Surat Municipal Corporation: South Zone
Surat Municipal Corporation: South Zone
SOUTH ZONE
SUMMARY SHEET
TOTAL 1,221,132.56
NET AMOUNT 1,221,200.00
CONTINGENCIES @ 5% 61,060.00
TOTAL 1,282,260.00
WORK CHARGE @ 2% 25,645.20
TOTAL 1,307,905.20
NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN, SOUTH ZONE,
SURAT MUNICIPAL CORPORATION, SURAT.
ABSTRACT SHEET
2
Item
SOR Description Qty. Rate Unit Amount
No.
Providing & Applying 20 mm. Th. Roller plaster on walls
or similar surfaces at all floor levels consisting of 12 mm av.
AS PER Th. Backing coat of C.M. 1:3 (1 cement : 3 sand) & 8 mm.
8
RA th. Finishing coat of C.M. 1:1 (1 cement : 1 sand)
3
Item
SOR Description Qty. Rate Unit Amount
No.
Providing and laying broken china mosaic flooring for
terrace using 12 mm to 20 mm broken pieces of glazed tiles
R&B to be laid over cement mortar 1:3 to plain or slope and to be
Page tempered to bring mortar crème out upto surface using white
10 111.00 483.79 S.M. 53700.69
No.149 cement including rounding off junctions and extending them
(14035) upto 15 cm along the wall, clearing with water and oxalic
acid etc. as directed.
(A) Same as above but Colour anodized 19.00 2042.22 S.M. 38802.18
4
Item
SOR Description Qty. Rate Unit Amount
No.
Apply two coats of Birla or Asian acrylic lappy (putty)
and two coats of primer of approved brand and manufacture
SMC on new wall surface to give an even shade including
13 Colour thoroughly brushing thr surface free from mortar dropping
Works (5) and other matter and sand papered smooth. For All floor
SMC Painting two coats of enamel paint over priming coat after
Colour removing entire whitewash/colourwash surface dirt, dust
14 foreign matter & also incl. preparing the surface even & sand
Works
(17) papered smooth etc. comp.
(A) For wall and similar surfaces 265.00 50.40 S.M 13356.00
(B) For ceilings & soffits of stairs 227.20 50.40 S.M 11451.03
SMC (40) Labour Charges For Half Round Edge For Granite. For all
17 252.00 150.00 R.M. 37800.00
(MR) floor
5
Item
SOR Description Qty. Rate Unit Amount
No.
The rates shall include providing and applying 12 mm thick
cement mortar (1:4) modified with plasticizer for finishing
smooth the repaired surfaces, providing and applying curing
agent on the repaired surfaces, etc. complete as directed by
the Engineer-in-charge. The make and quality of rust
removing chemical, anti-corrossive coating, polymer bonding
agent, polymer and expanding grout additives, plasticizer,
curing agent, etc. shall be approved by engineer-in-charge.
The procedure for application shall be strictly in accordance
with manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by the
Engineer-in-charge.
The rate shall include the cost of providing and supplying all tools,
materials, labour, scaffolding, props, formwork, etc. complete. The
make and quality of epoxy grout, epoxy putty, etc. shall be
approved by the Engineer-in-charge. The procedure for application
shall be strictly in accordance with manufacturer's detail
specification, which shall be submitted before start of work and
shall be approved by the Engineer-in-charge. (Actual no. of holes
and their locations shall be as decided by the Engineer-in-charge)
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per Approved
by engineer incharge 100 250.00 Nos. 25000.00
6
Item
SOR Description Qty. Rate Unit Amount
No.
The rate shall include the cost of providing and supplying all tools,
materials, labour, scaffolding, props, formwork, etc. complete. The
make and quality of epoxy grout, epoxy putty, etc. shall be
approved by the Engineer-in-charge. The procedure for application
shall be strictly in accordance with manufacturer's detail
specification, which shall be submitted before start of work and
shall be approved by the Engineer-in-charge. (Actual no. of holes
and their locations shall be as decided by the Engineer-in-charge)
20 450.00 Nos. 9000.00
22 Pointing on brickwork with cement mortar 1:3 (1-cement : 3- 682.00 S.M. 0.00
coarsed sand) (a) Flush pointing
7
SURAT MUNICIPAL CORPORATION
SOUTH ZONE
NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN, SOUTH ZONE,
SURAT MUNICIPAL CORPORATION, SURAT.
MEASUREMENT SHEET
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Outside plaster
Ground Floor
ht. = 3.10 + 0.15 = 3.25
front side 1 12.29 3.25 39.94
left side 1 13.39 3.25 43.52
right side 1 13.32 3.25 43.29
back side 1 10.56 3.25 34.32
deduction
W1 -4 0.60 1.55 -3.72
D1 -1 1.05 2.10 -2.21
collapsible door -0.5 1.44 2.75 -1.98
passage window 1 -0.5 4.47 1.12 -2.50
passage window 2 -0.5 3.22 1.12 -1.80
First Floor
ht. = 2.74 + 0.15 = 2.89
front side 1 12.29 2.89 35.52
left side 1 13.39 2.89 38.70
right side 1 13.32 2.89 38.49
back side 1 10.56 2.89 30.52
deduction
W1 -4 0.60 1.55 -3.72
D1 -1 1.05 2.10 -2.21
passage window 1 -0.5 4.47 1.12 -2.50
passage window 2 -0.5 3.22 1.12 -1.80
Terrace Floor
parapet sides 2 49.56 0.90 89.21
parapet top 1 49.56 0.23 11.40
Staircase Cabin 1 16.00 2.80 44.80
deduction
D1 -0.5 1.05 2.10 -1.10
Inside plaster
Ground Floor
ht. = 3.10
Room 1 1 23.60 3.10 73.16
Deduction
D -1 1.05 2.10 -2.21
W -1.5 0.60 1.55 -1.40
Room 2 1 23.60 3.10 73.16
Deduction
D -1 1.05 2.10 -2.21
W -2.5 0.60 1.55 -2.33
Passage 1 32.76 3.10 101.56
Deduction
Collapsible door -0.5 1.44 2.45 -1.76
W -2 0.60 1.55 -1.86
Grill at passage -0.5 3.22 1.12 -1.80
Grill at passage -0.5 4.47 1.12 -2.50
First Floor
ht. = 2.74
Room 1 1 23.60 2.74 64.66
Deduction
D -0.5 1.05 2.10 -1.10
W -1.5 0.60 1.55 -1.40
8
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Room 2 1 23.60 2.74 64.66
Deduction
D -0.05 1.05 2.10 -0.11
W -2.5 0.60 1.55 -2.33
Passage 1 32.76 2.74 89.76
Deduction
W -2 0.60 1.55 -1.86
Grill at passage -0.5 3.22 1.12 -1.80
Grill at passage -0.5 4.47 1.12 -2.50
Ground floor
Room 1 1 31.23 31.23
Room 2 1 31.23 31.23
passage 1 26.50 26.50
soffits of stair 1 1.58 3.91 6.18
1 1.58 2.68 4.23
mid landing 1 1.73 3.52 6.09
105.46
First floor
Room 1 1 31.23 31.23
Room 2 1 31.23 31.23
passage 1 26.50 26.50
soffits of stair 1 1.58 2.51 3.97
1 1.58 2.51 3.97
mid landing 1 1.73 3.52 6.09
102.98
9
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Terrace (Second) floor
Stair cabin 1 18.76 18.76
18.76
227.20 227.20 SM
Ground Floor
ht. = 3.10
Room 1 1 23.60 3.10 73.16
Deduction
D -1 1.05 2.10 -2.21
W -1.5 0.60 1.55 -1.40
Room 2 1 23.60 3.10 73.16
Deduction
D -1 1.05 2.10 -2.21
W -2.5 0.60 1.55 -2.33
Passage 1 32.76 3.10 101.56
Deduction
Collapsible door -0.5 1.44 2.45 -1.76
W -2 0.60 1.55 -1.86
Grill at passage -0.5 3.22 1.12 -1.80
Grill at passage -0.5 4.47 1.12 -2.50
231.82
50% of Internal Plaster Qty 115.91
say 116.00 SM
First Floor
ht. = 2.74
Room 1 1 23.60 2.74 64.66
Deduction
D -0.5 1.05 2.10 -1.10
W -1.5 0.60 1.55 -1.40
Room 2 1 23.60 2.74 64.66
Deduction
D -0.05 1.05 2.10 -0.11
W -2.5 0.60 1.55 -2.33
Passage 1 32.76 2.74 89.76
Deduction
W -2 0.60 1.55 -1.86
Grill at passage -0.5 3.22 1.12 -1.80
Grill at passage -0.5 4.47 1.12 -2.50
207.99
50% of Internal Plaster Qty 104.00
say 104.00 SM
Terrace(Second) floor
Stair cabin 1 17.82 2.8 49.90
Deduction
D -0.05 1.00 2.10 -0.11
49.79
50% of Internal Plaster Qty 24.90
say 25.00 SM
245.00
Providing & Applying 20 mm. Th. Roller plaster on
walls or similar surfaces at all floor levels consisting
of 12 mm av. Th. Backing coat of C.M. 1:3 (1 cement
8
: 3 sand) & 8 mm. th. Finishing coat of C.M. 1:1 (1
cement : 1 sand)
Outside plaster
Ground floor
ht. = 3.10 + 0.15 = 3.25
front side 1 12.29 3.25 39.94
left side 1 13.39 3.25 43.52
right side 1 13.32 3.25 43.29
back side 1 10.56 3.25 34.32
deduction
W1 -4 0.60 1.55 -3.72
10
ITEM
Description No. L B H/D Quantity Total Unit
NO.
D1 -1 1.05 2.10 -2.21
collapsible door -0.5 1.44 2.75 -1.98
passage window 1 -0.5 4.47 1.12 -2.50
passage window 2 -0.5 3.22 1.12 -1.80
First Floor
ht. = 2.74 + 0.15 = 2.89
front side 1 12.29 2.89 35.52
left side 1 13.39 2.89 38.70
right side 1 13.32 2.89 38.49
back side 1 10.56 2.89 30.52
deduction
W1 -4 0.60 1.55 -3.72
D1 -1 1.05 2.10 -2.21
passage window 1 -0.5 4.47 1.12 -2.50
passage window 2 -0.5 3.22 1.12 -1.80
Terrace Floor
parapet sides 2 49.56 0.90 89.21
parapet sides 1 49.56 0.23 11.40
Staircase Cabin 1 17.82 2.80 49.90
deduction
D1 -0.5 1.00 2.10 -1.05
chajja
Ground Floor
Window top and bottom 20 0.80 0.50 0.10 0.80
Window sides 20 1.55 0.50 0.10 1.55
First floor
Window top and bottom 20 0.80 0.50 0.10 0.80
Window sides 20 1.55 0.50 0.10 1.55
436.01 436.01 SM
11
ITEM
Description No. L B H/D Quantity Total Unit
NO.
(B) Providing and laying integral cement based water
proofing treatment including preparation of surface
as required for treatment of roofs, balconies, terraces
etc. consisting of following operations.
(a) Applying and grouting a slurry coat of neat
cement using 2.75 kg/sqm of cement admixed with
proprietary water proofing compound comforming to
IS:2645 over the R.C.C. slab including cleaning the
surface before tratment.
(b) Laying cement concrete using broken bricks/brick
bats 25 mm to 100 mm size with 50% of cement
mortar 1:5 (1 Cement : 5 Coarse sand) admixed with
proprietary water proofing compound conforming to
IS:2645 ,brick bats is finally covered by jointless
cement plaster 20mm th. in C.M. 1:4 added with
special water proofing compound confirming to
IS:2645 & top smooth finished with trowel with false
chequered marking of 300 mm.size.The treatment is
carried along the vertical surface of the parapet &
other adjoining wall up to height of about 300 mm in
a shape of quarter round vata Incl. curing etc. Comp.
With average thickness of 120 mm and minimum
thickness at khurra as 65 mm.
Terrace Floor
1 91.95 91.95
above staircase cabin 1 18.76 18.76
110.71
say 111.00 SM
(c) The whole terrace so finished shall be flooded
with water for a minimum period of two weeks for
curing and for final test. All above operations to be
down in order and as directed and specified by the
engineer-in-charge. With average thickness of 120 0.00 0.00 SM
mm and minimum thickness at khurra as 65 mm.
(Cement consumption 0.511 Bags / S.M.)
12
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Providing and fixing window having extruded
aluminium Powder Coated section frame main outer
size 63.50 x 38.10 x 1.95 mm (of Jindal section
no.4605, @ Wt. 1.094Kg/mt) horizontal Two track
member size 61.85 mm x 31.75 mm x 1.20 mm (of
jindal section no:8687, @ Wt. 0.695 Kg/mt.) vertical
member of size 61.85 mm x 31.75 mm x 130 mm (of
jindal section no:8758 @ wt. of 0.659 kg/mt) with
sliding shutters of horizontal member size 40 mm x18
mm x 1.29 mm (of jindal section no : 8949, @ Wt.
of .456 Kg/mt) vertical member of size 40 mm x 18
11 mm x 1.29 mm (of jindal section no:8947, @ Wt. of
0.456 Kg/mt/section 8948, @ Wt. of 0.457 Kg/mt)
with 5 mm thick tranparent bronze colour tineted float
glass with powder coated aluminium fittings and
fixtures and transparent silicon sealant glass fixing to
frame as per details etc. complete for window. for all
floor
Ground Floor
windows 10 0.6 1.55 9.30
First Floor
windows 10 0.6 1.55 9.30
18.60 19.00 S.M.
(A) For wall and similar surfaces Quantity same as Item No. 7 439.81 SM
say 440.00 SM
(B) For ceilings & soffits of stairs Quantity same as Item No.6 227.20 SM
TOTAL QUANTITY 667.20 SM
13
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Painting two coats of enamel paint over priming
coat after removing entire whitewash/colourwash
surface dirt, dust foreign matter & also incl. preparing
14
the surface even & sand papered smooth etc. comp.
(A) For wall and similar surfaces Quantity Same as Item No.12 440.00
A 440.00 SM
deduction
Enamel paint Quantity Same as Item No.13 175.00
B 175.00 SM
NET QUANTITY (A-B) 265.00 SM
(B) For ceilings & soffits of stairs Quantity Same as Item No.12 227.20 SM
TOTAL QUANTITY 492.20 SM
---do---- Extra Subsequant coat over above Item
Ground Floor
W1 20 0.60 0.28 3.36
20 0.28 1.55 8.68
passage window 1 2 3.22 0.28 1.80
2 0.28 1.12 0.63
passage window 2 2 4.47 0.28 2.50
2 0.28 1.12 0.63
17.60
say 18.00 SM
First Floor
W1 20 0.60 0.28 3.36
20 0.28 1.55 8.68
passage window 1 2 3.22 0.28 1.80
2 0.28 1.12 0.63
14
ITEM
Description No. L B H/D Quantity Total Unit
NO.
passage window 2 2 4.47 0.28 2.50
2 0.28 1.12 0.63
17.60
say 18.00 SM
Terrace Floor
0.00 0.00 SM
Total Quantity 36.00 SM
15
ITEM
Description No. L B H/D Quantity Total Unit
NO.
chemical use BASF, Sunanda, Fosroc, Pidilite etc as
per Approved by engineer incharge
Column
C1,C4,C7,C8,C9,C13,C16,C19 16 0.30 7.04 33.79
16 0.45 7.04 50.69
C2,C3,C5,C6,C10,C11,C12,C14,C15,C17,C18,C20,C 26 0.23 7.04 42.10
21
26 0.30 7.04 54.91
181.49
say 182.00 SM
Beam
B1,B2,B3,B4,B5,B6,B7 14 4.99 0.23 16.07
14 4.99 0.45 31.44
B8,B9 4 1.60 0.23 1.47
4 1.60 0.45 2.88
B10,B11 4 1.70 0.23 1.56
4 1.70 0.45 3.06
B12,B13,B14,B15 8 1.44 0.23 2.65
8 1.44 0.45 5.18
B16,B17 4 1.70 0.23 1.56
4 1.70 0.45 3.06
B18,B19 4 1.53 0.23 1.41
4 1.53 0.45 2.75
B20,B21,B22,B23,B24,B25 6 3.38 0.23 4.66
6 3.38 0.45 9.13
B26,B27 4 1.50 0.23 1.38
4 1.50 0.45 2.70
B28 2 3.53 0.23 1.62
2 3.53 0.45 3.18
B29 2 3.41 0.23 1.57
2 3.41 0.45 3.07
B30 2 1.70 0.23 0.78
2 1.70 0.45 1.53
B31 2 1.53 0.23 0.70
2 1.53 0.45 1.38
104.80
say 105.00 SM
TOTAL QUANTITY 287.00 SM
16
ITEM
Description No. L B H/D Quantity Total Unit
NO.
17
SURAT MUNICIPAL CORPORATION
CENTRAL ZONE
NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN, SOUTH ZONE,
SURAT MUNICIPAL CORPORATION, SURAT.
CEMENT CONSUMPTION
Consp. Bags
Item No. Description Qty. Unit Total Bags
Unit
WORK UP TO PLINTH
Providing & laying C.C 1:3:6 (1cement :3 coarse sand :6 Crushed stone agg
3 20m.m Nominal size)&curing comp. incl. cost of form work in :(a) #NAME? 4.56 C.M. #NAME?
foundation & Plinth
Providing & laying ordinary cement con. 1:1.5:3 (1 cement : 1.5 sand : 3
graded stone agg. 20 mm nominal size) finishing smooth curing etc. comp.
5 Incld. Cost of form work but excl. Cost of reinforcement for R.C.C. Work
in:Up to G.L./P.L.
(A) COLUMNS:
(1) Having c/s area up to 0.08 s.mt #NAME? 8.00 C.M. #NAME?
(2) Having c/s area more than 0.08 sq. mt. & upto 0.12 sq.mt 0.00 8.00 C.M. 0.00
(3) Having cross sectional area more than 0.12 sq. mt. 0.00 8.00 C.M. 0.00
(B) BEAMS :
(1)Having c/s area up to 0.08s.mt 0.00 8.00 C.M. 0.00
(2) Having c/s area more than 0.08 sq. mt. & upto 0.12 sq.mt 1.50 8.00 C.M. 12.00
(3) Having cross sectional area more than 0.12 sq. mt. 0.00 8.00 C.M. 0.00
Providing & construction brick work using Fly Ash bricks having
crushing strength not less than 35 Kg./sq.cm. in foundation & plinth in C.M.
8 1:6 (1 cement:6 sand ) etc. comp. Up to G.L./P.L. #NAME? 1.20 C.M. #NAME?
Providing and applying 20mm. thick sand faced cement plaster on walls
or similar surfaces consisting of 12mm. thick backing coat of c.m. 1:3 ( 1
cement : 3 sand ) and 8mm. thick finishing coat of c.m. 1:1 ( 1cement : 1
9
sand ) etc. comp..
(A) COLUMNS
(1) Having c/s area up to 0.085 s.mt
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(2) c/s area more than 0.085 sq. mt. & upto 0.12 sq.mt
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(3) Having cross sectional area more than 0.12 sq. mt.
19
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(B) BEAMS
(1) Having c/s area up to 0.08s.mt
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(2) Having c/s area more than 0.08 s.m. & upto 0.12 s.m
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(3) Having cross sectional area more than 0.12 sq. mt.
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(C) SLABS
(2) Slabs having more than 8cm. and upto 10 cm. Th.
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(3) Slabs having more than 10 cm. & upto 13 cm. Th.
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(4) Slabs having more than 13 cm. Thickness
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(D) LINTELS
Ground floor #NAME? 8.00 C.M. #NAME?
First floor #NAME? 8.00 C.M. #NAME?
Second floor #NAME? 8.00 C.M. #NAME?
Third floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(E) CHAJJAS
Ground floor #NAME? 8.00 C.M. #NAME?
First floor #NAME? 8.00 C.M. #NAME?
Second floor #NAME? 8.00 C.M. #NAME?
Third floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(F) COPING
Ground floor #NAME? 8.00 C.M. #NAME?
First floor #NAME? 8.00 C.M. #NAME?
Second floor #NAME? 8.00 C.M. #NAME?
Third floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
20
Providing & laying ordinary cement con. 1:1.5:3 (1 cement : 1.5 sand : 3
graded graded stone agg. 20 mm nominal size) finishing smooth curing etc.
12 comp. Incl. Cost of form work but excl. Cost of reinforcement for R.C.C.
Work in
The rates shall include the cost of providing, erecting and maintaining
leakproof shuttering /formwork /scaffolding, etc. to be used for concreting,
providing and erecting props, temporary frame work and maintain them in
position for required time, to existing load bearing elemnts for reliving loads
coming on to structural members being repaired/strengthened but excludes
the cost of reinforcement, Shear connector and plaster . The rate shall also
include required breaking of adjoining RCC structural elements like slab,
beam, etc. and reinstating the same in original shape and size by using above
mentioned procedure and material, as directed by the Engineer-in-charge,
etc. complete.
21
If required all loose cover concrete shall be removed as directed by the
engineer-in-charge.
Any other work which may get disturbed due to above mentioned procedure
shall be repaired and reinstated to original condition to the complete
satisfaction of the Engineer-in-charge and no claim for extra payment for the
same shall be entertained.
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per Approved by
engineer incharge #NAME? 4.73 C.M. #NAME?
Providing and applying cement mortar (1:3) modified by using polymer and
expanding grout additives at various thickness for repair/strengthening of
various RCC elements at all Floor levels, lead, lift, including breaking,
chipping, dismentling existing cover concrete and exposing existing
reinforcement, applying wirebrush for making surfaces of steel and concrete
24
free from rust and other loose materials, applying rust removing chemical on
existing reinforcement, applying anti-corrosive coating on existing
reinforcement, applying polymer bonding agent on existing concrete
surfaces before applying polymer modified mortar in specified thickness as
directed by the Engineer-in-charge.
The rates shall include providing and applying 12 mm thick cement mortar
(1:4) modified with plasticizer for finishing smooth the repaired surfaces,
providing and applying curing agent on the repaired surfaces, etc. complete
as directed by the Engineer-in-charge. The make and quality of rust
removing chemical, anti-corrossive coating, polymer bonding agent,
polymer and expanding grout additives, plasticizer, curing agent, etc. shall
be approved by engineer-in-charge. The procedure for application shall be
strictly in accordance with manufacturer's detail specification, which shall
be submitted before start of work and shall be approved by the Engineer-in-
charge.
The rates shall include the cost of providing, erecting and maintaining
leakproof shuttering /formwork /scaffolding, etc. to be used for the purpose,
providing and erecting props, temporary frame work and maintain them in
position for required time, to existing load bearing elemnts for reliving loads
coming on to structural members being repaired/strengthened but excludes
the cost of reinforcement.
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per Approved by
engineer incharge
Beam / Columns #NAME? 0.40 S.M. #NAME?
Ceiling #NAME? 0.40 S.M. #NAME?
The rate shall include the cost of providing and supplying all tools,
materials, labour, scaffolding, props, formwork, etc. complete. The make
and quality of epoxy grout, epoxy putty, etc. shall be approved by the
Engineer-in-charge. The procedure for application shall be strictly in
accordance with manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by the Engineer-in- #NAME? 0.10 Nos. #NAME?
charge. (Actual no. of holes and their locations shall be as decided by the
Engineer-in-charge)
22
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per Approved by
engineer incharge
Providing & construction brick work using Fly Ash bricks having
crushing strength not less than 35 Kg./sq.cm. in foundation & plinth in C.M.
30 1:6 (1 cement : 6 sand ) etc. comp.
Providing & constructing Half brick masonary in Fly Ash bricks having
31 crushing strength not less than 70 kg/sq.cm in c.m 1:4 (1 cement: 4 sand)
curing etc complete.
Providing & Applying 10mm. th. cement plaster in single coat on brick/
concrete walls similar surfaces for plastering & finished even & smooth
with a floating coat of cement slurry mixed with admixture of lime or neeru
32 in required proportion etc. comp. in C.M 1:3 (1 cement : 3 sand)
Providing and applying 20mm. thick sand faced cement plaster on walls
or similar surfaces at all floor levels consisting of 12mm. thick backing coat
of c.m. 1:3 (1 cement : 3 sand) and 8mm. thick finishing coat of c.m. 1:1
33
(1cement : 1 sand) etc. comp.
Providing & Laying green polished kota stone slab flooring at all floor
levels,over 20 mm av.th.base of C.M. 1:6(1cement: 6 sand) laid
over&joined with grey cement slurry incl. Rubbing & polishing etc. comp.
41 (A) 22 mm. (Tolerance +/- 2mm) #NAME? 0.13 S.M. #NAME?
Providing & Laying polished kota stone of machine cut edge slab 22 mm.
th. in riser of steps, tread, dedo & pillars center piece not less than 1.2
42 mt.in width &side pieces of equal size as per design, laid on 10 mm. th. #NAME? 0.20 S.M. #NAME?
C.M.1:3(1 cement : 3 sand) joined & polishing etc
Providing & Laying white glazed tiles 6mm. th. of Orient, Kajaria,
Jhonson,Nitco,Somani ,Bell make at all floor levels, in flooring, treads of
steps & landings laid on a bed of 20 mm. Av. Th. C.M.1:3 (1 cement : 3
43 sand) finished with flush pointing in white cement etc. com. For all floor #NAME? 0.13 S.M. #NAME?
(Basic Rate:- Rs.285.0/S.M.)
Providing & Laying white glazed tiles 6mm. th. of Orient, Kajaria,
Jhonson,Nitco,Somani,Bell make at all floor levels in skirting risers of
steps & dado on 10 mm. th. C.M.1:3 (1cement : 3 sand) including
44 necessary cement paste for fixing and joined with white cement slurry etc. #NAME? 0.20 S.M. #NAME?
complete. For all floors (Basic Rate:- Rs.285.0/S.M.)
Providing & laying granite slab 18mm thick in skirting, risers of steps,
dedo and pillars laid on 10mm thick cement mortar 1:4 (1 Cement : 4
Coarse sand) and finished with flush pointing in white or colour cement
47 including rubbing & polishing comp. For all floor (Basic Rate:- #NAME? 0.20 S.M. #NAME?
Rs.1614.0/S.M.)
Providing & laying granite slab 18mm thick in Window-Door seal Frame
Etc laid on 10mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand) with
nessary adhesive material and finished with flush pointing in white or colour
48 cement, including rubbing & polishing comp. (Basic Rate:- Rs.1200.0/S.M.) #NAME? 0.20 S.M. #NAME?
24
NOTE :- (1) The whole work is to be executed through specialized agency
with a guarantee of 10 (Ten) years given on a prescribed proforma duly
50 stamped (2) The rate shall include for work at all floors & conducting water
proof test as directed.
(B) Providing and laying integral cement based water proofing treatment
including preparation of surface as required for treatment of roofs,
balconies, terraces etc. consisting of following operations.
(a) Applying and grouting a slurry coat of neat cement using 2.75 kg/sqm of
cement admixed with proprietary water proofing compound comforming to
IS:2645 over the R.C.C. slab including cleaning the surface before tratment.
(b) Laying cement concrete using broken bricks/brick bats 25 mm to 100
mm size with 50% of cement mortar 1:5 (1 Cement : 5 Coarse sand)
admixed with proprietary water proofing compound conforming to
IS:2645 ,brick bats is finally covered by jointless cement plaster 20mm th.
in C.M. 1:4 added with special water proofing compound confirming to
IS:2645 & top smooth finished with trowel with false chequered marking of
300 mm.size.The treatment is carried along the vertical surface of the
parapet & other adjoining wall up to height of about 300 mm in a shape of
quarter round vata Incl. curing etc. Comp. With average thickness of 120
mm and minimum thickness at khurra as 65 mm. 0.00 0.30 S.M. 0.00
(c) The whole terrace so finished shall be flooded with water for a
minimum period of two weeks for curing and for final test. All above
operations to be down in order and as directed and specified by the engineer-
in-charge. With average thickness of 120 mm and minimum thickness at
khurra as 65 mm. (Cement consumption 0.511 Bags / S.M.)
Providing and laying broken china mosaic flooring for terrace using 12 mm
to 20 mm broken pieces of glazed tiles to be laid over cement mortar 1:3 to
plain or slope and to be tempered to bring mortar crème out upto surface
using white cement including rounding off junctions and extending them
52 upto 15 cm along the wall, clearing with water and oxalic acid etc. as 111.00 0.13 S.M. 14.43
directed.
Providing & Fixing PVC Nanhi trap 31/2" ht.of Prince/ Supreme/ Jain/
Astral/ Tulsi/Finolex make at all floor levels of self cleaning design with
53 screwed down or hinged grating incl. cost of cutting making good the walls
& floors etc. For all Floor
Providing, Lowering & laying joining R.C.C. NP2 CLASS Pipe In C.M.
56 1:1 of following nominal internal diameters incl. Testing of pipes and
joints etc. Comp
25
(B) 150 mm dia. #NAME? 0.024 R.M. #NAME?
(A) Same as above but Precast RCC heavy duty Cover instead of C.I. Cover #NAME? 3.00 Nos. #NAME?
59 Extra for every additional depth of 0.1 mt beyoung 0.45 mt #NAME? 0.67 Nos. #NAME?
Providing and fixing Wash Down Water closet European type W.C. pan
with integral P or S trap with normal closing seat cover L bend ncluding
jointing the trap with soil pipe in cement mortar 1:1 (1 cement : 1 find sand)
60 (A) Viterous china pattern - I
Make- Cera, Parry ware, HindWare- 350 x 500 x 390 mm #NAME? 0.50 Nos. #NAME?
Prov.& Fixing water closet squatting pan (Orissa type W.C.pan) at all floor
levels, size 500mm x 400 mm incl. 100 mm size "P'or "S" trap for water
closet squatting pan joining the trap with the pan & soil pipe in C.M. 1:1
61 (1cement :1 fine sand) etc. Comp.(A) Vitreous china long pattern
Make- Cera, Parry ware, Jaquar ,HindWare #NAME? 0.50 Nos. #NAME?
Providing & laying cement concrete 1:2:4 (1 cement:2 sand:4 graded stone
agg. 20 mm nominal size)& curing comp. Includ.cost of form work but
exclu. Cost of reinforcement for reinforced concrete work in : (A)
88 #NAME? 6.25 C.M. #NAME?
Foundation, footing, Base of columns and Mass concrete.
(B) BEAMS :
(1)Having c/s area up to 0.08s.mt #NAME? 6.25 C.M. #NAME?
(2) Having c/s area more than 0.08 sq. mt. & upto 0.12 sq.mt #NAME? 6.25 C.M. #NAME?
(3) Having cross sectional area more than 0.12 sq. mt. #NAME? 6.25 C.M. #NAME?
26
NET TOTAL THEORETICAL CONSUMPTION OF BAGS #NAME?
27
SURAT MUNICIPAL CORPORATION
CENTRAL ZONE
NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN, SOUTH ZONE, SUR
MUNICIPAL CORPORATION, SURAT.
STEEL CONSUMPTION
ITEM NO
SR. QTY IN MULTIPLYING STEEL IN
AS PER ITEM RATE/KG
NO CMT FACTOR KG
SCH-B
FIRST FLOOR
1 13 #NAME? #NAME? #NAME? #NAME? 45.45
2 13 #NAME? #NAME? #NAME? #NAME? 45.45
3 13 #NAME? #NAME? #NAME? #NAME? 45.45
4 13 #NAME? #NAME? #NAME? #NAME? 45.45
5 13 #NAME? #NAME? #NAME? #NAME? 45.45
6 13 #NAME? #NAME? #NAME? #NAME? 45.45
7 13 #NAME? #NAME? #NAME? #NAME? 45.45
8 13 #NAME? #NAME? #NAME? #NAME? 45.45
9 13 #NAME? #NAME? #NAME? #NAME? 45.45
SECOND FLOOR
1 13 #NAME? #NAME? #NAME? #NAME? 46.06
2 13 #NAME? #NAME? #NAME? #NAME? 46.06
3 13 #NAME? #NAME? #NAME? #NAME? 46.06
4 13 #NAME? #NAME? #NAME? #NAME? 46.06
5 13 #NAME? #NAME? #NAME? #NAME? 46.06
6 13 #NAME? #NAME? #NAME? #NAME? 46.06
7 13 #NAME? #NAME? #NAME? #NAME? 46.06
8 13 #NAME? #NAME? #NAME? #NAME? 46.06
9 13 #NAME? #NAME? #NAME? #NAME? 46.06
THIRD FLOOR
1 13 #NAME? #NAME? #NAME? #NAME? 46.66
2 13 #NAME? #NAME? #NAME? #NAME? 46.66
3 13 #NAME? #NAME? #NAME? #NAME? 46.66
4 13 #NAME? #NAME? #NAME? #NAME? 46.66
5 13 #NAME? #NAME? #NAME? #NAME? 46.66
6 13 #NAME? #NAME? #NAME? #NAME? 46.66
7 13 #NAME? #NAME? #NAME? #NAME? 46.66
8 13 #NAME? #NAME? #NAME? #NAME? 46.66
9 13 #NAME? #NAME? #NAME? #NAME? 46.66
TOTAL
TOTAL AMOUNT FOR
EACH FLOOR
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
AREA STATEMENT
1863649
Name of work :- Structural Rehabilitation Works of Various Schools at in South East
Zone (Limbayat), SMC, Surat.
ABSTRACT SHEET
SR.
DESCRIPTION NOS RATE PER
NO.
ITEM NO.2
2 To fill up the hole by appropriate non - shrink grout material 500.00+ Service tax
from where the cross are extracted. @ prevailling Rate
__ do __ One hole
ITEM NO.3
3 To carry out the rebound hammer test at various floors for 500.00+ Service tax
structural members of Annexed Building. __ do __ @ prevailling Rate Per Point
ITEM NO.4
4 To carry out the Ultra sonic test at various floors for structural 500.00+ Service tax
members of Annexed Building. __ do __ @ prevailling Rate Per Point
ITEM NO.5
5 To prepare photographic documentation of existing condition 50000.00+ Service
of the structure, provide general observations about structural tax @ prevailling
condition of the Annexed Building Based on visual Rate
01 Report Per Building
inspection and testing.
ITEM
NO AS MULTIPLYI
SR. NO ITEM QTY IN CMT STEEL IN KG RATE/KG TOTAL
PER NG FACTOR
SCH-B
UP TO PLINTH
1 5 Footing #NAME? #NAME? #NAME? 44.84 #NAME?
2 Columns #NAME? #NAME? #NAME? 44.84 #NAME?
3 beams #NAME? #NAME? #NAME? 44.84 #NAME?
4 JAKETING #NAME? 44.84 #NAME?
ABOVE PLINTH
GROUND FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 44.84 #NAME?
2 12-B beams #NAME? #NAME? #NAME? 44.84 #NAME?
3 12-D lintel #NAME? #NAME? #NAME? 44.84 #NAME?
4 12-E chajja #NAME? #NAME? #NAME? 44.84 #NAME?
5 12-C slab #NAME? #NAME? #NAME? 44.84 #NAME?
6 14-A stair #NAME? #NAME? #NAME? 44.84 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 44.84 #NAME?
8 14-B Vertical fins #NAME? #NAME? #NAME? 44.84 #NAME?
FIRST FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 45.45 #NAME?
2 12-B beams #NAME? #NAME? #NAME? 45.45 #NAME?
3 12-D lintel #NAME? #NAME? #NAME? 45.45 #NAME?
4 12-E chajja #NAME? #NAME? #NAME? 45.45 #NAME?
5 12-C slab #NAME? #NAME? #NAME? 45.45 #NAME?
6 14-A stair #NAME? #NAME? #NAME? 45.45 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 45.45 #NAME?
8 14-B Vertical fins #NAME? #NAME? #NAME? 45.45 #NAME?
SECOND FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 46.06 #NAME?
2 12-B beams #NAME? #NAME? #NAME? 46.06 #NAME?
3 12-D lintel #NAME? #NAME? #NAME? 46.06 #NAME?
4 12-E chajja #NAME? #NAME? #NAME? 46.06 #NAME?
5 12-C slab #NAME? #NAME? #NAME? 46.06 #NAME?
6 14-A stair #NAME? #NAME? #NAME? 46.06 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 46.06 #NAME?
8 14-B Vertical fins #NAME? #NAME? #NAME? 46.06 #NAME?
THIRD FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 46.66 #NAME?
3 12-B beams #NAME? #NAME? #NAME? 46.66 #NAME?
4 12-D lintel #NAME? #NAME? #NAME? 46.66 #NAME?
5 12-E chajja #NAME? #NAME? #NAME? 46.66 #NAME?
6 12-C slab #NAME? #NAME? #NAME? 46.66 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 46.66 #NAME?
8 vartical fins #NAME? #NAME? #NAME? 47.66 #NAME?
THIRD FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 47.27 #NAME?
3 12-B beams #NAME? #NAME? #NAME? 47.27 #NAME?
4 12-D lintel #NAME? #NAME? #NAME? 47.27 #NAME?
5 12-E chajja #NAME? #NAME? #NAME? 47.27 #NAME?
6 12-C slab #NAME? #NAME? #NAME? 47.27 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 47.27 #NAME?
8 vartical fins #NAME? #NAME? #NAME? 47.27 #NAME?