0% found this document useful (0 votes)
47 views1 page

AHP Layout

The document shows a layout of an AHP (Ash Handling Plant) with various components labeled, including fly ash silos, clarifiers, pump houses, and ash disposal areas. FAE stacks T1-T4 are shown along with ESP units A-B and VPH units 1-2 that are part of the ash collection and transport system. An ash dyke is labeled for ash slurry disposal.

Uploaded by

Kumaraswamy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

AHP Layout

The document shows a layout of an AHP (Ash Handling Plant) with various components labeled, including fly ash silos, clarifiers, pump houses, and ash disposal areas. FAE stacks T1-T4 are shown along with ESP units A-B and VPH units 1-2 that are part of the ash collection and transport system. An ash dyke is labeled for ash slurry disposal.

Uploaded by

Kumaraswamy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

AHP Layout

FAE T-4

FAE T-2

FAE T-1
FAE T-3

VPH-1
VPH-2

ESPESP
ESP A
ESP B

ESP
ESP

ESP
ESP

ESP

A A
BB
ASH slurry disposal pipe rack
SILO UTILITY
BUILDING

FLY ASH SILO ASH WATER


CLARIFIER

PUMP HOUSE

AWRS

ASH slurry disposal pipe pedestal


Ash Dyke

You might also like