Procedural Checklist: 1.1-1 Set Up and Prepare Machine and Equipment
Procedural Checklist: 1.1-1 Set Up and Prepare Machine and Equipment
Procedural Checklist: 1.1-1 Set Up and Prepare Machine and Equipment
1-1
Set Up And Prepare Machine And Equipment
During the performance of the activity did the trainee follow the steps by
step procedure?
Procedure Yes No
1. First, fill the water tank of your espresso
machine, then make sure all the switches
are set to “OFF”.
2. Then turn on your machine’s “ON” switch.
Comment:
Date: ______________________