Value Stream Design Product Family Editor Team C Date Feb. 28,2020 Supplier

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

Value Stream Design

Product Family
Editor Team C  
Date Feb. 28,2020
     
Supplier

Digital Information flow

RECEIVING, SORTING
AND DISTRIBUTION

Receiving, Sorting of items,


and distribution of sorted items

TAKT TIME
OPERATORS
LEAD TIME
CYCLE TIME
VALUE ADDED TIME
TIME/SHIFT
WIP
NVA TIME
SCRAP RATE
REWORK RATE

I
PRODUCTION CONTROL

CUTTING
PUSH
Cutting of items according to the pattern

f sorted items INVENTORY

I
4.06779661016949 TAKT TIME
1 OPERATORS
--UNUTILIZED
50 minutes WORKER LEAD TIME
-INVENTORY CYCLE TIME
VALUE ADDED TIME
TIME/SHIFT
WIP
NVA TIME
None SCRAP RATE
None REWORK RATE
Demand Time 240 Minutes
Budget Cost ₱49,860,000.00

 
Customer

ASSEMBLY

o the pattern INVENTORY Items are being assembled

I
4.06779661016949 TAKT TIME
3 OPERATORS
-INVENTORY
50 minutes -WAITING LEAD TIME
49.52 minutes CYCLE TIME
47.64 minutes VALUE ADDED TIME
TIME/SHIFT
WIP
1.88 minutes NVA TIME
None SCRAP RATE
None REWORK RATE
SET-UP

Organizing the items


according to the customer's demand

TAKT TIME 4.06779661016949


OPERATORS 1
LEAD TIME 50 minutes
CYCLE TIME 50 minutes
VALUE ADDED TIME 2 minutes
TIME/ SHIFT
WIP
NVA TIME 48 minutes
SCRAP RATE None
REWORK RATE None

4.06779661016949
4
-INVENTORY
50 minutes -WAITING
48.73 minutes
40.12 minutes
8.61 minutes
None
None