Javero, Karl Gaspar Tech Proposal # 4 June 23, 2020 2011141720 COE132/E02 We Construction and Renovation Experts (CARE)

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 44

Javero, Karl Gaspar Tech Proposal # 4 June 23, 2020

2011141720 COE132/E02

We Construction and Renovation Experts (CARE)

I. INTRODUCTION

Figure 1. Company Logo

Business Name: WeCare


Type: Service

 Main Product

We CARE will is a mobile application that will act as the client’s internal
project manager that will provide quotation, estimates to project owners and
assist them in quality assurance, quality control of both materials and labor. The
project owner will be asked to input their desired theme, budget, number of
rooms, toilet and fixture and lighting, the application will then propose a
registered architect that would contact them and ask schedule for appointment.
After deliberations with the designs the architect will assign designs to structural
engineer, interior designer, mechanical, electrical engineer for the MEPF’s

1
designs. After the designs are approved by the owner the application will act as a
monitoring tool for the client to check if the contractor is on or behind schedule.
In construction projects we find out that there are plenty of first-time home
owners that are being tricked and deceived by construction contractors, in order
to solve this we came up with the WeCare app. This will be beneficial for both the
contractor and the project owner, best to protect both of their interest. When the
project owner is not satisfied and was disappointed at the work done by the
contractor they could give him a bad review. Bad review will result to a loss of
point that will decrease chances of getting accounts. The application has a
feature that you need to maintain at least a certain number of stars for you to be
referred by the application.

 Allied Product

We Care signs partnership with companies that provide quality products that
would be delivered on time.

o Ready mix concrete and pumpcrete supplier


 The design would agree to certain psi level of the concrete, this will
assure the quality of the cement that would be poured to structure.

o Hardware company
 They will provide materials for cement, gravel and sand with
varying grades depending on the designs. They will also be in
charge of the paint both inside and outside of the house, they will
make sure the proper ratio of paint. Toilet and bath supplies will be
available and also regulated approved wires.

2
o Furniture shop
 The furniture shop will provide the application with its current line-
up of furniture, the project owner can choose from its wide array of
customized furniture.

 Product Partner Range/Brands

The application will be available in both android and IOS devices which
can be downloaded in Play Store and Apple Store respectively. The application
will be the owners internal project manager and will monitor the progress of the
project.

Here is the list of Mattress Company certified by the app:


1. Cemex Philippines
Leading cement provider in the Philippines, its goal is to give
its customers with consistent high-quality products. One of
their boasted technology is the EcoCrete, it produces and
designs a wide range of ready-mix concrete products which
provide high strength and resistance against varying
environmental conditions. These products are famous for
long-term performance and are proven cost-effective choices
for use in all kinds of structural applications.

2. Wilcon
Wilcon Depot, the Philippines’ leading home improvement
and construction supplies retailer, carries the most extensive
product selection of trusted local and international brands
with high-grade features and superior quality ranging from
Tiles, Sanitarywares, Plumbing, Furniture, Home Interior,
Building Materials, Hardware, Electrical, Appliances and
other DIY items.

3
3. Crate&Barrel
Crate and Barrel brings worldwide trends to local Filipino
customers. Known for its diverse catalogue of products, the
store offers on-trend furnishings as well as seasonal decor.
From larger items such as a luxurious new bed and
headboard for the master bedroom to smaller purchases of
linen bedding, Crate and Barrel carries products for every
room in the home. In-store displays offer inspirational motifs
of arranged furniture that allow you to picture the items right
in your own home.

Descriptive Definition of the Product

 Need
The internal project manager is a very vital role and specialized hence it
doesn’t come cheap, when we pursue its digitalization many project owners
would benefit from it since the system is incorruptible, it will follow the
requirement and will has no emotion over the project.
The application will be responsible for keeping a close eye on the
construction budget. That involves closely monitoring if or when a particular trade
is out of sync with the budget, and making adjustments before the close of the
project. This application will be on the side of the project owner who looks out for
his financial interests and communicates with him to report and discuss any
overages. In construction, things often take longer and cost more than originally
planned, so having a digitalized project manager with good communication
programs is a real plus.

 Business opportunity

4
We CARE can ride the government’s initiative of build, build, build and we
at we CARE believed that it is still the best strategy for providing jobs to people
that are below the poverty line, this application will encourage project owners to
still pursue construction projects even though whole world is experiencing global
pandemic because somehow this application will provide project owners with
peace of mind that they are not being taken advantage of construction
contractors. It is the future of construction, it needs to go digital to monitor and
update their current progress real time and also communicate to each other
using high technology project management systems.

 Proposed Solution

The application will provide the project owner with his own virtual
project manager, it will be in charge of monitoring the progress of the
project. It will also be in charge of matching jobs to requirements, it will
ensure that materials will be on site when needed. The application will
communicate with the project partners such as Cemex, Wilcon and Crate
and Barrel.

 Business Model Canvas

Key Partners Key Activities Value Proposition Customer Relation Customer


- hips. Segments
Professionals Production Project Owners
* Architect - Mobile Benefits/Value: GET Demographics
* Civil application - Reliable Digital - Through Age:
Engineer development Project Manager advertisement both 25 – 65 years
* Electrical - Budget and online and organic old
Engineer - IT Quotations - Seminars
* Mechanical professionals - Quality Assurance KEEP Sex:
Engineer and Quality Control - After sales support Both Male and

5
- Financial - Real time monitoring when project Female
-Business to Institutions and - Expert advice turnover
Business Angel investors provided by - The app will notify Marital Status:
transactions: professionals with good them after one year Married
* Contractors - Sales and reviews and and asked problem Couple
* Interior marketing testimonials encountered and
Designers schedule fixing. Generation:
* Sub- Government Solves the following GROW X
Contractor institution problems: - Get Client Millennials
* Lawyers partnership 1. Contractor mistrust Feedback Z
- Connect with 2. Expensive Internal - Get client referrals
Philippine Project Manager Former living
Contractors 3. Professionally Situations:
Association managed site * Rented prior
Board 4. Construction industry to residence
innovation through
- Connect with mobile application * Live with
Construction integration. family and
Industry relatives
Authority of the
Philippines

Key Resources

Human Channels

- Engineers
- Designers Virtual Channels

- Project Download

Managers application through

-Software -Play Store for

Developers Android device user


-App store for IOS

6
- application device user
developers
- lawyers Physical Channels
Join WORLDBEX
Physical The Philippine world
- Construction and Construction
Equipment and Exposition
tools
- Trucks and
other shuttle
services for the
workers

Cost Structure Revenue Streams


- 1.5% of the total project cost will go to WeCare
- Application Maintenance Cost - Product advertisement from key partners on mobile application
- Professionals/Employees’ - Subscription Revenue
Salaries
- Software Development Cost

Revenue Model

7
SUBSCRIPTION
REVENUE REVENUE
MODEL

FEATURED
LISTING/
PROJECT ADVERTISEMENT
COMMISION

1. Revenue Source
WeCare project management application will get its revenue from:
a. Subscription Revenue– by helping our key partner to target our client
base, that they would acquire certain niche information that will able
them to design and provide quality construction materials and services.
The subscribed project owner will heard it first in WeCare on the latest
innovation in Construction materials and will able to buy it before
anyone else.
b. Featured listing/Advertisement – WeCare will bid to key partners who
want their product to stand out. Key partners can appear on key section
of the WeCare app.
c. Project Commission – the company will charge the project owner a total
cost of 1.5% of the total construction cost.

2. Value to Offer

8
This mobile application lets you choose from the pool of professionals from
architect, engineers and construction contractors. The pool or the database of
professionals were carefully selected before they can be employee partners.
Another value is that the partnership with hardware stores, it will all be aligned to
the delivery schedules.

3. How to price the Project Commission

The usual industry practice for the cost of project manager in the
Philippines is usually around 3-5%, for example if the total construction cost is 40
million pesos the commission of the project manager will be between 1.2-2
million pesos and sometimes it could be more when corrupted by your contractor
if they bride your internal project manager to cover some mishaps. Usually the
duration for a 40 million project will be 12 months but can be finished earliest by
8 months, divide the commission and the profit of the project manager per month
would be between 100-166 thousand pesos.

But the WeCare application will only cost you 1.5% of the total project
cost, to use our 40 million example the application will only profit 600 thousand
pesos that will be finished in 8 months. In case the project contractor chooses to
not disclose some mishaps the application will advise the project owner to
contact the lawyer for fines and legal implications.

4. Who pays for the value


* First time home buyers
* Project Owners
* Contractors
* Suppliers
* Key Partners

9
Customer Segment

 25 to 65 years old
o 25 – 35 years old, these are single male or female that would like to
experience being independent. Income brackets between one hundred
thousand monthly to two hundred thousand pesos. Their go to design is
usually condos because of the lifestyle, they love urban living and these
age brackets are always on the go. You would always spot them doing
shopping and dine out with their friends and family.
o 35 – 45 years old, these are the age bracket that would probably plan
having a family. Their usual design would include a baby room and a
preparation room for at least 2 additional members of the family.
o 45 – 65 years old, these are the age bracket that are planning to retire and
the design usually for these types have wider hallway and ramps. The
masters bedroom will be located at the ground floor and the toilet and bath
will commonly have hand rails and are wider.

 Rented prior to residence


o These are the people that their rent cost is almost the same as paying
mortgage so they finally decide that it’s better to own than to rent.

 Lived with relatives and family


o In the Philippines people exercise living in compounds with their relatives
and family. The problem with these is that you cannot do anything that
your family would not find out, people who decide to build their house
usually want privacy and

Value proposition

Project Owners Benefits/Value:

10
 WeCare is in charge of establishing that all decisions made during the design
stage and execution of the construction proper are aligned with the cost plan.
No decisions will be made and implemented whose implications are likely to
exceed the total construction budget. 
 All methodology will be aligned with the Project Management Institute and
only accredited contractors with professional license can register in the
mobile application. The project will be professionally managed.
 Project owner can choose from real-time, weekly to monthly report, to
measure the project base on cost and accomplishment.
 WeCare will stimulate the digitalization of the construction industry and
promote innovation.
a
Contractors Benefit
 Contractors can rest assured that when they execute the plan properly they
will received good review and WeCare will suggest them to other project
owner.
 Contractors will be sure that when they delivered on time WeCare will also be
on time on the release of their pay or post-dated checks. This will also prompt
the project owner that it is time to pay a certain percentage to the contractor.

Channels

Virtual Channels

 IOS Appstore – This is for Apple community, where IOS device users can
download WeCare application to help them in their construction project
concerns.
 Google Play Store – This is for Android community, where devices like
Samsung and Vivo device users can download WeCare application to help
them in their construction project concerns.

11
Physical Channels

Join WORLDBEX
The Philippine world and Construction Exposition
 This is a good avenue to introduce your mobile application to the construction
industry, to be part of it you need to be an exhibitor. You can connect to
construction supplies, contractors, and professionals.

Customer Relationship

GET
 Demand creation will be stimulated by joining events similar to WORLBEX, it
is a good opportunity to GET stakeholders like project owners, construction
supplies owner, contractors, sub-contractors and engineering professionals.
 Another customer driver is through using digital campaign advertisement on
social media like Facebook and Instagram.
 Presentation and pitching to AMO and COSH seminars, partnering with
institutions providing this requirement for those who want to be licensed
contractors.

KEEP
 Customer retention will happen through effective after sales support, WeCare
will prompt the project owner that it has been 1 year since project turnover
and we would like to get your feedback and provide FREE help with any of
the back jobs.

GROW
 After providing FREE help with any of the backjobs WeCare will ask for client
referrals and testimonials regarding the superb service that they experienced
using WeCare app.

Revenue Streams

12
REVENUE DESCRIPTION WHO WILL PAY COST
STREAM

The subscribed
Subscription Project Owners 30 pesos per click
project owner will
Revenue
be the first one to
hear the latest
innovation in
Construction
Materials and will
able to avail it
before anyone
else.

WeCare will bid to


Featured Listing Key Partners 1000- 2000 pesos for
key partners who
and two weeks
want their product
Advertisement
to stand out. Key
partners can
appear on key
section of the
WeCare app.

Application Application Google Play 3000 pesos


Download download from the Store/ IOS store
Google play for
Android or IOS
store for Apple.

13
Project Clients who wants Project Owner 1.5% of the total
Commission to avail our project construction cost
management
Services.

 Project Commission – is the main source of income of the WeCare mobile


application, portion of the total construction cost will go to WeCare.
 Application Download – is offered at a 3000 pesos per download to
discourage people to randomly download the application without the intention
of construction project.
 Featured Listing & Advertisements - by allowing other key partner businesses
to advertise and participate their products in the apps, featured listing will cost
them 1000 to 2000 per week.

Key Resources

Human Resources
 Engineer – different types of engineer will be employed from Structural,
Electrical and Mechanical engineering that will be responsible for the designs
and plans.
 Designers – Architect and interior designer will be in charge of the overall
aesthetic and flow of the Structure.
 Software and Application Developers – they are the one responsible for
designing both computer and mobile applications, they focused on consumer
behavior. This is not limited to learning the users need and developing
software solution, to monitor and measure people and systems.
 Advertising Manager - They will oversee the creation and implementation of
advertising strategies that will increase the number of mobile application
users.

14
Physical

 Construction Equipment and tools will also be available for rent incase
contractors are required to use it.

Key Partners
 License Professionals - will be the one who will be running the show but
WeCare will be the one to standardized them according to performance base
criteria. Through client testimonials and review WeCare will assess them and
give points. They will be in charge of Designing and building the project,
WeCare will act as a digital project management consultant.
 Contractors – will the one to execute the design, they will be in charge of
project completion to project turnover and after one year they will ask for the
project owner’s feedback regarding their project and they will give FREE
house checkups.
 Lawyers –they will be the one to prepare the necessary contracts between
the contractor and the project owner.

Cost Structure
 Software Development and Maintenance cost- The development and
maintenance of the mobile application requires the expertise of software
developers for the reason that they will be responsible for the success of the
application. They will also be responsible for the innovation of the design of
the application together with WeCare marketing team.
 Partner Employees – they will be responsible for the administration and
mobilization of people required in a certain project.

Target Market
 The primary target market of this application will be the first time home
owners because they have the largest market segment in the recent
infographic post by Generational Trend which constitute to a 38% market
share.

15
 The secondary target of this application will be starting real estate developers,
in a recent count from Urban Real Estate Institute year per year there is an
increase of student enrolling in their Real estate develop courses.

Existing Technology
 According to one of my favorite quotes by Steve Jobs, “To me, ideas are
worth nothing unless executed. They are just a multiplier, execution is worth
millions.” So where do we go from here, with this idea we need to consult a
lawyer regarding protecting our intellectual property. With regards to our
competition the closest will be:

1. Task & Project Management MeisterTask

- MeisterTask is an intuitive tool for project management and task management.


It is ideal for personal organization, but also for agile and efficient team. Whether
you want to manage projects and tasks of all kinds or create to-do lists.

2. PhilGeps

- Philippine Government Electronic Procurement System (PhilGEPS), the single


and centralized electronic portal that serves as the primary and definitive source
of information on all government procurement. The PhilGEPS is open to all
government agencies and public organizations in the Philippines whose

16
procurement practices are governed by the laws and regulations of the Republic
of the Philippines, and to all suppliers, contractors, consultants, and all other
private entities who wish to market their goods and services across all
government organizations.
-

Advantage Over Competitors

WeCare is an intuitive project manager that specialize and partner in both private
and government institutions. PhilGeps limitation is its just for government use, the
MeisterTask is for private use only.
It is the first digital project manager in the Philippines, which you can measure,
track and monitor the progress of both the project against the contractors.

Marketing Strategy
● Advertisements
- We are going to utilize social networking sites such as Facebook,
Instagram, Twitter, YouTube and Vimeo and the likes we are going to
integrate it with the WeCare application. These sites can boost WeCare
brand since we are lock into the information age.
● Creative Promotions
- WeCare Marketing will plan promotions to newly married couples and
target them specifically through paid promotions like Facebook Ad, Google
Adwords and other organic marketing techniques that will put WeCare on
top of mind of those first-time home buyers.

Long Term Objectives

The mission of WeCare is to provide answers to those confused, no idea first


time home buyers and our vision is that contractors and project owners will conduct
business with integrity and ethics to the point that the project will be finished on time

17
and within the specified budget. Project Owners will pay on time while Contractors will
not do any shortcuts on the project. We also envision a future where construction
industry meets technology to better serve the need of Building quality sound
construction projects.

Project Highlight

Main Feature:
1. Project Owner Registration
2. Professional listing of Architects together with their profile and portfolio
3. Setting up of meeting
4. Project preparation
5. Organization Structure
6. Functional Chart
7. Position Chart
8. Work Plan
9. Equipment Schedule
10. Budget Cashflow
11. Workplan
a. Bar chart schedule and S – Curve
b. Financial bar chart schedule and S – Curve
c. Construction Bar Chart Schedule and S - Curve

Service Differentiation
- It would the first every digital project manager in the Philippines that would both
cater to private and government construction projects.
- It would collaborate with Construction Industry Association of the Philippines and
other construction organization to help with their methodology.

Success Factors

18
The success of WeCare is dependent to the help of both private and government
institutions, we plan to collaborate with MegaWorld, Ayala Development to arrive at the
best application that will be useful to the Filipino consumer.

Dependent on the design and application knowledge of application developer and we


will collect funding by pitching in angel investor conference. We will also partner with
financial institutions and get their advice on how to get start up capital.

Environmental Analysis
A. Technology Factors
1. Internet Connectivity

In the Philippines Internet providers are not reliable, there are two big
companies(Smart and Globe) that instead of driving growth is driving
every user insane. The process of applying for your postpaid plan is
tedious, the infrastructure of both Smart and Globe are behind the
rest of the world hence regardless of being successful on getting your
postpaid account the next issue would be the signal. This is going to
be a challenge for WeCare mobile application, it is very important
that the client has internet connectivity because one of the important
feature of the application is real time monitoring. Small players (Sky
Fiber, Eastern Communication, Converge ICT) are going to be a big
part of the industry because they could disrupt the process.

Globe
 At home
 Prepaid Plans

Smart PLDT
 Home Fiber
 Whole Home Wifi

19
 Home Prepaid Wifi
Sky Fiber
 Unlimited Broadband
 All in one box
 Home Wifi Plans
 HD TV Cable Plans
Eastern Communication
 Evo Air
 EVOLEC Air

Converge ICT
 FiberX
 FiberXtreme

2. Digital Process Automation

Processes that are repetitive can be automated to achieve


operational efficiency, it will help in keeping WeCare application to
keep workflow documentation updated. We would like to achieve a
smooth flow between each step of the process in relationship with the
Construction Projects. It will allow WeCare to setup highly complex
process flow then testing and the program should learn to prepare
adjustments and then it need to adapt. Many companies both local
and abroad is already implementing Digital Process Automation,
some of them for example is the digitalization of banks like BDO, BPI.
More and more of them are hiring local Software and Mobilie
application Contractors to convert to digital.

3. Cloud Technology/On demand Computing


a) Computing

20
b) Productivity
c) Collaboration

If we are going to scan the market and


4. Internet of things

Internet of things basically connects everything from mobile


phones to laptops and desktops. It acts as catalyst for every
industry to encourage efficient performance. Industries that made a
move to go digital are manufacturing, logistics, oil, gas and aviation
with the objective of optimizing operational efficiency through
automation and joining the smart industry.
Through implementation of Internet of things in WeCare we
can make sure that updates can be monitor eventually across all
platforms paired with cloud technology.

B. Government Legal-Political Factors


1. Data Privacy Act of 2012
a) Signed by: President Benigno S. Aquino III
b) Description: Under section 2 “It is the policy of the state to protect
the fundamental right of privacy of communication while ensuring
free flow of information to promote innovation and growth. The
State recognizes the vital role of information and communications
technology in nation-building and its inherent obligation to ensure
that personal information in information and communications
systems in the government and in the private sector are secured
and protected”

2. Electronic Commerce Act of 2000


a) Signed by: President Joseph E. Estrada

21
b) Description: “An act providing for the recognition and use of
electronic commercial and non-commercial transaction, penalties
for unlawful use thereof and other purposes”

C. Socio-Cultural-Societal and other Environmental Factors


1. Income Class/Social Class

We need to understand Income classes in the Philippines to


be able to cater to our market and to come with better services.

Income Cluster Per Capita Income Monthly income


Poor Less than the official Less than PHP 10,481
poverty threshold
Low income Between the poverty Between PHP 10,481
line and twice the and PHP 20,962
poverty line
Lower middle Between two and four Between PHP 20,962
times the poverty line and PHP 41,924
Middle income Between four and Between PHP 41,924
seven times the poverty and PHP 73,367
line
Upper middle Between twelve times Between PHP 73,367
the poverty line and PHP 125,772
Upper income Between twelve and Between PHP 125,772
twenty times the and PHP 209, 620
poverty line
Rich At least 20 times the PHP 209, 620 and
poverty line above
Table: Philippine Institute of Development Studies (PIDS)

WeCare is targeting classes from lower middle to upper


income, the rich as observed will always be comfortable with hiring
a professional project manager.

22
2. Language

There are two main language in the Philippines, these are


English and Tagalog, we decide that we will use TagLish in our
WeCare application for the reason that the Philippine construction
industry have a very unique vocabulary. We need to understand the
language of the construction laborers from Carpenter, Foreman,
Lead man and the professionals (Engineers and Architects).

3. Human Resources

All professionals that are with the company and has good
review and testimonial they will be given seminars to improve their
skills and be updated in the latest construction material.

4. Customer Preference

It always complements customer needs, these are usually


and can be attributed to likes, dislikes, motivation and inclination of
customers.
A low cost house customer would find it unnecessary to build a
swimming pool in his or her project but a mid to high cost project
customer would find it that swimming pool is going to be a basic part
of the project.

5. Educational Attainment

INDUSTRY ANALYSIS

Industry Overview
There is a rise on practicing engineers (Civil, Electrical, Mechanical, Structural),
architect, small time developers, investors that are engaged in Project planning and

23
construction management. It is an industry trying to apply new technology to their
methodologies with the basic intention of improving people’s lives.

Project Owners, Professionals and project developers will find this mobile
application useful and relevant to their needs. Detailed list of responsibilities of project
partners, monitoring and evaluation techniques in digital format.

Key Players
1. Partner Employees

From all designers, engineer, architect down to construction laborer


they all play a vital in accomplishment of the project. We would go far as
to say that they are sometimes the key to success of a company
especially to a service industry like Project Construction.

Every member of the team can influence the output of everyone,


example the without the design of the architect the structural cannot base
its design on its own. There are work dependencies and prerequisites.
Basically everyone’s job depends on someone else’s job in order for them
to complete it.

2. Mobile Application Users(MAU)

Mobile Application Users are the one who would use the system,
they are the one will benefit with our innovation. It is the foundation of any
business success, WeCare should really put importance on the stages of
identifying our target market to ensure customer service satisfaction then
building up on that reputation to get referrals so that more people will use
it and avail its services.

3. Competition

24
It is vital that you have competition, people will soon find out what’s
your Unique selling proposition. Taking advantage of these you can use
these as your positioning in the market, it will also enable you to market
your business more effectively. According to my brother no competition
will result to no progress, it drives each business to be better.

4. Sponsors

Sponsor are important stakeholders, they will provide capital


infusion to the company with proportional percentage annual. In order for
your business to grow faster you need a lot help coming from Sponsors,
first they can connect you with the proper people to help you in your
marketing and operations and other resources that you could tap.

5. Business owner

`The head of the company, the one in charge of identifying the needs to
be satisfied by the mobile application. They are going to be the heart of
the business, the one who will put the idea into execution. The business
owner will set the direction of the company, responsible for making
decisions that would benefit customers and company’s stakeholders.

Value Chain

25
1. Support activities

a) Firm Infrastructure

This is the part of the general management, department and


responsibilities usual includes Strategic Planning, finance,
accounting, legal, its basic function is it supports the entire
business or the entire value chain.

b) Human Resource Management

In these are of the support activity especially in WeCare


application, this is the department that is incharge of scouting
professionals such as in our case architect, engineers,
contractors and the likes. There function is to recruit, hire and
develop Partner employees, in charge of developing ladder
program for them and incentives.

26
c) Technology Development

In WeCare Technology Development they are in charge of


incorporating technology in every aspect of the business. From
Accounting, operations and marketing. They are in charge of
improving digital processes that will improve the service.

2. Primary Activities
a) Operations

Operations is the one responsible for processing all the inputs


from resources and convert to an actual service or product, it is
usually transforming inputs to final product form. It is the
department responsible for designing and controlling the process of
service production and getting feedback from customers to fine
tune business processes.

b) Marketing and Sales

This department is responsible for promoting and selling the


services of WeCare, they are also responsible for anticipating and
satisfying customer needs. Also implementing Marketing strategies
thru different channels like TV, Radio, online advertisements and
print advertisement materials.

c) Service

Technology Industry System

27
Technology Ecosystem is in a loop between three components and
these are the Providers, Application and Users.
Providers: These are the people who are WeCare business parners
from our Construction suppliers, Professionals (Engineers, Architects,
Project Managers) and laborers.
Application: These is the mobile application interface that the
clients will use to improve their construction management. WeCare will
integrate supplies, builders and construction managers.
Users: These are the one that would use the application on their
micro or big construction projects. They would then send feedback to the
company so that providers can improve their products and services.

Industry Size

28
In line with the initiative of the Government “Build, Build, Build program” the
construction is the chosen industry to uplift and lessen the poverty in the Philippines. It
is an important industry because it employs a lot of people below poverty line like
construction workers and laborers.

The government is looking build more infrastructure to solve some of its traffic
problem nationwide, there are more or less 100 infrastructure project have been
prepared by the public sector since February 17, 2020. This would be managed by
Department of Public Works and Highways in partnership with Department of
Transportation.

29
Porter’s 5 Forces of Competition

1. Competition

WeCare should not fall into the mistake of being complacent,


just because we are the first mover it does not mean that we are
going to be victorious all the time. If we fail to deliver relevant
service to our clients, they will find and look for better application to
put their projects.
In the Philippines there is no such mobile application that
would accompany any project owner, the construction industry in
the Philippines is left in the dust when in comes to adopting

30
technology in their businesses. That is why many first time home
buyers are deceived by fly by night contractors.

2. Threat of New Entrant

We at WeCare would not mind to share the market to


competitors but our main advantage is incorporating technology
and construction. Capital will be a barrier to those who want to
pursue this kind of industry, connection and relationships with
Construction Supplies, Professionals and laborers.
If you suddenly decide to exit this kind of business it would
not be that easy because of the capital infusion that you will pour to
it and construction industry is intensive on contracts, hence almost
every time there is a lawyer involved.

3. Threat of Substitute

There are many substitutes but the promise of contractors


not deceiving customers are not present. You can hire your local
contractors but since they are have their own motivation and
reasons most commonly profit, you wouldn’t be sure if your project
will come into fruition. Also substitute can be your foreman, in the
Philippines foreman are the ones that don’t do schooling but
gathered enough experience to do small projects but beware
because they are notorious and can not do proper construction
estimates. Again there are pros and cons to hiring substitutes.

4. Bargaining Powers of Supplier

Supplier that have bargaining power are the construction supplies


companies, professionals because of their man power supply.

31
1. WeCare company will have 12 construction supplies
partners and 12 interior supplies. So that we will not be
dependent on just one quotation of construction supplies
and the availability of delivery services when needed.

2. There will also be 12 partners in supplying aggregates


like sand, gravel and cement. This will depend on the
location of the site and of course the best price, because
in WeCare we believe in the best value for your money.

Bargaining powers of suppliers are low, because the mobile


application will let the construction supplies company to compete
for customers through bidding process. They will be notified about
the lead time to help them comply with the project schedule.

5. Bargaining Powers of Consumers

Bargaining powers of consumer will be high in terms of services


only, but they cannot influence the price because we also need to
take care the interest of construction contractors. Otherwise they
will not be motivated to execute the project, WeCare would identify
the best pricing for the construction contractor and project owners.

1. Bargaining powers of consumer is to choose their local


foreman.
2. They could source out their own construction materials
3. They could hire their own designers and engineer outside
of the WeCare Mobile Application

Market Study

32
Product Description:

WeCare is a Virtual project manager that will aid the client in micro or large
construction project. WeCare will aid from project conception to project turnover, the
application will provide assistance in finding the right designers for your dream house. It
will also provide you with real time assessment and project monitoring and will provide
suggestion for corrective measures. After one year of project turnover WeCare will ask
for your feedback regarding the professionals hired and the contractor, any problems
encountered within on year WeCare will notice the contractor responsible and fix
whatever trouble you may have experience.

Market Projection
1. Demand Analysis

It is imperative that WeCare do Demand Analysis to understand customer


requirement for a service in a specific target market. This will be
somewhat equivalent to a feasibility study.

33
This is the Share of Economic Sector from year 2008 to 2018, three
industries are dominant and these are agricultural, other industry and
Service industry.

According to the PSA, GDP year on year growth is 6.4%. According to the
survey the main driver of growth is in Trade and Repair Motorcycles,
Personal goods and Household goods, Manufacturing and Construction.
Hence there is great demand in the construction industry in the coming 5
years.

A. Market Identification

According to the Philippine Contractors Association Board there


are more and more contractors every year that are practicing that
does not have a license. Businessmen are also moving to the

34
construction industry to ride the wave of the initiative of the
government’s program (Build, Build, Build). This created a
problem that is evident in the news, left and right there are
buildings and house collapsing because of not following
construction standards sometimes causing people’s lives.

Now more and more micro and big construction project owners
are not satisfied with their contractors, unregistered contractors
are very confident that those micro project owners would not pose
a threat to them legally. WeCare’s market if for people that are
tired of having failed encounters with contractors and
professionals.

B. Business Cycle

Since the Philippines compare to other country is behind,


Construction industry is definitely and an emerging industry. It
skipped the industrial age and is currently in the information age
and for it to win it needs to build infrastructure to encourage
growth of the information age.

C. Product Niche

This is where WeCare comes in, more and more people are going
to build both micro and big construction projects first because
more and more people are going to earn at least one hundred
thousand pesos in the coming year through ecommerce and other
digital businesses, they are now steering away from employment
and more on creating their own businesses hence they will have
the buying power to build.

2. Supply Analysis

35
In terms of resources it will be managed by the resource
management team, construction materials will be sourced out from
twelve different hardware stores, Manpower and labor will be
pooled and carefully selected with drug test exam. Equipment will
either be rented out of we have to buy our own, databases will be
regulary checked and improved by our mobile application
developers to ensure customer satisfaction.

3. Supply and Demand Analysis

The demand is the users of the mobile application that want to avail
WeCare’s construction management services. Then WeCare will
supply them with the best construction materials, the best
designers, the best engineers and the best contractors. WeCare
will be available in both IOS and Android devices, again WeCare
will be responsible for the planning with the client to the project
turnover.

4. Price Study

The price will be dependent on the budget of the client, he will set a
budget and WeCare application will suggest designers based on
that. Construction materials that are going to be used in the project
will be aligned with the client’s budget.

5. SWOT Analysis

Strength Weaknesses Opportunities Threats

● First of its ● It lacks ● Can target ● Competitors


kind, virtual desktop and big project will get into
project laptop ● Would be adopting the
manager integration available technology
mobile ● Stock out of worldwide ● Laws
application cement and regarding

36
● Database of other Project
all aggregates construction
professionals ● No investor
with and low
testimonials credit rating
and reviews in banks
● Integrated
resource
management
● Real time
monitoring

ORGANIZATIONAL AND MANAGEMENT STUDY

A. ORGANIZATIONAL STRUCTURE

a. Partner Business

37
These are our partner businesses that we will tap to
ensure operational efficiency from our construction materials to
our sources of capital.

b. Resource Department

These department is in charge of all the particular from


the bill of materials, manning schedule, equipment schedules
and the likes. This department will be the basis of monitoring if
the project is within its promised time.

c. Designers

Department where all the professionals are gathered, we


will have a database of Engineers and Architect on top. They
will provide the designs to be executed by the contractor.

d. Support Activities

This department is in charge of the operation of the


company, to marketing it and to keeping track of expense both
of clients and WeCare.

B. MANAGEMENT TEAM AND KEY PERSONNEL


1. Management Team
a. Chief Executive Officer: Karl G. Javero

Computer Engineering undergraduate degree in Mapua


Institute of Technology, Management Trainee in Javero
Construction Supplies, Part owner of Carwash in Pasig,
Part Owner in The Lodge Restaurant, Head of Project
Athena an Ecommerce business. In charge of decision
making on the over all direction of WeCare company.

38
b. Chief Operations Officer: Kim G. Javero, MBA

Bachelor of Science in Electronics and


Communications Engineering in Mapua, Masters in
Business Administration University of the Philippines
Diliman, On-going PhD in Business Administration in
University of the Philippines Diliman. In charge of
improving and maintaining operations in WeCare.
Extensive experience on contracting, project manager
of small to medium construction projects.

2. Key Personnel
a. Designers
a) Engineers

Their role is to design the structural, electrical,


mechanical sections of the project. They will be the one
to quality control and quality assurance with regards to
the construction materials up to the methodology.

b) Architects

Responsible for the planning and designing of the


construction project with regards to the adjacent building
or the environment, their principal purpose is for human
occupancy.

c) Developers

They are one who is going to make sure that the mobile
application is up and running. They are also in charge of
innovating the features of WeCare mobile application.

b. Finance

39
a) Accountants

Their responsibility is checking the financial health of the


company, they are in charge of keeping, budgeting of
the income and expense of the company.

c. Sales and Marketing


a) Sales Team

In charge of activities that are going to bring more client


for WeCare, they are the one that are going to
encourage professionals to join WeCare’s Database.
They are also in charge of building up our Business
Partners (Hardware stores, Wilcon, Crate& Barrel,
Cemex and the likes.)

b) Marketing Team

Their responsibility includes the process or techniques


of bringing, promoting and selling the services of
WeCare. In charge of trying out theories that may have
the chance of achieving the overall strategy of the
company.

d. Resource Manager

Responsible for matching, one is job matching assigning the


right people for the right job. Assignment of the right supplier
for a particular client, assigning the right architect to the right
client, the right equipment to the right project with a certain
budget. In charge of all resources, be it human, machine and
money.

C. STRATEGIES AND PROGRAM

40
a. STRATEGIC CORPORATE

To make sure the company is running in high performance


management should always measure operation through the help of an
accountant and operation manager to prepare the ratios of operations.
Understanding the ratios and the financial health of the company will
help management to navigate water with ease. Marketing also plays a
big role in the company to continuously target segments that would
benefit and get value from employing WeCare services. Every now
and then management should get the feedback of customers to make
sure that we satisfy their needs and expectations.

b. SALES AND MARKETING

After identifying the segment that would benefit our service, WeCare
marketing team can prepare techniques that would capture that
certain target segment. One example that WeCare should utilize is
adavertisement through social media like Facebook Ads, Adwords by
Google, these social media networking site can help you target
anyone in the world and you get to specify everything from
demographic to their interest. One of the responsibilities of Personal
Relationship Management and Marketing is to connect to right people
in our industry. Marketing team should identify business partners and
develop a relationship with them that will improve the growth of the
business.

c. HUMAN RESOURCES

The company will only hire licensed professional to maintain its


integrity to the client and then the company would then assess that
future partner employee to be. Once part of the company, the
company will provide a ladder program that will also catalyze the
growth of that professional. From the designers down to the Support

41
activities department, the accountant, operations manager, marketing
manager. Also since we are implementing it through mobile
application, we would hire the best developers for the virtual project
management application. Bottom line is that at WeCare all partner
employees are going to be regarded as top professionals that have
integrity and competency.

d. TECHNOLOGY
Under this section hopefully the company will develop its own
research and development department in the future. For the
meantime WeCare should encourage the use of technology in the
construction industry, WeCare will push the envelope in technology
adaptation. Application developers will be closely monitored to create,
maintain and improve the functions of WeCare. Through technology
WeCare would be top of mind of people in the construction industry.

D. OTHER STRATEGIES AND PLANS


1. Alternative Plans

WeCare will set a standard, in the case that the companies target
and quota are not met we will analyze the situation and if we found
out that its due to lack of performance of some department, we
would give them training regarding that certain area that they are
not good at. Also while doing that we are going to pool resume to
get the best people out there, we will develop a filtering phase
every after 3 months to make sure that everyone whose going to be
left with the company has a drive aligned with the companies
mission, vision and initiatives.

2. Exit Strategy

42
Sell the business to mobile application companies, hire business
consultant and hire them to sell your business to competitors or
people who want to get into the construction industry.

References:
https://www.crateandbarrel.com/stores/makati/str982

https://www.cemexholdingsphilippines.com/products-and-services/ready-mix-concrete

Project Management and Construction Engineering


Author: Engr. Florencio F. Paderal, MBA, DPA Engr. Eustaquio T. Coronel , Jr.

The Real Book of Real Estate


Author: Robert Kiyosaki

https://en.wikipedia.org/wiki/Generation#:~:text=A%20generation%20is%20%22all
%20of,and%20begin%20to%20have%20children.%22

https://worldbex.com/

http://ciap.dti.gov.ph/
https://twomonkeystravelgroup.com/fastest-internet-providers-in-the-philippines/

https://tallyfy.com/digital-process-automation/#:~:text=Process%20automation
%20refers%20to%20the,accomplish%20a%20workflow%20or%20function.&text=Sales

43
%2C%20marketing%2C%20production%2C%20supply,benefitting%20from%20digital
%20process%20automation.

https://iotnews.asia/85/iotinfographics/infographic-internet-things/

https://www.i-scoop.eu/internet-of-things-guide/industrial-internet-things-iiot-saving-
costs-innovation/#:~:text=Industrial%20IoT%2C%20short%20for%20the,industrial
%20sectors%20and%20the%20use

https://www.privacy.gov.ph/data-privacy-act/#1

https://www.mondaq.com/CorporateCommercial-Law/9200/Electronic-Commerce-Act-
Republic-Act-No-8792#:~:text=Philippines%3A%20Electronic%20Commerce%20Act
%20(Republic,8792)&text=Estrada%20signed%20into%20law%20R.A.,the
%20%22Electronic%20Commerce%20Act.%22

https://sg.news.yahoo.com/understanding-social-class-philippines-class-
020037877.html

https://www.business-to-you.com/value-chain/#:~:text=Firm%20infrastructure
%20consists%20of%20a,chain%2C%20and%20not%20individual%20activities.

https://www.statista.com/topics/6011/construction-sector-in-the-philippines/

https://psa.gov.ph/system/files/Q4%202019%20Press%20Release.pdf

44

You might also like