BBS Pile, Tie Beam & Stair Case
BBS Pile, Tie Beam & Stair Case
BBS Pile, Tie Beam & Stair Case
Minor & RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build
Lump Sum basis from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station
towards Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar
in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
BBS for 300mm Dia Pile Location: Staff Quarter
Dia.of Cutting Total
Bar Spacing No. of Wt/m in Total wt in
S No Shape of bar bar 'mm'
length length Remarks
no. bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'
220
110
160
Total 42.032
Total for 8 mm 12.691
10 mm 0.000
12 mm 29.341
3550
TB1 Top
1 & 95 95 16 4 6 3676 88224 1.580 139.394
Bottom
200 250
200 250
200 250
200 250
200 250
200 250
200 250
200 250
200 250
200 250
200 250
200 250
TB13 A 1690
& B Top
27 95 95 16 4 6 1816 43584 1.580 68.863
&
Bottom
200 250
200 250
200 250
Total 2676.323
Total for 8 mm 740.136
16 mm 1936.187
Footing main
1 75 75 12 150 9 1212 10908 0.888 9.686
bar
1110
outer side(wall
3 12 150 9 2714 24426 0.888 21.690
) 1438
300
1153
300
inner side(wall
5 12 150 9 2056 18504 0.888 16.432
) 1480
300
1153
6 Distribution 8 150 9 1153 10377 0.395 4.099
300
stair ramp
7 (plinth level to 12 150 9 4194 37746 0.888 33.518
first lending ) 3594
300
1153
8 Distribution 8 150 24 1153 27672 0.395 10.930
1270
1st landing (
9 300 75 12 150 9 1621 14589 0.888 12.955
bottom )
1150
1st landing (
10 1000 75 12 150 9 2201 19809 0.888 17.590
Top)
3594
1st landing to 300
2nd landing 75 12 150 9 5390 48510 0.888 43.077
12
( bottom )
ramp 1445
1153
14 Distribution 8 150 24 1153 27672 0.395 10.930
1st landing to
15 2nd landing 300 75 12 150 9 1942 17478 0.888 15.520
( Top ) ramp
1591
1st landing to
16 2nd landing 1000 12 150 9 1300 11700 0.888 10.390
( top )
300
1153
17 Distribution 8 150 7 1153 8071 0.395 3.188
2595
distribution (1
18 st landing Top 8 150 18 2595 46710 0.395 18.450
& bottom )
2nd Landing
19 500 300 8 150 9 800 7200 0.395 2.844
bottom )
2nd Landing
21 500 1000 10 150 9 1500 13500 0.617 8.330
Top)
Total 256.338
Total for 8 mm 60.916
10 mm 14.564
12 mm 180.858
s.no bar no. profile of bar dia of banos spacing ctting iengttotal iength
S1 & S2 main 3510
1 bar 8 132 150 c/c 3.51 463.32
4840
distribution 8 96 150 c/c 4.84 464.64
3510
main bar top 8 64 150 c/c 3.51 224.64
2360
distribution 12 144 100 c/c 2.36 339.84
1
1
mark 3 -4 7
( bottom ) 0 8 28 200 c/c 1.17 32.76
1
1
7
top 0 8 28 200 c/c 1.17 32.76
distribution 1120
top & bottom 8 32 200 c/c 1.12 35.84
7
mark 1-3 & A( 3
top ) 0 8 48 200 c/c 0.73 35.04
3510
distribution 8 16 200c/c 3.51 56.16
7
mark 4( top ) 3 8 72 200 c/c 0.73 52.56
0
3510
distribution 8 16 200c/c 3.51 56.16
530
8 1660 530
85
2 S3 main bar 5 8 72 150 c/c 2.858 205.776
8
630 2535 6308
distribution 5 5 8 36 200 c/c 3.933 141.588
2360
distribution 8 12 200 c/c 2.36 28.32
3 s4 slab 0
3510
main bar 8 96 150 c/c 3.51 336.96
3510
distribution 8 96 150 c/c 3.51 336.96
1850
mark B 8 88 125 c/c 1.85 162.8
3510
distribution 8 40 200c/c 3.51 140.4
730
mark 1 8 48 200 c/c 0.73 35.04
3510
distribution 8 16 200 c/c 3.51 56.16
730
mark c 8 72 200 c/c 0.73 52.56
3510
distribution 8 16 200 c/c 3.51 56.16
1
1
mark b -c 7
( bottom ) 0 8 28 200 c/c 1.17 32.76
1
1
7
top 0 8 28 200 c/c 1.17 32.76
distribution 1120
top & bottom 8 32 200 c/c 1.12 35.84
4 s5 slab 0
3600
main bar 8 144 125 c/c 3.6 518.4
4360
distribution 8 100 150 c/c 4.36 436
1850
slab s4 & s5 8 116 125 c/c 1.85 214.6
4360
distribution 8 20 200c/c 4.36 87.2
3510
distribution 8 20 200 c/c 3.51 70.2
730
mark b 8 76 200 c/c 0.73 55.48
3600
distribution 8 16 200c/c 3.6 57.6
1125
slab s5 & s5 8 116 125 c/c 1.125 130.5
3600
distribution 8 24 200c/c 3.6 86.4
1030
mark 5 8 12 125 c/c 1.03 12.36
2890
distribution 8 32 200c/c 2.89 92.48
1550
mark 5 8 96 125 c/c 1.55 148.8
5 s6 slab 0
2310
main bar 8 60 200 c/c 2.31 138.6
2890
distribution 8 48 200 c/c 2.89 138.72
630
mark b 8 48 200 c/c 0.63 30.24
2310
distribution 8 16 200 c/c 2.31 36.96
630
mark 6 8 60 200 c/c 0.63 37.8
2890
distribution 8 16 200 c/c 2.89 46.24
1450
mark c 8 76 125 c/c 1.45 110.2
2310
distribution 8 16 200 c/c 2.31 36.96
6 slab s7 0
2510
main bar 8 46 200 c/c 2.51 115.46
6795
distribution 8 13 200 c/c 6.795 88.335
2650
mark b 8 42 200 c/c 2.65 111.3
2510
distribution 8 20 200 c/c 2.51 50.2
780
mark 6 10 17 200 c/c 0.78 13.26
6795
distribution 8 10 200c/c 6.795 67.95
630
mark c 8 12 125 c/c 0.63 7.56
6795
distribution 8 4 200 c/c 6.795 27.18
3 s4 slab
3510
main bar 8 96 150 c/c 3.51 336.96
3510
distribution 8 96 150 c/c 3.51 336.96
1850
mark B 8 88 125 c/c 1.85 162.8
3510
distribution 8 40 200c/c 3.51 140.4
730
mark 1 8 48 200 c/c 0.73 35.04
3510
distribution 8 16 200 c/c 3.51 56.16
730
mark c 8 72 200 c/c 0.73 52.56
3510
distribution 8 16 200 c/c 3.51 56.16
1
1
mark b -c 7
( bottom ) 0 8 28 200 c/c 1.17 32.76
1
1
7
top 0 8 28 200 c/c 1.17 32.76
distribution 1120
top & bottom 8 32 200 c/c 1.12 35.84
4 s5 slab
3600
main bar 8 116 125 c/c 3.6 417.6
4360
distribution 8 100 150 c/c 4.36 436
1850
slab s4 & s5 8 116 125 c/c 1.85 214.6
4360
distribution 8 20 200c/c 4.36 87.2
3510
distribution 8 20 200 c/c 3.51 70.2
1150
mark b 8 40 150 c/c 1.15 46
3600
distribution 8 16 200c/c 3.6 57.6
1125
slab s5 & s5 8 116 125 c/c 1.125 130.5
3600
distribution 8 24 200c/c 3.6 86.4
1030
mark 5 8 12 125 c/c 1.03 12.36
2890
distribution 8 32 200c/c 2.89 92.48
1550
mark 5 8 64 125 c/c 1.55 99.2
5 s6 slab
2310
main bar 8 60 200 c/c 2.31 138.6
2890
distribution 8 48 200 c/c 2.89 138.72
630
mark b 8 48 200 c/c 0.63 30.24
2310
distribution 8 16 200 c/c 2.31 36.96
630
mark 6 8 60 200 c/c 0.63 37.8
2890
distribution 8 16 200 c/c 2.89 46.24
1450
mark c 8 76 125 c/c 1.45 110.2
2310
distribution 8 16 200 c/c 2.31 36.96
6 slab s7
2510
main bar 8 46 200 c/c 2.51 115.46
6795
distribution 8 13 200 c/c 6.795 88.335
2650
mark b 8 42 200 c/c 2.65 111.3
2510
distribution 8 20 200 c/c 2.51 50.2
780
mark 6 10 17 200 c/c 0.78 13.26
6795
distribution 8 10 200c/c 6.795 67.95
630
mark c 8 12 125 c/c 0.63 7.56
6795
distribution 8 4 200 c/c 6.795 27.18
eting, Viaducts, Rail Flyover, Bridges (Major, Minor &
fied railway line on Design Build Lump Sum basis from
w Sonenagar station towards Garhwa and at Dehri-on-
ate of Bihar in India.
Staff Quarter
drawing no-
location:
1/RB/T-
11/SK003/0
unit wt. total wt. Remarks
0.395 183.0114
0.395 183.5328
0.395 88.7328
0.888 301.77792
0.395 12.9402
0.395 12.9402
0.395 14.1568
0.395 13.8408
0.395 22.1832
0.395 20.7612
0.395 22.1832
0.395 81.28152
0.395 55.92726
0.395 11.1864
0.395 10.428
0
0.395 133.0992
0.395 133.0992
0.395 64.306
0.395 55.458
0.395 13.8408
0.395 22.1832
0.395 20.7612
0.395 22.1832
0.395 12.9402
0.395 12.9402
0.395 14.1568
0.395 204.768
0.395 172.22
0.395 84.767
0.395 34.444
0.395 27.729
0.395 21.9146
0.395 22.752
0.395 51.5475
0.395 34.128
0.395 4.8822
0.395 36.5296
0.395 58.776
0
0.395 54.747
0.395 54.7944
0.395 11.9448
0.395 14.5992
0.395 14.931
0.395 18.2648
0.395 43.529
0.395 14.5992
0.395 45.6067
0.395 34.892325
0.395 43.9635
0.395 19.829
0.617 8.18142
0.395 26.84025
0.395 2.9862
0.395 10.7361
2714.754
Staff Quarter
drawing no-
location:
1/RB/T-
11/SK003/0
0.395 183.0114
0.395 183.5328
0.395 88.7328
0.888 301.77792
0.395 12.9402
0.395 12.9402
0.395 14.1568
0.395 13.8408
0.395 22.1832
0.395 10.3806
0.395 22.1832
0.395 10.8862
0.395 12.0159
0.395 8.9586
0.395 10.4912
0.395 29.072
0.395 8.0106
0.395 27.492
0.395 5.2456
0.395 133.0992
0.395 133.0992
0.395 64.306
0.395 55.458
0.395 13.8408
0.395 22.1832
0.395 20.7612
0.395 22.1832
0.395 12.9402
0.395 12.9402
0.395 14.1568
0.395 164.952
0.395 172.22
0.395 84.767
0.395 34.444
0.395 27.729
0.395 18.17
0.395 22.752
0.395 51.5475
0.395 34.128
0.395 4.8822
0.395 36.5296
0.395 39.184
0.395 54.747
0.395 54.7944
0.395 11.9448
0.395 14.5992
0.395 14.931
0.395 18.2648
0.395 43.529
0.395 14.5992
0.395 45.6067
0.395 34.892325
0.395 43.9635
0.395 19.829
0.617 8.18142
0.395 26.84025
0.395 2.9862
0.395 10.7361
2706.5069
264.5069
Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major, Minor & RUBs) Supply and
Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump Sum basis from Howrah end approach of DFCC Sone
bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards Garhwa and at Dehri-on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with
Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
BBS FOR Lintel band in brick masonry at lintel Staff Quarter drawing no-
Location:
level 1/RB/T-11/SK003/0
dia of spacing cutting total
s.no Bar no. profile of bar nos unit wt. total wt. Remarks
bar in (mm) length length
1 175 175 1
7
7 5
5 3 34502
4 0 1751
bed room -1, W/C & living room 7 2 7
5 2500 5 10 4 18.11 72.44 0.617 44.70
(inner side) 5
5
6
6
150 0
1 3500
2
0
3 2
bed room -1, W/C & living room 5 1 2500
5
7 175 10 4 17.58 70.32 0.617 43.39
(outer side) 0
0 5
75
5
150 6
6
60 600
link 8 236 150 0.278 65.608 0.395 25.92
190
75
R ING ( SECTION 3-3 75 8 52 100 c/c 0.6 31.2 0.395 12.32
190
4
RING SECTION 3-3( DETAILS -Z) 650 50 10 40 125 c/c 0.78 31.2 0.617 19.25
65 75
1150
Distribution 8 12 200 c/c 1.15 13.8 0.395 5.45
75
75 8 56 100 c/c 0.6 33.6 0.395 13.27
190
5
1100
Distribution 8 20 200 c/c 1.1 22 0.395 8.69
790
50 10 40 125 c/c 0.85 34 0.617 20.98
50
6
75
Ring 75 8 44 100 c/c 0.6 26.4 0.395 10.43
190
1 175 175 1
7 3450 7
5 3 5
bed room- 2 (inner side) (B-C & 2 4 1
E-D)( 1 to 3 & 12 to 10) 7 2 5 10 4 15.085 60.34 0.617 37.23
5 3300 2 0
0
3500
8 3
5 4
bed room- 2 (outer side) 0 2 10 4 18.115 72.46 0.617 44.71
0 4
3500 1 5
5
0
60
6 60
6
link 190 8 240 150 0.278 66.72 0.395 26.35
1410
Almari Mark-(1-1) (B-C & E-D)( 1
10 8 1.14 9.12 0.617 5.63
& 12 ) Top Reinfoircement Ring
75
ring 75 8 56 100 c/c 0.6 33.6 0.395 13.27
190
9
790
50 10 40 125 c/c 0.85 34 0.617 20.98
50
1200
Window w1 mark (1-1) top (B-C
10 8 1.2 9.6 0.617 5.92
& E-D)( 1 & 12 ) R/F ring
75
ring section (3-3) details -z 75 8 52 100 c/c 0.6 31.2 0.395 12.32
190
10
650
65 75 50 10 40 125 c/c 0.78 31.2 0.617 19.25
75
ring 75 8 36 100 c/c 0.6 21.6 0.395 8.53
190
12
650
Chajja top Bar 65 75 50 10 36 125 c/c 0.78 28.08 0.617 17.33
Chajja Dist. Bar 1150 8 6 200 c/c 1.115 6.69 0.395 2.64
1 3590 1
Dinning & living room 2-2 (C-D) 5 5
( 3 to 5 & 10 to 8) B/S 01 3590 01 10 4 3.85 15.4 0.617 9.50
5 5
13 0 0
60
6 60
6
link 190 8 22 150 0.278 6.116 0.395 2.42
1
1450 4
Bathroom main wall with Bed 5
Room 2-2 (A-B & F-E)( 3 to 5 & 0 10 8 11.23 89.84 0.617 55.43
10 to 8)
3440
60
Bed Room 60 8 44 150 0.278 12.232 0.395 4.83
14 75
75
ring 75 8 136 100 c/c 0.37 50.32 0.395 19.88
75
175 175
1 2535 1
7 7
kitchen & stair ( inner side ) (A- 54 4 5
C )( 8 to 5) 10 1 16.685 16.685 0.617 10.29
3 3
7 7
1 5 1
5
2300 2300
5 5
0 0
15
15
2585
4
kitchen & stair ( outer side )(A- 3 4 10 1 16.685 16.685 0.617 10.29
C )( 8 to 5) 7 3
1 5
2275 7 1
5 2275
5 5
1
0 175 7 175 0
5
60 60
link 8 88 150 0.278 24.464 0.395 9.66
190
1 2225 1
kitchen( outer side wall, stair ) 5
51 10 2 5.045 10.09 0.617 6.23
(A-B) (5 to 6 & (8 to 7) 2300 10
05 5
0 0
60 60
link 8 10 150 0.278 2.78 0.395 1.10
190
650
Chajja top Bar 50 10 18 125 c/c 0.78 14.04 0.617 8.66
65 75
Chajja Dist. Bar 700 8 6 200 c/c 115 0.7 0.395 0.28
1 2275 1
5 7
0 25
Kitchen Entrance Side 8 10 2 8.22 16.44 0.617 10.14
1 3
5 2275 01
0 7 175
5
1 2300
0
0
2
Kitchen Entrance Side 8 10 2 7.7 15.4 0.617 9.50
8
0
1
0 2300
17 0
60 60
link 8 86 150 0.278 23.908 0.395 9.44
190
75
ring 75 8 20 100 c/c 0.6 12 0.395 4.74
190
650
Chajja top Bar 50 10 12 125 c/c 0.78 9.36 0.617 5.78
65 75
Chajja Dist. Bar 850 8 6 200 c/c 115 0.85 0.395 0.34
Total 729.76972
9 3790 9
ring bottom R/F 5 16 8 3.916 31.328 1.58 49.498
5
9
1 5 3790 9
ring top R/F 5 16 8 3.916 31.328 1.58 49.498
7 3340
5
75 2
ring 5 8 136 100 C/C 0.986 134.096 0.395 52.968
200 0
33400
BEAM 1 B -2 ( 250 MM *300 MM )(A -F, B-C & E-D) (1-12 , 4-3 & 10-9) Almirah
1610
ring bottom R/F 12 16 1.712 27.392 0.89 24.379
7
77 1610 5
2 55
ring top R/F 7 12 16 1.712 27.392 0.89 24.379
7 5
5
75 2
ring 5 8 96 100 C/C 0.986 94.656 0.395 37.389
200 0
3 9 1650
ring top R/F 5 16 8 1.776 14.208 1.58 22.449
9
7 5
5
275
ring 5 8 52 150 C/C 0.986 51.272 0.395 20.252
200 0
BEAM 1 B -4 & 5 ( 250 MM * 300 MM ) ( C & D) 4 & 5
9 9
ring bottom R/F 5 2835 16 4 2.961 11.844 1.58 18.714
5
9 2835 9
4 ring top R/F 5 5 16 4 2.961 11.844 1.58 18.714
2460
75 2
ring 7 5 8 50 100 C/C 0.986 49.3 0.395 19.474
5200 0 24.6
Total 360.162
BEAM 1 B -2 ( 250 MM *300 MM )( A & F,B-C & E-D) (2 to 4 , 11 to 9,1 & 12) Almirah
1610
ring bottom R/F 12 16 1.752 28.032 0.89 24.948
99 1610 9
2 55 5
ring top R/F 9 12 16 1.752 28.032 0.89 24.948
7 5
5
75 2
ring 5 8 96 100 C/C 0.986 94.656 0.395 37.389
200 0
3 9 1650
ring top R/F 5 16 8 1.776 14.208 1.58 22.449
9
7 5
5
575
ring 2 8 36 150 C/C 0.986 35.496 0.395 14.021
200 5
BEAM 1 B -4 & 5 ( 250 MM * 300 MM ) ( C & D) 7 & 6
9
9 5
ring bottom R/F 5 2835 20 4 2.945 11.78 2.469 29.085
9 2835 9
4 ring top R/F 5 5 16 4 2.961 11.844 1.58 18.714
75 2
ring 7 5 8 48 100 C/C 0.986 47.328 0.395 18.695
5200 0
Total 367.512
Staff Quarter
DRAWING NO-
BBS for SEPTIC TANK FOR 40 USERS Location:
1/RB/T-
11/0008/0/D
Dia.of Cutting Total
Spacing No. of Wt/m in Total wt in
S No Bar no. Shape of bar bar 'mm' length length
bars 'Kg.' 'Kg.'
'mm' 'mm' 'mm'
Distributi
1 10 150 C/C 6 4410 26460 0.617 16.326
on R/F 75 75
4300
500 500
Distributi
2 10 150 C/C 5 4452 22260 0.617 13.734
on R/F 75 106 106 75
3150
MAIN R/F
3 TOP & 10 150 C/C 12 350 4200 0.617 2.591
BOTTOM
350
500 200
75 106 25
4 MAIN R/F 10 150 C/C 2 1311 2622 0.617 1.618
475
200
5 MAIN R/F 25 75 10 150 C/C 4 1290 5160 0.617 3.184
1050
500 200
DISTRIB 106
6 75 25 10 150 C/C 2 1061 2122 0.617 1.309
UTION 225
200
DISTRIB
7 10 150 C/C 2 1060 2120 0.617 1.308
UTION 25 75
800
300
DISTRIB 106 200
8 75 25 10 150 C/C 2 566 1132 0.617 0.698
UTION 25
200
DISTRIB
9 10 150 C/C 2 660 1320 0.617 0.814
UTION 25 75
PRE
CAST 8 150 C/C 10 400 4000 0.395 1.580
10 CONCRE
TE
400
COVER
PRE
CAST
11 CONCRE 8 150 C/C 8 550 4400 0.395 1.738
TE 550
COVER
Total 84.740
Total for 8 mm 6.794
10 mm 76.788
12 mm 1.158
Staff Quarter
DRAWING NO-
1/RB/T-
11/0008/0/D
Remarks