PESTLE Analysis: Political Economic Social
PESTLE Analysis: Political Economic Social
There is a committed mind-set within Finally, the PRT investment will There will be improvements through
KPK Government to provide an PRT create economic benefits through a reducing traffic emissions thereby
which represents value for money, cleaner environment through reduced leading to a cleaner environment and
minimal subsidy, is achievable and air emissions and a more viable resulting in better respiratory health
provides for the long term security public transport system in the long for those whose lives revolve around
and flexibility for travel across the term. the corridor(s) of the proposed PRT.
city.
Technological Legal Environmental
The PRT system will bring There are no legal impediments for At this PFS stage, and subject to
improvements in fleet conditions and the KPK Government establishing a there being a project reflecting the
overall capacity for preventive Peshawar Rapid Transit Board or decision reached in the Steering
maintenance programs to reflect best Company to oversee implementation Committee meeting of March 7, no
practice. In addition, the introduction and manage the operations/contracts significant adverse environment
into the future. impacts from the PRT project have
of supporting system wide
been identified. Improvements in
components such as AFCS, RTPI,
In addition, there are no known legal urban transport will reduce vehicle
CCTV, security protocols and PRT emissions. In this instance, the PRT
Control Room will introduce a new impediments for the passing of
project could reduce the CO2
era of technology improvements for Province based traffic legislation
emissions of the transport sector by
the public transport sector in general. specifically related to PRT priority. approximately 12,500 kgs annually or
250 tonnes over the 20 year
assessment period.
New policies, planning, community New PRT priority compliance regime, The above observations are based on
engagement and project operation and maintenance and an at grade PRT option. If there is an
implementation ability will require an monitoring of fleet and infrastructure appetite for elevated sections (in
up-skilling and capacity enhancement will require additional technological whole or in part), then the
of the KPK Government agency skills. It may also require additional environmental (short and longer term)
allocated responsible for the PRT. by-laws to be introduced.
will need to be further assessed.