Section 1 - TCS Drawing
Section 1 - TCS Drawing
0.25
0.25
3.00 7.00 1.75 2.50 10.50 0.50 8.50 0.50 10.50 2.50 1.50 1.50 7.00 3.00
Right of Way
/Utility Space
/Utility Space
Shoulder
Footpath
Shoulder
Footpath
Separator
Shoulder
Earthen
Shoulder
Paved
Earthen
Median
Future
Paved
Left Left Right Right
/Drain
Future Future
Service Road Carriageway Widening Widening Carriageway Service Road
3% 3%
1% FRL FRL 2.5% 1%
SRFRL 2.5% 2.5% 2.5% SRFRL
3% 3%
DRAIN 2H Unlined 1V
2H
1V
Drain
STONE MATRIX ASPHALT
BITUMINOUS CONCRETE DENSE BITUMINOUS MACADAM
DENSE BITUMINOUS MECADAM WET MIX MACADAM
WET MIX MACADAM GRANULAR SUB BASE
GRANULAR SUB BASE SUB GRADE
SUB GRADE
DRAIN 1.60
UNLINED
DRAIN
Min. 0.60
1V
1.25 2H 1.50
1.75
SCALE :
THIS DRAWING IS THE PROPERTY OF
REFERENCE DRAWINGS STATUS CODES 1 : FOR REVIEW / APPROVAL 2 : DRAFT DPR 3 : FINAL DPR
213-NARIMAN POINT.
MUMBAI 400 021.
672, ANNA SALAI, NANDANAM,
CHENNAI - 600 035
TYPICAL CROSS SECTION 14603 / E / TCS / DD - 101 1
0.25 100.000
0.25
3.00 7.00 1.75 2.50 10.50 0.50 8.50 0.50 10.50 2.50 1.50
3.50 1.50 3.50
Right of Way
Right of Way
/Utility Space
Shoulder
Footpath
Separator
Shoulder
Shoulder
Paved
Earthen
Median
Future
Paved
Left Left Right
/Drain
Future Future
Service Road Carriageway Widening Widening Carriageway
3% 3%
1% FRL FRL
SRFRL 2.5% 2.5% 2.5%
3%
DRAIN
2H
Unlined
1V
Drain
100.00
0.25
0.25
3.00 7.00 1.50 1.50 2.50 10.50 0.50 8.50 0.50 10.50 2.50 1.50 1.50 7.00 3.00
Right of Way
/Utility Space
/Utility Space
Shoulder
Footpath
Shoulder
Footpath
Shoulder
Shoulder
Shoulder
Divider
Earthen
Earthen
Earthen
/Drain
Paved
Paved
Median
Future
Left Left Future Future Right Right
Service Road Carriageway Widening Widening Carriageway Service Road
3% 3%
1% 2.5% 2.5% 2.5% 2.5% 1%
3% 3% 3% 3%
2H
Unlined 2H 2H
Unlined 2H
1V
Drain 1V 1V
Drain 1V
TCS - 3 : SIX LANE ROAD WITH SERVICE ROAD ON BOTH SIDES WITHOUT SEPARATOR
STUP CONSULTANTS PVT LTD. IT SHOULD NOT
BE USED, COPIED OR REPRODUCED WITHOUT
SCALE :
THIS DRAWING IS THE PROPERTY OF
REFERENCE DRAWINGS STATUS CODES 1 : FOR REVIEW / APPROVAL 2 : DRAFT DPR 3 : FINAL DPR
213-NARIMAN POINT.
MUMBAI 400 021.
672, ANNA SALAI, NANDANAM,
CHENNAI - 600 035
TYPICAL CROSS SECTION 14603 / E / TCS / DD - 102 1
100.000
0.525
0.250
0.525
0.500
0.25
0.25
3.00 7.00 14.00 8.50 10.50 2.50 1.50 1.50 7.00 3.00
Left
Carriageway 3.50 1.50 3.50
Right of Way
Right of Way
/Utility Space
/Utility Space
Footpath
Shoulder
Shoulder
Earthen
Shoulder
Footpath
Earthen
Paved
Right
Median
Left Right
Future
Future Future
Service Road 2.5% Widening Widening Carriageway Service Road
3%
1% FRL 2.5% 1%
SRFRL 2.5% 2.5% SRFRL
3% 3%
DRAIN
2H
1V Unlined 1V
2H
Drain
100.00
0.525
0.250
0.525
0.500
0.25
0.25
3.00 7.00 14.00 8.50 10.50 2.50 1.50 1.50 7.00 3.00
Left
Carriageway 3.50 1.50 3.50
2.5% FRL
Right of Way
Right of Way
/Utility Space
/Utility Space
Footpath
Shoulder
Footpath
Shoulder
Earthen
Shoulder
Median
Earthen
Future
Paved
Left Widening Future Right Right
Service Road Future Widening Carriageway Service Road
3% 3%
1% FRL 2.5% 1%
SRFRL 2.5% 2.5% 3% SRFRL
3%
DRAIN
2H
1V Unlined 1V
2H
Drain
SCALE :
THIS DRAWING IS THE PROPERTY OF
REFERENCE DRAWINGS STATUS CODES 1 : FOR REVIEW / APPROVAL 2 : DRAFT DPR 3 : FINAL DPR
213-NARIMAN POINT.
MUMBAI 400 021.
672, ANNA SALAI, NANDANAM,
CHENNAI - 600 035
TYPICAL CROSS SECTION 14603 / E / TCS / DD - 103 1
100.00
0.525
0.725
0.525
0.25
3.00 7.50 14.00 8.50 14.00 1.50 7.00 3.00
Left Left
Carriageway 3.50 1.50 3.50 Carriageway
Median
Future
Future Future
Right of Way
Right of Way
Widening Widening
/Utility Space
Shoulder
Footpath
Earthen
Left Right
FRL FRL
Service Road 2.5%
2.5% Service Road
1% 2.5% 1%
SRFRL 2.5% SRFRL
3%
DRAIN
Unlined 1V
2H
Drain
100.00
8.50
0.525
0.525
0.250
0.525
0.525
0.25
0.25
3.00 7.00 14.00 14.00 1.50 7.00 3.00
Left Right
Carriageway Carriageway
Right of Way
/Utility Space
/Utility Space
Footpath
Shoulder
Footpath
Earthen
Left Right
Service Road Service Road
1% 2.5% 1%
SRFRL 2.5% SRFRL
3%
DRAIN
2H
1V Unlined 1V
2H
Drain
SCALE :
THIS DRAWING IS THE PROPERTY OF
REFERENCE DRAWINGS STATUS CODES 1 : FOR REVIEW / APPROVAL 2 : DRAFT DPR 3 : FINAL DPR
213-NARIMAN POINT.
MUMBAI 400 021.
672, ANNA SALAI, NANDANAM,
CHENNAI - 600 035
TYPICAL CROSS SECTION 14603 / E / TCS / DD - 104 1
0.25 100.000
0.25
0.25
3.00 7.00 1.75 2.50 10.50 0.50 8.50 0.50 10.50 2.50 4.00 30.00 2.75 3.75 1.50 7.00 3.00
Right of Way
/Utility Space
/Utility Space
Shoulder
Footpath
Shoulder
Footpath
Separator
Shoulder
Earthen
Paved
Median
Future
Paved
Left Left Right Right
/Drain
Future Future
Service Road Carriageway Widening Widening Carriageway Separator Truck lay Bye Service Road
3% 3%
1% FRL FRL
SRFRL 2.5% 2.5% 2.5%
2.5% 1%
2.5% SRFRL
3%
DRAIN DRAIN
DRAIN
8.50
0.525
0.525
0.525
0.525
0.525
0.525
0.525
0.450
0.450
0.525
1.50 8.00 14.00 14.00 8.00 1.50
Footpath
Footpath
Left Right
Service Road Left Right
Carriageway Carriageway Service Road
FRL FRL FRL FRL
2.5% 2.5% 2.5% 2.5%
RIGHT OF WAY
RIGHT OF WAY
TCS - 9 : VIADUCT PORTION OF BRIDGES
STUP CONSULTANTS PVT LTD. IT SHOULD NOT
BE USED, COPIED OR REPRODUCED WITHOUT
SCALE :
THIS DRAWING IS THE PROPERTY OF
REFERENCE DRAWINGS STATUS CODES 1 : FOR REVIEW / APPROVAL 2 : DRAFT DPR 3 : FINAL DPR
213-NARIMAN POINT.
MUMBAI 400 021.
672, ANNA SALAI, NANDANAM,
CHENNAI - 600 035
TYPICAL CROSS SECTION 14603 / E / TCS / DD - 105 1
30.20
MEDIAN
Carriageway Carriageway
2.5% 2.5%
33.05
4.00
TCS - 10 : APPROACH PORTION OF BRIDGE @ CH: 1+540 0.525 14.00 14.00 0.525
Left 0.525 0.525 Right
Carriageway Carriageway
2.5% FRL FRL 2.5%
BL BL BL BL
30.20
1.150
0.525 14.00 14.00 0.525 TCS - 12 : VIADUCT PORTION OF BRIDGE @ CH: 1+540
Left 0.525 0.100 0.525 Right
Carriageway Carriageway
2.5% FRL FRL 2.5%
GL GL GL GL
SCALE :
THIS DRAWING IS THE PROPERTY OF
REFERENCE DRAWINGS STATUS CODES 1 : FOR REVIEW / APPROVAL 2 : DRAFT DPR 3 : FINAL DPR
213-NARIMAN POINT.
MUMBAI 400 021.
672, ANNA SALAI, NANDANAM,
CHENNAI - 600 035
TYPICAL CROSS SECTION 14603 / E / TCS / DD - 106 1