2) 8-Jan-16 10-Jan-16 9.00am CLOSED 16-Jan-16 8 ACCEPTED 1 1
2549 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02520 dorce 7-Jan-16 ZN2 ELE Electrical works Building first floor cable insulation test (SA2) 8-Jan-16 10-Jan-16 9.00am CLOSED 10-Jan-16 2 ACCEPTED 1 1
2550 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02521 dorce 7-Jan-16 ZN2 ELE Electrical works Building second floor cable insulation test (SA2) 8-Jan-16 10-Jan-16 9.00am CLOSED 10-Jan-16 2 ACCEPTED 1 1
2551 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02522 dorce 7-Jan-16 ZN2 ELE Electrical works Building third floor cable insulation test (SA2) 8-Jan-16 10-Jan-16 9.00am CLOSED 10-Jan-16 2 ACCEPTED 1 1
2552 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02523 dorce 9-Jan-16 ZN2 ELE Electrical works Building ground floor cable insulation test (SA4) 11-Jan-16 13-Jan-16 9.00am CLOSED 18-Jan-16 7 ACCEPTED 1 1
2553 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02524 dorce 9-Jan-16 ZN2 ELE Electrical works Building first floor cable insulation test (SA4) 11-Jan-16 13-Jan-16 9.00am CLOSED 18-Jan-16 7 ACCEPTED 1 1
2554 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02525 dorce 9-Jan-16 ZN2 ELE Electrical works Building second floor cable insulation test (SA4) 11-Jan-16 13-Jan-16 9.00am CLOSED 18-Jan-16 7 ACCEPTED 1 1
2555 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02526 dorce 9-Jan-16 ZN2 ELE Electrical works Building third floor cable insulation test (SA4) 11-Jan-16 13-Jan-16 9.00am CLOSED 18-Jan-16 7 ACCEPTED 1 1
2562 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02533 dorce 14-Jan-16 ZN2 STR Assembling works Building chassis to stump connection inspection at CLA2 15-Jan-16 17-Jan-16 9.00am CLOSED 17-Jan-16 2 ACCEPTED 1 1
2563 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02534 dorce 14-Jan-16 ZN2 STR Assembling works Building chassis to stump connection inspection at CLA4 15-Jan-16 17-Jan-16 9.15am CLOSED 17-Jan-16 2 ACCEPTED 1 1
2564 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02535 dorce 14-Jan-16 ZN2 STR Assembling works Building chassis to stump connection inspection at CLA6 15-Jan-16 17-Jan-16 9.30am CLOSED 16-Jan-16 1 ACCEPTED 1 1
2569 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02540 AEIE 16-Jan-16 ZN2 ELE Earthing test Lightning protection system test at Messhall Building 16-Jan-16 18-Jan-16 10.00am CLOSED 3-Feb-16 18 ACCEPTED 1 1
2571 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02542 Dorce 6-Dec-15 ZN2 ELE Electrical works Building electrical panel board installation inspection at 7-Dec-15 9-Dec-15 10.00am CLOSED 27-Jan-16 51 ACCEPTED 1 1
Maintanance workshop
2573 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02544 Gapura 19-Jan-16 ZN2 STR material Install hot dip galvanized steel oil interceptor cover at 19-Jan-16 21-Jan-16 2.00pm CLOSED 20-Jan-16 1 ACCEPTED 1 1
Mess hall Kitchen
2574 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02545 dorce 16-Jan-16 ZN2 ELE Electrical works Building ground floor cable insulation test (CLA6) 18-Jan-16 20-Jan-16 9.30am CLOSED 27-Jan-16 9 ACCEPTED 1 1
2575 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02546 dorce 16-Jan-16 ZN2 ELE Electrical works Building first floor cable insulation test (CLA6) 18-Jan-16 20-Jan-16 9.30am CLOSED 27-Jan-16 9 ACCEPTED 1 1
2576 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02547 dorce 16-Jan-16 ZN2 ELE Electrical works Building second floor cable insulation test (CLA6) 18-Jan-16 20-Jan-16 9.30am CLOSED 27-Jan-16 9 ACCEPTED 1 1
2577 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02548 dorce 16-Jan-16 ZN2 ELE Electrical works Building third floor cable insulation test (CLA6) 18-Jan-16 20-Jan-16 9.30am CLOSED 27-Jan-16 9 ACCEPTED 1 1
2578 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02549 dorce 16-Jan-16 ZN2 ELE Electrical works Building ground floor cable insulation test (CLA2) 18-Jan-16 20-Jan-16 10.00am CLOSED 27-Jan-16 9 ACCEPTED 1 1
2579 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02550 dorce 16-Jan-16 ZN2 ELE Electrical works Building first floor cable insulation test (CLA2) 18-Jan-16 20-Jan-16 10.00am CLOSED 27-Jan-16 9 ACCEPTED 1 1
2580 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02551 dorce 16-Jan-16 ZN2 ELE Electrical works Building second floor cable insulation test (CLA2) 18-Jan-16 20-Jan-16 10.00am CLOSED 27-Jan-16 9 ACCEPTED 1 1
2581 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02552 dorce 16-Jan-16 ZN2 ELE Electrical works Building third floor cable insulation test (CLA2) 18-Jan-16 20-Jan-16 10.00am CLOSED 24-Jan-16 6 ACCEPTED 1 1
2582 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02553 dorce 16-Jan-16 ZN2 ELE Electrical works Building ground floor cable insulation test (CLA4) 18-Jan-16 20-Jan-16 2.00pm CLOSED 27-Jan-16 9 ACCEPTED 1 1
2583 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02554 dorce 16-Jan-16 ZN2 ELE Electrical works Building first floor cable insulation test (CLA4) 18-Jan-16 20-Jan-16 2.00pm CLOSED 27-Jan-16 9 ACCEPTED 1 1
2584 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02555 dorce 16-Jan-16 ZN2 ELE Electrical works Building second floor cable insulation test (CLA4) 18-Jan-16 20-Jan-16 2.00pm CLOSED 27-Jan-16 9 ACCEPTED 1 1
2585 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02556 dorce 16-Jan-16 ZN2 ELE Electrical works Building third floor cable insulation test (CLA4) 18-Jan-16 20-Jan-16 2.00pm CLOSED 27-Jan-16 9 ACCEPTED 1 1
2586 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02557 dorce 20-Jan-16 ZN2 ARC membrane application Building ground floor water proofing membrane 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
application inspection (LA6)
2587 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02558 dorce 20-Jan-16 ZN2 ARC membrane application Building first floor water proofing membrane application 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
inspection (LA6)
2588 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02559 dorce 20-Jan-16 ZN2 ARC membrane application Building second floor water proofing membrane 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
application inspection (LA6)
2589 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02560 dorce 20-Jan-16 ZN2 ARC membrane application Building third floor water proofing membrane application 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
inspection (LA6)
2590 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02561 dorce 20-Jan-16 ZN2 ARC screeding works Building ground floor screed works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2591 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02562 dorce 20-Jan-16 ZN2 ARC screeding works Building first floor screed works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2592 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02563 dorce 20-Jan-16 ZN2 ARC screeding works Building second floor screed works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2593 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02564 dorce 20-Jan-16 ZN2 ARC screeding works Building third floor screed works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2594 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02565 dorce 20-Jan-16 ZN2 ARC Ceramic tiles works Building ground floor ceramic tiles works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2595 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02566 dorce 20-Jan-16 ZN2 ARC Ceramic tiles works Building first floor ceramic tiles works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2596 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02567 dorce 20-Jan-16 ZN2 ARC Ceramic tiles works Building second floor ceramic tiles works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2597 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02568 dorce 20-Jan-16 ZN2 ARC Ceramic tiles works Building third floor ceramic tiles works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2598 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02569 dorce 20-Jan-16 ZN2 ARC PVC covering works Building ground floor PVC floor covering works inspection 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
(LA6)
2599 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02570 dorce 20-Jan-16 ZN2 ARC PVC covering works Building first floor PVC floor covering works inspection 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
(LA6)
2600 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02571 dorce 20-Jan-16 ZN2 ARC PVC covering works Building second floor PVC floor covering works inspection 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
(LA6)
2601 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02572 dorce 20-Jan-16 ZN2 ARC PVC covering works Building third floor PVC floor covering works inspection 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
(LA6)
2602 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02573 dorce 20-Jan-16 ZN2 ARC Painting works Building ground floor painting works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2603 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02574 dorce 20-Jan-16 ZN2 ARC Painting works Building first floor painting works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2604 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02575 dorce 20-Jan-16 ZN2 ARC Painting works Building second floor painting works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2605 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02576 dorce 20-Jan-16 ZN2 ARC Painting works Building third floor painting works inspection (LA6) 22-Jan-16 24-Jan-16 9.00am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2606 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02577 dorce 21-Jan-16 ZN2 ARC Painting works Building third floor painting works inspection 22-Jan-16 24-Jan-16 9.00am CLOSED 22-Jan-16 0 ACCEPTED 1 1
(Maintenance workshop)
2608 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02579 dorce 21-Jan-16 ZN2 ARC water proofing works Building first floor water proofing works inspection (LA2) 23-Jan-16 25-Jan-16 9.00am CLOSED 24-Jan-16 1 ACCEPTED 1 1
2610 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02581 dorce 21-Jan-16 ZN2 ARC water proofing works Building third floor water proofing works inspection (LA2) 23-Jan-16 25-Jan-16 9.00am CLOSED 24-Jan-16 1 ACCEPTED 1 1
2612 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02583 dorce 21-Jan-16 ZN2 ARC PVC covering works Building first floor PVC floor covering works inspection 23-Jan-16 25-Jan-16 9.00am CLOSED 24-Jan-16 1 ACCEPTED 1 1
(LA2)
2613 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02584 dorce 21-Jan-16 ZN2 ARC PVC covering works Building second floor PVC floor covering works inspection 23-Jan-16 25-Jan-16 9.00am CLOSED 24-Jan-16 1 ACCEPTED 1 1
(LA2)
2614 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02585 dorce 21-Jan-16 ZN2 ARC PVC covering works Building third floor PVC floor covering works inspection 23-Jan-16 25-Jan-16 9.00am CLOSED 24-Jan-16 1 ACCEPTED 1 1
(LA2)
2615 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02586 dorce 21-Jan-16 ZN2 ARC PVC covering works Building ground floor PVC floor covering works inspection 23-Jan-16 25-Jan-16 9.00am CLOSED 2-Feb-16 10 ACCEPTED 1 1
(LA4)
2616 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02587 dorce 21-Jan-16 ZN2 ARC PVC covering works Building first floor PVC floor covering works inspection 23-Jan-16 25-Jan-16 9.00am CLOSED 2-Feb-16 10 ACCEPTED 1 1
(LA4)
2617 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02588 dorce 21-Jan-16 ZN2 ARC PVC covering works Building second floor PVC floor covering works inspection 23-Jan-16 25-Jan-16 9.00am CLOSED 2-Feb-16 10 ACCEPTED 1 1
(LA4)
2618 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02589 dorce 21-Jan-16 ZN2 ARC PVC covering works Building third floor PVC floor covering works inspection 23-Jan-16 25-Jan-16 9.00am CLOSED 2-Feb-16 10 ACCEPTED 1 1
(LA4)
2619 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02590 dorce 21-Jan-16 ZN2 ARC Painting works Building ground floor painting works inspection (LA4) 23-Jan-16 25-Jan-16 9.00am CLOSED 2-Feb-16 10 ACCEPTED 1 1
2620 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02591 dorce 21-Jan-16 ZN2 ARC Painting works Building first floor painting works inspection (LA4) 23-Jan-16 25-Jan-16 9.00am CLOSED 2-Feb-16 10 ACCEPTED 1 1
2621 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02592 dorce 21-Jan-16 ZN2 ARC Painting works Building second floor painting works inspection (LA4) 23-Jan-16 25-Jan-16 9.00am CLOSED 2-Feb-16 10 ACCEPTED 1 1
2622 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02593 dorce 21-Jan-16 ZN2 ARC Painting works Building third floor painting worksinspection (LA4) 23-Jan-16 25-Jan-16 9.00am CLOSED 2-Feb-16 10 ACCEPTED 1 1
2623 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02594 dorce 21-Jan-16 ZN2 ARC screeding works Building ground floor screed works inspection (SA4) 23-Jan-16 25-Jan-16 9.00am CLOSED CANCEL 1 1
2624 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02595 dorce 21-Jan-16 ZN2 ARC screeding works Building first floor screed works inspection (SA4) 23-Jan-16 25-Jan-16 9.00am CLOSED CANCEL 1 1
2625 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02596 dorce 21-Jan-16 ZN2 ARC screeding works Building second floor screed works inspection (SA4) 23-Jan-16 25-Jan-16 9.00am CLOSED CANCEL 1 1
2626 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02597 dorce 21-Jan-16 ZN2 ARC screeding works Building third floor screed works inspection (SA4) 23-Jan-16 25-Jan-16 9.00am CLOSED CANCEL 1 1
2634 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02605 dorce 21-Jan-16 ZN2 ARC PVC covering works Building third floor PVC floor covering works inspection 23-Jan-16 25-Jan-16 9.00am CLOSED 4-Feb-16 12 ACCEPTED 1 1
(SA4)
2635 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02606 seribu bio 21-Jan-16 ZN2 ELE lightpole installation Lighting pole installation at Mini circket 2 (CR-2) (small 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
package)
2636 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02607 seribu bio 21-Jan-16 ZN2 ELE lightpole installation Lighting pole installation at Mini circket 1 (CR-1) (small 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
package)
2637 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02608 seribu bio 21-Jan-16 ZN2 ELE lightpole installation Installation 8m lightpoles at Five a side field 2 (FB-2) 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
2638 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02609 seribu bio 21-Jan-16 ZN2 ELE lightpole installation Installation of 8m light pole at Five-a side field 1 (FB-1) 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
2639 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02610 seribu bio 21-Jan-16 ZN2 ELE lightpole installation program logic controller installation / placement at five a 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
side 1(FB-1)
2640 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02611 seribu bio 21-Jan-16 ZN2 ELE lightpole installation program logic controller installation / placement at five a 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
side 2(FB-2)
2641 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02612 seribu bio 21-Jan-16 ZN2 CIV Goalpost installation Goal post installation at Five a side football 1 (FB-1) 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
2642 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02613 seribu bio 21-Jan-16 ZN2 CIV Goalpost installation Goal post installation at Five a side football 2 (FB-2) 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
2643 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02614 seribu bio 21-Jan-16 ZN2 CIV Netting Installation of netting at bracing at Mini cricket 1 (CR-1) 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
2644 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02615 seribu bio 21-Jan-16 ZN2 CIV Survey Netting installation at Mini cricket 2 (CR-2) 22-Jan-16 24-Jan-16 4.00pm CLOSED 19-Feb-16 28 ACCEPTED 1 1
2645 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02616 seribu bio 21-Jan-16 ZN2 CIV Marking Line marking for Five-a-side field 1 (FB-1) 22-Jan-16 24-Jan-16 4.00pm CLOSED 25-Apr-16 94 ACCEPTED 1 1
2646 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02617 seribu bio 21-Jan-16 ZN2 CIV Marking Line marking forMini cricket 1 (CR-1) 22-Jan-16 24-Jan-16 4.00pm CLOSED 25-Apr-16 94 ACCEPTED 1 1
2647 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02618 seribu bio 21-Jan-16 ZN2 CIV Marking Line marking for Five-a-side field 2 (FB-2) 22-Jan-16 24-Jan-16 4.00pm CLOSED 25-Apr-16 94 ACCEPTED 1 1
2648 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02619 seribu bio 21-Jan-16 ZN2 CIV Marking Line marking forMini cricket 2 (CR-2) 22-Jan-16 24-Jan-16 4.00pm CLOSED 25-Apr-16 94 ACCEPTED 1 1
2654 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02625 iszda 19-Jan-16 ZN2 ELE testing Inspection of testing receiver SMATV at SA4 20-Jan-16 22-Jan-16 10.00am CLOSED 28-Jan-16 8 ACCEPTED 1 1
2655 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02626 iszda 20-Jan-16 ZN2 ELE testing Inspection of testing receiver SMATV at SA2 21-Jan-16 23-Jan-16 9.30am CLOSED 28-Jan-16 7 ACCEPTED 1 1
2656 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02627 I-GEN 20-Jan-16 ZN2 MNE testing Testing of fire alarm system at SA2 22-Jan-16 24-Jan-16 5.00pm CLOSED 30-Jan-16 8 ACCEPTED 1 1
2657 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02628 dorce 26-Jan-16 ZN2 ARC membrane application Water proofing membrane application inspection at toilet 27-Jan-16 29-Jan-16 9.00am CLOSED 27-Jan-16 0 ACCEPTED 1 1
area(Laundry)
2658 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02629 dorce 26-Jan-16 ZN2 ARC screeding works Screed works inspection at Toilet area(Laundry) 28-Jan-16 30-Jan-16 9.00am CLOSED 28-Jan-16 0 ACCEPTED 1 1
2659 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02630 dorce 26-Jan-16 ZN2 ARC membrane application Water proofing membrane application inspection at toilet 28-Jan-16 30-Jan-16 9.00am CLOSED 28-Jan-16 0 ACCEPTED 1 1
area(Mess hall)
2660 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02631 dorce 26-Jan-16 ZN2 ARC Painting works Building painting work inspection (Mess hall) 28-Jan-16 30-Jan-16 9.00am CLOSED 28-Jan-16 0 ACCEPTED 1 1
2663 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02634 Shinryo 14-Jan-16 ZN2 MNE Installation Installation of water heater (GF) at SA2 15-Jan-16 17-Jan-16 10.00am CLOSED 15-Jan-16 0 ACCEPTED 1 1
2664 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02635 iszda 20-Jan-16 ZN2 ELE testing Inspection ICT for cable analyzer and test result SA2 22-Jan-16 24-Jan-16 9.30am CLOSED 27-Jan-16 5 ACCEPTED 1 1
2666 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02637 dorce 5-Jan-16 ZN2 ELE Electrical works Building first floor cable pulling installation inspection 6-Jan-16 8-Jan-16 9.00am CLOSED 6-Jan-16 0 ACCEPTED 1 1
(SA4)
2667 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02638 dorce 5-Jan-16 ZN2 ELE Electrical works Building second floor cable pulling installation inspection 6-Jan-16 8-Jan-16 9.00am CLOSED 22-Feb-16 47 ACCEPTED 1 1
(SA4)
2669 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02640 dorce 13-Jan-16 ZN2 ELE Electrical works Building MDB electrical panel board installation inspection 14-Jan-16 16-Jan-16 10.00am CLOSED 26-Feb-16 43 ACCEPTED 1 1
(CSA2)
2672 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02643 dorce 19-Jan-16 ZN2 ELE Electrical works Building second floor SDB panel board installation 20-Jan-16 22-Jan-16 4.00pm CLOSED 20-Jan-16 0 ACCEPTED 1 1
inspection (CSA2)
2674 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02645 Shinryo 14-Jan-16 ZN2 MNE Installation Installation of ACSU (GF) SA2 15-Jan-16 17-Jan-16 9.00am CLOSED 17-Jan-16 2 ACCEPTED 1 1
2675 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02646 Shinryo 14-Jan-16 ZN2 MNE Installation Installation of ACSU (1st F) SA2 15-Jan-16 17-Jan-16 9.00am CLOSED 17-Jan-16 2 ACCEPTED 1 1
2676 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02647 Shinryo 14-Jan-16 ZN2 MNE Installation Installation of ACSU (2nd F) SA2 15-Jan-16 17-Jan-16 9.00am CLOSED 17-Jan-16 2 ACCEPTED 1 1
2677 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02648 Shinryo 14-Jan-16 ZN2 MNE Installation Installation of ACSU (3rd F) SA2 15-Jan-16 17-Jan-16 9.00am CLOSED CANCEL 1 1
2678 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02649 Shinryo 14-Jan-16 ZN2 MNE Installation Installation of water heater (1 F) SA2 15-Jan-16 17-Jan-16 10.00am CLOSED CANCEL 1 1
2679 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02650 Shinryo 14-Jan-16 ZN2 MNE Installation Installation of water heater (2 F) SA2 15-Jan-16 17-Jan-16 10.00am CLOSED 15-Jan-16 0 ACCEPTED 1 1
2680 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02651 Shinryo 14-Jan-16 ZN2 MNE Installation Installation of water heater (3 F) SA2 15-Jan-16 17-Jan-16 2.30pm CLOSED 15-Jan-16 0 ACCEPTED 1 1
2681 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02652 I-GEN 21-Jan-16 ZN2 MNE testing Testing of fire alarm system at LA6 23-Jan-16 25-Jan-16 5.00pm CLOSED 30-Jan-16 7 ACCEPTED 1 1
2682 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02653 I-GEN 20-Jan-16 ZN2 MNE testing Testing of fire alarm system at SA4 24-Jan-16 26-Jan-16 4.00pm CLOSED 30-Jan-16 6 ACCEPTED 1 1
2683 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02654 I-GEN 19-Jan-16 ZN2 MNE Installation Installation of fire fighting equipments/system at SA4 20-Jan-16 22-Jan-16 9.30am CLOSED 20-Jan-16 0 ACCEPTED 1 1
building (ground floor)
2684 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02655 I-GEN 19-Jan-16 ZN2 MNE Installation Installation of fire fighting equipments/system at SA4 (first 20-Jan-16 22-Jan-16 9.30am CLOSED 20-Jan-16 0 ACCEPTED 1 1
floor)
2685 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02656 I-GEN 19-Jan-16 ZN2 MNE Installation Installation of fire fighting equipments/system at SA4 20-Jan-16 22-Jan-16 9.30am CLOSED 20-Jan-16 0 ACCEPTED 1 1
second floor)
2688 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02659 I-GEN 19-Jan-16 ZN2 MNE Installation Installation of fire fighting equipments/system at SA2 (first 20-Jan-16 22-Jan-16 9.30am CLOSED 20-Jan-16 0 ACCEPTED 1 1
floor)
2689 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02660 I-GEN 19-Jan-16 ZN2 MNE Installation Installation of fire fighting equipments/system at SA2 20-Jan-16 22-Jan-16 9.30am CLOSED 20-Jan-16 0 ACCEPTED 1 1
(second floor)
2690 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02661 I-GEN 19-Jan-16 ZN2 MNE Installation Installation of fire fighting equipments/system at SA2 20-Jan-16 22-Jan-16 9.30am CLOSED 20-Jan-16 0 ACCEPTED 1 1
(third floor)
2691 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02662 Dorce 13-Jan-16 ZN2 ELE Electrical works Building ground floor polarity test at SA2 14-Jan-16 16-Jan-16 2.00pm CLOSED 30-Jan-16 16 ACCEPTED 1 1
2692 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02663 Dorce 13-Jan-16 ZN2 ELE Electrical works Building first floor polarity test at SA2 14-Jan-16 16-Jan-16 2.00pm CLOSED 2-Feb-16 19 ACCEPTED 1 1
2693 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02664 Dorce 13-Jan-16 ZN2 ELE Electrical works Building second floor polarity test at SA2 14-Jan-16 16-Jan-16 2.00pm CLOSED 2-Feb-16 19 ACCEPTED 1 1
2694 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02665 Dorce 13-Jan-16 ZN2 ELE Electrical works Building third floor polarity test at SA2 14-Jan-16 16-Jan-16 2.00pm CLOSED 2-Feb-16 19 ACCEPTED 1 1
2695 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02666 Dorce 19-Jan-16 ZN2 ELE Electrical works Building ground floor functionality test SA2 20-Jan-16 22-Jan-16 9.00am CLOSED 20-Jan-16 0 ACCEPTED 1 1
2696 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02667 Dorce 19-Jan-16 ZN2 ELE Electrical works Building first floor functionality test SA2 21-Jan-16 23-Jan-16 9.00am CLOSED 21-Jan-16 0 ACCEPTED 1 1
2697 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02668 Dorce 19-Jan-16 ZN2 ELE Electrical works Building second floor functionality test SA2 22-Jan-16 24-Jan-16 9.00am CLOSED 22-Jan-16 0 ACCEPTED 1 1
2698 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02669 Dorce 19-Jan-16 ZN2 ELE Electrical works Building third floor functionality test SA2 23-Jan-16 25-Jan-16 9.00am CLOSED 23-Jan-16 0 ACCEPTED 1 1
2699 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02670 I-GEN 24-Jan-16 ZN2 MNE testing Testing of fire alarm system at LA2 buiding 26-Jan-16 28-Jan-16 4.00pm CLOSED 30-Jan-16 4 ACCEPTED 1 1
2700 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02671 I-GEN 25-Jan-16 ZN2 MNE testing Testing of fire alarm system at LA4 buiding 26-Jan-16 28-Jan-16 3.00pm CLOSED 30-Jan-16 4 ACCEPTED 1 1
2702 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02673 AEIE 30-Jan-16 ZN2 MNE testing Earthing test DB at LA2 31-Jan-16 2-Feb-16 2.00pm CLOSED 19-Mar-16 48 ACCEPTED 1 1
2703 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02674 AEIE 30-Jan-16 ZN2 MNE testing Earthing test DB at LA6 31-Jan-16 2-Feb-16 2.00pm CLOSED 19-Mar-16 48 ACCEPTED 1 1
2704 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02675 AEIE 30-Jan-16 ZN2 MNE testing Earthing test DB at SA2 31-Jan-16 2-Feb-16 2.00pm CLOSED 19-Mar-16 48 ACCEPTED 1 1
2705 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02676 AEIE 30-Jan-16 ZN2 MNE testing Earthing test DB at SA4 31-Jan-16 2-Feb-16 2.00pm CLOSED 19-Mar-16 48 ACCEPTED 1 1
2707 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02678 shinryo 25-Jan-16 ZN2 MNE testing Testing ACSU first floor 28-Jan-16 30-Jan-16 9.30am CLOSED 28-Jan-16 0 ACCEPTED 1 1
(SA2)
2708 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02679 shinryo 25-Jan-16 ZN2 MNE testing Testing ACSU second floor 28-Jan-16 30-Jan-16 9.30am CLOSED 29-Jan-16 1 ACCEPTED 1 1
(SA2)
2709 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02680 shinryo 25-Jan-16 ZN2 MNE testing Testing ACSU third floor 28-Jan-16 30-Jan-16 9.30am CLOSED 29-Jan-16 1 ACCEPTED 1 1
(SA2)
2712 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02683 shinryo 19-Jan-16 ZN2 MNE testing Testing water heater second floor 20-Jan-16 22-Jan-16 10.00am CLOSED 21-Jan-16 1 ACCEPTED 1 1
(SA2)
2713 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02684 shinryo 19-Jan-16 ZN2 MNE testing Testing water heater third floor 20-Jan-16 22-Jan-16 10.00am CLOSED 21-Jan-16 1 ACCEPTED 1 1
(SA2)
2714 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02685 shinryo 15-Jan-16 ZN2 MNE testing Testing ceiling fan ground floor 16-Jan-16 18-Jan-16 9.00am CLOSED 16-Jan-16 0 ACCEPTED 1 1
(SA2)
2715 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02686 shinryo 15-Jan-16 ZN2 MNE testing Testing ceiling fan first floor 16-Jan-16 18-Jan-16 9.00am CLOSED 17-Jan-16 1 ACCEPTED 1 1
(SA2)
2716 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02687 shinryo 15-Jan-16 ZN2 MNE testing Testing ceiling fan second floor 16-Jan-16 18-Jan-16 9.00am CLOSED 16-Jan-16 0 ACCEPTED 1 1
(SA2)
2717 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02688 shinryo 15-Jan-16 ZN2 MNE testing Testing ceiling fan third floor 16-Jan-16 18-Jan-16 9.00am CLOSED 17-Jan-16 1 ACCEPTED 1 1
(SA2)
2718 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02689 dorce 28-Jan-16 ZN2 ELE installation electrical fixtures installation 29-Jan-16 31-Jan-16 2.30pm CLOSED 29-Jan-16 0 ACCEPTED 1 1
ground floor (SA4)
**MANA DIAA
2719 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02690 dorce 1-Feb-16 ZN2 STR installation Building firsr floor chassis installation at Fire station 12-Sep-15 14-Sep-15 2.00pm CLOSED 12-Sep-15 0 ACCEPTED LOCATION AND 1 1
SALAH
2720 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02691 dorce 1-Feb-16 ZN2 STR installation Building first floor wall panel installation at Fire station 12-Sep-15 14-Sep-15 2.15pm CLOSED 12-Sep-15 0 ACCEPTED 1 1
2721 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02692 seribu bio 1-Feb-16 ZN2 ELE Electrical works Electrical termination from feeder pillar to control panel at 1-Feb-16 3-Feb-16 8.00pm CLOSED 17-May-16 106 REJECTED 1 1
FB1 ,FB2,CR1,CR2 (small package)
2722 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02693 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at laundry 1-Feb-16 3-Feb-16 2.00pm CLOSED 18-Mar-16 46 ACCEPTED 1 1
2723 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02694 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at messhall 1-Feb-16 3-Feb-16 2.00pm CLOSED 18-Mar-16 46 ACCEPTED 1 1
2724 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02695 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at gymnasium 1-Feb-16 3-Feb-16 2.00pm CLOSED 18-Mar-16 46 ACCEPTED 1 1
2725 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02696 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at internet café 2-Feb-16 4-Feb-16 2.00pm CLOSED 18-Mar-16 45 ACCEPTED 1 1
2726 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02697 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at office catering 2-Feb-16 4-Feb-16 2.00pm CLOSED 18-Mar-16 45 ACCEPTED 1 1
maintenance
2727 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02698 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at maintenance 1-Feb-16 3-Feb-16 2.00pm CLOSED 18-Mar-16 46 ACCEPTED 1 1
workshop
2728 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02699 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at la6 1-Feb-16 3-Feb-16 2.00pm CLOSED 1-Feb-16 0 REJECTED 1 1
2729 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02700 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at club house 1-Feb-16 3-Feb-16 2.00pm CLOSED 18-Mar-16 46 ACCEPTED 1 1
2730 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02701 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at dojo 1-Feb-16 3-Feb-16 2.00pm CLOSED CANCEL 1 1
2731 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02702 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at grocery 1-Feb-16 3-Feb-16 2.00pm CLOSED CANCEL 1 1
2732 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02703 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at post office 1-Feb-16 3-Feb-16 2.00pm CLOSED 18-Mar-16 46 ACCEPTED 1 1
2733 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02704 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at LA6 1-Feb-16 3-Feb-16 2.00pm CLOSED 15-Mar-16 43 ACCEPTED 1 1
2734 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02705 AEIE 1-Feb-16 ZN2 ELE installation Lightning protection system installation at LA5 1-Feb-16 3-Feb-16 2.00pm CLOSED 15-Mar-16 43 ACCEPTED 1 1
2735 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02706 15-Feb-16 ZN2 MNE testing Testing of exhaust fan (GF) at SA2 16-Jan-16 18-Jan-16 9.00am CLOSED 16-Jan-16 0 ACCEPTED 1 1
shinryo
2736 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02707 15-Feb-16 ZN2 MNE testing Testing of exhaust fan (1F) at SA2 16-Jan-16 18-Jan-16 9.00am CLOSED 17-Jan-16 1 ACCEPTED 1 1
shinryo
2737 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02708 15-Feb-16 ZN2 MNE testing Testing of exhaust fan (2F) at SA2 16-Jan-16 18-Jan-16 9.00am CLOSED 17-Jan-16 1 ACCEPTED 1 1
shinryo
2738 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02709 15-Feb-16 ZN2 MNE testing Testing of exhaust fan (3F) at SA2 16-Jan-16 18-Jan-16 9.00am CLOSED 17-Jan-16 1 ACCEPTED 1 1
shinryo
2739 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02710 dorce 28-Jan-16 ZN2 ELE electrical works Building ground floor functionality test SA4 29-Jan-16 31-Jan-16 9.00am CLOSED 29-Jan-16 0 ACCEPTED 1 1
2740 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02711 dorce 28-Jan-16 ZN2 ELE electrical works Building first floor functionality test SA4 29-Jan-16 31-Jan-16 9.00am CLOSED 29-Jan-16 0 ACCEPTED 1 1
2741 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02712 dorce 28-Jan-16 ZN2 ELE electrical works Building second floor functionality test SA4 29-Jan-16 31-Jan-16 9.00am CLOSED 29-Jan-16 0 ACCEPTED 1 1
2742 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02713 dorce 28-Jan-16 ZN2 ELE electrical works Building third floor functionality test SA4 29-Jan-16 31-Jan-16 9.00am CLOSED 29-Jan-16 0 ACCEPTED 1 1
2743 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02714 dorce 28-Jan-16 ZN2 ELE electrical works Building first floor electrical fixtures installation inspection 29-Jan-16 31-Jan-16 9.30am CLOSED 29-Jan-16 0 ACCEPTED 1 1
(SA4)
2745 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02716 dorce 28-Jan-16 ZN2 ELE electrical works Building third floor electrical fixtures installation 29-Jan-16 31-Jan-16 9.30am CLOSED 29-Jan-16 0 ACCEPTED 1 1
inspection (SA4)
2746 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02717 yuzuki 30-Jan-16 ZN2 CIV Fencing work Excavation and install fencing post at location RP1a 30-Jan-16 1-Feb-16 2.30pm CLOSED 24-Mar-16 54 ACCEPTED 1 1
2747 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02718 AEIE 30-Jan-16 ZN2 ELE Earthing Installation Lightning protection system installation of LA2 8-Feb-16 10-Feb-16 2.00pm CLOSED 15-Mar-16 36 ACCEPTED 1 1
2748 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02719 AEIE 30-Jan-16 ZN2 ELE Earthing Installation Lightning protection system installation of LA4 8-Feb-16 10-Feb-16 2.00pm CLOSED CANCEL 1 1
2749 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02720 AEIE 30-Jan-16 ZN2 ELE Earthing Installation Lightning protection system installation of MA3 8-Feb-16 10-Feb-16 2.00pm CLOSED 15-Mar-16 36 ACCEPTED 1 1
2750 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02721 AEIE 30-Jan-16 ZN2 ELE Earthing Installation Lightning protection system installation of MA4 8-Feb-16 10-Feb-16 2.00pm CLOSED 15-Mar-16 36 ACCEPTED 1 1
2751 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02722 AEIE 30-Jan-16 ZN2 ELE Earthing Installation Lightning protection system installation of SA2 8-Feb-16 10-Feb-16 2.00pm CLOSED CANCEL 1 1
2752 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02723 AEIE 30-Jan-16 ZN2 ELE Earthing Installation Lightning protection system installation of SA4 8-Feb-16 10-Feb-16 2.00pm CLOSED CANCEL 1 1
2753 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02724 AEIE 30-Jan-16 ZN2 ELE Earthing Installation Lightning protection system installation of Barber 8-Feb-16 10-Feb-16 2.00pm CLOSED CANCEL 1 1
2754 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02725 AEIE 30-Jan-16 ZN2 ELE material Reeiving inspection for 2x350 Kva generator set at small 9-Feb-16 11-Feb-16 3.00pm CLOSED 18-Mar-16 38 ACCEPTED 1 1
package for temporary supply to MA1 and MA3
2757 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02728 Dorce 14-Dec-15 ZN2 ELE Electrical works Building first floor cable pulling works inspection at CSA2 15-Dec-15 17-Dec-15 10.00am CLOSED CANCEL 1 1
2759 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02730 Dorce 14-Dec-15 ZN2 ELE Electrical works Building third floor cable pulling works inspection at CSA2 15-Dec-15 17-Dec-15 10.00am CLOSED CANCEL 1 1
2766 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02737 Dorce 3-Jan-16 ZN2 ELE Electrical works Building second floor SDB electrical panel board 4-Jan-16 6-Jan-16 10.00am CLOSED 26-Feb-16 53 ACCEPTED 1 1
installation inspection at CLA6
2769 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02740 Dorce 3-Jan-16 ZN2 ELE Electrical works Building first floor cable pulling installation inspection at 4-Jan-16 6-Jan-16 10.00am CLOSED 20-May-16 137 ACCEPTED 1 1
CLA6
2770 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02741 Dorce 3-Jan-16 ZN2 ELE Electrical works Building second floor cable pulling installation inspection 4-Jan-16 6-Jan-16 10.00am CLOSED 20-May-16 137 ACCEPTED 1 1
at CLA6
2772 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02743 Dorce 3-Jan-16 ZN2 ELE Electrical works Building MDB electrical panel board isntallation inspection 4-Jan-16 6-Jan-16 10.00am CLOSED 26-Feb-16 53 ACCEPTED 1 1
at CSA4
2774 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02745 Dorce 3-Jan-16 ZN2 ELE Electrical works Building first floor SDB electrical panel board installation 4-Jan-16 6-Jan-16 10.00am CLOSED 27-Feb-16 54 ACCEPTED 1 1
inspection at CSA4
2775 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02746 Dorce 3-Jan-16 ZN2 ELE Electrical works Building second floor SDB electrical panel board 4-Jan-16 6-Jan-16 10.00am CLOSED 27-Feb-16 54 ACCEPTED 1 1
installation inspection at CSA4
2783 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02754 Dorce 11-Jan-16 ZN2 ELE Electrical works Building first floor cable pulling works inspection at CLA2 12-Jan-16 14-Jan-16 10.00am CLOSED CANCEL 1 1
Building second floor cable pulling works inspection at
2784 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02755 Dorce 11-Jan-16 ZN2 ELE Electrical works CLA2 12-Jan-16 14-Jan-16 10.00am CLOSED CANCEL 1 1
2785 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02756 Dorce 11-Jan-16 ZN2 ELE Electrical works Building third floor cable pulling works inspection at CLA2 12-Jan-16 14-Jan-16 10.00am CLOSED 2-Jun-16 142 ACCEPTED 1 1
2786 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02757 Dorce 11-Jan-16 ZN2 ELE Electrical works Building ground floor cable pulling works inspection at 12-Jan-16 14-Jan-16 10.00am CLOSED 18-Feb-16 37 ACCEPTED 1 1
CLA4
2787 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02758 Dorce 11-Jan-16 ZN2 ELE Electrical works Building first floor cable pulling works inspection at CLA4 12-Jan-16 14-Jan-16 10.00am CLOSED 20-May-16 129 ACCEPTED 1 1
2788 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02759 Dorce 11-Jan-16 ZN2 ELE Electrical works Building second floor cable pulling works inspection at 12-Jan-16 14-Jan-16 10.00am CLOSED 20-May-16 129 ACCEPTED 1 1
CLA4
2789 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02760 Dorce 11-Jan-16 ZN2 ELE Electrical works Building third floor cable pulling works inspection at CLA4 12-Jan-16 14-Jan-16 10.00am CLOSED 20-May-16 129 ACCEPTED 1 1
2790 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02761 shinryo 13-Jan-16 ZN2 MNE installation Installation of exhaust fan (GF) at SA2 14-Jan-16 16-Jan-16 10.00am CLOSED CANCEL 1 1
2791 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02762 shinryo 13-Jan-16 ZN2 MNE installation Istallation of exhaust fan (1F) at SA2 14-Jan-16 16-Jan-16 10.00am CLOSED CANCEL 1 1
2792 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02763 shinryo 13-Jan-16 ZN2 MNE installation Installation of exhaust fan (2F) at SA2 14-Jan-16 16-Jan-16 10.00am CLOSED CANCEL 1 1
2793 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02764 shinryo 13-Jan-16 ZN2 MNE installation Installation of exhaust fan (3F) at SA2 14-Jan-16 16-Jan-16 10.00am CLOSED CANCEL 1 1
2794 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02765 AEIE 3-Feb-16 ZN2 ELE testing IR test for incoming, outgoing FP HM6 3-Feb-16 5-Feb-16 2.00pm CLOSED 19-Mar-16 45 ACCEPTED 1 1
2795 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02766 AEIE 3-Feb-16 ZN2 ELE testing IR test for incoming, outgoing FP HM4 3-Feb-16 5-Feb-16 2.00pm CLOSED 19-Mar-16 45 ACCEPTED 1 1
2796 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02767 AEIE 3-Feb-16 ZN2 ELE testing IR test for incoming, outgoing FP HM7 3-Feb-16 5-Feb-16 2.00pm CLOSED 19-Mar-16 45 ACCEPTED 1 1
2797 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02768 shinryo 13-Jan-16 ZN2 MNE installation Installation of ceiling fan (GF) at SA2 14-Jan-16 16-Jan-16 10.00am CLOSED 15-Feb-16 32 ACCEPTED 1 1
2798 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02769 shinryo 13-Jan-16 ZN2 MNE installation Installation of ceiling fan (1F) at SA2 14-Jan-16 16-Jan-16 10.00am CLOSED 15-Jan-16 1 ACCEPTED 1 1
2799 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02770 shinryo 13-Jan-16 ZN2 MNE installation Installation of ceiling fan (2F) at SA2 14-Jan-16 16-Jan-16 10.00am CLOSED CANCEL 1 1
2800 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02771 shinryo 13-Jan-16 ZN2 MNE installation Installation of ceiling fan (3F) at SA2 14-Jan-16 16-Jan-16 10.00am CLOSED 14-Jan-16 0 ACCEPTED 1 1
2801 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02772 shinryo 19-Jan-16 ZN2 MNE installation Installation of ACSU (GF) at SA4 20-Jan-16 22-Jan-16 9.30am CLOSED 20-Jan-16 0 ACCEPTED 1 1
2802 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02773 shinryo 19-Jan-16 ZN2 MNE installation Installation of ACSU (1F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2803 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02774 shinryo 19-Jan-16 ZN2 MNE installation Installation of ACSU (2F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED 23-Jan-16 1 ACCEPTED 1 1
2804 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02775 shinryo 19-Jan-16 ZN2 MNE installation Installation of ACSU (3F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED 24-Jan-16 2 ACCEPTED 1 1
2805 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02776 shinryo 19-Jan-16 ZN2 MNE installation Installation of exhaust fan (GF) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2806 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02777 shinryo 19-Jan-16 ZN2 MNE installation Installation of exhaust fan (1F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2807 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02778 shinryo 19-Jan-16 ZN2 MNE installation Installation of exhaust fan (2F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2808 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02779 shinryo 19-Jan-16 ZN2 MNE installation Installation of exhaust fan (3F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2809 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02780 shinryo 19-Jan-16 ZN2 MNE installation Installation of ceiling fan (GF) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2810 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02781 shinryo 19-Jan-16 ZN2 MNE installation Installation of ceiling fan (1F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2811 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02782 shinryo 19-Jan-16 ZN2 MNE installation Installation of ceiling fan (2F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2812 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02783 shinryo 19-Jan-16 ZN2 MNE installation Installation of ceiling fan (3F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2813 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02784 shinryo 19-Jan-16 ZN2 MNE installation Installation of water heater (1F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED 22-Jan-16 0 ACCEPTED 1 1
2814 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02785 shinryo 19-Jan-16 ZN2 MNE installation Installation of water heater (2F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2815 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02786 shinryo 19-Jan-16 ZN2 MNE installation Installation of water heater (3F) at SA4 22-Jan-16 24-Jan-16 9.30am CLOSED CANCEL 1 1
2816 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02787 I-GEN 21-Jan-16 ZN2 MNE testing Testing of fire alarm system at Guard house 3 (GH3) 26-Jan-16 28-Jan-16 10.30am CLOSED CANCEL 1 1
2817 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02788 dorce 26-Jan-16 ZN2 ELE testing Building ground floor polarity test (SA4) 27-Jan-16 29-Jan-16 9.30am CLOSED CANCEL 1 1
2818 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02789 dorce 26-Jan-16 ZN2 ELE testing Building first floor polarity test (SA4) 27-Jan-16 29-Jan-16 9.30am CLOSED CANCEL 1 1
2819 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02790 dorce 26-Jan-16 ZN2 ELE testing Building second floor polarity test (SA4) 27-Jan-16 29-Jan-16 9.30am CLOSED CANCEL 1 1
2820 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02791 dorce 26-Jan-16 ZN2 ELE testing Building third floor polarity test (SA4) 27-Jan-16 29-Jan-16 9.30am CLOSED CANCEL 1 1
2821 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02792 shinryo 19-Jan-16 ZN2 MNE installation Installation of water heater (GF) at SA4 21-Jan-16 23-Jan-16 9.30am CLOSED 27-Feb-16 37 ACCEPTED 1 1
2827 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02798 seribu bio 2-Feb-16 ZN2 ELE testing Functionality test at Five a side football 1 (FB1) 3-Feb-16 5-Feb-16 2.00pm CLOSED CANCEL 1 1
2828 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02799 seribu bio 2-Feb-16 ZN2 ELE testing Functionality test at Five a side football 2 (FB2) 3-Feb-16 5-Feb-16 2.00pm CLOSED CANCEL 1 1
2829 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02800 seribu bio 2-Feb-16 ZN2 ELE testing Functionality test at Mini cricket 1 (MC1) 3-Feb-16 5-Feb-16 2.00pm CLOSED 3-Feb-16 0 REJECTED 1 1
2830 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02801 seribu bio 2-Feb-16 ZN2 ELE testing Functionality test at Mini cricket 2 (MC2) 3-Feb-16 5-Feb-16 2.00pm CLOSED CANCEL 1 1
2832 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02803 UEMB AZRI 22-Jan-16 ZN2 ARC Building Furniture Furniture Supply & Arrangement Inspection (Laundry) LD1 24-Jan-16 26-Jan-16 9.00am CLOSED 29-Feb-16 36 ACCEPTED 1 1
2833 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02804 dorce 4-Feb-16 ZN2 ARC Painting works Building Ground Floor painting works inspection (LA2) 4-Feb-16 6-Feb-16 9.00am CLOSED 12-Apr-16 68 ACCEPTED 1 1
2834 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02805 dorce 4-Feb-16 ZN2 ARC Painting works Building First Floor painting works inspection (LA2) 4-Feb-16 6-Feb-16 9.00am CLOSED 12-Apr-16 68 ACCEPTED 1 1
2835 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02806 dorce 4-Feb-16 ZN2 ARC Painting works Building second Floor painting works inspection (LA2) 4-Feb-16 6-Feb-16 9.00am CLOSED 12-Apr-16 68 ACCEPTED 1 1
2836 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02807 dorce 4-Feb-16 ZN2 ARC Painting works Building third Floor painting works inspection (LA2) 4-Feb-16 6-Feb-16 9.00am CLOSED 12-Apr-16 68 ACCEPTED 1 1
2837 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02808 dorce 1-Feb-16 ZN2 ELE Testing Building Third Floor polarity Test (LA4) 2-Feb-16 4-Feb-16 9.00am CLOSED 25-Feb-16 23 ACCEPTED 1 1
2838 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02809 dorce 1-Feb-16 ZN2 ELE Testing Building Second Floor polarity Test (LA4) 2-Feb-16 4-Feb-16 9.30am CLOSED 25-Feb-16 23 ACCEPTED 1 1
2839 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02810 dorce 1-Feb-16 ZN2 ELE Testing Building First Floor polarity Test (LA4) 2-Feb-16 4-Feb-16 9.30am CLOSED 21-Feb-16 19 ACCEPTED 1 1
2840 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02811 dorce 1-Feb-16 ZN2 ELE Testing Building Ground Floor polarity Test (LA4) 2-Feb-16 4-Feb-16 9.30am CLOSED 21-Feb-16 19 ACCEPTED 1 1
2841 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02812 dorce 1-Feb-16 ZN2 ELE Testing Building Ground Floor polarity Test (LA2) 2-Feb-16 4-Feb-16 9.30am CLOSED 25-Feb-16 23 ACCEPTED 1 1
2842 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02813 dorce 1-Feb-16 ZN2 ELE Testing Building First Floor polarity Test (LA2) 2-Feb-16 4-Feb-16 9.30am CLOSED 25-Feb-16 23 ACCEPTED 1 1
2843 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02814 dorce 1-Feb-16 ZN2 ELE Testing Building Second Floor polarity Test (LA2) 2-Feb-16 4-Feb-16 9.30am CLOSED 21-Feb-16 19 ACCEPTED 1 1
2844 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02815 dorce 1-Feb-16 ZN2 ELE Testing Building Third Floor polarity Test (LA2) 2-Feb-16 4-Feb-16 9.30am CLOSED 21-Feb-16 19 ACCEPTED 1 1
2845 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02816 Iszda 23-Jan-16 ZN2 ELE Testing Inspection ICT for Cable analyzer and test result (SA4) 25-Jan-16 27-Jan-16 9.30am CLOSED 18-Feb-16 24 ACCEPTED 1 1
2846 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02817 dorce 31-Jan-16 ZN2 ELE Testing Building ground floor functionality test (LA2) 1-Feb-16 3-Feb-16 2.30pm CLOSED 18-Feb-16 17 ACCEPTED 1 1
2847 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02818 dorce 31-Jan-16 ZN2 ELE Testing Building first floor functionality test (LA2) 1-Feb-16 3-Feb-16 2.30pm CLOSED 18-Feb-16 17 ACCEPTED 1 1
2848 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02819 dorce 31-Jan-16 ZN2 ELE Testing Building second floor functionality test (LA2) 1-Feb-16 3-Feb-16 2.30pm CLOSED 18-Feb-16 17 ACCEPTED 1 1
2849 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02820 dorce 31-Jan-16 ZN2 ELE Testing Building third floor functionality test (LA2) 1-Feb-16 3-Feb-16 2.30pm CLOSED 18-Feb-16 17 ACCEPTED 1 1
2850 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02821 dorce 29-Jan-16 ZN2 ELE Electrical works Building functionality test (Ground floor)at Labour 30-Jan-16 1-Feb-16 9.00am CLOSED 19-Feb-16 20 ACCEPTED 1 1
accommodation 6 (LA6)
Building functionality test (first floor)at Labour
2851 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02822 dorce 29-Jan-16 ZN2 ELE Electrical works accommodation 6 (LA6) 30-Jan-16 1-Feb-16 9.00am CLOSED 19-Feb-16 20 ACCEPTED 1 1
2852 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02823 dorce 29-Jan-16 ZN2 ELE Electrical works Building functionality test (second floor)at Labour 30-Jan-16 1-Feb-16 9.00am CLOSED 19-Feb-16 20 ACCEPTED 1 1
accommodation 6 (LA6)
2853 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02824 dorce 29-Jan-16 ZN2 ELE Electrical works Building functionality test (third floor)at Labour 30-Jan-16 1-Feb-16 9.00am CLOSED 19-Feb-16 20 ACCEPTED 1 1
accommodation 6 (LA6)
2855 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02826 dorce 3-Feb-16 ZN2 ELE Electrical works Building functionality test (first floor)at Labour 4-Feb-16 6-Feb-16 2.30pm CLOSED 19-Feb-16 15 ACCEPTED 1 1
accommodation 4 (LA4)
2857 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02828 dorce 3-Feb-16 ZN2 ELE Electrical works Building functionality test (third floor)at Labour 4-Feb-16 6-Feb-16 2.30pm CLOSED 19-Feb-16 15 ACCEPTED 1 1
accommodation 4 (LA4)
2858 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02829 dorce 3-Feb-16 ZN2 ELE Electrical works Building ground floor electrical fixtures installation 4-Feb-16 6-Feb-16 2.30pm CLOSED 19-Feb-16 15 ACCEPTED 1 1
inspection at LA2
2860 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02831 dorce 3-Feb-16 ZN2 ELE Electrical works Building second floor electrical fixtures installation 4-Feb-16 6-Feb-16 2.30pm CLOSED 19-Feb-16 15 ACCEPTED 1 1
inspection at LA2
2862 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02833 dorce 3-Feb-16 ZN2 ELE Electrical works Building ground floor electrical fixtures installation 4-Feb-16 6-Feb-16 3.00pm CLOSED 19-Feb-16 15 ACCEPTED 1 1
inspection at LA6
2863 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02834 dorce 3-Feb-16 ZN2 ELE Electrical works Building first floor electrical fixtures installation inspection 4-Feb-16 6-Feb-16 3.00pm CLOSED 19-Feb-16 15 ACCEPTED 1 1
at LA6
2865 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02836 dorce 3-Feb-16 ZN2 ELE Electrical works Building third floor electrical fixtures installation 4-Feb-16 6-Feb-16 3.00pm CLOSED 19-Feb-16 15 ACCEPTED 1 1
inspection at LA6
2868 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02839 dorce 3-Feb-16 ZN2 ELE Electrical works Building second floor electrical installation inspection at 4-Feb-16 6-Feb-16 10.00am CLOSED 8-Feb-16 4 ACCEPTED 1 1
LA4
2869 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02840 dorce 3-Feb-16 ZN2 ELE Electrical works Building third floor electrical installation inspection at LA4 4-Feb-16 6-Feb-16 10.00am CLOSED 8-Mar-16 33 ACCEPTED 1 1
2870 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02841 shinryo 27-Jan-16 ZN2 MNE installation installation of ceiling fan at LA2 (GF) 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2871 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02842 shinryo 27-Jan-16 ZN2 MNE installation installation of ceiling fan at LA2 (1F) 28-Jan-16 30-Jan-16 10.00am CLOSED 28-Jan-16 0 ACCEPTED 1 1
2872 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02843 shinryo 27-Jan-16 ZN2 MNE installation installation of ceiling fan at LA2 (2F) 28-Jan-16 30-Jan-16 10.00am CLOSED 28-Jan-16 0 ACCEPTED 1 1
2873 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02844 shinryo 27-Jan-16 ZN2 MNE installation installation of ceiling fan at LA2 (3F) 28-Jan-16 30-Jan-16 10.00am CLOSED 28-Jan-16 0 ACCEPTED 1 1
2874 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02845 shinryo 27-Jan-16 ZN2 MNE testing Testing exhaust fan (GF) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2875 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02846 shinryo 27-Jan-16 ZN2 MNE testing Testing exhaust fan (1F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2876 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02847 shinryo 27-Jan-16 ZN2 MNE testing Testing ceiling fan (2F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2877 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02848 shinryo 27-Jan-16 ZN2 MNE testing Testing exhaust fan (3F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2878 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02849 shinryo 27-Jan-16 ZN2 MNE testing Testing ceiling fan (GF) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2879 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02850 shinryo 27-Jan-16 ZN2 MNE testing Testing ceiling fan (1F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2880 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02851 shinryo 27-Jan-16 ZN2 MNE testing Testing ceiling fan (2F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2881 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02852 shinryo 27-Jan-16 ZN2 MNE testing Testing ceiling fan (3F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2882 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02853 shinryo 27-Jan-16 ZN2 MNE installation Installation exhaust fan(GF) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2883 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02854 shinryo 27-Jan-16 ZN2 MNE installation Installation exhaust fan(1F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2884 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02855 shinryo 27-Jan-16 ZN2 MNE installation Installation exhaust fan(2F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2885 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02856 shinryo 27-Jan-16 ZN2 MNE installation Installation exhaust fan(3F) at LA2 28-Jan-16 30-Jan-16 10.00am CLOSED CANCEL 1 1
2886 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02857 Dorce 9-Feb-16 ZN2 ELE Electrical works Building ground floor polarity test LA6 10-Feb-16 12-Feb-16 2.30pm CLOSED 8-Mar-16 27 ACCEPTED 1 1
2887 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02858 Dorce 9-Feb-16 ZN2 ELE Electrical works Building first floor polarity test LA6 10-Feb-16 12-Feb-16 2.30pm CLOSED 8-Mar-16 27 ACCEPTED 1 1
2888 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02859 Dorce 9-Feb-16 ZN2 ELE Electrical works Building second floor polarity test LA6 10-Feb-16 12-Feb-16 2.30pm CLOSED 8-Mar-16 27 ACCEPTED 1 1
2889 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02860 Dorce 9-Feb-16 ZN2 ELE Electrical works Building third floor polarity test LA6 10-Feb-16 12-Feb-16 2.30pm CLOSED 8-Mar-16 27 ACCEPTED 1 1
2890 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02861 shinryo 29-Jan-16 ZN2 MNE testing Testing of ceiling fan (GF) SA4 5-Feb-16 7-Feb-16 2.30pm CLOSED 5-Feb-16 0 ACCEPTED 1 1
2892 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02863 I-GEN 1-Feb-16 ZN2 MNE installation Installation of fire fighting equipments/system at LA4 (first 3-Feb-16 5-Feb-16 10.00am CLOSED 3-Feb-16 0 REJECTED SUPERCEDED WITH RFIN 03103 1 1
floor)
2894 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02865 I-GEN 1-Feb-16 ZN2 MNE installation Installation of fire fighting equipments/system at LA4 3-Feb-16 5-Feb-16 10.00am CLOSED 4-Feb-16 1 REJECTED SUPERCEDED WITH RFIN 03105 1 1
(Third floor)
2895 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02866 I-GEN 1-Feb-16 ZN2 MNE installation Installation of fire fighting equipments/system at LA2 3-Feb-16 5-Feb-16 2.30pm CLOSED 7-Mar-16 33 REJECTED SUPERCEDED WITH RFIN 03098 1 1
(ground floor)
2897 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02868 I-GEN 1-Feb-16 ZN2 MNE installation Installation of fire fighting equipments/system at LA2 3-Feb-16 5-Feb-16 2.30pm CLOSED 4-Feb-16 1 REJECTED SUPERCEDED WITH RFIN 03100 1 1
(second floor)
2900 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02871 shinryo 3-Feb-16 ZN2 MNE installation Installation of exhaust fan at LA6 (1F) 4-Feb-16 6-Feb-16 9.30am CLOSED CANCEL 1 1
2901 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02872 shinryo 3-Feb-16 ZN2 MNE installation Installation of exhaust fan at LA6 (2F) 4-Feb-16 6-Feb-16 9.30am CLOSED CANCEL 1 1
2902 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02873 shinryo 3-Feb-16 ZN2 MNE installation Installation of exhaust fan at LA6 (3F) 4-Feb-16 6-Feb-16 9.30am CLOSED CANCEL 1 1
2903 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02874 shinryo 3-Feb-16 ZN2 MNE installation Installation of ceiling fan at LA6 (GF) 4-Feb-16 6-Feb-16 9.30am CLOSED 4-Feb-16 0 ACCEPTED 1 1
2904 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02875 shinryo 3-Feb-16 ZN2 MNE installation Installation of ceiling fan at LA6 (1F) 4-Feb-16 6-Feb-16 9.30am CLOSED CANCEL 1 1
2905 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02876 shinryo 3-Feb-16 ZN2 MNE installation Installation of ceiling fan at LA6 (2F) 4-Feb-16 6-Feb-16 9.30am CLOSED CANCEL 1 1
2906 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02877 shinryo 3-Feb-16 ZN2 MNE installation Installation of ceiling fan at LA6 (3F) 4-Feb-16 6-Feb-16 9.30am CLOSED CANCEL 1 1
2907 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02878 shinryo 3-Feb-16 ZN2 MNE installation Installation of exhaust fan at LA4 (GF) 4-Feb-16 6-Feb-16 9.30am CLOSED 5-Feb-16 1 ACCEPTED 1 1
2908 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02879 shinryo 3-Feb-16 ZN2 MNE installation Installation of exhaust fan at LA4 (1F) 4-Feb-16 6-Feb-16 9.30am CLOSED 5-Feb-16 1 ACCEPTED 1 1
2909 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02880 shinryo 3-Feb-16 ZN2 MNE installation Installation of exhaust fan at LA4 (2F) 4-Feb-16 6-Feb-16 9.30am CLOSED 5-Feb-16 1 ACCEPTED 1 1
2910 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02881 shinryo 3-Feb-16 ZN2 MNE installation Installation of exhaust fan at LA4 (3F) 4-Feb-16 6-Feb-16 9.30am CLOSED 5-Feb-16 1 ACCEPTED 1 1
2911 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02882 shinryo 6-Feb-16 ZN2 MNE testing Testing exhaust fan LA4 (GF) 8-Feb-16 10-Feb-16 9.30am CLOSED 10-Feb-16 2 ACCEPTED 1 1
2912 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02883 shinryo 6-Feb-16 ZN2 MNE testing Testing exhaust fan LA4 (1F) 8-Feb-16 10-Feb-16 9.30am CLOSED 10-Feb-16 2 ACCEPTED 1 1
2913 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02884 shinryo 6-Feb-16 ZN2 MNE testing Testing exhaust fan LA4 (2F) 8-Feb-16 10-Feb-16 9.30am CLOSED 10-Feb-16 2 ACCEPTED 1 1
2914 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02885 shinryo 6-Feb-16 ZN2 MNE testing Testing exhaust fan LA4 (3F) 8-Feb-16 10-Feb-16 9.30am CLOSED CANCEL 1 1
2915 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02886 shinryo 6-Feb-16 ZN2 MNE testing Testing ceiling fan LA6 (GF) 8-Feb-16 10-Feb-16 10.00am CLOSED CANCEL 1 1
2916 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02887 shinryo 6-Feb-16 ZN2 MNE testing Testing ceiling fan LA6 (1F) 8-Feb-16 10-Feb-16 10.00am CLOSED CANCEL 1 1
2917 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02888 shinryo 6-Feb-16 ZN2 MNE testing Testing ceiling fan LA6 (2F) 8-Feb-16 10-Feb-16 10.00am CLOSED CANCEL 1 1
2918 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02889 shinryo 6-Feb-16 ZN2 MNE testing Testing ceiling fan LA6 (3F) 8-Feb-16 10-Feb-16 10.00am CLOSED CANCEL 1 1
2919 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02890 shinryo 6-Feb-16 ZN2 MNE testing Testing exhaust fan LA6 (GF) 8-Feb-16 10-Feb-16 10.00am CLOSED CANCEL 1 1
2920 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02891 shinryo 6-Feb-16 ZN2 MNE testing Testing exhaust fan LA6 (1F) 8-Feb-16 10-Feb-16 10.00am CLOSED CANCEL 1 1
2921 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02892 shinryo 6-Feb-16 ZN2 MNE testing Testing exhaust fan LA6 (2F) 8-Feb-16 10-Feb-16 10.00am CLOSED CANCEL 1 1
2922 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02893 shinryo 6-Feb-16 ZN2 MNE testing Testing exhaust fan LA6 (3F) 8-Feb-16 10-Feb-16 10.00am CLOSED CANCEL 1 1
2924 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02895 shinryo 29-Jan-16 ZN2 MNE testing Testing of ceiling fan (1F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2925 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02896 shinryo 29-Jan-16 ZN2 MNE testing Testing of ceiling fan (2F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2926 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02897 shinryo 29-Jan-16 ZN2 MNE testing Testing of ceiling fan (3F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2927 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02898 shinryo 29-Jan-16 ZN2 MNE testing Testing of ACSU (GF) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2928 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02899 shinryo 29-Jan-16 ZN2 MNE testing Testing of ACSU (1F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2929 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02900 shinryo 29-Jan-16 ZN2 MNE testing Testing of ACSU (2F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2930 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02901 shinryo 29-Jan-16 ZN2 MNE testing Testing of ACSU (3F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2931 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02902 shinryo 29-Jan-16 ZN2 MNE testing Testing of water heater (GF) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 6-Feb-16 1 ACCEPTED 1 1
2932 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02903 shinryo 29-Jan-16 ZN2 MNE testing Testing of water heater (1F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2933 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02904 shinryo 29-Jan-16 ZN2 MNE testing Testing of water heater (2F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2934 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02905 shinryo 29-Jan-16 ZN2 MNE testing Testing of water heater (3F) SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2936 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02907 shinryo 29-Jan-16 ZN2 MNE Testing Testing of exhaust fan (GF) at SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 6-Feb-16 1 ACCEPTED 1 1
2937 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02908 shinryo 29-Jan-16 ZN2 MNE Testing Testing of exhaust fan (1F) at SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 6-Feb-16 1 ACCEPTED 1 1
2938 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02909 shinryo 29-Jan-16 ZN2 MNE Testing Testing of exhaust fan (2F) at SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 6-Feb-16 1 ACCEPTED 1 1
2939 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02910 shinryo 29-Jan-16 ZN2 MNE Testing Testing of exhaust fan (3F) at SA4 5-Feb-16 7-Feb-16 10.00am CLOSED 5-Feb-16 0 ACCEPTED 1 1
2940 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02911 seribu bio 11-Feb-16 ZN2 ELE Testing Insulation test (megger test) at small package five a side 12-Feb-16 14-Feb-16 9.00am CLOSED 3-Mar-16 20 ACCEPTED 1 1
2(FB2) and MC2
2942 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02913 seribu bio 11-Feb-16 ZN2 ELE Testing Earthing test at Five a side 2 (FB2) and MC2 at Small 12-Feb-16 14-Feb-16 9.00am CLOSED 3-Mar-16 20 ACCEPTED 1 1
package
2943 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02914 seribu bio 11-Feb-16 ZN2 ELE Testing Insulation test (megger test) at small package five a side 12-Feb-16 14-Feb-16 9.00am CLOSED 3-Mar-16 20 ACCEPTED 1 1
1(FB1) and MC1
2944 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02915 UEMB AZRI 18-Feb-16 ZN2 ARC screeding works Building screeding work inspection (toilet only) (1F) MA3 19-Feb-16 21-Feb-16 9.00am CLOSED 29-Feb-16 10 ACCEPTED 1 1
2945 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02916 UEMB AZRI 18-Feb-16 ZN2 ARC screeding works Building screeding work inspection (toilet only) (2F) MA3 19-Feb-16 21-Feb-16 9.00am CLOSED 29-Feb-16 10 ACCEPTED 1 1
2950 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02921 AEIE 29-Dec-15 ZN2 ELE Testing Earthing test of lighting protection system at LA6 30-Dec-15 1-Jan-16 9.30am CLOSED 17-Feb-16 49 ACCEPTED 1 1
2951 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02922 dorce 27-Nov-15 ZN2 MNE testing Pressure test for hose reel system at Huard House 3 (GH3) 17-Feb-16 19-Feb-16 2.30pm CLOSED CANCEL 1 1
2953 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02924 yuzuki 16-Dec-15 ZN2 CIV Fencing work Install chainlink,barbed wire and straining wire at location 17-Dec-15 19-Dec-15 11.00am CLOSED 24-Mar-16 98 ACCEPTED 1 1
RP1a
2954 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02925 AEIE 22-Feb-16 ZN2 ELE Earthing test Earthing test for FPC12 at Small package 23-Feb-16 25-Feb-16 2.00pm CLOSED 11-May-16 78 ACCEPTED 1 1
2955 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02926 AEIE 22-Feb-16 ZN2 ELE Earthing Installation Earthing installation for FPC12 at Small package 23-Feb-16 25-Feb-16 1.00pm CLOSED 3-Mar-16 9 ACCEPTED 1 1
2956 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02927 AEIE 22-Feb-16 ZN2 ELE Earthing test Lightning protection system test at Guard house 3 (GH3) 23-Feb-16 25-Feb-16 2.00pm CLOSED 15-Mar-16 21 ACCEPTED 1 1
2957 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02928 AEIE 22-Feb-16 ZN2 ELE Earthing test Earthing DB test for Guard House 3 (GH3) 23-Feb-16 25-Feb-16 1.00pm CLOSED 15-Mar-16 21 ACCEPTED 1 1
2958 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02929 AEIE 22-Feb-16 ZN2 ELE Earthing Installation Installation earthing DB at Guard House 3 (GH3) 23-Feb-16 25-Feb-16 2.00pm CLOSED 3-Mar-16 9 ACCEPTED 1 1
2959 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02930 AEIE 22-Feb-16 ZN2 ELE Earthing Installation Installation earthing lightning protection system at Guard 23-Feb-16 25-Feb-16 2.00pm CLOSED 3-Mar-16 9 ACCEPTED 1 1
House 3 (GH3)
2961 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02932 AEIE 22-Feb-16 ZN2 ELE testing Meggering outgoing cable FPC12 1x4C 35mm2 23-Feb-16 25-Feb-16 1.00pm CLOSED 3-Mar-16 9 ACCEPTED 1 1
XLPE/SWA/PVC to Compact sub LP10 SSSP/2
2964 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02935 AEIE 22-Feb-16 ZN2 ELE installation INSTALLATION MAIN FP C12 AT SMALL PACKAGE 23-Feb-16 25-Feb-16 2.00pm CLOSED 3-Mar-16 9 ACCEPTED 1 1
2965 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02936 dorce 22-Feb-16 ZN2 ARC PVC works Building PVC floor covering works inspection at Guard 24-Feb-16 26-Feb-16 9.00am CLOSED 24-Feb-16 0 ACCEPTED 1 1
House 3(GH3)
2966 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02937 dorce 22-Feb-16 ZN2 ARC Painting works Building painting works inspection at Guard House 3(GH3) 24-Feb-16 26-Feb-16 9.00am CLOSED 26-Feb-16 2 ACCEPTED 1 1
2967 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02938 dorce 22-Feb-16 ZN2 ARC Ceramic tiles works Buildingceramic tiles works installation inspection at 24-Feb-16 26-Feb-16 9.00am CLOSED 26-Feb-16 2 ACCEPTED 1 1
Guard House 3(GH3)
2970 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02941 UEMB Aswad 1-Mar-16 ZN2 CIV Turnstile Slab Inspection on rebar and formwork installation for turstile 2-Mar-16 4-Mar-16 10.30am CLOSED 9-Apr-16 38 ACCEPTED 1 1
Foundation slab foundation and concreting work
2972 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02943 seribu bio 24-Feb-16 ZN2 CIV testing Sand blasting profile test for Multipurpose court 1(MC1) & 25-Feb-16 27-Feb-16 3.30pm CLOSED 18-Aug-16 175 ACCEPTED 1 1
Multipurpose court 2 (MC2)
2973 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02944 seribu bio 1-Mar-16 ZN2 CIV testing Prime coat(1st coat) micion test 2-Mar-16 4-Mar-16 9.00am CLOSED 18-Aug-16 169 ACCEPTED 1 1
2974 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02945 shinryo 26-Feb-16 ZN2 MNE installation installation of ceiling fan at LA4(GF) 29-Feb-16 2-Mar-16 10.00am CLOSED 29-Feb-16 0 ACCEPTED 1 1
2975 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02946 shinryo 26-Feb-16 ZN2 MNE installation installation of ceiling fan at LA4(1F) 29-Feb-16 2-Mar-16 10.00am CLOSED 29-Feb-16 0 ACCEPTED 1 1
2976 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02947 shinryo 26-Feb-16 ZN2 MNE installation installation of ceiling fan at LA4(2F) 29-Feb-16 2-Mar-16 10.00am CLOSED 29-Feb-16 0 ACCEPTED 1 1
2977 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02948 shinryo 26-Feb-16 ZN2 MNE installation installation of ceiling fan at LA4(3F) 29-Feb-16 2-Mar-16 10.00am CLOSED 29-Feb-16 0 ACCEPTED 1 1
2978 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02949 shinryo 27-Feb-16 ZN2 MNE testing Testing of ceiling fan at LA4(GF) 1-Mar-16 3-Mar-16 10.00am CLOSED CANCEL 1 1
2979 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02950 shinryo 27-Feb-16 ZN2 MNE testing Testing of ceiling fan at LA4(1F) 1-Mar-16 3-Mar-16 10.00am CLOSED CANCEL 1 1
2980 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02951 shinryo 27-Feb-16 ZN2 MNE testing Testing of ceiling fan at LA4(2F) 1-Mar-16 3-Mar-16 10.00am CLOSED CANCEL 1 1
2981 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02952 shinryo 27-Feb-16 ZN2 MNE testing Testing of ceiling fan at LA4(3F) 1-Mar-16 3-Mar-16 10.00am CLOSED CANCEL 1 1
2982 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02953 Dorce 25-Feb-16 ZN2 ELE Electrical works Building fixtures functionality test at Guard house 3 (GH3) 27-Feb-16 29-Feb-16 10.00am CLOSED 24-Mar-16 26 ACCEPTED 1 1
2984 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02955 seribu bio 4-Mar-16 ZN2 ELE material Solenoid valve installation at Five a side 1 (FB-1) 4-Mar-16 6-Mar-16 3.00pm CLOSED CANCEL 1 1
2985 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02956 seribu bio 4-Mar-16 ZN2 ELE material Solenoid valve installation at Five a side 2 (FB-2) 4-Mar-16 6-Mar-16 3.00pm CLOSED 25-Apr-16 52 ACCEPTED 1 1
2986 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02957 seribu bio 4-Mar-16 ZN2 ELE material Solenoid valve installation at Mini cricket 1 (CR-1) 4-Mar-16 6-Mar-16 3.00pm CLOSED 25-Apr-16 52 ACCEPTED 1 1
2987 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02958 Dorce 3-Dec-15 ZN2 ELE testing Polarity test for Guard house 3 (GH3) 3-Dec-15 5-Dec-15 3.00pm CLOSED 24-Mar-16 112 ACCEPTED 1 1
2989 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02960 Dorce 26-Dec-15 ZN2 ELE Electrical works Building lightning protection ispection at Labour 29-Dec-15 31-Dec-15 10.00am CLOSED 24-Mar-16 86 ACCEPTED 1 1
Accomodation 6 (LA6)
2991 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02962 Dorce 31-Dec-15 ZN2 ELE Electrical works Building lightning protection ispection at Labour 2-Jan-16 4-Jan-16 9.30am CLOSED 24-Mar-16 82 ACCEPTED 1 1
Accomodation 2 (LA2)
2992 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02963 Dorce 12-Jan-16 ZN2 ELE Electrical works Building lightning protection ispection at Labour 13-Jan-16 15-Jan-16 10.00am CLOSED 24-Mar-16 71 ACCEPTED 1 1
Accomodation 4 (LA4)
2994 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02965 paneagle 26-Dec-15 ZN2 CIV installation Inspection of BRC,installation and formwork prior to 28-Dec-15 30-Dec-15 11.00am CLOSED 5-Jan-16 8 ACCEPTED 1 1
concrete work for slab at MPC 1& MPC 2
2995 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02966 AEIE 29-Jan-16 ZN2 ELE testing Testing for earthing for DB protection at LA4 29-Jan-16 31-Jan-16 2.00pm CLOSED 22-Mar-16 53 ACCEPTED 1 1
Building MDB electrical panel board installation inspection
2996 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02967 Dorce 4-Jan-16 ZN2 ELE Electrical works at LA4 5-Jan-16 7-Jan-16 10.00am CLOSED 24-Mar-16 79 ACCEPTED 1 1
2997 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02968 Dorce 4-Jan-16 ZN2 ELE Electrical works Building ground floor electrical panel board installation 5-Jan-16 7-Jan-16 10.00am CLOSED 24-Mar-16 79 ACCEPTED 1 1
inspection at LA4
2998 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02969 Dorce 4-Jan-16 ZN2 ELE Electrical works Building first floor electrical panel board installation 5-Jan-16 7-Jan-16 10.00am CLOSED 24-Mar-16 79 ACCEPTED 1 1
inspection at LA4
3000 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02971 Dorce 4-Jan-16 ZN2 ELE Electrical works Building third floor electrical panel board installation 5-Jan-16 7-Jan-16 10.00am CLOSED 24-Mar-16 79 ACCEPTED 1 1
inspection at LA4
3001 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02972 shinryo 2-Mar-16 ZN2 MNE testing Testing ACSU at Guard house 3 (GH3) 11-Mar-16 13-Mar-16 10.00am CLOSED CANCEL 1 1
3002 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02973 shinryo 2-Mar-16 ZN2 MNE testing Testing exhaust fan at Guard house 3 (GH3) 11-Mar-16 13-Mar-16 10.00am CLOSED CANCEL 1 1
3003 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02974 shinryo 2-Mar-16 ZN2 MNE testing Testing water heater at Guard house 3 (GH3) 11-Mar-16 13-Mar-16 10.00am CLOSED 24-Mar-16 13 ACCEPTED 1 1
3004 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02975 shinryo 2-Mar-16 ZN2 MNE installation install exhaust fan at Guard house 3 (GH3) 11-Mar-16 13-Mar-16 2.30pm CLOSED 23-Mar-16 12 ACCEPTED 1 1
3005 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02976 shinryo 2-Mar-16 ZN2 MNE installation install water heater at Guard house 3 (GH3) 11-Mar-16 13-Mar-16 2.30pm CLOSED 23-Mar-16 12 ACCEPTED 1 1
3006 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02977 shinryo 2-Mar-16 ZN2 MNE installation install ACSU at Guard house 3 (GH3) 11-Mar-16 13-Mar-16 2.30pm CLOSED 22-Mar-16 11 ACCEPTED 1 1
3007 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-02978 Prima gas 17-Feb-16 ZN2 MNE installation DOSH inspection - LPG piping system, DOSH witness 17-Feb-16 19-Feb-16 10.45am CLOSED 1-Apr-16 44 ACCEPTED 1 1
pneumatic test at Messhall Kitchen
3008 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-02979 Flexi team 24-Mar-16 ZN2 CIV lifting Lifting soft cabin )change the location of Guard house door 24-Mar-16 26-Mar-16 3.30pm CLOSED 24-Mar-16 0 ACCEPTED CANCEL 1 1
facing to small package
3010 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02981 AEIE 29-Mar-16 ZN2 ELE Punchlist Punch list for compound lighting at Smallpackage FP-CL7 29-Mar-16 31-Mar-16 3.00pm CLOSED 24-Mar-16 -5 CANCEL no need to submit RFIN for 1 1
punchlist
3011 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02982 seribu bio 29-Mar-16 ZN2 STR material Receiving column for steel structure at Multipurpose court 30-Mar-16 1-Apr-16 10.00am CLOSED 26-Apr-16 27 ACCEPTED 1 1
3012 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02983 seribu bio 29-Mar-16 ZN2 STR material Receiving truss for steel structure at Multipurpose court 30-Mar-16 1-Apr-16 10.00am CLOSED 26-Apr-16 27 ACCEPTED 1 1
3013 RAPID-P20A1-UEMB-ZN2-STR-RFIN-02984 seribu bio 29-Mar-16 ZN2 STR material Receiving deck roofing for steel structure at Multipurpose 30-Mar-16 1-Apr-16 10.00am CLOSED 26-May-16 57 ACCEPTED 1 1
court
3015 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02986 AEIE 30-Mar-16 ZN2 ELE testing Earthing test for feeder pillar Messhall 30-Mar-16 1-Apr-16 3.00pm CLOSED 2-Apr-16 3 ACCEPTED 1 1
3016 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02987 AEIE 30-Mar-16 ZN2 ELE testing Installation of FP Messhall at Small package area 30-Mar-16 1-Apr-16 2.00pm CLOSED 2-Apr-16 3 ACCEPTED 1 1
3018 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02989 AEIE 30-Mar-16 ZN2 ELE testing Underground cable installation from MFP C7 to FP 30-Mar-16 1-Apr-16 2.00pm CLOSED 30-Mar-16 0 ACCEPTED 1 1
Messhall. 1x4C 400mm 89 XLPE/SWA/PVC
3019 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02990 AEIE 30-Mar-16 ZN2 ELE testing Earthing installation for feeder pillar Messhall 30-Mar-16 1-Apr-16 2.00pm CLOSED 2-Apr-16 3 ACCEPTED 1 1
3021 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02992 AEIE 31-Mar-16 ZN2 ELE installation FP C1 installation and termination 18-Mar-16 20-Mar-16 1.00pm CLOSED 2-Apr-16 15 ACCEPTED 1 1
3022 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02993 AEIE 31-Mar-16 ZN2 ELE installation FP C2 installation and termination 31-Mar-16 2-Apr-16 1.00pm CLOSED 2-Apr-16 2 ACCEPTED 1 1
3023 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02994 AEIE 31-Mar-16 ZN2 ELE installation FP C5 installation and termination 31-Mar-16 2-Apr-16 2.00pm CLOSED 2-Apr-16 2 ACCEPTED 1 1
3024 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02995 AEIE 31-Mar-16 ZN2 ELE installation FP C11 installation and termination 31-Mar-16 2-Apr-16 4.00pm CLOSED 2-Apr-16 2 ACCEPTED 1 1
3025 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02996 AEIE 31-Mar-16 ZN2 ELE installation FP C7 installation and termination 31-Mar-16 2-Apr-16 4.00pm CLOSED 31-Mar-16 0 ACCEPTED 1 1
3026 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-02997 AEIE 31-Mar-16 ZN2 ELE installation FP C4 installation and termination 31-Mar-16 2-Apr-16 4.00pm CLOSED 2-Apr-16 2 ACCEPTED 1 1
3027 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02998 UEMB AZRI 6-Apr-16 ZN2 ARC furniture Furniture supply for Supervisory accomodation 2(SA2) 8-Apr-16 10-Apr-16 9.00am CLOSED 8-Apr-16 0 ACCEPTED 1 1
3028 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-02999 UEMB AZRI 6-Apr-16 ZN2 ARC furniture Furniture supply for Supervisory accomodation 4(SA4) 8-Apr-16 10-Apr-16 9.00am CLOSED 8-Apr-16 0 ACCEPTED 1 1
3029 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03000 UEMB AZRI 6-Apr-16 ZN2 ARC furniture Furniture supply for Labour accomodation 2(LA2) 8-Apr-16 10-Apr-16 9.00am CLOSED 8-Apr-16 0 ACCEPTED 1 1
3030 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03001 UEMB AZRI 6-Apr-16 ZN2 ARC furniture Furniture supply for Labour accomodation 4(LA4) 8-Apr-16 10-Apr-16 9.00am CLOSED 8-Apr-16 0 ACCEPTED 1 1
3031 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03002 UEMB AZRI 6-Apr-16 ZN2 ARC furniture Furniture supply for Labour accomodation 6(LA6) 8-Apr-16 10-Apr-16 9.00am CLOSED 8-Apr-16 0 ACCEPTED 1 1
3032 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03003 UEMB AZRI 6-Apr-16 ZN2 ARC furniture Furniture supply for Guard house 3 (GH3) 8-Apr-16 10-Apr-16 3.00pm CLOSED 8-Apr-16 0 ACCEPTED 1 1
3034 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-03005 khidmat hijau 9-Apr-16 ZN2 PIP Welding Inspection of installation fire water pipeline for Guard 12-Jan-16 14-Jan-16 10.30am CLOSED 12-May-16 121 ACCEPTED 1 1
House 3 (GH3) (piping & fitting installation)
3035 RAPID-P20A1-UEMB-ZN2-TNK-RFIN-03006 khidmat hijau 9-Apr-16 ZN2 TNK septic tank Inspection of installation Septic tank at Guard House 3 15-Jan-16 17-Jan-16 10.30am CLOSED 13-Jun-16 150 ACCEPTED 1 1
(GH3)
3037 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-03008 khidmat hijau 9-Apr-16 ZN2 PIP Welding Inspection of installation potable water pipeline for Guard 25-Jan-16 27-Jan-16 10.30am CLOSED 12-May-16 108 ACCEPTED 1 1
House 3 (GH3) (piping & fitting installation)
3039 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03010 seribu bio 12-Apr-16 ZN2 ELE installation Installation LED at site for Multipurpose court -small 12-Apr-16 14-Apr-16 3.00pm CLOSED 17-May-16 35 ACCEPTED 1 1
package
3048 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03019 Iszda 30-Mar-16 ZN2 ELE installation Electrical installation work at Messhall building and 1-Apr-16 3-Apr-16 10.00am CLOSED 1-Jul-16 91 REJECTED superceded with 1 1
kitchen 15nos 2x28W flourescent light RFIN 3066
3050 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03021 Iszda 30-Mar-16 ZN2 ELE testing Testing electrical installation work at Maintenance 2-Apr-16 4-Apr-16 10.00am CLOSED 11-May-16 39 ACCEPTED 1 1
workshop and store 13nos 2x28W flourescent light
3053 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03024 Iszda 30-Mar-16 ZN2 ELE installation electrical installation work at Prayer building 144nos 1-Apr-16 3-Apr-16 10.00am CLOSED CANCEL 1 1
2x24W flourescent light
3054 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03025 AEIE 19-Apr-16 ZN2 ELE installation FP-HM7 installation and termination (road lighting) 21-Apr-16 23-Apr-16 9.15am CLOSED 29-Apr-16 8 ACCEPTED 1 1
3055 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03026 AEIE 19-Apr-16 ZN2 ELE installation FP-CL7 installation and termination (road lighting) 21-Apr-16 23-Apr-16 12.00pm CLOSED 29-Apr-16 8 ACCEPTED 1 1
3056 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03027 AEIE 20-Apr-16 ZN2 ELE installation Replacement MCCB at FP-C6 21-Apr-16 23-Apr-16 12.00pm CLOSED 3-May-16 12 ACCEPTED 1 1
3057 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03028 AEIE 20-Apr-16 ZN2 ELE installation FP-CL6 installation and termination 21-Apr-16 23-Apr-16 2.00pm CLOSED 29-Apr-16 8 ACCEPTED 1 1
3058 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03029 AEIE 20-Apr-16 ZN2 ELE installation FP-HM6 installation and termination 21-Apr-16 23-Apr-16 2.15pm CLOSED 29-Apr-16 8 ACCEPTED 1 1
3059 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03030 AEIE 24-Apr-16 ZN2 ELE installation FP-HM6 installation and terminations (area lighting) 25-Apr-16 27-Apr-16 10.00am CLOSED 11-May-16 16 ACCEPTED 1 1
3060 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03031 AEIE 24-Apr-16 ZN2 ELE installation FP-HM7 installation and terminations (area lighting) 25-Apr-16 27-Apr-16 11.00am CLOSED 11-May-16 16 ACCEPTED 1 1
3061 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03032 AEIE 24-Apr-16 ZN2 ELE installation FP-HM4 installation and terminations (area lighting) 25-Apr-16 27-Apr-16 2.30pm CLOSED 11-May-16 16 ACCEPTED 1 1
3062 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03033 Gapura 26-Apr-16 ZN2 ARC fencing Final inspection for wiremesh fencing at Gymnasium, Club 5-Apr-16 7-Apr-16 2.30pm CLOSED 5-Apr-16 0 ACCEPTED 1 1
house, Office for catering & matainance
3064 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03035 AEIE 26-Apr-16 ZN2 ELE Migger test Meggering outgoing cable 1x4C 16mm sq. XLPE/SWA/PVC 28-Apr-16 30-Apr-16 11.30am CLOSED 11-May-16 13 ACCEPTED 1 1
for FP-CL6
3066 RAPID-P20A1-UEMB-ZN2-PIP-RFIN-03037 khidmat hijau 26-Apr-16 ZN2 PIP testing Inspection of pressure testt & leakage test for potable 27-Apr-16 29-Apr-16 10.30am CLOSED 20-May-16 23 ACCEPTED 1 1
water pipeline at Guard house 3 (GH3)
3067 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03038 seribu bio 27-Apr-16 ZN2 CIV Lay SIKA to lay SIKA undulation for multipurpose small package 28-Apr-16 30-Apr-16 10.30am CLOSED 27-Jul-16 90 ACCEPTED 1 1
concrete slab
3068 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03039 seribu bio 27-Apr-16 ZN2 ELE earthing Earthing test for multipurpose 2,1 20-Apr-16 22-Apr-16 11.00am CLOSED 27-Apr-16 7 ACCEPTED 1 1
3069 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03040 seribu bio 27-Apr-16 ZN2 ELE testing Megger test for multipurpose 2, 1 20-Apr-16 22-Apr-16 11.00am CLOSED 27-Apr-16 7 ACCEPTED 1 1
3070 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03041 flexi team 4-May-16 ZN2 ELE testing Testing & commissioning checking for boom gate 4-May-16 6-May-16 3.00pm CLOSED 10-May-16 6 ACCEPTED 1 1
3071 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03042 seribu bio 5-May-16 ZN2 CIV material Receiving material -SIKA material for the remedy works fof 23-Apr-16 25-Apr-16 3.00pm CLOSED 15-Aug-16 114 ACCEPTED 1 1
Multpurpose sport court
3072 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03043 seribu bio 5-May-16 ZN2 CIV mock up Mock up of PU flooring at multipurpose court 30-Apr-16 2-May-16 3.00pm CLOSED 26-May-16 26 ACCEPTED 1 1
3074 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03045 seribu bio 7-May-16 ZN2 ARC coating Installation of polyurethee surfacing floor at Multipurpose 7-May-16 9-May-16 5.00pm CLOSED 28-Jul-16 82 ACCEPTED 1 1
1&2
3078 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03049 AEIE 9-May-16 ZN2 ELE Underground cable Inspection installation for underground cable laying FP- 10-May-16 12-May-16 9.00am CLOSED 26-May-16 16 ACCEPTED 1 1
laundry to CCTV box 1x4C 16mm sq. XLPE/SWA/PVC
3079 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03050 AEIE 9-May-16 ZN2 ELE Migger test Meggering outgoing cable 1x4C 16mm sq XLPE/SWA/PVC 10-May-16 12-May-16 9.30am CLOSED 9-Jun-16 30 ACCEPTED 1 1
for FP-laundry to CT1
3081 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03052 AEIE 9-May-16 ZN2 ELE Underground cable Inspection installation for underground cable laying FP- 10-May-16 12-May-16 11.00am CLOSED 2-Jun-16 23 ACCEPTED 1 1
laundry to CT2 box 1x4C 16mm sq. XLPE/SWA/PVC
3082 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03053 AEIE 9-May-16 ZN2 ELE Underground cable Inspection installation for underground cable laying FP- 10-May-16 12-May-16 11.30am CLOSED 19-May-16 9 ACCEPTED 1 1
laundry to CT1 box 1x4C 16mm sq. XLPE/SWA/PVC
3085 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03056 AEIE 17-May-16 ZN2 ELE Underground cable Inspection underground cable laying for turnstile 14-May-16 16-May-16 9.00am CLOSED 19-May-16 5 ACCEPTED 1 1
fromFPC6 1x4C 16m2 XLPE/SWA/PVC
3087 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03058 AEIE 17-May-16 ZN2 ELE installation Earthing installation forFP-Freezer container 18-May-16 20-May-16 9.00am CLOSED 19-May-16 1 ACCEPTED 1 1
Inspection for earthing resistance test forFP-freezer
3088 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03059 AEIE 17-May-16 ZN2 ELE installation container 18-May-16 20-May-16 10.00am CLOSED 9-Jun-16 22 ACCEPTED 1 1
3090 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03061 AEIE 17-May-16 ZN2 ELE installation FP-freezer container installation and termination 18-May-16 20-May-16 11.30am CLOSED 19-May-16 1 ACCEPTED 1 1
3092 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03063 AEIE 17-May-16 ZN2 ELE installation Earthing test FP-laundry 18-May-16 20-May-16 8.15am CLOSED 3-Jun-16 16 ACCEPTED 1 1
3093 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03064 AEIE 17-May-16 ZN2 ELE installation Inspection of FP-laundry installation 18-May-16 20-May-16 9.00am CLOSED 9-Jun-16 22 ACCEPTED 1 1
3094 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03065 AEIE 17-May-16 ZN2 ELE installation Installation earthing forFP-laundry at Smallpackage 18-May-16 20-May-16 8.00am CLOSED 6-Sep-16 111 ACCEPTED 1 1
3095 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03066 Iszda 17-May-16 ZN2 ELE installation Electrical installation works at Messhall and kitchen 17-May-16 19-May-16 10.00am CLOSED 1-Jul-16 45 ACCEPTED 1 1
3096 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03067 Iszda 17-May-16 ZN2 ELE installation Electrical installation works at Maintenance workshopand 17-May-16 19-May-16 10.00am CLOSED 1-Jul-16 45 ACCEPTED 1 1
store
3097 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03068 Dorce 9-Jul-15 ZN2 ELE installation Building ground floor UPVC pipes instalation and water 10-Jul-15 12-Jul-15 10.00am CLOSED 20-May-16 315 ACCEPTED 1 1
flow test inspection at SA1
3099 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03070 Dorce 9-Jul-15 ZN2 ELE installation Building second floor UPVC pipes instalation and water 10-Jul-15 12-Jul-15 10.00am CLOSED 20-May-16 315 ACCEPTED 1 1
flow test inspection at SA1
3101 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03072 UEMB AZRI 18-May-16 ZN2 ARC furniture Gym/ fitness equipemtn supply for gymnasium 19-May-16 21-May-16 10.00am CLOSED 20-May-16 1 ACCEPTED 1 1
3102 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03073 UEMB AZRI 18-May-16 ZN2 ARC furniture Supply and install hair dressing table for Barber building 19-May-16 21-May-16 10.00am CLOSED 20-May-16 1 ACCEPTED 1 1
3103 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03074 core manpower 19-Apr-16 ZN2 CIV material Pepare and concreting base slab forsliding gate 28-Apr-16 30-Apr-16 10.00am CLOSED 20-Jun-16 53 ACCEPTED 1 1
3104 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03075 core manpower 19-Apr-16 ZN2 CIV sliding gate Installation sliding gate 29-Mar-16 31-Mar-16 10.00am CLOSED 20-Jun-16 83 ACCEPTED 1 1
3105 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03076 Dorce 9-Oct-15 ZN2 ELE Electrical works Building cable pulling installation inspection at Messhall 10-Oct-15 12-Oct-15 2.00pm CLOSED 20-May-16 223 ACCEPTED 1 1
and kitchen
3107 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03078 Dorce 6-Jan-16 ZN2 ARC Assembling works Building chassis to stump connection inspection 7-Jan-16 9-Jan-16 2.00pm CLOSED CANCEL 1 1
3108 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03079 Dorce 6-Jan-16 ZN2 ARC Assembling works Building chassis to stump connection inspection 7-Jan-16 9-Jan-16 2.00pm CLOSED CANCEL 1 1
3109 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03080 Dorce 6-Jan-16 ZN2 ARC Painting works Building first floor painting works inspection 7-Jan-16 9-Jan-16 2.00pm CLOSED CANCEL 1 1
3110 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03081 Dorce 6-Jan-16 ZN2 ARC Painting works Building painting works inspection 7-Jan-16 9-Jan-16 2.00pm CLOSED CANCEL 1 1
3111 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03082 Dorce 6-Jan-16 ZN2 ARC Ceramic works Building third floor ceramic works inspection 7-Jan-16 9-Jan-16 2.00pm CLOSED CANCEL 1 1
3112 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03083 Dorce 6-Jan-16 ZN2 ARC Ceramic works Building ground floor ceramic works inspection 7-Jan-16 9-Jan-16 2.00pm CLOSED CANCEL 1 1
3113 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03084 Dorce 6-Jan-16 ZN2 ARC Ceramic works Building second floor ceramic works inspection 7-Jan-16 9-Jan-16 2.00pm CLOSED CANCEL 1 1
3114 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03085 Dorce 6-Jan-16 ZN2 ARC Ceramic tiles works Building first floor ceramic works inspection 7-Jan-16 9-Jan-16 2.00pm CLOSED CANCEL 1 1
3115 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03086 Dorce 6-Feb-16 ZN2 ARC Painting works Building works floor painting works inspection 7-Feb-16 9-Feb-16 2.00pm CLOSED CANCEL 1 1
3116 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03087 Dorce 6-Feb-16 ZN2 ARC Painting works Building second floor painting works inspection 7-Feb-16 9-Feb-16 2.00pm CLOSED CANCEL 1 1
3117 RAPID-P20A1-UEMB-ZN2-ARC-RFIN-03088 Dorce 2-Jun-16 ZN2 ARC Painting works Building third floor painting works inspection 3-Jun-16 5-Jun-16 2.00pm CLOSED CANCEL 1 1
3118 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03089 Dorce 2-Jun-16 ZN2 ELE Electrical works Building electrical fixtures installation inspection 3-Jun-16 5-Jun-16 2.00pm CLOSED CANCEL 1 1
FDT (subgrade) in small package road, FDT (Subbase) in
3119 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03090 aswad 17-Oct-15 ZN2 CIV Roadwork 18-Oct-15 20-Oct-15 10.00am CLOSED 18-Oct-15 0 ACCEPTED 1 1
small package road
3120 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03091 aswad 8-Oct-15 ZN2 CIV Roadwork FDT (Subgrade) in small package road 8-Oct-15 10-Oct-15 11.00am CLOSED 8-Oct-15 0 ACCEPTED 1 1
3121 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03092 AEIE 24-Jun-16 ZN2 ELE earthing DB test earthing test DB at refuse chamber at small package 24-Jun-16 26-Jun-16 9.35am CLOSED 18-Aug-16 55 ACCEPTED 1 1
3122 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03093 AEIE 24-Jun-16 ZN2 ELE earthing earthing DB installation for refuse chamber at small 24-Jun-16 26-Jun-16 9.35am CLOSED 18-Aug-16 55 ACCEPTED 1 1
package
3123 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03094 AEIE 24-Jun-16 ZN2 ELE installation installation DB at refuse chamber at small package 24-Jun-16 26-Jun-16 9.35am CLOSED 11-Aug-16 48 ACCEPTED 1 1
installation for 2x10W mirror louver and reflector for flour.
3124 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03095 AEIE 24-Jun-16 ZN2 ELE installation 24-Jun-16 26-Jun-16 9.00am CLOSED 24-Jun-16 0 ACCEPTED 1 1
Lamp fitting (1 nos)
3126 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03097 I-GEN 23-Feb-16 ZN2 MNE installation installation of fire fighting equipment/system at SA 4 9-Mar-16 11-Mar-16 9.00am CLOSED 19-Jul-16 132 ACCEPTED 1 1
Building (3rd Floor)
3128 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03099 I-GEN 23-Feb-16 ZN2 MNE installation installation of fire fighting equipment/system at LA 2 8-Mar-16 10-Mar-16 9.00am CLOSED 19-Jul-16 133 ACCEPTED 1 1
Building (First Floor)
3130 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03101 I-GEN 23-Feb-16 ZN2 MNE installation installation of fire fighting equipment/system at LA 2 8-Mar-16 10-Mar-16 9.00am CLOSED 18-Jul-16 132 ACCEPTED 1 1
Building (Third Floor)
3131 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03102 I-GEN 23-Feb-16 ZN2 MNE installation installation of fire fighting equipment/system at LA 4 8-Mar-16 10-Mar-16 9.00am CLOSED 18-Jul-16 132 ACCEPTED 1 1
Building (Ground Floor)
3132 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03103 I-GEN 23-Feb-16 ZN2 MNE installation installation of fire fighting equipment/system at LA 4 8-Mar-16 10-Mar-16 9.00am CLOSED 18-Jul-16 132 ACCEPTED 1 1
Building (First Floor)
3134 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03105 I-GEN 23-Feb-16 ZN2 MNE installation installation of fire fighting equipment/system at LA 4 8-Mar-16 10-Mar-16 9.00am CLOSED 18-Jul-16 132 ACCEPTED 1 1
Building (Third Floor)
3135 RAPID-P20A1-UEMB-ZN2-ELE-RFIN-03106 seribu bio 11-Aug-16 ZN2 ELE testing Earthing testing for lightning arrestor at multipurpose 12-Aug-16 14-Aug-16 9.00am CLOSED 18-Aug-16 6 ACCEPTED 1 1
court MC1 & MC2
3136 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03107 AEIE 8-Aug-16 ZN2 ELE testing Inspection material functionality test at Refuse chamber 9-Aug-16 11-Aug-16 2.30pm CLOSED 23-Aug-16 14 ACCEPTED 1 1
(small package)
3137 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03108 AEIE 8-Aug-16 ZN2 ELE testing Inspection material functionality test at Refuse chamber 9-Aug-16 11-Aug-16 3.30pm CLOSED 23-Aug-16 14 ACCEPTED 1 1
(small package)
3138 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03109 AEIE 19-Aug-16 ZN2 ELE testing Earthing test for DB Laundry 20-Aug-16 22-Aug-16 2.30pm CLOSED 23-Aug-16 3 ACCEPTED 1 1
3139 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03110 AEIE 19-Aug-16 ZN2 ELE testing Earthing test for DB Gymnasium 20-Aug-16 22-Aug-16 3.30pm CLOSED 23-Aug-16 3 ACCEPTED 1 1
3140 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03111 AEIE 19-Aug-16 ZN2 ELE testing Earthing test for DB FP-CL6 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
3141 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03112 AEIE 19-Aug-16 ZN2 ELE testing Earthing test for DB FP-CL7 20-Aug-16 22-Aug-16 9.00am CLOSED 23-Aug-16 3 ACCEPTED 1 1
3143 RAPID-P20A1-UEMB-ZN2-MNE-RFIN-03114 Iszda 29-Jun-16 ZN2 MNE installation receiving for master clock at small package, common 29-Jun-16 1-Jul-16 10.00am CLOSED 6-Oct-16 99 ACCEPTED 1 1
building and facilities
3151 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03122 shahrizal 9-Sep-15 ZN2 CIV Roadwork preparation of road base and dipping at small package CH 10-Sep-15 12-Sep-15 10.00am CLOSED 9-Sep-16 365 ACCEPTED 1 1
0 - CH 100
3152 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03123 shahrizal 14-Sep-15 ZN2 CIV Roadwork preparation of road base and dipping at small package CH 15-Sep-15 17-Sep-15 10.00am CLOSED 9-Sep-16 360 ACCEPTED 1 1
0 - CH 135
3154 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03125 shahrizal 4-Sep-15 ZN2 CIV Roadwork preparation of subbase and dipping at small package CH 1 5-Sep-15 7-Sep-15 10.00am CLOSED 9-Sep-16 370 ACCEPTED 1 1
- CH 30
3155 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03126 shahrizal 11-Sep-15 ZN2 CIV Roadwork preparation of subbase and dipping at small package CH 0 12-Sep-15 14-Sep-15 10.00am CLOSED 9-Sep-16 363 ACCEPTED 1 1
- CH 50
preparation of subbase and dipping at small package CH 0
3156 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03127 shahrizal 18-Sep-15 ZN2 CIV Roadwork 19-Sep-15 21-Sep-15 10.00am CLOSED 9-Sep-16 356 ACCEPTED 1 1
- CH 50
3157 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03128 shahrizal 2-Sep-15 ZN2 CIV Roadwork preparation of subgrade and dipping at small package CH 3-Sep-15 5-Sep-15 10.00am CLOSED 9-Sep-16 372 ACCEPTED 1 1
0 - CH 30
3158 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03129 shahrizal 8-Sep-15 ZN2 CIV Roadwork preparation of subgrade and dipping at small package CH 9-Sep-15 11-Sep-15 10.00am CLOSED 9-Sep-16 366 ACCEPTED 1 1
0 - CH 80
3159 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03130 shahrizal 15-Sep-15 ZN2 CIV Roadwork preparation of subgrade and dipping at small package CH 16-Sep-15 18-Sep-15 10.00am CLOSED 9-Sep-16 359 ACCEPTED 1 1
0 - CH 110
3160 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03131 AEIE 26-Aug-16 ZN2 CIV installation Earthing installation at FP-CL7 27-Aug-16 29-Aug-16 9.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
3161 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03132 AEIE 26-Aug-16 ZN2 CIV installation Earthing installation at FP-CL6 27-Aug-16 29-Aug-16 9.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
3162 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03133 AEIE 26-Aug-16 ZN2 CIV installation Earthing installation at DB LA5 27-Aug-16 29-Aug-16 10.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
3163 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03134 AEIE 26-Aug-16 ZN2 CIV installation Earthing installation at DB Gym 27-Aug-16 29-Aug-16 9.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
3164 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03135 AEIE 26-Aug-16 ZN2 CIV installation Earthing installation at DB Laundry 27-Aug-16 29-Aug-16 12.00am CLOSED 17-Oct-16 51 ACCEPTED 1 1
3167 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03138 acme bestari 20-Apr-16 ZN2 ELE installation Installation of Cisco EDGE Switch at Small Packages Camp 20-Apr-16 22-Apr-16 11.00am CLOSED 16-Nov-16 210 ACCEPTED 1 1
(SPC) in Gae House 2 (GH2) and Assmbly Area (AS1)
3169 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03140 acme bestari 21-Apr-16 ZN2 ELE testing Testing of Cisco EDGE Switch at Small Packages Camp 21-Apr-16 23-Apr-16 11.00am CLOSED 16-Nov-16 209 ACCEPTED 1 1
(SPC) in Gae House 2 (GH2) and Assmbly Area (AS1)
3171 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03142 acme bestari 21-Apr-16 ZN2 ELE Commisioning Commisioning of Cisco EDGE Switch at Small Packages 21-Apr-16 23-Apr-16 11.00am CLOSED 16-Nov-16 209 ACCEPTED 1 1
Camp (SPC) in Gae House 2 (GH2) and Assmbly Area (AS1)
3174 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03145 opensis 8-Oct-16 ZN2 ELE testing testing of door access system (catering & maintenance 10-Oct-16 12-Oct-16 11.00am CLOSED 10-Oct-16 0 ACCEPTED 1 1
office)
commisioning of door access system (catering &
3175 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03146 opensis 8-Oct-16 ZN2 ELE Commisioning maintenance office) 10-Oct-16 12-Oct-16 11.00am CLOSED 10-Oct-16 0 ACCEPTED 1 1
3176 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03147 AEIE 14-Oct-16 ZN2 ELE testing Earthing test lightning protection system at offices for 15-Oct-16 17-Oct-16 8.00am CLOSED 10-Nov-16 26 ACCEPTED 1 1
Catering and Maintenance
3177 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03148 AEIE 14-Oct-16 ZN2 ELE testing Earthing test lightning protection system at Maintenance 15-Oct-16 17-Oct-16 8.15am CLOSED 10-Nov-16 26 ACCEPTED 1 1
workshop and store
3179 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03150 AEIE 14-Oct-16 ZN2 ELE installation Installation earthing lightning protection system at barber 15-Oct-16 17-Oct-16 3.00pm CLOSED 10-Nov-16 26 ACCEPTED 1 1
shop building
3180 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03151 AEIE 14-Oct-16 ZN2 ELE installation Installation earthing lightning protection system at grocery 15-Oct-16 17-Oct-16 4.00pm CLOSED 10-Nov-16 26 ACCEPTED 1 1
3181 RAPID-P20A1-UEMB-ZN2-CIV-RFIN-03152 UEMB Azizi 29-Feb-16 ZN2 ELE Commisioning Testing & Commisioning of Closed Circuit Television 29-Feb-16 2-Mar-16 10.00am CLOSED 14-Dec-16 289 ACCEPTED 1 1
System workstation -Central Security Building (RSCC)
3182 3181
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(ZONE 3)
RFI No. Requested by Submission Date Section/Area Discipline Inspection Description of Works Inspection Status Date closed KPI (days) Remarks
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(ZONE 4)
1 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00001 En Misbah 9-Oct-14 ZN4 CIV Testing Drilling borehole for S.I No 18 9-Oct-14 11-Oct-14 8.00 am CLOSED 18-Oct-14 7 ACCEPTED 1 1
2 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00002 En Halim 14-Oct-14 ZN4 CIV Testing Drilling borehole for S.I No 17 15-Oct-14 17-Oct-14 8.00 am CLOSED 15-Oct-14 0 ACCEPTED 1 1
4 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00004 How Thong 14-Jan-15 ZN4 STR Structure Borehole drilling for Soil Investigation 15-Jan-15 17-Jan-15 11.00am CLOSED 02-Feb-15 18 REJECTED 1 1
7 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00007 En Alwi 28-Jan-15 ZN4 STR Survey Joint Survey for STP1 Area 29-Jan-15 31-Jan-15 10.00am CLOSED 29-Jan-15 0 ACCEPTED 1 1
8 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00008 How Thong 29-Jan-15 ZN4 STR Survey Pilling points for water tank joint survey 30-Jan-15 1-Feb-15 10.00am CLOSED 30-Jan-15 0 ACCEPTED 1 1
9 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00009 How thong 31-Jan-15 ZN4 MNE Structure Pilling work commence at potable water tank 2-Feb-15 4-Feb-15 09.00am CLOSED 04-Mar-15 30 ACCEPTED 1 1
10 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00010 How Thong 2-Feb-15 ZN4 MNE Structure PDA Test 4-Feb-15 6-Feb-15 10.00am CLOSED 12-Feb-15 8 ACCEPTED 1 1
11 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00011 How Thong 2-Feb-15 ZN4 STR Structure Pilling Works (Tank 4) 5-Feb-15 7-Feb-15 08.00am CLOSED 12-Feb-15 7 ACCEPTED 1 1
12 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00012 Syafiq 4-Feb-15 ZN4 STR Structure Spun Pile delivery (Potable water tank) 5-Feb-15 7-Feb-15 3.00pm CLOSED 26-Feb-15 21 ACCEPTED 1 1
13 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00013 Rosle 5-Feb-15 ZN4 STR Structure Delivery RC pile 200X200mm (API SDN BHD) 7-Feb-15 9-Feb-15 10.00pm CLOSED 06-Mar-15 27 ACCEPTED 1 1
14 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00014 How Thong 7-Feb-15 ZN4 STR Structure Spun Pile deliverd 7-Feb-15 9-Feb-15 10.00am CLOSED 23-Feb-15 16 ACCEPTED 1 1
15 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00015 How Thong 5-Feb-15 ZN4 STR Structure Piling works at tank D 8-Feb-15 10-Feb-15 10.00am CLOSED 17-Aug-16 556 ACCEPTED 1 1
16 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00016 How Thong 8-Feb-15 ZN4 STR Structure Piling works at tank D 11-Feb-15 13-Feb-15 10.00am CLOSED 17-Aug-16 553 ACCEPTED 1 1
18 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00018 How Thong 10-Feb-15 ZN4 STR Structure Joint Inspection for piling point fot Tank A and Tank C 11-Feb-15 13-Feb-15 10.00am CLOSED 12-Feb-15 1 ACCEPTED 1 1
19 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00019 How Thong 11-Feb-15 ZN4 STR Structure Piling works at tank D (continued) refer 14-Feb-15 16-Feb-15 10.00am CLOSED 16-Aug-16 549 ACCEPTED 1 1
attachmen drawing)
20 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00020 Ocned Water 11-Feb-15 ZN4 MNE Structure Joint Survay STP 1 area (100 point) 11-Feb-15 13-Feb-15 04.00pm CLOSED 11-Feb-15 0 ACCEPTED 1 1
21 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00021 Ocned Water 16-Feb-15 ZN4 CIV Structure Rc Pile delivery inspection 184837,184837,184809. 16-Feb-15 18-Feb-15 04.00pm CLOSED 18-Mar-15 30 ACCEPTED 1 1
22 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00022 How Thong 23-Feb-15 ZN4 MNE Structure Piling works tank D (Reffer attached extract dwg) 23-Feb-15 25-Feb-15 0730am CLOSED 06-Mar-15 11 ACCEPTED 1 1
23 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00023 How Thong 24-Feb-15 ZN4 CIV Structure Piling works tank C,D (Reffer attached extract dwg) 26-Feb-15 28-Feb-15 0730am CLOSED 10-Mar-15 12 REJECTED 1 1
26 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00026 Ocned Water 28-Feb-15 ZN4 MNE Structure RC pile delivery inspection 185052 28-Feb-15 2-Mar-15 04.00pm CLOSED 06-Mar-15 6 ACCEPTED 1 1
27 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00027 How Thong 28-Feb-15 ZN4 M&E Structure Piling work Tank D 2-Mar-15 4-Mar-15 04.00pm CLOSED 16-Aug-16 533 ACCEPTED 1 1
28 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00027A How Thong 1-Mar-15 ZN4 STR Piling works Piling work Tank E 3-Mar-15 5-Mar-15 9.00am CLOSED 30-Mar-15 27 ACCEPTED 1 1
29 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00028 ALWI 2-Mar-15 ZN4 MNE Structure Maintain Load Test point 57 g7 tank c 4-Mar-15 6-Mar-15 10.00pm CLOSED 04-Mar-15 0 ACCEPTED 1 1
30 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00029 Ocned Water 2-Mar-15 ZN4 MNE Structure Delivery RC pile 200X200mm X 6 m. 3-Mar-15 5-Mar-15 10.00pm CLOSED 14-Mar-15 11 ACCEPTED 1 1
34 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00033 Ocned Water 4-Mar-15 ZN4 M&E Survey To do Survey work at location as per drawing attech 5-Mar-15 7-Mar-15 9.00pm CLOSED CANCEL 1 1
35 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00034 Ocned Water 7-Mar-15 ZN4 MNE Structure Inspection for Rebar Delivery 7-Mar-15 9-Mar-15 9.00am CLOSED 14-Mar-15 7 ACCEPTED 1 1
37 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00036 How Thong 12-Mar-15 ZN4 MNE Structure Material delivery inspection for reinforcement bar 12-Mar-15 14-Mar-15 3.00Pm CLOSED 14-Mar-15 2 ACCEPTED 1 1
39 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00037 How Thong 12-Mar-15 ZN4 MNE Structure Delivery Galvanised carbon steel at site. 12-Mar-15 14-Mar-15 4.00Pm CLOSED 10-Apr-15 29 ACCEPTED 1 1
40 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00037A How Thong 12-Mar-15 ZN4 STR Piling works Driving piling at Tank C 12-Mar-15 14-Mar-15 9.00am CLOSED 22-Jun-16 468 ACCEPTED 1 1
How Thong 12-Mar-15 ZN4 STR Piling works Supply, handle & pitch 350mm spun pile for tank 12-Mar-15 14-Mar-15 9.00am 28-Mar-16
41 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00037B
F potable water CLOSED 382 ACCEPTED 1 1
42 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00038 Ocned Water 9-Mar-15 ZN4 MNE Material Material Delivery inspection for RC pile 10-Mar-15 12-Mar-15 08.00am CLOSED 18-Mar-15 8 ACCEPTED 1 1
43 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00039 Ocned Water 13-Mar-15 ZN4 MNE Material Material Delivery inspection for RC pile 14-Mar-15 16-Mar-15 08.00am CLOSED 15-Mar-15 1 ACCEPTED 1 1
44 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00040 Ocned Water 13-Mar-15 ZN4 M&E Survey Join survey (as per drawing attach) 14-Mar-15 16-Mar-15 08.00am CLOSED CANCEL 1 1
45 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00041 How Tong 14-Mar-15 ZN4 MNE Structure Survey work at location Tank E 16-Mar-15 18-Mar-15 08.00am CLOSED 16-Mar-15 0 ACCEPTED 1 1
47 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00042 How Tong 14-Mar-15 ZN4 MNE Structure Delivery spun pile 350mm 15-Mar-15 17-Mar-15 08.00am CLOSED 17-Mar-15 2 ACCEPTED 1 1
48 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00043 How Tong 16-Mar-15 ZN4 MNE Structure Material Delivery Inspection Spun Pile 350 mm 17-Mar-15 19-Mar-15 09.00am CLOSED 25-Mar-15 8 ACCEPTED 1 1
49 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00043A How Tong 15-Mar-15 ZN4 MNE Structure Driving piling at Tank E 16-Mar-15 18-Mar-15 09.00am CLOSED 22-Jun-16 464 ACCEPTED 1 1
50 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00044 How Tong 17-Mar-15 ZN4 CIV Piling works Piling works for clarifier tank 1, grit chamber, 18-Mar-15 20-Mar-15 09.00am CLOSED 13-Jul-16 483 ACCEPTED 1 1
administration room and control room at STP 1
51 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00045 How Tong 18-Mar-15 ZN4 CIV Structure Inspection for lean concrete raft footing of portoble 18-Mar-15 20-Mar-15 09.00am CLOSED 20-Mar-15 2 ACCEPTED 1 1
water (Tank D)
52 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00046 Ocned Water 17-Mar-15 ZN4 MNE Material Material delivery inspection polyethlene (PE) 18-Mar-15 20-Mar-15 11.00am CLOSED 18-Mar-15 0 ACCEPTED 1 1
Chemical mater storage tank
Ocned Water 18-Mar-15 ZN4 M&E Survey Join Survey for Len-conc at STP per attech 20-Mar-15 22-Mar-15 09.00am
55 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00049
drawing CLOSED CANCEL 1 1
56 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00050 Ocned Water 19-Mar-15 ZN4 MNE Structure Inspection for lean concrete rafting of STP 20-Mar-15 22-Mar-15 02.00am CLOSED 21-Mar-15 1 ACCEPTED 1 1
57 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00051 How Tong 19-Mar-15 ZN4 STR Structure PDA test at Tank E (D9, B10) PDA test at Tank F 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED 1 1
(G13,J12)
59 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00052A How Tong 20-Mar-15 ZN4 STR Piling works Piling works at Tank C 21-Mar-15 23-Mar-15 10.00am CLOSED 22-Jun-16 459 ACCEPTED 1 1
60 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00053 How Tong 17-Mar-15 ZN4 MNE Structure As Built pile position at tank D 18-Mar-15 20-Mar-15 10.00am CLOSED 19-Mar-15 1 ACCEPTED 1 1
61 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00053a How Tong 18-Mar-15 ZN4 MNE Structure As Built additional pile position at tank D 19-Mar-15 21-Mar-15 10.00am CLOSED 19-Mar-15 0 ACCEPTED 1 1
62 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00053B How Tong 18-Mar-15 ZN4 STR Structure Piling works tank D at PWT 19-Mar-15 21-Mar-15 10.00am CLOSED 19-Mar-15 0 ACCEPTED 1 1
63 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00053C How Tong 18-Mar-15 ZN4 MNE Structure Piling works tank E at PWT 19-Mar-15 21-Mar-15 10.00am CLOSED 22-Jun-16 461 ACCEPTED 1 1
64 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00053D How Tong 18-Mar-15 ZN4 STR Structure Piling works tank F at PWT 19-Mar-15 21-Mar-15 10.00am CLOSED 25-Jun-16 464 ACCEPTED 1 1
65 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00054 Ocned Water 19-Mar-15 ZN4 MNE Survey Joint Survey as per drawing attech 20-Mar-15 22-Mar-15 08.00am CLOSED 20-Mar-15 0 ACCEPTED 1 1
66 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00055 Ocned Water 19-Mar-15 ZN4 MNE Survey As Built pilling point at aeretion tank 20-Mar-15 22-Mar-15 08.00am CLOSED 20-Mar-15 0 ACCEPTED 1 1
69 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00058 Ocned Water 20-Mar-15 ZN4 MNE Structure Concrete work grade c20/25N for lean con 19-Mar-15 21-Mar-15 10.00am CLOSED 10-Jun-15 83 REJECTED 1 1
70 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00059 Ocned Water 20-Mar-15 ZN4 MNE Structure Inspection for Lean Con raft footinf of STP 21-Mar-15 23-Mar-15 08.00am CLOSED 10-Jun-15 81 REJECTED 1 1
72 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00061 Ocned Water 21-Mar-15 ZN4 MNE Structure Container arrived at site 24-Mar-15 26-Mar-15 08.00am CLOSED 25-Mar-15 1 ACCEPTED 1 1
73 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00062 Ocned Water 24-Mar-15 ZN4 MNE Material Inspection material delivery for RC Pile 24-Mar-15 26-Mar-15 10.00am CLOSED 26-Mar-15 2 ACCEPTED 1 1
74 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00063 Ocned Water 24-Mar-15 ZN4 MNE Structure Concrete work for grade C20/25N for lean concrete 24-Mar-15 26-Mar-15 10.00am CLOSED 25-Mar-15 1 ACCEPTED 1 1
75 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00064 Ocned Water 24-Mar-15 ZN4 MNE Material Material Delivery Inspection for IEM MIXER RW 25-Mar-15 27-Mar-15 10.00am CLOSED 26-Mar-15 1 ACCEPTED 1 1
300/XRWCN
77 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00066 Ocned Water 24-Mar-15 ZN4 MNE Structure Survey work for sludge thickened tank as per attach 25-Mar-15 27-Mar-15 10.00am CLOSED 25-Mar-15 0 ACCEPTED 1 1
78 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00067 How Tong 24-Mar-15 ZN4 MNE Structure Inspection of Raft footing Tank D 25-Mar-15 27-Mar-15 10.00am CLOSED 25-Mar-15 0 ACCEPTED 1 1
79 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00068 How Tong 24-Mar-15 ZN4 MNE Structure Delivery inspection Spun Pile 350mm 25-Mar-15 27-Mar-15 10.00am CLOSED 28-Mar-15 3 ACCEPTED 1 1
Inspection material delivery for Geitube Model
80 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00069 Ocned Water 24-Mar-15 ZN4 MNE Material 25-Mar-15 27-Mar-15 05.00am CLOSED 26-Mar-15 1 ACCEPTED 1 1
ISTC5030
82 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00071 Ocned Water 25-Mar-15 ZN4 MNE Structure Join Survey for disinfection Chamber 26-Mar-15 28-Mar-15 08.00am CLOSED 26-Mar-15 0 ACCEPTED 1 1
83 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00072 Ocned Water 4-Mar-15 ZN4 MNE Structure To do Survey works at location as per attech 4-Mar-15 6-Mar-15 10.00am CLOSED 20-Mar-15 16 ACCEPTED 1 1
84 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00073 Ocned Water 25-Mar-15 ZN4 MNE Structure Join survey for Sludge Holding Tank 26-Mar-15 28-Mar-15 08.00am CLOSED 26-Mar-15 0 ACCEPTED 1 1
85 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00074 Ocned Water 25-Mar-15 ZN4 MNE Structure As Built for Clarifier tank 1 26-Mar-15 28-Mar-15 08.00am CLOSED 26-Mar-15 0 ACCEPTED 1 1
86 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00075 How Tong 26-Mar-15 ZN4 MNE Survey Joint Survey Pum House for Piling point 26-Mar-15 28-Mar-15 08.00am CLOSED 27-Mar-15 1 ACCEPTED 1 1
87 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00076 How Tong 26-Mar-15 ZN4 MNE Structure Piling work for pump house at potable water area 27-Mar-15 29-Mar-15 08.00am CLOSED 28-Mar-15 1 ACCEPTED 1 1
88 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00077 Ocned Water 26-Mar-15 ZN4 MNE Material Material receiving inspection for RC pile 27-Mar-15 29-Mar-15 08.00am CLOSED 28-Mar-15 1 ACCEPTED 1 1
90 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00079 Ocned Water 27-Mar-15 ZN4 MNE Material Material receiving inspection for Grundfos Pumps 28-Mar-15 30-Mar-15 08.00am CLOSED 28-Mar-15 0 ACCEPTED 1 1
91 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00080 Ocned Water 27-Mar-15 ZN4 MNE Structure Pouring lean concrete at aeration Tank 28-Mar-15 30-Mar-15 09.00am CLOSED 20-Aug-15 145 ACCEPTED 1 1
95 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00084 Ocned Water 27-Mar-15 ZN4 M&E Survey Joint survey for as built point in clarifier tank 2 28-Mar-15 30-Mar-15 10.30am CLOSED 19-May-16 418 REJECTED 1 1
96 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00085 Ocned Water 29-Mar-15 ZN4 MNE Material Material receiving inspection for RC pile 200mm 30-Mar-15 1-Apr-15 09.00am CLOSED 30-Mar-15 0 REJECTED 1 1
97 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00086 How Tong 27-Mar-15 ZN4 MNE Material Delivery spun pile 350 and 250mm 28-Mar-15 30-Mar-15 10.30am CLOSED 29-Mar-15 1 ACCEPTED 1 1
98 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00086A How Tong 27-Mar-15 ZN4 STR Piling works Piling works at Tank C 29-Mar-15 31-Mar-15 10.30am CLOSED 29-Mar-15 0 ACCEPTED 1 1
99 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00086B How Tong 27-Mar-15 ZN4 STR Piling works Piling works at Tank E PWT 29-Mar-15 31-Mar-15 10.30am CLOSED 29-Mar-15 0 ACCEPTED 1 1
100 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00086C How Tong 27-Mar-15 ZN4 STR Piling works Piling works at Tank F PWT 29-Mar-15 31-Mar-15 10.30am CLOSED 22-Jun-16 451 ACCEPTED 1 1
101 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00087 How Tong 30-Mar-15 ZN4 MNE Material Delivery spun pile 350 and 250mm 31-Mar-15 2-Apr-15 10.30am CLOSED 02-Apr-15 2 ACCEPTED 1 1
102 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00087A How Tong 30-Mar-15 ZN4 STR Piling works Piling works at Tank A 31-Mar-15 2-Apr-15 10.00am CLOSED 22-Jun-16 449 ACCEPTED 1 1
106 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00091 Ocned Water 30-Mar-15 ZN4 MNE Structure Inspection materisl on site for Hight tensile 31-Mar-15 2-Apr-15 11.00am CLOSED 31-Mar-15 0 ACCEPTED 1 1
Deformed Bars. T12x12m, T25 x 12m
107 RAPID-P20A1-UEMB-ZN4-M&E-RFIN-00092 Ocned Water 30-Mar-15 ZN4 M&E Structure Pouring lean Concrete ( C20/25N) at Clarifier Tank 1-Apr-15 3-Apr-15 04.30am CLOSED 17-Apr-15 16 ACCEPTED 1 1
108 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00093 How Tong 31-Mar-15 ZN4 MNE Survey As- Built pile position tank E 1-Apr-15 3-Apr-15 10.00am CLOSED 01-Apr-15 0 ACCEPTED 1 1
112 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00097 How Tong 2-Apr-15 ZN4 MNE Structure Delivery spun pile 350mm 3-Apr-15 5-Apr-15 9.00am CLOSED 10-Apr-15 7 ACCEPTED 1 1
Request for joint survey for piling point on Genset
113 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00098 Ocned Water 2-Apr-15 ZN4 MNE Survey 3-Apr-15 5-Apr-15 9.00am CLOSED 03-Apr-15 0 ACCEPTED 1 1
Room STP1
115 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00100 Ocned Water 2-Apr-15 ZN4 MNE Material Inspection on material on site ( RC pile) 3-Apr-15 5-Apr-15 11.00am CLOSED 10-Apr-15 7 ACCEPTED 1 1
116 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00101 How Thong 2-Apr-15 ZN4 M&E Structure Concreting pile plug Tank E 3-Apr-15 5-Apr-15 10.00am CLOSED CANCEL 1 1
117 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00102 How Tong 2-Apr-15 ZN4 STR Piling works Piling works tank C 4-Apr-15 6-Apr-15 2.45pm CLOSED 4-Apr-15 0 ACCEPTED 1 1
118 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00103 How Tong 2-Apr-15 ZN4 STR Piling works Driving spun pile Tank A 4-Apr-15 6-Apr-15 08.00pm CLOSED 26-Feb-16 328 ACCEPTED 1 1
120 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00105 Ocned Water 3-Apr-15 ZN4 MNE Structure Piling works at Desinfection Chamber STP1 4-Apr-15 6-Apr-15 08.00pm CLOSED 20-Apr-15 16 ACCEPTED 1 1
121 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00106 Ocned Water 3-Apr-15 ZN4 MNE Structure Piling works at Blower Room STP1 4-Apr-15 6-Apr-15 08.00pm CLOSED 20-Apr-15 16 ACCEPTED 1 1
122 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00107 Ocned Water 3-Apr-15 ZN4 MNE Structure Piling works at Genset Room STP1 4-Apr-15 6-Apr-15 08.00pm CLOSED 23-Apr-15 19 ACCEPTED 1 1
126 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00111 How Tong 6-Apr-15 ZN4 MNE Structure Lean concrete Booster pumping station grade 25 7-Apr-15 9-Apr-15 10.00pm CLOSED 10-Apr-15 3 ACCEPTED 1 1
127 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00112 How Tong 6-Apr-15 ZN4 MNE Structure Lean concrete grade 25. Distribution pumping station 7-Apr-15 9-Apr-15 11.00pm CLOSED 10-Apr-15 3 ACCEPTED 1 1
128 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00113 How Tong 7-Apr-15 ZN4 MNE Structure Delivery material inspection roof structure (Lipp) 8-Apr-15 10-Apr-15 10.00pm CLOSED 10-Apr-15 2 ACCEPTED 1 1
131 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00116 How Tong 7-Apr-15 ZN4 STR Structure 'Driving and spun pile 350mm Tank C 8-Apr-15 10-Apr-15 10.00am CLOSED 22-Jun-16 441 ACCEPTED 1 1
132 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00117 How Tong 7-Apr-15 ZN4 MNE Structure Concrete pile plug pam house Booster 8-Apr-15 10-Apr-15 10.00am CLOSED 10-Apr-15 2 ACCEPTED 1 1
133 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00118 How Tong 7-Apr-15 ZN4 MNE Structure Concrete pile plug Distribution pum house 8-Apr-15 10-Apr-15 10.00am CLOSED 10-Apr-15 2 ACCEPTED 1 1
134 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00119 Ocned Water 8-Apr-15 ZN4 STR Structure Pouring lean concrete at Clarifier tank 9-Apr-15 11-Apr-15 11.00am CLOSED 9-Apr-15 0 REJECTED 1 1
135 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00120 Ocned Water 8-Apr-15 ZN4 MNE Structure Check bottom bar and top ber at aeration tank tank 9-Apr-15 11-Apr-15 3.00pm CLOSED 09-Apr-15 0 ACCEPTED 1 1
136 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00121 How Tong 7-Apr-15 ZN4 MNE Structure Concrete pile plug Tank F Grade 45 8-Apr-15 10-Apr-15 3.00pm CLOSED 10-Apr-15 2 ACCEPTED 1 1
137 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00122 How Tong 7-Apr-15 ZN4 MNE Structure Lean Concrete tank F 8-Apr-15 10-Apr-15 3.00pm CLOSED 08-Apr-15 0 ACCEPTED 1 1
138 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00123 How Tong 7-Apr-15 ZN4 MNE Survey Asbuilt for piling point tank F 8-Apr-15 10-Apr-15 10.00am CLOSED 08-Apr-15 0 ACCEPTED 1 1
139 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00124 How Thong 7-Apr-15 ZN4 STR Survey Survey piling point tank B 8-Apr-15 10-Apr-15 10.00am CLOSED CANCEL 1 1
140 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00125 Ocned Water 8-Apr-15 ZN4 MNE Survey Join survey for as built piling point on slidge holding 9-Apr-15 11-Apr-15 9.00am CLOSED 09-Apr-15 0 ACCEPTED 1 1
tank STP1
143 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00128 Ocned Water 8-Apr-15 ZN4 MNE Survey Join Survey for as built piling point on Guard House 9-Apr-15 11-Apr-15 10.30am CLOSED 09-Apr-15 0 ACCEPTED 1 1
144 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00129A UEMB ZULFAQAR 10-Apr-15 ZN4 MNE Structure Driving piling Tank A 11-Apr-15 13-Apr-15 9.00am CLOSED 26-Apr-15 15 ACCEPTED 1 1
145 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00129 UEMB ZULFAQAR 8-Apr-15 ZN4 STR Structure Driving piling Tank B 9-Apr-15 11-Apr-15 9.00am CLOSED CANCEL 1 1
146 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00130 Ocned Water 9-Apr-15 ZN4 MNE Structure Check level of lean concrete & form works before 11-Apr-15 13-Apr-15 9.00am CLOSED 11-Apr-15 0 ACCEPTED 1 1
pauring concrete for base slab at aeration tank
147 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00131 How Tong 9-Apr-15 ZN4 MNE Structure Delivery spun pile 250 mm 10-Apr-15 12-Apr-15 10.00am CLOSED 10-Apr-15 0 ACCEPTED 1 1
149 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00133 How Tong 9-Apr-15 ZN4 MNE Structure Inspection rebar at distribution pumping station 10-Apr-15 12-Apr-15 10.00am CLOSED 10-Apr-15 0 ACCEPTED 1 1
150 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00134 How Tong 9-Apr-15 ZN4 MNE Structure Concrete pilecap for distribution pumping station 10-Apr-15 12-Apr-15 10.00am CLOSED 10-Apr-15 0 ACCEPTED 1 1
151 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00135 How Tong 9-Apr-15 ZN4 MNE Structure Concrete pilecap for booster pumping station 10-Apr-15 12-Apr-15 10.00am CLOSED 15-Apr-15 5 REJECTED no activity 1 1
152 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00136 How Tong 9-Apr-15 ZN4 MNE Structure Installation Lipp Truss at Tank D 10-Apr-15 12-Apr-15 10.00am CLOSED 29-Jun-15 80 ACCEPTED 1 1
153 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00137 How Tong 10-Apr-15 ZN4 STR Structure As Built pum House Booster 11-Apr-15 13-Apr-15 9.00am CLOSED 11-Apr-15 0 ACCEPTED 1 1
154 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00137A How Tong 10-Apr-15 ZN4 STR Structure Piling works at Tank C at PWT 11-Apr-15 13-Apr-15 9.00am CLOSED 22-Jun-16 438 ACCEPTED 1 1
155 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00138 Zulfaqar 11-Apr-15 ZN4 MNE Structure Inspection rebar and formwork for Tank E 13-Apr-15 15-Apr-15 9.00am CLOSED 30-Apr-15 17 REJECTED 1 1
157 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00140 Zunaidi 11-Apr-15 ZN4 MNE Structure Inspection formwork, rebar and concreting lift wall 13-Apr-15 15-Apr-15 10.00am CLOSED 30-Apr-15 17 REJECTED 1 1
159 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00142 How Tong 13-Apr-15 ZN4 MNE Structure Delivery spun pile 350mm 14-Apr-15 16-Apr-15 10.00am CLOSED 15-Apr-15 1 ACCEPTED 1 1
160 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00143 How Tong 13-Apr-15 ZN4 MNE Structure Delivery spun pile 250mm 14-Apr-15 16-Apr-15 10.00am CLOSED 15-Apr-15 1 ACCEPTED 1 1
161 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00144 How Tong 13-Apr-15 ZN4 M&E Structure Driving pile tank B 14-Apr-15 16-Apr-15 3.00pm CLOSED 26-Apr-15 12 ACCEPTED 1 1
165 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00148 How Tong 14-Apr-15 ZN4 MNE Structure Installation rebar for pile cap pum house booster 15-Apr-15 17-Apr-15 10.00am CLOSED 15-Apr-15 0 ACCEPTED 1 1
166 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00149 How Tong 14-Apr-15 ZN4 MNE Structure Concrete pile cap pum house booster 15-Apr-15 17-Apr-15 10.00am CLOSED 17-Apr-15 2 ACCEPTED 1 1
168 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00151 How Tong 14-Apr-15 ZN4 MNE Structure Delivery of material roof structure (Lipp) Tank 2 15-Apr-15 17-Apr-15 10.00am CLOSED 15-Apr-15 0 ACCEPTED 1 1
169 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00152 Ocned Water 14-Apr-15 ZN4 MNE Structure To perform pile driving analysis ( PDA) on Gen set 15-Apr-15 17-Apr-15 9.30am CLOSED 15-Apr-15 0 ACCEPTED 1 1
room. Point B-1-3a and B-1-3.
Ocned Water 15-Apr-15 ZN4 STR Structure Pouring lean concrete for pile cap at Grit 16-Apr-15 18-Apr-15 10.00am
171 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00154
Chamber CLOSED 21-Apr-16 371 REJECTED 1 1
172 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00155 How Tong 15-Apr-15 ZN4 MNE Structure Concrete tank E (Slab) 17-Apr-15 19-Apr-15 9.00am CLOSED 19-Apr-15 2 ACCEPTED 1 1
173 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00156 Ocned Water 15-Apr-15 ZN4 STR Structure Inspection rebar of pile cap at Grit Chamber 16-Apr-15 18-Apr-15 9.00am CLOSED 19-May-16 399 ACCEPTED 1 1
175 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00158 How Tong 16-Apr-15 ZN4 MNE Structure Delivery spun pile 250mm 17-Apr-15 19-Apr-15 10.00am CLOSED 20-Apr-15 3 REJECTED no activity 1 1
176 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00159 How Tong 16-Apr-15 ZN4 MNE Structure Delivery spun pile 350mm 17-Apr-15 19-Apr-15 10.00am CLOSED 20-Apr-15 3 ACCEPTED 1 1
177 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00160 How Thong 16-Apr-15 ZN4 STR Structure Driving spun pile Tank B 350mm 17-Apr-15 19-Apr-15 10.00am CLOSED 22-Jun-16 432 ACCEPTED 1 1
180 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00163 How Tong 16-Apr-15 ZN4 MNE Painting Roof structure & painting body tank (Lipp) 17-Apr-15 19-Apr-15 10.00am CLOSED 29-Jun-15 73 ACCEPTED 1 1
Inspection for rebar and formwork on wall at
181 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00164 Ocned Water 16-Apr-15 ZN4 MNE Structure aearation tank,pouring concrete on wall at aeration 17-Apr-15 19-Apr-15 3.00pm CLOSED 18-Apr-15 1 ACCEPTED 1 1
tank
183 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00166 Ocned Water 17-Apr-15 ZN4 MNE Structure Inspection on rebar of wall before install formwork 18-Apr-15 20-Apr-15 10.00am CLOSED 18-Apr-15 0 ACCEPTED 1 1
184 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00167 How Tong 17-Apr-15 ZN4 MNE Structure Inspection rebar for slab Tank F 18-Apr-15 20-Apr-15 10.00am CLOSED 28-Apr-15 10 ACCEPTED 1 1
185 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00168 How Tong 17-Apr-15 ZN4 MNE Structure Concreting works for slab at tank F 21-Apr-15 23-Apr-15 10.00am CLOSED 20-Apr-15 -1 ACCEPTED 1 1
186 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00169 How Thong 18-Apr-15 ZN4 STR Structure Roof structure installation(LIPP) Tank D 21-Apr-15 23-Apr-15 10.00am CLOSED 21-Aug-15 122 REJECTED 1 1
188 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00171 How Tong 20-Apr-15 ZN4 MNE Structure Inspection rebar for beam at Distribution pumping 21-Apr-15 23-Apr-15 9.00am CLOSED 30-Apr-15 9 REJECTED 1 1
station
190 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00173 How Tong 20-Apr-15 ZN4 MNE Survey Asbuilt Tank C 21-Apr-15 23-Apr-15 10.00am CLOSED 21-Apr-15 0 ACCEPTED 1 1
191 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00174 How Tong 20-Apr-15 ZN4 MNE Structure Installation of Roofting cover. For tank D (Lipp) 22-Apr-15 24-Apr-15 10.00am CLOSED 21-Aug-15 121 REJECTED 1 1
192 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00175 Zulfaqar 21-Apr-15 ZN4 MNE Structure Lean concrete for tank C 22-Apr-15 24-Apr-15 8.00am CLOSED 22-Apr-15 0 ACCEPTED 1 1
194 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00177 Ocned Water 21-Apr-15 ZN4 MNE Structure Inspection for rebar and formwork on wall at Clarifire 22-Apr-15 24-Apr-15 10.00am CLOSED 22-Apr-15 0 ACCEPTED 1 1
Tank 1. Powring concrete on wall at Clarifire tank 1.
Ocned Water 22-Apr-15 ZN4 STR Structure Inspection concreting works for lean con at 23-Apr-15 25-Apr-15 10.00am
195 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00178
Genset Room CLOSED 21-Apr-16 364 ACCEPTED 1 1
197 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00180 En Mokhtar 22-Apr-15 ZN4 STR Structure Joint inspection workdone for STP 24-Apr-15 26-Apr-15 10.00am CLOSED CANCEL 1 1
198 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00181 How Tong 22-Apr-15 ZN4 MNE Structure Delivery spun pile 350mm 23-Apr-15 25-Apr-15 10.00am CLOSED 27-Apr-15 4 ACCEPTED 1 1
199 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00182 How Tong 22-Apr-15 ZN4 MNE Structure Delivery spun pile 250mm 23-Apr-15 25-Apr-15 10.00am CLOSED 27-Apr-15 4 ACCEPTED 1 1
203 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00186 Ocned Water 23-Apr-15 ZN4 STR Structure Inspection lean con for tie beam at Grit Chamber 24-Apr-15 26-Apr-15 10.00am CLOSED 20-May-15 26 REJECTED 1 1
204 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00187 Ocned Water 23-Apr-15 ZN4 STR Structure Inspection lean con for Clarifier Tank 2 24-Apr-15 26-Apr-15 10.00am CLOSED 21-Apr-16 363 ACCEPTED 1 1
205 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00188 How Tong 23-Apr-15 ZN4 MNE Painting Rolling Tank (Erection) & painting Tank D 25-Apr-15 27-Apr-15 10.00am CLOSED 09-Jul-15 75 ACCEPTED 1 1
208 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00191 Ocned Water 24-Apr-15 ZN4 MNE Structure Inspection formwork and concreting at areation tank. 25-Apr-15 27-Apr-15 10.00am CLOSED 25-Apr-15 0 ACCEPTED 1 1
209 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00192 How Tong 24-Apr-15 ZN4 MNE Structure Concreting works for beam at Distribution Pump 24-Apr-15 26-Apr-15 10.00am CLOSED 26-Apr-15 2 ACCEPTED 1 1
station
210 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00193 How Tong 24-Apr-15 ZN4 MNE Structure Inspection rebar for ground beam at Distribution 24-Apr-15 26-Apr-15 2.00pm CLOSED 25-May-15 31 ACCEPTED 1 1
Pumping station
211 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00194 How Tong 24-Apr-15 ZN4 MNE Structure Inspection Anchor Bolth at Distribution pump station 24-Apr-15 26-Apr-15 3.00pm CLOSED 25-May-15 31 REJECTED 1 1
213 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00196 How Tong 24-Apr-15 ZN4 MNE Structure Rolling Tank Till 2 M Height 25-Apr-15 27-Apr-15 10.00am CLOSED 29-Jun-15 65 ACCEPTED 1 1
214 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00197 How Tong 24-Apr-15 ZN4 MNE Painting Painting 2 M heigh (Minimum 80 Umicron) 25-Apr-15 27-Apr-15 10.00am CLOSED 27-Apr-15 2 ACCEPTED 1 1
215 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00198 UEMB ZULFAQAR 24-Apr-15 ZN4 STR Testing PDA test for tank B (M-&-63 and L-4-28) 25-Apr-15 27-Apr-15 9.00am CLOSED CANCEL 1 1
Ocned Water 25-Apr-15 ZN4 STR Structure Inspection for rebar and formworks on tie beam 26-Apr-15 28-Apr-15 9.00am 19-May-16
217 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00200
at Grit Chamber CLOSED 389 ACCEPTED 1 1
219 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00202 How Thong 25-Apr-15 ZN4 STR Structure Rolling tank 2 m h to 4 m height ( Tnk D) 25-Apr-15 27-Apr-15 10.00am CLOSED 25-Apr-15 0 ACCEPTED 1 1
220 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00203 How Tong 25-Apr-15 ZN4 MNE Painting 2 m to 4 m height painting Tank D 25-Apr-15 27-Apr-15 10.00am CLOSED 26-Apr-15 1 ACCEPTED 1 1
221 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00203A How Tong 25-Apr-15 ZN4 STR Piling works piling works at Silo line 25-Apr-15 27-Apr-15 10.00am CLOSED 21-Jun-16 423 ACCEPTED 1 1
Ocned Water 25-Apr-15 ZN4 STR Structure Inspection for rebar and formwork on tie beam 26-Apr-15 28-Apr-15 10.00am 19-May-16
225 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00207
at Genset Room CLOSED 389 ACCEPTED 1 1
226 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00208 How Tong 25-Apr-15 ZN4 MNE Structure Rool tank 4M 1H till 6 M (H) Tank D 26-Apr-15 28-Apr-15 5.00pm CLOSED 26-Apr-15 0 ACCEPTED 1 1
227 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00209 How Tong 25-Apr-15 ZN4 M&E Structure Painting 4m (H) till 6m (H) 27-Apr-15 29-Apr-15 8.30am CLOSED 10-Jun-15 44 ACCEPTED 1 1
229 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00211 Ocned Water 25-Apr-15 ZN4 MNE Structure Inspection for concreting on tie beam at Grit 27-Apr-15 29-Apr-15 10.00am CLOSED 10-Jun-15 44 REJECTED 1 1
Chamber
No activity
232 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00214 Ocned Water 25-Apr-15 ZN4 MNE Structure Inspection for concreting on wall at aeration tank 27-Apr-15 29-Apr-15 10.00am CLOSED 10-Jun-15 44 REJECTED 1 1
No activity
234 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00216 How Tong 25-Apr-15 ZN4 MNE Survey As Built Tank A 27-Apr-15 29-Apr-15 10.00am CLOSED 27-Apr-15 0 ACCEPTED 1 1
235 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00217 How Tong 27-Apr-15 ZN4 MNE Structure Lean Concrete Tank A 27-Apr-15 29-Apr-15 10.00am CLOSED 27-Apr-15 0 ACCEPTED 1 1
236 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00218 How Tong 27-Apr-15 ZN4 MNE Structure Concrete pile plug tank A 27-Apr-15 29-Apr-15 10.00am CLOSED 13-Jul-15 77 ACCEPTED 1 1
238 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00220 How Tong 27-Apr-15 ZN4 MNE Structure Delivery foofting structure (Lipp Tank) 28-Apr-15 30-Apr-15 11.00am CLOSED 07-Jun-15 40 ACCEPTED 1 1
240 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00222 How Tong 27-Apr-15 ZN4 MNE Structure Inspection rebar for ground beam at Distribution 28-Apr-15 30-Apr-15 10.00am CLOSED 29-Apr-15 1 ACCEPTED 1 1
Pumping station
241 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00223 How Tong 27-Apr-15 ZN4 MNE Structure Delivery spun pile 250mm 28-Apr-15 30-Apr-15 10.00am CLOSED 29-Apr-15 1 ACCEPTED 1 1
243 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00225 How Tong 27-Apr-15 ZN4 MNE Structure Installation of angle ring Tank E 29-Apr-15 1-May-15 4.00pm CLOSED 29-Jun-15 61 ACCEPTED 1 1
244 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00226 How Tong 27-Apr-15 ZN4 STR Structure Roll tank to 1m or 3 layer (Tank E) 29-Apr-15 1-May-15 10.00am CLOSED 29-Jun-15 61 ACCEPTED 1 1
245 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00227 How Tong 28-Apr-15 ZN4 MNE Structure PDA test tank B L-4 28,M-7 63 28-Apr-15 30-Apr-15 10.00am CLOSED 28-Apr-15 0 ACCEPTED 1 1
249 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00231 How Tong 29-Apr-15 ZN4 MNE Structure Concreting works raft foundation for Tank C 30-Apr-15 2-May-15 9.00am CLOSED 30-May-15 30 ACCEPTED 1 1
251 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00233 Ocned Water 29-Apr-15 ZN4 MNE Structure Inspection for rebar and formwork at grir chamber 30-Apr-15 2-May-15 10.00am CLOSED 30-May-15 30 ACCEPTED 1 1
( Tie beam)
252 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00234 Ocned Water 29-Apr-15 ZN4 MNE Structure Inspection for rebar and formwork at Distribution 30-Apr-15 2-May-15 10.00am CLOSED 30-May-15 30 ACCEPTED 1 1
chamber ( Tie Beam)
253 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00235 Ocned Water 29-Apr-15 ZN4 MNE Structure Inspection for rebar and formwork on wall at 30-Apr-15 2-May-15 10.00am CLOSED 30-May-15 30 ACCEPTED 1 1
aeration tank
254 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00236 How Tong 30-Apr-15 ZN4 MNE Structure Painting tank D 6M to 8M Height (80 Umicron 30-Apr-15 2-May-15 4.00pm CLOSED 03-May-15 3 ACCEPTED 1 1
255 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00237 How Tong 30-Apr-15 ZN4 MNE Structure Rolling Tank 6 M to 8 M height Tank D 30-Apr-15 2-May-15 4.00pn CLOSED 27-Jun-15 58 ACCEPTED 1 1
256 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00238 How Thong 30-Apr-15 ZN4 STR Structure Installation of Roof Truss (Tank E) 2-May-15 4-May-15 10.00am CLOSED 4-Mar-16 307 ACCEPTED 1 1
257 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00239 How Tong 30-Apr-15 ZN4 MNE Painting Painting tank D 8 M to 10 M Height ( 80 uMicron) 2-May-15 4-May-15 2.00pm CLOSED 30-Apr-15 -2 ACCEPTED 1 1
258 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00240 How Thong 30-Apr-15 ZN4 STR Structure Rolling Tank 8M to 10 M Height Tank D 2-May-15 4-May-15 2.00pm CLOSED CANCEL 1 1
261 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00243 Ocned Water 29-Apr-15 ZN4 STR Structure Inspection for lean con at Control Room 30-Apr-15 2-May-15 2.00pm CLOSED 19-May-16 385 ACCEPTED 1 1
262 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00244 Ocned Water 29-Apr-15 ZN4 MNE Structure Inspection for leancon at Sludge Holding Tank 30-Apr-15 2-May-15 2.00pm CLOSED 29-May-15 29 ACCEPTED 1 1
263 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00245 How Tong 30-Apr-15 ZN4 MNE Structure Supply delivery roof structure Lipp Tank No 4 2-May-15 4-May-15 9.00am CLOSED 09-Jun-15 38 ACCEPTED 1 1
Concreting works on tie beam at Distribution
264 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00246 Ocned Water 29-Apr-15 ZN4 STR Structure Chamber 30-Apr-15 2-May-15 5.00pm CLOSED 19-May-16 385 ACCEPTED 1 1
265 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00247 PPEC 30-Apr-15 ZN4 MNE Structure Leancon for ground beam at Fire Water Tank 2-May-15 4-May-15 9.00am CLOSED 07-Dec-15 219 ACCEPTED 1 1
267 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00249 How Tong 2-May-15 ZN4 MNE Structure Installation of Zincalume Tank E 4-May-15 6-May-15 9.00am CLOSED 08-May-15 4 ACCEPTED 1 1
268 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00250 How Tong 2-May-15 ZN4 MNE Structure Rool tank to 2M height (Tank E) 5-May-15 7-May-15 10.00am CLOSED 08-May-15 3 ACCEPTED 1 1
269 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00251 How Tong 2-May-15 ZN4 MNE Structure Painting to 2M height (Tank E) 80 micron 5-May-15 7-May-15 10.00am CLOSED 10-May-15 5 ACCEPTED 1 1
270 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00252 How Tong 2-May-15 ZN4 MNE Structure Rolling tank 10M to 11.5M Height Tank D 5-May-15 7-May-15 4.00am CLOSED 08-May-15 3 ACCEPTED 1 1
271 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00253 How Tong 2-May-15 ZN4 MNE Painting Painting 10M to 11.5M height Tank D 80 Micron 5-May-15 7-May-15 3.00pm CLOSED 05-May-15 0 ACCEPTED 1 1
272 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00254 How Tong 5-May-15 ZN4 MNE Structure Concreting works for slab distribution pumping 5-May-15 7-May-15 11.00am CLOSED 06-May-15 1 REJECTED 1 1
station
273 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00255 How Tong 3-May-15 ZN4 STR Piling works Piling works at Silo line 4-May-15 6-May-15 8.00am CLOSED 22-Jun-16 415 ACCEPTED 1 1
274 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00255A How Tong 3-May-15 ZN4 STR Piling works Piling works at Minor Building (Block 2) 4-May-15 6-May-15 8.00am CLOSED 22-Jun-16 415 ACCEPTED 1 1
275 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00256 How Tong 5-May-15 ZN4 MNE Structure Inspection rebar for slab distribution pumping station 5-May-15 7-May-15 10.00am CLOSED 29-Jun-15 55 ACCEPTED 1 1
277 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00258 Ocned Water 4-May-15 ZN4 MNE Structure Inspection for rebar and form works on Colum at 5-May-15 7-May-15 10.00am CLOSED 21-Nov-15 200 ACCEPTED 1 1
distribution chamber 2
278 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00259 Ocned Water 4-May-15 ZN4 STR Structure To do lean concrete works at Clarifier Tank 2 5-May-15 7-May-15 10.00am CLOSED 21-Apr-16 352 REJECTED 1 1
283 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00264 Ocned Water 4-May-15 ZN4 STR Structure To do Lean concrete at Admin room 5-May-15 7-May-15 2.00pm CLOSED 19-May-16 380 ACCEPTED 1 1
284 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00265 How Thong 5-May-15 ZN4 STR Survey As- built joint survey for Tank B 6-May-15 8-May-15 10.00am CLOSED 06-May-15 0 ACCEPTED 1 1
285 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00266 How Thong 5-May-15 ZN4 STR Survey As- built joint survey for Remineralization Tank 6-May-15 8-May-15 10.00am CLOSED 6-May-15 0 ACCEPTED 1 1
287 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00268 Ocned Water 5-May-15 ZN4 MNE Structure To do concrete works on pile cam at admin room 6-May-15 8-May-15 9.00am CLOSED 06-Jun-15 31 REJECTED 1 1
289 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00270 Ocned Water 5-May-15 ZN4 MNE Structure To do concrete works on slab at Gen set room 6-May-15 8-May-15 9.00am CLOSED 08-May-15 2 REJECTED 1 1
290 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00271 Ocned Water 5-May-15 ZN4 STR Structure To do concrete works on wall at anoxic Tank 6-May-15 8-May-15 9.00am CLOSED 19-May-16 379 ACCEPTED 1 1
Ocned Water 5-May-15 ZN4 STR Structure To do concrete works on column at Aeration 6-May-15 8-May-15 9.00am 21-Apr-16
291 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00272
Tank CLOSED 351 ACCEPTED 1 1
292 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00273 How Tong 6-May-15 ZN4 MNE Painting Painting works tank D 10m to 11.5m 7-May-15 9-May-15 10.00am CLOSED 07-May-15 0 ACCEPTED 1 1
293 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00274 How Tong 6-May-15 ZN4 MNE Painting Painting works 2m to 4m Tank E 7-May-15 9-May-15 10.00am CLOSED 08-May-15 1 ACCEPTED 1 1
Ocned Water 6-May-15 ZN4 STR Structure To do inspection works for rebar & formwork on 8-May-15 10-May-15 9.00am 21-Apr-16
294 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00275
column at aeration tank 2 CLOSED 349 ACCEPTED 1 1
295 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00276 How Tong 6-May-15 ZN4 MNE Structure Inspection of rebar for raft foundation at Tank A 7-May-15 9-May-15 11.00am CLOSED 29-Jun-15 53 ACCEPTED 1 1
299 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00280 How Tong 7-May-15 ZN4 MNE Structure PDA test at minor Building block 1 (Silo line) 8-May-15 10-May-15 3.00pm CLOSED 08-May-15 0 ACCEPTED 1 1
300 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00281 How Tong 7-May-15 ZN4 MNE Structure PDA test at Backwash pumping station 8-May-15 10-May-15 3.00pm CLOSED 08-May-15 0 ACCEPTED 1 1
301 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00282 How Tong 7-May-15 ZN4 MNE Structure PDA test at minor Building block 2 8-May-15 10-May-15 3.00pm CLOSED 08-May-15 0 ACCEPTED 1 1
302 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00283 Ocned Water 8-May-15 ZN4 STR Structure Material delivery inspection for Ductile iron pipe 9-May-15 11-May-15 11.00am CLOSED 9-May-15 0 REJECTED 1 1
304 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00285 Ocned Water 7-May-15 ZN4 STR Structure To do concreting works Trench at Clarifier Tank 2 8-May-15 10-May-15 11.00am CLOSED 19-May-16 377 ACCEPTED 1 1
305 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00286 Ocned Water 7-May-15 ZN4 STR Structure Inspection rebar 2nd lift wall areation tank 8-May-15 10-May-15 4.00pm CLOSED 21-Apr-16 349 ACCEPTED 1 1
308 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00289 Ocned Water 8-May-15 ZN4 STR Structure To do concrete on pile cap at Admin Room 9-May-15 11-May-15 10.00am CLOSED 19-May-16 376 ACCEPTED 1 1
311 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00292 How Thong 8-May-15 ZN4 STR Structure Concreting work for tank A 9-May-15 11-May-15 9.00am CLOSED 09-May-15 0 ACCEPTED 1 1
313 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00294 How Tong 8-May-15 ZN4 MNE Structure Inspection for receiving materials (steel structure) 9-May-15 11-May-15 8.30am CLOSED 10-May-15 1 ACCEPTED 1 1
Material delivery inspection for High Tensile
314 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00295 Ocned Water 9-May-15 ZN4 MNE Material 11-May-15 13-May-15 1.00pm CLOSED 05-Jun-15 25 ACCEPTED 1 1
Detormed bar
Ocned Water 9-May-15 ZN4 STR Structure To do concrete works on slab at Distribution 11-May-15 13-May-15 1.00pm 19-May-16
318 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00299
Chamber 2 CLOSED 374 ACCEPTED 1 1
319 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00300 Ocned Water 9-May-15 ZN4 STR Structure To do piling works at Disnfection Chamber 10-May-15 12-May-15 8.00am CLOSED 19-May-16 375 ACCEPTED 1 1
321 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00302 PPEC 9-May-15 ZN4 MNE Structure Concreting works for fire water tank (Slab) 11-May-15 13-May-15 2.30pm CLOSED 07-Dec-15 210 ACCEPTED 1 1
322 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00303 How Thong 11-May-15 ZN4 STR Structure Concrete pile plug for Remineralization Tank 11-May-15 13-May-15 2.00pm CLOSED CANCEL 1 1
323 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00304 How Thong 11-May-15 ZN4 STR Structure Concrete pile plug Tank B 11-May-15 13-May-15 2.00pm CLOSED CANCEL 1 1
326 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00307 How Tong 11-May-15 ZN4 MNE Structure Concrete booster pumping station 11-May-15 13-May-15 2.00pm CLOSED 11-May-15 0 ACCEPTED 1 1
327 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00308 How Tong 12-May-15 ZN4 MNE Structure Tank E, Inspect Thickness above 80 Micron 6M to 8M 12-May-15 14-May-15 4.00pm CLOSED 12-May-15 0 ACCEPTED 1 1
329 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00310 Ocned Water 12-May-15 ZN4 STR Structure To do grouting works on wall at aeration tank2 13-May-15 15-May-15 8.00am CLOSED 19-May-16 372 REJECTED 1 1
To do lean con work at oil and Grease chamber
330 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00311 Ocned Water 12-May-15 ZN4 STR Structure on slab 13-May-15 15-May-15 3.00pm CLOSED 19-May-16 372 ACCEPTED 1 1
331 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00312 Ocned Water 12-May-15 ZN4 M&E Material Material delivery inspection for rebar 13-May-15 15-May-15 1.00pm CLOSED 05-Jun-15 23 ACCEPTED 1 1
332 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00313 Ocned Water 12-May-15 ZN4 MNE Structure Inspection formwork/rebar on Ground Beam at 13-May-15 15-May-15 2.00pm CLOSED 05-Aug-15 84 REJECTED 1 1
administration Room
333 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00314 Ocned Water 12-May-15 ZN4 MNE Structure Inspection for formwork on Column at aeration Tank2 13-May-15 15-May-15 2.00pm CLOSED 20-Aug-15 99 REJECTED 1 1
338 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00319 How Tong 12-May-15 ZN4 MNE Structure Painting 8m to 10m Tank E (80 Micron) 13-May-15 15-May-15 10.30am CLOSED 13-May-15 0 ACCEPTED 1 1
340 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00323 How Tong 14-May-15 ZN4 MNE Structure Lean concrete slab Backwash pump house 14-May-15 16-May-15 3.00pm CLOSED 22-Aug-15 100 ACCEPTED 23 1 1
341 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00324 How Tong 14-May-15 ZN4 MNE Structure Lean concrete pile cap booster 14-May-15 16-May-15 3.30pm CLOSED 22-Aug-15 100 ACCEPTED 24 1 1
342 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00325 How Tong 14-May-15 ZN4 MNE Structure Delivery MS pipe 800mm 15-May-15 17-May-15 10.00am CLOSED 11-Jun-15 27 ACCEPTED 1 1
343 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00326 Ocned Water 14-May-15 ZN4 STR Structure Material delivery RC pile 15-May-15 17-May-15 10.00am CLOSED 19-May-16 370 REJECTED 1 1
344 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00327 Ocned Water 14-May-15 ZN4 MNE Structure To do lean con for Ground Slab at Admin room) 15-May-15 17-May-15 2.00pm CLOSED 17-May-15 2 REJECTED 1 1
345 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00328 Ocned Water 14-May-15 ZN4 MNE Structure Inspection for rebar & formwork on slab and wall oil 15-May-15 17-May-15 2.00pm CLOSED 05-Jan-16 235 ACCEPTED 1 1
& grease
346 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00329 Ocned Water 14-May-15 ZN4 MNE Structure To do concrete works on slab at oil & Grease 15-May-15 17-May-15 4.00pm CLOSED 29-Jun-15 45 ACCEPTED 1 1
347 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00330 How Tong 14-May-15 ZN4 MNE Structure material receiving roof Tank F 16-May-15 18-May-15 10.30am CLOSED 18-May-15 2 ACCEPTED 1 1
349 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00332 How Tong 14-May-15 ZN4 MNE Structure Delivery fittings MSCL pipe 16-May-15 18-May-15 10.00am CLOSED 10-Aug-15 86 ACCEPTED 1 1
350 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00333 How Tong 15-May-15 ZN4 MNE Structure Inspection rebar booster pump house (Slab) 16-May-15 18-May-15 10.00am CLOSED 29-Jun-15 44 ACCEPTED 1 1
351 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00334 How Tong 15-May-15 ZN4 STR Structure Concrete slab booster pump house 16-May-15 18-May-15 10.00am CLOSED 16-May-15 0 ACCEPTED 1 1
352 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00335 How Tong 15-May-15 ZN4 MNE Structure Concrete pile cap Backwash tank 16-May-15 18-May-15 2.00pm CLOSED 16-May-15 0 ACCEPTED 1 1
353 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00336 How Tong 15-May-15 ZN4 MNE Structure Concrete pile plug Brickwash Tank 16-May-15 18-May-15 2.00pm CLOSED 16-May-15 0 ACCEPTED 1 1
354 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00337 How Tong 16-May-15 ZN4 MNE Structure Inspection painting for check 80 micron Tank E(10m- 17-May-15 19-May-15 9,00am CLOSED 10-Jun-15 24 ACCEPTED 1 1
11.5m)
355 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00338 How Tong 16-May-15 ZN4 MNE Material Delivery HDPE pipe 18-May-15 20-May-15 10.00am CLOSED 07-Jun-15 20 ACCEPTED 1 1
357 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00340 Ocned Water 16-May-15 ZN4 MNE Structure Inspection Formwork/rebar on wall at Distribution 18-May-15 20-May-15 1.00pm CLOSED 29-Jun-15 42 ACCEPTED 1 1
Chamber
359 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00342 Ocned Water 16-May-15 ZN4 MNE Structure Inspection formwork/rebar on RC walk way at 18-May-15 20-May-15 1.00pm CLOSED 20-Aug-15 94 ACCEPTED 1 1
aeration Tank
360 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00343 Ocned Water 16-May-15 ZN4 MNE Structure Inspection formwork on second wall at aeration Tank 18-May-15 20-May-15 1.00pm CLOSED 21-Nov-15 187 ACCEPTED 1 1
361 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00344 Ocned Water 16-May-15 ZN4 MNE Structure Inspection formwork reabar on slab at Admin room 18-May-15 20-May-15 1.30pm CLOSED 10-Jun-15 23 REJECTED 1 1
362 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00345 Ocned Water 16-May-15 ZN4 MNE Structure Inspection formwork rebar on slab at Grit Chamber 18-May-15 20-May-15 1.00pm CLOSED 29-Jun-15 42 ACCEPTED 1 1
363 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00346 Ocned Water 16-May-15 ZN4 MNE Structure Concrete work on wall at Distribution Chamber 19-May-15 21-May-15 9.00am CLOSED 10-Jun-15 22 REJECTED 1 1
364 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00347 Ocned Water 16-May-15 ZN4 MNE Structure Concrete work on top slab at Aeration Tank 19-May-15 21-May-15 9.00am CLOSED 20-May-15 1 ACCEPTED 1 1
365 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00348 Ocned Water 16-May-15 ZN4 MNE Structure Concrete work on wall at aeration Tank 19-May-15 21-May-15 9.00am CLOSED 29-Jun-15 41 ACCEPTED 1 1
366 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00349 Ocned Water 16-May-15 ZN4 MNE Structure Concrete work on slab at Admin room 19-May-15 21-May-15 9.00am CLOSED 10-Jun-15 22 REJECTED 1 1
367 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00350 Ocned Water 16-May-15 ZN4 MNE Structure Concrete work on RC walk way at aeration Tank 19-May-15 21-May-15 9.00am CLOSED 20-May-15 1 ACCEPTED 1 1
368 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00351 Ocned Water 16-May-15 ZN4 MNE Structure Concrete work on column at aeration Tank 2 19-May-15 21-May-15 9.00am CLOSED 10-Jun-15 22 REJECTED 1 1
369 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00352 Ocned Water 16-May-15 ZN4 MNE Structure Concrete work on slab at Grit Chamber 19-May-15 21-May-15 9.00am CLOSED 29-Jun-15 41 ACCEPTED 1 1
370 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00353 How Tong 16-May-15 ZN4 MNE Structure Installation of roof truss Tank F 18-May-15 20-May-15 9.30am CLOSED 18-Jun-15 31 ACCEPTED 1 1
371 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00354 How Tong 16-May-15 ZN4 MNE Structure Material receiving roof structure Tank E 18-May-15 20-May-15 10.00am CLOSED 11-Jun-15 24 ACCEPTED 1 1
372 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00355 How Tong 16-May-15 ZN4 MNE Structure Installation of 'L' Angle of ambeded plate tank D 18-May-15 20-May-15 10.00am CLOSED 29-Jun-15 42 ACCEPTED 1 1
373 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00356 How Tong 16-May-15 ZN4 MNE Structure Installation of 'L' Angle of ambeded plate tank E 19-May-15 21-May-15 10.30am CLOSED 29-Jun-15 41 ACCEPTED 1 1
374 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00357 How Tong 16-May-15 ZN4 MNE Structure Installation of Purlin at Tank F 19-May-15 21-May-15 4.00pm CLOSED 29-Jun-15 41 ACCEPTED 1 1
375 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00358 Ocned Water 18-May-15 ZN4 STR Structure Lean con works at Sludge Holding Tank aon Slab 18-May-15 20-May-15 10.30am CLOSED 21-Apr-16 339 ACCEPTED 1 1
376 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00359 Ocned Water 18-May-15 ZN4 STR Structure Lean con works at Sand drying bed on slab 18-May-15 20-May-15 10.30am CLOSED 19-May-16 367 ACCEPTED 1 1
377 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00360 Ocned Water 18-May-15 ZN4 MNE Structure Lean con works on slab at Admin room 18-May-15 20-May-15 10.30am CLOSED 20-Aug-15 94 ACCEPTED 1 1
379 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00362 How Tong 18-May-15 ZN4 MNE Structure Inspection of rebar and formwork for Tank B ( Slab) 19-May-15 21-May-15 9.00am CLOSED 29-Jun-15 41 ACCEPTED 1 1
380 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00363 How Tong 18-May-15 ZN4 MNE Structure Concrete for slab at Tank B 19-May-15 21-May-15 10.00am CLOSED 19-May-15 0 REJECTED 1 1
384 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00367 Ocned Water 19-May-15 ZN4 MNE Structure Concrete works on roof slab at blower & control 20-May-15 22-May-15 2.00pm CLOSED 20-May-15 0 ACCEPTED 1 1
room
387 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00370 Ocned Water 19-May-15 ZN4 MNE Structure Concreting work on wall at oil & Grease Chamber 20-May-15 22-May-15 2.00pm CLOSED 05-Jan-16 230 REJECTED 1 1
Inspection of thickness check on 800mm
388 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00371 How Thong 17-May-15 ZN4 MNE Structure diameter Mild Steel Cement Lining (MSCL) pipe 18-May-15 20-May-15 11.00am CLOSED 18-May-15 0 ACCEPTED 1 1
390 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00373 How Tong 19-May-15 ZN4 MNE Structure Lean con for slab at backwash pumping station 20-May-15 22-May-15 3.00pm CLOSED 03-Aug-15 75 ACCEPTED 1 1
391 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00374 How Tong 20-May-15 ZN4 MNE Structure Installation of civer roofing Tank F (Zinculume) 21-May-15 23-May-15 10.00am CLOSED 29-Jun-15 39 ACCEPTED 1 1
393 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00376 How Thong 20-May-15 ZN4 STR Structure Rectification Crack line at Tank C 23-May-15 25-May-15 10.00am CLOSED 4-Mar-16 286 ACCEPTED 1 1
394 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00377 How Tong 21-May-15 ZN4 MNE Structure Painting 0 M to 2 M height Tank F (80 Micron) 22-May-15 24-May-15 9.30am CLOSED 25-May-15 3 ACCEPTED 1 1
397 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00380 Ocned Water 21-May-15 ZN4 MNE Structure Inspection for rebar & Formwork on slab at Admin 22-May-15 24-May-15 10.00am CLOSED 10-Jun-15 19 REJECTED 1 1
room
No activity
398 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00381 Ocned Water 21-May-15 ZN4 MNE Structure Concrete work on slab at Admin room 22-May-15 24-May-15 2.00pm CLOSED 10-Jun-15 19 REJECTED 1 1
No activity
399 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00382 Ocned Water 21-May-15 ZN4 MNE Structure Inspection for rebar & Formwork on Circular Clarifier 22-May-15 24-May-15 10.00am CLOSED 10-Jun-15 19 REJECTED 1 1
Tank 1 slab
No activity
400 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00383 Ocned Water 21-May-15 ZN4 MNE Structure Concrete work on cricular slab at Clarifier Tank 1 22-May-15 24-May-15 2.00am CLOSED 10-Jun-15 19 REJECTED 1 1
No activity
No activity
402 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00385 Ocned Water 21-May-15 ZN4 MNE Structure Concrete work on slab Geo tube sand draying bed 22-May-15 24-May-15 2.00pm CLOSED 10-Jun-15 19 REJECTED 1 1
No activity
403 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00386 Ocned Water 21-May-15 ZN4 MNE Structure Concrete work on wall at Oil & Grease sand bed 22-May-15 24-May-15 2.00pm CLOSED 24-Jun-15 33 REJECTED 1 1
No activity
404 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00387 How Tong 21-May-15 ZN4 MNE Structure Rectification of Crack Line at Tank A 22-May-15 24-May-15 10.00am CLOSED 3-Aug-15 73 ACCEPTED 1 1
Inspection rebar and formwork Ground beam
405 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00388 How Tong 21-May-15 ZN4 MNE Structure 22-May-15 24-May-15 10.00am CLOSED 25-May-15 3 ACCEPTED 1 1
Backwash
406 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00389 How Tong 21-May-15 ZN4 MNE Structure Concrete Ground beam Backwash 22-May-15 24-May-15 3.00pm CLOSED 22-Jun-15 31 ACCEPTED 1 1
407 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00390 How Thong 21-May-15 ZN4 STR Structure As Built piling point backwash 22-May-15 24-May-15 3.00pm CLOSED 5-Aug-15 75 ACCEPTED 1 1
408 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00391 PPEC 21-May-15 ZN4 MNE Structure Concreting on fore water Tank ( Wall Beam) 22-May-15 24-May-15 10.00am CLOSED 07-Dec-15 199 ACCEPTED 1 1
409 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00392 Ocned Water 22-May-15 ZN4 MNE Material Marterial delivery inspection for OGEE Joint Pipe 23-May-15 25-May-15 10.00am CLOSED 25-Aug-15 94 ACCEPTED 1 1
411 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00394 How Tong 22-May-15 ZN4 MNE Structure Inspection formwork and rebar remineralization Tank 23-May-15 25-May-15 9.00am CLOSED 29-Jun-15 37 ACCEPTED 1 1
412 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00395 How Tong 22-May-15 ZN4 MNE Structure Inspection sika grout-215 steel column distribution 23-May-15 25-May-15 11.00am CLOSED 10-Jun-15 18 REJECTED 1 1
413 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00396 How Tong 22-May-15 ZN4 MNE Structure Concrete slab remineralization tank 23-May-15 25-May-15 10.00am CLOSED 23-Jun-15 31 ACCEPTED 1 1
414 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00397 How Tong 22-May-15 ZN4 MNE Structure As built piling point Block 2 23-May-15 25-May-15 10.00am CLOSED 23-Jun-15 31 ACCEPTED 1 1
415 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00398 How Tong 22-May-15 ZN4 MNE Survey As buitl piling point block 1 23-May-15 25-May-15 10.00am CLOSED 23-May-15 0 ACCEPTED 1 1
417 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00400 How Thong 23-May-15 ZN4 STR Structure Delivery HDPE fittings pipe 25-May-15 27-May-15 10.00am CLOSED CANCEL 1 1
418 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00401 How Tong 23-May-15 ZN4 MNE Structure Concrete Ground beam minor building Block 2 25-May-15 27-May-15 10.00am CLOSED 26-May-15 1 ACCEPTED 1 1
419 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00402 How Tong 23-May-15 ZN4 MNE Civil Delivery reinforce concrete ( Pipe Culvert) 25-May-15 27-May-15 10.00am CLOSED 11-Jun-15 17 ACCEPTED 1 1
420 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00403 Ocned Water 23-May-15 ZN4 STR Structure Inspection for rebar & Formwork on slab at Admin 25-May-15 27-May-15 8.00am CLOSED 09-Sep-15 107 ACCEPTED 1 1
room
421 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00404 Ocned Water 23-May-15 ZN4 MNE Structure Concrete work on slab at Admin room 25-May-15 27-May-15 9.00am CLOSED 29-Jun-15 35 ACCEPTED 1 1
Inspection for rebar & Formwork on Circular Clarifier
422 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00405 Ocned Water 23-May-15 ZN4 MNE Structure 25-May-15 27-May-15 8.00am CLOSED 29-Jun-15 35 ACCEPTED 1 1
Tank 1 slab
423 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00406 Ocned Water 23-May-15 ZN4 STR Structure Concrete work on cricular slab at Clarifier Tank 1 25-May-15 27-May-15 9.00am CLOSED 19-May-16 360 ACCEPTED 1 1
425 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00408 Ocned Water 23-May-15 ZN4 MNE Structure Concrete work on slab Geo tube sand draying bed 25-May-15 27-May-15 9.00am CLOSED 25-May-15 0 ACCEPTED 1 1
426 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00409 Ocned Water 23-May-15 ZN4 MNE Structure Concrete work on wall at Oil & Grease sand bed 25-May-15 27-May-15 9.00am CLOSED 29-Jun-15 35 ACCEPTED 1 1
428 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00411 Taufiq 25-May-15 ZN4 STR STR Concreting works for wall RP4 pump station 25-May-15 27-May-15 4.00pm CLOSED 27-May-15 2 ACCEPTED 1 1
431 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00414 Ocned Water 25-May-15 ZN4 MNE Structure Inspection formwork/rebar on column second lift at 25-May-15 27-May-15 3.00pm CLOSED 10-Jun-15 16 REJECTED 1 1
aeration Tank 2
432 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00415 Ocned Water 25-May-15 ZN4 MNE Structure Concrete work on column at aeration Tank 2 (Second 25-May-15 27-May-15 4.00pm CLOSED 10-Jun-15 16 ACCEPTED 1 1
Lift)
433 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00416 Ocned Water 25-May-15 ZN4 MNE Structure inspection rebar on wall at aeration tank 2 25-May-15 27-May-15 9.00am CLOSED 05-Aug-15 72 ACCEPTED 1 1
434 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00417 How Tong 25-May-15 ZN4 MNE Piping Welding works 800mm dia MSCL pipe 25-May-15 27-May-15 9.00am CLOSED 10-Jun-15 16 REJECTED 1 1
Ocned Water 26-May-15 ZN4 STR Structure Lean con on pile cap at Chlorine preparation 26-May-15 28-May-15 3.00pm 19-May-16
435 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00418
Shed CLOSED 359 ACCEPTED 1 1
436 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00419 Ocned Water 26-May-15 ZN4 MNE Structure Lean con on circular at Clarifier Tank 2 26-May-15 28-May-15 3.00pm CLOSED 05-Jan-16 224 ACCEPTED 1 1
438 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00421 How Tong 26-May-15 ZN4 MNE Structure Delivery butterfly Valve pipe 27-May-15 29-May-15 10.00am CLOSED 11-Jun-15 15 ACCEPTED 1 1
439 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00422 How Tong 26-May-15 ZN4 STR Structure Delivery pipe fitting at PWT 27-May-15 29-May-15 10.00am CLOSED 6-Jan-16 224 ACCEPTED 1 1
441 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00424 How Thong 27-May-15 ZN4 STR Structure Lean concrete minor building -Block 1 28-May-15 30-May-15 10.00am CLOSED 29-May-15 1 ACCEPTED CANCEL 1 1
443 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00426 Ocned Water 27-May-15 ZN4 MNE Structure Concreting on staircase at aeration tank 28-May-15 30-May-15 9.00am CLOSED 10-Jun-15 13 REJECTED 1 1
445 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00428 Ocned Water 27-May-15 ZN4 STR Structure Concreting work on column at Admin room 28-May-15 30-May-15 10.00am CLOSED 19-May-16 357 REJECTED 1 1
446 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00429 How Tong 27-May-15 ZN4 MNE Structure Installation of roof structure tank C 28-May-15 30-May-15 10.30am CLOSED 28-May-15 0 ACCEPTED 1 1
448 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00431 How Tong 28-May-15 ZN4 MNE Structure Painting tank F 4m to 6 m height check micron 80 29-May-15 31-May-15 9.00am CLOSED 30-May-15 1 ACCEPTED 1 1
449 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00432 How Tong 28-May-15 ZN4 MNE Structure Painting tank C 4m to 6 m height check micron 81 29-May-15 31-May-15 9.00am CLOSED 29-May-15 0 ACCEPTED 1 1
450 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00433 How Tong 28-May-15 ZN4 PIP Piping Delivery pipe HDPE material inspection 29-May-15 31-May-15 10.00am CLOSED 30-May-15 1 ACCEPTED 1 1
453 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00436 How Tong 29-May-15 ZN4 MNE Structure Painting works Tank F 6m to 8 m 80 micron 30-May-15 1-Jun-15 9.00am CLOSED 04-Jun-15 5 ACCEPTED 1 1
454 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00437 How Tong 29-May-15 ZN4 MNE Structure Painting works tank C 2M to 4M height 80 micron 30-May-15 1-Jun-15 9.00am CLOSED 30-May-15 0 ACCEPTED 1 1
455 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00438 How Tong 29-May-15 ZN4 MNE Structure Painting works tank F 8 m to 10m heignt '80 micron' 30-May-15 1-Jun-15 10.00am CLOSED 02-Jun-15 3 ACCEPTED 1 1
456 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00439 How Tong 29-May-15 ZN4 MNE Structure Painting works Tank c 4M to 6M 80 Micron 30-May-15 1-Jun-15 10.00am CLOSED 10-Jun-15 11 ACCEPTED 1 1
457 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00440 How Thong 29-May-15 ZN4 STR Structure Delivery Genset 1000KVA 30-May-15 1-Jun-15 10.00am CLOSED CANCEL 1 1
458 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00441 Ocned Water 29-May-15 ZN4 MNE Structure Inspection on Top Slab areration Tank 2 30-May-15 1-Jun-15 10.00am CLOSED 29-Jun-15 30 ACCEPTED 1 1
Ocned Water 29-May-15 ZN4 STR Structure Concreting works on wall & slab at aeration tank 30-May-15 1-Jun-15 10.00am 19-May-16
459 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00442
2 CLOSED 355 ACCEPTED 1 1
460 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00443 Ocned Water 29-May-15 ZN4 MNE Structure Inspection rebar and formwork on pile cap at 30-May-15 1-Jun-15 10.00am CLOSED 29-Jun-15 30 ACCEPTED 1 1
Chlorine preparation shed
462 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00445 How Tong 29-May-15 ZN4 MNE Piping Welding works 800mm dia MSCL pipe 30-May-15 1-Jun-15 9.00am CLOSED 25-Aug-15 87 ACCEPTED 1 1
463 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00446 How Tong 30-May-15 ZN4 MNE Structure Inspection Formwork and rebar slab Baskwash 31-May-15 2-Jun-15 9.00am CLOSED 29-Jun-15 29 ACCEPTED 1 1
464 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00447 How Tong 30-May-15 ZN4 MNE Structure Concrete Slab Backwash 31-May-15 2-Jun-15 9.30am CLOSED 29-Jun-15 29 ACCEPTED 1 1
465 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00448 How Thong 30-May-15 ZN4 STR Structure Lean concrete Genset Room 31-May-15 2-Jun-15 9.30am CLOSED CANCEL 1 1
466 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00449 How Tong 30-May-15 ZN4 MNE Structure Painting works 6M to 8M tank C 80 micron 1-Jun-15 3-Jun-15 9.30am CLOSED 01-Jun-15 0 ACCEPTED 1 1
467 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00450 Ocned Water 30-May-15 ZN4 MNE Structure Concrete work on slab at sludge holding tank 31-May-15 2-Jun-15 11.30am CLOSED 03-May-15 -28 REJECTED 1 1
468 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00451 How Thong 30-May-15 ZN4 MNE Structure Inspection Grooting works Tank D ( Groove area) 31-May-15 2-Jun-15 11.00am CLOSED 05-Aug-15 66 ACCEPTED 1 1
470 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00453 Ocned Water 1-Jun-15 ZN4 MNE Structure Concreting on staircase at Aeration Tank 2-Jun-15 4-Jun-15 2.00pm CLOSED 19-May-16 352 ACCEPTED 1 1
473 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00456 Ocned Water 1-Jun-15 ZN4 STR Structure Concreting on wall at Grit Chamber 2-Jun-15 4-Jun-15 2.00pm CLOSED 19-May-16 352 ACCEPTED 1 1
477 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00460 How Thong 2-Jun-15 ZN4 MNE Piping welding work 800mm MSCL Pipe 2-Jun-15 4-Jun-15 10.00am CLOSED 25-Aug-15 84 ACCEPTED 1 1
478 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00461 How Thong 2-Jun-15 ZN4 MNE Piping Inspection for air test 800mm dia. MSCL pipe at WS5 3-Jun-15 5-Jun-15 10.00am CLOSED 13-Nov-15 163 ACCEPTED 1 1
479 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00462 How Thong 3-Jun-15 ZN4 MNE Piping But fusion HDPE weldings 315mm dia. Pipe 4-Jun-15 6-Jun-15 10.00am CLOSED 31-Dec-15 210 ACCEPTED 1 1
480 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00463 How Thong 2-Jun-15 ZN4 MNE Structure Receiving material common brick solid 4-Jun-15 6-Jun-15 10.00am CLOSED 10-Jun-15 6 REJECTED 1 1
481 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00464 Ocned Water 4-Jun-15 ZN4 MNE Structure Inspection rebar & formwork on Roof slab at Admin 4-Jun-15 6-Jun-15 13.30pm CLOSED 29-Jun-15 25 ACCEPTED 1 1
Room
482 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00465 Ocned Water 4-Jun-15 ZN4 MNE Structure Concreting work on roof slab at admin room 4-Jun-15 6-Jun-15 4.00pm CLOSED 12-Jun-15 8 REJECTED 1 1
No activity
485 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00468 How Thong 4-Jun-15 ZN4 MNE Structure Inspection for slab reinforcement at Genset Room 5-Jun-15 7-Jun-15 3.00pm CLOSED 29-Jun-15 24 ACCEPTED 1 1
486 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00469 How Thong 4-Jun-15 ZN4 MNE Structure Concreting slab at Genset room 5-Jun-15 7-Jun-15 3.00pm CLOSED 05-Jun-15 0 ACCEPTED 1 1
488 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00471 Ocned Water 4-Jun-15 ZN4 MNE Structure Concreting work on wall 2nd lift at Anioxic Tank 1,2 5-Jun-15 7-Jun-15 2.00pm CLOSED 10-Jun-15 5 REJECTED 1 1
490 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00473 Ocned Water 4-Jun-15 ZN4 MNE Structure Concreting work on slab at Cliarifire Tank 2 5-Jun-15 7-Jun-15 2.00pm CLOSED 10-Jun-15 5 REJECTED 1 1
491 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00474 Ocned Water 4-Jun-15 ZN4 MNE Structure Painting work (Epoxy) on slab & wall at aeration tank 5-Jun-15 7-Jun-15 8.00am CLOSED 10-Jun-15 5 REJECTED 1 1
492 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00475 How Thong 8-Jun-15 ZN4 PIP Piping Welding works 800mm dia MSCL pipe 8-Jun-15 10-Jun-15 3.00pm CLOSED 30-Jul-15 52 ACCEPTED 1 1
493 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00476 Ocned Water 7-Jun-15 ZN4 CIV Rebar&Formwork Inspection Rebar/Formwork on slab at Chlorine 8-Jun-15 10-Jun-15 3.00pm CLOSED 29-Jun-15 21 ACCEPTED 1 1
no activity
496 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00479 Ocned Water 8-Jun-15 ZN4 CIV Concreting Concreting works on Roof Slab at Admin room 9-Jun-15 11-Jun-15 10.00am CLOSED 09-Jun-15 0 ACCEPTED 1 1
497 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00480 Ocned Water 8-Jun-15 ZN4 CIV Concreting Concreting work on 2nd wall at anocid tank 9-Jun-15 11-Jun-15 10.00am CLOSED 09-Jun-15 0 ACCEPTED 1 1
498 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00481 How Thong 8-Jun-15 ZN4 STR Material Reveiving Material -Steel Bar T20,T16,T10 9-Jun-15 11-Jun-15 10.00am CLOSED 10-Jun-15 1 ACCEPTED 1 1
no salah
No activity
506 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00489 How Thong 9-Jun-15 ZN4 MNE Welding Installation Angle Plate Affer rolled down Tank c 10-Jun-15 12-Jun-15 10.00am CLOSED 07-Jun-15 -3 ACCEPTED 1 1
508 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00491 How Thong 9-Jun-15 ZN4 STR Structure Concreting works for Plinth at Backwash Tank 10-Jun-15 12-Jun-15 10.15am CLOSED 19-Jan-16 223 ACCEPTED 1 1
509 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00492 How Thong 9-Jun-15 ZN4 MNE Structure Concreting works for column at Genset room 10-Jun-15 12-Jun-15 10.15am CLOSED CANCEL 1 1
PPEC 10-Jun-15 ZN4 STR Structure Dismantle formwork for slab pump house 11-Jun-15 13-Jun-15 3.00pm
510 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00493
station (Fire water tank) CLOSED CANCEL 1 1
511 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00494 How Thong 1-Jun-15 ZN4 STR Structure Grouting works Tank E (Groove area) 2-Jun-15 4-Jun-15 10.00am CLOSED 05-Aug-15 64 ACCEPTED 1 1
513 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00496 UEMB KHAIRIL IZWAN 11-Jun-15 ZN4 CIV Structure Coring concrete at grit chamber (STP) 12-Jun-15 14-Jun-15 9.00am CLOSED CANCEL 1 1
514 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00497 How Thong 12-Jun-15 ZN4 STR Casting Sika grout - 215 fo column distribution pump 13-Jun-15 15-Jun-15 10.00am CLOSED 7-Jan-16 208 ACCEPTED 1 1
515 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00498 How Thong 12-Jun-15 ZN4 STR Inspection Sika grout - 215 fo column distribution pump 13-Jun-15 15-Jun-15 10.00am CLOSED CANCEL 1 1
516 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00499 Ocned Water 13-Jun-15 ZN4 CIV Inspection Concreting work on wall and top slab at grit chamber 14-Jun-15 16-Jun-15 2.00 pm CLOSED 16-Jun-15 2 ACCEPTED 1 1
521 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00504 How Thong 13-Jun-15 ZN4 MNE Painting Painting works tank F 10.5 to 11.5 henght 80 micron 15-Jun-15 17-Jun-15 9.00am CLOSED 01-Jul-15 16 ACCEPTED 1 1
523 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00506 Ocned Water 13-Jun-15 ZN4 CIV Concreting Concreting on slab at Disinfection chember 15-Jun-15 17-Jun-15 2.00pm CLOSED 15-Jun-15 0 ACCEPTED 1 1
524 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00507 How Thong 14-Jun-15 ZN4 STR Rebar&Formwork Inspection of formwork at Ring Wall Tank D 15-Jun-15 17-Jun-15 3.30pm CLOSED 17-Jun-15 2 ACCEPTED 1 1
525 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00508 How Thong 14-Jun-15 ZN4 STR Concreting Casting Ring Wall Tank D 15-Jun-15 17-Jun-15 4.00pm CLOSED 17-Jun-15 2 ACCEPTED 1 1
526 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00509 How Thong 15-Jun-15 ZN4 PIP Piping Butt Fusion welding HDPE 450mm dia 15-Jun-15 17-Jun-15 4.00pm CLOSED 31-Dec-15 199 ACCEPTED 1 1
527 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00510 How Thong 15-Jun-15 ZN4 PIP Piping Welding works 800mmdia MSCL pipe 15-Jun-15 17-Jun-15 4.00pm CLOSED 14-Aug-15 60 ACCEPTED 1 1
528 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00511 How Thong 15-Jun-15 ZN4 STR Rebar&Formwork Inspection rebar for roof beam at Genset room 16-Jun-15 18-Jun-15 3.00pm CLOSED 22-Aug-15 67 REJECTED 1 1
529 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00512 How Thong 15-Jun-15 ZN4 STR Concreting Concreting roof beam at Genset Room 16-Jun-15 18-Jun-15 3.00pm CLOSED 19-Jun-15 3 ACCEPTED 1 1
530 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00513 How Thong 16-Jun-15 ZN4 STR Lean Concrete Lean concrete minor building -Block 1 17-Jun-15 19-Jun-15 10.00am CLOSED 22-Aug-15 66 ACCEPTED 1 1
532 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00515 How Thong 16-Jun-15 ZN4 STR Concreting Concreting slab Minor building -Block 2 17-Jun-15 19-Jun-15 10.00am CLOSED 19-Jun-15 2 ACCEPTED 1 1
533 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00516 How Thong 1-Jun-15 ZN4 STR Concreting Painting works tank C 8m to 10M height 80 micron 2-Jun-15 4-Jun-15 10.00am CLOSED 02-Jun-15 0 ACCEPTED 1 1
534 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00517 Ocned Water 17-Jun-15 ZN4 STR Rebar&Formwork Inspection formwork/rebar on wall at Sand Drying 18-Jun-15 20-Jun-15 9.00am CLOSED 21-Nov-15 156 ACCEPTED 1 1
bed (Geotube)
Inspection formwork and rebar on wall at Clarifire
535 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00518 Ocned Water 17-Jun-15 ZN4 STR Rebar&Formwork 18-Jun-15 20-Jun-15 8.30am CLOSED 20-Aug-15 63 ACCEPTED 1 1
Tank 1
537 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00520 Ocned Water 17-Jun-15 ZN4 STR Concreting Concreting works on top slab Chlorination Shed 18-Jun-15 20-Jun-15 9.00am CLOSED 17-Jun-15 -1 ACCEPTED 1 1
538 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00521 Zaki 18-Jun-15 ZN4 STR Rebar&Formwork Inspection rebar and formwork at fire water pump 19-Jun-15 21-Jun-15 3.00pm CLOSED 21-Aug-15 63 REJECTED 1 1
house
539 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00522 how Thong 17-Jun-15 ZN4 CIV Grouting Cgouting works Tank C 19-Jun-15 21-Jun-15 10.00am CLOSED 21-Aug-15 63 REJECTED 1 1
540 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00523 how Thong 19-Jun-15 ZN4 CIV install angle Installation of 'L' angle at groove tank F 21-Jun-15 23-Jun-15 3.00pm CLOSED 21-Aug-15 61 ACCEPTED 1 1
Ocned Water 19-Jun-15 ZN4 CIV Material Material Delivery control panel for pump station 20-Jun-15 22-Jun-15 9.00am 20-Jun-15
542 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00525
RP1,RP4,RP1A CLOSED 0 REJECTED 1 1
544 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00527 Ocned Water 19-Jun-15 ZN4 CIV Concreting Concreting on wall at sand bed drying 20-Jun-15 22-Jun-15 10.00am CLOSED 22-Jun-15 2 ACCEPTED 1 1
545 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00528 Ocned Water 20-Jun-15 ZN4 CIV Concreting Concreting works on wall at clarifire tank 1 21-Jun-15 23-Jun-15 9.00am CLOSED 23-Jun-15 2 ACCEPTED 1 1
546 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00529 Ocned Water 20-Jun-15 ZN4 CIV Rebar&Formwork Inspection formwork & rebar on access walkway at 21-Jun-15 23-Jun-15 10.00am CLOSED 05-Aug-15 45 ACCEPTED 1 1
Grit Chamber
547 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00530 Ocned Water 20-Jun-15 ZN4 CIV Concreting Concreting work on access walkway at Grit Chamber 21-Jun-15 23-Jun-15 11.00am CLOSED 22-Jun-15 1 ACCEPTED 1 1
548 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00531 How Thong 20-Jun-15 ZN4 STR Inspection Inspection scour/over flow Chamber Tank D and 22-Jun-15 24-Jun-15 10.00am CLOSED 21-Aug-15 60 ACCEPTED 1 1
Tank E
549 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00532 How Thong 20-Jun-15 ZN4 PIP Material Delivery spigot and ruber ring 22-Jun-15 24-Jun-15 10.00am CLOSED 22-Jun-15 0 ACCEPTED 1 1
553 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00536 How Thong 22-Jun-15 ZN4 PIP Welding Welding works 800mm dia MSCL pipe 23-Jun-15 25-Jun-15 8.00am CLOSED 14-Aug-15 52 ACCEPTED 1 1
554 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00537 How Thong 22-Jun-15 ZN4 PIP air test Inspection for Air test 800mm dia . MSCL pipe 23-Jun-15 25-Jun-15 10.00am CLOSED 26-Aug-15 64 ACCEPTED 1 1
555 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00538 Ocned Water 23-Jun-15 ZN4 CIV rebar Inspection formwork / rebar on wall at Sludge 24-Jun-15 26-Jun-15 9.30am CLOSED 01-Jan-16 191 ACCEPTED 1 1
Holding Tank
556 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00539 Ocned Water 23-Jun-15 ZN4 CIV Concreting Concreting work on wall at Sludge holding tank 24-Jun-15 26-Jun-15 9.00am CLOSED 25-Jun-15 1 ACCEPTED 1 1
558 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00541 Ocned Water 24-Jun-15 ZN4 MNE Material Material Delivery Ebara Pump 25-Jun-15 27-Jun-15 9.00am CLOSED 19-Sep-15 86 ACCEPTED 1 1
560 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00543 Zaki 24-Jun-15 ZN4 CIV Concreting Concreting column and stifner at Pump House fire 25-Jun-15 27-Jun-15 4.00pm CLOSED 27-Jun-15 2 ACCEPTED 1 1
water tank
561 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00544 Zaki 25-Jun-15 ZN4 CIV Post concreting Inspection post concreting column at Pump house 26-Jun-15 28-Jun-15 4.00pm CLOSED 20-Aug-15 55 REJECTED 1 1
fire water
562 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00545 How thong 25-Jun-15 ZN4 ARC Material Delivery timber pallet 26-Jun-15 28-Jun-15 10.00am CLOSED 27-Jun-15 1 ACCEPTED 1 1
563 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00546 How Thong 25-Jun-15 ZN4 STR Material Delivery steel HDGI tank and accessories fitting 26-Jun-15 28-Jun-15 10.00am CLOSED CANCEL 1 1
564 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00547 How Thong 25-Jun-15 ZN4 STR Material Delivery RC spigot 4500 26-Jun-15 28-Jun-15 10.00am CLOSED CANCEL 1 1
566 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00549 How thong 25-Jun-15 ZN4 STR Concreting concrete olumn minor block 2. ZN 4 26-Jun-15 28-Jun-15 11.00am CLOSED 26-Jun-15 0 ACCEPTED 1 1
568 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00551 How Thong 25-Jun-15 ZN4 STR Concreting concrete column minor buiding block 1. ZN 4 26-Jun-15 28-Jun-15 9.00am CLOSED 25-Jun-15 -1 REJECTED 1 1
569 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00552 How thong 25-Jun-15 ZN4 CIV Grouting start work grouting for tank C. ZN 4 26-Jun-15 28-Jun-15 9.30am CLOSED 21-Aug-15 56 ACCEPTED 1 1
570 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00553 How thong 25-Jun-15 ZN4 CIV Grouting start work grouting for tank F. ZN 4 26-Jun-15 28-Jun-15 9.30am CLOSED 02-Jul-15 6 REJECTED 1 1
571 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00554 Norhazah 25-Jun-15 ZN4 CIV Testing Windsore probe at cold joint area (STP) 26-Jun-15 28-Jun-15 9.00am CLOSED 28-Sep-15 94 ACCEPTED 1 1
572 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00555 How Thong 26-Jun-15 ZN4 CIV Formwork Formwork ring wall tank E 27-Jun-15 29-Jun-15 10.00am CLOSED 21-Aug-15 55 REJECTED 1 1
573 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00556 How Thong 26-Jun-15 ZN4 CIV Concreting Concreting works aof ring wall tank E 27-Jun-15 29-Jun-15 11.00am CLOSED 28-Jun-15 1 ACCEPTED 1 1
574 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00557 Ocned Water 26-Jun-15 ZN4 MNE Material Material delivery inspection for Wedge Gate Valve 27-Jun-15 29-Jun-15 9.30am CLOSED 09-Jul-15 12 ACCEPTED 1 1
576 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00559 Ocned Water 26-Jun-15 ZN4 CIV Concreting Concreting work on staircase at Aeration Tank 2 27-Jun-15 29-Jun-15 10.00am CLOSED 19-May-16 327 ACCEPTED 1 1
577 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00560 Ocned Water 26-Jun-15 ZN4 CIV Concreting Concreting on wall at Sand Drying bed second part 27-Jun-15 29-Jun-15 10.00am CLOSED 27-Jun-15 0 ACCEPTED 1 1
How Thong 27-Jun-15 ZN4 ELE Material As per attach order of on line instrumentation 29-Jun-15 1-Jul-15 10.30am
579 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00562
equipment and remineration package ZONE 4 CLOSED CANCEL 1 1
How Thong 27-Jun-15 ZN4 PIP Material As per attach delivery order of distribution 29-Jun-15 1-Jul-15 10.30am
580 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00563
pumping station. Zone 4 CLOSED CANCEL 1 1
586 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00569 Zaki 29-Jun-15 ZN4 CIV Concreting Concreting column stiffner and beam at pump house 29-Jun-15 1-Jul-15 5.00pm CLOSED 30-Jun-15 1 ACCEPTED 1 1
fire water
Inspection post concrete column , beam & stiffner at
587 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00570 Zaki 29-Jun-15 ZN4 CIV Post Concreting 30-Jun-15 2-Jul-15 5.00pm CLOSED 03-Aug-15 34 REJECTED 1 1
pump house fire water
589 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00572 Ocned Water 29-Jun-15 ZN4 CIV Post Concreting Concreting on wall at clarifier Tank 1 Second part 2-Jul-15 4-Jul-15 9.00am CLOSED 02-Jul-15 0 ACCEPTED 1 1
590 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00573 How Thong 29-Jun-15 ZN4 STR Structure Roof structure Tank B 30-Jun-15 2-Jul-15 9.30am CLOSED 21-Aug-15 52 ACCEPTED 1 1
591 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00574 How Thong 29-Jun-15 ZN4 STR Inspection Fizikal inspection for tank D before fill water 30-Jun-15 2-Jul-15 9.30am CLOSED 30-Jun-15 0 ACCEPTED 1 1
592 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00575 How Thong 29-Jun-15 ZN4 CIV grouting Grouting works tank F 30-Jun-15 2-Jul-15 9.30am CLOSED 02-Jul-15 2 ACCEPTED 1 1
593 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00576 How Thong 29-Jun-15 ZN4 PIP Butt Fusion Butt Fusion welding HDPE 450mm dia 29-Jun-15 1-Jul-15 8.00am CLOSED 31-Dec-15 185 ACCEPTED 1 1
594 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00577 How Thong 29-Jun-15 ZN4 PIP Welding Welding works MSCL pipe 800mm dia 29-Jun-15 1-Jul-15 8.00am CLOSED 04-Aug-15 36 ACCEPTED 1 1
595 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00578 How Thong 29-Jun-15 ZN4 PIP Testing Air test for MSCL 800mm dia pipe (Line 3) 12 Bar 30-Jun-15 2-Jul-15 9.00am CLOSED 04-Aug-15 35 ACCEPTED 1 1
599 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00582 How Thong 29-Jun-15 ZN4 STR Roof Roof structure Tank A 2-Jul-15 4-Jul-15 10.00am CLOSED 21-Aug-15 50 ACCEPTED 1 1
602 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00585 Ocned Water 30-Jun-15 ZN4 CIV Concreting Concrete on staircase at Grit Chamber 1-Jul-15 3-Jul-15 10.00am CLOSED 02-Jul-15 1 ACCEPTED 1 1
603 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00586 How Thong 30-Jun-15 ZN4 STR Formwork & Rebar Inspection rebar and formwork Cable Trench 1-Jul-15 3-Jul-15 9.00am CLOSED 21-Aug-15 51 ACCEPTED 1 1
604 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00587 How Thong 30-Jun-15 ZN4 STR Concreting Casting Cable Trench 1-Jul-15 3-Jul-15 9.00am CLOSED 01-Jul-15 0 ACCEPTED 1 1
606 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00589 Ocned Water 1-Jul-15 ZN4 CIV Post concreting Inspection for Clarifier Tank ( External wall surface) 2-Jul-15 4-Jul-15 9.00am CLOSED 01-Jan-16 183 REJECTED 1 1
607 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00590 Ocned Water 1-Jul-15 ZN4 CIV Lean Concrete Leancon on slab at Guard House 2-Jul-15 4-Jul-15 9.00am CLOSED 21-Nov-15 142 ACCEPTED 1 1
608 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00591 Ocned Water 1-Jul-15 ZN4 CIV Concrete Mass concrete on grit Chamber 2-Jul-15 4-Jul-15 9.00am CLOSED 19-May-16 322 ACCEPTED 1 1
609 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00592 How Thong 1-Jul-15 ZN4 STR Concrete Casting ring wall Tank E 2-Jul-15 4-Jul-15 9.00am CLOSED 05-Jul-15 3 REJECTED 1 1
610 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00593 Ocned Water 1-Jul-15 ZN4 CIV Formwork and rebar Inspection formwork & rebar on wall at Clarifire Tank 2-Jul-15 4-Jul-15 10.00pm CLOSED 21-Nov-15 142 ACCEPTED 1 1
2 First Part
How Thong 2-Jul-15 ZN4 MNE material online instrument equipment and 3-Jul-15 5-Jul-15 11.00 am
611 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00594
remineralization package CLOSED CANCEL 1 1
615 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00598 How Thong 2-Jul-15 ZN4 STR Concreting Concreting column minor Building block 1 3-Jul-15 5-Jul-15 10.00 am CLOSED 03-Jul-15 0 ACCEPTED 1 1
618 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00601 How Thong 3-Jul-15 ZN4 PIP Installation Pipe Laying 450mm dia RCP pipe 4-Jul-15 6-Jul-15 10.00am CLOSED 03-Aug-15 30 REJECTED 1 1
619 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00602 How Thong 3-Jul-15 ZN4 STR Painting works Painting works 0-2m height tank B 80 micron 4-Jul-15 6-Jul-15 9.00am CLOSED 15-Aug-15 42 ACCEPTED 1 1
620 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00603 How Thong 3-Jul-15 ZN4 STR Painting works Painting works 2-5m height tank B 80 micron 4-Jul-15 6-Jul-15 9.00am CLOSED 07-Jan-16 187 ACCEPTED 1 1
Inspection formwork/rebar on wall at Clarifier
621 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00604 Ocned Water 3-Jul-15 ZN4 CIV Rebar and formwork Tank 2nd Part 4-Jul-15 6-Jul-15 9.00am CLOSED 5-May-16 306 ACCEPTED 1 1
622 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00605 Ocned Water 3-Jul-15 ZN4 CIV Rebar Inspection rebar on down slab at Guard House 4-Jul-15 6-Jul-15 9.00am CLOSED 21-Nov-15 140 ACCEPTED 1 1
623 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00606 Ocned Water 3-Jul-15 ZN4 CIV Concreting Concreting on Down slab at guard House 4-Jul-15 6-Jul-15 10.00am CLOSED 07-Jul-15 3 ACCEPTED 1 1
624 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00607 Ocned Water 3-Jul-15 ZN4 CIV Testing Leakage test for aeration tank 1 4-Jul-15 6-Jul-15 10.00am CLOSED 19-May-16 320 REJECTED 1 1
625 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00608 Ocned Water 4-Jul-15 ZN4 CIV Formwork Dismantle formwork at Sand Drying bed 5-Jul-15 7-Jul-15 09.00am CLOSED 05-Jan-16 184 REJECTED 1 1
626 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00609 Ocned Water 4-Jul-15 ZN4 CIV Concreting concreting at Clarifire tank on wall 5-Jul-15 7-Jul-15 09.00am CLOSED 07-Jul-15 2 REJECTED 1 1
628 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00611 How Thong 4-Jul-15 ZN4 CIV Painting works Painting works 2-4m height tank A 6-Jul-15 8-Jul-15 09.00am CLOSED 21-Aug-15 46 REJECTED 1 1
'80 Micron'
630 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00613 How Thong 4-Jul-15 ZN4 CIV Painting works Painting works 6-8m height tank A 8-Jul-15 10-Jul-15 08.30am CLOSED 07-Jan-16 183 ACCEPTED 1 1
'80 Micron'
636 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00619 How Thong 6-Jul-15 ZN4 PIP Welding works Welding works MSCL pipe 800mm dia 7-Jul-15 9-Jul-15 10.00am CLOSED 03-Aug-15 27 ACCEPTED 1 1
637 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00620 How Thong 6-Jul-15 ZN4 PIP Testing Air test for MSCL 800mm dia pipe (Line 3) 7-Jul-15 9-Jul-15 10.00am CLOSED 04-Aug-15 28 ACCEPTED 1 1
638 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00621 How Thong 6-Jul-15 ZN4 PIP Butt Fusion Welding Butt Fusion HDPE pipe 450mm dia 7-Jul-15 9-Jul-15 10.00am CLOSED CANCEL 1 1
640 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00623 How Thong 7-Jul-15 ZN4 STR Casting Casting Scour pipe 8-Jul-15 10-Jul-15 10.30am CLOSED 07-Aug-15 30 ACCEPTED 1 1
642 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00625 How Thong 8-Jul-15 ZN4 STR Casting Casting slab ORS 2 at ZN 4 9-Jul-15 11-Jul-15 09.30am CLOSED 11-Jul-15 2 ACCEPTED 1 1
643 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00626 How Thong 8-Jul-15 ZN4 ARC Material Delivery brick at Zn 4 9-Jul-15 11-Jul-15 10.00am CLOSED 07-Jul-15 -2 REJECTED 1 1
644 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00627 How Thong 8-Jul-15 ZN4 CIV Formwork& rebar Inspection rebar and formwork slab office 2 at Zn 4. 9-Jul-15 11-Jul-15 09.00am CLOSED 11-Jul-15 2 ACCEPTED 1 1
645 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00628 Ocned Water 8-Jul-15 ZN4 CIV Plastering Plastering work at admin building at zone 4 for STP 1. 9-Jul-15 11-Jul-15 09.00am CLOSED 21-Aug-15 43 REJECTED 1 1
Ocned Water 8-Jul-15 ZN4 CIV Inspection inspection dismantle formwork and post 9-Jul-15 11-Jul-15 09.00am 21-Apr-16
647 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00630
concreting at clarifier tank 2 at zone 4 for STP 1. CLOSED 287 ACCEPTED 1 1
649 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00632 UEMB QAQC KHAIRIL 7-Jul-15 ZN4 CIV Testing MP tets STP 1 8-Jul-15 10-Jul-15 8.00am CLOSED 08-Jul-15 0 ACCEPTED 1 1
652 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00635 Zaki 8-Jul-15 ZN4 CIV Brickwork Inspection Brickwork at Fire water pump house 9-Jul-15 11-Jul-15 09.00am CLOSED 20-Aug-15 42 ACCEPTED 1 1
653 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00636 How Thong 8-Jul-15 ZN4 STR Painting works Painting Works 8M-10M height Tank A '80 micron' 9-Jul-15 11-Jul-15 09.00am CLOSED 26-Aug-15 48 ACCEPTED 1 1
654 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00637 How Thong 9-Jul-15 ZN4 STR Painting Painting works 10-11.5m height tank B 80 micron 10-Jul-15 12-Jul-15 09.00am CLOSED 19-Jan-16 193 ACCEPTED 1 1
655 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00638 How Thong 9-Jul-15 ZN4 STR Painting Painting works 10m-11.5m height Tank A (80 Micron) 10-Jul-15 12-Jul-15 09.00am CLOSED 06-Jan-16 180 ACCEPTED 1 1
656 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00639 How Thong 9-Jul-15 ZN4 STR Formwork ring Formwork ring wall Tank F 10-Jul-15 12-Jul-15 4.00pm CLOSED 21-Aug-15 42 REJECTED 1 1
658 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00641 How Thong 9-Jul-15 ZN4 MNE Site visit Fizikal inspection tank E before fill water 10-Jul-15 12-Jul-15 10.00am CLOSED 15-Jul-15 5 ACCEPTED 1 1
659 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00642 How Thong 9-Jul-15 ZN4 STR Structure Installation of 'L' angle at Tank A 11-Jul-15 13-Jul-15 10.00am CLOSED 21-Aug-15 41 ACCEPTED 1 1
660 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00643 How Thong 9-Jul-15 ZN4 STR Structure Installation of 'L' angle at Tank B 11-Jul-15 13-Jul-15 10.00am CLOSED 04-Sep-15 55 ACCEPTED 1 1
superceded RFIN
661 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00644 How Thong 9-Jul-15 ZN4 STR concreting Casting ring wall tank F 11-Jul-15 13-Jul-15 10.00am CLOSED 13-Jul-15 2 REJECTED 1 1
00736
662 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00645 How Thong 9-Jul-15 ZN4 STR Grouting Grouting works Tank B 12-Jul-15 14-Jul-15 9.30am CLOSED 3-Aug-15 22 ACCEPTED 1 1
664 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00647 Ocned Water 9-Jul-15 ZN4 CIV Formwork& rebar Inspection formwork / rebar for sump slab at water 10-Jul-15 12-Jul-15 9.00am CLOSED 21-Nov-15 134 ACCEPTED 1 1
waste pumping station
665 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00648 Ocned Water 9-Jul-15 ZN4 CIV Formwork& rebar Inspection formwork/rebar on ramb at oil and grese 10-Jul-15 12-Jul-15 9.00am CLOSED 21-Nov-15 134 ACCEPTED 1 1
668 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00651 Ocned Water 9-Jul-15 ZN4 CIV Formwork& rebar Inspection Rebar on wall second lift at Clarifier Tank 10-Jul-15 12-Jul-15 9.00am CLOSED 21-Nov-15 134 ACCEPTED 1 1
1 and 2
669 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00652 Ocned Water 9-Jul-15 ZN4 CIV Concreting Concrete work on ramb at sand Drying Bad 10-Jul-15 12-Jul-15 9.00am CLOSED 12-Jul-15 2 ACCEPTED 1 1
673 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00656 Ocned Water 10-Jul-15 ZN4 STR Structure Installation for genset shed and fencing 11-Jul-15 13-Jul-15 10.00am CLOSED 25-May-16 319 ACCEPTED 1 1
675 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00658 Ocned Water 11-Jul-15 ZN4 STR Painting Inspection for painting at blower/control room 12-Jul-15 14-Jul-15 9.00am CLOSED 03-Aug-15 22 ACCEPTED 1 1
677 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00660 Ocned Water 11-Jul-15 ZN4 CIV concreting Concret on wall at sludge tank / thickener tank 13-Jul-15 15-Jul-15 9.00am CLOSED 15-Jul-15 2 REJECTED 1 1
second lift
678 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00661 Ocned Water 11-Jul-15 ZN4 CIV concreting Concrete on Ramb at sand Drying Bed 13-Jul-15 15-Jul-15 9.00am CLOSED 11-Jul-15 -2 ACCEPTED 1 1
679 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00662 Ocned Water 11-Jul-15 ZN4 CIV concreting Concrete on Ramb at Oil/Grease Chamber 13-Jul-15 15-Jul-15 9.00am CLOSED 13-Jul-15 0 ACCEPTED 1 1
680 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00663 Ocned Water 11-Jul-15 ZN4 CIV concreting Concrete on wall at Clarifier Tank 1 (Second Lift) 13-Jul-15 15-Jul-15 9.00am CLOSED 15-Jul-15 2 REJECTED 1 1
682 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00665 How Thong 11-Jul-15 ZN4 PIP Testing Inspection for Air test 800mm dia . MSCL pipe Line 4 13-Jul-15 15-Jul-15 8.30am CLOSED 03-Aug-15 21 ACCEPTED 1 1
684 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00667 Khairil 11-Jul-15 ZN4 CIV Testing Coring at Grit Chamber and clefire (STP) 13-Jul-15 15-Jul-15 2.00pm CLOSED 15-Aug-15 33 ACCEPTED 1 1
685 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00668 I-Gen 13-Jul-15 ZN4 MNE material Material checklist inspection for fire tank 14-Jul-15 16-Jul-15 10.30am CLOSED CANCEL 1 1
686 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00669 I-Gen 13-Jul-15 ZN4 MNE material Material checklist inspection for fire pumps 14-Jul-15 16-Jul-15 10.30am CLOSED CANCEL 1 1
inspection formwork&rebar on wall at waste water
687 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00670 Ocned Water 13-Jul-15 ZN4 CIV rebar&formwork 14-Jul-15 16-Jul-15 10.00am CLOSED 03-Aug-15 20 ACCEPTED 1 1
pump station (Stump)
689 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00672 Ocned Water 13-Jul-15 ZN4 CIV concreting Concrete on Roof slab and beam at Guard House 14-Jul-15 16-Jul-15 2.00pm CLOSED 14-Jul-15 0 ACCEPTED 1 1
690 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00673 Ocned Water 13-Jul-15 ZN4 CIV concreting Concrete on wall at sawte water pump station (Sump) 14-Jul-15 16-Jul-15 2.00pm CLOSED 14-Jul-15 0 ACCEPTED 1 1
692 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00675 Ocned Water 14-Jul-15 ZN4 CIV Rectify Rectified works on leaking area at Grid Chamber and 15-Jul-15 17-Jul-15 10.00am CLOSED 21-Aug-15 37 REJECTED 1 1
anoxid tank
694 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00677 Ocned Water 22-Jul-15 ZN4 CIV Formwork& rebar Inspection formwork & rebar on wall and RC 23-Jul-15 25-Jul-15 9.00am CLOSED 03-Aug-15 11 ACCEPTED 1 1
walkway at sludge Holding/Thickener Tank
695 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00678 Ocned Water 22-Jul-15 ZN4 CIV Laying Brick Laying Brick at Guard house 23-Jul-15 25-Jul-15 9.00am CLOSED 05-Aug-15 13 REJECTED 1 1
696 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00679 Ocned Water 22-Jul-15 ZN4 CIV Formwork& rebar Inspection formwork & rebar on top slab at waste 23-Jul-15 25-Jul-15 9.00am CLOSED 03-Aug-15 11 ACCEPTED 1 1
water pump station
Ocned Water 22-Jul-15 ZN4 CIV Concreting Concrete on wall and RC walkway at Sludge 23-Jul-15 25-Jul-15 10.00am CLOSED 19-May-16
698 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00681
Holding/Thickener tank 301 ACCEPTED 1 1
699 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00682 how Thong 23-Jul-15 ZN4 CIV Grouting works Grouting works Tank A 23-Jul-15 25-Jul-15 10.30am CLOSED 03-Aug-15 11 ACCEPTED 1 1
700 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00683 how Thong 23-Jul-15 ZN4 ARC material Delivery material for brick (Batu Merah) 24-Jul-15 26-Jul-15 9.30am CLOSED 24-Jul-15 0 ACCEPTED 1 1
701 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00684 how Thong 23-Jul-15 ZN4 PIP Welding works Welding works MSCL pipe 800mm dia 24-Jul-15 26-Jul-15 800am CLOSED 30-Jul-15 6 ACCEPTED 1 1
702 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-00685 how Thong 23-Jul-15 ZN4 Tankage Clearing Disinfection and sterilization tank D 24-Jul-15 26-Jul-15 800am CLOSED 25-Jul-15 1 ACCEPTED 1 1
Inspection formwork/rebar on wall ( 2nd lift) at
703 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00686 Ocned Water 23-Jul-15 ZN4 CIV Rebar & formwork 24-Jul-15 26-Jul-15 9.00am CLOSED 03-Aug-15 10 REJECTED 1 1
Clarifier tank 1
window and door Installation for window and door frame at Guard
704 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00687 Ocned Water 23-Jul-15 ZN4 ARC installation house 24-Jul-15 26-Jul-15 8.00am CLOSED 25-May-16 306 REJECTED 1 1
705 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00688 Ocned Water 23-Jul-15 ZN4 ARC Plastering Plastering work (Skin coat) at admin room 24-Jul-15 26-Jul-15 8.00am CLOSED 25-May-16 306 REJECTED 1 1
706 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00689 Ocned Water 23-Jul-15 ZN4 ARC Plastering plastering work at Guard house 24-Jul-15 26-Jul-15 8.00am CLOSED 19-May-16 300 ACCEPTED 1 1
707 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00690 Ocned Water 24-Jul-15 ZN4 MNE Handrill Installation Handrilling at Grit Chamber 25-Jul-15 27-Jul-15 8.00am CLOSED 19-May-16 299 ACCEPTED 1 1
708 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00691 How Thong 24-Jul-15 ZN4 PIP Testing Inspection for air test 800mm dia MSCL pipe 25-Jul-15 27-Jul-15 8.00am CLOSED 30-Jul-15 5 ACCEPTED 1 1
709 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00692 Ocned Water 25-Jul-15 ZN4 STR Rectification Rectification for P.U Grouting at Aeration Rank 2 25-Jul-15 27-Jul-15 9.00am CLOSED 03-Aug-15 9 ACCEPTED 1 1
710 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00693 Ocned Water 25-Jul-15 ZN4 STR Rectification Rectification For P.U Grouting at Grit Chamber 26-Jul-15 28-Jul-15 9.00am CLOSED 03-Aug-15 8 REJECTED 1 1
712 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00695 Ocned Water 25-Jul-15 ZN4 MNE Painting Painting work on Handrill at aeration tank 26-Jul-15 28-Jul-15 9.00am CLOSED 26-Jul-15 0 REJECTED 1 1
713 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00696 Ocned Water 25-Jul-15 ZN4 MNE welding Welding on air piping at aeration tank 1 26-Jul-15 28-Jul-15 9.00am CLOSED 21-Apr-16 270 REJECTED 1 1
714 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00697 Ocned Water 25-Jul-15 ZN4 CIV Concreting Concrete on wall second lift at clarifier tank 27-Jul-15 29-Jul-15 9.00am CLOSED 27-Jul-15 0 ACCEPTED 1 1
720 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00703 How Thong 27-Jul-15 ZN4 PIP welding Welding works 800mm dia. MSCL pipe at line 5 28-Jul-15 30-Jul-15 8.00am CLOSED 06-Aug-15 9 ACCEPTED 1 1
721 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00704 Ocned Water 27-Jul-15 ZN4 CIV Post Concreting Inspection of post concrete on second lift at Clarifier 28-Jul-15 30-Jul-15 9.00am CLOSED 03-Aug-15 6 ACCEPTED 1 1
Tank 1
722 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00705 Ocned Water 27-Jul-15 ZN4 CIV Rectified Rectification for P.U Grouting at Aeration Tank 2 28-Jul-15 30-Jul-15 9.00am CLOSED 03-Aug-15 6 REJECTED 1 1
723 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00706 Ocned Water 27-Jul-15 ZN4 ARC Plastering Plastering internal work for wall at Guard house 28-Jul-15 30-Jul-15 9.00am CLOSED 27-Jan-16 183 ACCEPTED 1 1
725 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00708 Ocned Water 27-Jul-15 ZN4 CIV Concreting Mass concrete on slab for gradients at oil/grease 28-Jul-15 30-Jul-15 9.00am CLOSED 28-Jul-15 0 ACCEPTED 1 1
sand drying bed
728 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00711 Ocned Water 27-Jul-15 ZN4 CIV Testing Mackintosh Probe Test at Polymer shade 28-Jul-15 30-Jul-15 9.00am CLOSED 01-Jan-16 157 REJECTED 1 1
731 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00714 Ocned Water 28-Jul-15 ZN4 CIV Rectify Rectify works for honeycomb and cracks at internal 29-Jul-15 31-Jul-15 9.00am CLOSED 21-Nov-15 115 REJECTED 1 1
wall aeration tank 1 and 2
732 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00715 Ocned Water 28-Jul-15 ZN4 CIV Road work Leancon work at polymer shed at zone 4 29-Jul-15 31-Jul-15 9.00am CLOSED 19-May-16 295 REJECTED 1 1
Ocned Water 28-Jul-15 ZN4 MNE Installation Installation work for 350mm diameter ductile 29-Jul-15 31-Jul-15 10.00am CLOSED 1-Aug-15
733 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00716
iron MLSS return pipe 3 REJECTED 1 1
734 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00717 Ocned Water 28-Jul-15 ZN4 CIV Rectification Inspection rebar and formwork on 2nd lift wall at 29-Jul-15 31-Jul-15 9.00am CLOSED 21-Aug-15 23 REJECTED 1 1
clarifier tank 2
735 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00718 Ocned Water 28-Jul-15 ZN4 ELE Rotating Request inspection for cable layout routing 29-Jul-15 31-Jul-15 10.00am CLOSED 04-Aug-15 6 ACCEPTED 1 1
To inspect welding of flanges for fire water station
736 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00719 Igen 28-Jul-15 ZN4 MNE Welding 29-Jul-15 31-Jul-15 11.00am CLOSED 06-Aug-15 8 REJECTED 1 1
zone 4
738 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00721 Ocned Water 29-Jul-15 ZN4 CIV Formwork Inspection formwork/rebar on 2nd lift wall at clarifier 30-Jul-15 1-Aug-15 9.00am CLOSED 05-Jan-16 159 ACCEPTED 1 1
tank 2
739 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00722 Ocned Water 29-Jul-15 ZN4 CIV Concreting Concrete work on 2nd lift wall at clarifier tank 2 30-Jul-15 1-Aug-15 10.00am CLOSED 14-Jan-16 168 REJECTED 1 1
740 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00723 Ocned Water 29-Jul-15 ZN4 CIV Formwork Inspection formwork/rebar at polymer shed 30-Jul-15 1-Aug-15 9.00am CLOSED 01-Oct-15 63 ACCEPTED 1 1
741 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00724 Ocned Water 29-Jul-15 ZN4 CIV Concreting Concrete work at polymer shed at STP 1 zone 4 30-Jul-15 1-Aug-15 10.00am CLOSED 14-Jan-16 168 REJECTED 1 1
743 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00726 Ocned Water 30-Jul-15 ZN4 CIV Dismentle Dismantle nipple from PU wall at aeration tank 2 31-Jul-15 2-Aug-15 9.00am CLOSED 27-Jan-16 180 REJECTED 1 1
745 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00728 Ocned Water 30-Jul-15 ZN4 ARC Plastering Plastering on PU wall at aeration tank 2 31-Jul-15 2-Aug-15 9.00am CLOSED 20-Aug-15 20 ACCEPTED 1 1
748 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00731 Ocned Water 1-Aug-15 ZN4 CIV Testing MP test at Polymer Shed 3-Aug-15 5-Aug-15 9.00am CLOSED 01-Jan-16 151 ACCEPTED 1 1
Resubmission :
753 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00736 How Thong 3-Aug-15 ZN4 CIV Casting Casting ring wall Tank F 4-Aug-15 6-Aug-15 9.00am CLOSED 06-Aug-15 2 ACCEPTED 1 1
00644
754 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00737 Ocned Water 1-Aug-15 ZN4 ELE Repairing Repairing works on wall at aeration tank 1 3-Aug-15 5-Aug-15 8.00am CLOSED 19-May-16 290 ACCEPTED CANCEL 1 1
755 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00738 Ocned Water 4-Aug-15 ZN4 CIV Concreting Concreting work on 2nd lift wall at Clarifier tank 2 4-Aug-15 6-Aug-15 9.00am CLOSED 06-Aug-15 2 ACCEPTED 1 1
756 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00739 Ocned Water 4-Aug-15 ZN4 CIV Formwork& rebar Inspection formwork/rebar on 2nd lift wall at clarifier 4-Aug-15 6-Aug-15 CLOSED 20-Aug-15 16 ACCEPTED 1 1
tank 2
757 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00740 Ocned Water 4-Aug-15 ZN4 CIV Concreting Concreting work on slab at Polymer Shad 4-Aug-15 6-Aug-15 2.00pm CLOSED 14-Jan-16 163 REJECTED 1 1
758 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00741 Ocned Water 4-Aug-15 ZN4 CIV Concreting Concreting works on Staircase at sludge Holding tank 4-Aug-15 6-Aug-15 2.00pm CLOSED 01-Jan-16 150 ACCEPTED 1 1
/Thickeners Tank
761 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00744 Ocned Water 5-Aug-15 ZN4 ARC Plastering Plastering work on wall crack at Clarifier tank 1 6-Aug-15 8-Aug-15 9.00am CLOSED 08-Aug-15 2 ACCEPTED 1 1
762 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00745 Ocned Water 5-Aug-15 ZN4 ARC Plastering Plastering work on column at Aeration Tank 1 6-Aug-15 8-Aug-15 9.00am CLOSED 21-Apr-16 259 ACCEPTED 1 1
765 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00748 Gapura 5-Aug-15 ZN4 STR Material Material receiving steel roof for pump house 6-Aug-15 8-Aug-15 9.00am CLOSED 04-Sep-15 29 ACCEPTED 1 1
766 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00749 Gapura 5-Aug-15 ZN4 STR Installation roof Installation steel roof for water pump house 6-Aug-15 8-Aug-15 9.00am CLOSED 04-Sep-15 29 REJECTED 1 1
767 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00750 How Thong 5-Aug-15 ZN4 STR Formwork Inspection formwork scour chamber tank F 6-Aug-15 8-Aug-15 9.00am CLOSED 07-Jan-16 154 ACCEPTED 1 1
768 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00751 How Thong 5-Aug-15 ZN4 STR Concreting Casting scour Chamber tank F 6-Aug-15 8-Aug-15 9.00am CLOSED 07-Aug-15 1 ACCEPTED 1 1
771 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00754 Ocned Water 5-Aug-15 ZN4 CIV pre concreting Inspection formwork/rebar aon column at clarifier 6-Aug-15 8-Aug-15 9.00am CLOSED 21-Aug-15 15 REJECTED 1 1
tank 2
772 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00755 Ocned Water 5-Aug-15 ZN4 CIV pre concreting Inspection formwork on column at clarifier tank 1 6-Aug-15 8-Aug-15 9.00am CLOSED 20-Aug-15 14 REJECTED 1 1
773 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00756 Ocned Water 5-Aug-15 ZN4 CIV concreting Concreting work on column at Clarifier Tank 2 6-Aug-15 8-Aug-15 10.00am CLOSED 09-Aug-15 3 ACCEPTED 1 1
774 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00757 Ocned Water 5-Aug-15 ZN4 CIV concreting Concrete work on column at clarifier tank 1 6-Aug-15 8-Aug-15 10.00am CLOSED 08-Aug-15 2 ACCEPTED 1 1
776 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00759 Ocned Water 6-Aug-15 ZN4 CIV rebar&formwork Inspection Formwork/rebar on wall at Disinfection 7-Aug-15 9-Aug-15 9.00am CLOSED 21-Aug-15 14 ACCEPTED 1 1
Chamber
777 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00760 Ocned Water 6-Aug-15 ZN4 CIV Concreting Concreting work on wall at Disinfection chamber 7-Aug-15 9-Aug-15 10.00am CLOSED 06-Aug-15 -1 ACCEPTED 1 1
778 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00761 Ocned Water 6-Aug-15 ZN4 CIV Concreting Concreting work on slab at polymer shade 7-Aug-15 9-Aug-15 10.00am CLOSED 08-Aug-15 1 ACCEPTED 1 1
779 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00762 Ocned Water 6-Aug-15 ZN4 CIV PU Grouting PU grouting on wall at Distribution Chamber 2 7-Aug-15 9-Aug-15 8.00am CLOSED 20-Aug-15 13 REJECTED 1 1
780 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00763 Ocned Water 6-Aug-15 ZN4 CIV PU Grouting PU grouting on wall atGrit Chamber 7-Aug-15 9-Aug-15 8.00am CLOSED 20-Aug-15 13 REJECTED 1 1
782 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00765 Ocned Water 6-Aug-15 ZN4 ARC Plastering Plastering Honeycomb on wall at aeration Tank 1 7-Aug-15 9-Aug-15 8.00am CLOSED 21-Aug-15 14 REJECTED 1 1
785 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00768 How Thong 7-Aug-15 ZN4 STR Rectification Retification of works at Leakage at Tank D 8-Aug-15 10-Aug-15 10.00am CLOSED 10-Aug-15 2 REJECTED 1 1
786 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00769 How Thong 7-Aug-15 ZN4 STR Formwork Inspection formwork at Tank C 10-Aug-15 12-Aug-15 2.00pm CLOSED 11-Aug-15 1 ACCEPTED 1 1
787 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00770 How Thong 7-Aug-15 ZN4 CIV Casting Casting ringwall Tank c 10-Aug-15 12-Aug-15 9.30am CLOSED 07-Jan-16 150 ACCEPTED 1 1
788 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00771 Ocned Water 8-Aug-15 ZN4 CIV Apply sika Apply water proofing on slab at Admin Building 9-Aug-15 11-Aug-15 9.00am CLOSED 21-Aug-15 12 REJECTED 1 1
789 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00772 Ocned Water 8-Aug-15 ZN4 CIV Apply sika Apply water proofing on slab at Blower room 9-Aug-15 11-Aug-15 9.00am CLOSED 21-Aug-15 12 REJECTED 1 1
790 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00773 Ocned Water 8-Aug-15 ZN4 CIV Repairing repairing for honeycomb on wall at Clarifier tank 2 9-Aug-15 11-Aug-15 9.00am CLOSED 21-Aug-15 12 REJECTED 1 1
791 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00774 Ocned Water 8-Aug-15 ZN4 CIV Formwork & rebar Inspection formwork/ rebar on overflow at Clarifier 9-Aug-15 11-Aug-15 9.00am CLOSED 21-Aug-15 12 REJECTED 1 1
tank
792 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00775 Ocned Water 8-Aug-15 ZN4 CIV Concreting Concreting work on column at Clarifier tank 1 10-Aug-15 12-Aug-15 9.00am CLOSED 12-Aug-15 2 REJECTED 1 1
793 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00776 Ocned Water 8-Aug-15 ZN4 CIV Formwork & rebar Inspection formwork on column at Clarifier tank 1 10-Aug-15 12-Aug-15 9.00am CLOSED 21-Aug-15 11 REJECTED 1 1
794 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00777 Ocned Water 8-Aug-15 ZN4 CIV Concreting Concreting work on column at Clarifiee tank 2 10-Aug-15 12-Aug-15 10.00am CLOSED 12-Aug-15 2 REJECTED 1 1
795 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00778 Ocned Water 10-Aug-15 ZN4 CIV Formwork & rebar Inspection formwork/rebar on top slab roof at guard 11-Aug-15 13-Aug-15 9.00am CLOSED 21-Aug-15 10 REJECTED 1 1
house
796 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00779 Ocned Water 10-Aug-15 ZN4 CIV Concreting Concreting on roof top slab at Guard House 11-Aug-15 13-Aug-15 10.00am CLOSED 13-Aug-15 2 REJECTED 1 1
801 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00784 Ocned Water 11-Aug-15 ZN4 CIV Formwork & rebar Inspection formwork on column at Clarifier Tank 1 12-Aug-15 14-Aug-15 9.00am CLOSED 21-Aug-15 9 REJECTED 1 1
802 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00785 Ocned Water 11-Aug-15 ZN4 CIV Concreting Concrete work on column at Clarifier Tank 1 12-Aug-15 14-Aug-15 10.00am CLOSED 13-Aug-15 1 REJECTED 1 1
804 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00787 How Thong 11-Aug-15 ZN4 STR Rectification Rectification works leaking Tank D 12-Aug-15 14-Aug-15 10.00am CLOSED 21-Aug-15 9 REJECTED 1 1
806 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00789 How Thong 12-Aug-15 ZN4 STR Casting Casting roof slab block 1 - Soil 13-Aug-15 15-Aug-15 10.00am CLOSED 13-Aug-15 0 ACCEPTED 1 1
807 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00790 How Thong 12-Aug-15 ZN4 STR pre concreting Inspection formwork and rebar cable trench 13-Aug-15 15-Aug-15 9.30am CLOSED 07-Jan-16 147 ACCEPTED 1 1
808 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00791 How Thong 12-Aug-15 ZN4 STR Casting Casting cable trench 13-Aug-15 15-Aug-15 10.00am CLOSED 15-Aug-15 2 ACCEPTED 1 1
809 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-00792 How Thong 12-Aug-15 ZN4 ARC material Delivery batu bata merah ( Clay Brick) 13-Aug-15 15-Aug-15 10.00am CLOSED 13-Aug-15 0 REJECTED 1 1
810 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00793 Ocned Water 12-Aug-15 ZN4 CIV water proof Apply water proofing on slab at Blower room 13-Aug-15 15-Aug-15 9.00am CLOSED 21-Aug-15 8 REJECTED 1 1
812 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00795 Ocned Water 12-Aug-15 ZN4 CIV Water Proof Apply water proofing on salb at Admin Building 13-Aug-15 15-Aug-15 9.00am CLOSED 21-Aug-15 8 REJECTED 1 1
813 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00796 Ocned Water 12-Aug-15 ZN4 CIV Concreting Concreting works on staircae at Sludge holding/ 13-Aug-15 15-Aug-15 10.00am CLOSED 15-Aug-15 2 REJECTED 1 1
Thickener tank
815 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-00798 How Thong 12-Aug-15 ZN4 TNK Cleaning Disinfection and Sterilization at Tank E 13-Aug-15 15-Aug-15 10.00am CLOSED CANCEL 1 1
816 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00799 Ocned Water 13-Aug-15 ZN4 CIV Concreting Concreting work on overflow at clarifier tank 1 13-Aug-15 15-Aug-15 9.30am CLOSED 13-Aug-15 0 ACCEPTED 1 1
817 RAPID-P20A1-UEMB-ZN4-CTG-RFIN-00800 Ocned Water 13-Aug-15 ZN4 CTG Expocy Expocy painting on wall at aeration tank 1. 14-Aug-15 16-Aug-15 8.00am CLOSED 16-Aug-15 2 REJECTED 1 1
818 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00801 Ocned Water 13-Aug-15 ZN4 CIV Rebar Inspection rebar on wall at Treated Water tank 14-Aug-15 16-Aug-15 8.00am CLOSED 21-Nov-15 99 ACCEPTED 1 1
820 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00803 Ocned Water 13-Aug-15 ZN4 CIV Post Concreting Concreting works on slab at Guard House 14-Aug-15 16-Aug-15 10.00am CLOSED 16-Aug-15 2 REJECTED 1 1
821 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00804 How Thong 15-Aug-15 ZN4 STR Rectification Rectification of works leaking Tank D 15-Aug-15 17-Aug-15 9.00am CLOSED 17-Aug-15 2 ACCEPTED 1 1
822 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00805 How Thong 15-Aug-15 ZN4 MNE Fizikal inspection Fizikal inspection before fill water Tank F 17-Aug-15 19-Aug-15 9.00am CLOSED 17-Aug-15 0 ACCEPTED 1 1
823 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00806 How Thong 15-Aug-15 ZN4 PIP Material Delivery inspection for MSCL 450 17-Aug-15 19-Aug-15 10.00am CLOSED 19-Aug-15 2 ACCEPTED 1 1
825 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00808 Ocned Water 15-Aug-15 ZN4 CIV Formwork Inspection formwork on column at polymer shed 17-Aug-15 19-Aug-15 9.00am CLOSED 21-Nov-15 96 REJECTED 1 1
828 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00811 How Thong 17-Aug-15 ZN4 PIP Material Delivery culvert pipe for inspection 18-Aug-15 20-Aug-15 10.00am CLOSED 7-Jan-16 142 ACCEPTED 1 1
829 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00812 How Thong 17-Aug-15 ZN4 PIP Welding Welding MSCL pipe 450mm 18-Aug-15 20-Aug-15 10.00am CLOSED 13-Nov-15 87 ACCEPTED 1 1
830 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00813 Ocned Water 16-Aug-15 ZN4 CIV Formwork and rebar Inspection formwork and rebar on overflow wall at 17-Aug-15 19-Aug-15 9.00am CLOSED 21-Aug-15 4 REJECTED 1 1
Clarifier Tank 1
831 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00814 Ocned Water 16-Aug-15 ZN4 CIV Concreting Concreting works on overflow wall at Clarifier tank 1 17-Aug-15 19-Aug-15 10.00am CLOSED 21-Aug-15 4 ACCEPTED 1 1
832 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00815 Ocned Water 16-Aug-15 ZN4 CIV Concreting Mass concrete at Sludge Holding Tank 17-Aug-15 19-Aug-15 9.00am CLOSED 21-Aug-15 4 ACCEPTED 1 1
833 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00816 Ocned Water 16-Aug-15 ZN4 CIV Formwork and rebar Inspection formwork and rebar on roof slab at Guard 17-Aug-15 19-Aug-15 9.00am CLOSED 05-Jan-16 141 REJECTED 1 1
House
834 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00817 Ocned Water 16-Aug-15 ZN4 CIV Concreting Concreting work on roof slab at Guard House 17-Aug-15 19-Aug-15 10.00am CLOSED 21-Nov-15 96 REJECTED 1 1
835 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00818 Ocned Water 16-Aug-15 ZN4 CIV PU Grouting PU Grouting on External wall at Grit Chamber 17-Aug-15 19-Aug-15 8.00am CLOSED 27-Jan-16 163 ACCEPTED 1 1
836 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00819 Ocned Water 16-Aug-15 ZN4 CIV PU Grouting PU Grouting on external wall at Aeration Tank 2 17-Aug-15 19-Aug-15 8.00am CLOSED 27-Jan-16 163 ACCEPTED 1 1
837 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00820 How Thong 18-Aug-15 ZN4 CIV pre concreting Ring wall formwork tank B 19-Aug-15 21-Aug-15 9.30am CLOSED 21-Aug-15 2 REJECTED 1 1
838 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00821 How Thong 18-Aug-15 ZN4 CIV Concreting casting ring wall B 19-Aug-15 21-Aug-15 10.00am CLOSED 16-Dec-15 119 ACCEPTED 1 1
839 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00822 Ocned Water 18-Aug-15 ZN4 CIV Undergound servises Armour cable installation for Admin Building 18-Aug-15 20-Aug-15 11.00am CLOSED 04-Sep-15 17 ACCEPTED 1 1
840 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00823 Ocned Water 18-Aug-15 ZN4 CIV pre concreting Inspection formwork for wall at Treated water Tank 19-Aug-15 21-Aug-15 9.00am CLOSED 25-Aug-15 6 ACCEPTED 1 1
841 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00824 Ocned Water 18-Aug-15 ZN4 CIV Concreting Concreting work on wall treated water Tank 19-Aug-15 21-Aug-15 10.00am CLOSED 20-Aug-15 1 ACCEPTED 1 1
842 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00825 How Thong 18-Aug-15 ZN4 PIP Testing Welder prerformence testing 19-Aug-15 21-Aug-15 1.00pm CLOSED 02-Sep-15 14 ACCEPTED 1 1
844 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00827 How Thong 19-Aug-15 ZN4 STR casting casting scour chamber tank B 20-Aug-15 22-Aug-15 9.30am CLOSED 11-Nov-15 83 ACCEPTED 1 1
846 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00829 Ocned Water 19-Aug-15 ZN4 CIV concrete concrete work on collum/roof slab at Polymer Shed 20-Aug-15 22-Aug-15 10.00am CLOSED 21-Nov-15 93 ACCEPTED 1 1
847 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00830 Ocned Water 19-Aug-15 ZN4 CIV concrete concrete work on roof slab at Guard House 20-Aug-15 22-Aug-15 10.00am CLOSED 5-May-16 259 ACCEPTED 1 1
848 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00831 Ocned Water 19-Aug-15 ZN4 CIV formwork/rebar Inspection formwork/rebar on roof slab at Polymer 20-Aug-15 22-Aug-15 9.00am CLOSED 21-Nov-15 93 ACCEPTED 1 1
Shed
849 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00832 Ocned Water 19-Aug-15 ZN4 CIV formwork inspection formwork on collumn at Polymer Shed 20-Aug-15 22-Aug-15 9.00am CLOSED 21-Nov-15 93 ACCEPTED 1 1
850 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00833 Ocned Water 19-Aug-15 ZN4 CIV P.U grouting P.U grouting on external wall at Aeration Tank 2 20-Aug-15 22-Aug-15 8.00am CLOSED 27-Jan-16 160 ACCEPTED 1 1
851 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00834 Ocned Water 19-Aug-15 ZN4 CIV P.U grouting P.U grouting on external wall at Grit Chamber 20-Aug-15 22-Aug-15 8.00am CLOSED 25-May-16 279 ACCEPTED 1 1
853 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00836 How Thong 20-Aug-15 ZN4 PIP Welding welding piping MSCI 450 21-Aug-15 23-Aug-15 10.00am CLOSED 13-Nov-15 84 ACCEPTED 1 1
854 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00837 How Thong 20-Aug-15 ZN4 STR formwork & rebar Inspection rebar and formwork resum 21-Aug-15 23-Aug-15 9.00am CLOSED 19-Jan-16 151 ACCEPTED 1 1
855 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00838 How Thong 20-Aug-15 ZN4 STR casting casting re sum 21-Aug-15 23-Aug-15 9.00am CLOSED 19-Sep-16 395 REJECTED 1 1
859 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00842 UEMB ZIKRI 21-Aug-15 ZN4 ELE Control Panel Installation Control panel installation inspection 21-Aug-15 23-Aug-15 10.00am CLOSED 04-Sep-15 14 REJECTED 1 1
860 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00843 Ocned Water 20-Aug-15 ZN4 CIV Concreting Concrete works on centre column at Clarifier Tank 1 21-Aug-15 23-Aug-15 10.00am CLOSED 21-Nov-15 92 ACCEPTED 1 1
861 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00844 Ocned Water 20-Aug-15 ZN4 CIV Formwork Inspection formwork on centre column at Clarifier 21-Aug-15 23-Aug-15 9.00am CLOSED 21-Nov-15 92 ACCEPTED 1 1
Tank 1
862 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00845 How Thong 21-Aug-15 ZN4 CIV Formwork Formwork ring wall at Tank A 22-Aug-15 24-Aug-15 9.00am CLOSED 16-Dec-15 116 ACCEPTED 1 1
863 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00846 How Thong 21-Aug-15 ZN4 STR Concrete Casting ring wall at Tank A 22-Aug-15 24-Aug-15 9.00am CLOSED 16-Dec-15 116 REJECTED 1 1
submission with
00861
864 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00847 How Thong 21-Aug-15 ZN4 MNE Fizikal inspection Fizikal inspection Tank B Before fill water 24-Aug-15 26-Aug-15 11.00am CLOSED 25-Aug-15 1 ACCEPTED 1 1
865 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00848 How Thong 21-Aug-15 ZN4 MNE Fizikal Test Fizikal inspection Tank C Before fill water 24-Aug-15 26-Aug-15 10.30am CLOSED 25-Aug-15 1 ACCEPTED 1 1
868 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00851 How Thong 22-Aug-15 ZN4 STR Rebar and formwork Inspection rebar and formwork cable trench 23-Aug-15 25-Aug-15 12.00am CLOSED 11-Nov-15 80 ACCEPTED 1 1
869 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00852 How Thong 22-Aug-15 ZN4 STR Casting Casting cable trench 23-Aug-15 25-Aug-15 12.00am CLOSED CANCEL 1 1
870 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00853 Ocned Water 22-Aug-15 ZN4 CIV Formwork Inspection formwork on overflow/slab at Disinfection 24-Aug-15 26-Aug-15 9.00am CLOSED 21-Nov-15 89 ACCEPTED 1 1
Chamber
871 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00854 Ocned Water 22-Aug-15 ZN4 CIV Rebar and formwork Inspection formwork and rebar on overflow slab and 24-Aug-15 26-Aug-15 9.00am CLOSED 21-Nov-15 89 ACCEPTED 1 1
walkway at Clarifier Tank 2
Ocned Water 22-Aug-15 ZN4 CIV Concrete Concrete work on overvlow slab and walkway at 24-Aug-15 26-Aug-15 10.00am CLOSED 19-May-16
872 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00855
Clarifier Tank 2 269 ACCEPTED 1 1
878 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00861 How Thong 24-Aug-15 ZN4 CIV Casting Casting ring wall Tank A 26-Aug-15 28-Aug-15 9.30am CLOSED 16-Dec-15 112 ACCEPTED 1 1
superceded RFIN
00846
879 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00862 How Thong 24-Aug-15 ZN4 MNE Fizikal inspection Physical inspection Tank A before fill water 28-Aug-15 30-Aug-15 10.30am CLOSED 16-Dec-15 110 REJECTED 1 1
Control Panel
882 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00865 Ocned Water 24-Aug-15 ZN4 ELE Installation Control panel installation inspection 24-Aug-15 26-Aug-15 2.00pm CLOSED 29-Aug-15 5 ACCEPTED 1 1
884 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00867 Ocned Water 24-Aug-15 ZN4 CIV Concrete Concrete work on overflow slab at Sludge Holding/ 25-Aug-15 27-Aug-15 10.00am CLOSED 21-Nov-15 88 ACCEPTED 1 1
Thickener Tank
885 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00868 How Thong 24-Aug-15 ZN4 STR Pre concreting Inspection formwork and rebar for Scour Chamber 25-Aug-15 27-Aug-15 9.00am CLOSED 6-Jan-16 134 ACCEPTED 1 1
Tank C
886 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00869 How Thong 24-Aug-15 ZN4 STR Pre concreting Inspection formwork and rebar for Scour Chamber 25-Aug-15 27-Aug-15 9.00am CLOSED 11-Nov-15 78 ACCEPTED 1 1
Tank A
887 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00870 How Thong 24-Aug-15 ZN4 STR Casting Casting Scour Chamber Tank C 25-Aug-15 27-Aug-15 11.00am CLOSED 11-Nov-15 78 ACCEPTED 1 1
888 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00871 How Thong 24-Aug-15 ZN4 STR Casting Casting Scour ChamberTank A 25-Aug-15 27-Aug-15 11.00am CLOSED 11-Nov-15 78 REJECTED 1 1
891 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00874 Ocned Water 24-Aug-15 ZN4 CIV Concrete Concrete works on overflow slab at Clarifier Tank 2 25-Aug-15 27-Aug-15 9.00am CLOSED 21-Nov-15 88 ACCEPTED 1 1
892 RAPID-P20A1-UEMB-ZN4-CTG-RFIN-00875 Ocned Water 24-Aug-15 ZN4 CTG Painting Paint Epoxy on wall at Clarifier Tank 1 25-Aug-15 27-Aug-15 9.00am CLOSED 27-Jan-16 155 ACCEPTED 1 1
893 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00876 Ocned Water 25-Aug-15 ZN4 CIV pre concreting Inspection formwork and rebar at Sump return sump 26-Aug-15 28-Aug-15 9.00am CLOSED 21-Nov-15 87 ACCEPTED 1 1
894 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00877 Ocned Water 25-Aug-15 ZN4 STR pre concreting Inspection of rebar and formwork for 2nd lift Centre 26-Aug-15 28-Aug-15 10.00am CLOSED 21-Nov-15 87 ACCEPTED 1 1
column at Clarifier Tank 1
895 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00878 Ocned Water 25-Aug-15 ZN4 STR Concreting Concreting works for 2nd lift centre column at 26-Aug-15 28-Aug-15 10.00am CLOSED 21-Nov-15 87 ACCEPTED 1 1
Clarifier Tank 1
896 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00879 Ocned Water 26-Aug-15 ZN4 CIV Testing Water thignes test at Oil grease 27-Aug-15 29-Aug-15 8.00am CLOSED 31-Aug-15 4 ACCEPTED 1 1
897 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00880 Ocned Water 26-Aug-15 ZN4 CIV Testing Water thigness test at Anoxic tank 27-Aug-15 29-Aug-15 8.00am CLOSED 31-Aug-15 4 ACCEPTED 1 1
899 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00882 Ocned Water 26-Aug-15 ZN4 CIV Concrete Concrete work on Centre column at Clarifier tank 2 27-Aug-15 29-Aug-15 10.00am CLOSED 21-Nov-15 86 REJECTED 1 1
900 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00883 Ocned Water 26-Aug-15 ZN4 CIV Testing Water thignes test at Aeration Tank 2 27-Aug-15 29-Aug-15 8.00am CLOSED 31-Aug-15 4 ACCEPTED 1 1
902 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00885 Ocned Water 25-Aug-15 ZN4 ELE Undergound servises Armoured cable installation for compound light 26-Aug-15 28-Aug-15 10.00am CLOSED 08-Sep-15 13 ACCEPTED 1 1
903 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00886 Ocned Water 27-Aug-15 ZN4 CIV Concreting Concrete work slab at sump return sump 27-Aug-15 29-Aug-15 10.00am CLOSED 21-Nov-15 86 ACCEPTED 1 1
UEMB Faiz 27-Aug-15 ZN4 CIV Concreting Inspection formwork,rebar and concreting plinth 27-Aug-15 29-Aug-15 2.00pm
905 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00888
seeder pillar (FP-C10) for wall CLOSED CANCEL 1 1
UEMB Faiz 25-Aug-15 ZN4 CIV Concreting Inspection formwork,rebar and concreting plinth 26-Aug-15 28-Aug-15 2.00pm
906 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00889
seeder pillar (FP-C11) for Slab CLOSED CANCEL 1 1
Inspection formwork,rebar and concreting plinth
907 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00890 UEMB Faiz 25-Aug-15 ZN4 CIV Concreting seeder pillar (FP-C10) for Slab 26-Aug-15 28-Aug-15 2.00pm CLOSED CANCEL 1 1
911 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00894 Ocned Water 28-Aug-15 ZN4 CIV Concreting Concrete works on wall overflow at Clarifier Tank 2 29-Aug-15 31-Aug-15 10.00am CLOSED 21-Nov-15 84 ACCEPTED 1 1
912 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00895 Ocned Water 28-Aug-15 ZN4 CIV Concreting Concrete works on slab at Parshall fune 29-Aug-15 31-Aug-15 10.00am CLOSED 07-Nov-15 70 ACCEPTED 1 1
Ocned Water 28-Aug-15 ZN4 CIV pre concreting Plastering works on wall Building aera at Sand 29-Aug-15 31-Aug-15 10.00am CLOSED 21-Apr-16
913 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00896
beding bed geotube 236 ACCEPTED 1 1
914 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00897 How Thong 28-Aug-15 ZN4 STR pre concreting Inspection rebar and formwork for sump Tank B 29-Aug-15 31-Aug-15 9.30am CLOSED 07-Jan-16 131 ACCEPTED 1 1
915 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00898 How Thong 28-Aug-15 ZN4 STR pre concreting Inspection rebar and formwork for sump Tank C 29-Aug-15 31-Aug-15 9.00am CLOSED 7-Jan-16 131 ACCEPTED 1 1
916 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00899 How Thong 28-Aug-15 ZN4 STR pre concreting Inspection rebar and formwork for sump Tank A 29-Aug-15 31-Aug-15 8.30am CLOSED 7-Jan-16 131 ACCEPTED 1 1
917 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00900 How Thong 28-Aug-15 ZN4 STR Concreting Concreting work for sump Tank B 29-Aug-15 31-Aug-15 12.00am CLOSED 7-Jan-16 131 ACCEPTED 1 1
918 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00901 How Thong 28-Aug-15 ZN4 STR Concreting Concreting work for sump Tank C 29-Aug-15 31-Aug-15 11.00am CLOSED 07-Jan-16 131 ACCEPTED 1 1
919 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00902 How Thong 28-Aug-15 ZN4 STR Concreting Concreting work for sump Tank A 29-Aug-15 31-Aug-15 1.00pm CLOSED 07-Jan-16 131 ACCEPTED 1 1
921 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00904 AEIE 29-Aug-15 ZN4 ELE Undergound servises 2X 4C 240mm XPLE/SWA/PVC Cable Underground 29-Aug-15 31-Aug-15 4.00pm CLOSED 1-Sep-15 3 REJECTED 1 1
installation at STP 1
How Thong 1-Sep-15 ZN4 STR Pre concreting Inspection of formwork and rebar for Domestic 1-Sep-15 3-Sep-15 2.00pm 14-Jul-16 317 ACCEPTED
922 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00905
Waste Storage Tank CLOSED 1 1
How Thong 1-Sep-15 ZN4 STR Concreting Concreting work for Domestic Waste Storage 1-Sep-15 3-Sep-15 3.00pm 14-Jul-16 317 ACCEPTED
923 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00906
Tank CLOSED 1 1
924 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-00907 How Thong 1-Sep-15 ZN4 TKG Flushing Flushing pressure filter tank at remineralization 1-Sep-15 3-Sep-15 10.00am CLOSED 21-Sep-15 20 ACCEPTED 1 1
925 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00908 Ocned Water 1-Sep-15 ZN4 CIV Concrete Concrete works on centre column at Clarifier Tank 2 2-Sep-15 4-Sep-15 10.00am CLOSED 21-Nov-15 80 ACCEPTED 1 1
927 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00910 Ocned Water 1-Sep-15 ZN4 CIV Concrete Concrete works on wall at Parshall Fume ( Overflow) 2-Sep-15 4-Sep-15 10.00am CLOSED 21-Nov-15 80 ACCEPTED 1 1
928 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00911 Ocned Water 1-Sep-15 ZN4 CIV Testing Water thightness test at Grit chamber 2 (Retest) 2-Sep-15 4-Sep-15 10.00am CLOSED 19-May-16 260 ACCEPTED 1 1
929 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00912 Ocned Water 1-Sep-15 ZN4 CIV Concrete Concrete on top slab at Disinfection Chamber 2-Sep-15 4-Sep-15 10.00am CLOSED 21-Nov-15 80 ACCEPTED 1 1
930 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00913 Ocned Water 1-Sep-15 ZN4 CIV pre concreting Inspection rebar for top slab at Disinfection chamber 2-Sep-15 4-Sep-15 9.00am CLOSED 20-Oct-15 48 ACCEPTED 1 1
931 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00914 Ocned Water 1-Sep-15 ZN4 CIV Concrete Concrete works on wall at Disinfectoin chamber 2-Sep-15 4-Sep-15 10.00am CLOSED 21-Nov-15 80 ACCEPTED 1 1
How Thong 2-Sep-15 ZN4 STR pre concreting Inspectionformwork and rebar for top slab of 3-Sep-15 5-Sep-15 10.00am CANCEL
936 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00919
Domestic Waste Storage tank CLOSED 1 1
938 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00921 Ocned Water 3-Sep-15 ZN4 CIV water thightness test Water thigtnes test at Aeration Tank 1 4-Sep-15 6-Sep-15 9.00am CLOSED 07-Sep-15 3 ACCEPTED 1 1
939 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00922 Ocned Water 3-Sep-15 ZN4 CIV water thightness test Water thigtnes test at Anoxic Tank 1 4-Sep-15 6-Sep-15 9.00am CLOSED 07-Sep-15 3 ACCEPTED 1 1
940 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00923 Ocned Water 3-Sep-15 ZN4 CIV water thightness test Water thigtnes test at Grit Chamber 1 4-Sep-15 6-Sep-15 9.00am CLOSED 07-Sep-15 3 ACCEPTED 1 1
941 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00924 Ocned Water 3-Sep-15 ZN4 CIV water thightness test Water thigtnes test at oil and grease Tank1 4-Sep-15 6-Sep-15 9.00am CLOSED 07-Sep-15 3 ACCEPTED 1 1
942 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00925 Ocned Water 3-Sep-15 ZN4 CIV Pre concreting Inspection formwork/rebar on baffle wall at 4-Sep-15 6-Sep-15 9.00am CLOSED 01-Jan-15 -246 REJECTED 1 1
Disinfection Chamber
943 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00926 Ocned Water 3-Sep-15 ZN4 CIV Concrete Concrete works on raffle wall at Disifiction Chamber 4-Sep-15 6-Sep-15 10.00am CLOSED 21-Nov-15 78 REJECTED 1 1
945 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00928 Ocned Water 3-Sep-15 ZN4 CIV Concrete Concrete work on 2nd lift column at Clarifier tank 2 4-Sep-15 6-Sep-15 10.00am CLOSED 21-Nov-15 78 REJECTED 1 1
946 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00929 Ocned Water 3-Sep-15 ZN4 CIV Pre concreting Inspection formwork/rebar on overflow Box at 4-Sep-15 6-Sep-15 9.00am CLOSED 09-Dec-15 96 REJECTED 1 1
Clafifier Tank 1
947 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00930 Ocned Water 3-Sep-15 ZN4 CIV concrete Concrete work on Overflow Box at Clarifier Tank 1 4-Sep-15 6-Sep-15 10.00am CLOSED 21-Nov-15 78 REJECTED 1 1
949 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00932 Ocned Water 3-Sep-15 ZN4 CIV Concrete Concrete work on overflow Box at Clarifier Tank 2 4-Sep-15 6-Sep-15 10.00am CLOSED 21-Nov-15 78 REJECTED 1 1
951 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00934 Ocned Water 4-Sep-15 ZN4 CIV rectification work rectification work at sludge holding/thickener tank 5-Sep-15 7-Sep-15 9.00am CLOSED 14-Jan-16 131 ACCEPTED 1 1
(honeycomb)
953 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00936 Ocned Water 4-Sep-15 ZN4 CIV rectification work rectification work at RAS/WAS sump (honeycomb) 5-Sep-15 7-Sep-15 9.00am CLOSED 21-Nov-15 77 REJECTED 1 1
954 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00937 Ocned Water 4-Sep-15 ZN4 CIV epoxy painting epoxy painting at clarifier tank 2 (wall) 5-Sep-15 7-Sep-15 8.00am CLOSED 14-Jan-16 131 ACCEPTED 1 1
957 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00940 How Thong 5-Sep-15 ZN4 CIV Installation Installation of U-Drain at PWT 7-Sep-15 9-Sep-15 10.00am CLOSED 30-Jan-16 145 ACCEPTED 1 1
958 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00941 How Thong 5-Sep-15 ZN4 CIV Installation Installation of U-Drain(450X600) 7-Sep-15 9-Sep-15 10.00am CLOSED 30-Jan-16 145 ACCEPTED 1 1
959 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00942 How Thong 28-Aug-15 ZN4 CIV Delivery order Delivery order of U-Darin 600x300 29-Aug-15 31-Aug-15 10.00am CLOSED CANCEL 1 1
960 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00943 How Thong 28-Aug-15 ZN4 CIV Delivery order Delivery order of U-Darin 600x300 29-Aug-15 31-Aug-15 10.00am CLOSED CANCEL 1 1
961 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00944 How Thong 5-Sep-15 ZN4 CIV Delivery order Delivery order of U-Darin 600x300 7-Sep-15 9-Sep-15 10.00am CLOSED CANCEL 1 1
963 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00946 Ocned Water 7-Sep-15 ZN4 CIV Pre concreting Inspection formwork, rebar on raffle wall at 7-Sep-15 9-Sep-15 9.00am CLOSED 21-Nov-15 75 ACCEPTED 1 1
Disinfection Chamber
Ocned Water 7-Sep-15 ZN4 CIV Concreting Concrete works on 2nd lift concrete column at 7-Sep-15 9-Sep-15 10.00am
967 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00950
Clarifier Tank 2 CLOSED 25-May-16 261 ACCEPTED 1 1
969 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00952 Ocned Water 7-Sep-15 ZN4 CIV Concreting Concrete works on overflow box at Clarifier Tank 2 7-Sep-15 9-Sep-15 10.00am CLOSED 01-Jan-16 116 ACCEPTED 1 1
970 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00953 Ocned Water 7-Sep-15 ZN4 CIV Concreting Concrete works on overflow Box at Clarifier Tank 1 7-Sep-15 9-Sep-15 10.00am CLOSED 01-Jan-16 116 ACCEPTED 1 1
Ocned Water 7-Sep-15 ZN4 CIV Post Concreting Inspection for post concrete after Dismantle 8-Sep-15 10-Sep-15 9.00am 21-Apr-16
972 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00955
formwork treated water Tank (wall) CLOSED 226 ACCEPTED 1 1
975 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00958 Instant Option 8-Sep-15 ZN4 CIV Ecavation Inspection for excavation sub grade and joint Dipping 9-Sep-15 11-Sep-15 11.00am CLOSED 14-Jan-16 127 ACCEPTED 1 1
before laying sand 150mm
976 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00959 Ocned Water 9-Sep-15 ZN4 CIV Pre concreting Inspection formwork on wall overflow box at Clarifier 10-Sep-15 12-Sep-15 10.00am CLOSED 21-Nov-15 72 ACCEPTED 1 1
Tank 1 & 2
977 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00960 Ocned Water 9-Sep-15 ZN4 CIV Pre concreting Inspection rebar and formwork on staircase at 10-Sep-15 12-Sep-15 10.00am CLOSED 01-Jan-16 113 ACCEPTED 1 1
Disinfection Chamber
981 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00964 Ocned Water 9-Sep-15 ZN4 CIV Backfill Backfilling work on VCP pipe laying at Disinfection 10-Sep-15 12-Sep-15 10.00am CLOSED 21-Nov-15 72 REJECTED 1 1
Chamber
983 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00966 How Thong 10-Sep-15 ZN4 CIV Drainage works Installation of U drain 600x300 at PWT ( supplyer 10-Sep-15 12-Sep-15 10.00am CLOSED 6-Jan-16 118 ACCEPTED 1 1
Speed)
985 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00968 I-GEN 6-Dec-15 ZN4 MNE Testing Testing and commissioning at the Fire water 7-Dec-15 9-Dec-15 2.30pm CLOSED 9-May-16 154 ACCEPTED 1 1
pump house
986 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00969 How Thong 10-Sep-15 ZN4 MNE Fizikal inspection Fizikal inspection inside Tank A before fill water 11-Sep-15 13-Sep-15 10.30am CLOSED 06-Jan-16 117 ACCEPTED 1 1
987 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00970 Ocned Water 10-Sep-15 ZN4 CIV Water proof Water proofworks on roof slab at Admin room 11-Sep-15 13-Sep-15 8.00am CLOSED 01-Jan-16 112 REJECTED 1 1
988 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00971 Ocned Water 10-Sep-15 ZN4 CIV Water proof Water proofworks on roof slab at Blower room 11-Sep-15 13-Sep-15 8.00am CLOSED 01-Jan-16 112 REJECTED 1 1
Ocned Water 10-Sep-15 ZN2 CIV Post Concrete Inspection for post concrete on Overflow box at 11-Sep-15 13-Sep-15 9.00am 21-Apr-16
990 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00973
Clarifier Tank 1 CLOSED 223 ACCEPTED 1 1
992 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-00975 Ocned Water 10-Sep-15 ZN4 PIP Welding works Inspection for underground GI pipe ( Welding works) 11-Sep-15 13-Sep-15 9.00am CLOSED 09-Oct-15 28 ACCEPTED 1 1
994 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00977 Instant Option 12-Sep-15 ZN4 CIV Road works Inspection for sub base dipping 12-Sep-15 14-Sep-15 11.00am CLOSED 20-Oct-15 38 REJECTED 1 1
995 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00978 Ocned Water 8-Sep-15 ZN4 MNE Pre-commisioning pre-commissioning and functional test for phase 1 9-Sep-15 11-Sep-15 3.30pm CLOSED 23-Oct-15 44 ACCEPTED 1 1
996 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00979 Instant Option 10-Sep-15 ZN4 CIV Testing Inspection for sub grade FDT test at STP 1 11-Sep-15 13-Sep-15 3.30pm CLOSED 28-Sep-15 17 ACCEPTED 1 1
997 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00980 Instant Option 13-Sep-15 ZN4 CIV Installation VCP Laying VCP pipe at STP 1 14-Sep-15 16-Sep-15 11.00am CLOSED 23-Jan-16 131 ACCEPTED 1 1
998 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00981 Instant Option 13-Sep-15 ZN4 CIV Road works Diping test for road base at STP 1 14-Sep-15 16-Sep-15 11.00am CLOSED 20-Oct-15 36 REJECTED 1 1
999 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00982 Instant Option 12-Sep-15 ZN4 CIV Testing FDT test for sub base at STP 1 14-Sep-15 16-Sep-15 10.45am CLOSED 21-Jan-16 129 ACCEPTED 1 1
1000 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00983 How Thong 14-Sep-15 ZN4 CIV Material Delivery Udrain 600x450mm 14-Sep-15 16-Sep-15 10.00am CLOSED CANCEL 1 1
1001 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00984 How Thong 14-Sep-15 ZN4 CIV Dranage works Excavation works and laying crusher run for Udrain 14-Sep-15 16-Sep-15 10.00am CLOSED 6-Jan-16 114 ACCEPTED 1 1
at PWT
1002 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00985 How Thong 14-Sep-15 ZN4 CIV Dranage works Installation of UD 600x450 at PWT 14-Sep-15 16-Sep-15 10.00am CLOSED 6-Jan-16 114 ACCEPTED 1 1
1004 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00987 Instant Option 17-Sep-15 ZN4 CIV Rectification rectification work deeping vcp pipe at Sewerage 18-Sep-15 20-Sep-15 10.00am CLOSED 14-Jan-16 118 ACCEPTED 1 1
Treatment plant 1 STP1
1005 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00988 Instant Option 17-Sep-15 ZN4 CIV Install VCP pipe Laying VCP pipe at Sewerage Treatment plant STP 1 18-Sep-15 20-Sep-15 3.00pm CLOSED 14-Jan-16 118 ACCEPTED 1 1
1006 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00989 Ocned Water 17-Sep-15 ZN4 MNE Equipment Installation at clarifier scraper at clarifier tank 1 18-Sep-15 20-Sep-15 9.00am CLOSED 18-Sep-15 0 ACCEPTED 1
1007 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-00990 Ocned Water 17-Sep-15 ZN4 MNE Equipment Installation at clarifier scraper at clarifier tank 2 18-Sep-15 20-Sep-15 10.00am CLOSED 18-Sep-15 0 ACCEPTED 1
1008 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-00991 Ocned Water 17-Sep-15 ZN4 ELE Equipment genset functionality test and AMF board 18-Sep-15 20-Sep-15 1.30pm CLOSED CANCEL 1
1009 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00992 Ocned Water 17-Sep-15 ZN4 CIV u-drain Installation U-drain at STP1 (300mm x 300mm) 18-Sep-15 20-Sep-15 8.00am CLOSED 19-May-16 244 ACCEPTED 1 1
Ocned Water 17-Sep-15 ZN4 CIV water proofing water proofing on roof slab at Admin Building 18-Sep-15 20-Sep-15 8.00am
1010 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00993
Room CLOSED 25-May-16 250 ACCEPTED 1
1011 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00994 Ocned Water 17-Sep-15 ZN4 CIV water proofing water proofing on roof slab at blower room 18-Sep-15 20-Sep-15 8.00am CLOSED 25-May-16 250 ACCEPTED 1
1013 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00996 How Thong 18-Sep-15 ZN4 CIV Dranage works Excavation work and laying Crusher run for 600x450 18-Sep-15 20-Sep-15 9.00am CLOSED 6-Jan-16 110 ACCEPTED 1 1
UD at PWT
1014 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00997 How Thong 18-Sep-15 ZN4 CIV Dranage works Installation of UD 600x450 at PWT 18-Sep-15 20-Sep-15 10.00am CLOSED 6-Jan-16 110 ACCEPTED 1 1
1015 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00998 How Thong 18-Sep-15 ZN4 CIV Road works Dipping level for sub grade at PWT 18-Sep-15 20-Sep-15 10.00am CLOSED 21-Nov-15 64 REJECTED 1 1
1016 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-00999 How Thong 18-Sep-15 ZN4 CIV Road works Excavation works for preparing of subgrade road at 18-Sep-15 20-Sep-15 10.00am CLOSED 21-Nov-15 64 ACCEPTED 1 1
PWT
1017 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01000 How Thong 18-Sep-15 ZN4 CIV Road works FDT test at PWT area for subgrade 18-Sep-15 20-Sep-15 10.00am CLOSED 21-Nov-15 64 ACCEPTED 1 1
1018 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01001 Instant Option 18-Sep-15 ZN4 CIV Road works Sieve Analysis for subbase at STP 1 19-Sep-15 21-Sep-15 10.00am CLOSED 19-Sep-15 0 ACCEPTED 1 1
1019 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01002 Instant Option 18-Sep-15 ZN4 CIV Road works Sieve Analysis for Roadbase at STP 1 19-Sep-15 21-Sep-15 10.00am CLOSED 19-Sep-15 0 ACCEPTED 1 1
1020 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01003 Ocned Water 19-Sep-15 ZN4 CIV Fencing Installation fencing at STP1 20-Sep-15 22-Sep-15 8.00am CLOSED 19-May-16 242 ACCEPTED 1 1
1022 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01005 How Thong 21-Sep-15 ZN4 CIV Dranage works Installation of UD 600x450 at PWT 21-Sep-15 23-Sep-15 9.00am CLOSED 6-Jan-16 107 ACCEPTED 1 1
1023 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01006 How Thong 21-Sep-15 ZN4 CIV Road works Dipping level for sub grade at PWT 21-Sep-15 23-Sep-15 9.00am CLOSED 6-Jan-16 107 REJECTED 1 1
1024 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01007 Instant Option 21-Sep-15 ZN4 CIV Road works Dipping test for subgrade at STP 1 22-Sep-15 23-Sep-15 9.00am CLOSED 30-Dec-15 99 ACCEPTED 1 1
1025 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01008 Instant Option 21-Sep-15 ZN4 CIV Road works dipping test for Subgrade 21-Sep-15 23-Sep-15 9.00am CLOSED 21-Sep-15 0 ACCEPTED 1 1
1026 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01009 UEM ZIKRI 21-Sep-15 ZN4 ELE Material 4C x 95 mm XLPE/ SWAlPVC Cable inspection 22-Sep-15 23-Sep-15 9.00am CLOSED 22-Sep-15 0 ACCEPTED 1 1
1029 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01011 How Thong 28-Sep-15 ZN4 CIV Road works Dipping level for subgrade at PWT 28-Sep-15 30-Sep-15 11.00am CLOSED 16-Dec-15 79 ACCEPTED 1 1
1030 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01012 How Thong 25-Sep-15 ZN4 CIV Testing Field Density Test for subgrade at PWT 25-Sep-15 26-Sep-15 11.00am CLOSED 29-Jul-16 308 ACCEPTED 1 1
1031 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01013 How Thong 28-Sep-15 ZN4 CIV Dranage works Installation of U-Drain 450x600 at PWT 28-Sep-15 30-Sep-15 10.00am CLOSED 6-Jan-16 100 ACCEPTED 1 1
1032 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01014 How Thong 28-Sep-15 ZN4 CIV DraInage works Laying Crusher run for 450x600 U-Drain at PWT 28-Sep-15 30-Sep-15 10.00am CLOSED 6-Jan-16 100 ACCEPTED 1 1
1033 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01015 Ocned Water 28-Sep-15 ZN4 MNE Equipment Installation scrapper at Sludge holding tank at STP1 29-Sep-15 1-Oct-15 8.00am CLOSED 29-Sep-16 366 ACCEPTED 1 1
1038 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01020 How Thong 30-Sep-15 ZN4 TNK Sterilization Disinfection and sterilization at Tank F 1-Oct-15 3-Oct-15 9.00am CLOSED 1-Oct-15 0 REJECTED 1 1
1039 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01021 AEIE 1-Oct-15 ZN4 ELE MIGGERING INSULATION TEST FOR SUBMAIN CABLE 4X4C400M2 1-Oct-15 3-Oct-15 11.00AM CLOSED 16-Dec-15 76 ACCEPTED 1 1
TO FPC11
1040 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01022 How Thong 1-Oct-15 ZN4 CIV Road works Laying Crusher run aggregate for sub base at 1-Oct-15 29-Sep-15 9.00am CLOSED CANCEL 1 1
PWT area
1041 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01023 Ocned Water 1-Oct-15 ZN4 CIV Fencing Leveling ground soil for fencing level at STP1 2-Oct-15 4-Oct-15 10.00an CLOSED 21-Nov-15 50 ACCEPTED 1 1
1043 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01025 How Thong 5-Oct-15 ZN4 CIV testing FDT test for subbase at PWT 5-Oct-15 7-Oct-15 9.00am CLOSED 16-Nov-15 42 REJECTED 1 1
1044 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01026 How Thong 5-Oct-15 ZN4 CIV Turfing Turfing at PWT area 5-Oct-15 7-Oct-15 9.00am CLOSED 6-Jan-16 93 REJECTED 1 1
1046 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01028 How Thong 6-Oct-15 ZN4 CIV Sterilization disinfection and chlorination for tank c 6-Oct-15 8-Oct-15 10.00am CLOSED 6-Oct-15 0 ACCEPTED 1 1
1047 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01029 How Thong 6-Oct-15 ZN4 CIV Road works Dipping level for sub base at PWT area 6-Oct-15 8-Oct-15 10.00am CLOSED 16-Dec-15 71 ACCEPTED 1 1
1048 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01030 How Thong 6-Oct-15 ZN4 CIV Tankage Disinfection and Chlorination for Tank F 6-Oct-15 8-Oct-15 10.00am CLOSED 6-Oct-15 0 ACCEPTED 1 1
1049 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01031 How Thong 6-Oct-15 ZN4 CIV fencing Installation of fencing at PWT area 6-Oct-15 8-Oct-15 10.00am CLOSED CANCEL 1 1
1050 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01032 Instant Option 6-Oct-15 ZN4 CIV Turfing Preparation finishing level for turfing at STP 1 7-Oct-15 9-Oct-15 3.00pm CLOSED 30-Dec-15 84 REJECTED 1 1
1053 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01035 How Thong 7-Oct-15 ZN4 CIV Road works Installation of UD 600x450 at PWT 7-Oct-15 9-Oct-15 10.00am CLOSED 19-Jan-16 104 ACCEPTED 1 1
1055 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01037 8-Oct-15 ZN4 CIV Road works FDT test for subbase at PWT 8-Oct-15 10-Oct-15 10.00am CLOSED 08-Oct-15 0 ACCEPTED 1 1
UEMB NIK Zunaidi
1056 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01038 9-Oct-15 ZN4 CIV Road works laying crushed aggregate road base 10-Oct-15 12-Oct-15 CLOSED 16-Nov-15 37 REJECTED 1 1
How Thong 8.00am
1057 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01039 How Thong 9-Oct-15 ZN4 CIV SURVEY joint survey for test water truck filling station 10-Oct-15 12-Oct-15 10.00AM CLOSED 10-Oct-15 0 ACCEPTED 1 1
1058 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01040 Instant Option 9-Oct-15 ZN4 CIV Perimeter Drain Install Half Round Drain at Blower/ Control room, 10-Oct-15 12-Oct-15 9.30am CLOSED 23-Jan-16 105 ACCEPTED 1 1
Plastering
1059 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01041 Instant Option 9-Oct-15 ZN4 CIV Road works Preparation for Roadbase layer at STP1 10-Oct-15 12-Oct-15 9.00am CLOSED 27-Apr-16 200 ACCEPTED 1 1
1062 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01044 How Thong 12-Oct-15 ZN4 CIV Fencing Installation of fencing at PWT area 12-Oct-15 14-Oct-15 10.00am CLOSED 16-Dec-15 65 ACCEPTED 1 1
Preparation for Subgrade layer at STP 1 ( Road 3
1063 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01045 Instant Option 12-Oct-15 ZN4 CIV Road Works & 4) 13-Oct-15 15-Oct-15 10.30am CLOSED 25-Mar-16 164 ACCEPTED 1 1
1065 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01047 Instant Option 12-Oct-15 ZN4 CIV Road Works Preparation for roadbase layer at STP 1 (Road 4) 14-Oct-15 16-Oct-15 10.30am CLOSED 25-Mar-16 163 REJECTED 1 1
1067 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01049 Instant Option 12-Oct-15 ZN4 CIV Turfing Preparation Top Soil and Turfing at STP1 13-Oct-15 15-Oct-15 9.30am CLOSED 28-Jan-16 107 ACCEPTED 1 1
1069 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01051 How Thong 12-Oct-15 ZN4 CIV Road works Laying crusher run for road base at PWT 13-Oct-15 15-Oct-15 8.00am CLOSED 16-Nov-15 34 REJECTED 1 1
1070 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01052 How Thong 12-Oct-15 ZN4 CIV Testing Field Density Test for subgrade at PWT (FDT) 13-Oct-15 15-Oct-15 11.00am CLOSED 13-Oct-15 0 ACCEPTED 1 1
1071 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01053 How Thong 12-Oct-15 ZN4 CIV Road works Dipping for sub grade at PWT 13-Oct-15 15-Oct-15 11.00am CLOSED 19-Jan-16 98 ACCEPTED 1 1
1073 RAPID-P20A1-UEMB-ZN4-STR-RFIN-01055 Ocned water 13-Oct-15 ZN4 STR Fencing Installation fencing at STP 1 Zone 4 14-Oct-15 16-Oct-15 8.00am CLOSED 19-May-16 218 ACCEPTED 1 1
1074 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01056 Ocned water 13-Oct-15 ZN4 CIV Laying Gravel Laying Gravel at Sand drying bed 14-Oct-15 16-Oct-15 8.00am CLOSED 19-May-16 218 ACCEPTED 1 1
1078 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01060 Instant Option 14-Oct-15 ZN4 CIV Grass plantation Grass plantation at STP1 area 15-Oct-15 17-Oct-15 10.00am CLOSED 30-Dec-15 76 REJECTED 1 1
How Thong 17-Oct-15 ZN4 CIV Road works Laying sand and crusher aggregate sub base at 19-Oct-15 21-Oct-15 10.00am
1082 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01064
Potable water tank area CLOSED CANCEL 1 1
1083 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01065 Ocned water 19-Oct-15 ZN4 TNK water thightness test Water Thigtnes test at Clarifier Tank 1 20-Oct-15 22-Oct-15 8.00am CLOSED 25-Oct-15 5 REJECTED 1 1
1084 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01066 Ocned water 19-Oct-15 ZN4 TNK water thightness test Water Thigtnes test at Clarifier Tank 2 20-Oct-15 22-Oct-15 8.00am CLOSED 25-Oct-15 5 REJECTED 1 1
1085 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01067 Ocned water 19-Oct-15 ZN4 TNK water thightness test Water Thigtnes test at rass was tank 20-Oct-15 22-Oct-15 8.00am CLOSED 21-Oct-15 1 REJECTED 1 1
1086 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01068 Ocned water 19-Oct-15 ZN4 TNK water thightness test Water Thigtnes test at Sludge Holding Tank 20-Oct-15 22-Oct-15 8.00am CLOSED 29-Oct-15 9 REJECTED 1 1
1087 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01069 Ocned water 19-Oct-15 ZN4 TNK water thightness test Water Thigtnes test atTreated Water Tank 20-Oct-15 22-Oct-15 8.00am CLOSED 29-Oct-15 9 ACCEPTED 1 1
1088 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01070 Ocned water 19-Oct-15 ZN4 TNK water thightness test Water Thightnes test at Disinfection Chamber 20-Oct-15 22-Oct-15 8.00am CLOSED 21-Oct-15 1 ACCEPTED 1 1
1089 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01071 Ocned water 19-Oct-15 ZN4 TNK water thightness test Water Thigtnes test at Thickener Tank 20-Oct-15 22-Oct-15 8.00am CLOSED 29-Oct-15 9 REJECTED 1 1
1092 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-01074 Ocned water 19-Oct-15 ZN4 ARC Plastering Plastering works on Staircase at Grit Chamber 20-Oct-15 22-Oct-15 8.00am CLOSED 19-May-16 212 ACCEPTED 1 1
1093 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-01075 Ocned water 19-Oct-15 ZN4 ARC Plastering Plastering works on Staircase at Aeration Tank 2 20-Oct-15 22-Oct-15 8.00am CLOSED 21-Apr-16 184 ACCEPTED 1 1
1094 RAPID-P20A1-UEMB-ZN4-ARC-RFIN-01076 Ocned water 19-Oct-15 ZN4 ARC Plastering Plastering works on Staircase at Aeration Tank 1 20-Oct-15 22-Oct-15 8.00am CLOSED 19-May-16 212 ACCEPTED 1 1
Ocned water 19-Oct-15 ZN4 CIV Gravel Sand Fill Gravel and sand at Oil/Grease sand Drying 20-Oct-15 22-Oct-15 8.00am 19-May-16
1095 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01077
Bed CLOSED 212 ACCEPTED 1 1
1098 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01080 How Thong 20-Oct-15 ZN4 PIP Testing Pressure test for Booster piping 21-Oct-15 23-Oct-15 9.00am CLOSED CANCEL 1 1
1101 RAPID-P20A1-UEMB-ZN4-TKG-RFIN-01083 How Thong 20-Oct-15 ZN4 TNK Flushing Flushing for Pressure filter Tank 21-Oct-15 23-Oct-15 10.00am CLOSED 13-Nov-15 23 ACCEPTED 1 1
1102 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01084 How Thong 20-Oct-15 ZN4 CIV Testing FDT for Roadbase for PWT area 21-Oct-15 23-Oct-15 10.00am CLOSED 23-Oct-15 2 ACCEPTED 1 1
1103 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01085 How Thong 20-Oct-15 ZN4 CIV Testing FDT for subbase for PWT area 21-Oct-15 23-Oct-15 10.00am CLOSED CANCEL 1 1
1104 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01086 How Thong 20-Oct-15 ZN4 CIV Road works Dipping roadbase for PWT area 21-Oct-15 23-Oct-15 9.00am CLOSED 11-Nov-15 21 ACCEPTED 1 1
1105 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01087 How Thong 20-Oct-15 ZN4 CIV Road works Dipping subbase for PWT area 21-Oct-15 23-Oct-15 9.30am CLOSED 30-Jan-16 101 REJECTED 1 1
1106 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01088 Ocned water 21-Oct-15 ZN4 ELE Cable Jointing Cable jointing (Jointing no.10 -no.17) 22-Oct-15 24-Oct-15 9.00am CLOSED 29-Oct-15 7 ACCEPTED 1 1
1107 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01089 Ocned water 21-Oct-15 ZN4 ELE Cable Jointing Cable jointing (Jointing no.20 -no.22) 22-Oct-15 24-Oct-15 9.00am CLOSED 29-Oct-15 7 ACCEPTED 1 1
1108 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01090 Ocned water 21-Oct-15 ZN4 ELE Cable Jointing Cable jointing (Jointing no. 18 -no.19) 22-Oct-15 24-Oct-15 9.00am CLOSED 29-Oct-15 7 ACCEPTED 1 1
1109 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01091 Ocned water 21-Oct-15 ZN4 ELE GI pipe installation Galvanised Iron (GI) pipe installation for road 22-Oct-15 24-Oct-15 9.00am CLOSED 23-Oct-15 1 ACCEPTED 1 1
crossing at STP1
1110 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01092 Ocned water 21-Oct-15 ZN4 ELE Cable Jointing Compound Light Installation STP 1 22-Oct-15 24-Oct-15 9.00am CLOSED 29-Oct-15 7 ACCEPTED 1 1
1111 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01093 Ocned water 21-Oct-15 ZN4 ELE Cable Jointing Cable jointing (Jointing no.6 -no.9) 22-Oct-15 24-Oct-15 9.00am CLOSED CANCEL 1 1
1112 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01094 UEMB Taufiq 21-Oct-15 ZN4 CIV Testing FDT test for roadbase road at STP 1 21-Oct-15 23-Oct-15 2.00pm CLOSED 21-Jan-16 92 REJECTED 1 1
1113 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01095 AEIE 22-Oct-15 ZN4 ELE TNC Feeder pillar cable 1R test from LP18,SSSTP/1 to FP- 23-Oct-15 25-Oct-15 2.00pm CLOSED 30-Nov-15 38 ACCEPTED 1 1
C10
1115 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01097 Instant Option 22-Oct-15 ZN4 CIV Road works Prepare subgrade for road at Fire water Tank 24-Oct-15 26-Oct-15 8.30am CLOSED 15-Feb-16 114 ACCEPTED 1 1
1116 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01098 How Thong 22-Oct-15 ZN4 MNE Receiving Materials Receiving material for Caustic Soda Liquid (30 jar) 23-Oct-15 25-Oct-15 9.00am CLOSED 03-Nov-15 11 ACCEPTED 1 1
1117 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01099 How Thong 22-Oct-15 ZN4 MNE Receiving Materials Receiving material for Soduim Hypochlorite (70 jar) 23-Oct-15 25-Oct-15 9.00am CLOSED 03-Nov-15 11 ACCEPTED 1 1
1118 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01100 How Thong 23-Oct-15 ZN4 TNK Clorination Sterilization and chlorination for Tank B 23-Oct-15 25-Oct-15 10.00am CLOSED 24-Oct-15 1 ACCEPTED 1 1
1119 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01101 How Thong 23-Oct-15 ZN4 TNK Chlorination Sterilization and chlorination for Tank A 23-Oct-15 25-Oct-15 10.00am CLOSED 24-Oct-15 1 ACCEPTED 1 1
1120 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01102 Instant Option 23-Oct-15 ZN4 CIV Road works FDT for subgrade at Fire water tank 24-Oct-15 26-Oct-15 11.30am CLOSED 2-Jan-16 70 ACCEPTED 1 1
1121 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01103 Instant Option 23-Oct-15 ZN4 CIV Road works CBR test for sub grade at Fire water tank 24-Oct-15 26-Oct-15 12.00pm CLOSED 23-Jan-16 91 REJECTED CANCEL 1 1
1122 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01104 Instant Option 23-Oct-15 ZN4 CIV Road works Dipping test for subgrade at Fire water Tank 24-Oct-15 26-Oct-15 11.00am CLOSED 14-Jan-16 82 ACCEPTED 1 1
1123 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01105 Instant Option 23-Oct-15 ZN4 CIV Road works Preparation subbase for road at fire water tank 23-Oct-15 25-Oct-15 8.30am CLOSED 25-Mar-16 154 ACCEPTED 1 1
1124 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01106 Instant Option 26-Oct-15 ZN4 CIV Half round perimeter install half round drain at guard house at STP 1 27-Oct-15 29-Oct-15 9.00am CLOSED 14-Jan-16 79 ACCEPTED 1 1
drain
1125 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01107 Instant Option 26-Oct-15 ZN4 CIV Road works Field Density test for subbase at PWT area 26-Oct-15 28-Oct-15 10.00am CLOSED 21-Jan-16 87 ACCEPTED 1 1
1126 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01108 Instant Option 29-Oct-15 ZN4 CIV Road works FDT for roadbase at STP1 area 29-Oct-15 31-Oct-15 2.00Pm CLOSED 21-Jan-16 84 ACCEPTED 1 1
1127 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01109 How Thong 27-Oct-15 ZN4 CIV Road works Laying Crusher aggregate for roadbase at PWT 27-Oct-15 29-Oct-15 11.00am CLOSED 16-Dec-15 50 ACCEPTED 1 1
Ocned water 27-Oct-15 ZN4 TNK Water Thigtnes test at Disinfection Chamber 28-Oct-15 30-Oct-15 8.00am 28-Oct-15
1129 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01111 water thightness test
tank CLOSED 0 REJECTED 1 1
1130 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01112 Ocned water 27-Oct-15 ZN4 TNK water thightness test Water Thigtnes test at Treated water tank 28-Oct-15 30-Oct-15 8.00am CLOSED CANCEL 1 1
1131 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01113 Ocned water 27-Oct-15 ZN4 TNK water thightness test Water Thigtnes test at Clarifier tank 2 28-Oct-15 30-Oct-15 8.00am CLOSED 30-Oct-15 2 REJECTED 1 1
1132 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01114 Ocned water 27-Oct-15 ZN4 TNK water thightness test Water Thigtnes test at Clarifier tank 1 28-Oct-15 30-Oct-15 8.00am CLOSED 30-Oct-15 2 REJECTED 1 1
1133 How Thong 28-Oct-15 ZN4 CIV Road works Laying the primix at PWT area 29-Oct-15 31-Oct-15 10.00am CLOSED 16-Dec-15 48 REJECTED 1 1
1134 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01116 How Thong 28-Oct-15 ZN4 CIV Road works Spray prime coat for road at PWT 28-Oct-15 30-Oct-15 11.00am CLOSED 30-Jan-16 94 ACCEPTED 1 1
1135 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01117 ocned Water 28-Oct-15 ZN4 PIP Leak test Leak test for cold water system at Guard House 29-Oct-15 31-Oct-15 8.00am CLOSED 9-May-16 193 ACCEPTED 1 1
1137 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01119 UEMB ZIKRI 29-Oct-15 ZN4 ELE Cable Jointing Cable jointing (jointing no 23 - no 28) 29-Oct-15 31-Oct-15 4.00am CLOSED 29-Oct-15 0 ACCEPTED No silap 1 1
1138 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01120 Instant Option 21-Sep-15 ZN4 CIV Testing FDT Test for roadbase at STP 1 22-Sep-15 24-Sep-15 9.00am CLOSED 8-Apr-16 199 REJECTED 1 1
1139 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01121 Instant Option 29-Oct-15 ZN4 CIV Testing Dipping test for road base at STP 1 zone 4 29-Oct-15 31-Oct-15 9.00am CLOSED 14-Jan-16 77 ACCEPTED No silap 1 1
1140 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01122 Instant Option 30-Oct-15 ZN4 CIV Road works Lay premix at STP1 30-Oct-15 1-Nov-15 3.00pm CLOSED 14-Jan-16 76 ACCEPTED 1 1
1141 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01123 AEIE 31-Oct-15 ZN4 ELE Commisioning Commisioning of FP C10 STP1 2-Nov-15 4-Nov-15 10.30am CLOSED 8-Dec-15 36 ACCEPTED 1 1
1145 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01127 AEIE 28-Oct-15 ZN4 ELE Earthing test Earthing test for feeder pillar C11 STP1 29-Oct-15 31-Oct-15 10.00am CLOSED CANCEL 1 1
1147 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01129 How Thong 30-Oct-15 ZN4 CIV Road works Dipping for Roadbase 31-Oct-15 2-Nov-15 3.30pm CLOSED 19-Jan-16 80 ACCEPTED 1 1
1148 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01130 How Thong 30-Oct-15 ZN4 CIV Road works FDT for roadbase at PWT 31-Oct-15 2-Nov-15 4.00pm CLOSED 1-Nov-15 1 ACCEPTED 1 1
AEIE 1-Nov-15 ZN4 ELE Earthing installation Earthing installation for FP-c11 feeder pillar at 2-Nov-15 4-Nov-15 9.00am
1149 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01131
potable water tank area. CLOSED 8-Dec-15 36 ACCEPTED 1 1
1152 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01134 AEIE 1-Nov-15 ZN4 ELE Earthing installation Earthing Installation for feeder pillar FP-C10 2-Nov-15 4-Nov-15 9.00am CLOSED 08-Dec-15 36 ACCEPTED 1 1
1153 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01135 How Thong 1-Nov-15 ZN4 CIV Road works Lay Premix at PWT 2-Nov-15 4-Nov-15 10.00am CLOSED 16-Dec-15 44 ACCEPTED 1 1
1154 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01136 Instant Option 2-Nov-15 ZN4 CIV Road works Lay Tack Coat at STP 1 area 2-Nov-15 4-Nov-15 9.00am CLOSED 14-Jan-16 73 ACCEPTED 1 1
1155 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01137 Instant Option 2-Nov-15 ZN4 CIV Road works Lay Premix final layer at STP1 2-Nov-15 4-Nov-15 10.00am CLOSED 14-Jan-16 73 ACCEPTED 1 1
1156 RAPID-P20A1-UEMB-ZN4-STR-RFIN-01138 Ocned water 4-Nov-15 ZN4 CIV STP1 A frame lifting beam installation on RAS/WAS 5-Nov-15 7-Nov-15 8.00am CLOSED 9-May-16 186 ACCEPTED 1 1
1158 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01140 How Thong 10-Oct-15 ZN4 MNE TNC Commissioning Actuator (Valve) from ROTORK 10-Nov-15 12-Nov-15 9.00am CLOSED CANCEL 1 1
1159 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01141 How Thong 7-Jun-15 ZN4 PIP piping works Butt fusion welding HDPE 315mm dia pipe 8-Jun-15 10-Jun-15 9.00am CLOSED 31-Dec-16 572 ACCEPTED 1 1
1160 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01142 How Thong 30-Jun-15 ZN4 PIP piping works Butt fusion welding HDPE 315mm dia pipe 1-Jul-15 3-Jul-15 9.00am CLOSED 31-Dec-15 183 ACCEPTED 1 1
1162 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01144 Instant Option 11-Nov-15 ZN4 CIV Plinth Inspection for rebar/formwork concrete plinth at 13-Nov-15 15-Nov-15 8.30am CLOSED 14-Jan-16 62 ACCEPTED 1 1
Admin Building STP 1
1163 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01145 Instant Option 14-Nov-15 ZN4 CIV Road Works Dipping test for suB base AT Fire water tank 14-Nov-15 16-Nov-15 11.00am CLOSED 14-Jan-16 61 ACCEPTED 1 1
1164 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01146 UEMB NURUL 14-Nov-15 ZN4 CIV Testing Water sampling test at PWT 14-Nov-15 16-Nov-15 12.00pm CLOSED CANCEL 1 1
1165 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01147 UEMB ZIKRI 16-Nov-15 ZN4 CIV Testing Water tightness test at clarifier 1 (retesr) 16-Nov-15 18-Nov-15 11.00am CLOSED 16-Nov-15 0 ACCEPTED 1 1
1166 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01148 UEMB ZIKRI 16-Nov-15 ZN4 CIV Testing Water tightness test at clarifier 2(retesr) 16-Nov-15 18-Nov-15 11.00am CLOSED 16-Nov-15 0 ACCEPTED 1 1
1167 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01149 UEMB ZIKRI 16-Nov-15 ZN4 CIV Testing Water tightness test at RAS/WAS sump (retesr) 16-Nov-15 18-Nov-15 11.00am CLOSED 16-Nov-15 0 ACCEPTED 1 1
1168 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01150 How Thong 13-Nov-15 ZN4 ELE Testing Funtional test on main switcboard and 6 nos pump at 14-Nov-15 16-Nov-15 11.00am CLOSED 25-Nov-15 11 ACCEPTED 1 1
distribution pump
1169 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01151 How Thong 13-Nov-15 ZN4 ELE Testing Funtional test on main switcboard and 2 nos booster 14-Nov-15 16-Nov-15 11.00am CLOSED 25-Nov-15 11 ACCEPTED 1 1
pump and 2 nos backwash pump
1170 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01152 How Thong 13-Nov-15 ZN4 ELE Testing Funtional test on filter console and actuator at filler 14-Nov-15 16-Nov-15 11.00am CLOSED 25-Nov-15 11 ACCEPTED 1 1
yard
1171 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01153 UEMB TAUFIQ 21-Nov-15 ZN4 CIV Road works prepare road base for fire water tank 21-Nov-15 23-Nov-15 11.00am CLOSED 15-Feb-16 86 ACCEPTED 1 1
1172 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01154 Instant Option 21-Nov-15 ZN4 CIV Road works Dipping test for road base at Fire water Tank 21-Nov-15 23-Nov-15 4.00pm CLOSED 14-Jan-16 54 ACCEPTED 1 1
1173 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01155 Instant Option 21-Nov-15 ZN4 CIV Road works Lay premix for road at fire water tank 21-Nov-15 23-Nov-15 12.00pm CLOSED 27-Apr-16 158 ACCEPTED 1 1
1174 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01156 How Thong 21-Nov-15 ZN4 MNE Testing water tightness test for tank D 24-Nov-15 26-Nov-15 8.00am CLOSED 26-Nov-15 2 ACCEPTED 1 1
1175 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01157 OCNED 26-Nov-15 ZN4 MNE Precommisioning pre-commissioning and functional test for phase 2 27-Nov-15 29-Nov-15 9.00am CLOSED 15-Jan-16 49 ACCEPTED 1 1
1176 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01158 OCNED 26-Nov-15 ZN4 MNE Commisioning Testting and Commisioning at STP1 27-Nov-15 29-Nov-15 9.00am CLOSED 27-Nov-15 0 ACCEPTED 1 1
1177 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01159 How Thong 27-Nov-15 ZN4 ELE Earthing test Inspection on earthing equipment & Switchboard at 28-Nov-15 30-Nov-15 9.00am CLOSED 30-Nov-15 2 ACCEPTED 1 1
at Portable water supply
1178 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01160 How Thong 3-Dec-15 ZN4 CIV Testing Water tightness for tank C 3-Dec-15 5-Dec-15 10.00am CLOSED 7-Dec-15 4 ACCEPTED 1 1
1179 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01161 How Thong 3-Dec-15 ZN4 CIV Testing Water tightness for tank E 3-Dec-15 5-Dec-15 10.00am CLOSED 5-Dec-15 2 ACCEPTED 1 1
1181 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01163 How Thong 3-Dec-15 ZN4 ELE Pump alignment To do alignment for 6nos of Distribution pump 3-Dec-15 5-Dec-15 10.00am CLOSED 1-Feb-16 60 ACCEPTED 1 1
1182 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01164 How Thong 9-Dec-15 ZN4 TNK Test water Tightness for Tank F 9-Dec-15 11-Dec-15 8.00am CLOSED 12-Dec-15 3 ACCEPTED 1 1
1186 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01168 Instant Option 23-Dec-15 ZN4 CIV Road works Coring test for ACBC at fire water tank area 24-Sep-15 26-Sep-15 9.00am CLOSED 29-Dec-15 0 REJECTED 1 1
Installation for
1- 8W KELUAR sign c/w fluo.lamp
1188 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01170 AEIE 29-Dec-15 ZN4 ELE installation 2-8W EMERGENCY light c/w fluo. Lamp 29-Dec-15 31-Dec-15 2.00pm CLOSED 26-Jan-16 28 ACCEPTED 1 1
3-13A switch socket
at Firewater pump house
1189 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01171 AEIE 29-Dec-15 ZN4 ELE installation main DB Installation main DB FH at Fire water (pump) 29-Dec-15 31-Dec-15 2.00pm CLOSED 26-Jan-16 28 ACCEPTED 1 1
1191 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01173 AEIE 29-Dec-15 ZN4 ELE installation sub-DB Installation sub-DB FH at Fire water (pump) 29-Dec-15 31-Dec-15 5.00pm CLOSED 26-Jan-16 28 ACCEPTED 1 1
1193 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01175 AEIE 29-Dec-15 ZN4 ELE Earthing installation Earthing DB installation for Fire Water room 29-Dec-15 31-Dec-15 4.30pm CLOSED 26-Jan-16 28 ACCEPTED 1 1
1194 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01176 AEIE 29-Dec-15 ZN4 ELE Earthing test (ERT) Earthing test (ERT) for DB Fire water (pump) 29-Dec-15 31-Dec-15 4.30pm CLOSED 21-Jan-16 23 ACCEPTED 1 1
1196 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01178 Instant Option 4-Jan-16 ZN4 CIV roadwork Rectification road works at STP1 4-Jan-16 6-Jan-16 1.00pm CLOSED 8-Apr-16 95 REJECTED 1 1
1197 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01179 Instant Option 19-Nov-15 ZN4 CIV Testing FDT testing for road base at Fire water tank 20-Nov-15 22-Nov-15 3.00pm CLOSED 28-Jan-16 69 ACCEPTED 1 1
1198 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01180 Instant Option 19-Nov-15 ZN4 CIV Testing Coring test for ACBC at fire water tank area 19-Nov-15 21-Nov-15 5.00pm CLOSED 27-Apr-16 160 ACCEPTED 1 1
1199 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01181 UEMB NIK Zunaidi 19-Jan-16 ZN4 TNK Testing Water tightness for Tank B at PWT Zone 4 20-Jan-16 22-Jan-16 9.00am CLOSED 23-Jan-16 3 ACCEPTED 1 1
1200 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01182 ocned water 4-Feb-16 ZN4 MNE Testing Request inspection for noise test 5-Feb-16 7-Feb-16 8.00am CLOSED CANCEL 1 1
1201 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01183 paneagle 4-Feb-16 ZN4 CIV Fencing Inspection for fence post insrallation work prior to 5-Feb-16 7-Feb-16 11.30am CLOSED 27-Feb-16 22 ACCEPTED 1 1
concrete the footing -near to PMC office
1203 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01185 UEMB NIK Zunaidi 19-Mar-15 ZN4 CIV piling works Piling works at Clarifier tank 1 STP 1 20-Mar-15 22-Mar-15 9.00am CLOSED 18-Feb-16 335 ACCEPTED 1 1
1204 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01186 UEMB NIK Zunaidi 13-Mar-15 ZN4 CIV piling works Piling works at Aeration tank 1 STP 1 14-Mar-15 16-Mar-15 9.00am CLOSED 25-Mar-15 11 ACCEPTED 1 1
1205 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01187 UEMB NIK Zunaidi 11-Mar-15 ZN4 CIV piling works Piling works at Aeration tank 1 STP 1 12-Mar-15 14-Mar-15 9.00am CLOSED 20-Mar-15 8 ACCEPTED 1 1
1206 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01188 UEMB NIK Zunaidi 12-Mar-15 ZN4 CIV piling works Piling works at Aeration tank 1 STP 1 13-Mar-15 15-Mar-15 9.00am CLOSED 20-Mar-15 7 ACCEPTED 1 1
1207 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01189 UEMB NIK Zunaidi 13-Mar-15 ZN4 TNK testing Water tightness tank for Tank A 17-Feb-16 19-Feb-16 9.00am CLOSED 21-Feb-16 4 ACCEPTED 1 1
1208 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01190 How Thong 26-Oct-15 ZN4 CIV roadwork Dipping for subbase at PWT area 26-Oct-15 28-Oct-15 10.00a CLOSED 30-Jan-16 96 ACCEPTED 1 1
1210 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01192 Instant Option 11-Sep-15 ZN4 CIV roadwork Laying of subbase of roadworks at STP 1 (road 1) 12-Sep-15 14-Sep-15 3.00am CLOSED 25-Mar-16 195 ACCEPTED 1 1
1211 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01193 Instant Option 14-Sep-15 ZN4 CIV roadwork Laying of subgrade of roadworks at STP 1 (road 2) 15-Sep-15 17-Sep-15 2.00pm CLOSED 25-Mar-16 192 ACCEPTED 1 1
1212 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01194 Instant Option 21-Sep-15 ZN4 CIV roadwork Laying of subbase of roadworks at STP 1 (road 2) 22-Sep-15 24-Sep-15 10.00am CLOSED 22-Sep-15 0 ACCEPTED 1 1
1213 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01195 Instant Option 23-Sep-15 ZN4 CIV testing FDT test for subbase layer at STP 1(road 2) 24-Sep-15 26-Sep-15 9.30am CLOSED 25-Mar-16 183 ACCEPTED 1 1
1214 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01196 Instant Option 12-Oct-15 ZN4 CIV testing FDT test for subgrade layer at STP 1(road 3 and 4) 13-Oct-15 15-Oct-15 2.00Pm CLOSED 25-Mar-16 164 ACCEPTED 1 1
1215 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01197 Instant Option 16-Oct-15 ZN4 CIV roadwork Laying of roadbase of roadworks at STP 1 (road 1) 17-Oct-15 19-Oct-15 10.00am CLOSED 25-Mar-16 160 ACCEPTED 1 1
1216 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01198 Instant Option 26-Oct-15 ZN4 CIV roadwork Laying of roadbase of roadworks at STP 1 (road 2) 27-Oct-15 29-Oct-15 9.30am CLOSED 25-Mar-16 150 ACCEPTED 1 1
1217 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01199 Instant Option 4-Nov-15 ZN4 CIV testing Coring test for road works at STP 1 5-Nov-15 7-Nov-15 10.00am CLOSED 25-Mar-16 141 ACCEPTED 1 1
1218 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01200 Instant Option 15-Nov-15 ZN4 CIV testing FDT test for subbase layer at Fire water tank 16-Nov-15 18-Nov-15 3.00pm CLOSED 25-Mar-16 130 ACCEPTED 1 1
1219 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01201 Instant Option 16-Nov-15 ZN4 CIV roadwork Laying of geogrid of roadworks at Fire water tank 17-Nov-15 19-Nov-15 10.00am CLOSED 25-Mar-16 129 ACCEPTED 1 1
1221 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01203 Instant Option 18-Nov-15 ZN4 CIV roadwork Laying of roadbase of roadworks at Fire water tank 19-Nov-15 21-Nov-15 9.00am CLOSED 25-Mar-16 127 ACCEPTED 1 1
1222 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01204 Instant Option 20-Nov-15 ZN4 CIV testing FDT test for roadbase layer at STP 1 (road 3 and 4) 21-Nov-15 23-Nov-15 9.00am CLOSED 25-Mar-16 125 ACCEPTED 1 1
1223 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01205 Instant Option 20-Nov-15 ZN4 CIV roadwork Tack coat for road works at Fire water tank 20-Nov-15 22-Nov-15 9.00am CLOSED 25-Mar-16 126 ACCEPTED 1 1
1224 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01206 Instant Option 26-Feb-16 ZN4 CIV roadwork Laying premix 30mm at STP1 27-Feb-16 29-Feb-16 9.00am CLOSED 25-Mar-16 27 ACCEPTED 1 1
1225 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01207 Instant Option 26-Feb-16 ZN4 CIV roadwork Prime coat at STP 1 26-Feb-16 28-Feb-16 2.00Pm CLOSED CANCEL 1 1
1228 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01210 Instant Option 13-Sep-15 ZN4 CIV roadwork Laying of geogrid for roadworks at STP 1 (road 1) 14-Sep-15 16-Sep-15 5.00pm CLOSED 25-Mar-16 193 ACCEPTED 1 1
1229 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01211 Instant Option 17-Sep-15 ZN4 CIV roadwork Joint dipping of subgrade for roadworks at STP1 13-Sep-15 15-Sep-15 9.00am CLOSED 25-Mar-16 194 ACCEPTED 1 1
(road 2)
1230 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01212 Instant Option 22-Sep-15 ZN4 CIV roadwork Joint dipping of subbase for roadworks at STP1 (road 23-Sep-15 16-Sep-15 9.00am CLOSED 25-Mar-16 184 ACCEPTED 1 1
2)
1231 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01213 Instant Option 25-Sep-15 ZN4 CIV roadwork Laying of geogrid for roadworks at STP 1 (road 2) 26-Sep-15 28-Sep-15 9.00am CLOSED 25-Mar-16 181 ACCEPTED 1 1
1233 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01215 Instant Option 16-Oct-15 ZN4 CIV roadwork Laying of geogrid for roadworks at STP 1 (road 3&4) 17-Oct-15 19-Oct-15 9.00am CLOSED 25-Mar-16 160 ACCEPTED 1 1
1235 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01217 how Thong 14-Mar-16 ZN4 MNE tnc testing and commissioning at Potable Water Supply 15-Mar-16 17-Mar-16 9.00am CLOSED 2-Aug-16 140 ACCEPTED 1 1
1237 RAPID-P20A1-UEMB-ZN4-STR-RFIN-01219 How Thong 29-Apr-15 ZN4 STR piling works Piling work at Minor building PWT 30-Apr-15 2-May-15 10.00am CLOSED 22-Jun-16 419 ACCEPTED 1 1
Perform testing and commissioning on chemical
dosing system:
1-Lime Silo
1238 RAPID-P20A1-UEMB-ZN4-ELE-RFIN-01220 How Thong 9-Mar-16 ZN4 ELE Testing
2-Sodium Hypochlorite
9-Mar-16 11-Mar-16 10.00am CLOSED CANCEL 1 1
3-Sodium Hydroxide
at Potable water tank
1243 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01225 How Thong 22-Aug-15 ZN4 MNE Equipment RAS/WAS pump installation at RAS/WAS sump 24-Aug-15 26-Aug-15 3.00pm CLOSED 25-May-16 275 ACCEPTED 1 1
1244 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01226 How Thong 22-Aug-15 ZN4 PIP Welding works D.I pipe (150mm) installation at RAS/WAS sump at 24-Aug-15 26-Aug-15 3.00pm CLOSED 25-May-16 275 ACCEPTED 1 1
Sludge thckener
1245 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01227 How Thong 22-Aug-15 ZN4 MNE Equipment Sludge transfer pump installation at Sludge Holding 24-Aug-15 26-Aug-15 3.00pm CLOSED 25-May-16 275 ACCEPTED 1 1
tank
1249 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01231 How Thong 1-Sep-15 ZN4 TNK Equipment Polymer tankinstallation at Polymer shed 2-Sep-15 4-Sep-15 10.00am CLOSED 25-May-16 266 ACCEPTED 1 1
1250 RAPID-P20A1-UEMB-ZN4-TNK-RFIN-01232 How Thong 1-Sep-15 ZN4 TNK Material Polytank installation at Chlorine shed 2-Sep-15 4-Sep-15 10.00am CLOSED 25-May-16 266 ACCEPTED 1 1
1252 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01234 How Thong 6-Sep-15 ZN4 MNE Equipment Scum pump installation at Scum pump 8-Sep-15 10-Sep-15 3.00pm CLOSED 25-May-16 260 ACCEPTED 1 1
1253 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01235 How Thong 18-Sep-15 ZN4 MNE Equipment Agitator c/w suport installation at Polymer shed 19-Sep-15 21-Sep-15 3.00pm CLOSED 25-May-16 249 ACCEPTED 1 1
1254 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01236 How Thong 18-Sep-15 ZN4 MNE Equipment Metering pump installation at Polyer shed 19-Sep-15 21-Sep-15 3.00pm CLOSED 25-May-16 249 ACCEPTED 1 1
1256 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01238 How Thong 18-Sep-15 ZN4 MNE Equipment Metering pump installation at Chlorine shed 19-Sep-15 21-Sep-15 3.00pm CLOSED 25-May-16 249 ACCEPTED 1 1
1257 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01239 How Thong 21-Sep-15 ZN4 MNE Equipment Flow meter installation at Parshall flume 22-Sep-15 24-Sep-15 3.00pm CLOSED 25-May-16 246 ACCEPTED 1 1
1258 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01240 How Thong 21-Sep-15 ZN4 MNE Equipment Flow sensor installation at Parshall flume 22-Sep-15 24-Sep-15 3.00pm CLOSED 25-May-16 246 ACCEPTED 1 1
1259 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01241 How Thong 5-Oct-15 ZN4 MNE Material Geotube laying at Sand drying bed 6-Oct-15 8-Oct-15 3.00pm CLOSED 25-May-16 232 ACCEPTED 1 1
1260 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01242 OCNED 21-Oct-15 ZN4 CIV welding Handrail installation at Sand drying bed ramp 22-Oct-15 24-Oct-15 3.00pm CLOSED 20-Jul-16 272 ACCEPTED 1 1
1261 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01243 How Thong 20-Oct-15 ZN4 PIP installation Flexible hose installation at Sand drying bed 21-Oct-15 23-Oct-15 3.00pm CLOSED 25-May-16 217 ACCEPTED 1 1
1262 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01244 How Thong 26-Oct-15 ZN4 PIP welding G.I pipe (50mm) installation from metering pump at 27-Oct-15 29-Oct-15 3.00pm CLOSED 25-May-16 211 ACCEPTED 1 1
Chlorine shed to Disinfection chamber
1263 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01245 OCNED 26-Oct-15 ZN4 CIV welding Handrail installation at Disinfection chamber and 27-Oct-15 29-Oct-15 3.00pm CLOSED 20-Jul-16 267 ACCEPTED 1 1
treated water tank
1264 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01246 How Thong 26-Oct-15 ZN4 MNE Equipment Slide gate installaion at Disinfection chamber 27-Oct-15 29-Oct-15 3.00pm CLOSED 25-May-16 211 ACCEPTED 1 1
1268 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01250 How Thong 13-Nov-15 ZN4 MNE Equipment Emergency eyewash installation at Chlorine shed 14-Nov-15 16-Nov-15 3.00pm CLOSED 25-May-16 193 ACCEPTED 1 1
1270 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01252 How Thong 18-Nov-15 ZN4 PIP welding G.I pipe (80mm) installation at Dust Controltruck 19-Nov-15 21-Nov-15 3.00pm CLOSED 25-May-16 188 ACCEPTED 1 1
pump at Treated water tank
1271 RAPID-P20A1-UEMB-ZN4-MNE-RFIN-01253 OCNED WATER 31-Jan-16 ZN4 MNE welding Inspection for material receiving (lab equipment for 31-Jan-16 2-Feb-16 10.00am CLOSED 19-May-16 109 ACCEPTED 1 1
STP 1 & STP 2)
1273 RAPID-P20A1-UEMB-ZN4-PIP-RFIN-01255 How Thong 30-May-16 ZN4 PIP Testing Pressure Test to Close NCR No 039 30-May-16 1-Jun-16 9.00am CLOSED 31-May-16 1 ACCEPTED 1 1
1275 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01257 Instant Option 9-Nov-15 ZN4 CIV Half Round Drain Installation of Half Round Drain at Admin, Building. 9-Nov-15 11-Nov-15 4.00pm CLOSED CANCEL 1 1
1276 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01258 Instant Option 9-Nov-15 ZN4 CIV Half Round Drain Installation of Half Round Drain at Blower Room 10-Nov-15 12-Nov-15 4.00pm CLOSED CANCEL 1 1
1277 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01259 Instant Option 9-Nov-15 ZN4 CIV Half Round Drain Installation of Half Round Drain at Guard House 10-Nov-15 12-Nov-15 4.00pm CLOSED CANCEL 1 1
1278 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01260 Instant Option 11-Nov-15 ZN4 CIV Installation Installation of Gully Trap 13-Nov-15 15-Nov-15 3.00pm CLOSED CANCEL 1 1
1280 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01262 Instant Option 21-Nov-15 ZN4 CIV Concreting Concreting Works for RC Ramp at Admin Building 23-Nov-15 25-Nov-15 10.00am CLOSED CANCEL 1 1
Installation of rebar and fomwork for RC Ramp at
1281 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01263 Instant Option 20-Nov-15 ZN4 CIV Pre-concreting
Blower Room
21-Nov-15 23-Nov-15 3.00pm CLOSED CANCEL 1 1
1282 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01264 Instant Option 21-Nov-15 ZN4 CIV Concreting Concreting Works for RC Ramp at Blower Room 23-Nov-15 25-Nov-15 10.00am CLOSED CANCEL 1 1
1286 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01268 Instant Option 21-Nov-15 ZN4 CIV Concreting Concreting works for RC Apron at Admin building 25-Nov-15 27-Nov-15 10.00am CLOSED CANCEL 1 1
1287 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01269 Instant Option 16-Nov-15 ZN4 CIV Turfing Laying of top soil for turfing 17-Nov-15 19-Nov-15 3.00pm CLOSED CANCEL 1 1
1289 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01271 Instant Option 28-Mar-16 ZN4 CIV installation Installation of Galvanised Grating 29-Mar-16 31-Mar-16 3.00pm CLOSED CANCEL 1 1
1290 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01272 Instant Option 25-Nov-15 ZN4 CIV Turfing Turfing Works 26-Nov-15 28-Nov-15 3.00pm CLOSED CANCEL 1 1
1293 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01275 Instant Option 17-Nov-15 ZN4 CIV Dewatering Dewatering water from Aeration Tank (Pump) 23-Nov-15 25-Nov-15 3.00pm CLOSED CANCEL 1 1
1295 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01277 Instant Option 4-Dec-15 ZN4 CIV Remove Remove existing U-drains 5-Dec-15 7-Dec-15 3.00pm CLOSED CANCEL 1 1
1296 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01278 Instant Option 7-Dec-15 ZN4 CIV Concreting Concrete works for RC bars of Fire Water Pump 26-Nov-15 28-Nov-15 3.00pm CLOSED CANCEL 1 1
1297 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01279 Instant Option 7-Jun-16 ZN4 CIV Concreting Concreting worksfor ground beam at STP 1 8-Jun-16 10-Jun-16 3.00pm CLOSED 21-Jul-16 43 ACCEPTED 1 1
1298 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01280 Instant Option 7-Jun-16 ZN4 CIV Inspection Inspection of rebar and formwork for ground beam 8-Jun-16 10-Jun-16 9.00am CLOSED 21-Jul-16 43 ACCEPTED 1 1
at STP1
1300 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01282 UEMB ASWAD 20-Sep-15 ZN4 CIV Testing FDT (Subgrade) in STP 1 road 21-Sep-15 23-Sep-15 9.30am CLOSED 21-Sep-15 0 ACCEPTED 1 1
1301 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01283 Instant Option 21-Jun-16 ZN4 CIV Concreting concreting works for ground beam at STP 1 (beam 1 22-Jun-16 24-Jun-16 10.00am CLOSED 21-Jul-16 29 ACCEPTED 1 1
and 2)
1303 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00144A How Tong 14-Apr-15 ZN4 STR Structure Driving pile tank B 15-Apr-15 17-Apr-15 3.00pm CLOSED 29-Jun-16 441 ACCEPTED 1 1
1304 RAPID-P20A1-UEMB-ZN4-STR-RFIN-00108A How Tong 4-Apr-15 ZN4 STR piling works Driving pile tank A 6-Apr-15 8-Apr-15 8.00am CLOSED 29-Jun-16 450 ACCEPTED 1 1
1305 RAPID-P20A1-UEMB-ZN4-CIV-RFIN-01285 Instant Option 13-Jul-16 ZN4 CIV Post Concrete post concreting for ground beam at STP 1 (beam 1 & 14-Jul-16 16-Jul-16 8.00am CLOSED 14-Jul-16 0 CANCEL 1 1
2)
1 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00001 En Misbah 6-Oct-14 ZN5 CIV Testing Drilling bore hole for S.I No 3 6-Oct-14 8-Oct-14 8.00 am CLOSED 13-Oct-14 5 ACCEPTED
3 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00003 Infra Tech 19-Mar-15 ZN5 CIV Infra Huedyc DC at TNB ( 60m x 180m) 19-Mar-15 21-Mar-15 10.00am CLOSED 21-Mar-15 2 ACCEPTED
5 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00005 Infra Tech 21-Mar-15 ZN5 CIV Testing Plate bearing test TNB 24-Mar-15 26-Mar-15 09.00am CLOSED 23-Mar-15 -1 ACCEPTED
8 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00008 Pek Chew KL 26-Mar-15 ZN5 CIV Structure Piling work at TNB SSU station 27-Mar-15 29-Mar-15 8.00am CLOSED 30-Mar-15 3 ACCEPTED
10 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00010 Uem Azah 27-Mar-15 ZN5 CIV Structure PDA test at TNB area (2P1 1/D) 30-Mar-15 1-Apr-15 10.00am CLOSED 31-Mar-15 1 ACCEPTED
11 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00011 Zunaidi 29-Mar-15 ZN5 CIV Structure Piling work at TNB SSU station 30-Mar-15 1-Apr-15 08.30am CLOSED 30-Mar-15 0 ACCEPTED
13 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00013 Zunaidi 1-Apr-15 ZN5 CIV Structure Driven Spun Pile 350mm TNB SSU 1-Apr-15 3-Apr-15 08.00AM CLOSED 02-Apr-15 1 ACCEPTED
Material receiving inspection for
14 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00014 Zunaidi 1-Apr-15 ZN5 CIV Structure 1-Apr-15 3-Apr-15 08.00AM CLOSED 06-Apr-15 5 ACCEPTED
spun pile 350mm
15 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00015 Zunaidi 4-Apr-15 ZN5 CIV Structure Driven Spun Pile 350mm TNB SSU 5-Apr-15 7-Apr-15 08.00AM CLOSED 07-Apr-15 2 ACCEPTED
18 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00018 Zunaidi 8-Apr-15 ZN5 CIV Structure Excavation works at TNB area 9-Apr-15 11-Apr-15 10.00am CLOSED 21-Apr-15 12 REJECTED
21 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00021 liwo 10-Apr-15 ZN5 CIV Structure Excavation for Footing 11-Apr-15 13-Apr-15 08.00am CLOSED 16-Apr-15 5 ACCEPTED
23 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00023 Zunaidi 10-Apr-15 ZN5 CIV Survey Joint Survey Gridline Transfomer 11-Apr-15 13-Apr-15 09.00am CLOSED 11-Apr-15 0 ACCEPTED
24 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00024 Zunaidi 10-Apr-15 ZN5 CIV Structure Excavation for pile cap at TNB area 11-Apr-15 13-Apr-15 08.00am CLOSED 20-Apr-15 9 ACCEPTED
35 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00035 Zunaidi 23-Apr-15 ZN5 CIV Structure Backfill for pile cap at the TNB area 24-Apr-15 26-Apr-15 09.00am CLOSED 10-Jun-15 47 ACCEPTED
Zunaidi 24-Apr-15 ZN5 CIV Structure Inspection for concreting works 25-Apr-15 27-Apr-15 08.00am
37 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00037
(Lean con Beam) at TNB area CLOSED 26-Apr-15 1 ACCEPTED
49 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00049 Liwo 30-Apr-15 ZN5 CIV Structure Inspection for BRC 2-May-15 4-May-15 10.00am CLOSED 15-May-15 13 ACCEPTED
67 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00067 liwo 12-May-15 ZN5 CIV Structure Compact substation plinth (Pre-cast) 12-May-15 14-May-15 10.00am CLOSED 19-May-15 7 REJECTED
68 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00068 Zaki 11-May-15 ZN5 CIV Structure Backfilling at TNB area 12-May-15 14-May-15 10.00am CLOSED 14-May-15 2 ACCEPTED
69 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00069 Zaki 13-May-15 ZN5 CIV Structure FDT for area backfilling at TNB 13-May-15 15-May-15 3.00pm CLOSED 10-Jun-15 28 ACCEPTED
Joint survey as built center of
70 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00070 Zaki 13-May-15 ZN5 CIV Survey
stump at TNB
13-May-15 15-May-15 3.00pm CLOSED CANCEL
72 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00072 Zaki 13-May-15 ZN5 CIV Structure Lean con for slab at TNB area 13-May-15 15-May-15 5.00pm CLOSED 14-May-15 1 ACCEPTED
74 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00074 liwo 14-May-15 ZN5 CIV Structure Switch gear ground beam concreting 15-May-15 17-May-15 10.00am CLOSED 10-Jun-15 26 ACCEPTED
79 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00078 Zaki 14-May-15 ZN5 CIV Structure Concrete slab at TNB area 15-May-15 17-May-15 8.00pm CLOSED 12-Jun-15 28 REJECTED
82 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00081 liwo 14-May-15 ZN5 CIV Structure Transformer ground beam concreting 16-May-15 18-May-15 4.00pm CLOSED 10-Jun-15 25 ACCEPTED
96 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00093 liwo 19-May-15 ZN5 CIV Structure FDT test for crusherun lay 20-May-15 22-May-15 10.00am CLOSED 21-May-15 1 ACCEPTED
107 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00104 liwo 22-May-15 ZN5 CIV Structure Transformer slab concretiong 23-May-15 25-May-15 4.00pm CLOSED 12-Jun-15 20 REJECTED
114 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00111 liwo 25-May-15 ZN5 CIV Structure Transformer slab concreting 26-May-15 28-May-15 11.00am CLOSED 25-May-15 -1 ACCEPTED
123 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00120 liwo 29-May-15 ZN5 CIV Structure Transformer plinth concreting 30-May-15 1-Jun-15 11.00pm CLOSED 10-Jun-15 11 ACCEPTED
124 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00121 liwo 29-May-15 ZN5 CIV Structure Transformer column concreting 30-May-15 1-Jun-15 11.00pm CLOSED 12-Jun-15 13 REJECTED
135 RAPID-P20A1-UEMB-ZN5-STR-RFIN-00131 liwo 5-Jun-15 ZN5 STR Structure Transformer lintel beam concreting 8-Jun-15 10-Jun-15 10.00am CLOSED 11-Jun-15 3 ACCEPTED
146 RAPID-P20A1-UEMB-ZN5-ARC-RFIN-00141 Liwo 17-Jun-15 ZN5 ARC Material Inspection of common solid Bricks 18-Jun-15 20-Jun-15 10.00am CLOSED 18-Jun-15 0 ACCEPTED
152 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00147 Liwo 17-Jun-15 ZN5 CIV Concreting Transformer roof beam concreting 18-Jun-15 20-Jun-15 2.00pm CLOSED 20-Jun-15 2 ACCEPTED
156 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00151 Liwo 19-Jun-15 ZN5 ELE Material 11KV switch gear-ABB 19-Jun-15 21-Jun-15 10.00am CLOSED 19-Jun-15 0 ACCEPTED
157 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00152 Liwo 19-Jun-15 ZN5 ELE Material Transformer 25MVA-ABB 19-Jun-15 21-Jun-15 10.00am CLOSED 19-Jun-15 0 ACCEPTED
158 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00153 Liwo 19-Jun-15 ZN5 ELE Material Battery Charger 110VDC 19-Jun-15 21-Jun-15 10.00am CLOSED 19-Jun-15 0 ACCEPTED CANCEL
159 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00154 Liwo 19-Jun-15 ZN5 ELE Material 315 KVA transformer 19-Jun-15 21-Jun-15 10.00am CLOSED 19-Jun-15 0 ACCEPTED
166 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00161 Liwo 27-Jun-15 ZN5 CIV Dranage Inspection precast U drain installation 29-Jun-15 1-Jul-15 10.00am CLOSED 13-Nov-15 137 ACCEPTED
UEMB QAQC
179 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00174 6-Jul-15 ZN5 CIV Testing MP test at TNB SSU station 7-Jul-15 9-Jul-15 11.00am CLOSED 08-Jul-15 1 ACCEPTED
KHAIRIL
193 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00188 liwo 8-Jul-15 ZN5 CIV Material Inspection of sump Grating 600x600 9-Jul-15 11-Jul-15 10.00am CLOSED 13-Nov-15 127 ACCEPTED
200 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00195 Zaki 24-Jul-15 ZN5 CIV Concreting Concreting work at TNB mainhole 25-Jul-15 27-Jul-15 10.00am CLOSED 27-Jul-15 2 REJECTED
203 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00198 liwo 24-Jul-15 ZN5 CIV Concreting Dranage capping beam concreting 25-Jul-15 27-Jul-15 10.00am CLOSED 27-Jul-15 2 ACCEPTED
Installation of earthing
204 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00199 liwo 28-Jul-15 ZN5 ELE Earthing installation at zone 5 29-Jul-15 31-Jul-15 10.00am CLOSED 28-Jul-15 -1 ACCEPTED
system
205 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00200 liwo 28-Jul-15 ZN5 ELE Material Material receiving man hole at zone 5 29-Jul-15 31-Jul-15 10.00am CLOSED 28-Jul-15 -1 ACCEPTED
208 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00203 liwo 28-Jul-15 ZN5 ELE Material Material inspection (NER) at zone 5 29-Jul-15 31-Jul-15 10.00am CLOSED 28-Jul-15 -1 ACCEPTED
212 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00207 liwo 31-Jul-15 ZN5 CIV Material Inspection for transformer slab 1-Aug-15 3-Aug-15 10.00am CLOSED 13-Nov-15 104 ACCEPTED
214 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00209 Zaki 31-Jul-15 ZN5 CIV Concreting Concreting base slab at manhole TNB 1-Aug-15 3-Aug-15 10.00am CLOSED 20-Aug-15 19 ACCEPTED
216 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00211 Zaki 5-Aug-15 ZN5 CIV Concreting Concreting Wall at manhole TNB 6-Aug-15 8-Aug-15 10.00am CLOSED 20-Aug-15 14 ACCEPTED
218 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00213 Zaki 15-Aug-15 ZN5 CIV Concreting Concreting PC slab at manhole TNB 16-Aug-15 18-Aug-15 10.00am CLOSED 20-Aug-15 4 ACCEPTED
220 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00215 liwo 19-Aug-15 ZN 5 ELE Equipment Light fitting and switches installation 20-Aug-15 22-Aug-15 10.00am CLOSED 4-Sep-15 15 ACCEPTED
223 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00218 liwo 24-Aug-15 ZN 5 CIV Road works Inspection for sub base dipping 25-Aug-15 27-Aug-15 10.00am CLOSED 28-Aug-15 3 ACCEPTED
224 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00219 liwo 24-Aug-15 ZN5 CIV Road works Preparation of laying sub base 25-Aug-15 27-Aug-15 10.00am CLOSED 16-Feb-16 175 ACCEPTED
225 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00220 liwo 27-Aug-15 ZN5 CIV Road works CBR test for Sub Base 28-Aug-15 30-Aug-15 10.00am CLOSED 28-Aug-15 0 ACCEPTED
226 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00221 liwo 27-Aug-15 ZN 5 CIV Road works Dipping for sub Base 28-Aug-15 30-Aug-15 10.00am CLOSED 28-Aug-15 0 ACCEPTED
227 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00222 liwo 2-Sep-15 ZN 5 CIV Road works Dipping for Road Base 3-Sep-15 5-Sep-15 10.00am CLOSED 04-Nov-15 62 ACCEPTED
229 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00224 liwo 9-Sep-15 ZN 5 CIV Road works Lay Geo Grid G x 80 10-Sep-15 12-Sep-15 10.00am CLOSED 11-Sep-15 1 ACCEPTED
232 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00227 liwo 19-Sep-15 ZN 5 CIV Road works Bitumen prime coat test 21-Sep-15 23-Sep-15 10.00am CLOSED 21-Sep-15 0 ACCEPTED
233 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00228 liwo 21-Sep-15 ZN 5 CIV Road works Laying Binder course ACBC 28 22-Sep-15 24-Sep-15 10.00am CLOSED 22-Sep-15 0 ACCEPTED
234 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00229 liwo 21-Sep-15 ZN 5 CIV Road works Marshall test for bunder course 22-Sep-15 24-Sep-15 10.00am CLOSED CANCEL
237 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00232 liwo 29-Sep-15 ZN 5 ELE Testing Testing for fire system 30-Sep-15 2-Oct-15 10.00am CLOSED 30-Sep-15 0 ACCEPTED
238 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00233 liwo 29-Sep-15 ZN 5 ELE Testing Earth resistance test 30-Sep-15 2-Oct-15 10.00am CLOSED 30-Sep-15 0 ACCEPTED
246 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00241 amman tech 30-Jan-16 ZN 5 CIV Testing Dipping for subbase at TNB 1-Feb-16 3-Feb-16 5.00pm CLOSED CANCEL
247 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00242 amman tech 29-Jan-16 ZN 5 CIV Testing FDT test for subbase at TNB area 2-Feb-16 4-Feb-16 5.00pm CLOSED CANCEL
248 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00243 amman tech 29-Jan-16 ZN 5 CIV Testing Dipping for roadbase at TNB 2-Feb-16 4-Feb-16 3.00pm CLOSED CANCEL
249 RAPID-P20A1-UEMB-ZN5-CIV-RFIN-00244 amman tech 1-Feb-16 ZN 5 CIV Testing FDT test for roadbase at TNB area 2-Feb-16 4-Feb-16 5.00pm CLOSED CANCEL
1 X 3C 300mm sq XLPE/SWA/PVC
256 RAPID-P20A1-UEMB-ZN5-ELE-RFIN-00251 Liwo 10-May-16 ZN 5 ELE Inspection 10-May-16 12-May-16 3.00Pm CLOSED 24-May-16 14 ACCEPTED
11kV cable brand FEC, 20meter
12/26/2014
TOTAL RFIN CLOSED RFIN
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
256 256
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(ZONE 6)
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
1 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00001 Sudarman 21-May-15 ZN6 CIV Material Material receiving inspection for RC pil3 200x200 22-May-15 24-May-15 9.00am CLOSED 22-May-15 0 ACCEPTED 1 1
3 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00003 Ocned Water 8-May-15 ZN6 CIV survey To do Joint survey for piling point at STP 2 9-May-15 11-May-15 10.00am CLOSED 09-May-15 0 ACCEPTED 1 1
4 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00004 Ocned Water 25-May-15 ZN6 CIV Piling Work Piling work at STP 2 26-May-15 12-May-15 8.00am CLOSED 26-Feb-16 276 REJECTED 1 1
5 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00005 Ocned Water 27-May-15 ZN6 CIV Testing Maintain Load Test 28-May-15 12-May-15 10.00am CLOSED 17-Aug-16 447 ACCEPTED 1 1
6 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00006 Ocned Water 2-Jun-15 ZN6 CIV Test MLT test (Maintain Load Test) STP 2 Zone 6 :P-13-267 3-Jun-15 5-Jun-15 10.00am CLOSED 10-Jun-15 7 ACCEPTED 1 1
7 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00007 Ocned Water 8-Jun-15 ZN6 CIV Piling Work Piling work at STP 2 8-Jun-15 10-Jun-15 9.10am CLOSED 27-Jun-16 385 ACCEPTED 1 1
8 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00008 Zaki 11-Jun-15 ZN6 CIV Testing Maintained load test (MLT) result at STP 2 11-Jun-15 13-Jun-15 10.00 pm CLOSED 17-Jun-15 6 ACCEPTED 1 1
10 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00010 Ocned Water 10-Jun-15 ZN6 CIV Piling Work Piling work at STP 2 zone 6 11-Jun-15 13-Jun-15 10.00 pm CLOSED 09-Jun-16 364 ACCEPTED 1 1
11 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00011 Ocned Water 14-Jun-15 ZN6 CIV Piling Work Piling work at STP 2 zone 6 15-Jun-15 17-Jun-15 8.00am CLOSED 17-Aug-16 429 ACCEPTED 1 1
12 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00012 Ocned Water 17-Jun-15 ZN6 CIV Piling Work Piling work at STP 2 zone 6 18-Jun-15 20-Jun-15 8.00am CLOSED 17-Aug-16 426 ACCEPTED 1 1
13 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00013 Ocned Water 17-Jun-15 ZN6 CIV survey Joint Survey on piling point at Clarifier tank 1 and 2 20-Jun-15 22-Jun-15 8.00am CLOSED 26-Jun-15 6 ACCEPTED 1 1
15 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00015 Ocned Water 20-Jun-15 ZN6 CIV Piling Work Piling work at STP 2 zone 6 21-Jun-15 23-Jun-15 3.00pm CLOSED 16-Aug-16 422 ACCEPTED 1 1
16 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00016 Ocned Water 23-Jun-15 ZN6 CIV Piling Work Piling work at STP 2 zone 6 24-Jun-15 26-Jun-15 3.00pm CLOSED 17-Aug-16 420 ACCEPTED 1 1
18 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00018 Ocned Water 24-Jun-15 ZN6 CIV Testing PDA tets on piling point aeration tank at Stp zone 6 25-Jun-15 27-Jun-15 9.00am CLOSED 28-Sep-15 21 ACCEPTED 1 1
20 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00020 Ocned Water 26-Jun-15 ZN6 CIV Piling Work Piling work at STP 2 zone 6 24-Jun-15 26-Jun-15 3.00pm CLOSED 27-May-16 1 ACCEPTED 1 1
23 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00023 Ocned Water 30-Jun-15 ZN6 CIV Piling Work Piling work on clarifier Tank at STP 2 1-Jul-15 3-Jul-15 9.00am CLOSED 27-May-16 50 ACCEPTED 1 1
25 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00025 Ocned Water 30-Jun-15 ZN6 CIV survey Joint survey on piling point at Disinfection Chamber 1-Jul-15 3-Jul-15 9.00am CLOSED 30-Jun-16 50 ACCEPTED 1 1
26 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00026 Ocned Water 30-Jun-15 ZN6 CIV survey Joint survey on piling point at Guard House 1-Jul-15 3-Jul-15 9.00am CLOSED 16-Oct-15 20 REJECTED 1 1
27 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00027 Ocned Water 30-Jun-15 ZN6 CIV survey Joint survey on piling point at Sludge holding tank 1-Jul-15 3-Jul-15 9.00am CLOSED 16-Oct-15 20 REJECTED 1 1
28 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00028 Ocned Water 2-Jul-15 ZN6 CIV Material Material Delivery RC pile : 200mmx200mmx6m 3-Jul-15 5-Jul-15 9.00am CLOSED 30-Jun-16 50 ACCEPTED 1 1
29 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00029 Ocned Water 6-Jul-15 ZN6 CIV Piling Work Piling works at SROP 2 Zone 6 (Disinfiction Chamber) 7-Jul-15 9-Jul-15 9.00am CLOSED 17-Aug-16 51 ACCEPTED 1 1
30 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00030 Ocned Water 6-Jul-15 ZN6 CIV Piling Work Piling works on blower, control room at STP 2 zone 6 7-Jul-15 9-Jul-15 9.00am CLOSED 17-Aug-16 51 ACCEPTED 1 1
31 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00031 Ocned Water 6-Jul-15 ZN6 CIV Piling Work Piling works on Grit Chamber at STP 2 Zone 6 7-Jul-15 9-Jul-15 9.00am CLOSED 10-Jul-15 1 REJECTED 1 1
32 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00032 Ocned Water 6-Jul-15 ZN6 CIV Piling Work Piling works on sludge holding tank at STP 2 Zone 6 7-Jul-15 9-Jul-15 9.00am CLOSED 17-Aug-16 51 ACCEPTED 1 1
33 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00033 Ocned Water 6-Jul-15 ZN6 CIV Piling Work Piling works on administration room at STP 2 Zone 6 7-Jul-15 9-Jul-15 9.00am CLOSED 17-Aug-16 51 ACCEPTED 1 1
34 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00034 Ocned Water 9-Jul-15 ZN6 CIV Piling Work Piling works at Grid Chamber and disinfaction Chamber 10-Jul-15 12-Jul-15 8.00am CLOSED 17-Aug-16 51 ACCEPTED 1 1
35 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00035 Ocned Water 9-Jul-15 ZN6 CIV Piling Work Piling work for additional point at aeration tank 10-Jul-15 12-Jul-15 8.00am CLOSED 30-Jun-16 356 REJECTED 1 1
36 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00036 Ocned Water 9-Jul-15 ZN6 CIV survey Join survey on piling point at Disinfiction Chamber 10-Jul-15 12-Jul-15 9.00am CLOSED 30-Jun-16 356 ACCEPTED 1 1
38 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00038 Ocned Water 31-Jul-15 ZN6 CIV Material Material receiving for RC pile 1-Aug-15 3-Aug-15 8.00am CLOSED 30-Jun-16 334 ACCEPTED 1 1
39 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00039 Ocned Water 31-Jul-15 ZN6 CIV cutting pile Cutting and Hacking piling at STP 2 1-Aug-15 3-Aug-15 8.00am CLOSED CANCEL en mahathir
1 1
suruh
42 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00042 Ocned Water 7-Aug-15 ZN6 CIV Testing Pile intergrity test (PIT) on piling point at aeration tank 8-Aug-15 10-Aug-15 10.00am CLOSED 30-Oct-15 83 ACCEPTED 1 1
43 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00043 Ocned Water 7-Aug-15 ZN6 CIV Testing PDA test on piling point at Grit Chamber 8-Aug-15 10-Aug-15 10.00am CLOSED 27-May-16 293 ACCEPTED 1 1
44 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00044 Ocned Water 19-Aug-15 ZN6 CIV RC pile material delivery inspection for RC pile 20-Aug-15 22-Aug-15 8.00am CLOSED 30-Jun-16 315 ACCEPTED 1 1
45 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00045 Ocned Water 19-Aug-15 ZN6 CIV piling work Piling work for additional point at aeration tank 20-Aug-15 22-Aug-15 8.00am CLOSED 21-Jul-16 336 ACCEPTED 1 1
46 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00046 Ocned Water 19-Aug-15 ZN6 CIV piling work Piling work for additional point at Distribution Chamber 20-Aug-15 22-Aug-15 8.00am CLOSED 21-Jul-16 336 ACCEPTED 1 1
47 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00047 Ocned Water 19-Aug-15 ZN6 CIV piling work Piling work for additional point at Sludge Holding Tank 20-Aug-15 22-Aug-15 8.00am CLOSED 21-Jul-16 336 ACCEPTED 1 1
48 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00048 Ocned Water 19-Aug-15 ZN6 CIV piling work Piling work for additional point at clarifier tank 1 20-Aug-15 22-Aug-15 8.00am CLOSED 21-Jul-16 336 ACCEPTED 1 1
49 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00049 Ocned Water 19-Aug-15 ZN6 CIV piling work Piling work for additional point at Grid chamber 20-Aug-15 22-Aug-15 8.00am CLOSED 21-Jul-16 336 ACCEPTED 1 1
50 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00050 Ocned Water 19-Aug-15 ZN6 CIV piling work Piling work for additional point at Genset room 20-Aug-15 22-Aug-15 8.00am CLOSED 21-Jul-16 336 ACCEPTED 1 1
UEMB QAQC
51 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00051 5-Sep-15 ZN6 CIV Testing MP test at Guard House 3 ( Pase 2, near STP 2) 5-Sep-15 7-Sep-15 5.00pm CLOSED 15-Oct-15 8 REJECTED 1 1
KHAIRIL
52 RAPID-P20A1-UEMB-ZN6-BLD-RFIN-00052 UEMB CONST 5-Sep-15 ZN6 BLD Excavation Excavation Work Guard house 3 7-Sep-15 9-Sep-15 4.30pm CLOSED 15-Oct-15 8 REJECTED 1 1
ZULAKMAL
UEMB CONST
53 RAPID-P20A1-UEMB-ZN6-BLD-RFIN-00053 7-Sep-15 ZN6 BLD Concrete Lean Con Guard House 3 8-Sep-15 10-Sep-15 5.00pm CLOSED 15-Oct-15 8 ACCEPTED 1 1
ZULAKMAL
54 RAPID-P20A1-UEMB-ZN6-BLD-RFIN-00054 UEMB CONST 10-Sep-15 ZN6 BLD Concrete Inspection formwork,rebar,concreting raft foundation Guard 11-Sep-15 13-Sep-15 9.00 am CLOSED 16-Oct-15 9 ACCEPTED 1 1
ZULAKMAL House 3
UEMB CONST
55 RAPID-P20A1-UEMB-ZN6-BLD-RFIN-00055 12-Sep-15 ZN6 BLD Concrete Inspection formwork,rebar,concreting stump Guard House 3 14-Sep-15 16-Sep-15 9.00 am CLOSED 16-Oct-15 9 ACCEPTED 1 1
ZULAKMAL
UEMB CONST
56 RAPID-P20A1-UEMB-ZN6-BLD-RFIN-00056
ZULAKMAL 14-Sep-15 ZN6 BLD Concrete Joint survey as built stump guard house 3 15-Sep-15 17-Sep-15 9.00 am CLOSED CANCEL en mahathir
1 1
suruh
57 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00057 instant Option 5-Oct-15 ZN6 STR Excavation Excavation and cut of pile at clarifier tankSTP 2 6-Oct-15 8-Oct-15 10.00am CLOSED 06-Oct-15 0 ACCEPTED 1 1
58 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00058 instant Option 14-Sep-15 ZN6 STR Leancon Lean concrete for the Slab in STP 2 area 15-Sep-15 17-Sep-15 10.00am CLOSED 12-Oct-15 4 REJECTED 1 1
59 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00059 instant Option 18-Sep-15 ZN6 STR excavation, cut of piles Excavation and cut of pile at aeration tank 19-Sep-15 21-Sep-15 10.00am CLOSED 12-Oct-15 4 REJECTED 1 1
60 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00060 instant Option 19-Sep-15 ZN6 STR excavation, cut of piles Lean concrete for slab at STP 2 area for aeration tank 20-Sep-15 22-Sep-15 10.00am CLOSED 20-May-16 4 ACCEPTED 1 1
62 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00061A instant Option 21-Sep-15 ZN6 STR Excavation 1) excavation at Disinfection chamber at STP 2 Zone 6 22-Sep-15 24-Sep-15 10.00am CLOSED 16-Oct-15 24 ACCEPTED 1 1
65 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00063A instant Option 21-Sep-15 ZN6 STR Excavation 1) excavation at Oil and Grease chamber 2nos at STP 2 22-Sep-15 24-Sep-15 10.00am CLOSED 16-Oct-15 24 ACCEPTED 1 1
67 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00065 instant Option 19-Sep-15 ZN6 STR Material T 12 rebar (96 length x 10 bals) 20-Sep-15 22-Sep-15 10.00am CLOSED 28-Jan-16 130 ACCEPTED 1 1
69 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00067 instant Option 25-Sep-15 ZN6 STR cut of piles cut of piles in Disinfection chamber at STP2 26-Sep-15 28-Sep-15 10.00am CLOSED 16-Oct-15 0 REJECTED 1 1
70 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00068 instant Option 25-Sep-15 ZN6 STR cut of piles cut of piles in grit chamber STP2 26-Sep-15 28-Sep-15 10.00am CLOSED 16-Oct-15 1 REJECTED 1 1
71 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00069 instant Option 25-Sep-15 ZN6 STR cut of piles cut of piles at Oil & grease tank STP 2 26-Sep-15 28-Sep-15 10.00am CLOSED 16-Oct-15 6 REJECTED 1 1
72 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00070 instant Option 25-Sep-15 ZN6 STR cut of piles cut of piles at clarifier tank in STP2 26-Sep-15 28-Sep-15 10.00am CLOSED 16-Oct-15 20 REJECTED 1 1
73 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00071 instant Option 28-Sep-15 ZN6 STR lean con lean con for the slab at STP2 zone 6 for the Aeration Tank area 29-Sep-15 1-Oct-15 10.00am CLOSED 12-Oct-15 3 REJECTED 1 1
76 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00074 instant Option 29-Sep-15 ZN6 STR Lean conc Leanconcrete for the slab at STP2 for oil & grease chamber 30-Sep-15 2-Oct-15 10.00am CLOSED 15-Oct-15 5 ACCEPTED 1 1
77 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00075 instant Option 29-Sep-15 ZN6 STR Lean conc Lean concrete for the slab in Distribution Chamber 1 at STP2 30-Sep-15 2-Oct-15 10.00am CLOSED 13-Oct-15 1 ACCEPTED 1 1
78 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00076 instant Option 29-Sep-15 ZN6 STR Lean conc Lean concrete for the slab at screen chamber at STP2 30-Sep-15 2-Oct-15 10.00am CLOSED 15-Oct-15 3 ACCEPTED 1 1
79 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00077 instant Option 29-Sep-15 ZN6 STR Lean conc Lean concrete for slab at Desinfection Chamber at STP 2 30-Sep-15 2-Oct-15 10.00am CLOSED 16-Oct-15 3 ACCEPTED 1 1
80 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00078 instant Option 29-Sep-15 ZN6 STR Lean conc Lean concrete for the slab at Grit Chamber for STP2 30-Sep-15 2-Oct-15 10.00am CLOSED 19-Oct-15 3 ACCEPTED 1 1
81 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00079 instant Option 29-Sep-15 ZN6 STR Lean conc Lean concrete for the slab at Genset Shed at STP 2 30-Sep-15 2-Oct-15 10.00am CLOSED 19-Oct-15 3 ACCEPTED 1 1
82 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00080 instant Option 29-Sep-15 ZN6 STR Lean conc Lean concrete for blower & control room Slab at STP 2 30-Sep-15 2-Oct-15 10.00am CLOSED 15-Oct-15 3 ACCEPTED 1 1
83 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00081 instant Option 2-Oct-15 ZN6 STR Lean conc Lean concrete at STP 2 Clarifier tank (1Nos) 3-Oct-15 5-Oct-15 9.00am CLOSED 15-Oct-15 -1 ACCEPTED 1 1
85 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00083 instant Option 3-Oct-15 ZN6 STR Lean conc Lean concrete layer placement at Chlorine preparation Shed 4-Oct-15 6-Oct-15 8.00am CLOSED 15-Oct-15 2 ACCEPTED 1 1
86 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00084 instant Option 3-Oct-15 ZN6 STR Lean conc Lean concrete layer placement at blower room & Control Room 4-Oct-15 6-Oct-15 10.00am CLOSED 15-Oct-15 2 ACCEPTED 1 1
87 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00085 instant Option 3-Oct-15 ZN6 STR Lean conc Leanconcrete layer placement at Grit Chamber 4-Oct-15 6-Oct-15 9.30am CLOSED 19-Oct-15 7 ACCEPTED 1 1
88 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00086 instant Option 3-Oct-15 ZN6 STR Lean conc Lean concrete layer placement at Gen-set shed 4-Oct-15 6-Oct-15 8.30am CLOSED 19-Oct-15 6 ACCEPTED 1 1
89 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00087 instant Option 5-Oct-15 ZN6 CIV Excavation Excavation and Cut of pile at Clarifier tank 2 6-Oct-15 8-Oct-15 10.00am CLOSED 19-Oct-15 6 ACCEPTED 1 1
90 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00088 instant Option 5-Oct-15 ZN6 CIV Lean conc Lean con for Clarifier Tank 2 6-Oct-15 8-Oct-15 10.00am CLOSED 16-Oct-15 3 ACCEPTED 1 1
91 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00089 instant Option 5-Oct-15 ZN6 CIV Lean conc Lean con for guard House STP2 6-Oct-15 8-Oct-15 10.00am CLOSED 19-Oct-15 6 ACCEPTED 1 1
92 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00090 instant Option 5-Oct-15 ZN6 CIV survey Joint survey for confirm top of lean concrete Aeration tank STP 2 6-Oct-15 8-Oct-15 10.00am CLOSED 20-Oct-15 5 ACCEPTED 1 1
98 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00096 instant Option 6-Oct-15 ZN6 STR Material Material inspection for Plastic H/Duty Chair Spacer 7-Oct-15 9-Oct-15 10.00am CLOSED CANCEL 1 1
en mahathir
suruh
Inspection formwork and rebar for Aeration & Anoxic Tank
99 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00097 instant Option 6-Oct-15 ZN6 STR Concreting 7-Oct-15 9-Oct-15 10.00am CLOSED 20-Oct-15 1 ACCEPTED 1 1
( Ground Slab)
101 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00099 instant Option 7-Oct-15 ZN6 STR Pre concreting Inspection formwork and rebar for trench Clarifier tank (Slab) 7-Oct-15 9-Oct-15 2.00pm CLOSED 25-Mar-16 1 ACCEPTED 1 1
102 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00100 instant Option 7-Oct-15 ZN6 STR Concreting Concreting works for trench Clarifier (Slab) 7-Oct-15 9-Oct-15 2.30pm CLOSED 22-Oct-15 3 REJECTED 1 1
103 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00101 instant Option 7-Oct-15 ZN6 STR Concrete Concreting works for slab (Guard House) STP2 8-Oct-15 10-Oct-15 2.00pm CLOSED 19-Oct-15 0 ACCEPTED 1 1
104 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00102 instant Option 7-Oct-15 ZN6 STR pre concrete Inspection formwork and rebar for Chlorination shed ( Slab ) 8-Oct-15 10-Oct-15 2.00pm CLOSED 12-Oct-15 4 REJECTED 1 1
STP2 No Activity
105 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00103 instant Option 7-Oct-15 ZN6 STR Concrete Concreting works for Chlorination Shed ( Slab) STP2 8-Oct-15 10-Oct-15 2.00pm CLOSED 12-Oct-15 4 REJECTED 1 1
No Activity
106 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00104 instant Option 7-Oct-15 ZN6 STR Concrete concreting works for pile cap (Disinfection Chamber) STP2 8-Oct-15 10-Oct-15 10.00am CLOSED 22-Oct-15 3 ACCEPTED 1 1
110 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00108 instant Option 7-Oct-15 ZN6 STR Post concreting Post Concreting works for Aeration and Anoxic Tank ( Ground 9-Oct-15 11-Oct-15 10.00am CLOSED 23-Oct-15 1 ACCEPTED 1 1
Slab)
111 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00109 instant Option 8-Oct-15 ZN6 STR Concreting Concreting works for Aeration Tank (Raft Foundation) at STP2 9-Oct-15 11-Oct-15 3.00pm CLOSED 23-Oct-15 1 ACCEPTED 1 1
113 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00111 instant Option 8-Oct-15 ZN6 STR Material High Tensile Deformed Bar 25mmx12mm 9-Oct-15 11-Oct-15 9.30am CLOSED 09-Oct-15 0 ACCEPTED 1 1
114 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00112 instant Option 8-Oct-15 ZN6 STR Concreting Concreting works for Anoxic Tank ( Raft Foundation at STP 2 9-Oct-15 11-Oct-15 3.00pm CLOSED 24-Oct-15 4 REJECTED 1 1
115 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00113 instant Option 8-Oct-15 ZN6 STR Pre concreting Inspectin formwork and rebar for Anoxic Tank ( Raft Foundation) 9-Oct-15 11-Oct-15 10.00am CLOSED 24-Oct-14 -363 ACCEPTED 1 1
116 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00114 instant Option 8-Oct-15 ZN6 STR Concreting Concreting works for pile cap (Distribution Chamber 2) at STP 2 9-Oct-15 11-Oct-15 3.00pm CLOSED 23-Oct-15 0 REJECTED 1 1
118 RAPID-P20A1-UEMB-ZN6-PIP -RFIN-00116 Ocned Water 9-Oct-15 ZN6 STR Equipment Installation at G.I pipe at Clarifier Tank1 and 2 10-Oct-15 12-Oct-15 10.00am CLOSED 16-Nov-15 0 ACCEPTED 1 1
119 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00117 instant Option 9-Oct-15 ZN6 STR concreting concreting works for trench clarifier tank 2 (Base) 10-Oct-15 12-Oct-15 2.00pm CLOSED 26-Oct-15 4 REJECTED 1 1
120 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00118 instant Option 9-Oct-15 ZN6 STR pre-concreting Inspection formwork and rebar at Trench Clarifier Tank 2(Base) 10-Oct-15 12-Oct-15 10.00am CLOSED 26-Oct-15 4 REJECTED 1 1
122 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00120 instant Option 10-Oct-15 ZN6 STR Excavation works Excavation works at Sludge Holding Tank 12-Oct-15 14-Oct-15 10.00am CLOSED 26-Oct-15 4 REJECTED 1 1
123 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00121 instant Option 10-Oct-15 ZN6 STR Excavation works Excavation works at Sludge Thickener tank 12-Oct-15 14-Oct-15 10.00am CLOSED 03-Nov-15 8 ACCEPTED 1 1
124 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00122 instant Option 10-Oct-15 ZN6 STR Concreting works Concreting works at Trench Clarifier tank 1 ( Wall) 16-Oct-15 18-Oct-15 10.00am CLOSED 03-Nov-15 6 ACCEPTED 1 1
125 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00123 instant Option 10-Oct-15 ZN6 STR Pre Concreting Inspection formwork and rebar at Trench Clarifier Tank 1 (Wall) 16-Oct-15 18-Oct-15 10.00am CLOSED 30-Oct-15 6 ACCEPTED 1 1
126 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00124 instant Option 12-Oct-15 ZN6 STR Lean Con Lean Concrete at Clarifier Tank 2 12-Oct-15 14-Oct-15 2.00pm CLOSED 30-Oct-15 6 ACCEPTED 1 1
128 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00126 instant Option 12-Oct-15 ZN6 STR Concreting Concreting works at Trench Clarifier tank 2 ( Wall) 16-Oct-15 18-Oct-15 2.00pm CLOSED 27-Oct-15 3 ACCEPTED 1 1
129 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00127 instant Option 12-Oct-15 ZN6 STR Lean Concrete Lean concrete at Sludge Holding tank 13-Oct-15 15-Oct-15 10.00am CLOSED 27-Oct-15 3 ACCEPTED 1 1
130 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00128 instant Option 12-Oct-15 ZN6 STR Lean Concrete Lean concrete at Sludge Thickner tank 13-Oct-15 15-Oct-15 10.00am CLOSED 30-Oct-15 3 ACCEPTED 1 1
131 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00128A instant Option 12-Oct-15 ZN6 STR Concreting Concreting works for column at Aeration Tank 1 12-Oct-15 14-Oct-15 10.00am CLOSED 03-Nov-15 6 ACCEPTED 1 1
132 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00129 instant Option 13-Oct-15 ZN6 STR Pre Concreting Inspection formwork and rebar for column at Aeration tank 2 13-Oct-15 15-Oct-15 11.00am CLOSED 31-Oct-15 4 ACCEPTED 1 1
133 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00130 instant Option 13-Oct-15 ZN6 STR Concreting Concreting works for column at the Aeration tank 2 (Stage1) 13-Oct-15 15-Oct-15 11.00am CLOSED 31-Oct-15 4 ACCEPTED 1 1
135 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00132 instant Option 12-Oct-15 ZN6 STR Concreting Concreting works for pile cap (Distribution Chamber 2) at STP 2 13-Oct-15 15-Oct-15 3.00pm CLOSED 27-Oct-15 0 ACCEPTED 1 1
136 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00133 instant Option 12-Oct-15 ZN6 STR Concreting Inspection formwork and rebar for Chlorination shed ( Slab ) 13-Oct-15 15-Oct-15 3.00pm CLOSED 15-Oct-15 0 REJECTED 1 1
STP2
138 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00135 instant Option 13-Oct-15 ZN6 STR Excavation Excavation works at Admistration Room 15-Oct-15 17-Oct-15 9.00am CLOSED 31-Oct-15 4 ACCEPTED 1 1
139 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00136 instant Option 13-Oct-15 ZN6 STR Backfilling Backfilling and compaction works at Aeration tank 1 & 2 15-Oct-15 17-Oct-15 11.00am CLOSED 03-Nov-15 3 REJECTED 1 1
140 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00137 instant Option 13-Oct-15 ZN6 STR Lean concrete Lean concrete at Admistration room 15-Oct-15 17-Oct-15 3.00pm CLOSED 03-Nov-15 19 ACCEPTED 1 1
Joint survey for sludge Thickner Tank as Check of pile
141 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00138 instant Option 13-Oct-15 ZN6 STR survey
Cutting
14-Oct-15 16-Oct-15 8.00am CLOSED CANCEL 1 1
en mahathir
suruh
142 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00139 instant Option 13-Oct-15 ZN6 STR survey Joint survey for Sludge Holding Tank as Check of pile Cutting 14-Oct-15 16-Oct-15 8.00am CLOSED CANCEL 1 1
en mahathir
suruh
145 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00141A instant Option 17-Oct-15 ZN6 STR Lean Concrete Lean concrete for slab at Clarifier Tank B 17-Oct-15 19-Oct-15 2.00pm CLOSED 03-Nov-15 4 ACCEPTED 1 1
146 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00142 instant Option 17-Oct-15 ZN6 STR Lean concrete Lean concrete for slab at Clarifier tank A 19-Oct-15 21-Oct-15 9.00am CLOSED 30-Oct-15 11 ACCEPTED 1 1
147 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00143 instant Option 17-Oct-15 ZN6 STR Lean concrete Lean concrete for slab at Clarifier tank B 17-Oct-15 19-Oct-15 2.00pm CLOSED CANCEL 1 1
en mahathir
suruh
149 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00145 instant Option 19-Oct-15 ZN6 STR Concreting Concreting works for second lift column at Aeration tank A 19-Oct-15 21-Oct-15 4.00pm CLOSED 06-Nov-15 8 REJECTED 1 1
151 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00147 instant Option 19-Oct-15 ZN6 STR Concreting Concreting works for second lift column at Aeration tank B 19-Oct-15 21-Oct-15 4.00pm CLOSED 02-Nov-15 3 ACCEPTED 1 1
152 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00148 instant Option 19-Oct-15 ZN6 PIP Ductile iron installation Ductile iron installation at Clarifier tank tranches A 19-Oct-15 21-Oct-15 4.00pm CLOSED 03-Nov-15 4 ACCEPTED 1 1
153 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00149 instant Option 19-Oct-15 ZN6 STR Pre concreting Inspection formwork and rebar for wall at Aeration tank A 20-Oct-15 22-Oct-15 9.00am CLOSED 03-Nov-15 4 ACCEPTED 1 1
154 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00150 instant Option 19-Oct-15 ZN6 STR Concreting Concreting works for wall at Aeration Tank A 20-Oct-15 22-Oct-15 2.00pm CLOSED 03-Nov-15 2 ACCEPTED 1 1
155 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00151 instant Option 19-Oct-15 ZN6 STR Pre concreting Inspection formwork and rebar of wall at Aeration tank B 19-Oct-15 21-Oct-15 9.00am CLOSED 03-Nov-15 4 ACCEPTED 1 1
156 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00152 instant Option 19-Oct-15 ZN6 STR Concreting Concreting works of wall at Aeration Tank B 19-Oct-15 21-Oct-15 2.00pm CLOSED 03-Nov-15 2 ACCEPTED 1 1
158 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00154 instant Option 19-Oct-15 ZN6 STR Concreting Concreting for column at Distribution Chamber 2 20-Oct-15 22-Oct-15 2.00pm CLOSED 03-Nov-15 3 ACCEPTED 1 1
159 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00155 instant Option 20-Oct-15 ZN6 STR Pre concreting Inspection formwork and rebar at Clarifier Tank 2 ( Slab) 22-Oct-15 24-Oct-15 9.00am CLOSED 05-Nov-15 5 REJECTED 1 1
160 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00156 instant Option 20-Oct-15 ZN6 STR Concreting Concreting works for Clarifier Tank 2 (Slab) 22-Oct-15 24-Oct-15 2.00pm CLOSED 05-Nov-15 5 ACCEPTED 1 1
161 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00157 instant Option 20-Oct-15 ZN6 STR Pre concreting Inspection formwork and rebar at Clarifier Tank 1 (Slab) 24-Oct-15 26-Oct-15 9.00am CLOSED 03-Nov-15 3 REJECTED 1 1
162 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00158 instant Option 20-Oct-15 ZN6 STR Concreting Concreting works for Clarifier Tank 1 (Slab) 24-Oct-15 26-Oct-15 2.00pm CLOSED 05-Nov-15 3 REJECTED 1 1
163 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00159 instant Option 20-Oct-15 ZN6 STR Pre concreting Inspection formwork and rebar for slab at Sludge Holding Tank 20-Oct-15 22-Oct-15 3.00pm CLOSED 05-Nov-15 3 ACCEPTED 1 1
164 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00160 instant Option 20-Oct-15 ZN6 STR Pre concreting Inspection formwork and rebar for slab at sludge Thickener Tank 20-Oct-15 22-Oct-15 3.00pm CLOSED 05-Nov-15 3 ACCEPTED 1 1
165 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00161 instant Option 20-Oct-15 ZN6 STR Concreting Concreting works for slab at Sludge Holding Tank 21-Oct-15 23-Oct-15 3.00pm CLOSED 05-Nov-15 2 REJECTED 1 1
166 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00162 instant Option 20-Oct-15 ZN6 STR Concreting Concreting works for slab at Sludge Thickener Tank 21-Oct-15 23-Oct-15 3.00pm CLOSED 05-Nov-15 2 ACCEPTED 1 1
170 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00166 instant Option 21-Oct-15 ZN6 STR Concreting Concreting works for slab at Chlorination Preparation Shed 22-Oct-15 24-Oct-15 2.30pm CLOSED 05-Nov-15 3 ACCEPTED 1 1
171 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00167 instant Option 21-Oct-15 ZN6 STR Concreting Concreting works for Guard House ( Slab) 22-Oct-15 24-Oct-15 1.00pm CLOSED 05-Nov-15 3 ACCEPTED 1 1
172 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00168 instant Option 21-Oct-15 ZN6 STR Pre concreting Inspection formwork and rebar for Guard House ( Slab) 22-Oct-15 24-Oct-15 9.00am CLOSED 05-Nov-15 3 ACCEPTED 1 1
173 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00169 instant Option 26-Oct-15 ZN6 STR Pre Concreting Inspection formwork and rebar for pile cap at Blower room, 26-Oct-15 28-Oct-15 4.30pm CLOSED 02-Nov-15 0 ACCEPTED 1 1
control room an Gen set shed
175 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00171 instant Option 23-Oct-15 ZN6 STR Pre Concreting Inspection formwork for wall at Aeration Tank B 23-Oct-15 25-Oct-15 10.00am CLOSED 28-Jan-16 97 ACCEPTED 1 1
176 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00172 instant Option 23-Oct-15 ZN6 STR pre-concreting inspection formwork and rebar for anoxic tank B (wall) 24-Oct-15 26-Oct-15 4.00pm CLOSED 28-Jan-16 96 ACCEPTED 1 1
177 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00173 instant Option 23-Oct-15 ZN6 STR concreting concreting works for anoxic tank b (Wall) 24-Oct-15 26-Oct-15 4.00pm CLOSED 28-Jan-16 96 ACCEPTED 1 1
178 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00174 instant Option 23-Oct-15 ZN6 STR concreting Concreting works of wall at Aeration Tank B 24-Oct-15 26-Oct-15 4.00pm CLOSED 28-Jan-16 96 ACCEPTED 1 1
179 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00175 instant Option 24-Oct-15 ZN6 STR lean concrete lean concrete works at blower room and control room 24-Oct-15 26-Oct-15 2.00pm CLOSED 11-Nov-15 6 ACCEPTED 1 1
181 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00177 instant Option 24-Oct-15 ZN6 STR lean concrete lean concrete works at gen-set 24-Oct-15 26-Oct-15 2.00pm CLOSED 05-Nov-15 0 ACCEPTED 1 1
182 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00178 instant Option 24-Oct-15 ZN6 STR pre-concreting inspection rebar for wall at Aeration tank A 24-Oct-15 26-Oct-15 10.00am CLOSED 11-Nov-15 5 REJECTED 1 1
183 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00179 instant Option 24-Oct-15 ZN6 STR pre-concreting Inspection of rebar for wall at Anoxic Tank A 24-Oct-15 26-Oct-15 10.00am CLOSED 11-Nov-15 5 ACCEPTED 1 1
185 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00181 instant Option 26-Oct-15 ZN6 STR concreting Concreting works for pile cap at Blower room, Control room and 27-Oct-15 29-Oct-15 3.00pm CLOSED 11-Nov-15 5 ACCEPTED 1 1
genset Shed
187 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00183 instant Option 26-Oct-15 ZN6 STR Pre Concreting Inspection formwork and rebar for Guard House ( Slab) STP2 27-Oct-15 29-Oct-15 9.00am CLOSED 11-Nov-15 5 ACCEPTED 1 1
188 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00184 instant Option 26-Oct-15 ZN6 STR concreting Concreting works for Guard House ( Slab) STP2 27-Oct-15 29-Oct-15 2.30pm CLOSED 11-Nov-15 5 ACCEPTED 1 1
191 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00187 instant Option 27-Oct-15 ZN6 STR Pre Concreting Inspection formwork for wall at Aeration Tank A 27-Oct-15 29-Oct-15 3.00pm CLOSED 11-Nov-15 5 ACCEPTED 1 1
192 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00188 instant Option 27-Oct-15 ZN6 STR Pre Concreting Inspection of formwork for wall at Anoxic Tank A 27-Oct-15 29-Oct-15 3.00pm CLOSED 11-Nov-15 5 REJECTED 1 1
193 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00189 instant Option 27-Oct-15 ZN6 STR concreting Concreting for wall at Aeration Tank A 27-Oct-15 29-Oct-15 4.30pm CLOSED 11-Nov-15 5 ACCEPTED 1 1
194 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00190 instant Option 27-Oct-15 ZN6 STR concreting Concreting for wall at Anoxic Tank A 27-Oct-15 29-Oct-15 4.30pm CLOSED 11-Nov-15 6 ACCEPTED 1 1
198 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00194 instant Option 28-Oct-15 ZN6 STR concreting Concreting works for column at Distribution Chamber 2 28-Oct-15 30-Oct-15 4.30pm CLOSED 11-Nov-15 4 ACCEPTED 1 1
200 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00196 instant Option 29-Oct-15 ZN6 STR Concreting concreting works for column at Chlorine preparation shed 1-Nov-15 3-Nov-15 3.00pm CLOSED 13-Nov-15 4 REJECTED 1 1
201 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00197 instant Option 29-Oct-15 ZN6 STR Concreting Concreting works for pile cap nat distribution chamber 1 30-Oct-15 1-Nov-15 2.00pm CLOSED 13-Nov-15 4 ACCEPTED 1 1
203 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00199 instant Option 28-Oct-15 ZN6 STR Concreting Concreting works for pile cap at dgen set shed 28-Oct-15 30-Oct-15 4.30am CLOSED 13-Nov-15 4 REJECTED 1 1
204 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00200 instant Option 28-Oct-15 ZN6 STR Pre-concreting Inspection rebar and formwork for pile cap at dgen set shed 28-Oct-15 30-Oct-15 4.30am CLOSED 11-Nov-15 2 ACCEPTED 1 1
205 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00201 instant Option 29-Oct-15 ZN6 MNE Installation Installation ductile iron pipe from clarifier tank to sludge tank 29-Oct-15 31-Oct-15 5.30pm CLOSED 11-Nov-15 2 ACCEPTED 1 1
206 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00202 instant Option 29-Oct-15 ZN6 MNE Installation Installation ductile iron scum pipe at wall of clarifier tank 29-Oct-15 31-Oct-15 5.30pm CLOSED 11-Nov-15 0 ACCEPTED 1 1
207 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00203 instant Option 30-Oct-15 ZN6 STR Pre Concreting Inspection formwork and rebar for Column at Guard House 30-Oct-15 1-Nov-15 11.00am CLOSED 11-Nov-15 2 ACCEPTED 1 1
208 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00204 instant Option 30-Oct-15 ZN6 STR Lean Concrete Lean Concrete for blower room & Control Room 30-Oct-15 1-Nov-15 3.00pm CLOSED 01-Dec-15 22 ACCEPTED 1 1
209 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00205 instant Option 30-Oct-15 ZN6 STR Lean Concrete Lean Concrete for Gen set Shed 30-Oct-15 1-Nov-15 3.00pm CLOSED 01-Dec-15 22 ACCEPTED 1 1
210 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00206 instant Option 30-Oct-15 ZN6 STR Concreting Concrete works for Column at Guard House 1-Nov-15 3-Nov-15 2.00pm CLOSED 01-Dec-15 22 ACCEPTED 1 1
211 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00207 instant Option 30-Oct-15 ZN6 STR Lean Concrete Lean concrete at Admin Building 30-Oct-15 1-Nov-15 2.00pm CLOSED 01-Dec-15 22 ACCEPTED 1 1
212 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00208 instant Option 30-Oct-15 ZN6 STR Pre Concreting Inspection formwork and rebar for pile cap at Admin Building 1-Nov-15 3-Nov-15 2.00pm CLOSED 01-Dec-15 22 ACCEPTED 1 1
213 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00209 instant Option 30-Oct-15 ZN6 STR Concreting Concreting works for pipe cap at Admin building 30-Oct-15 1-Nov-15 2.00pm CLOSED 01-Dec-15 22 ACCEPTED 1 1
214 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00210 instant Option 31-Oct-15 ZN6 STR Pre Concreting Inspection rebar for wall at Clarifier tank B (CT4) 31-Oct-15 2-Nov-15 11.00am CLOSED 01-Dec-15 -8 ACCEPTED 1 1
215 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00211 instant Option 31-Oct-15 ZN6 STR Pre Concreting Inspection rebar at Clarifier Tank A (Wall) 31-Oct-15 2-Nov-15 11.00am CLOSED 13-Nov-15 1 ACCEPTED 1 1
216 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00212 instant Option 31-Oct-15 ZN6 STR Concreting Concreting works for pile cap and sump at Treated water tank 31-Oct-15 2-Nov-15 3.00pm CLOSED 13-Nov-15 1 ACCEPTED 1 1
Inspection rebar and formwork for pile cap and sump at Treated
217 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00213 instant Option 31-Oct-15 ZN6 STR Pre Concreting 31-Oct-15 2-Nov-15 11.30am CLOSED 13-Nov-15 1 ACCEPTED 1 1
water Tank
218 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00214 instant Option 31-Oct-15 ZN6 STR Concreting Inspection formwork for wall at Clarifier Tank at CT3 2-Nov-15 4-Nov-15 11.30am CLOSED 13-Nov-15 1 ACCEPTED 1 1
219 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00215 instant Option 31-Oct-15 ZN6 STR Pre Concreting Inspection formwork for wall at Clarifier Tank B (CT4) 2-Nov-15 4-Nov-15 9.00am CLOSED 13-Nov-15 1 ACCEPTED 1 1
220 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00216 instant Option 31-Oct-15 ZN6 STR Pre Concreting Concreting works for wall at Sludge Thickener tank, Ras/Was 2-Nov-15 4-Nov-15 9.00am CLOSED 13-Nov-15 1 ACCEPTED 1 1
sump & sludge Holding Tank
221 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00217 instant Option 31-Oct-15 ZN6 STR Concreting Concreting works for clarifier tank A (wall) 3-Nov-15 5-Nov-15 2.00pm CLOSED 13-Nov-15 1 ACCEPTED 1 1
222 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00218 instant Option 31-Oct-15 ZN6 STR Concreting Concreting works for wall at Clarifier Tank B (CT4) 3-Nov-15 5-Nov-15 2.00pm CLOSED 13-Nov-15 1 ACCEPTED 1 1
223 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00219 instant Option 2-Nov-15 ZN6 STR Pre Concreting Inspection rebar and formwork (Beam) and control room 2-Nov-15 4-Nov-15 3.00pm CLOSED 13-Nov-15 0 ACCEPTED 1 1
224 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00220 instant Option 2-Nov-15 ZN6 STR Concreting Concreting works for beam at Blower and control room 2-Nov-15 4-Nov-15 3.00pm CLOSED 13-Nov-15 0 ACCEPTED 1 1
225 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00221 instant Option 2-Nov-15 ZN6 STR Pre Concreting Inspection rebar and formwork for beam at Genset sheed 2-Nov-15 4-Nov-15 3.00pm CLOSED 17-Nov-15 4 ACCEPTED 1 1
226 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00222 instant Option 2-Nov-15 ZN6 STR Concreting Concreting works beam at genset shed 2-Nov-15 4-Nov-15 3.00pm CLOSED 17-Nov-15 4 ACCEPTED 1 1
228 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00224 instant Option 2-Nov-15 ZN6 STR Concreting Concreting for beam at Screen Chamber, Grit Chamber, Oil & 2-Nov-15 4-Nov-15 3.00pm CLOSED 17-Nov-15 4 ACCEPTED 1 1
Gease and distribution Chamber
Inspection rebar for second lift wall at Aeration and Anoxic Tank
229 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00225 instant Option 2-Nov-15 ZN6 STR Pre Concreting 2-Nov-15 4-Nov-15 3.00pm CLOSED 17-Nov-15 4 ACCEPTED 1 1
B
231 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00227 Ocned Water 2-Nov-15 ZN6 PIP Piping works Installation DI pipe 600mm at STP2 3-Nov-15 5-Nov-15 10.00am CLOSED 30-Jun-16 0 ACCEPTED 1 1
232 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00228 instant Option 2-Nov-15 ZN6 STR Pre Concreting Inspection rebar and formwork for beam at Chlorine preparation 3-Nov-15 5-Nov-15 10.00am CLOSED 01-Dec-15 17 ACCEPTED 1 1
Shed
2 kali issue
00254
233 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00229 instant Option 2-Nov-15 ZN6 STR Concreting Concreting works for beam at Chlorine preparation Shed 3-Nov-15 5-Nov-15 10.00am CLOSED 17-Nov-15 3 ACCEPTED 1 1
2 kali issue
00255
234 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00230 instant Option 2-Nov-15 ZN6 STR Concreting Concreting works for second lift at Aeration and Anoxic Tank B 3-Nov-15 5-Nov-15 10.00am CLOSED 26-Nov-15 12 REJECTED 1 1
236 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00232 instant Option 5-Nov-15 ZN6 STR Pre Concreting Inspection rebar for wall at Clarifier tank A 5-Nov-15 7-Nov-15 11.00am CLOSED 20-Nov-15 6 ACCEPTED 1 1
237 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00233 instant Option 5-Nov-15 ZN6 STR Concreting Lean Concrete for ground beam at Admin Building 5-Nov-15 7-Nov-15 11.00am CLOSED 15-Nov-15 0 ACCEPTED 1 1
238 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00234 instant Option 5-Nov-15 ZN6 STR Concreting Lean Concrete for ground slab at Genset Shed 5-Nov-15 7-Nov-15 11.00am CLOSED 17-Nov-15 2 ACCEPTED 1 1
240 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00236 instant Option 5-Nov-15 ZN6 STR Pre Concreting Inspection formwork for wall at Clarifier Tank A 6-Nov-15 8-Nov-15 11.00am CLOSED 20-Nov-15 4 ACCEPTED 1 1
241 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00237 instant Option 5-Nov-15 ZN6 STR Pre Concreting Inspection rebar and formwork for slab at Genset Shed 6-Nov-15 8-Nov-15 11.00am CLOSED 20-Nov-15 14 ACCEPTED 1 1
242 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00238 instant Option 5-Nov-15 ZN6 STR Post concreting Post concreting works for slab at Guard House 6-Nov-15 8-Nov-15 11.00am CLOSED 01-Dec-15 13 ACCEPTED 1 1
243 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00239 instant Option 5-Nov-15 ZN6 STR Post concreting Post Concreting works for pile cap at Genset shed 6-Nov-15 8-Nov-15 11.00am CLOSED 26-Nov-15 10 REJECTED 1 1
244 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00240 instant Option 5-Nov-15 ZN6 STR Post concreting Post Concreting works for pile cap at Blower room & Control 6-Nov-15 8-Nov-15 11.00am CLOSED 01-Dec-15 25 ACCEPTED 1 1
Room
247 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00243 instant Option 5-Nov-15 ZN6 STR Post concreting Post Concreting works for slab at Clarifier tank B 6-Nov-15 8-Nov-15 11.00am CLOSED 26-Nov-15 10 REJECTED 1 1
248 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00244 instant Option 5-Nov-15 ZN6 STR Post concreting Post Concreting works for slab at Clarifier tank A 6-Nov-15 8-Nov-15 11.00am CLOSED 17-Nov-15 1 ACCEPTED 1 1
249 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00245 instant Option 5-Nov-15 ZN6 STR Post concreting Post Concreting works for slab, column and wall at Aeration & 6-Nov-15 8-Nov-15 11.00am CLOSED 26-Nov-15 9 REJECTED 1 1
Anoxic tank B
Post Concreting works for slab, column and wall at Aeration &
250 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00246 instant Option 5-Nov-15 ZN6 STR Post concreting 6-Nov-15 8-Nov-15 11.00am CLOSED 26-Nov-15 9 REJECTED 1 1
Anoxic tank A
251 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00247 instant Option 5-Nov-15 ZN6 STR Concreting Concreting works for beam at Blower and control room 5-Nov-15 7-Nov-15 11.00am CLOSED 01-Dec-15 13 ACCEPTED 1 1
253 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00249 instant Option 5-Nov-15 ZN6 STR Material material receive inspection for steel bars 5-Nov-15 7-Nov-15 11.00am CLOSED 01-Dec-15 14 ACCEPTED 1 1
254 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00250 UEMB ZIKRI 5-Nov-15 ZN6 ELE Cable Trench Control room cable trench inspection 5-Nov-15 7-Nov-15 11.00am CLOSED 18-Nov-15 12 ACCEPTED 1 1
255 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00251 instant Option 6-Nov-15 ZN6 STR Concreting Concreting works for beam at admin buidling 7-Nov-15 9-Nov-15 11.00am CLOSED 01-Dec-15 12 ACCEPTED 1 1
256 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00252 instant Option 6-Nov-15 ZN6 STR Concreting Concreting works for slab at Genset shed 7-Nov-15 9-Nov-15 2.00pm CLOSED 27-Nov-15 7 REJECTED 1 1
259 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00255 instant Option 7-Nov-15 ZN6 STR Concreting Concreting works fot beam at Chlorine preparation Shed 9-Nov-15 11-Nov-15 2.30pm CLOSED 27-Nov-15 7 REJECTED 1 1
2 kali issue
260 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00256 instant Option 7-Nov-15 ZN6 STR Pre Concreting Inspection rebar and formwork for beam at Guard House 9-Nov-15 11-Nov-15 10.30am CLOSED 27-Nov-15 7 ACCEPTED 1 1
261 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00257 instant Option 7-Nov-15 ZN6 STR Concreting Concreting works for beam at Guard house 9-Nov-15 11-Nov-15 2.30pm CLOSED 02-Dec-15 12 ACCEPTED 1 1
Inspection rebar for second lift wall at Aeration and Anoxic Tank
262 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00258 instant Option 7-Nov-15 ZN6 STR Pre Concreting 9-Nov-15 11-Nov-15 9.00am CLOSED 02-Dec-15 12 ACCEPTED 1 1
A
Concreting works for second lift wall at Aeration tank and Anoxic
264 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00260 instant Option 7-Nov-15 ZN6 STR Concreting Tank A 11-Nov-15 13-Nov-15 2.00pm CLOSED 26-Nov-15 6 REJECTED 1 1
265 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00261 instant Option 7-Nov-15 ZN6 STR Concreting Concreting works for wall at Clarifier Tank A 9-Nov-15 11-Nov-15 9.00am CLOSED 20-Nov-15 0 ACCEPTED 1 1
266 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00262 instant Option 7-Nov-15 ZN6 STR Post concreting Post concreting for pile cap at Treated water Tank 9-Nov-15 11-Nov-15 9.00am CLOSED 26-Nov-15 6 REJECTED 1 1
267 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00263 instant Option 7-Nov-15 ZN6 STR Post concreting Post Concreting works for column at Guard House 9-Nov-15 11-Nov-15 9.00am CLOSED 26-Nov-15 6 REJECTED 1 1
270 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00266 instant Option 7-Nov-15 ZN6 STR Post concreting Pos concreting works for Ground beam at Gen set Shed 9-Nov-15 11-Nov-15 9.00am CLOSED 01-Dec-15 10 ACCEPTED 1 1
271 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00267 instant Option 7-Nov-15 ZN6 STR Post concreting Post concreting works for pile cap at Admin Building 9-Nov-15 11-Nov-15 9.00am CLOSED 27-Nov-15 4 REJECTED 1 1
272 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00268 instant Option 7-Nov-15 ZN6 STR Post concreting Pos concreting works for wall at Clarofier tank B 9-Dec-15 11-Dec-15 9.00am CLOSED 27-Nov-15 4 REJECTED 1 1
278 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00274 instant Option 12-Nov-15 ZN6 STR Concreting Concreting works for beam and slab at Guard House 12-Nov-15 14-Nov-15 4.00pm CLOSED 01-Dec-15 7 ACCEPTED 1 1
279 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00275 instant Option 12-Nov-15 ZN6 STR Concreting Concreting works for beam and slab at Chlorine preparation shed 12-Nov-15 14-Nov-15 4.00pm CLOSED 01-Dec-15 7 ACCEPTED 1 1
280 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00276 instant Option 12-Nov-15 ZN6 STR Concreting Concreting works for slab at blower and control room 12-Nov-15 14-Nov-15 4.00pm CLOSED 01-Dec-15 6 REJECTED 1 1
281 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00277 instant Option 12-Nov-15 ZN6 STR Lean Concrete Lean concrete for slab at Admin Building 13-Nov-15 15-Nov-15 10.00am CLOSED 01-Dec-15 6 REJECTED 1 1
282 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00278 instant Option 12-Nov-15 ZN6 STR Lean Concrete Lean Concrete for slab at Blower and control room 13-Nov-15 15-Nov-15 11.00am CLOSED 26-Nov-15 0 ACCEPTED 1 1
284 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00280 instant Option 12-Nov-15 ZN6 STR Pre concrete Inspection for rebar at clarifier tank B (wall) 13-Nov-15 15-Nov-15 11.00am CLOSED 01-Dec-15 5 ACCEPTED 1 1
285 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00281 instant Option 12-Nov-15 ZN6 STR Pre concrete Inspection for formwork wall at clarifier tank B 13-Nov-15 15-Nov-15 12.30pm CLOSED 01-Dec-15 6 ACCEPTED 1 1
286 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00282 instant Option 12-Nov-15 ZN6 STR concrete Concreting work for wall at Clarifier tank B (2nd lift) 13-Nov-15 15-Nov-15 4.00pm CLOSED 01-Dec-15 5 REJECTED 1 1
288 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00284 instant Option 12-Nov-15 ZN6 STR concrete Concreting works for column at blower room & control rrom 13-Nov-15 15-Nov-15 4.30pm CLOSED 01-Dec-15 6 ACCEPTED 1 1
289 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00285 instant Option 12-Nov-15 ZN6 STR concrete Inspection for rebar and formwork (slab) at admin building 13-Nov-15 15-Nov-15 3.30pm CLOSED 01-Dec-15 5 ACCEPTED 1 1
291 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00287 instant Option 13-Nov-15 ZN6 STR Pre concrete INSPECTION FOR REBAR(wall) AT CLARIFIER TANK A 14-Nov-15 16-Nov-15 9.30am CLOSED 01-Dec-15 4 REJECTED 1 1
292 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00288 instant Option 13-Nov-15 ZN6 STR Pre concrete INSPECTION FOR REBAR AT CLARIFIER TANK B 14-Nov-15 16-Nov-15 9.00am CLOSED 01-Dec-15 4 REJECTED 1 1
293 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00289 instant Option 13-Nov-15 ZN6 STR concrete concreting for slab admin building 14-Nov-15 16-Nov-15 9.00am CLOSED 02-Dec-15 5 ACCEPTED 1 1
298 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00294 instant Option 14-Nov-15 ZN6 STR Pre concrete Inspection for rebar (column) at admin building 16-Nov-15 18-Nov-15 10.00am CLOSED 01-Dec-15 4 REJECTED 1 1
299 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00295 instant Option 14-Nov-15 ZN6 STR Pre concrete Inspection for formwork (column) at admin building 16-Nov-15 18-Nov-15 10.00am CLOSED 01-Dec-15 4 ACCEPTED 1 1
300 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00296 instant Option 14-Nov-15 ZN6 STR concrete Concreting works for column at admin building 17-Nov-15 19-Nov-15 10.00am CLOSED 01-Dec-15 4 ACCEPTED 1 1
301 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00297 instant Option 14-Nov-15 ZN6 STR concrete Concreting works for clarifier tank A (wall) 2nd lift 18-Nov-15 20-Nov-15 9.00am CLOSED 01-Dec-15 4 REJECTED 1 1
302 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00298 instant Option 14-Nov-15 ZN6 STR Pre concrete Inspection for rebar for staircase at aeration tank A 16-Nov-15 18-Nov-15 9.00am CLOSED 02-Dec-15 4 REJECTED 1 1
303 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00299 instant Option 14-Nov-15 ZN6 STR Pre concrete Inspection for rebar for walkaway at aeration tank A 18-Nov-15 20-Nov-15 9.00am CLOSED 01-Dec-15 2 REJECTED 1 1
304 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00300 instant Option 14-Nov-15 ZN6 STR Pre concrete Inspection for rebar for staircase at aeration tank B 18-Nov-15 20-Nov-15 9.00am CLOSED 01-Dec-15 1 ACCEPTED 1 1
305 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00301 instant Option 14-Nov-15 ZN6 STR Pre concrete Inspection for rebar for walkaway at aeration tank B 16-Nov-15 18-Nov-15 9.00am CLOSED 01-Dec-15 3 ACCEPTED 1 1
306 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00302 instant Option 14-Nov-15 ZN6 STR Pre concrete Inspection for rebar and formwork (slab) at blower room & 16-Nov-15 18-Nov-15 9.00am CLOSED 01-Dec-15 3 ACCEPTED 1 1
control rrom
308 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00304 instant Option 16-Nov-15 ZN6 STR Pre concrete Concreting works for overflow at clarifier tank B 17-Nov-15 19-Nov-15 3.00pm CLOSED 02-Dec-15 2 ACCEPTED 1 1
309 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00305 instant Option 16-Nov-15 ZN6 STR concrete Inspection works for rebar overflow at clarifier tank B 17-Nov-15 19-Nov-15 10.30am CLOSED 04-Dec-15 4 ACCEPTED 1 1
310 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00306 instant Option 16-Nov-15 ZN6 STR Pre concrete inspection of formwork for second lift wall at clarifier tank A 18-Nov-15 20-Nov-15 10.00am CLOSED 02-Dec-15 2 ACCEPTED 1 1
311 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00307 instant Option 16-Nov-15 ZN6 STR Pre concrete inspection of rebar for second lift wall at clarifier tank A 17-Nov-15 19-Nov-15 9.30am CLOSED 04-Dec-15 4 ACCEPTED 1 1
312 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00308 instant Option 16-Nov-15 ZN6 CIV excavation excavation works for sand drying bed 17-Nov-15 19-Nov-15 9.30am CLOSED 04-Dec-15 4 REJECTED 1 1
313 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00309 instant Option 18-Nov-15 ZN6 STR Concreting Concreting works for walkway at aeration and anoxic tank A 19-Nov-15 21-Nov-15 3.00pm CLOSED 04-Dec-15 4 REJECTED 1 1
314 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00310 instant Option 18-Nov-15 ZN6 STR Concreting Concreting works for walkway at aeration and anoxic tank B 19-Nov-15 21-Nov-15 3.00pm CLOSED 04-Dec-15 4 REJECTED 1 1
315 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00311 instant Option 18-Nov-15 ZN6 CIV Testing Road work lane crusher run FDT test for road base 20-Nov-15 22-Nov-15 3.00pm CLOSED 04-Dec-15 4 REJECTED 1 1
316 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00312 instant Option 18-Nov-15 ZN6 CIV Testing Road work FDT test soil subgrade at STP2 20-Nov-15 22-Nov-15 3.00pm CLOSED 04-Dec-15 4 REJECTED 1 1
317 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00313 instant Option 18-Nov-15 ZN6 CIV Testing Road works infra sand FDT test of road sub-base at STP2 20-Nov-15 22-Nov-15 3.00pm CLOSED 07-Dec-15 7 REJECTED 1 1
318 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00314 instant Option 18-Nov-15 ZN6 CIV Concreting concreting works of haunching for DI pipe at Sludge 20-Nov-15 22-Nov-15 3.00pm CLOSED 08-Dec-15 7 ACCEPTED 1 1
319 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00315 instant Option 18-Nov-15 ZN6 CIV Lean concrete Lean concrete at Sand Drying Bed 20-Nov-15 22-Nov-15 3.00pm CLOSED 08-Dec-15 7 ACCEPTED 1 1
320 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00316 instant Option 18-Nov-15 ZN6 CIV Testing FDT test for crusher run surface at Sand Drying Bed 20-Nov-15 22-Nov-15 3.00pm CLOSED 08-Dec-15 5 ACCEPTED 1 1
321 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00317 instant Option 18-Nov-15 ZN6 CIV Testing FDT test for soil subgrade at Sand Drying Bed 20-Nov-15 22-Nov-15 3.00pm CLOSED 08-Dec-15 6 ACCEPTED 1 1
323 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00319 instant Option 18-Nov-15 ZN6 CIV brick work brick works for wall at Guard House 20-Nov-15 22-Nov-15 3.00pm CLOSED 08-Dec-15 7 REJECTED 1 1
324 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00320 instant Option 18-Nov-15 ZN6 CIV Lean Concrete Lean concrete for slab at Treated Water Tank 20-Nov-15 22-Nov-15 9.00am CLOSED 08-Dec-15 6 ACCEPTED 1 1
325 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00321 instant Option 19-Nov-15 ZN6 STR Pre-concreting Inspection of rebar for culvert at Clarifier Tank A and Tank B 26-Nov-15 28-Nov-15 9.00am CLOSED 08-Dec-15 6 REJECTED 1 1
327 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00323 instant Option 19-Nov-15 ZN6 STR Material Inspection of materials received for High Tensile Deformed Bar 20-Nov-15 22-Nov-15 9.30am CLOSED 02-Dec-15 0 REJECTED 1 1
328 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00324 instant Option 19-Nov-15 ZN6 STR concreting Concreting works for Apron sump ( Slab) at Clarifier Tank B 20-Nov-15 22-Nov-15 9.30am CLOSED 08-Dec-15 6 ACCEPTED 1 1
329 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00325 instant Option 21-Nov-15 ZN6 STR concreting concreting works for slab roof at blower and control room 21-Nov-15 23-Nov-15 2.30pm CLOSED 04-Dec-15 1 ACCEPTED 1 1
330 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00326 instant Option 21-Nov-15 ZN6 STR concreting concreting works for roof slab/beam at admin building 23-Nov-15 25-Nov-15 10.30am CLOSED 04-Dec-15 1 ACCEPTED 1 1
331 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00327 instant Option 21-Nov-15 ZN6 STR Pre-concreting inspection formwork & rebar for roof slab annd beam at admin 23-Nov-15 25-Nov-15 10.30am CLOSED 04-Dec-15 1 ACCEPTED 1 1
building
333 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00329 instant Option 21-Nov-15 ZN6 STR concreting Concrteing works for overflow through at sludge thickener tank 23-Nov-15 25-Nov-15 10.30am CLOSED 08-Dec-15 5 ACCEPTED 1 1
336 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00332 instant Option 24-Nov-15 ZN6 STR brick work Brick works for wall at guard house 24-Nov-15 26-Nov-15 3.00pm CLOSED 08-Dec-15 5 ACCEPTED 1 1
337 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00333 instant Option 24-Nov-15 ZN6 STR Pre-concreting inspection of rebar and formwork for effluent sump (slab) at 24-Nov-15 26-Nov-15 3.00pm CLOSED 08-Dec-15 5 ACCEPTED 1 1
clarifier tank A and B
338 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00334 instant Option 24-Nov-15 ZN6 STR concreting Concreting works for effluent sump (slab) at clarifier tank A and B 24-Nov-15 26-Nov-15 4.00pm CLOSED 04-Dec-15 1 ACCEPTED 1 1
339 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00335 instant Option 24-Nov-15 ZN6 STR pre-concreting Inspection of rebar and formwork for walkway at Clarifier Tank B 25-Nov-15 27-Nov-15 9.00am CLOSED 08-Dec-15 4 ACCEPTED 1 1
340 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00336 instant Option 24-Nov-15 ZN6 STR Concreting Concreting works for walkway at Clarifier Tank B 25-Nov-15 27-Nov-15 2.00pm CLOSED 08-Dec-15 4 ACCEPTED 1 1
342 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00338 instant Option 24-Nov-15 ZN6 STR pre concreting Inspection of rebar and formwork for slab at Disinfection 25-Nov-15 27-Nov-15 9.00am CLOSED 14-Dec-15 10 ACCEPTED 1 1
Chamber and treated water tank
343 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00339 instant Option 24-Nov-15 ZN6 STR Concreting Concreting works for slab and beam at Distribution Chamber 2 26-Nov-15 28-Nov-15 2.00pm CLOSED 08-Dec-15 4 ACCEPTED 1 1
344 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00340 instant Option 24-Nov-15 ZN6 STR Pre concreting Inspection of rebar and formwork for beam and slab at 25-Nov-15 27-Nov-15 9.00am CLOSED 08-Dec-15 13 ACCEPTED 1 1
Distribution Chamber 2
345 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00341 instant Option 24-Nov-15 ZN6 STR Pre concreting Inspection of formwork for culvert at Clarifier Tank A and B 26-Nov-15 28-Nov-15 9.00am CLOSED 14-Dec-15 7 ACCEPTED 1 1
346 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00342 instant Option 25-Nov-15 ZN6 STR Pre concreting Inspection of rebar and formwork for overflow at Clarifier Tank B 25-Nov-15 27-Nov-15 9.00am CLOSED 09-Dec-15 14 ACCEPTED 1 1
347 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00343 instant Option 25-Nov-15 ZN6 STR Concreting Concreting works for overflow at Clarifier Tank B 25-Nov-15 27-Nov-15 2.00pm CLOSED 22-Dec-15 15 ACCEPTED 1 1
350 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00346 Ocned Water 26-Nov-15 ZN6 ELE Equipment laying GI pipe for road crossing cable at STP2 27-Nov-15 29-Nov-15 9.00am CLOSED 27-Nov-15 0 ACCEPTED 1 1
353 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00349 instant Option 26-Nov-15 ZN6 STR Pre concreting Inspection for rebar and formwork for roof slab and beam at 27-Nov-15 29-Nov-15 9.00am CLOSED 16-Dec-15 11 ACCEPTED 1 1
Admin Building
354 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00350 instant Option 26-Nov-15 ZN6 STR Pre concreting Inspection of rebar and formwork for walkway at Clarifier Tank A 27-Nov-15 29-Nov-15 9.00am CLOSED 22-Dec-15 14 ACCEPTED 1 1
358 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00354 instant Option 26-Nov-15 ZN6 STR Concreting Concreting works for slab and beam at Sand Drying bed 27-Nov-15 29-Nov-15 2.00pm CLOSED 14-Dec-15 7 ACCEPTED 1 1
359 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00355 instant Option 26-Nov-15 ZN6 STR Concreting Concreting works for roof slab and beam at Admin Building 27-Nov-15 29-Nov-15 2.00pm CLOSED 22-Dec-15 14 ACCEPTED 1 1
Concreting works for wall at Clarifier Tank A and B (Effluent
360 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00356 instant Option 26-Nov-15 ZN6 STR Concreting 27-Nov-15 29-Nov-15 2.00pm CLOSED 14-Dec-15 6 ACCEPTED 1 1
sump)
361 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00357 instant Option 26-Nov-15 ZN6 STR Concreting Concreting works for walkway at clarifier tank A 27-Nov-15 29-Nov-15 2.00pm CLOSED 08-Dec-15 0 ACCEPTED 1 1
362 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00358 instant Option 26-Nov-15 ZN6 STR Concreting Concreting works for overflow wall and Clarifier Tank B 28-Nov-15 30-Nov-15 2.00pm CLOSED 14-Dec-15 5 ACCEPTED 1 1
363 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00359 instant Option 26-Nov-15 ZN6 STR Concreting Concreting works for overflow wall at Clarifier Tank A 29-Nov-15 1-Dec-15 2.00pm CLOSED 14-Dec-15 4 ACCEPTED 1 1
364 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00360 instant Option 26-Nov-15 ZN6 STR Concreting Concreting works for overflow slab at Clarifier Tank A 30-Nov-15 2-Dec-15 2.00pm CLOSED 14-Dec-15 4 ACCEPTED 1 1
366 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00362 instant Option 27-Nov-15 ZN6 STR Material Inspection or material reveive for steel bar 28-Nov-15 30-Nov-15 9.00am CLOSED 14-Dec-15 3 ACCEPTED 1 1
367 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00363 instant Option 28-Nov-15 ZN6 STR Pre concreting Inspection of rebar for wall at Distribution Chamber 2 30-Nov-15 2-Dec-15 9.00am CLOSED 14-Dec-15 2 ACCEPTED 1 1
368 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00364 instant Option 28-Nov-15 ZN6 STR Pre concreting Inspection of rebar and formwork for walkway at Clarifier Tank A 30-Nov-15 2-Dec-15 10.00am CLOSED 14-Dec-15 2 ACCEPTED 1 1
369 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00365 instant Option 28-Nov-15 ZN6 STR Concreting Concreting works for walkway at Clarifier Tank A 30-Nov-15 2-Dec-15 2.00pm CLOSED 14-Dec-15 2 ACCEPTED 1 1
370 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00366 instant Option 28-Nov-15 ZN6 STR Pre concreting Inspection of rebar and formwork for walkway at Clarifier Tank B 30-Nov-15 2-Dec-15 9.00am CLOSED 14-Dec-15 2 ACCEPTED 1 1
371 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00367 instant Option 28-Nov-15 ZN6 STR Concreting Concreting works for walkway at Clarifier Tank B 30-Nov-15 2-Dec-15 2.00pm CLOSED 16-Dec-15 3 ACCEPTED 1 1
372 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00368 instant Option 28-Nov-15 ZN6 STR Pre concreting Inspection of rebar and formwork for slab at Sand Drying bed 30-Nov-15 2-Dec-15 9.00am CLOSED 16-Dec-15 3 ACCEPTED 1 1
373 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00369 instant Option 28-Nov-15 ZN6 STR Concreting Concreting works for slab at Sand drying bed 30-Nov-15 2-Dec-15 2.00pm CLOSED 16-Dec-15 3 ACCEPTED 1 1
374 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00370 instant Option 28-Nov-15 ZN6 STR Concreting Concreting works for slab at Clarifier Tank A and Tank B 30-Nov-15 2-Dec-15 2.00pm CLOSED 16-Dec-15 16 ACCEPTED 1 1
375 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00371 instant Option 28-Nov-15 ZN6 STR Pre concreting Inspection of rebar and formwork for wall at Screen chamber, 30-Nov-15 2-Dec-15 9.00am CLOSED 14-Dec-15 14 ACCEPTED 1 1
Grit chamber, Oil & Grease chamber & Distribution chamber 1
376 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00372 instant Option 28-Nov-15 ZN6 ARC Pre concreting Inspection of brick works for wall at Guard House 30-Nov-15 2-Dec-15 9.00am CLOSED 29-Dec-15 16 ACCEPTED 1 1
377 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00373 Ocned Water 30-Nov-15 ZN6 PIP Material material receiving inspection 30-Nov-15 2-Dec-15 4.00pm CLOSED 29-Dec-15 16 ACCEPTED 1 1
378 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00374 instant Option 30-Nov-15 ZN6 STR Pre concrete Inspection of rebar for overflow wall at Clarifier Tank A 1-Dec-15 3-Dec-15 10.300am CLOSED 29-Dec-15 15 ACCEPTED 1 1
ready
379 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00375 instant Option 30-Nov-15 ZN6 STR Pre concrete Inspection of rebar for overflow wall at Clarifier Tank B 1-Dec-15 3-Dec-15 9.00am CLOSED 29-Dec-15 15 ACCEPTED 1 1
ready
380 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00376 instant Option 30-Nov-15 ZN6 STR Pre concreting Inspection of formwork for culvert at Clarifier Tank A and B 3-Dec-15 5-Dec-15 2.00pm CLOSED 16-Dec-15 1 ACCEPTED 1 1
ready
381 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00377 instant Option 30-Nov-15 ZN6 STR Concreting Concreting works for overflow wall at clarifier Tank B 2-Dec-15 4-Dec-15 2.00pm CLOSED 22-Dec-15 5 ACCEPTED 1 1
ready
384 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00380 instant Option 30-Nov-15 ZN6 STR Concreting Concreting works for overflow wall at clarifer tank A 2-Dec-15 4-Dec-15 2.00pm CLOSED 29-Dec-15 12 ACCEPTED 1 1
ready
Inspection of formwork for wall at Treated Water Tankz and
385 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00381 instant Option 1-Dec-15 ZN6 STR Pre concreting 2-Dec-15 4-Dec-15 11.00am CLOSED 29-Dec-15 12 ACCEPTED 1 1
Disinfection Chamber ready
386 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00382 instant Option 1-Dec-15 ZN6 CIV Material Inspection of material for steel bar (Y10 BS x 12) 2-Dec-15 4-Dec-15 9.00am CLOSED 29-Dec-15 12 ACCEPTED 1 1
ready
387 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00383 instant Option 1-Dec-15 ZN6 CIV Material Inspection of material for steel BRC 2-Dec-15 4-Dec-15 9.00am CLOSED 29-Dec-15 12 ACCEPTED 1 1
ready
388 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00384 instant Option 1-Dec-15 ZN6 STR Pre concreting Inspection of rebar for culvert at Clarifier Tank A and B 2-Dec-15 4-Dec-15 9.00am CLOSED 29-Dec-15 12 ACCEPTED 1 1
ready
389 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00385 instant Option 2-Dec-15 ZN6 STR concreting Concreting works for slab at Sand drying Bed 3-Dec-15 5-Dec-15 10.00am CLOSED 22-Dec-15 5 ACCEPTED 1 1
ready
Inspection of rebar and formwork for staircase at Aeration Tank
390 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00386 instant Option 2-Dec-15 ZN6 STR pre concreting 3-Dec-15 5-Dec-15 2.00pm CLOSED 22-Dec-15 5 ACCEPTED 1 1
B ready
391 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00387 instant Option 2-Dec-15 ZN6 STR concreting Concreting works for staircase at Aeration Tank B 3-Dec-15 5-Dec-15 4.00pm CLOSED 29-Dec-15 10 ACCEPTED 1 1
ready
392 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00388 instant Option 2-Dec-15 ZN6 STR pre concreting Inspection of rebar and formwork for staircase at AerationTank A 3-Dec-15 5-Dec-15 10.00am CLOSED 29-Dec-15 10 ACCEPTED 1 1
ready
393 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00389 instant Option 2-Dec-15 ZN6 STR concreting Concreting works for staircase at Aeration TankA 3-Dec-15 5-Dec-15 3.00pm CLOSED 29-Dec-15 10 ACCEPTED 1 1
ready
Inspection of rebar for wall at Screen Chamber, Grit chamber, Oil
394 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00390 instant Option 2-Dec-15 ZN6 STR pre concreting 3-Dec-15 5-Dec-15 10.30am CLOSED 29-Dec-15 10 ACCEPTED 1 1
& Grease Chamber, and Distribution chamber 1
ready
395 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00391 instant Option 2-Dec-15 ZN6 STR pre concreting Inspection of rebar for wall at Distribution chamber 2 3-Dec-15 5-Dec-15 10.00am CLOSED 22-Dec-15 3 ACCEPTED 1 1
ready
396 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00392 instant Option 2-Dec-15 ZN6 STR pre concreting Inspection of formwork for wall at Distribution chamber 2 3-Dec-15 5-Dec-15 10.00am CLOSED 29-Dec-15 10 ACCEPTED 1 1
ready
397 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00393 instant Option 2-Dec-15 ZN6 STR concreting Concreting works for wallat Distribution Chamber 2 3-Dec-15 5-Dec-15 3.00pm CLOSED 22-Dec-15 3 ACCEPTED 1 1
ready
398 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00394 instant Option 3-Dec-15 ZN6 STR pre concreting Inspectin of rebar and formwork for slab at Sand Drying Bed 3-Dec-15 5-Dec-15 9.30am CLOSED 29-Dec-15 10 ACCEPTED 1 1
ready
399 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00395 instant Option 4-Dec-15 ZN6 STR pre concreting Inspection of formwork for overflow wall at Clarifier Tank A 4-Dec-15 6-Dec-15 9.30am CLOSED 29-Dec-15 10 ACCEPTED 1 1
ready
400 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00396 instant Option 4-Dec-15 ZN6 STR pre concreting Inspection of formwork for overflow wall at Clarifier Tank B 4-Dec-15 6-Dec-15 9.00am CLOSED 22-Dec-15 3 ACCEPTED 1 1
ready
401 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00397 instant Option 4-Dec-15 ZN6 STR concreting Concreting works for culvert at Clarifier Tank A 4-Dec-15 6-Dec-15 9.00am CLOSED 29-Dec-15 10 ACCEPTED 1 1
ready
402 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00398 instant Option 4-Dec-15 ZN6 STR concreting Concreting haunching for D.I pipe at Sludge Tank 4-Dec-15 6-Dec-15 9.00am CLOSED 29-Dec-15 10 ACCEPTED 1 1
ready
Applied bitumen coating at outside of sludge tank (below level
403 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00399 instant Option 4-Dec-15 ZN6 STR Bitumen coating 4-Dec-15 6-Dec-15 9.00am CLOSED 1-Jan-16 10 ACCEPTED 1 1
5.0)
ready
ready
Concreting works for wall at Treated Water Tank abd
405 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00401 instant Option 4-Dec-15 ZN6 STR concreting Disinfection Chamber 5-Dec-15 7-Dec-15 2.00pm CLOSED 29-Dec-15 24 ACCEPTED 1 1
ready
406 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00402 instant Option 5-Dec-15 ZN6 STR pre concreting Inspection of formwork for column at Sand Drying Bed 7-Dec-15 9-Dec-15 9.30am CLOSED 14-Dec-15 7 REJECTED 1 1
ready
407 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00403 instant Option 5-Dec-15 ZN6 STR pre concreting Inspection of rebar for column at Sand Drying Bed 7-Dec-15 9-Dec-15 9.30am CLOSED 29-Dec-15 22 ACCEPTED 1 1
ready
408 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00404 instant Option 5-Dec-15 ZN6 STR pre concreting Inspection of formwork for wall at Sand Drying Bed 7-Dec-15 9-Dec-15 9.30am CLOSED 14-Dec-15 7 REJECTED 1 1
409 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00405 instant Option 5-Dec-15 ZN6 STR pre concreting Inspection of rebar wall at Sand Draying Bed 7-Dec-15 9-Dec-15 9.30am CLOSED 1-Jan-16 25 ACCEPTED 1 1
ready
411 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00407 instant Option 5-Dec-15 ZN6 STR concreting Concreting works for column at Sand Drying Bed 7-Dec-15 9-Dec-15 2.30pm CLOSED 29-Dec-15 22 ACCEPTED 1 1
ready
412 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00408 instant Option 5-Dec-15 ZN6 STR concreting Concreting works for wall at sand Drying Bed 7-Dec-15 9-Dec-15 2.30pm CLOSED 14-Dec-15 7 REJECTED 1 1
414 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00410 instant Option 5-Dec-15 ZN6 CIV Material Brick net expandedmetal at STP2 5-Dec-15 7-Dec-15 11.00am CLOSED 29-Dec-15 7 ACCEPTED 1 1
ready
417 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00413 instant Option 7-Dec-15 ZN6 ARC brick work Inspection of brick works for wall at Blower and Control room 8-Dec-15 10-Dec-15 10.30am CLOSED 22-Dec-15 11 ACCEPTED 1 1
418 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00414 instant Option 7-Dec-15 ZN6 ARC brick work Inspection of brick works for wall at Admin building 8-Dec-15 10-Dec-15 10.00am CLOSED 22-Dec-15 14 ACCEPTED 1 1
419 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00415 instant Option 7-Dec-15 ZN6 ARC brick work Inspection of brick works for wall at Guard House 8-Dec-15 10-Dec-15 9.30am CLOSED 22-Dec-15 14 ACCEPTED 1 1
420 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00416 instant Option 7-Dec-15 ZN6 STR pre concreting Inspection of rebar for wall at Grit, Oil & grease chamber and 7-Dec-15 9-Dec-15 11.00am CLOSED 29-Dec-15 7 ACCEPTED 1 1
Distribution chamber 1
ready
421 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00417 Instant Option 7-Dec-15 ZN6 ARC Installation Installation of door frame and window frame at Guard House 8-Dec-15 10-Dec-15 9.30am CLOSED 22-Dec-15 10 REJECTED 1 1
422 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00418 Instant Option 7-Dec-15 ZN6 STR structure Inspection of rebar for stiffner at Blower and Control Room (wall) 8-Dec-15 10-Dec-15 9.00am CLOSED 6-May-16 150 ACCEPTED 1 1
425 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00421 Ocned Water 7-Dec-15 ZN6 MNE Material Material delivery inspection for Handrailing 8-Dec-15 10-Dec-15 8.00am CLOSED 29-Dec-15 21 ACCEPTED 1 1
426 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00422 Ocned Water 7-Dec-15 ZN6 PIP Material Material delivery inspection for D.I pipe 8-Dec-15 10-Dec-15 8.00am CLOSED 29-Dec-15 21 REJECTED 1 1
430 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00426 instant Option 8-Dec-15 ZN6 STR pre concreting Inspection of rebar for culvert at Clarifier Tank A and B (2nd Lift) 9-Dec-15 11-Dec-15 9.00am CLOSED 29-Dec-15 20 ACCEPTED 1 1
ready
431 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00427 instant Option 8-Dec-15 ZN6 STR pre concreting Inspection of rebar for stiffner ar Admin Building 9-Dec-15 11-Dec-15 9.30am CLOSED 6-May-16 149 ACCEPTED 1 1
432 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00428 instant Option 8-Dec-15 ZN6 STR pre concreting Inspection of formwork for Stifner at Admin Building 9-Dec-15 11-Dec-15 9.30am CLOSED 6-May-16 149 ACCEPTED 1 1
433 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00429 instant Option 8-Dec-15 ZN6 STR Concreting works Concreting works for stiffner at Admin Building 9-Dec-15 11-Dec-15 10.00am CLOSED 6-May-16 149 ACCEPTED 1 1
434 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00430 instant Option 9-Dec-15 ZN6 STR pre concreting Inspection of formwork for ramp ( Slab) and wall at Sand Drying 10-Dec-15 12-Dec-15 11.00am CLOSED 1-Jan-16 9 REJECTED 1 1
Bed
ready
435 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00431 instant Option 9-Dec-15 ZN6 STR pre concreting Inspection of formwork for column at Sand drying bed 10-Dec-15 12-Dec-15 11.00am CLOSED 14-Dec-15 4 REJECTED 1 1
ready
438 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00434 instant Option 11-Dec-15 ZN6 STR Concreting works concreting works for slab screen chamber 12-Dec-15 14-Dec-15 2.00pm CLOSED 14-Dec-15 0 ACCEPTED 1 1
ready
439 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00435 instant Option 11-Dec-15 ZN6 STR pre concreting inspection of rebar & formworks for slab at screen chamber 12-Dec-15 14-Dec-15 9.00am CLOSED 14-Dec-15 0 ACCEPTED 1 1
ready
440 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00436 instant Option 11-Dec-15 ZN6 STR pre concreting inspection of formworks for wall at grit, oil and grease chamber 12-Dec-15 14-Dec-15 9.30am CLOSED 14-Dec-15 2 ACCEPTED 1 1
and distribution chamber 1
ready
concreting works for wall at grit, oil and grease chamber and
441 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00437 instant Option 11-Dec-15 ZN6 STR Concreting works 12-Dec-15 14-Dec-15 2.30pm CLOSED 14-Dec-15 2 ACCEPTED 1 1
distribution chamber 1
ready
442 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00438 instant Option 11-Dec-15 ZN6 STR pre concreting inspection of formwork for inside wall in disinfection chamber 13-Dec-15 15-Dec-15 9.30am CLOSED 1-Jan-16 4 ACCEPTED 1 1
443 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00439 instant Option 11-Dec-15 ZN6 STR Concreting works concreting works for inside wall in disinfection chamber 13-Dec-15 15-Dec-15 2.30pm CLOSED 16-Dec-15 3 ACCEPTED 1 1
444 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00440 instant Option 11-Dec-15 ZN6 STR Concreting works concreting works for ramp (slab) and wall at sand drying bed 13-Dec-15 15-Dec-15 3.00pm CLOSED 16-Dec-15 3 ACCEPTED 1 1
445 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00441 instant Option 11-Dec-15 ZN6 STR Concreting works concreting works for short column at sand drying bed 13-Dec-15 15-Dec-15 3.00pm CLOSED 16-Dec-15 3 ACCEPTED 1 1
446 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00442 instant Option 11-Dec-15 ZN6 STR Concreting works concreting works for culvert at clarifier tank A & B (2nd lift) 12-Dec-15 14-Dec-15 3.00pm CLOSED 14-Dec-15 2 ACCEPTED 1 1
ready
447 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00443 instant Option 12-Dec-15 ZN6 CIV Lean Concrete Lean concrete for scum return sump 13-Dec-15 15-Dec-15 11.00am CLOSED 28-Dec-15 0 REJECTED 1 1
448 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00444 instant Option 12-Dec-15 ZN6 CIV excavation excavation works for scump return sump 13-Dec-15 15-Dec-15 11.00am CLOSED 28-Dec-15 0 REJECTED 1 1
450 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00446 instant Option 12-Dec-15 ZN6 STR pre concreting Inspection of rebar for wall at Screen Chamber 14-Dec-15 16-Dec-15 10.00am CLOSED 29-Dec-15 15 REJECTED 1 1
451 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00447 instant Option 14-Dec-15 ZN6 STR pre concreting Inspection of formwork for column , ramp and wall at Sand 15-Dec-15 17-Dec-15 9.00am CLOSED 16-Dec-15 1 ACCEPTED 1 1
Drying bed
ready
Ductile iron pipe installation (dia. 200mm transfer pipe)at STP 2
452 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00448 instant Option 16-Dec-15 ZN6 MNE Installation 16-Dec-15 18-Dec-15 11.00am CLOSED 16-Dec-15 2 ACCEPTED 1 1
ZN6
453 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00449 instant Option 16-Dec-15 ZN6 STR pre concreting Inspection of rebar and formwork for slab at Parshall flume 17-Dec-15 19-Dec-15 9.30am CLOSED 22-Dec-15 5 ACCEPTED 1 1
chamber and overflow. (Treated water tank)
457 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00453 instant Option 16-Dec-15 ZN6 CIV Installation Installation of post and fencing at STP 2 17-Dec-15 19-Dec-15 9.00am CLOSED 29-Dec-15 12 REJECTED 1 1
458 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00454 instant Option 16-Dec-15 ZN6 CIV Installation Installation of RC U-drain at STP 2 17-Dec-15 19-Dec-15 9.00am CLOSED 6-May-16 141 ACCEPTED 1 1
459 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00455 instant Option 16-Dec-15 ZN6 CIV excavation Excavation works for drainage and fencing 17-Dec-15 19-Dec-15 9.00am CLOSED 29-Dec-15 12 ACCEPTED 1 1
460 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00456 instant Option 16-Dec-15 ZN6 CIV Installation Installation of VC pipe at STP 2 17-Dec-15 19-Dec-15 9.30am CLOSED 29-Dec-15 12 REJECTED 1 1
461 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00457 instant Option 16-Dec-15 ZN6 STR Concreting works Mass Concreting works at sludge Tank (slab) 17-Dec-15 19-Dec-15 9.30am CLOSED 29-Dec-15 12 ACCEPTED 1 1
462 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00458 instant Option 16-Dec-15 ZN6 CIV Material Inspection of material received for RC U-drain 17-Dec-15 19-Dec-15 9.30am CLOSED 22-Dec-15 5 ACCEPTED 1 1
463 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00459 instant Option 16-Dec-15 ZN6 CIV Material Inspection of material received for VC pipe 17-Dec-15 19-Dec-15 9.30am CLOSED 22-Dec-15 5 ACCEPTED 1 1
464 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00460 instant Option 18-Dec-15 ZN6 STR pre concreting Inspection of rebar for wall at Screen chamber 19-Dec-15 21-Dec-15 9.00am CLOSED 29-Dec-15 10 ACCEPTED 1 1
465 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00461 instant Option 18-Dec-15 ZN6 STR pre concreting Inspection of formwork for wall at Screen chamber 19-Dec-15 21-Dec-15 9.30am CLOSED 29-Dec-15 10 ACCEPTED 1 1
466 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00462 instant Option 18-Dec-15 ZN6 STR concreting Concreting works for wall at Sceen chamber 19-Dec-15 21-Dec-15 2.30am CLOSED 29-Dec-15 10 ACCEPTED 1 1
467 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00463 instant Option 18-Dec-15 ZN6 STR pre concreting Inspection of formwork for wall at Oil & Grease chamber 19-Dec-15 21-Dec-15 9.30am CLOSED 29-Dec-15 10 ACCEPTED 1 1
468 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00464 instant Option 18-Dec-15 ZN6 STR pre concreting Inspection of rebar for wall at Oil & Grease chamber 19-Dec-15 21-Dec-15 9.00am CLOSED 22-Dec-15 3 ACCEPTED 1 1
469 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00465 instant Option 18-Dec-15 ZN6 STR concreting Concreting works for wall at Oil & Grease chamber 19-Dec-15 21-Dec-15 2.30pm CLOSED 29-Dec-15 10 ACCEPTED 1 1
473 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00469 instant Option 18-Dec-15 ZN6 STR pre concreting Inspection of rebar for overflow wall at Disinfection chamber 19-Dec-15 21-Dec-15 9.30am CLOSED 22-Dec-15 3 ACCEPTED 1 1
475 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00471 instant Option 18-Dec-15 ZN6 STR concreting Concreting works for overflow wall at Disinfection Chamber 19-Dec-15 21-Dec-15 3.00pm CLOSED 29-Dec-15 10 ACCEPTED 1 1
477 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00473 instant Option 21-Dec-15 ZN6 STR Mass concrete Mass concreting works at Sludge Thickener Tank 22-Dec-15 24-Dec-15 9.00am CLOSED 1-Jan-16 10 ACCEPTED 1 1
478 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00474 instant Option 21-Dec-15 ZN6 STR Mass concrete Mass concreting works at Treated Water Tank (First stage) 22-Dec-15 24-Dec-15 9.00am CLOSED 29-Dec-15 7 REJECTED 1 1
Inspection of rebar and formwork for walkway at Treated Water
479 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00475 instant Option 21-Dec-15 ZN6 STR pre concreting 22-Dec-15 24-Dec-15 9.30am CLOSED 29-Dec-15 7 ACCEPTED 1 1
Tank
480 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00476 instant Option 21-Dec-15 ZN6 STR concreting Concreting works for walkway at Treated Water Tank 22-Dec-15 24-Dec-15 2.00pm CLOSED 29-Dec-15 7 ACCEPTED 1 1
482 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00478 instant Option 21-Dec-15 ZN6 STR concreting Concreting works for walkway at Disinfection Chamber 22-Dec-15 24-Dec-15 2.30am CLOSED 29-Dec-15 7 ACCEPTED 1 1
483 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00479 instant Option 21-Dec-15 ZN6 STR excavation Excavation works for Grit & Oil/Grease Sand Bed 22-Dec-15 24-Dec-15 9.00am CLOSED 1-Jan-16 10 ACCEPTED 1 1
484 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00480 instant Option 21-Dec-15 ZN6 STR Lean Concrete Lean concrete at Grit & Oil/Grease Sand Bed 22-Dec-15 24-Dec-15 9.00am CLOSED 1-Jan-16 10 ACCEPTED 1 1
485 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00481 instant Option 21-Dec-15 ZN6 STR Excavation Excavation works for Polymer Shed 22-Dec-15 24-Dec-15 9.30am CLOSED 29-Dec-15 7 ACCEPTED 1 1
486 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00482 instant Option 21-Dec-15 ZN6 STR Lean Concrete Lean concrete at Polymer Shed 22-Dec-15 24-Dec-15 10.00am CLOSED 29-Dec-15 7 ACCEPTED 1 1
488 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00484 instant Option 21-Dec-15 ZN6 STR concreting Concreting works for ground beam at Polymer Shed 22-Dec-15 24-Dec-15 2.30pm CLOSED 29-Dec-15 7 ACCEPTED 1 1
489 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00485 instant Option 21-Dec-15 ZN6 STR pre concreting Inspection of rebar and formwork for slab at Polymer Shed 22-Dec-15 24-Dec-15 9.00am CLOSED 29-Dec-15 7 ACCEPTED 1 1
490 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00486 instant Option 21-Dec-15 ZN6 STR concreting Concreting works for slab at Polymer Shed 22-Dec-15 24-Dec-15 9.00am CLOSED 29-Dec-15 7 ACCEPTED 1 1
491 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00487 instant Option 21-Dec-15 ZN6 CIV Epoxy painting Apply epoxy painting in Aeration Tank A 21-Dec-15 23-Dec-15 2.30pm CLOSED 1-Jan-16 11 ACCEPTED 1 1
492 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00488 instant Option 21-Dec-15 ZN6 CIV Epoxy painting Apply epoxy painting in Aeration Tank B 22-Dec-15 24-Dec-15 2.00pm CLOSED 29-Dec-15 7 REJECTED 1 1
493 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00489 instant Option 21-Dec-15 ZN6 CIV pre concreting Inspection of rebar and formwork for slab at Scum Return scump 22-Dec-15 24-Dec-15 10.00am CLOSED 29-Dec-15 7 ACCEPTED 1 1
494 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00490 instant Option 21-Dec-15 ZN6 CIV Lean Concrete Lean concrete for scum return sump 22-Dec-15 24-Dec-15 9.00am CLOSED 29-Dec-15 7 ACCEPTED 1 1
495 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00491 instant Option 21-Dec-15 ZN6 CIV concreting Concreting works for slab atScum Return sump 23-Dec-15 25-Dec-15 2.00pm CLOSED 1-Jan-16 9 ACCEPTED 1 1
496 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00492 instant Option 22-Dec-15 ZN6 CIV FDT 'testing FDT test for subgrade at Grit & Oil /Grease Sand bed 22-Dec-15 24-Dec-15 10.00am CLOSED 1-Jan-16 10 ACCEPTED 1 1
497 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00493 Ocned Water 22-Dec-15 ZN6 MNE Equipment Request inspection for MLSS pump installation 23-Dec-15 25-Dec-15 9.00am CLOSED 23-Dec-15 0 ACCEPTED 1 1
501 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00497 instant Option 22-Dec-15 ZN6 STR concreting Concreting works for staircase at Disinfection Chamber 23-Dec-15 25-Dec-15 2.30am CLOSED 29-Dec-15 6 REJECTED 1 1
503 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00499 instant Option 23-Dec-15 ZN6 STR Pre concrete Inspetion of rebar for column at Polymer Shed 23-Dec-15 25-Dec-15 2.00pm CLOSED 29-Dec-15 6 REJECTED 1 1
504 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00500 instant Option 23-Dec-15 ZN6 STR Pre concrete Inspection of formwork for column at Polymer Shed 23-Dec-15 25-Dec-15 2.30pm CLOSED 29-Dec-15 6 REJECTED 1 1
505 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00501 instant Option 23-Dec-15 ZN6 STR concreting Concreting works for column at Polymer Shed 23-Dec-15 25-Dec-15 3.00pm CLOSED 29-Dec-15 6 REJECTED 1 1
506 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00502 instant Option 23-Dec-15 ZN6 CIV FDT 'testing FDT test for subbase at Grit and Oil/ Grease Sand Bed (STP 2) 23-Dec-15 25-Dec-15 2.00pm CLOSED 1-Jan-16 9 ACCEPTED 1 1
507 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00503 instant Option 23-Dec-15 ZN6 CIV pre concreting Inspection of rebar for wall at Scum Return sump 23-Dec-15 25-Dec-15 2.00pm CLOSED 29-Dec-15 6 REJECTED 1 1
508 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00504 instant Option 23-Dec-15 ZN6 CIV pre concreting Inspection of formwork for wall at Scum Return sump 23-Dec-15 25-Dec-15 2.30pm CLOSED 29-Dec-15 6 REJECTED 1 1
509 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00505 instant Option 23-Dec-15 ZN6 CIV concreting Concreting works for wall at Scum Return sump 23-Dec-15 25-Dec-15 3.00pm CLOSED 29-Dec-15 6 REJECTED 1 1
510 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00506 instant Option 23-Dec-15 ZN6 STR Mass concrete Mass concreting works for slab at Sand Drying Bed 23-Dec-15 25-Dec-15 3.00pm CLOSED 1-Jan-16 9 ACCEPTED 1 1
511 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00507 instant Option 23-Dec-15 ZN6 CIV Lean Concrete Lean concrete at Sump Return waste 23-Dec-15 25-Dec-15 3.00pm CLOSED 1-Jan-16 9 ACCEPTED 1 1
512 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00508 instant Option 23-Dec-15 ZN6 CIV excavation Excavation works for sump return waste 23-Dec-15 25-Dec-15 2.00pm CLOSED 1-Jan-16 9 ACCEPTED 1 1
513 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00509 instant Option 26-Dec-15 ZN6 CIV Pre concrete Inspection of rebar and formwork for ramp at sand drying bed 28-Dec-15 30-Dec-15 10.00am CLOSED 1-Jan-16 4 ACCEPTED 1 1
514 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00510 instant Option 26-Dec-15 ZN6 CIV concreting concreting work for staircase at disinfection chamber 28-Dec-15 30-Dec-15 10.00am CLOSED 1-Jan-16 4 ACCEPTED 1 1
concreting work for for slab and beam at grit & oil/grease sand
516 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00512 instant Option 26-Dec-15 ZN6 CIV concreting bed 28-Dec-15 30-Dec-15 3.00pm CLOSED 28-Dec-15 0 ACCEPTED 1 1
517 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00513 instant Option 26-Dec-15 ZN6 CIV concreting concreting work for ramp at sand drying bed 28-Dec-15 30-Dec-15 3.00pm CLOSED 1-Jan-16 4 ACCEPTED 1 1
518 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00514 instant Option 26-Dec-15 ZN6 CIV Pre concrete Inspection of rebar and formwork for culvert at clarifier tank A 28-Dec-15 30-Dec-15 10.00am CLOSED 1-Jan-16 4 ACCEPTED 1 1
519 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00515 instant Option 26-Dec-15 ZN6 CIV concreting concreting works for rebar and formwork for culvert at Clarifier 28-Dec-15 30-Dec-15 3.00pm CLOSED 1-Jan-16 4 ACCEPTED 1 1
tank A
521 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00517 instant Option 27-Dec-15 ZN6 STR pre concreting Inspetion of rebar slab for return waste water 28-Dec-15 30-Dec-15 10.00am CLOSED 1-Jan-16 4 ACCEPTED 1 1
522 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00518 instant Option 28-Dec-15 ZN6 STR concreting Concreting work for wall scump return sump 28-Dec-15 30-Dec-15 CLOSED 28-Dec-15 0 ACCEPTED 1 1
3.00pm
524 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00520 instant Option 30-Dec-15 ZN6 STR pre concreting Inspection for rebar and formwork for wall scum return sump 28-Dec-15 30-Dec-15 CLOSED 28-Dec-15 0 ACCEPTED 1 1
10.00am
527 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00523 instant Option 28-Dec-15 ZN6 STR concreting Concreting works for slab at Return Waste Water 29-Dec-15 31-Dec-15 2.30pm CLOSED 5-Jan-16 7 ACCEPTED 1 1
528 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00524 Ocned Water 29-Dec-15 ZN6 PIP Equipment Request inspection for D.I pipe instalation at Clarifier tank 30-Dec-15 1-Jan-16 9.00am CLOSED 30-Jun-16 183 ACCEPTED 1 1
529 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00525 instant Option 30-Dec-15 ZN6 STR concreting Inspection of rebar and formwork for wall at Grit and Oil / 30-Dec-15 1-Jan-16 10.00am CLOSED 5-Jan-16 6 ACCEPTED 1 1
Grease sand Bed
530 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00526 instant Option 30-Dec-15 ZN6 CIV testing Soil bearing capacity testing at STP2 30-Dec-15 1-Jan-16 4.00pm CLOSED 1-Jan-16 2 ACCEPTED 1 1
531 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00527 instant Option 30-Dec-15 ZN6 STR concreting 30-Dec-15 1-Jan-16 4.30pm CLOSED 5-Jan-16 6 ACCEPTED 1 1
Concreting works for wall at Grit and Oil/grease Sand bed
535 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00531 instant Option 4-Jan-16 ZN6 STR pre concreting Mass concreting works at Grit chamber and Distribution 4-Jan-16 6-Jan-16 9.00am CLOSED 14-Jan-16 10 ACCEPTED 1 1
chamber 1
536 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00532 instant Option 5-Jan-16 ZN6 CIV compaction Compaction of subgrade at ReturnWaste Water pumping system 6-Jan-16 8-Jan-16 9.30am CLOSED 12-Jan-16 6 ACCEPTED CANCEL 1 1
537 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00533 instant Option 5-Jan-16 ZN6 STR Lean Concrete Lean concreting at Return waste water pumping station 6-Jan-16 8-Jan-16 10.30am CLOSED 12-Jan-16 6 ACCEPTED 1 1
539 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00535 instant Option 5-Jan-16 ZN6 STR concreting Concreting works for slab at Return waste water 6-Jan-16 8-Jan-16 2.00pm CLOSED 25-Mar-16 79 ACCEPTED 1 1
540 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00536 instant Option 5-Jan-16 ZN6 STR concreting Concreting works for slab at Grit and oil/grease sand bed 6-Jan-16 8-Jan-16 2.30pm CLOSED 12-Jan-16 6 ACCEPTED 1 1
*****xpasti
541 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00537 instant Option 6-Jan-16 ZN6 CIV leakage test Water tightness test at Aeration Tank STP2 6-Jan-16 8-Jan-16 9.00am CLOSED 14-Jan-16 8 ACCEPTED 1 1
542 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00538 instant Option 6-Jan-16 ZN6 STR Mass concrete Mass concrete works at Screen Chamber and Grit chamber 6-Jan-16 8-Jan-16 2.00pm CLOSED 13-Jan-16 7 ACCEPTED 1 1
543 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00539 instant Option 6-Jan-16 ZN6 CIV Material Inspection of material received for chain link fencing at STP 2 6-Jan-16 8-Jan-16 2.00pm CLOSED 14-Jan-16 8 ACCEPTED 1 1
545 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00541 instant Option 7-Jan-16 ZN6 STR concreting Concreting works for wall and upper slab at Return Waste water 8-Jan-16 10-Jan-16 2.00pm CLOSED 25-Mar-16 77 ACCEPTED 1 1
Pumping station
546 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00542 Ocned Water 8-Jan-16 ZN6 PIP Underground services Dia. 600mm2 ductile iron pipe installation at STP2 9-Jan-16 11-Jan-16 9.00am CLOSED 10-Jan-16 1 ACCEPTED 1 1
installation
547 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00543 instant Option 8-Jan-16 ZN6 CIV Testing FDT testing for 50mm crusher run layer of roadwork at STP2 9-Jan-16 11-Jan-16 9.00am CLOSED 14-Jan-16 5 REJECTED 1 1
548 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00544 instant Option 8-Jan-16 ZN6 CIV Testing FDT testing for subgrade layer of roadwork at STP2 8-Jan-16 10-Jan-16 3.00pm CLOSED 9-Jan-16 1 ACCEPTED 1 1
550 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00546 instant Option 9-Jan-16 ZN6 CIV roadwork laying of 50mm crusher run for road at STP2(road 1) 9-Jan-16 11-Jan-16 4.00pm CLOSED 26-Feb-16 48 REJECTED 1 1
551 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00547 instant Option 9-Jan-16 ZN6 CIV roadwork Laying of geogrid for road at STP2 9-Jan-16 11-Jan-16 4.00pm CLOSED 15-Feb-16 37 REJECTED 1 1
552 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00548 instant Option 9-Jan-16 ZN6 CIV roadwork Leveling of 240mm subbase for road at STP2 11-Jan-16 13-Jan-16 2.00pm CLOSED 26-Feb-16 46 ACCEPTED 1 1
553 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00549 instant Option 9-Jan-16 ZN6 CIV roadwork Water tightness test at Sludge thickener tank STP2 11-Jan-16 13-Jan-16 9.00am CLOSED 21-Jan-16 10 ACCEPTED 1 1
554 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00550 instant Option 9-Jan-16 ZN6 CIV roadwork Apply epoxy painting in Sludge holding and thickener tank STP2 11-Jan-16 13-Jan-16 9.00am CLOSED 28-Jan-16 17 ACCEPTED 1 1
555 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00551 instant Option 9-Jan-16 ZN6 CIV roadwork Joint dipping for subgrade layer for road at STP2 (road 1) 9-Jan-16 11-Jan-16 9.00am CLOSED 15-Feb-16 37 ACCEPTED 1 1
556 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00552 instant Option 11-Jan-16 ZN6 STR pre concreting Inspection of rebar and formwork for Apron at Admin building 12-Jan-16 14-Jan-16 9.00am CLOSED 14-Jan-16 2 ACCEPTED 1 1
557 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00553 instant Option 11-Jan-16 ZN6 STR concreting Concreting works for apron at Admin Building 12-Jan-16 14-Jan-16 2.00pm CLOSED 14-Jan-16 2 ACCEPTED 1 1
558 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00554 instant Option 12-Jan-16 ZN6 CIV Epoxy painting Apply epoxy painting in Anoxic Tank A 12-Jan-16 14-Jan-16 4.00pm CLOSED 12-Jan-16 0 ACCEPTED 1 1
559 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00555 instant Option 12-Jan-16 ZN6 CIV roadwork FDT testing of 240mm subbase for road at STP2 12-Jan-16 14-Jan-16 4.00pm CLOSED 26-Feb-16 45 REJECTED 1 1
560 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00556 instant Option 12-Jan-16 ZN6 CIV roadwork Joint dipping of subbase for road at STP2 12-Jan-16 14-Jan-16 4.00pm CLOSED 26-Feb-16 45 REJECTED 1 1
561 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00557 instant Option 12-Jan-16 ZN6 CIV testing Water tightness test at Anoxic Tank A STP2 12-Jan-16 14-Jan-16 4.30pm CLOSED 28-Jan-16 16 REJECTED 1 1
562 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00558 instant Option 2-Feb-16 ZN6 CIV roadwork laying and compaction of subgrade layer for road at STP2 3-Feb-16 5-Feb-16 5.00pm CLOSED 26-Feb-16 23 ACCEPTED 1 1
563 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00559 instant Option 3-Feb-16 ZN6 CIV roadwork FDT testing for subgrade at STP 2 (road 4) 3-Feb-16 5-Feb-16 5.00pm CLOSED 26-Feb-16 23 ACCEPTED 1 1
564 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00560 instant Option 12-Jan-16 ZN6 CIV roadwork FDT testing for 50mm crusher run layer of roadwork at STP 2 12-Jan-16 14-Jan-16 5.00pm CLOSED 26-Feb-16 45 REJECTED 1 1
565 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00561 instant Option 2-Feb-16 ZN6 CIV roadwork Joint dipping for subgrade layer at STP2 (road 4) 3-Feb-16 5-Feb-16 5.00pm CLOSED 26-Feb-16 23 ACCEPTED 1 1
566 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00562 Ocned Water 12-Jan-16 ZN6 PIP Installation Dia. 100mm Ductile Iron Transfer pipe installation 13-Jan-16 15-Jan-16 9.00am CLOSED 13-Jan-16 0 ACCEPTED 1 1
567 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00563 Ocned Water 12-Jan-16 ZN6 PIP Installation Dia. 600mm Ductile Iron Discharge pipe installation 13-Jan-16 15-Jan-16 9.00am CLOSED 13-Jan-16 0 ACCEPTED 1 1
568 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00564 instant Option 13-Jan-16 ZN6 STR Mass concrete Mass concrete at Grit oil and Grease sand Bed 14-Jan-16 16-Jan-16 4.00pm CLOSED 21-Jan-16 7 ACCEPTED 1 1
569 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00565 instant Option 13-Jan-16 ZN6 CIV testing Sieve analysis for sand at Grit and Oil/ Grease Sand bed 14-Jan-16 16-Jan-16 4.00pm CLOSED 26-Feb-16 43 ACCEPTED 1 1
570 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00566 instant Option 13-Jan-16 ZN6 CIV testing Sieve analysis for sand at Sand drying bed 15-Jan-16 17-Jan-16 10.00am CLOSED 28-Feb-16 44 ACCEPTED 1 1
571 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00567 Ocned Water 13-Jan-16 ZN6 PIP Welding Installation of GI pipe dia. 150mm (air pipe) STP2 14-Jan-16 16-Jan-16 4.00pm CLOSED 15-Jan-16 1 ACCEPTED 1 1
573 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00569 Ocned Water 13-Jan-16 ZN6 MNE Installation Inspecition for penstock installation at RAS/WAS tank-2nos 14-Jan-16 16-Jan-16 4.00pm CLOSED 14-Jan-16 0 ACCEPTED 1 1
575 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00571 Ocned Water 13-Jan-16 ZN6 ELE Material Material inspection for cable at STP 2 14-Jan-16 16-Jan-16 4.00pm CLOSED 15-Jan-16 1 ACCEPTED 1 1
576 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00572 Ocned Water 14-Jan-16 ZN6 ELE cable pulling Cable pulling for Aeration Tank 15-Jan-16 17-Jan-16 4.00pm CLOSED 15-Jan-16 0 ACCEPTED 1 1
577 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00573 Ocned Water 14-Jan-16 ZN6 PIP Installation Inspection for Scum return sump piping 15-Jan-16 17-Jan-16 3.00pm CLOSED 30-Jun-16 167 ACCEPTED 1 1
578 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00574 Ocned Water 14-Jan-16 ZN6 PIP Installation Inspection for blower & piping installation at Blower room STP 2 15-Jan-16 17-Jan-16 3.00pm CLOSED 15-Jan-16 0 ACCEPTED 1 1
579 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00575 Ocned Water 14-Jan-16 ZN6 Cable laying Cable laying for Scum Return sump at STP 2 15-Jan-16 17-Jan-16 3.00pm CLOSED 20-Jan-16 5 ACCEPTED 1 1
ELE
580 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00576 Ocned Water 14-Jan-16 ZN6 Cable laying Cable laying for RAS/WAS sump at STP 2 15-Jan-16 17-Jan-16 3.00pm CLOSED 20-Jan-16 5 ACCEPTED 1 1
ELE
581 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00577 Ocned Water 14-Jan-16 ZN6 ELE Cable laying Cable laying for Sludge holding tank at STP 2 15-Jan-16 17-Jan-16 3.00pm CLOSED 20-Jan-16 5 ACCEPTED 1 1
582 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00578 Ocned Water 14-Jan-16 ZN6 Cable laying Cable laying for Sludge Thickener tank at STP 2 15-Jan-16 17-Jan-16 3.00pm CLOSED 20-Jan-16 5 ACCEPTED 1 1
ELE
583 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00579 Ocned Water 14-Jan-16 ZN6 Cable laying Cable laying for street lighting 3 & 4 at STP 2 15-Jan-16 17-Jan-16 3.00pm CLOSED 20-Jan-16 5 ACCEPTED 1 1
ELE
584 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00580 instant Option 16-Jan-16 ZN6 STR concreting mass concreting for perimeter at Admin building STP2 16-Jan-16 18-Jan-16 11.30am CLOSED 21-Jan-16 5 ACCEPTED 1 1
585 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00581 instant Option 18-Jan-16 ZN6 STR Epoxy painting Apply epoxy painting in aeration tank B 18-Jan-16 20-Jan-16 2.00pm CLOSED 28-Jan-16 10 ACCEPTED 1 1
586 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00582 instant Option 18-Jan-16 ZN6 STR Epoxy painting Apply epoxy painting in Disinfection chamber 18-Jan-16 20-Jan-16 2.00pm CLOSED 28-Jan-16 10 ACCEPTED 1 1
587 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00583 instant Option 18-Jan-16 ZN6 STR Epoxy painting Apply epoxy painting in Treated water tank 18-Jan-16 20-Jan-16 2.00pm CLOSED 28-Jan-16 10 ACCEPTED 1 1
588 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00584 instant Option 18-Jan-16 ZN6 CIV Vc pipe Inspection of VC pipe at STP2 (clay pipe) 18-Jan-16 20-Jan-16 2.00pm CLOSED 23-Jan-16 5 ACCEPTED 1 1
589 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00585 instant Option 18-Jan-16 ZN6 CIV roadwork Levelling subgrade layer for road at STP2 18-Jan-16 20-Jan-16 2.00pm CLOSED CANCEL 1 1
590 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00586 instant Option 18-Jan-16 ZN6 CIV roadwork Joint dipping for subgrade layer of road at STP2 18-Jan-16 20-Jan-16 2.30pm CLOSED 15-Feb-16 28 ACCEPTED 1 1
591 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00587 instant Option 18-Jan-16 ZN6 CIV testing FDT test forsubgrade layer of road at STP2 18-Jan-16 20-Jan-16 2.30pm CLOSED 28-Jan-16 10 ACCEPTED 1 1
592 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00588 instant Option 18-Jan-16 ZN6 CIV testing Water tightness test at Sludge Holding Tank 26-Jan-16 28-Jan-16 2.30pm CLOSED 25-Feb-16 30 ACCEPTED 1 1
593 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00589 instant Option 18-Jan-16 ZN6 CIV testing Water tightness test at Disinfection Chamber 18-Jan-16 20-Jan-16 4.00pm CLOSED 18-Jan-16 0 ACCEPTED 1 1
594 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00590 instant Option 18-Jan-16 ZN6 CIV testing Water tightness test at Anoxic Tank A STP2 18-Jan-16 20-Jan-16 4.00pm CLOSED 25-Feb-16 38 ACCEPTED 1 1
595 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00591 instant Option 18-Jan-16 ZN6 CIV testing Water tightness test at Anoxic Tank B STP3 26-Jan-16 28-Jan-16 4.00pm CLOSED 26-Feb-16 31 ACCEPTED 1 1
596 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00592 instant Option 18-Jan-16 ZN6 CIV testing Mackintosh probe test at STP2 18-Jan-16 20-Jan-16 4.00pm CLOSED 25-Mar-16 67 ACCEPTED 1 1
597 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00593 instant Option 18-Jan-16 ZN6 STR Steel works Inspection of steel works for Genset shed at STP2 19-Jan-16 21-Jan-16 10.00am CLOSED 27-Apr-16 99 ACCEPTED 1 1
598 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00594 instant Option 18-Jan-16 ZN6 ARC plastering Plastering works at Guard house STP2 (external & internal) 19-Jan-16 21-Jan-16 9.00am CLOSED 25-Mar-16 66 ACCEPTED 1 1
599 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00595 instant Option 18-Jan-16 ZN6 ARC plastering Plastering works at Admin building STP2 (EXTERNAL /INTERNAL) 19-Jan-16 21-Jan-16 9.00am CLOSED 25-Mar-16 66 ACCEPTED 1 1
Post concreting works for ground floor beam, ground floor slab,
600 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00596 instant Option 18-Jan-16 ZN6 STR Post concreting 19-Jan-16 21-Jan-16 9.00am CLOSED 28-Jan-16 9 ACCEPTED 1 1
column,roof beam and roof slab at Admin building STP2
Post concreting works for ground floor beam, ground floor slab,
601 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00597 instant Option 18-Jan-16 ZN6 STR Post concreting column,roof beam and roof slab at Guard house STP2 19-Jan-16 21-Jan-16 9.00am CLOSED 28-Jan-16 9 ACCEPTED 1 1
602 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00598 instant Option 18-Jan-16 ZN6 STR Post concreting Post concreting works for slab at Genset shed 19-Jan-16 21-Jan-16 9.00am CLOSED 28-Jan-16 9 ACCEPTED 1 1
Post concreting works for ground floor beam, ground floor slab,
603 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00599 instant Option 18-Jan-16 ZN6 STR Post concreting column,roof beam and roof slab at Blower and control room 19-Jan-16 21-Jan-16 9.30am CLOSED 28-Jan-16 9 ACCEPTED 1 1
STP2
609 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00605 instant Option 18-Jan-16 ZN6 STR Post concreting Post concreting works for slab, wall, beam and ramp at Grit and 19-Jan-16 21-Jan-16 10.00am CLOSED 28-Jan-16 9 ACCEPTED 1 1
oil/grease sand bed
Post concretig works for column, slab, wall and walkway at
610 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00606 instant Option 18-Jan-16 ZN6 STR Post concreting 19-Jan-16 21-Jan-16 10.00am CLOSED 28-Jan-16 9 ACCEPTED 1 1
Distribution chamber 2
Post concreting works for column, slab, wall and ramp atSand
612 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00608 instant Option 18-Jan-16 ZN6 STR Post concreting 19-Jan-16 21-Jan-16 10.00am CLOSED 28-Jan-16 9 ACCEPTED 1 1
drying bed
615 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00611 instant Option 19-Jan-16 ZN6 PIP Installation Installation of piping at Admin Building 20-Jan-16 22-Jan-16 9.00am CLOSED 5-May-16 106 ACCEPTED 1 1
617 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00613 instant Option 20-Jan-16 ZN6 STR concreting Concreting works for apron at Blower and Control room 20-Jan-16 22-Jan-16 2.30pm CLOSED 28-Jan-16 8 ACCEPTED 1 1
618 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00614 instant Option 20-Jan-16 ZN6 STR Mass concrete Mass concrete works for perimeter drain at Guard House STP2 20-Jan-16 22-Jan-16 11.00am CLOSED 28-Jan-16 8 ACCEPTED 1 1
619 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00615 instant Option 20-Jan-16 ZN6 STR Mass concrete Mass concreting for perimeter at Blower and control room STP2 20-Jan-16 22-Jan-16 11.00am CLOSED 28-Jan-16 8 ACCEPTED 1 1
620 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00616 instant Option 19-Jan-16 ZN6 STR Lean Concrete Lean concreting for apron at Blower and control room 21-Jan-16 23-Jan-16 5.00pm CLOSED 28-Jan-16 7 ACCEPTED 1 1
622 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00618 instant Option 20-Jan-16 ZN6 STR concreting Concreting works for stiffener door frame at blower and control 21-Jan-16 23-Jan-16 5.00pm CLOSED 1-Feb-16 11 ACCEPTED 1 1
room STP2
623 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00619 instant Option 23-Jan-16 ZN6 STR pre concreting Inspection of rebar and formwork for ramp at Admin building 26-Jan-16 28-Jan-16 9.00am CLOSED 1-Feb-16 6 ACCEPTED 1 1
STP2
624 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00620 instant Option 23-Jan-16 ZN6 STR concreting Concreting works for ramp at Admin building STP2 26-Jan-16 28-Jan-16 2.00pm CLOSED 1-Feb-16 6 ACCEPTED 1 1
625 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00621 instant Option 23-Jan-16 ZN6 STR pre concreting Inspection of rebar and formwork for ramp at Blower and control 26-Jan-16 28-Jan-16 9.00am CLOSED 1-Feb-16 6 ACCEPTED 1 1
room STP2
626 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00622 instant Option 23-Jan-16 ZN6 STR concreting Concreting works for ramp at Blower and control room STP2 26-Jan-16 28-Jan-16 2.00pm CLOSED 1-Feb-16 6 ACCEPTED 1 1
627 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00623 instant Option 23-Jan-16 ZN6 STR pre concreting Inspection of rebar and formwork for ramp at Guard house STP2 26-Jan-16 28-Jan-16 9.00am CLOSED 1-Feb-16 6 ACCEPTED 1 1
628 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00624 instant Option 23-Jan-16 ZN6 STR concreting Concreting works for ramp atGuard house STP2 26-Jan-16 28-Jan-16 2.00pm CLOSED 1-Feb-16 6 ACCEPTED 1 1
629 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00625 Ocned Water 21-Jan-16 ZN6 ELE Installation Inspection of flowmeter installation at Water treated tank 22-Jan-16 24-Jan-16 3.00pm CLOSED 23-Jan-16 1 ACCEPTED 1 1
630 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00626 Ocned Water 21-Jan-16 ZN6 ELE Material Cable & cable tray arranging & termination at RAS/WAS STP2 22-Jan-16 24-Jan-16 3.00pm CLOSED 30-Jun-16 160 ACCEPTED 1 1
631 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00627 Ocned Water 21-Jan-16 ZN6 ELE Material Cable & cable tray arranging & termination at Aeration tank/ 22-Jan-16 24-Jan-16 3.00pm CLOSED 30-Jun-16 160 ACCEPTED 1 1
anoxic STP2
632 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00628 Ocned Water 21-Jan-16 ZN6 ELE Material Cable & cable tray arranging & termination at Scum pump STP2 22-Jan-16 24-Jan-16 3.00pm CLOSED 30-Jun-16 160 ACCEPTED 1 1
633 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00629 Ocned Water 21-Jan-16 ZN6 ELE Installation Inspection for street light installation (3nos) 22-Jan-16 24-Jan-16 3.00pm CLOSED 23-Jan-16 1 ACCEPTED 1 1
635 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00631 Ocned Water 21-Jan-16 ZN6 MNE Equipment Inspection for submesrsible mixer installation (4nos) STP2 22-Jan-16 24-Jan-16 3.00pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
636 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00632 Ocned Water 21-Jan-16 ZN6 MNE Material Inspection for V-noch installation at Clarifier tank 1 22-Jan-16 24-Jan-16 3.00pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
637 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00633 Ocned Water 21-Jan-16 ZN6 MNE Equipment Inspection for V-noch installation at Clarifier tank 2 STP2 22-Jan-16 24-Jan-16 3.00pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
638 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00634 Ocned Water 21-Jan-16 ZN6 MNE Equipment Scraper and bridge installation at Clarifier tank 1 STP2 22-Jan-16 24-Jan-16 3.00pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
639 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00635 Ocned Water 21-Jan-16 ZN6 MNE Equipment Mechanical fine screen installation (2nos) STP2 22-Jan-16 24-Jan-16 3.00pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
640 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00636 Ocned Water 21-Jan-16 ZN6 MNE Equipment Screw conveyer installation STP2 22-Jan-16 24-Jan-16 3.00pm CLOSED 29-Jan-16 7 ACCEPTED 1 1
641 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00637 Ocned Water 21-Jan-16 ZN6 MNE Material Inspection for RAS/WAS pump and piping installation STP2 22-Jan-16 24-Jan-16 3.00pm CLOSED 30-Jun-16 160 ACCEPTED 1 1
642 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00638 Ocned Water 22-Jan-16 ZN6 PIP Installation Inspection for 300mm and 150mm G.I air pipe installation STP2 23-Jan-16 25-Jan-16 3.00pm CLOSED 25-Jan-16 2 ACCEPTED 1 1
643 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00639 instant Option 26-Jan-16 ZN6 CIV testing Water tightness test at Treated water tank at STP2 26-Jan-16 28-Jan-16 4.00pm CLOSED 26-Jan-16 0 ACCEPTED 1 1
644 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00640 instant Option 26-Jan-16 ZN6 CIV testing Water tightness test at RAS/WAS at STP2 26-Jan-16 28-Jan-16 4.00pm CLOSED 25-Feb-16 30 REJECTED 1 1
646 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00642 instant Option 26-Jan-16 ZN6 CIV Epoxy painting Apply epoxy painting in anoxic tank B STP2 27-Jan-16 29-Jan-16 2.00pm CLOSED 28-Jan-16 1 ACCEPTED 1 1
647 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00643 instant Option 26-Jan-16 ZN6 CIV Epoxy painting Apply epoxy painting in Sand drying bed STP2 27-Jan-16 29-Jan-16 2.00pm CLOSED 28-Jan-16 1 ACCEPTED 1 1
660 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00656 yuzuki 2-Feb-16 ZN6 CIV fencing works Excavation and install and concreting post at LP15 SSN/2 2-Feb-16 4-Feb-16 2.00pm CLOSED 24-Mar-16 51 ACCEPTED 1 1
661 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00657 instant Option 29-Jan-16 ZN6 ARC screeding works screeding works at Admin building and Guard house STP2 30-Jan-16 1-Feb-16 3.00pm CLOSED 28-Feb-16 29 ACCEPTED 1 1
662 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00658 instant Option 29-Jan-16 ZN6 STR roadwork Laying of subgrade layer for roadworks at STP2 (road2) 30-Jan-16 1-Feb-16 3.30pm CLOSED 15-Feb-16 16 ACCEPTED 1 1
663 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00659 instant Option 29-Jan-16 ZN6 CIV roadwork Joint dipping of subgrade layer for roadworks at STP2 (road 2) 30-Jan-16 1-Feb-16 4.00pm CLOSED 15-Feb-16 16 ACCEPTED 1 1
664 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00660 instant Option 29-Jan-16 ZN6 CIV testing FDT test for subgrade layer for road works at STP2 (road 2) 30-Jan-16 1-Feb-16 4.00pm CLOSED 15-Feb-16 16 ACCEPTED 1 1
665 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00661 instant Option 29-Jan-16 ZN6 STR fencing works Concreting works for post fencing at STP2 30-Jan-16 1-Feb-16 4.00pm CLOSED 15-Feb-16 16 ACCEPTED 1 1
666 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00662 Amman tech 29-Jan-16 ZN6 CIV testing Excavation,levelling, compaction and dipping for subgrade at 2-Feb-16 4-Feb-16 10.00am CLOSED CANCEL 1 1
Guard House 6 (GH6)- carpark area
668 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00664 Amman tech 29-Jan-16 ZN6 CIV testing Dipping subbase at Guard house 6 (GH6)carpark area 2-Feb-16 4-Feb-16 5.00pm CLOSED CANCEL 1 1
669 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00665 Amman tech 29-Jan-16 ZN6 CIV testing Excavation,levelling, compaction and FDT for subbase at Guard 2-Feb-16 4-Feb-16 4.00pm CLOSED CANCEL 1 1
House 6 (GH6)-carpark area
670 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00666 Amman tech 29-Jan-16 ZN6 CIV testing Dipping roadbase at Guard house 6 (GH6)-carpark area 2-Feb-16 4-Feb-16 4.00pm CLOSED CANCEL 1 1
672 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00668 instant Option 1-Feb-16 ZN6 ARC Installation Installation of tiles for toilet at Guard house STP2 2-Feb-16 4-Feb-16 9.00am CLOSED 26-Feb-16 24 ACCEPTED 1 1
673 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00669 instant Option 1-Feb-16 ZN6 ARC Installation Installation of tiles for toilet and pantry at Admin building STP2 2-Feb-16 4-Feb-16 9.00am CLOSED 15-Feb-16 13 ACCEPTED 1 1
675 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00671 instant Option 1-Feb-16 ZN6 ARC undercoat Undercoat of internal and external wall at Admin House STP2 2-Feb-16 4-Feb-16 9.30am CLOSED 15-Feb-16 13 ACCEPTED 1 1
676 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00672 instant Option 1-Feb-16 ZN6 ARC undercoat Undercoat of internal and external wall at Guard House STP2 2-Feb-16 4-Feb-16 9.30am CLOSED 15-Feb-16 13 ACCEPTED 1 1
Laying SIKA top seal for roof waterproofing atBlower and control
678 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00674 instant Option 1-Feb-16 ZN6 ARC Roof waterproofing 2-Feb-16 4-Feb-16 10.00am CLOSED 15-Feb-16 13 ACCEPTED 1 1
room STP2
679 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00675 instant Option 1-Feb-16 ZN6 ARC Roof waterproofing Laying SIKA top seal for roof waterproofing at Guard house STP2 2-Feb-16 4-Feb-16 10.00am CLOSED 15-Feb-16 13 ACCEPTED 1 1
680 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00676 instant Option 1-Feb-16 ZN6 CIV Epoxy painting Apply epoxy painting in Return waste water STP2 2-Feb-16 4-Feb-16 9.00am CLOSED 15-Feb-16 13 ACCEPTED 1 1
683 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00679 instant Option 1-Feb-16 ZN6 CIV Epoxy painting Apply epoxy painting in Clarifier Tank A STP2 2-Feb-16 4-Feb-16 2.00pm CLOSED 15-Feb-16 13 ACCEPTED 1 1
684 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00680 instant Option 1-Feb-16 ZN6 CIV Epoxy painting Apply epoxy painting in Clarifier Tank B STP2 2-Feb-16 4-Feb-16 2.00pm CLOSED 15-Feb-16 13 ACCEPTED 1 1
686 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00682 instant Option 3-Feb-16 ZN6 CIV roadwork Laying of roadbase layer at STP2 (road2) 3-Feb-16 5-Feb-16 4.00pm CLOSED 26-Feb-16 23 REJECTED 1 1
687 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00683 instant Option 3-Feb-16 ZN6 CIV roadwork Joint dipping of roadbase layer at STP2 (road 2) 3-Feb-16 5-Feb-16 4.00pm CLOSED 26-Feb-16 23 REJECTED 1 1
688 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00684 instant Option 3-Feb-16 ZN6 CIV roadwork FDT test of roadbase layer at STP2 (road2) 3-Feb-16 5-Feb-16 4.00pm CLOSED 26-Feb-16 23 REJECTED 1 1
689 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00685 instant Option 3-Feb-16 ZN6 STR Post concrete Post concreting works for slab and wall at Scum return sump 3-Feb-16 5-Feb-16 4.00pm CLOSED 15-Feb-16 12 ACCEPTED 1 1
Post concreting wotks for slab, wall and top slab at Retur waste
690 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00686 instant Option 3-Feb-16 ZN6 STR post concrete water pumping station STP2 3-Feb-16 5-Feb-16 4.00pm CLOSED 15-Feb-16 12 ACCEPTED 1 1
691 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00687 instant Option 4-Feb-16 ZN6 CIV Testing Water Tightness Test at Grit Chamber 3-Feb-16 5-Feb-16 4.00.pm CLOSED 25-Feb-16 22 ACCEPTED 1 1
692 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00688 instant Option 4-Feb-16 ZN6 CIV Testing Water Tightness Test at Oil and grease chamber 3-Feb-16 5-Feb-16 4.00.pm CLOSED 25-Feb-16 22 ACCEPTED 1 1
693 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00689 instant Option 4-Feb-16 ZN6 CIV Testing Water Tightness Test at anoxic tank B 5-Feb-16 7-Feb-16 4.00.pm CLOSED 25-Feb-16 20 ACCEPTED 1 1
694 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00690 instant Option 10-Feb-16 ZN6 CIV Concreting works Concreting works for post fencing at STP2 10-Feb-16 12-Feb-16 10.00am CLOSED 26-Feb-16 16 ACCEPTED 1 1
695 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00691 instant Option 10-Feb-16 ZN6 CIV roadwork Laying of roadbase for roadwork at STP2 10-Feb-16 12-Feb-16 11.30am CLOSED CANCEL 1 1
696 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00692 instant Option 16-Feb-16 ZN6 CIV roadwork Joint dipping of roadbase for roadworks at STP2 16-Feb-16 18-Feb-16 5.00pm CLOSED 26-Feb-16 10 ACCEPTED 1 1
697 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00693 instant Option 10-Feb-16 ZN6 CIV Vc pipe Inspection of VC pipe at STP2 10-Feb-16 12-Feb-16 2.00pm CLOSED 26-Feb-16 16 ACCEPTED 1 1
698 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00694 instant Option 10-Feb-16 ZN6 CIV testing FDT test for roadbase for roadworks at STP2 10-Feb-16 12-Feb-16 4.30pm CLOSED 26-Feb-16 16 ACCEPTED 1 1
699 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00695 instant Option 13-Feb-16 ZN6 CIV Concreting works Concreting works for beam fencing at STP2 15-Feb-16 17-Feb-16 9.00am CLOSED 6-May-16 81 ACCEPTED 1 1
703 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00699 dorce 10-Feb-16 ZN6 ELE electrical works Building cable insulation testat Guard house 6 (GH6) 11-Feb-16 13-Feb-16 2.30pm CLOSED 22-Feb-16 11 ACCEPTED 1 1
704 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00700 AEIE 15-Feb-16 ZN6 ELE ir test Meggering cable for 1x4C 400mm2 from FPC9 to STP2 15-Feb-16 17-Feb-16 2.00pm CLOSED 22-Feb-16 7 ACCEPTED 1 1
705 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00701 AEIE 15-Feb-16 ZN6 ELE ir test Meggering cable for 2x4C 400mm2 from FPC9 to LP8 SSS/TP2 15-Feb-16 17-Feb-16 2.00pm CLOSED 22-Feb-16 7 ACCEPTED 1 1
708 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00704 AEIE 15-Feb-16 ZN6 ELE Earthing test Earthing test for FPC9 at STP2 15-Feb-16 17-Feb-16 2.00pm CLOSED 15-Feb-16 0 ACCEPTED 1 1
709 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00705 AEIE 15-Feb-16 ZN6 ELE Installation Installation FPC9 at STP 2 area 15-Feb-16 17-Feb-16 1.00pm CLOSED 22-Feb-16 7 ACCEPTED 1 1
710 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00706 yuzuki 15-Feb-16 ZN6 CIV fencing works Excavation, install and concreting post at location LP8 SSTP/2 16-Feb-16 18-Feb-16 9.00am CLOSED 24-Mar-16 37 ACCEPTED 1 1
711 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00707 I-GEN 27-Jan-16 ZN6 MNE installation Installation of fire fighting equipments/system at Guard house 6 30-Jan-16 1-Feb-16 2.30pm CLOSED 30-Jan-16 0 REJECTED 1 1
(GH6)
712 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00708 instant Option 9-Feb-16 ZN6 CIV Testing Water tightness test at RAS/WAS tank STP 2 10-Feb-16 12-Feb-16 2.00pm CLOSED 8-Apr-16 58 ACCEPTED 1 1
713 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00709 instant Option 17-Feb-16 ZN6 CIV Concreting works Concreting works for fencing beam at STP2 17-Feb-16 19-Feb-16 9.00am CLOSED 26-Feb-16 9 ACCEPTED 1 1
714 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00710 Ocned Water 18-Feb-16 ZN6 ELE Testing Generator set testing 18-Feb-16 20-Feb-16 2.00pm CLOSED 18-Feb-16 0 ACCEPTED 1 1
715 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00711 instant Option 18-Feb-16 ZN6 CIV Concreting works Concreting works for fencing beam at STP2 (2nd part) 22-Feb-16 24-Feb-16 2.00pm CLOSED 6-May-16 74 ACCEPTED 1 1
716 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00712 instant Option 18-Feb-16 ZN6 CIV survey Joint survey for sewerage as built details (phase 1 & phase 2) 18-Feb-16 20-Feb-16 3.00pm CLOSED CANCEL 1 1
717 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00713 instant Option 18-Feb-16 ZN6 CIV survey Joint survey for fire water as built details (phase 1 & phase 2) 18-Feb-16 20-Feb-16 3.00pm CLOSED CANCEL 1 1
Joint survey for potable water as built details (phase 1 & phase
718 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00714 instant Option 18-Feb-16 ZN6 CIV survey 2) 18-Feb-16 20-Feb-16 3.00pm CLOSED CANCEL 1 1
719 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00715 Ocned Water 19-Feb-16 ZN6 ELE testing Cable insulation & continuity test STP 2 19-Feb-16 21-Feb-16 2.00pm CLOSED 7-Apr-16 48 ACCEPTED 1 1
720 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00716 dorce 30-Jan-16 ZN6 MNE Testing Building PPRC piping installation inspection and hydrotest at 1-Feb-16 3-Feb-16 2.30pm CLOSED CANCEL 1 1
Guard House 3 (GH3)
722 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00718 instant Option 19-Feb-16 ZN6 CIV roadwork Laying of tack coat for roadwork at STP2 20-Feb-16 22-Feb-16 2.00pm CLOSED 25-Mar-16 34 ACCEPTED 1 1
723 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00719 instant Option 20-Feb-16 ZN6 CIV roadwork Premix binder coarse of 63mm for road at STP2 22-Feb-16 24-Feb-16 9.00am CLOSED 25-Mar-16 32 ACCEPTED 1 1
724 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00720 instant Option 20-Feb-16 ZN6 CIV roadwork Water tightness test at Distribution chamber 2 21-Feb-16 23-Feb-16 9.00am CLOSED 25-Mar-16 33 REJECTED 1 1
726 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00722 instant Option 25-Feb-16 ZN6 CIV roadwork Premix binder coarse pf 63mm for road at STP2 25-Feb-16 27-Feb-16 9.00am CLOSED 25-Mar-16 29 ACCEPTED 1 1
727 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00723 Ocned Water 2-Mar-16 ZN6 ELE pre commissioning STP 2 pre commissioning 3-Mar-16 5-Mar-16 2.00pm CLOSED 4-Mar-16 1 ACCEPTED 1 1
728 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00724 iszda 22-Feb-16 ZN6 ELE Installation Inspection of installation ICT at Guard house 6 (GH6) 23-Feb-16 25-Feb-16 10.00am CLOSED CANCEL 1 1
729 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00725 instant Option 2-Mar-16 ZN7 CIV roadwork Coring test for premix at STP 2 3-Mar-16 5-Mar-16 10.00am CLOSED 25-Mar-16 22 ACCEPTED 1 1
730 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00726 dorce 14-Jan-16 ZN6 STR Assembly works Building roof installation inspection at Guard House 6 (GH6) 16-Jan-16 18-Jan-16 9.00am CLOSED 16-Jan-16 0 ACCEPTED 1 1
731 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00727 dorce 14-Jan-16 ZN6 STR Assembling works Building wall panel installation inspection at Guard house 6 (GH6) 16-Jan-16 18-Jan-16 8.45am CLOSED 16-Jan-16 0 ACCEPTED 1 1
732 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00728 dorce 14-Jan-16 ZN6 STR Assembling works Building chassis installation inspection Guard house 6 (GH6) 16-Jan-16 18-Jan-16 8.30am CLOSED 16-Jan-16 0 ACCEPTED 1 1
733 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00729 dorce 27-Jan-16 ZN6 STR Assembling works Building Chassis to stump connection at Guard House (GH6) 29-Jan-16 31-Jan-16 4.00pm CLOSED 29-Jan-16 0 ACCEPTED 1 1
734 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00730 instant Option 3-Mar-16 ZN6 CIV Testing Water tightness test at Clarifier Tank A 3-Mar-16 5-Mar-16 4.00pm CLOSED 8-Apr-16 36 ACCEPTED 1 1
735 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00731 instant Option 3-Mar-16 ZN6 CIV Testing Water tightness test at Clarifier Tank b 3-Mar-16 5-Mar-16 4.00pm CLOSED 8-Apr-16 36 ACCEPTED 1 1
736 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00732 UEMB ZULAKMAL 10-Mar-16 ZN6 ARC Painting Inspection for painting work at Aeration tank STP 2 (undercoat) 11-Mar-16 13-Mar-16 9.00am CLOSED CANCEL 1 1
737 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00733 instant Option 23-Feb-16 ZN6 ARC Painting Final coat for wall at Blower and Control room STP 2 24-Feb-16 26-Feb-16 10.00am CLOSED 6-May-16 72 ACCEPTED 1 1
738 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00734 instant Option 24-Feb-16 ZN6 ARC Painting Final coat for wall at Admin Building STP 2 24-Feb-16 26-Feb-16 10.00am CLOSED 24-Feb-16 0 ACCEPTED 1 1
739 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00735 instant Option 23-Feb-16 ZN6 ARC Painting Final coat for wall at Guard House Building STP 2 24-Feb-16 26-Feb-16 10.00am CLOSED 6-May-16 72 ACCEPTED 1 1
740 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00736 instant Option 25-Feb-16 ZN6 CIV testing Sieve analysis for coarse sand at STP 2 26-Feb-16 28-Feb-16 9.00am CLOSED 27-Apr-16 61 ACCEPTED 1 1
741 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00737 instant Option 27-Feb-16 ZN6 CIV testing Sieve analysis for coarse gravel at STP 2 28-Feb-16 1-Mar-16 10.00am CLOSED 27-Apr-16 59 ACCEPTED 1 1
742 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00738 instant Option 14-Mar-16 ZN6 CIV Installation Installation of main gates and fencing at STP 2 15-Mar-16 17-Mar-16 9.00am CLOSED 5-May-16 51 ACCEPTED 1 1
743 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00739 instant Option 14-Mar-16 ZN6 CIV Installation Installation of gates at Genset shedSTP 2 15-Mar-16 17-Mar-16 9.00am CLOSED 25-Mar-16 10 ACCEPTED 1 1
744 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00740 instant Option 14-Mar-16 ZN6 CIV Installation Concreting works for fencing beam at STP 2 14-Mar-16 16-Mar-16 11.00am CLOSED 27-Apr-16 44 ACCEPTED 1 1
745 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00741 instant Option 14-Mar-16 ZN6 ARC Installation Installation of door at Blower and control room STP 2 15-Mar-16 17-Mar-16 11.00am CLOSED CANCEL 1 1
746 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00742 instant Option 14-Mar-16 ZN6 ARC Installation Installation of door and window at Admin building STP 2 15-Mar-16 17-Mar-16 11.00am CLOSED 6-May-16 52 ACCEPTED 1 1
747 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00743 instant Option 14-Mar-16 ZN6 ARC Installation Installation of door aand window at Guard house building STP 2 15-Mar-16 17-Mar-16 9.00am CLOSED 21-Jul-16 128 ACCEPTED 1 1
748 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00744 UEMB ZULAKMAL 16-Mar-16 ZN6 ARC Painting Inspection for painting works at Aeration tank (final coat) STP2 17-Mar-16 19-Mar-16 9.00am CLOSED CANCEL 1 1
749 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00745 AEIE 17-Mar-16 ZN6 ELE Earthing test DB Earthing test for DB at Guard House 6 (GH6) 18-Mar-16 20-Mar-16 2.00pm CLOSED 24-Mar-16 6 ACCEPTED 1 1
752 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00748 AEIE 17-Mar-16 ZN6 ELE Installation Laying underground cable installation from FPC9 to Guard House 18-Mar-16 20-Mar-16 2.00pm CLOSED 24-Mar-16 6 ACCEPTED 1 1
6 (GH6) 1x4C 16mm2 XLPE/SWA/PVC
Earthing test DB
753 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00749 AEIE 17-Mar-16 ZN6 ELE Installation earthing DB at Guard House 6 (GH6) 18-Mar-16 20-Mar-16 4.00pm CLOSED 24-Mar-16 6 ACCEPTED 1 1
installation
Earthing test LPS Installation earthing lightning protection system at Guard House
754 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00750 AEIE 14-Oct-16 ZN6 ELE 15-Oct-16 17-Oct-16 4.00pm CLOSED 10-Nov-16 26 ACCEPTED 1 1
installation 6 (GH6)
755 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00751 instant Option 5-Feb-16 ZN6 ARC plastering Plastering works at Blower and control room STP 2 6-Feb-16 8-Feb-16 4.00pm CLOSED 6-May-16 90 ACCEPTED 1 1
756 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00752 instant Option 8-Mar-16 ZN6 CIV poly tank Installation of poly tank at Guard House STP 2 9-Mar-16 11-Mar-16 9.30am CLOSED 25-Mar-16 16 ACCEPTED 1 1
757 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00753 instant Option 8-Mar-16 ZN6 CIV poly tank Installation of poly tank at Admin building STP 2 9-Mar-16 11-Mar-16 9.00am CLOSED 25-Mar-16 16 ACCEPTED 1 1
758 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00754 instant Option 16-Mar-16 ZN6 STR sand laying Laying of medium sand, coarse sand and coarse gravel at Grit 17-Mar-16 19-Mar-16 11.00am CLOSED 25-Mar-16 8 ACCEPTED 1 1
and oil /grease sand bed
760 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00756 iszda 8-Mar-16 ZN6 ELE testing Inspection of cable analyzer at Guard house 6 (GH6) 8-Mar-16 10-Mar-16 10.00am CLOSED CANCEL 1 1
761 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00757 iszda 15-Mar-16 ZN6 ELE electrical works Building polarity test at Guard House 6 (GH6) 17-Mar-16 19-Mar-16 2.30pm CLOSED CANCEL 1 1
763 RAPID-P20A1-UEMB-ZN6-ELE-RFIN-00759 iszda 15-Mar-16 ZN6 ELE electrical works Building fixtures functionality test at Guard House 6 (GH6) 17-Mar-16 19-Mar-16 2.30pm CLOSED CANCEL 1 1
764 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00760 Shinryo 13-Mar-16 ZN6 MNE Installation Installation of exhaust fan at Guard house 3 (GH3) 14-Mar-16 16-Mar-16 3.30pm CLOSED 22-Mar-16 8 ACCEPTED 1 1
765 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00761 Shinryo 13-Mar-16 ZN6 MNE Installation Installation of ACSU at Guard house 3 (GH3) 14-Mar-16 16-Mar-16 3.30pm CLOSED 22-Mar-16 8 ACCEPTED 1 1
766 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00762 Shinryo 13-Mar-16 ZN6 MNE Installation Installation of water heater at Guard house 3 (GH3) 14-Mar-16 16-Mar-16 3.30pm CLOSED 22-Mar-16 8 ACCEPTED 1 1
767 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00763 Shinryo 15-Mar-16 ZN6 MNE testing Testing Exhaust fan at Guard House 6 (Gh6) 16-Mar-16 18-Mar-16 2.30pm CLOSED 22-Mar-16 6 ACCEPTED 1 1
768 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00764 Shinryo 15-Mar-16 ZN6 MNE testing Testing ACSU at Guard House 6 (Gh6) 16-Mar-16 18-Mar-16 2.30pm CLOSED 22-Mar-16 6 ACCEPTED 1 1
769 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00765 Shinryo 15-Mar-16 ZN6 MNE testing Testing water heater at Guard House 6 (Gh6) 16-Mar-16 18-Mar-16 2.30pm CLOSED 22-Mar-16 6 ACCEPTED 1 1
770 RAPID-P20A1-UEMB-ZN6-STR-RFIN-00766 instant Option 21-Sep-16 ZN6 STR testing Excavation in grit chamber 2 nos at STP2 22-Sep-16 24-Sep-16 10.00am CLOSED 16-Oct-16 24 ACCEPTED 1 1
771 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00767 Shinryo 15-Mar-16 ZN6 MNE testing Testing water heater at Guard House 6 (Gh6) 16-Mar-16 18-Mar-16 2.30pm CLOSED CANCEL 1 1
773 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00769 instant Option 16-Mar-16 ZN6 CIV Concreting works Concreting works for fencing beam at STP2 17-Mar-16 19-Mar-16 11.00am CLOSED 27-Apr-16 41 ACCEPTED 1 1
775 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00771 I-GEN 3-Mar-16 ZN6 MNE Testing Testing fire alarm system at Guard House 6 (GH6) 5-Mar-16 7-Mar-16 10.00am CLOSED CANCEL 1 1
776 RAPID-P20A1-UEMB-ZN6-MNE-RFIN-00772 Ocned Water 7-Apr-16 ZN6 MNE Testing Testing and commissioning for STP2 7-Apr-16 9-Apr-16 4.00pm CLOSED 1-Jun-16 55 ACCEPTED 1 1
777 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00773 Khidmat hijau 9-Apr-16 ZN6 PIP Welding Inspection of installation fire water piping for Guard House 6 19-Jan-16 21-Jan-16 10.30am CLOSED 12-May-16 114 ACCEPTED 1 1
(GH6) (piping & fitting installation)
779 RAPID-P20A1-UEMB-ZN6-PIP-RFIN-00775 Khidmat hijau 9-Apr-16 ZN6 PIP septic tank Inspection for installation of septic tank of Guard House 6 (GH6) 27-Jan-16 29-Jan-16 10.30am CLOSED 13-Jun-16 138 ACCEPTED 1 1
781 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00777 instant Option 9-Apr-16 ZN6 CIV Turfing turfing works at STP2 28-Mar-16 30-Mar-16 10.00am CLOSED 27-Apr-16 30 ACCEPTED 1 1
782 RAPID-P20A1-UEMB-ZN6-CIV-RFIN-00778 instant Option 9-Apr-16 ZN6 CIV rectification of leakage rectification of leakage by using Sikadur 52,Sikadur 31, and PU- 1-Apr-16 3-Apr-16 2.00pm CLOSED 27-Apr-16 26 ACCEPTED 1 1
3000 injection at Clarifier Tank A and B
784 RAPID-P20A1-UEMB-ZN6-ARC-RFIN-00780 instant Option 18-Apr-16 ZN6 ARC installation Installation of laboratory sink in Admin Building at STP 2 19-Apr-16 21-Apr-16 10.30am CLOSED 21-Jul-16 93 ACCEPTED 1 1
2 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00002 Opensis 19-Aug-15 TCF ELE Backfill Backfill works trench at TCF area ( R0-5) CH 20-Aug-15 22-Aug-15 11.00am CLOSED 19-Sep-15 30 ACCEPTED
237.5-737.5 1 1
6 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00006 Opensis 8-Sep-15 TCF ELE Backfill Backfill work trench at TCF area (S3-8) CH0-625 9-Sep-15 11-Sep-15 11.00am CLOSED 17-Sep-15 8 ACCEPTED 1 1
8 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00008 Opensis 8-Sep-15 TCF ELE Backfill Backfill work trench at TCF area (S1-12) CH0- 9-Sep-15 11-Sep-15 11.00am CLOSED 10-Dec-15 92 ACCEPTED
992.49 1 1
Instant Option 12-Oct-15 TCF ELE Pulling of cooper Pulling of cooper wire at WCT area 13-Oct-15 15-Oct-15 10.00am
10 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00010
wire CLOSED CANCEL 1 1
13 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00013 Opensis 16-Oct-15 TCF ELE Excavation Excavation and laying of HDPE Corrugated pipe 18-Oct-15 20-Oct-15 11.00am CLOSED 04-Nov-15 17 ACCEPTED 1 1
at TCF Area (S1-5) (CH0-450)
14 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00014 Opensis 16-Oct-15 TCF ELE Backfill Backfill work trench at TCF area (S1-5) CH0-450 18-Oct-15 20-Oct-15 11.00am CLOSED 04-Nov-15 17 ACCEPTED 1 1
15 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00015 Opensis 16-Oct-15 TCF ELE Excavation Excavation and laying of HDPE corrugated pipe 18-Oct-15 20-Oct-15 11.00am CLOSED 04-Nov-15 17 ACCEPTED 1 1
inside at TCF Area (R1-5) CH133.50-583.50
16 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00016 Opensis 16-Oct-15 TCF ELE Backfill Backfill works trench at TCF area (R1-5) 18-Oct-15 20-Oct-15 11.00am CLOSED 04-Nov-15 17 ACCEPTED 1 1
CH133.5-=583.50
21 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00021 Instant Option 20-Oct-15 TCF ELE Corrugated pipe Installation of GI pipe dranage crossing at 21-Oct-15 23-Oct-15 9.00am CLOSED 8-Apr-16 14 ACCEPTED 1 1
Temporary Common Facelities
Instant Option 27-Oct-15 TCF ELE Fibre Optic Copper cable pulling though, Corrugated 28-Oct-15 30-Oct-15 9.00am
24 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00024
pipe at WCT area CLOSED 9-Apr-16 14 ACCEPTED 1 1
Instant Option 27-Oct-15 TCF ELE Fibre Optic Pulling of copper wire 10 Cable at lot 10 28-Oct-15 30-Oct-15 10.00am
26 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00026
(P2) CLOSED CANCEL 1 1
Instant Option 29-Oct-15 TCF ELE Installation Installation of copper cables through 30-Oct-15 1-Nov-15 9.00am
28 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00028
corrugated pipe at WCT area CLOSED 9-Apr-16 14 ACCEPTED 1 1
29 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00029 Instant Option 29-Oct-15 TCF ELE Installation excavation, sandbedding and laying 30-Oct-15 1-Nov-15 10.00am CLOSED 22-Nov-16 389 ACCEPTED 1 1
corrugated pipe at WCT area -TCF-2 way
Instant Option 30-Oct-15 TCF ELE Fibre Optic Installation of manhole JC9C at SAJ-TCF- 31-Oct-15 2-Nov-15 10.00am
30 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00030
for fiber optic distribution CLOSED 9-Apr-16 14 ACCEPTED 1 1
Instant Option 30-Oct-15 TCF ELE Fibre Optic Installation of FDC for fiberoptic 31-Oct-15 2-Nov-15 10.00am
32 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00032
distribution at WCT area CLOSED 22-Nov-16 14 ACCEPTED 1 1
manhole installatin at temporary common
33 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00033 Instant Option 16-Nov-15 TCF ELE Fibre Optic facilities area SR3 for fibre optic cable 17-Nov-15 19-Nov-15 10.00am CLOSED 9-Apr-16 14 ACCEPTED 1 1
distribution.
40 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00040 UEMB Hafiz 6-Nov-15 TCF ELE survey Joint survey setting out alignment for fiber 7-Oct-15 9-Oct-15 9.00am CLOSED 7-Oct-15 0 ACCEPTED 1 1
optic at POP to Lot 11
42 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00042 UEMB Hafiz 10-Oct-15 TCF ELE survey Joint survey setting out alignment for fiber 12-Oct-15 14-Oct-15 9.00am CLOSED 12-Oct-15 0 ACCEPTED 1 1
optic at lot 11 to lot 45
45 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00045 Instant Option 31-Dec-15 TCF ELE excavation Manhole installation for fibre optic distribution 2-Jan-15 4-Jan-15 11.00am CLOSED 18-Dec-15 14 ACCEPTED 1 1
at WCT area
47 RAPID-P20A1-UEMB-TCF-PIP-RFIN-00047 flexi team 5-Jan-16 TCF PIP Boom gate To supply and lay piping and wiring for Boom 6-Jan-16 8-Jan-16 2.00pm CLOSED 6-Jan-16 0 REJECTED 1 1
turnstile gate turnstile
48 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00048 flexi Team 6-Jan-16 TCF PIP Boom gate To supply and lay piping and wiring for Boom 7-Jan-16 9-Jan-16 10.00am CLOSED 12-Jan-16 5 ACCEPTED 1 1
turnstile gate turnstile at Gate 2
56 RAPID-P20A1-UEMB-TCF-MNE-RFIN-00056 flexi Team 20-Jan-16 TCF MNE Turnstiles, poles To supply & delivery 8 units turnstiles,13units 21-Jan-16 23-Jan-16 11.00am CLOSED 21-Jan-16 0 ACCEPTED 1 1
optical sensor pole & holders
72 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00072 iszda 1-Feb-16 TCF ELE material Inspection of material functional for fiber optic 2-Feb-16 4-Feb-16 2.00pm CLOSED 16-Feb-16 14 ACCEPTED 1 1
functional at main FDC and FDC4
material Inspection of material functional for fiber optic
73 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00073 iszda 1-Feb-16 TCF ELE functional at main FDC and FDC3 2-Feb-16 4-Feb-16 2.00pm CLOSED 16-Feb-16 14 ACCEPTED 1 1
76 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00076 iszda 20-Jan-16 TCF ELE Cable laying Inspection of fiber optic cable laying 8C from 23-Jan-16 25-Jan-16 2.00pm CLOSED 16-Feb-16 24 ACCEPTED 1 1
PMC menta office to Pedestal lot 1(340m)
80 RAPID-P20A1-UEMB-TCF-MNE-RFIN-00080 flexi Team 4-Mar-16 TCF MNE boom gate Material receiving for boomgate turnstile Gate 4-Mar-16 6-Mar-16 2.30pm CLOSED 11-Mar-16 7 ACCEPTED 1 1
turnstile 3
Installation of manhole for fibre optic
81 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00081 Instant Option 5-Apr-16 TCF ELE Installation distribution at WCT area 6-Apr-16 8-Apr-16 10.00am CLOSED 1-Dec-16 239 ACCEPTED 1 1
92 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00092 iszda 28-May-16 TCF ELE material Inspection of material equipment & 30-May-16 1-Jun-16 2.00pm CLOSED 2-Jul-16 33 ACCEPTED 1 1
functional installation fiber optic at Lot 117
93 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00093 iszda 28-May-16 TCF ELE Testing Inspection of fiber optic Testing & 30-May-16 1-Jun-16 2.00pm CLOSED 2-Jul-16 33 ACCEPTED 1 1
Commisioning at Lot 117
Inspection of fiber optic cable laying using 48
core & 8 core fiber optic cable single mode
94 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00094 iszda 24-May-16 TCF ELE Cable laying 25-May-16 27-May-16 2.00pm CLOSED 2-Jul-16 38 ACCEPTED 1 1
9/125 from central Security building to Gate
01, Gate 02 & Gate 03
95 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00095 iszda 24-May-16 TCF ELE Cable laying Inspection of fiber optic material, equipment 25-May-16 27-May-16 2.00pm CLOSED 2-Jul-16 38 ACCEPTED 1 1
& installation for main gate 1,2 & 3
97 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00097 iszda 24-May-16 TCF ELE Cable laying Inspection of cable jointing fiber optic for 25-May-16 27-May-16 2.00pm CLOSED 2-Jul-16 38 ACCEPTED 1 1
cabling from gate 02 to gate 03
111 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00112 iszda 1-Sep-16 TCF ELE Testing Inspection Testing and Commisioning of fiber 2-Sep-16 4-Sep-16 2.30pm CLOSED 6-Oct-16 34 ACCEPTED 1 1
optic for FDC4 to Lot 52, 133 & 142
To do inspection of UPVC Telecom pipe laying
112 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00113 iszda 29-Aug-16 TCF ELE installation 30-Aug-16 1-Sep-16 10.00am CLOSED 9-Oct-16 40 ACCEPTED 1 1
underground lot 135(P14)
To do inspection of UPVC Telecom pipe laying
113 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00114 iszda 5-Sep-16 TCF ELE installation underground lot 92(P16A), lot 92a(P7) & lot 6-Sep-16 8-Sep-16 10.00am CLOSED 9-Oct-16 33 ACCEPTED 1 1
93a(P11)
114 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00115 iszda 15-Sep-16 TCF ELE installation To do inspection of UPVC Telecom pipe laying 15-Sep-16 17-Sep-16 2.00pm CLOSED 9-Oct-16 24 ACCEPTED 1 1
underground lot 96(P9)
To do inspection of UPVC Telecom pipe laying
115 RAPID-P20A1-UEMB-TCF-ELE-RFIN-00116 iszda 27-Sep-16 TCF ELE installation underground lot 142(OSM), lot 90(P14) & lot 27-Sep-16 29-Sep-16 2.00pm CLOSED 9-Oct-16 12 ACCEPTED 1 1
89
138 138
EPCC OF TEMPORARY COMMON CAMP AND FACILITIES (P20A1) FOR RAPID PENGERANG JOHOR
SUMMARY STATUS FOR REQUEST FOR WORK INSPECTION
(Temporary Camp Facilities)
RAPID-P20A1-UEMB-TSF-STR-RFIN- Pump
4 00004 How Thong 3-Nov-15 TSF MNE installation Installation 2 nos pumps at TSF 4-Nov-15 23-Oct-15 9.00am CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-STR-RFIN-
5
00005
How Thong 3-Nov-15 TSF MNE Pipe Installation Pipe installation at TSF 4-Nov-15 24-Oct-15 9.00am CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
11
00011
How Thong 12-Nov-15 TSF CIV Drainage Installing UD 600x450 at TSF 12-Nov-15 28-Oct-15 10.00am CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
12
00012
How Thong 30-Nov-15 TSF CIV road work Dipping level for subgrade at TSF 30-Nov-15 2-Dec-15 3.00pm CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
13
00013
How Thong 30-Nov-15 TSF CIV road work fdt for subgrade 1-Dec-15 3-Dec-15 3.00pm CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
15
00015
How Thong 5-Dec-15 TSF CIV road work Dipping for subbase at TSF area 5-Dec-15 7-Dec-15 4.00pm CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
16 00016 nik zunaidi 5-Dec-15 TSF CIV road work FDT for subbase at TSF area 5-Dec-15 7-Dec-15 4.00pm CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
17
00017
How Thong TSF CIV road work Laying Geo grid for roadbase at TSF 9-Dec-15 11-Dec-15 9.00am CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
18
00018
How Thong 16-Dec-15 TSF CIV road work Dipping for roadbase at TSF 16-Dec-15 18-Dec-15 3.00pm CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
19
00019
How Thong TSF CIV road work FDT for roadbase at TSF 16-Dec-15 18-Dec-15 3.00pm CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
20
00020
How Thong TSF CIV road work Laying prime coat at TSF 17-Dec-15 19-Dec-15 10.00am CLOSED CANCEL
RAPID-P20A1-UEMB-TSF-CIV-RFIN-
21
00021
How Thong 16-Dec-15 TSF CIV road work Laying premix at TSF 18-Dec-15 20-Dec-15 9.00am CLOSED 18-Dec-15 0 ACCEPTED
24 RAPID-P20A1-UEMB-SAJ-PIP-RFIN-00024 instant Option 27-Aug-15 SAJ PIP Piping Inspection of bulk Meter stand 28-Aug-15 30-Aug-15 10.00am CLOSED 8-Oct-15 41 REJECTED
26 RAPID-P20A1-UEMB-SAJ-PIP-RFIN-00026 instant Option 2-Sep-15 SAJ PIP Piping Inspection of block Meter stand 3-Sep-15 5-Sep-15 8.00am CLOSED 08-Oct-15 35 ACCEPTED
instant Option 8-Sep-15 SAJ ARC Turfing Turfing works at SAJ incoming 9-Sep-15 11-Sep-15 8.00am
27 RAPID-P20A1-UEMB-SAJ-ARC-RFIN-00027
pipe line CLOSED CANCEL
29 RAPID-P20A1-UEMB-SAJ-PIP-RFIN-00029 instant Option 26-Sep-15 SAJ PIP Bulkmeter Installation installation of bulkmeter at SAJ 27-Sep-15 29-Sep-15 10.00am CLOSED 14-Nov-15 48 ACCEPTED
39 RAPID-P20A1-UEMB-SAJ-CIV-RFIN-00039 instant Option 31-Mar-16 SAJ CIV Flushing Flushing at SAJ piping at TSF area 31-Mar-16 2-Apr-16 10.00am CLOSED 18-Apr-16 18 ACCEPTED
12/26/2014
NEW STATUS
TOTAL RFIN CLOSED RFIN
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
CANCEL 1 1
1 1
1 1
1 1
1 1
CANCEL 1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
39 39
77 77