Alstom Test Reports
alstom transformer sample test reports for testing power transformers
Uploaded by
Mohammed Shoaib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Alstom Test Reports For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
435 views
23 pages
Alstom Test Reports
alstom transformer sample test reports for testing power transformers
Uploaded by
Mohammed Shoaib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Alstom Test Reports For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Alstom Test Reports For Later
You are on page 1
/ 23
Search
Fullscreen
Head Offce 14 Kin, Ferozepur Road, Lahore-§4760 GPO Box No, 1614, Lahore -Pakiston. we (92.42) SB11051-53 (6 Lines) Facsimile (482 42) 5810156, 5622882 Website: wum-pelcom.pk Observations/omments/Minutes of the Inspection 14 Januory 2012 Physical inspection of Radiator catried out with satisfactory results. Accessory Catalogues will be provided by M/s PEL 1P55 required in outdoor Control Panel, resolved as requested. ssszoany202 | = Lamp Test Gircuit to be provided in auxiliary control panel. 10% of accessories will be provided with the transformer. - Rating Plate of transformer will be provided after tests are complete. - One Indication Lamp is faulty, which will be replaced before dispatch, - Software of AVR will be provided along with the panel, - Bottom plaie for the control auxiliary control pane! will be provided as spare. Pre Delivery Inspection of Paint and complete finishing touching will be done by M/s PEL. = 4 Nos, Set of as built drawings will be provided along with the panel t | = 4.508 of operation & Maintenance manual will be required with the Transformer. { | Attended By). \\ (i) Se | Raza Aftab 4p Abdul Rehman | Senor enpnset See Teningengneet-PE ' | 5 ita le | khatid Memon (| Le Bilal Aslam \) bakihol | Executive Eninwertrat)= HESCO assistant Manager ~ SP. WAPDA House | syed Tahir Hussain fantom) Ja Project Mansa Alstom 7Z%q, Marketing Engineer PEL) Abid Alam Moheet Syed Akhtar Ahmed | Sales Engineer - PEI Senior Manager~ Lucky Pot neration w tamatnase o> Manager (E&!) ~ Lucky Power Generation Registered Office:17-Aziz, Canal Bank, Registered Office:17-Aziz Ave portent ie ymi PAK ELEKTRON LiMiTED} Inspection & Quality Control (HV Transformer); CUSTOMER INSPECTION TEST REPORTS! POWER TRANSFORMER; RATING 31.5/40MVA j VOLTAGERATIO 6.3/13ZkVj Customer : Lucky Cement/ ; HESCO SERIAL NUMBER PEL HV 1120002 i DATE OF INSPECTION 16-Jan-12,TABLE OF CONTENT Test Description MEASUREMENT OF INSULATION RESISTANCE OF THE WINDINGS MEASUREMENT OF VOLTAGE RATIO AND CHECK OF PHASE DISPLACEMENT MEASUREMENT OF WINDING RESISTANCE (HY & LV) MEASUREMENT OF CAPACITANCE & DISSIPATION FACTOR OF INSULATION SYSTEM OF TRANSFORMER AND BUSHINGS, MEASUREMENT OF NO-LOAD LOSS & CURRENT. MFASURMENT OF SHORT CIRCUIT IMPEDANCE & LOAD LOSS MEASURMENT OF DIELECTRIC STRENGTH OF OIL SEPARATE SOURCE VOLTAGE WITHSTAND TEST INDUCED OVER-VOLTAGE WITHSTAND TEST WITH MEASURMENT OF PARTIAL DISCHARGES. (OLTC FUNCTIONAL TESTS LIST OF ACCESSORIES FUNCTIONAL TESTING OF ACCESSORIES MOUNTED ON THE OUTDOOR & AUXILIARY CONTROL PANELS LIGHTNING IMPULSE VOLTAGE WITHSTAND TEST u 2 B ect ai narnia ereCUSTOMER INSPECTION TEST REPORTS, Customer : Tacky CemenHESCO ‘Transformer Rating MEASUREMENT OF INSULATION RESISTANCE TSAO MYA 633240 Sr. No, PEL HV 1120002 Date W-Fan-12 OF THE WINDINGS Temperature Recorded: oy B¥eLyWalng oe se00 voc Meise = 2820 MOtm a ooee | = ae mole Acros Ra “Tat 1s bi. wirwnaingsomaem asi ex rex Voge: 000 voc >) TH =1Ssecs = 3320, MOhms 6 12 = 60: 4670 zy fad Huot tami eH AV Wading Earth sais “Test Voltage: 6000 vc begs \ Ti =\Sses = 4270 MOhms e o-S / ma sGosea- =< pee NOt is Lal bbs b ‘Absorption Ratio T/T] = 12 oe Instrument: Measuring Cireit Megger MITS20 - UK, “Test results are satisfactory. ‘Above are recorded values during Testing, For comparison R6O/RIS 1.2 @20°C may be considered. ees Qu A Gin. Selene ‘eileen Byes Aor Ames Shed Tone Hussain | Serger ‘Aatatnk anager Senior Manager Projet anager PEL SP, Wanda House icky Power Generation ‘stom Grid Page 1Customer ) CUSTOMER INSPECTION TEST REPORTS Tacky vannilgrae ole TESAO MIVA Conte sco Transformer Rating Me, S.No PELMV 1120002 Dae: 16-Jan-32 MEASUREMENT OF VOLTAGE RATIO AND CHECK OF PHASE DISPLACEMENT ‘Measuring Cireit Vector Group Detete apne, ana ens Tre] (aBan)| (2c-bn)| (ca-en)| eet Value 73:04 1368 | 73306 3 | 13.008 ia080 | 12185 3 [r2e08 | ras01 | 120m | 15.006 4 | tase | r2a06 [e805 | 12976 3 | 12800 | 12786 | rarer | —rea06 | ta7as [2808 | re800 | 12756 7] 160s | 12600 | 12.802 | 12646 | vas0e [12501 [ese | rs 3 | waato | tae | 12005 | 12426 io | vata | 1208 | tas00 | 123976 af wants | 12.210 | 12.200 | 12206 a [tants | ra911 | rasa | 12096 73_|-s2ore | ats | ois | 17.966 14_[ areas | sane | vio | 0676 15 [ mea] viet | niet] 71.766 16 [sires | wire [vir [11856 a7 | sisas [vis | 185 | 11506 ve [ansar | 182s | 11526 | 11486 1 raao| 11427 [11420 | 11526 2o_[ race | sao | ssa | 19216 21 aaas [an2ae | a1an8| 1.106 ze [ aise | tree | i106 | 10996 2 | tho | ¥4.096 | 11.098 | 1086 RAYTECH Mark Spy I= Suita Tes rau are stator we re 4 ar LFn le Sarl hes Sa Taian = Sener Pepa PEL Tak Power Geerson “Aiton Oris PapePEL, CUSTOMER INSPECTION TEST REPORTS: ft wa li Tacky ia SrSA0MVA CemendHESCO Tears: 63/32 KY Customer PEL HV 1120002 Date T6-Jan-12 MEASUREMENT OF WINDING RESISTANCE (HV & LV) Winding Resistance HY Temperature Recorded: 24 °C Tap [_-ABzio Bo Position | 7c | 240°C | 7e-c | 2a0°c| 7e°c | 240°C Measuring Creit 7 _| 2286 | 1970 | 2286 | 1010 | 2286 | 1.970 2 1891 7.805 1895 3 1875 877 137 4 1057 | 1.859 7158 5 7.830 1.840 “1840 6 +823 | 71824 "1824 7 7.805 7.805 “1805 8 5.788 4.789 7.788 8 4770 771 7a i 1782 1155 7.758 i 7.736 1737 ST 12_| 2053 [4745 | 2059 | 1.715 | 2053 | 4715 13 1.735 1.736 “1736 14 1752 1.755 “1758 15 1770 4770 1770 16 4787 1787 "787 7 7.806 7.806 7.806 78 7.8% 7.825 71023 19 7.938 7.838 71898 20 1.855 7.855 7.856 2 1873 1873 “B74 2 7.890 7.891 71800 23__| 267 | 1.906 | 2203 | 4907 | 2700 | 1.905 ~ Sy Winding Resistance LV Team Tee | 240°C 3770_| 3.46 instrume ‘Multiamp Ohm Meter - Meggar-U! Standard: “Test method is-as per LEC 60076-1 Results: Test results are satisfactory. lor Arn Byes Tone Mites [Executive Ergineer(Pai)___Aaaatant Manager ‘Sener Manager Pret anager ESCO ‘SP, Wapda House Lucky Power Generation ‘Alstom Grid PegesCUSTOMER INSPECTION TEST REPORTS Tacky - SESMO VA ransformer Rating Sr.No. Cemen/HESCO a Rating SrNe PEL HV 1120002 Customer 6313240. Date 16-Jan- (CFOR OF INSULATION SYSTEM OF TRANSFORMER AND | HINGS Ambient Temperate: 16.0°C Applied Voltage: 10.0 kV Weather: Cloudy O1Winding Temperature: 26.0 °C Homily: 69% Bushings: NO 145-850-800 Passoni & Villa- aly Connection Scheme Teakage | [Dissipation (Power) Factor () Measured Bushing Tet | connection Curront | P™°r [—~“iteasured Correctod Capacitance Mode |_°O foals may waits 260°C 200°C FP Black toH® A usT/R pope os2 | 0.022 07 0.364 165.48 Black to H& 8 ust/R meth 082 | 002 0.404 0.353 165.64 Black to H& 6: usr/R eee os21 | 0.024 0.487 0.399 165.71 Black toH& N usT/R ee 1.009 | 0.033 0.326 0.283 321.09 HONE yeynome) | 4 r—1t Fa Tantomercomestonouonm yg Sg, Connection Scheme Leakage Dissipation (Power) Factor Vo) Measured Power opacitances |Test | connection Gurrant Measured Corrected Capacitance Mode (may | watts 26.0 °C 20.0 °C 49F) Ca [ust7a] aecreneneree | 47087 | o288 | 02% a8 Baa Cine Cro [GND RB| Black toH & Red tol 25.579 | 0.708 0.277 0.242 8144.85 Cio | Gane | eucreneneson | aaea | 0322 | 0379 oat 7298.78 Tin Cu GND Ra| eworiou enesen | 4736s | oan | 0257 oz24 1507617 Cao | can | aucrocensvon | soase | oasn | 0282 02 3690.8 Tis Cin ]OND RE] Back to Her e Red ord | 30.745 | 0.155. 0.298 0260 1392.77 lastrament: Doble M4000 Insulation Analyze - USA. standard: Testmthod sas pe IEC 60071 ests: “Tes results ests. L 4 wept [COI AS Wninessed BY Lxzz SSseener ‘Sarma om yes Tan Husa Bre | Coc emer) Restor ner ener Trae Ha FEL TESCO 3 apd Ho Taek Power Goneraton Tivo rd aTCUSTOMER INSPECTION TEST REPORTS Tacky CemenvHESCO “Transformer Rating Sasa VA 5t.No, eais2Kv x PEL AY 1120002 {All che readings are taken at Principal Tay V6sdaneI2 MEASUREMENT OF NO-LOAD LOSS & CURRENT P.(Corrected) = Pm (14d) 19.078 Kw Applied voltage ‘Measured Current (Amps) Measured Losses| age wy Phase A Phase Phasee wa 100 $30 2.87606 322202 3.62052 9.49360 Vue 629118 KV Vous = 64276 KV ‘d= (Vaan = Vs) Vea 2.1684 % ‘Measuring Cirewit 1- Powor supply 2. Supply (intermediate) Transformor 2 Current Transiormoes ‘Test method is as por IEC 60076-1 “Test results ae satisfactory 5: Powor Analyser & Transformer undor tost 4 Voltage Transformers Vv : Vnesed BY a Ba Sad foes Serer eter 5 Upeir — | Etrn eger 60) or are os Fearae Pa TESCO SP Wapia House Ladly Power Gonertion "Asim rid PagesCUSTOMER INSPECTION TEST REPORTS Tacky stones Rating, SESAOMVA =n Comenstesco "estore RBS gsszay SEN PEL AV 1120002 -MEASURMENT OF SHORT CIRCUIT IMPEDANCE & LOAD LOSS Date: January 16, 2012 Guarntod Losses a 10096 ONAN 120000 Watts .T-used 250001110 Vis TapPoston, 2 CT usod: 4011 Amps ‘Hvcurent. 1978 Amps LW Resience: 20530nme at 240° vCumon: 2886;7 Amps Ly Rosslance: 348 mOhms at 240°C Current amps) Votage (at Power (Watts) iiaae (se Phase A. Phase 8 Phase C (Wants aea26 eect outst ‘0.008 araro Ambiont Temperature: 250°C Reference Temperature: 160°C fe (Ratedcaron: 1378 Amps re Rated curen): 1378 Amps VR: 98195.1 Watts PR 117078.7 Watts We (loadiosses): 111400. Wats Us (mpedance voto) 131608 Vos Us (mpedancevotago! 131478 Volts Us (Reactonce vtage) 13138. Volts Us (Roacten volago): 191998 Vos U, Resistive weoge! 837.0 Volts U, (Reese votage!; 466.8 Vols Load losses Measured): 1201860 Watts %U; (Measured: 9.96 % Load losses (Guaranted): 1200000 Wats Up (Guaranteed); 1000 % Measuring Clrnit . feorere foaea sea ea tek SBS Re an te ee a Sepeienioen Eee Sethe ok Senne Standard: Testmethod i spr IBC 60076 esas: Tes teahs a sna, Pp x maser as a ca Bilal Aslam ‘Syed Akhtar Ahmed ‘Syed Tahir Hussain ec Bethe | Emcins pent PO) ada ae cae ar Fae re TESCO 3 apaa Hause Laaly Power Ganson sion ri PaneerCUSTOMER INSPECTION TEST REPORTS Customer Tacky cman SAORI . Cemeumesco —Tarsformer Rating: “Ey Sr.No. Pex HY 1120002 standards JResut Date: January 16,2012 MEASURMENT OF SHORT CIRCUIT IMPEDANCE & LOAD LOSS Guarantoed Losses at 100% ONAF 7 PT. used: 25000/110 Volts Tap Postion 2 ©.T. usec: 400/1 Amps Hvcurent 4749 Amps ‘HV Rosstonce: 2083 Ohms at 240°C Lvconent 3665.6 Amps Li/Roaitance: 38 mOhmsat 240°C Current (Amps) Voltage (Wott Power (Wats) ae tveie PhaseA Phase B Phase oe 05826 99.681 s0..at 90.008 aero Ambient Temperature: 250°C Referance Temperature: 780°C 1 (Rated currant: 174.9 Amps 1 (Rated curont): 174.9 Amps (PR: 158990.2 Watts FR: 188789.4 Wetts We (Load esses): 179692.4 Watts Uz (Impedance vatege): 18609.0 Volts Uz (Impedance vatage)’ 18695.6 Volts Us, (Reactance votege): 16688.1 Volts Us (Reaclance votage): 1685.1 Volts , (Resiswe votago): 684.9 Volts U, (Resistive voltage): 592.8 Volts Loose (ensures): 20887 Wan “Ue (Mesure); 1288 % Loedtmves(Gunente’): s $0: ommend Mesirieg Chesin | i © Hal Ww # ott (caoeeo Ege] eneons 1: Power sup ‘5 Power Anayeae 2 Sippy imermedia) Teanelorner § Translerme’ undo 08 5-Cumor Trantormere C Compensation Capacitor gowns 2 Velage Tenstormers “Test method is as por TEC 60076-1. “Test eslls are satisfactory. (WL Basten bits Bye ar Rie Beata Hessen i Bato racine Erne PE) asta Nanoger Senor Manager Prope ange ESCO SP, Wapda Hours icky Power Goneration Alstom Gre Pages) PEL) ( CUSTOMER INSPECTION TEST REPORTS Customer Tacky ComenvHESCO No. Test Value 1 Test Valuo 2 Test Value 3 Test Value 4 Test Value 5 Test Value 6 ‘Mean (Observed) = ‘Mean (Specified) : ‘Transformer Rating MEASURMENT OF DIELECTRIC STRENGTH OF OIL. SESAOMVA 6332 kV Breakdown Value (kV) Transformer C7) (kv) Bottom 56.2 63.0 75 817 620 60.0 Sr.No. oe 635 66.1 st PEL AV 1120002 fasrunent: VO Meyer Fase 100482 Standart Tava area px TEC 602 fcaks, | Tedrenlsensatce, acer ie oe Qe AEE nesseasr (Wt 7 mr sae Sates cre oe ‘Sr. End ecutive Engineer (Pal) “Assistant Manager ‘Senior Manager Project Manager Er Tee Se Waa nso any Powe areata tov Poge 7PEL, CUSTOMER INSPECTION TEST REPORTS TESaDMVA 6x12 Lachy “Transformer Rating Sr.No. PEL HY 1120002 Customers CemenviHESCO Dawe: 16-Jan-12 SEPARATE SOURCE VOLTAGE WITHSTAND TEST lav side [rest Voltage Love: 140 wv Hime Duration: 60 Sec Lv side [Test Voltage Levet 20 KV [rime Duration 60 Sec ‘Measuring Circuit 1- Adjustable voltage transformer 2- Current transformer and ampermeter 3- Test transformer input voltage voltmeter 5- Capacitive voltage divider 4- Test transformer 6- Effective voltage voltmeter 7- Peak value voltmeter (Peak value/V'2 ) 8- Transformer under test Phenix-USA make Power Frequency Test Se, sun Texvaerwe inure sie 3 we fous Tends witconl te Foe Fen ielotHV & LY Se 2 (OT eee er A Balter Baas Siar anon yes Tan isa alge eee eames Soma a = ea yee ae PageCUSTOMER INSPECTION TEST REPORTS eS ety “Transformer Rating SEVOMYAseNo.: PEL HV 1120002 Costomers CementMESCO essay Vossen? INDUCED OVER-VOLTAGE WITHSTAND TEST WITH MEASURMENT OF PARTIAL DISCHARGES cenaniome SEY Goon ime eee foros veN ee et gevasnegenmny toon SaaS = SP . ae = ” [are ene ea wr eet - = ee ee eee % (1.10, Firat hat) # ae | mae - - * (1.30, First halt) s6mh; | Haat - 4 1.11, Sone! hat - ae | reas G mens ee ee 14 Q hice i Ce oe Se ee eS a ee PatPEL CUSTOMER INSPECTION TEST REPORTS Tacky fmaFignar Katina SSA MIVA a ” |_cosomer: comentntesco_Tanstome ali jaaaky EN PEL HV 1120002 Date 16-Jan-12 OLTC FUNCTIONAL TESTS (OPERATIONAL TEST With the tap-changer fully assembled on the transformer the following sequence of operations shall be performed without failure, 4.4) With the transformer un-energized, eight complete cycles of operation (a cycle of operation goes from one end of the tapping range to the other, and back 4.2) With the transformer un-energized, and with the auxiliary voltage reduced to 85% of its rated value, one complete cycle of operation. 4.3) With the transformer energized at rated voltage and frequency at no load, one ‘complete cycle of operation. 4.4) With one winding short-circuited and, as far as practicable, rated current in the tapped winding, 10 tap-change operations across the range of two steps on ‘each side from where a coarse or reversing changeover selector operates, or otherwise from the middle tapping. Standard “Test method is as per IEC 6076-1, Results ‘Tap changer successfully completed the required operations. Ye rr oR atin Siar Alan ‘yea ‘Syed ahr Hussain Se Ergneer recive Engines (PAD Assistant Manaper ‘Senor Wanager Project Manager PEL ESCO ‘SP, Wapda House Lusky Power Generation ‘Alstom Grid age 10PEL, (CUSTOMER INSPECTION TEST REPORTS - om a came Tp ee | Item Sr. No. Description of Ronis: TYPE ‘MAKE Qty. paar eee a TT 2 a tt a A ee a eset | conereny | —— ete ao eee — pe a a a emesis ros ee — oe _| TRETTA Jon Loe Top Chango’ wit hair Dv Unt Bowl Gear — [OTT W AAMT) 1248171 _ {Mechanism & Connecting Shats wee y aoe soe: | Tet a oo cee 2 — See ——— sate Cone ——e Sa Base Paes eS se a aes ee oe =. Tae bea nisin vse —_ TE : Se =| att a woo =e 7 petscteonn ie ne | eee _——fesfiaes oa a Fr ae tt Te ae a - 2 = esteetas ——— ee ee ee —— | ae te fen ans (Sos oe) of ove oe = = ; ~__ [prone remount goes | 2 oeereenniet sins 151 Sud baie eloena ee le cea otomaasedSban im ee Ha ie Rowe omni yh. i er $I a ee ee eo PEL HESCO ‘SP, Wapda House “Lucky Power Generation “Alstom Grid | PagETTCUSTOMER INSPECTION TEST REPORTS ISAO NVA era Castomer Lucky ransformer Rating No. te Cement HESCO q Rating Sn PEL RV 1120002 Date T6sJan-12 FUNCTIONAL TESTING OF ACCESSORIES MOUNTED ON THE OUTDOOR & AUXILIARY CONTROL PANELS Remarks: 6 r Remote function of OLTC including Raise, Lower & Emergency Trip operation with indication of tap on ACP ‘Automatic operation of cooling fans with Oil & Winding Temperature indicators with Indication on the ACP ‘Manual operation of cooling fans (Remote & Local) Operation of Pressure Relief Device with indication on the ACP Operation of Buchholz Relay with indication on the ACP Operation of Magnetic Operation of TAPCON 230 Automatic Voltage Regulator All accessories of OCP & ACP are found functional Exeoawe craweer(PE) ___Aavatant Nananer ESCO SP, Wapda House Lucky Power Generation Taisiom Gd Page 12PEL, CUSTOMER INSPECTION TEST REPORTS cama tty omen TESCO Tt ag TROT ong ra vans Date Tdan-12 Test Saquonce: 1 edcod lve! i wove at (50-75% ofthe est ove = aft wave ato let ove Wave Shape: 1.2/0 mero seconds, ierance +90 on the wave fant and 20% om the wave a. 3% rane on ogo pak Pade 17 mows Wining mow Trawe [ Tou | Wtswcnennv, [omer kvs| Von tooanea | prase [Toot | UnecieRY, | U ema, | Vontaence teas | asa me = Te | w.s0 a = a [Raven wae os rawoa] * oom TP Te Gi acave| 650 056 092 Fut wave 0 399 028 Faven| wor 308 raw] * oe Reams | 25-4678 a0 Pass Rete | a0-30 08 = [Fen ow ose 395 Faw] © © oom 02) wav 650 00.8 163 Fut wave « “0 200 on a) 128 raeee] © oom Rete | a5 aar wis rece | 20-30 Poe ¢ [Fume ow wn a0 Fain] ~ 200 100-25) we| 650 47 0.08 Full wav 0 “0 9.00 a) oy a8 Tarwe] © 300 fisrag oa y _ ta Ty nt2220% pS it ” Hanns . J) - . = t eure "TonasenawToaj Tan bas Padiiitie us il instrument, Passni Vi, SODRY pie Geverior ancards —Tenmetodieo per EC 763 Rests: The Temloemer mcs withthe ihn nus oR HY LY. ary Z A awe ere FED ei opcttemr FEL TESCO, Wings Howse Thy Power Goneration ison GrIMPULSE TEST REPORT P.E.L. Exports in High Voltage I ‘ap Voge Tes Geog | Teng Dope PEPE Da ct Powe Tamer Coeemb ie sisowa Sal namber_stp2 aus 0 wena ‘pont Pennies a Cae [eustoner: ESCO Data Acquistion Syston by PASSONI & VILLA - MILAN - ITALY.IMPULSE TEST REPORT P.E.L. Experts in High Voltage Tale Volage Ten Osctgrana | Tesing periment PEL Dai Onject Power Transformer Commision: pe 15Wo WA Sefat Number: 110002 650 80) HV Pine -B Tap Postion 12 Parmar ature coat [Gert HESCO Data Acquisition System of SSONIE VILLA - MILAN - ITALY[IMPULSE TEST REPORT PEL, Experts in High Voltage iz Tape Vas Ys Oeaiogens | Tetig Dope PEL AE Dats Oe Pe Taner rs Tye. 31.50 WA ‘Sova Number, 1120002 pe: _ 50 aM) HV Phase Tap Potion: 23 —nprantc io Cpe 2 on v2 Paransters T [sioner HESCO and Data Regulition Syston NE VILLA = MILAN = MALY 7 TY atoaseIMPULSE TEST REPORT P.E.L. Exports in High Voltage Tape Vong Tet Ooo [ Teng Dope PEL Pa Data Object: Power Tanstormer “Commision Tye: ‘Seva Number 1120002 eu « By LV Phase A ve Aruantfanig ow A Raseteh vote a Ame {ge Comer nesco LP ('e VILA MILAN -ITALY Data Aequlstion System by PiIMPULSE TEST REPORT | PEL. Experts in High Voltage pube Votage Vest Oscioprane [Testing Depatmeat= PEL PO Date Onc Power Transformer ‘Commision ie 3.540 uvA Sofa Humber: 1120002 Bu: py, Lv Phase Parematare Parameters ted ue Data Acquisition System INI & VILLA = MILAN - ITALY.IMPULSE TEST REPORT PEL. Experts in High Voltage Te Voge Tet Grogan | Tetng Dopatren= PEL AE ee os ee Sau STS cin my (Customer: HESCO_ WS Data Acquisition System by ‘VILLA - MILAN - ITALY
You might also like
Rectifier Circuits Typical Parameters
PDF
No ratings yet
Rectifier Circuits Typical Parameters
1 page
Pi Juge
PDF
No ratings yet
Pi Juge
1 page
Machinery Estimate SAR 20M
PDF
No ratings yet
Machinery Estimate SAR 20M
1 page
10kVA 1Ph
PDF
No ratings yet
10kVA 1Ph
8 pages
4000 34.5 11.5 Dyn11 (Core)
PDF
No ratings yet
4000 34.5 11.5 Dyn11 (Core)
1 page
ABB 12 MVA Alternator LEAP Test Report
PDF
No ratings yet
ABB 12 MVA Alternator LEAP Test Report
29 pages
A View "A": Bushing Din 42533 30NF/1000A
PDF
No ratings yet
A View "A": Bushing Din 42533 30NF/1000A
1 page
BBFS (R-3)
PDF
No ratings yet
BBFS (R-3)
4 pages
Po Box 15410 Dubai, United Arab Amirates: Commercial Invoice
PDF
No ratings yet
Po Box 15410 Dubai, United Arab Amirates: Commercial Invoice
1 page
Thickness of Paint Coatings Layers / Festési Rétegek Vastagságai
PDF
No ratings yet
Thickness of Paint Coatings Layers / Festési Rétegek Vastagságai
1 page
Testing Equipment
PDF
No ratings yet
Testing Equipment
1 page
Pak Elektron Limited (PEL) 31.5 / 40 MVA 01 23.50 KW 168 KW (Principal Tap, 40 MVA Basis) 191.50 KW
PDF
No ratings yet
Pak Elektron Limited (PEL) 31.5 / 40 MVA 01 23.50 KW 168 KW (Principal Tap, 40 MVA Basis) 191.50 KW
1 page
02-03 0 A4
PDF
No ratings yet
02-03 0 A4
2 pages
Order Sheet For Ventilator: CG Electric Systems Hungary ZRT
PDF
No ratings yet
Order Sheet For Ventilator: CG Electric Systems Hungary ZRT
1 page
Polarization Depolarization Analysis Test - PDCA-Summary
PDF
No ratings yet
Polarization Depolarization Analysis Test - PDCA-Summary
1 page
Finance Application Form For Small Enterprises
PDF
No ratings yet
Finance Application Form For Small Enterprises
2 pages
Sillicon 7225.1100
PDF
No ratings yet
Sillicon 7225.1100
49 pages
650KVA Witnessed Test Report
PDF
No ratings yet
650KVA Witnessed Test Report
2 pages
01-03 A A4
PDF
No ratings yet
01-03 A A4
3 pages
40MVA Jinnah Hydel
PDF
No ratings yet
40MVA Jinnah Hydel
53 pages
25KVA Powertech Data
PDF
No ratings yet
25KVA Powertech Data
17 pages
200kva Hammad Engineering
PDF
No ratings yet
200kva Hammad Engineering
14 pages
10 MVA METCO (KSA) - Dimensional Sketch
PDF
No ratings yet
10 MVA METCO (KSA) - Dimensional Sketch
1 page
Despt User Guide
PDF
No ratings yet
Despt User Guide
48 pages
Application For Issuance of Letter of Credit (LC) / Back To Back Letter of Credit (B2BLC)
PDF
No ratings yet
Application For Issuance of Letter of Credit (LC) / Back To Back Letter of Credit (B2BLC)
5 pages
MM Tender 19 02 2020
PDF
No ratings yet
MM Tender 19 02 2020
2 pages
Sheets
PDF
No ratings yet
Sheets
42 pages
Name Plate
PDF
No ratings yet
Name Plate
1 page
Unit 2 Transformer Maintenance 1
PDF
No ratings yet
Unit 2 Transformer Maintenance 1
55 pages
Material List: GANZ Transformer
PDF
No ratings yet
Material List: GANZ Transformer
3 pages
Progno Rso Kit 1722448049
PDF
No ratings yet
Progno Rso Kit 1722448049
23 pages
HV Connectors Test Report PDF
PDF
No ratings yet
HV Connectors Test Report PDF
21 pages
HV Connectors Test Report PDF
PDF
No ratings yet
HV Connectors Test Report PDF
21 pages
Conditional Monitoring and Diagonostic Testing of Transformers - Lohit Gupta
PDF
100% (2)
Conditional Monitoring and Diagonostic Testing of Transformers - Lohit Gupta
33 pages
Transformer Testing Equipment Catalogue 2020 - MEGGER
PDF
No ratings yet
Transformer Testing Equipment Catalogue 2020 - MEGGER
32 pages
Part 3 - 010405
PDF
No ratings yet
Part 3 - 010405
101 pages
SFRA Connections Guide
PDF
No ratings yet
SFRA Connections Guide
6 pages
Secrets of Bushing Oil Level-Goff
PDF
100% (1)
Secrets of Bushing Oil Level-Goff
8 pages
TRF FAT 12-Dec-2023 20-42-15
PDF
No ratings yet
TRF FAT 12-Dec-2023 20-42-15
4 pages
HV Impulse Test Equipment
PDF
No ratings yet
HV Impulse Test Equipment
28 pages
CT FAT Bhiwadi High Tension - 3
PDF
No ratings yet
CT FAT Bhiwadi High Tension - 3
7 pages
Electrical Testing: Epstein Testing (Core Loss Testing) Per ASTM A343
PDF
No ratings yet
Electrical Testing: Epstein Testing (Core Loss Testing) Per ASTM A343
4 pages
EA Technology - Partial Discharge Survey Examples of MV and HV Assets
PDF
No ratings yet
EA Technology - Partial Discharge Survey Examples of MV and HV Assets
32 pages
ESMO 2016 An Introduction To Electrical Diagnostic Testing of Power Transformers
PDF
No ratings yet
ESMO 2016 An Introduction To Electrical Diagnostic Testing of Power Transformers
8 pages
E 38 CT Test Report
PDF
No ratings yet
E 38 CT Test Report
15 pages
Efficient Method To Accelerate Resistance Measurement of Transformer LV Winding
PDF
No ratings yet
Efficient Method To Accelerate Resistance Measurement of Transformer LV Winding
8 pages
SSC Thorsten
PDF
No ratings yet
SSC Thorsten
55 pages
Percentage-Differential: For The Protection of AC Rotating Machinery and Power Transformers
PDF
No ratings yet
Percentage-Differential: For The Protection of AC Rotating Machinery and Power Transformers
4 pages
Insulation Resistance Testing
PDF
No ratings yet
Insulation Resistance Testing
3 pages
Adaptador Bucha Abb
PDF
No ratings yet
Adaptador Bucha Abb
12 pages
EDOC-Transformer Diagnostics and Condition Assessment
PDF
No ratings yet
EDOC-Transformer Diagnostics and Condition Assessment
16 pages
Stray Gassing
PDF
No ratings yet
Stray Gassing
9 pages
Transformer - Test Report
PDF
No ratings yet
Transformer - Test Report
8 pages
KK Murty 2-Rev PPR on-RLA of Power Transformers - Rev3 Final - With CIGRE India Membership
PDF
100% (1)
KK Murty 2-Rev PPR on-RLA of Power Transformers - Rev3 Final - With CIGRE India Membership
10 pages
Transformer SFRA Application Note - Sister Transformers
PDF
100% (1)
Transformer SFRA Application Note - Sister Transformers
26 pages
Baker EXP4000 Dynamic Motor Analyzer
PDF
No ratings yet
Baker EXP4000 Dynamic Motor Analyzer
8 pages
Transformer Inspection and Test Forms
PDF
No ratings yet
Transformer Inspection and Test Forms
6 pages
2012 Handout PDF
PDF
No ratings yet
2012 Handout PDF
5 pages
Type C 10-kV Resonating Inductor 03-00
PDF
No ratings yet
Type C 10-kV Resonating Inductor 03-00
2 pages
Guidelines For Rla of Transformers PDF
PDF
No ratings yet
Guidelines For Rla of Transformers PDF
9 pages
Little Known Facts About Dissipation Factor Testing
PDF
100% (1)
Little Known Facts About Dissipation Factor Testing
3 pages
PDI Vs NQN
PDF
No ratings yet
PDI Vs NQN
4 pages
Dirana
PDF
No ratings yet
Dirana
2 pages
Instrument Transformer Gateway To Protection and Metering Scheme
PDF
No ratings yet
Instrument Transformer Gateway To Protection and Metering Scheme
68 pages
Partial Discharge Analysis
PDF
No ratings yet
Partial Discharge Analysis
49 pages
Capacitance and Dissipation Factor Measurements
PDF
No ratings yet
Capacitance and Dissipation Factor Measurements
10 pages
Transformer Test Format
PDF
100% (5)
Transformer Test Format
31 pages
SPECcmp Man E0101
PDF
100% (1)
SPECcmp Man E0101
48 pages
Agging Effect in Insulating Oil of Power Transformer
PDF
No ratings yet
Agging Effect in Insulating Oil of Power Transformer
5 pages
Bushing Diagnostics PDF
PDF
100% (1)
Bushing Diagnostics PDF
32 pages
The Extension of IEC 60599 To Open Type Transformers: by E. Bräsel
PDF
No ratings yet
The Extension of IEC 60599 To Open Type Transformers: by E. Bräsel
3 pages
Estimating Moisture in Power Transformers: Mohammad Tariq, Megger
PDF
No ratings yet
Estimating Moisture in Power Transformers: Mohammad Tariq, Megger
9 pages
Voltage Transformers
PDF
No ratings yet
Voltage Transformers
27 pages
10 Alstom GenMaintAssessRepairs 2
PDF
No ratings yet
10 Alstom GenMaintAssessRepairs 2
23 pages
Oil Regeneration Plants by GlobeCore GMBH
PDF
No ratings yet
Oil Regeneration Plants by GlobeCore GMBH
13 pages
Keema Report On PD Test
PDF
No ratings yet
Keema Report On PD Test
1 page
POWER TRANSFORMERS - Inicial Test Report
PDF
No ratings yet
POWER TRANSFORMERS - Inicial Test Report
122 pages
Pi SQF CCL Traf 435
PDF
No ratings yet
Pi SQF CCL Traf 435
5 pages
Dirana Anp 10018 Enu
PDF
100% (1)
Dirana Anp 10018 Enu
35 pages
CIGRÉ 2008 - Corrosive Sulfur in FR3
PDF
No ratings yet
CIGRÉ 2008 - Corrosive Sulfur in FR3
8 pages
Shell Diala D Oil
PDF
No ratings yet
Shell Diala D Oil
2 pages
Man VLF Sinus 51 Eng 2
PDF
No ratings yet
Man VLF Sinus 51 Eng 2
33 pages
Equipment Failure Report of CEA
PDF
No ratings yet
Equipment Failure Report of CEA
53 pages
CPC 100 Brochure ENU
PDF
No ratings yet
CPC 100 Brochure ENU
48 pages
A Review of Polarization Index and IEEE Standard 43-2000
PDF
No ratings yet
A Review of Polarization Index and IEEE Standard 43-2000
5 pages
Routine Tests For Trihal
PDF
No ratings yet
Routine Tests For Trihal
21 pages