PESTLE Analysis: Political Economic Social

The document provides an analysis of the Peshawar Rapid Transit (PRT) project using the PESTLE framework. Politically, decisions need to be made promptly based on technical factors to take advantage of the opportunity window. Economically, the PRT will encourage passengers to switch from buses and reduce emissions and congestion. Socially, there will be improved access and service standards for users. Technologically, the PRT will modernize the transport system with new fleet maintenance programs and control systems. Legally, there are no known impediments to establishing the necessary oversight body or traffic legislation. Environmentally, the PRT is expected to reduce vehicle emissions and have no significant adverse impacts.

Uploaded by

aliraza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

PESTLE Analysis: Political Economic Social

The document provides an analysis of the Peshawar Rapid Transit (PRT) project using the PESTLE framework. Politically, decisions need to be made promptly based on technical factors to take advantage of the opportunity window. Economically, the PRT will encourage passengers to switch from buses and reduce emissions and congestion. Socially, there will be improved access and service standards for users. Technologically, the PRT will modernize the transport system with new fleet maintenance programs and control systems. Legally, there are no known impediments to establishing the necessary oversight body or traffic legislation. Environmentally, the PRT is expected to reduce vehicle emissions and have no significant adverse impacts.

Uploaded by

aliraza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PESTLE Analysis

Political Economic Social


The ongoing “ political competition” The introduction of the PRT will No lasting adverse social impacts are
between parties across Pakistan and encourage existing passengers to anticipated on corridor 2. The
the capacity design shortcomings in transfer from transporter vehicles alignment along the median (or
the Lahore Metro bus project is currently serving the route. Unless elevated) will provide additional
clouding the essential technical these transporter vehicle drivers and access rather than reduce access, as
issues that must drive the design of owners are involved in the future there will be reduced congestion
the PRT project investment. services provided by the PRT, then along GT ROAD section and the
this will have a negative impact on intersections along the Jamrud Road
Providing decisions are made their finances. to Hayatabad. In parts of the
University Town section, kerbside
promptly and on the basis of rational
parking will need to be reduced by
technical and financial aspects, there The reduction of transporter vehicles
providing off street parking plazas in
exists an adequate window of on the PRT corridor will result in
addition to those existing.
opportunity for undertaking the FS reduced emissions and improved In Saddar, the narrow ROW and the
and securing finance for construction travel times for passengers and the presence of street vendors means
and commissioning in early –mid private vehicles in the corridor. social impacts will occur in this
2016. section.
If an early election is called and the The complementary measures The PRT and complementary
current KPK Government changes, outlined in the PFS reports will measures proposed will provide
the preference for the project and/or provide opportunities for additional improved service standards through
the corridor/mode may alter. In this mobility and improved access to frequency and reliability; adequate
case, the overall future of the project employment and commercial seating for women; barrier free
and the 20 Year Roadmap cannot be opportunities. access to stations and buses. These
guaranteed. The reduction in vehicle kilometers as benefits will be received by those
a result of the PRT will result in who have few alternatives and are
reduced accident levels. captive to the public transporters.

There is a committed mind-set within Finally, the PRT investment will There will be improvements through
KPK Government to provide an PRT create economic benefits through a reducing traffic emissions thereby
which represents value for money, cleaner environment through reduced leading to a cleaner environment and
minimal subsidy, is achievable and air emissions and a more viable resulting in better respiratory health
provides for the long term security public transport system in the long for those whose lives revolve around
and flexibility for travel across the term. the corridor(s) of the proposed PRT.
city.
Technological Legal Environmental
The PRT system will bring There are no legal impediments for At this PFS stage, and subject to
improvements in fleet conditions and the KPK Government establishing a there being a project reflecting the
overall capacity for preventive Peshawar Rapid Transit Board or decision reached in the Steering
maintenance programs to reflect best Company to oversee implementation Committee meeting of March 7, no
practice. In addition, the introduction and manage the operations/contracts significant adverse environment
into the future. impacts from the PRT project have
of supporting system wide
been identified. Improvements in
components such as AFCS, RTPI,
In addition, there are no known legal urban transport will reduce vehicle
CCTV, security protocols and PRT emissions. In this instance, the PRT
Control Room will introduce a new impediments for the passing of
project could reduce the CO2
era of technology improvements for Province based traffic legislation
emissions of the transport sector by
the public transport sector in general. specifically related to PRT priority. approximately 12,500 kgs annually or
250 tonnes over the 20 year
assessment period.
New policies, planning, community New PRT priority compliance regime, The above observations are based on
engagement and project operation and maintenance and an at grade PRT option. If there is an
implementation ability will require an monitoring of fleet and infrastructure appetite for elevated sections (in
up-skilling and capacity enhancement will require additional technological whole or in part), then the
of the KPK Government agency skills. It may also require additional environmental (short and longer term)
allocated responsible for the PRT. by-laws to be introduced.
will need to be further assessed.