Drainage Testing Report

The drainage testing report for Ateeqha Central Market identified several issues. Multiple manholes were found to be missing, blocked, or not up to standard. Many floor drain covers needed cleaning. Toilet areas in several blocks had non-functional flush valves, wash basins, and blocked drains. Recommendations were provided to address missing ground clean outs, clean and fix drain covers, improve manhole standards and slopes, and repair plumbing in toilet areas.

Uploaded by

Umar Farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
519 views3 pages

Drainage Testing Report

The drainage testing report for Ateeqha Central Market identified several issues. Multiple manholes were found to be missing, blocked, or not up to standard. Many floor drain covers needed cleaning. Toilet areas in several blocks had non-functional flush valves, wash basins, and blocked drains. Recommendations were provided to address missing ground clean outs, clean and fix drain covers, improve manhole standards and slopes, and repair plumbing in toilet areas.

Uploaded by

Umar Farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Ateeqha Central Market

Drainage Testing Report

A Draiange Testing done for all shops and outside Drainage lines
B Water Flushing done in all shops floor drains , out side Manholes and Main lines

The following Comments noted in each Block and outside drainage lines:

S.No Block:13
Total Shops :08
Total No of Manholes:01
1 Ground Clean Out (GCO)missing on both side of B-13 line
2 All floor Drains steel cover to be cleaned and fixed

Block:14,15
Total Shops :15
Total No of Manholes:0
1 All floor Drains steel cover to be cleaned and fixed

Block:16
Total Shops :24
Total No of Manholes:02
1 Manhole MH-F-04 missing
2 If no need for Manhole then Ground clean out (GCO) must be there which is missing
3 All floor Drains steel cover to be cleaned and fixed
4 Manhole MH-D-08 blocked

Block:17
Total Shops :18
Total No of Manholes:03
1 All floor Drains steel cover to be cleaned and fixed

Block:18
Total Shops :40+Toilets Area
Total No of Manholes:06
1 All floor Drains steel cover to be cleaned and fixed
Toilets Area
1 All Arabic W.Cs have drainage problem
2 one english w.c is damage (broken)
3 All Flush valves not working
4 wash basin (W.B) have water supply problem
5 floor Drains blocked in Handicap toilet
6 floor Drains blocked in W.B contained bathroom
7 Hand Sprays missing in all toilets
8 Handicap W.C cover missing
9 Ablution Area 3-Tap mixers not working
10 Ablution area 1 floor Drain blocked
Block:19
Total Shops :46 ( 23 shops in front side & 23 in Back side)
Total No of Manholes:07
1 All floor Drains steel cover to be cleaned and fixed
2 Back side 4 Shops floor Drains are blocked

Block:20,31,32
Total Shops :30
Total No of Manholes:05
1 All floor Drains steel cover to be cleaned and fixed
2 floor Drain in one shop not installed
3 one side GCO missing while other side is blocked

Block:21
Total Shops :84 (42 front+42 back side)
Total No of Manholes:14
1 All floor Drains steel cover to be cleaned and fixed
2 One GCO missing
3 MH-K-01 manhole is blocked (Near to Municipal Main Manhole)

Block:23,24,25
Total Shops :47+ Toilets Area+ offices area
Total No of Manholes:04
1 All floor Drains steel cover to be cleaned and fixed
2 Main Manhole between B23 toilets & B25 Toilets is not as per standard,all 4 inlets lines and one outlet line are at
the same level,also outlet line size is small i-e 4" dia pipe is used.
3 Back side of B23,one GCO missing
4 Manhole MH-L-02 is missing
5 2 Hands Sprays missing in Office Area Toilets

Block:26,27,28
Total Shops : 92
Total No of Manholes:10
1 All floor Drains steel cover to be cleaned and fixed
2 Manhole MH-L-04 need inside cleaning
3 Slope require among Manhole MH-L-03,MH-L-04 & MH-L-05, the already established slope is very less,Blockage
chances is very high.
4 2 GCO missing at B26,B27