Check List For Panels Function Test: Project No
Check List For Panels Function Test: Project No
Check List For Panels Function Test: Project No
1 Prior to start:
a.
Approved commissioning copy schematic drawing shall be rechecked.
b. All secondary injection and all components tests shall be completed and
witnessed. All test results must be available and signed.
`
c. All final settings applied as appropriate (timers, annunciators, etc.) shall be
applied and witnessed.
Verify that each supply is wired point to point, with no unsupervised branches,
2 Supervision is checked by wire removal at every point in the circuits to make
sure the supervision flag drops.
Check the thermostat and the space heaters according to the schematic
5
drawing.
Check the AC lamp, DC lamps and door switch and Check lamp test for all
6
equipment according to the schematic drawing.
7 Check AC sockets according to the schematic drawing.
8 Check the AC & DC supervision according to the schematic drawing.
9 Check panels earthing as per specifications.
Check that CT and VT circuits are provided with suitable covers and caution
10
labels for protection.
b. Solid type TB for control circuits & knife type for alarms
Name
Signature
Designation
Date