Surat Municipal Corporation: South Zone

This document provides a summary sheet and abstract sheet for structural rehabilitation works of a building in Surat, India. It includes costs for various construction works like dismantling, masonry, plastering, waterproofing, steel works, flooring and repairs totaling over 1.3 million. The largest expenses are for repair and rehabilitation works at 595,000 and color works at 159,000. Waterproofing works will cost 103,000 and involve providing waterproofing treatment to walls and roofs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views39 pages

Surat Municipal Corporation: South Zone

This document provides a summary sheet and abstract sheet for structural rehabilitation works of a building in Surat, India. It includes costs for various construction works like dismantling, masonry, plastering, waterproofing, steel works, flooring and repairs totaling over 1.3 million. The largest expenses are for repair and rehabilitation works at 595,000 and color works at 159,000. Waterproofing works will cost 103,000 and involve providing waterproofing treatment to walls and roofs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 39

SURAT MUNICIPAL CORPORATION

SOUTH ZONE

NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA


ABHIYAN, SOUTH ZONE, SURAT MUNICIPAL CORPORATION, SURAT.

SUMMARY SHEET

Sr No. Description Amount

A DISMANTLING WORKS 22,514.50


B MASONARY & PLASTER WORKS 195,547.39
C WATERPROOFING WORKS 102,762.69
D STEEL ALUMINIUM WORK 38,802.18
E COLOUR WORK 158,807.80
F FLOORING WORK 107,748.00
G REPAIR & REHABILITATION WORKS 594,950.00

TOTAL 1,221,132.56
NET AMOUNT 1,221,200.00
CONTINGENCIES @ 5% 61,060.00
TOTAL 1,282,260.00
WORK CHARGE @ 2% 25,645.20
TOTAL 1,307,905.20

GROSS TOTAL AMOUNT 1,308,000.00


SURAT MUNICIPAL CORPORATION
SOUTH ZONE

NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN, SOUTH ZONE,
SURAT MUNICIPAL CORPORATION, SURAT.

ABSTRACT SHEET

SOR 2015-16 & MR


Item
SOR Description Qty. Rate Unit Amount
No.

PART A:- DISMANTLING WORKS

Removing the scraping of old deteriosted plaster of any


thickness from wall/R.C.C. member including strcking of
1 SMC (76) serviceable material and disposal of unserviceable from site 866.00 12.42 S.M. 10755.72
of work with all lead and lift.

R&B Demolition of terrace including stacking of serviceable


Page materials and disposal of unserviceable materials with all
2 111.00 40.40 S.M. 4484.40
No.169 lead and lift.'
(20004) 1.) Brick tile covering

Dismantling tiled or stonefloors laid in mortar includind


3 SMC (75) stacking of serviceable material and disposal of 111.00 30.30 S.M. 3363.30
unserviceable material with all lead and lift

Dismantling doors, windows, ventilators etc. (wood or


R&B steel) shutters including chowkhats architraves, hold fasts
Page and other attachment etc. complete and stacking them within
4 20.00 119.18 EACH 2383.60
No.170 all lead and lift (ii) Not exceeding 3 Sq.M in area
(20013A)

R&B Disposal of Building Rubbish


Page 1. 1.00 to 1.50 km 7.36 100.76 C.M. 741.69
5 No.302 Sr
No.
2. 1.50 to 2.00 km 7.36 106.75 C.M. 785.79
3.2.1.A

TOTAL AMOUNT FOR PART - A DISMANTLING WORKS 22514.50

PART B:- MASONARY & PLASTER WORKS

Providing & Applying 10mm. th. cement plaster in single


coat on brick/ concrete walls similar surfaces for plastering &
finished even & smooth with a floating coat of cement slurry
6 SMC (24) mixed with admixture of lime or neeru in required
proportion etc. comp. in C.M 1:3 (1 cement : 3 sand)

(B) for ceilings and soffits of stairs


Ground floor 105.46 129.89 S.M. 13698.43
First floor 102.98 146.45 S.M. 15081.60
Terrace (Second) Floor 18.76 163.01 S.M. 3058.07

Providing & Applying 15mm. th. cement plaster in single


coat on brick/ concrete walls similar surfaces for plastering &
finished even & smooth with a floating coat of cement slurry
7 SMC (25) mixed with admixture of lime or neeru in required proportion
etc. comp. in C.M 1:3 (1 cement : 3 sand) (A) For wall and
similar surfaces

Ground floor 116.00 144.43 S.M. 16753.88


First floor 104.00 162.31 S.M. 16880.24
Terrace (Second) Floor 25.00 180.19 S.M. 4504.75

2
Item
SOR Description Qty. Rate Unit Amount
No.
Providing & Applying 20 mm. Th. Roller plaster on walls
or similar surfaces at all floor levels consisting of 12 mm av.
AS PER Th. Backing coat of C.M. 1:3 (1 cement : 3 sand) & 8 mm.
8
RA th. Finishing coat of C.M. 1:1 (1 cement : 1 sand)

All Floors 436.01 288.00 S.M. 125570.42

TOTAL AMOUNT FOR PART - B MASONARY & PLASTER WORKS 195547.39

PART C:- WATERPROOFING WORKS

NOTE :- (1) The whole work is to be executed through


specialized agency with a guarantee of 10 (Ten) years given
SMC (67) on a prescribed proforma duly stamped (2) The rate shall
9
(MR) include for work at all floors & conducting water proof test
as directed.

(A) Providing and laying water proofing treatment to


vertical and horizontal surfaces of depressed portions of
W.C.,kitchen and the like consisting of :
(a) I course of applying cement slurry @ 4.4 kg/sqm mixed
with water proofing compound conforming to IS : 2645 in
recommended proportions.
(b) II course of a layer of plaster in C.M. 1:3 with water
proofing compound confirming to IS:2645 about 25 mm. th'
in the floor of the depression & about 18mm th' On the side
walls of the depression up to the floor level, water proofing
plaster about 18 mm. th' be continued on the walls above the 0.00 261.00 S.M. 0.00
floor level for a height of 600 mm. with surface suitable to
receive further treatment
(c) Finishing top with stone aggregate 10mm to 12mm
nominal size spreading @0.008 C.M./S.M., thoroughly
embedad in plaster layer.
as per specifications & instructions of Engineer in charge
(Cement consumption 0.316 Bags / S.M.)

(B) Providing and laying integral cement based water


proofing treatment including preparation of surface as
required for treatment of roofs, balconies, terraces etc.
consisting of following operations.
(a) Applying and grouting a slurry coat of neat cement using
2.75 kg/sqm of cement admixed with proprietary water
proofing compound comforming to IS:2645 over the R.C.C.
slab including cleaning the surface before tratment.
(b) Laying cement concrete using broken bricks/brick bats 25
mm to 100 mm size with 50% of cement mortar 1:5 (1
Cement : 5 Coarse sand) admixed with proprietary water
proofing compound conforming to IS:2645 ,brick bats is
finally covered by jointless cement plaster 20mm th. in C.M.
1:4 added with special water proofing compound confirming
to IS:2645 & top smooth finished with trowel with false
chequered marking of 300 mm.size.The treatment is carried
along the vertical surface of the parapet & other adjoining 111.00 442.00 S.M. 49062.00
wall up to height of about 300 mm in a shape of quarter
round vata Incl. curing etc. Comp. With average thickness of
120 mm and minimum thickness at khurra as 65 mm.

(c) The whole terrace so finished shall be flooded with water


for a minimum period of two weeks for curing and for final
test. All above operations to be down in order and as directed
and specified by the engineer-in-charge. With average
thickness of 120 mm and minimum thickness at khurra as 65
mm. (Cement consumption 0.511 Bags / S.M.)

3
Item
SOR Description Qty. Rate Unit Amount
No.
Providing and laying broken china mosaic flooring for
terrace using 12 mm to 20 mm broken pieces of glazed tiles
R&B to be laid over cement mortar 1:3 to plain or slope and to be
Page tempered to bring mortar crème out upto surface using white
10 111.00 483.79 S.M. 53700.69
No.149 cement including rounding off junctions and extending them
(14035) upto 15 cm along the wall, clearing with water and oxalic
acid etc. as directed.

TOTAL AMOUNT FOR PART - C WATERPROOFING WORKS 102762.69

PART D :- STEEL ALUMINIUM WORK

Providing and fixing window having extruded aluminium


Powder Coated section frame main outer size 63.50 x 38.10
x 1.95 mm (of Jindal section no.4605, @ Wt. 1.094Kg/mt)
horizontal Two track member size 61.85 mm x 31.75 mm x
1.20 mm (of jindal section no:8687, @ Wt. 0.695 Kg/mt.)
vertical member of size 61.85 mm x 31.75 mm x 130 mm (of
jindal section no:8758 @ wt. of 0.659 kg/mt) with sliding
shutters of horizontal member size 40 mm x18 mm x 1.29
SMC mm (of jindal section no : 8949, @ Wt. of .456 Kg/mt)
Aluminiu- vertical member of size 40 mm x 18 mm x 1.29 mm (of
11
m Work jindal section no:8947, @ Wt. of 0.456 Kg/mt/section 8948,
(3) @ Wt. of 0.457 Kg/mt) with 5 mm thick tranparent bronze
colour tineted float glass with powder coated aluminium
fittings and fixtures and transparent silicon sealant glass
fixing to frame as per details etc. complete for window. for
all floor

(A) Same as above but Colour anodized 19.00 2042.22 S.M. 38802.18

TOTAL AMOUNT FOR PART D - STEEL ALUMINIUM WORK 38802.18

PART E :- COLOUR WORK

Providing and applying coats for superstructure 100%


Acrylic breathable, Anti-carbonation, Waterproof, Heat
insulating, decorative external coating of approved shade
after appling prime coat of samematerial. Mix 1Lit Acrylic
paint and applying it as a primer and allow it to dry for 4-
6hours. Mix 1lit of anticarbonation paint with 400-600 mL of
water and apply two coats using brush/roller/spray at 24
hours of interval between each coat. Acrylic paint shall be
spary/brush/roller applied and shall have conform to the
following properties. Carbon dioxide diffusion equivalent air
layer thickness (DINEN1062-6)>100m; Carbon dioxide
diffusion resistance coefficient (DINEN1062-6) > 105m;
Elongation of cured film shall be as per ASTMD 2370 / 98 >
400% Chloridel on Diffusion (ASTMC1202) = Zero
SMC Penetratin ; Adhesion of concrete (ASTMD4541) > 2N/mm²;
Colour Solar Reflective Index (ASTME1980 -11, EN673:2011,
12
Works EN410:2011) >104. The inter coat gap to be 24hours. The
(18) (MR) rate shall include complete treatment mentioned above.
Acrylic, Anti-Carbonation Paint (ACP) of makes as per
tender and shade/colour as approved by Engineer-in-charge,
surface preparation, applying primer coat as per the make
slisted in thetender, including all type of scaffolding, safety
accessories, labour, all materials, lead,l ift, tools, plants,
taxes, testing etc to exe cute the work as directed,etc.
complete for superstructure components.

For All floor 436.01 210.00 S.M 91561.76

4
Item
SOR Description Qty. Rate Unit Amount
No.
Apply two coats of Birla or Asian acrylic lappy (putty)
and two coats of primer of approved brand and manufacture
SMC on new wall surface to give an even shade including
13 Colour thoroughly brushing thr surface free from mortar dropping
Works (5) and other matter and sand papered smooth. For All floor

667.20 47.87 S.M 31939.01

SMC Painting two coats of enamel paint over priming coat after
Colour removing entire whitewash/colourwash surface dirt, dust
14 foreign matter & also incl. preparing the surface even & sand
Works
(17) papered smooth etc. comp.

For All floor 175.00 60.00 S.M 10500.00

Wall painting with two coats of Acrylic emulsion plastic


paint of approved brand over existing surface to give an even
SMC
shade & surface free from mortar dropping & other foreign
15 Colour
matter & sand papered smooth etc. comp. For All floor
Works (8)

(A) For wall and similar surfaces 265.00 50.40 S.M 13356.00
(B) For ceilings & soffits of stairs 227.20 50.40 S.M 11451.03

---do---- Extra Subsequant coat over above Item


15A 492.20 S.M 0.00

TOTAL AMOUNT FOR PART E :- COLOUR WORK 158807.80

PART F :- FLOORING WORK

Providing & laying granite slab 18mm thick in Window-


Door seal Frame Etc laid on 10mm thick cement mortar 1:4
(1 Cement : 4 Coarse sand) with nessary adhesive material
SMC (39) and finished with flush pointing in white or colour cement,
16
(MR) including rubbing & polishing comp. (Basic Rate:-
Rs.1200.0/S.M.)

Ground Floor 18.00 1943.00 S.M. 34974.00


First Floor 18.00 1943.00 S.M. 34974.00
Terrace (Second) Floor 0.00 1943.00 S.M. 0.00

SMC (40) Labour Charges For Half Round Edge For Granite. For all
17 252.00 150.00 R.M. 37800.00
(MR) floor

TOTAL AMOUNT FOR PART - F FLOORING WORK 107748.00

PART G :- REPAIR & REHABILITATION WORKS

Providing and applying cement mortar (1:3) modified by


using polymer and expanding grout additives at various
thickness for repair/strengthening of various RCC elements
at all Floor levels, lead, lift, including breaking, chipping,
dismentling existing cover concrete and exposing existing
AS PER reinforcement, applying wirebrush for making surfaces of
APPROVE
steel and concrete free from rust and other loose materials,
D IN
18 ANNEXI applying rust removing chemical on existing reinforcement,
BUILDIN applying anti-corrosive coating on existing reinforcement,
G applying polymer bonding agent on existing concrete
TENDER surfaces before applying polymer modified mortar in
specified thickness as directed by the Engineer-in-charge.

5
Item
SOR Description Qty. Rate Unit Amount
No.
The rates shall include providing and applying 12 mm thick
cement mortar (1:4) modified with plasticizer for finishing
smooth the repaired surfaces, providing and applying curing
agent on the repaired surfaces, etc. complete as directed by
the Engineer-in-charge. The make and quality of rust
removing chemical, anti-corrossive coating, polymer bonding
agent, polymer and expanding grout additives, plasticizer,
curing agent, etc. shall be approved by engineer-in-charge.
The procedure for application shall be strictly in accordance
with manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by the
Engineer-in-charge.

The rates shall include the cost of providing, erecting and


maintaining leakproof shuttering /formwork /scaffolding, etc.
to be used for the purpose, providing and erecting props,
temporary frame work and maintain them in position for
required time, to existing load bearing elemnts for reliving
loads coming on to structural members being
repaired/strengthened but excludes the cost of reinforcement.

chemical use BASF, Sunanda, Fosroc, Pidilite etc as per


Approved by engineer incharge
Beam / Columns 287.00 1850.00 S.M. 530950.00

Carrying out Injection grouting for cracks in RCC structural


members by drilling holes of 15 mm diameter upto minimum depth
of 75 mm, fixing aluminium nozzle / rubber pipe using
cementitious compound, injecting polymer modified slurry (acrylic
non-SBR based polymer+cement+water) 1:1:1 material at
specified pressure with grouting pump till the material refuses to
impregnate inside the hole. If required or suggested by the
AS PER Engineer-in-charge, injection grouting shall be carried out more
APPROVE than once for a hole to assure proper spreading of grout material and
D IN filling of capillaries / voids within the element. After satisfactory
19 ANNEXI injection grouting, the nozzle/pipe shall be cut and sealed by non-
BUILDIN shrink epoxy putty. The surface shall be finished smooth with C:M
G (1:4) and reinstated to the original condition as directed by the
TENDER Engineer-in-charge.

The rate shall include the cost of providing and supplying all tools,
materials, labour, scaffolding, props, formwork, etc. complete. The
make and quality of epoxy grout, epoxy putty, etc. shall be
approved by the Engineer-in-charge. The procedure for application
shall be strictly in accordance with manufacturer's detail
specification, which shall be submitted before start of work and
shall be approved by the Engineer-in-charge. (Actual no. of holes
and their locations shall be as decided by the Engineer-in-charge)
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per Approved
by engineer incharge 100 250.00 Nos. 25000.00

Carrying out Injection grouting for cracks in RCC structural


members by drilling holes of 15 mm diameter upto minimum depth
of 75 mm, fixing aluminium nozzle / rubber pipe using non-shrink
epoxy putty, injecting epoxy grout material at specified pressure
with grouting pump till it the material refuses to impregnate inside
the hole. Epoxy grout material should have viscosity of 400-500
AS PER centipoise, Gel time 45-60 mins, bond strength 2500 Psi,
APPROVE compressive strength 10000 Psi, tensile strength 6000 Psi. If
D IN required or suggested by the Engineer-in-charge, injection grouting
20 ANNEXI shall be carried out more than once for a hole to assure proper
BUILDIN spreading of grout material and filling of capillaries / voids within
G the element. After satisfactory injection grouting, the nozzle/pipe
TENDER shall be cut and sealed by non-shrink epoxy putty. The surface shall
be finished smooth with C:M (1:4) and reinstated to the original
condition as directed by the Engineer-in-charge.

6
Item
SOR Description Qty. Rate Unit Amount
No.
The rate shall include the cost of providing and supplying all tools,
materials, labour, scaffolding, props, formwork, etc. complete. The
make and quality of epoxy grout, epoxy putty, etc. shall be
approved by the Engineer-in-charge. The procedure for application
shall be strictly in accordance with manufacturer's detail
specification, which shall be submitted before start of work and
shall be approved by the Engineer-in-charge. (Actual no. of holes
and their locations shall be as decided by the Engineer-in-charge)
20 450.00 Nos. 9000.00

Providing and applying cement mortar 1:4 enriched with expanding


grout additive in required proportion in cement for repair of cracks
in RCC and Non-RCC members after making 25mm x 25mm
AS PER groove, cleaning the surface and applying coat of bonding, finishing
APPROVE smooth the repaired surfaces, providing and applying curing agent
D IN on the repaired surfaces, etc. complete at all floor levels as directed
21 ANNEXI 250.00 120.00 R.M. 30000.00
BUILDIN by engineer-in-charge. The make and quality of expanding grout
G additives, bonding agent, curing agent, etc. shall be approved by the
TENDER engineer-in-charge. The procedure for application shall be strictly in
accordance with manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by the
Engineer-in-charge.

22 Pointing on brickwork with cement mortar 1:3 (1-cement : 3- 682.00 S.M. 0.00
coarsed sand) (a) Flush pointing

TOTAL AMOUNT FOR PART - G REPAIR & REHABILITATION WORK 594950.00

7
SURAT MUNICIPAL CORPORATION
SOUTH ZONE
NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN, SOUTH ZONE,
SURAT MUNICIPAL CORPORATION, SURAT.

MEASUREMENT SHEET
ITEM
Description No. L B H/D Quantity Total Unit
NO.

PART A :- DISMANTLING WORKS

Removing the scraping of old deteriosted plaster of


any thickness from wall/R.C.C. member including
strcking of serviceable material and disposal of
1
unserviceable from site of work with all lead and lift.

Outside plaster
Ground Floor
ht. = 3.10 + 0.15 = 3.25
front side 1 12.29 3.25 39.94
left side 1 13.39 3.25 43.52
right side 1 13.32 3.25 43.29
back side 1 10.56 3.25 34.32
deduction
W1 -4 0.60 1.55 -3.72
D1 -1 1.05 2.10 -2.21
collapsible door -0.5 1.44 2.75 -1.98
passage window 1 -0.5 4.47 1.12 -2.50
passage window 2 -0.5 3.22 1.12 -1.80
First Floor
ht. = 2.74 + 0.15 = 2.89
front side 1 12.29 2.89 35.52
left side 1 13.39 2.89 38.70
right side 1 13.32 2.89 38.49
back side 1 10.56 2.89 30.52
deduction
W1 -4 0.60 1.55 -3.72
D1 -1 1.05 2.10 -2.21
passage window 1 -0.5 4.47 1.12 -2.50
passage window 2 -0.5 3.22 1.12 -1.80
Terrace Floor
parapet sides 2 49.56 0.90 89.21
parapet top 1 49.56 0.23 11.40
Staircase Cabin 1 16.00 2.80 44.80
deduction
D1 -0.5 1.05 2.10 -1.10

Inside plaster
Ground Floor
ht. = 3.10
Room 1 1 23.60 3.10 73.16
Deduction
D -1 1.05 2.10 -2.21
W -1.5 0.60 1.55 -1.40
Room 2 1 23.60 3.10 73.16
Deduction
D -1 1.05 2.10 -2.21
W -2.5 0.60 1.55 -2.33
Passage 1 32.76 3.10 101.56
Deduction
Collapsible door -0.5 1.44 2.45 -1.76
W -2 0.60 1.55 -1.86
Grill at passage -0.5 3.22 1.12 -1.80
Grill at passage -0.5 4.47 1.12 -2.50
First Floor
ht. = 2.74
Room 1 1 23.60 2.74 64.66
Deduction
D -0.5 1.05 2.10 -1.10
W -1.5 0.60 1.55 -1.40

8
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Room 2 1 23.60 2.74 64.66
Deduction
D -0.05 1.05 2.10 -0.11
W -2.5 0.60 1.55 -2.33
Passage 1 32.76 2.74 89.76
Deduction
W -2 0.60 1.55 -1.86
Grill at passage -0.5 3.22 1.12 -1.80
Grill at passage -0.5 4.47 1.12 -2.50

Total Quantity 865.97 866.00 SM


REMOVING GRILL ITEM
NEW GRILL
Demolition of terrace including stacking of
serviceable materials and disposal of unserviceable
2 materials with all lead and lift.'
1.) Brick
tile covering
Terrace Floor
1 89.37 89.37
above staircase cabin 1 21.19 21.19
110.56
say 111.00 SM

Dismantling tiled or stonefloors laid in mortar


includind stacking of serviceable material and
3
disposal of unserviceable material with all lead and
lift
Terrace Floor
1 89.37 89.37
above staircase cabin 1 21.19 21.19
110.56
say 111.00 SM

Dismantling doors, windows, ventilators etc. (wood


or steel) shutters including chowkhats architraves,
4 hold fasts and other attachment etc. complete and
stacking them within all lead and lift (ii) Not
exceeding 3 Sq.M in area
windows 20 20.00
20.00 20.00 Each

5 Disposal of Building Rubbish


1. 1.00 to 1.50 km 1 7.361 7.36
2. 1.50 to 2.00 km 1 7.361 7.36
14.72 14.72 C.M

PART B:- MASONARY & PLASTER WORKS

Providing & Applying 10mm. th. cement plaster in


single coat on brick/ concrete walls similar surfaces
for plastering & finished even & smooth with a
floating coat of cement slurry mixed with admixture
6 of lime or neeru in required proportion etc. comp. in
C.M 1:3 (1 cement : 3 sand) (B) For ceilings &
soffits of stairs

Ground floor
Room 1 1 31.23 31.23
Room 2 1 31.23 31.23
passage 1 26.50 26.50
soffits of stair 1 1.58 3.91 6.18
1 1.58 2.68 4.23
mid landing 1 1.73 3.52 6.09
105.46
First floor
Room 1 1 31.23 31.23
Room 2 1 31.23 31.23
passage 1 26.50 26.50
soffits of stair 1 1.58 2.51 3.97
1 1.58 2.51 3.97
mid landing 1 1.73 3.52 6.09
102.98
9
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Terrace (Second) floor
Stair cabin 1 18.76 18.76
18.76
227.20 227.20 SM

Providing & Applying 15mm. th. cement plaster in


single coat on brick/ concrete walls similar surfaces
for plastering & finished even & smooth with a
floating coat of cement slurry mixed with admixture
7 of lime or neeru in required proportion etc. comp. in
C.M 1:3 (1 cement : 3 sand) (A) For wall and
similar surfaces

Ground Floor
ht. = 3.10
Room 1 1 23.60 3.10 73.16
Deduction
D -1 1.05 2.10 -2.21
W -1.5 0.60 1.55 -1.40
Room 2 1 23.60 3.10 73.16
Deduction
D -1 1.05 2.10 -2.21
W -2.5 0.60 1.55 -2.33
Passage 1 32.76 3.10 101.56
Deduction
Collapsible door -0.5 1.44 2.45 -1.76
W -2 0.60 1.55 -1.86
Grill at passage -0.5 3.22 1.12 -1.80
Grill at passage -0.5 4.47 1.12 -2.50
231.82
50% of Internal Plaster Qty 115.91
say 116.00 SM
First Floor
ht. = 2.74
Room 1 1 23.60 2.74 64.66
Deduction
D -0.5 1.05 2.10 -1.10
W -1.5 0.60 1.55 -1.40
Room 2 1 23.60 2.74 64.66
Deduction
D -0.05 1.05 2.10 -0.11
W -2.5 0.60 1.55 -2.33
Passage 1 32.76 2.74 89.76
Deduction
W -2 0.60 1.55 -1.86
Grill at passage -0.5 3.22 1.12 -1.80
Grill at passage -0.5 4.47 1.12 -2.50
207.99
50% of Internal Plaster Qty 104.00
say 104.00 SM
Terrace(Second) floor
Stair cabin 1 17.82 2.8 49.90
Deduction
D -0.05 1.00 2.10 -0.11
49.79
50% of Internal Plaster Qty 24.90
say 25.00 SM
245.00
Providing & Applying 20 mm. Th. Roller plaster on
walls or similar surfaces at all floor levels consisting
of 12 mm av. Th. Backing coat of C.M. 1:3 (1 cement
8
: 3 sand) & 8 mm. th. Finishing coat of C.M. 1:1 (1
cement : 1 sand)

Outside plaster
Ground floor
ht. = 3.10 + 0.15 = 3.25
front side 1 12.29 3.25 39.94
left side 1 13.39 3.25 43.52
right side 1 13.32 3.25 43.29
back side 1 10.56 3.25 34.32
deduction
W1 -4 0.60 1.55 -3.72
10
ITEM
Description No. L B H/D Quantity Total Unit
NO.
D1 -1 1.05 2.10 -2.21
collapsible door -0.5 1.44 2.75 -1.98
passage window 1 -0.5 4.47 1.12 -2.50
passage window 2 -0.5 3.22 1.12 -1.80
First Floor
ht. = 2.74 + 0.15 = 2.89
front side 1 12.29 2.89 35.52
left side 1 13.39 2.89 38.70
right side 1 13.32 2.89 38.49
back side 1 10.56 2.89 30.52
deduction
W1 -4 0.60 1.55 -3.72
D1 -1 1.05 2.10 -2.21
passage window 1 -0.5 4.47 1.12 -2.50
passage window 2 -0.5 3.22 1.12 -1.80
Terrace Floor
parapet sides 2 49.56 0.90 89.21
parapet sides 1 49.56 0.23 11.40
Staircase Cabin 1 17.82 2.80 49.90
deduction
D1 -0.5 1.00 2.10 -1.05

chajja
Ground Floor
Window top and bottom 20 0.80 0.50 0.10 0.80
Window sides 20 1.55 0.50 0.10 1.55
First floor
Window top and bottom 20 0.80 0.50 0.10 0.80
Window sides 20 1.55 0.50 0.10 1.55
436.01 436.01 SM

PART D:- WATERPROOFING WORKS

NOTE :- (1) The whole work is to be executed


through specialized agency with a guarantee of 10
(Ten) years given on a prescribed proforma duly
9 stamped (2) The rate shall include for work at all
floors & conducting water proof test as directed.

(A) Providing and laying water proofing treatment


to vertical and horizontal surfaces of depressed
portions of W.C.,kitchen and the like consisting of :
(a) I course of applying cement slurry @ 4.4 kg/sqm
mixed with water proofing compound conforming to
IS : 2645 in recommended proportions.
(b) II course of a layer of plaster in C.M. 1:3 with
water proofing compound confirming to IS:2645
about 25 mm. th' in the floor of the depression &
about 18mm th' On the side walls of the depression
up to the floor level, water proofing plaster about 18
mm. th' be continued on the walls above the floor
level for a height of 600 mm. with surface suitable to 0.00 0.00 SM
receive further treatment
(c) Finishing top with stone aggregate 10mm to
12mm nominal size spreading @0.008 C.M./S.M.,
thoroughly embedad in plaster layer.
as per specifications & instructions of Engineer in
charge (Cement consumption 0.316 Bags / S.M.)

11
ITEM
Description No. L B H/D Quantity Total Unit
NO.
(B) Providing and laying integral cement based water
proofing treatment including preparation of surface
as required for treatment of roofs, balconies, terraces
etc. consisting of following operations.
(a) Applying and grouting a slurry coat of neat
cement using 2.75 kg/sqm of cement admixed with
proprietary water proofing compound comforming to
IS:2645 over the R.C.C. slab including cleaning the
surface before tratment.
(b) Laying cement concrete using broken bricks/brick
bats 25 mm to 100 mm size with 50% of cement
mortar 1:5 (1 Cement : 5 Coarse sand) admixed with
proprietary water proofing compound conforming to
IS:2645 ,brick bats is finally covered by jointless
cement plaster 20mm th. in C.M. 1:4 added with
special water proofing compound confirming to
IS:2645 & top smooth finished with trowel with false
chequered marking of 300 mm.size.The treatment is
carried along the vertical surface of the parapet &
other adjoining wall up to height of about 300 mm in
a shape of quarter round vata Incl. curing etc. Comp.
With average thickness of 120 mm and minimum
thickness at khurra as 65 mm.

Terrace Floor
1 91.95 91.95
above staircase cabin 1 18.76 18.76
110.71
say 111.00 SM
(c) The whole terrace so finished shall be flooded
with water for a minimum period of two weeks for
curing and for final test. All above operations to be
down in order and as directed and specified by the
engineer-in-charge. With average thickness of 120 0.00 0.00 SM
mm and minimum thickness at khurra as 65 mm.
(Cement consumption 0.511 Bags / S.M.)

Providing and laying broken china mosaic flooring


for terrace using 12 mm to 20 mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to plain
or slope and to be tempered to bring mortar crème out
10 upto surface using white cement including rounding
off junctions and extending them upto 15 cm along
the wall, clearing with water and oxalic acid etc. as
directed.

Terrace area 1 89.37 89.37


above staircase cabin 1 21.19 21.19
110.56
say 111.00 SM

PART H:- STEEL ALUMINIUM WORK

12
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Providing and fixing window having extruded
aluminium Powder Coated section frame main outer
size 63.50 x 38.10 x 1.95 mm (of Jindal section
no.4605, @ Wt. 1.094Kg/mt) horizontal Two track
member size 61.85 mm x 31.75 mm x 1.20 mm (of
jindal section no:8687, @ Wt. 0.695 Kg/mt.) vertical
member of size 61.85 mm x 31.75 mm x 130 mm (of
jindal section no:8758 @ wt. of 0.659 kg/mt) with
sliding shutters of horizontal member size 40 mm x18
mm x 1.29 mm (of jindal section no : 8949, @ Wt.
of .456 Kg/mt) vertical member of size 40 mm x 18
11 mm x 1.29 mm (of jindal section no:8947, @ Wt. of
0.456 Kg/mt/section 8948, @ Wt. of 0.457 Kg/mt)
with 5 mm thick tranparent bronze colour tineted float
glass with powder coated aluminium fittings and
fixtures and transparent silicon sealant glass fixing to
frame as per details etc. complete for window. for all
floor

Ground Floor
windows 10 0.6 1.55 9.30
First Floor
windows 10 0.6 1.55 9.30
18.60 19.00 S.M.

PART I:- COLOUR WORK

Providing and applying coats for superstructure 100%


Acrylic breathable, Anti-carbonation, Waterproof,
Heat insulating, decorative external coating of
approved shade after appling prime coat of
samematerial. Mix 1Lit Acrylic paint and applying it
as a primer and allow it to dry for 4-6hours. Mix 1lit
of anticarbonation paint with 400-600 mL of water
and apply two coats using brush/roller/spray at 24
hours of interval between each coat. Acrylic paint
shall be spary/brush/roller applied and shall have
conform to the following properties. Carbon dioxide
diffusion equivalent air layer thickness (DINEN1062-
6)>100m; Carbon dioxide diffusion resistance
coefficient (DINEN1062-6) > 105m; Elongation of
cured film shall be as per ASTMD 2370 / 98 > 400%
Chloridel on Diffusion (ASTMC1202) = Zero
12 Penetratin ; Adhesion of concrete (ASTMD4541) >
2N/mm²; Solar Reflective Index (ASTME1980 -11,
EN673:2011, EN410:2011) >104. The inter coat gap
to be 24hours. The rate shall include complete
treatment mentioned above. Acrylic, Anti-
Carbonation Paint (ACP) of makes as per tender and
shade/colour as approved by Engineer-in-charge,
surface preparation, applying primer coat as per the
make slisted in thetender, including all type of
scaffolding, safety accessories, labour, all materials,
lead,l ift, tools, plants, taxes, testing etc to exe cute
the work as directed,etc. complete for superstructure
components.

For All floor Quantity Same as Item No. 6 436.01 SM


436.01 SM

13 Apply two coats of Birla or Asian acrylic lappy


(putty) and two coats of primer of approved brand
and manufacture on new wall surface to give an even
shade including thoroughly brushing thr surface free
from mortar dropping and other matter and sand
papered smooth. For All floor

(A) For wall and similar surfaces Quantity same as Item No. 7 439.81 SM
say 440.00 SM

(B) For ceilings & soffits of stairs Quantity same as Item No.6 227.20 SM
TOTAL QUANTITY 667.20 SM

13
ITEM
Description No. L B H/D Quantity Total Unit
NO.
Painting two coats of enamel paint over priming
coat after removing entire whitewash/colourwash
surface dirt, dust foreign matter & also incl. preparing
14
the surface even & sand papered smooth etc. comp.

(A) For wall and similar surfaces


Ground Floor
Room 1 1 23.60 1.00 23.60
Deduction
D -1 1.05 1.00 -1.05
Room 2 1 23.60 1.00 23.60
Deduction
D -1 1.05 1.00 -1.05
Passage 1 32.76 1.00 32.76
Deduction
Collapsible door -0.5 1.44 1.00 -0.72
First Floor
Room 1 1 23.60 1.00 23.60
Deduction
D -0.5 1.05 1.00 -0.53
Room 2 1 23.60 1.00 23.60
Deduction
D -0.05 1.05 1.00 -0.05
Passage 1 32.76 1.00 32.76
Terrace Floor
Staircase cabin 1 17.9 1.00 17.90
174.42
say 175.00 SM

Wall painting with two coats of Acrylic emulsion


plastic paint of approved brand over existing surface
to give an even shade & surface free from mortar
15
dropping & other foreign matter & sand papered
smooth etc. comp. For All floor

(A) For wall and similar surfaces Quantity Same as Item No.12 440.00
A 440.00 SM
deduction
Enamel paint Quantity Same as Item No.13 175.00
B 175.00 SM
NET QUANTITY (A-B) 265.00 SM

(B) For ceilings & soffits of stairs Quantity Same as Item No.12 227.20 SM
TOTAL QUANTITY 492.20 SM
---do---- Extra Subsequant coat over above Item

(A) For wall and similar surfaces 265.00 SM


(B) For ceilings & soffits of stairs 227.20 SM
492.20 SM
PART D:- FLOORING WORK

Providing & laying granite slab 18mm thick in


Window-Door seal Frame Etc laid on 10mm thick
cement mortar 1:4 (1 Cement : 4 Coarse sand) with
nessary adhesive material and finished with flush
16 pointing in white or colour cement, including rubbing
& polishing comp. (Basic Rate:- Rs.1200.0/S.M.)

Ground Floor
W1 20 0.60 0.28 3.36
20 0.28 1.55 8.68
passage window 1 2 3.22 0.28 1.80
2 0.28 1.12 0.63
passage window 2 2 4.47 0.28 2.50
2 0.28 1.12 0.63
17.60
say 18.00 SM
First Floor
W1 20 0.60 0.28 3.36
20 0.28 1.55 8.68
passage window 1 2 3.22 0.28 1.80
2 0.28 1.12 0.63
14
ITEM
Description No. L B H/D Quantity Total Unit
NO.
passage window 2 2 4.47 0.28 2.50
2 0.28 1.12 0.63
17.60
say 18.00 SM
Terrace Floor
0.00 0.00 SM
Total Quantity 36.00 SM

Labour Charges For Edge Finished For Granite. For


17 all floor
Ground Floor
W1 40 0.60 24.00
40 1.55 62.00
passage window 1 4 3.22 12.88
4 1.12 4.48
passage window 2 4 4.47 17.88
4 1.12 4.48
125.72
say 126.00 RM
First Floor
W1 40 0.60 24.00
40 1.55 62.00
passage window 1 4 3.22 12.88
4 1.12 4.48
passage window 2 4 4.47 17.88
4 1.12 4.48
125.72
say 126.00 RM
Terrace Floor 0.00 RM
TOTAL QUANTITY OF ALL FLOOR 252.00 RM

PART C :- REPAIR & REHABILITATION WORKS

Providing and applying cement mortar (1:3) modified


by using polymer and expanding grout additives at
various thickness for repair/strengthening of various
RCC elements at all Floor levels, lead, lift, including
breaking, chipping, dismentling existing cover
concrete and exposing existing reinforcement,
applying wirebrush for making surfaces of steel and
concrete free from rust and other loose materials,
applying rust removing chemical on existing
18 reinforcement, applying anti-corrosive coating on
existing reinforcement, applying polymer bonding
agent on existing concrete surfaces before applying
polymer modified mortar in specified thickness as
directed by the Engineer-in-charge.

The rates shall include providing and applying 12 mm


thick cement mortar (1:4) modified with plasticizer
for finishing smooth the repaired surfaces, providing
and applying curing agent on the repaired surfaces,
etc. complete as directed by the Engineer-in-charge.
The make and quality of rust removing chemical,
anti-corrossive coating, polymer bonding agent,
polymer and expanding grout additives, plasticizer,
curing agent, etc. shall be approved by engineer-in-
charge. The procedure for application shall be strictly
in accordance with manufacturer's detail
specification, which shall be submitted before start of
work and shall be approved by the Engineer-in-
charge.

The rates shall include the cost of providing, erecting


and maintaining leakproof shuttering /formwork
/scaffolding, etc. to be used for the purpose, providing
and erecting props, temporary frame work and
maintain them in position for required time, to
existing load bearing elemnts for reliving loads
coming on to structural members being
repaired/strengthened but excludes the cost of
reinforcement.

15
ITEM
Description No. L B H/D Quantity Total Unit
NO.
chemical use BASF, Sunanda, Fosroc, Pidilite etc as
per Approved by engineer incharge
Column
C1,C4,C7,C8,C9,C13,C16,C19 16 0.30 7.04 33.79
16 0.45 7.04 50.69
C2,C3,C5,C6,C10,C11,C12,C14,C15,C17,C18,C20,C 26 0.23 7.04 42.10
21
26 0.30 7.04 54.91
181.49
say 182.00 SM
Beam
B1,B2,B3,B4,B5,B6,B7 14 4.99 0.23 16.07
14 4.99 0.45 31.44
B8,B9 4 1.60 0.23 1.47
4 1.60 0.45 2.88
B10,B11 4 1.70 0.23 1.56
4 1.70 0.45 3.06
B12,B13,B14,B15 8 1.44 0.23 2.65
8 1.44 0.45 5.18
B16,B17 4 1.70 0.23 1.56
4 1.70 0.45 3.06
B18,B19 4 1.53 0.23 1.41
4 1.53 0.45 2.75
B20,B21,B22,B23,B24,B25 6 3.38 0.23 4.66
6 3.38 0.45 9.13
B26,B27 4 1.50 0.23 1.38
4 1.50 0.45 2.70
B28 2 3.53 0.23 1.62
2 3.53 0.45 3.18
B29 2 3.41 0.23 1.57
2 3.41 0.45 3.07
B30 2 1.70 0.23 0.78
2 1.70 0.45 1.53
B31 2 1.53 0.23 0.70
2 1.53 0.45 1.38
104.80
say 105.00 SM
TOTAL QUANTITY 287.00 SM

Carrying out Injection grouting for cracks in RCC structural


members by drilling holes of 15 mm diameter upto
minimum depth of 75 mm, fixing aluminium nozzle /
rubber pipe using cementitious compound, injecting
polymer modified slurry (acrylic non-SBR based
polymer+cement+water) 1:1:1 material at specified
pressure with grouting pump till the material refuses to
impregnate inside the hole. If required or suggested by the
Engineer-in-charge, injection grouting shall be carried out
more than once for a hole to assure proper spreading of
grout material and filling of capillaries / voids within the
element. After satisfactory injection grouting, the
19 nozzle/pipe shall be cut and sealed by non-shrink epoxy
putty. The surface shall be finished smooth with C:M (1:4)
and reinstated to the original condition as directed by the
Engineer-in-charge.

The rate shall include the cost of providing and supplying


all tools, materials, labour, scaffolding, props, formwork,
etc. complete. The make and quality of epoxy grout, epoxy
putty, etc. shall be approved by the Engineer-in-charge. The
procedure for application shall be strictly in accordance
with manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by the
Engineer-in-charge. (Actual no. of holes and their locations
shall be as decided by the Engineer-in-charge)
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per
Approved by engineer incharge 100 100 100 Nos.

16
ITEM
Description No. L B H/D Quantity Total Unit
NO.

Carrying out Injection grouting for cracks in RCC


structural members by drilling holes of 15 mm diameter
upto minimum depth of 75 mm, fixing aluminium nozzle /
rubber pipe using non-shrink epoxy putty, injecting epoxy
grout material at specified pressure with grouting pump till
it the material refuses to impregnate inside the hole. Epoxy
grout material should have viscosity of 400-500 centipoise,
Gel time 45-60 mins, bond strength 2500 Psi, compressive
strength 10000 Psi, tensile strength 6000 Psi. If required or
suggested by the Engineer-in-charge, injection grouting
shall be carried out more than once for a hole to assure
proper spreading of grout material and filling of capillaries /
voids within the element. After satisfactory injection
20 grouting, the nozzle/pipe shall be cut and sealed by non-
shrink epoxy putty. The surface shall be finished smooth
with C:M (1:4) and reinstated to the original condition as
directed by the Engineer-in-charge.

The rate shall include the cost of providing and supplying


all tools, materials, labour, scaffolding, props, formwork,
etc. complete. The make and quality of epoxy grout, epoxy
putty, etc. shall be approved by the Engineer-in-charge. The
procedure for application shall be strictly in accordance
with manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by the
Engineer-in-charge. (Actual no. of holes and their locations
shall be as decided by the Engineer-in-charge)
20 20 20 Nos.

Providing and applying cement mortar 1:4 enriched with


expanding grout additive in required proportion in cement
for repair of cracks in RCC and Non-RCC members after
making 25mm x 25mm groove, cleaning the surface and
applying coat of bonding, finishing smooth the repaired
surfaces, providing and applying curing agent on the
repaired surfaces, etc. complete at all floor levels as
21
directed by engineer-in-charge. The make and quality of
expanding grout additives, bonding agent, curing agent, etc.
shall be approved by the engineer-in-charge. The procedure
for application shall be strictly in accordance with
manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by the
Engineer-in-charge.
L.S 1 250.00 250.00 250.00 RM

22 Pointing on brickwork with cement mortar 1:3 (1-


cement : 3-coarsed sand) (a) Flush pointing
QUANTITY SAME AS DISMENTALING OF PLASTER
ITEM 15MM +20MMO/S
681.01
say 682.00 SM

17
SURAT MUNICIPAL CORPORATION
CENTRAL ZONE

NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA


ABHIYAN, SOUTH ZONE, SURAT MUNICIPAL CORPORATION, SURAT.
SURAT MUNICIPAL CORPORATION
CENTRAL ZONE

NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN, SOUTH ZONE,
SURAT MUNICIPAL CORPORATION, SURAT.

CEMENT CONSUMPTION

Consp. Bags
Item No. Description Qty. Unit Total Bags
Unit

PART A:- RCC WORKS

WORK UP TO PLINTH
Providing & laying C.C 1:3:6 (1cement :3 coarse sand :6 Crushed stone agg
3 20m.m Nominal size)&curing comp. incl. cost of form work in :(a) #NAME? 4.56 C.M. #NAME?
foundation & Plinth

Providing & laying cement concrete 1:1.5:3 (1 cement:1.5 sand:3 graded


stone agg. 20 mm nominal size)& curing comp. Includ.cost of form work
but exclu. Cost of reinforcement for reinforced concrete work in : (A)
4 Foundation, footing, Base of columns and Mass concrete. #NAME? 8.00 C.M. #NAME?

Providing & laying ordinary cement con. 1:1.5:3 (1 cement : 1.5 sand : 3
graded stone agg. 20 mm nominal size) finishing smooth curing etc. comp.
5 Incld. Cost of form work but excl. Cost of reinforcement for R.C.C. Work
in:Up to G.L./P.L.

(A) COLUMNS:
(1) Having c/s area up to 0.08 s.mt #NAME? 8.00 C.M. #NAME?
(2) Having c/s area more than 0.08 sq. mt. & upto 0.12 sq.mt 0.00 8.00 C.M. 0.00
(3) Having cross sectional area more than 0.12 sq. mt. 0.00 8.00 C.M. 0.00

(B) BEAMS :
(1)Having c/s area up to 0.08s.mt 0.00 8.00 C.M. 0.00
(2) Having c/s area more than 0.08 sq. mt. & upto 0.12 sq.mt 1.50 8.00 C.M. 12.00
(3) Having cross sectional area more than 0.12 sq. mt. 0.00 8.00 C.M. 0.00

Providing & construction brick work using Fly Ash bricks having
crushing strength not less than 35 Kg./sq.cm. in foundation & plinth in C.M.
8 1:6 (1 cement:6 sand ) etc. comp. Up to G.L./P.L. #NAME? 1.20 C.M. #NAME?

Providing and applying 20mm. thick sand faced cement plaster on walls
or similar surfaces consisting of 12mm. thick backing coat of c.m. 1:3 ( 1
cement : 3 sand ) and 8mm. thick finishing coat of c.m. 1:1 ( 1cement : 1
9
sand ) etc. comp..

up to plinth level 120.00 0.22 S.M. 26.40

WORK ABOVE PLINTH LEVEL


Providing & laying ordinary cement con. 1:1.5:3 (1 cement : 1.5 sand :3
graded graded stone agg. 20 mm nominal size) finishing smooth curing etc.
10 comp. Incl. Cost of form work but excl. Cost of reinforcement for R.C.C.
Work in

(A) COLUMNS
(1) Having c/s area up to 0.085 s.mt
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(2) c/s area more than 0.085 sq. mt. & upto 0.12 sq.mt
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(3) Having cross sectional area more than 0.12 sq. mt.

19
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?

(B) BEAMS
(1) Having c/s area up to 0.08s.mt
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(2) Having c/s area more than 0.08 s.m. & upto 0.12 s.m
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(3) Having cross sectional area more than 0.12 sq. mt.
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?

(C) SLABS
(2) Slabs having more than 8cm. and upto 10 cm. Th.
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(3) Slabs having more than 10 cm. & upto 13 cm. Th.
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?
(4) Slabs having more than 13 cm. Thickness
Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third Floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?

(D) LINTELS
Ground floor #NAME? 8.00 C.M. #NAME?
First floor #NAME? 8.00 C.M. #NAME?
Second floor #NAME? 8.00 C.M. #NAME?
Third floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?

(E) CHAJJAS
Ground floor #NAME? 8.00 C.M. #NAME?
First floor #NAME? 8.00 C.M. #NAME?
Second floor #NAME? 8.00 C.M. #NAME?
Third floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?

(F) COPING
Ground floor #NAME? 8.00 C.M. #NAME?
First floor #NAME? 8.00 C.M. #NAME?
Second floor #NAME? 8.00 C.M. #NAME?
Third floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?

Providing & laying cement concrete 1:4:8 (1 cement : 4 sand : 8 graded


11 stone agg. 40 mm nominal size) & curing comp. incl.cost of form work in #NAME? 3.23 C.M. #NAME?
(A) Foundation and Plinth

20
Providing & laying ordinary cement con. 1:1.5:3 (1 cement : 1.5 sand : 3
graded graded stone agg. 20 mm nominal size) finishing smooth curing etc.
12 comp. Incl. Cost of form work but excl. Cost of reinforcement for R.C.C.
Work in

(A) Staircases including landings etc.


Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?

(B) Vertical and horizontal fins


Ground Floor #NAME? 8.00 C.M. #NAME?
First Floor #NAME? 8.00 C.M. #NAME?
Second Floor #NAME? 8.00 C.M. #NAME?
Third floor #NAME? 8.00 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 8.00 C.M. #NAME?

TOTAL BAGS FOR PART - A RCC WORKS #NAME?

PART C:- REPAIR & REHABILITATION WORKS

Providing Cement Concrete work 50% - M30-(1:1:2) by weight mix and


50% micro concrete by weight plus recron - 3s or equivalent (12mm
long polyester fiber) plus appropriate dose of super plasticizer (as per
manufacturers spacification and approved by consultant) with curing,
finishing smooth, etc. complete for jacketing of structural members at all
floor levels, lead, lift, including breaking, chipping, dismentling existing
loose cover concrete and exposing respective existing reinforcement as
directed by the engineer-in-charge, applying wirebrush for making surfaces
of steel and concrete free from rust and other loose materials, Providing and
Applying a rust removing, chloride and sulphate free non-alkaline, inorganic
nano film forming surface passivating solution conforming to IS 9077 Rust
remover & passivater of approved brand by brush or cotton swab to the
23
existing reinforcement bars. Chemical should react with corrosion products
to convert them to a stable passivating nano-film on the surface of the steel
and return the steel back to its original greyish white colour and special
surface acting chemicals help in promoting the adhesion of consequent
coatings to the steel surface. Further the coating should be non-alkaline so as
to remove any water soluble salts especially corrosion inducing chlorides
and the formation of the passivating film prevents flash rusting between the
rust removal and the primer application.

Cleaning the surface after 24 hrs of chemical application, to remove


detached rust deposits. Ensure that the steel surface is rust free., Providing
and applying Rust preventing anticorrosive coating (As per manufacturer
specification) over steel free from rust. Apply this slurry over steel and
allow it to cure for at least 6 hours. Similarly Applying second coat of Rust
preventing anticorrosive coating over steel and allow it to cure, Applying
bonding coat of approved make to the entire damaged surface on existing
concrete surfaces as directed by the Engineer-in-charge, etc. complete. The
procedure for application shall be strictly in accordance with manufacturer's
detail specification, which shall be submitted before start of work and shall
be approved by the Engineer-in-charge.

The rates shall include the cost of providing, erecting and maintaining
leakproof shuttering /formwork /scaffolding, etc. to be used for concreting,
providing and erecting props, temporary frame work and maintain them in
position for required time, to existing load bearing elemnts for reliving loads
coming on to structural members being repaired/strengthened but excludes
the cost of reinforcement, Shear connector and plaster . The rate shall also
include required breaking of adjoining RCC structural elements like slab,
beam, etc. and reinstating the same in original shape and size by using above
mentioned procedure and material, as directed by the Engineer-in-charge,
etc. complete.

21
If required all loose cover concrete shall be removed as directed by the
engineer-in-charge.
Any other work which may get disturbed due to above mentioned procedure
shall be repaired and reinstated to original condition to the complete
satisfaction of the Engineer-in-charge and no claim for extra payment for the
same shall be entertained.
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per Approved by
engineer incharge #NAME? 4.73 C.M. #NAME?

Providing and applying cement mortar (1:3) modified by using polymer and
expanding grout additives at various thickness for repair/strengthening of
various RCC elements at all Floor levels, lead, lift, including breaking,
chipping, dismentling existing cover concrete and exposing existing
reinforcement, applying wirebrush for making surfaces of steel and concrete
24
free from rust and other loose materials, applying rust removing chemical on
existing reinforcement, applying anti-corrosive coating on existing
reinforcement, applying polymer bonding agent on existing concrete
surfaces before applying polymer modified mortar in specified thickness as
directed by the Engineer-in-charge.
The rates shall include providing and applying 12 mm thick cement mortar
(1:4) modified with plasticizer for finishing smooth the repaired surfaces,
providing and applying curing agent on the repaired surfaces, etc. complete
as directed by the Engineer-in-charge. The make and quality of rust
removing chemical, anti-corrossive coating, polymer bonding agent,
polymer and expanding grout additives, plasticizer, curing agent, etc. shall
be approved by engineer-in-charge. The procedure for application shall be
strictly in accordance with manufacturer's detail specification, which shall
be submitted before start of work and shall be approved by the Engineer-in-
charge.
The rates shall include the cost of providing, erecting and maintaining
leakproof shuttering /formwork /scaffolding, etc. to be used for the purpose,
providing and erecting props, temporary frame work and maintain them in
position for required time, to existing load bearing elemnts for reliving loads
coming on to structural members being repaired/strengthened but excludes
the cost of reinforcement.
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per Approved by
engineer incharge
Beam / Columns #NAME? 0.40 S.M. #NAME?
Ceiling #NAME? 0.40 S.M. #NAME?

Carrying out Injection grouting for cracks in RCC structural members by


drilling holes of 15 mm diameter upto minimum depth of 75 mm, fixing
aluminium nozzle / rubber pipe using cementitious compound, injecting
polymer modified slurry (SBR+cement+water) 1:1:1 material at specified
pressure with grouting pump till it the material refuses to impregnate inside
the hole. If required or suggested by the Engineer-in-charge, injection
grouting shall be carried out more than once for a hole to assure proper
spreading of grout material and filling of capillaries / voids within the
element. After satisfactory injection grouting, the nozzle/pipe shall be cut
28
and sealed by non-shrink epoxy putty. The surface shall be finished smooth
with C:M (1:4) and reinstated to the original condition as directed by the
Engineer-in-charge.

The rate shall include the cost of providing and supplying all tools,
materials, labour, scaffolding, props, formwork, etc. complete. The make
and quality of epoxy grout, epoxy putty, etc. shall be approved by the
Engineer-in-charge. The procedure for application shall be strictly in
accordance with manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by the Engineer-in- #NAME? 0.10 Nos. #NAME?
charge. (Actual no. of holes and their locations shall be as decided by the
Engineer-in-charge)

22
chemical use BASF, Sunanda, Fosroc, Pidilite etc as per Approved by
engineer incharge

TOTAL BAGS FOR PART - C REPAIR & REHABILITATION WORKS #NAME?

PART D:- MASONARY & PLASTER WORKS

Providing & construction brick work using Fly Ash bricks having
crushing strength not less than 35 Kg./sq.cm. in foundation & plinth in C.M.
30 1:6 (1 cement : 6 sand ) etc. comp.

Ground floor #NAME? 1.20 C.M. #NAME?


First floor #NAME? 1.20 C.M. #NAME?
Second floor #NAME? 1.20 C.M. #NAME?
Third Floor #NAME? 1.20 C.M. #NAME?
Terrace (Fourth) Floor #NAME? 1.20 C.M. #NAME?

Providing & constructing Half brick masonary in Fly Ash bricks having
31 crushing strength not less than 70 kg/sq.cm in c.m 1:4 (1 cement: 4 sand)
curing etc complete.

Ground floor #NAME? 0.21 S.M. #NAME?


First floor #NAME? 0.21 S.M. #NAME?
Second floor #NAME? 0.21 S.M. #NAME?
Third Floor #NAME? 0.21 S.M. #NAME?
Terrace (Fourth) Floor #NAME? 0.21 S.M. #NAME?

Providing & Applying 10mm. th. cement plaster in single coat on brick/
concrete walls similar surfaces for plastering & finished even & smooth
with a floating coat of cement slurry mixed with admixture of lime or neeru
32 in required proportion etc. comp. in C.M 1:3 (1 cement : 3 sand)

(A) for wall and similar surfaces


Ground floor #NAME? 0.11 S.M. #NAME?
First floor #NAME? 0.11 S.M. #NAME?
Second floor #NAME? 0.11 S.M. #NAME?
Third Floor #NAME? 0.11 S.M. #NAME?
Terrace (Fourth) Floor #NAME? 0.11 S.M. #NAME?
(B) for ceilings and soffits of stairs
Ground floor #NAME? 0.11 S.M. #NAME?
First floor #NAME? 0.11 S.M. #NAME?
Second floor #NAME? 0.11 S.M. #NAME?
Third Floor #NAME? 0.11 S.M. #NAME?
Terrace (Fourth) Floor #NAME? 0.11 S.M. #NAME?

Providing and applying 20mm. thick sand faced cement plaster on walls
or similar surfaces at all floor levels consisting of 12mm. thick backing coat
of c.m. 1:3 (1 cement : 3 sand) and 8mm. thick finishing coat of c.m. 1:1
33
(1cement : 1 sand) etc. comp.

All Floors #NAME? 0.22 S.M. #NAME?

Providing 35 mm wide throating or plaster drip and moulding it to R.C.C.


34 chajja etc. comp. For all floor
Ground floor #NAME? 0.05 R.M. #NAME?
First floor #NAME? 0.05 R.M. #NAME?
Second floor #NAME? 0.05 R.M. #NAME?
Third Floor #NAME? 0.05 R.M. #NAME?
Terrace (Fourth) Floor #NAME? 0.05 R.M. #NAME?

Providing 20 mm deep finished groove in plaster in line and level etc.


35 Comp. For all Floor
Ground floor #NAME? 0.05 R.M. #NAME?
First floor #NAME? 0.05 R.M. #NAME?
Second floor #NAME? 0.05 R.M. #NAME?
Third Floor #NAME? 0.05 R.M. #NAME?
Terrace (Fourth) Floor #NAME? 0.05 R.M. #NAME?

Providing cement vata ( 10 cm x 10 cm size ) quarter round in cement


36 mortar 1:1 including neat cement finishing, watering etc. complete. For all
floors
Ground floor #NAME? 0.05 R.M. #NAME?
First floor #NAME? 0.05 R.M. #NAME?
23
Second floor #NAME? 0.05 R.M. #NAME?
Third Floor #NAME? 0.05 R.M. #NAME?
Terrace (Fourth) Floor #NAME? 0.05 R.M. #NAME?

TOTAL BAGS FOR PART - D MASONARY & PLASTER WORKS #NAME?

PART E- FLOORING WORKS

Providing & Laying green polished kota stone slab flooring at all floor
levels,over 20 mm av.th.base of C.M. 1:6(1cement: 6 sand) laid
over&joined with grey cement slurry incl. Rubbing & polishing etc. comp.
41 (A) 22 mm. (Tolerance +/- 2mm) #NAME? 0.13 S.M. #NAME?

Providing & Laying polished kota stone of machine cut edge slab 22 mm.
th. in riser of steps, tread, dedo & pillars center piece not less than 1.2
42 mt.in width &side pieces of equal size as per design, laid on 10 mm. th. #NAME? 0.20 S.M. #NAME?
C.M.1:3(1 cement : 3 sand) joined & polishing etc

Providing & Laying white glazed tiles 6mm. th. of Orient, Kajaria,
Jhonson,Nitco,Somani ,Bell make at all floor levels, in flooring, treads of
steps & landings laid on a bed of 20 mm. Av. Th. C.M.1:3 (1 cement : 3
43 sand) finished with flush pointing in white cement etc. com. For all floor #NAME? 0.13 S.M. #NAME?
(Basic Rate:- Rs.285.0/S.M.)

Providing & Laying white glazed tiles 6mm. th. of Orient, Kajaria,
Jhonson,Nitco,Somani,Bell make at all floor levels in skirting risers of
steps & dado on 10 mm. th. C.M.1:3 (1cement : 3 sand) including
44 necessary cement paste for fixing and joined with white cement slurry etc. #NAME? 0.20 S.M. #NAME?
complete. For all floors (Basic Rate:- Rs.285.0/S.M.)

Providing & laying Vitrified tiles of 8mm thick of Orient, Kajaria,


Jhonson, Nitco, Somani, Bell, Asian or Euro make in flooring,treads of
steps & Landing laid on bed of 20 mm (Average) base of cement mortar
1:6 (1 Cement : 6 Coarse sand) on new surface or fixing on existing flooring
by adhesive material including dismentaling of existing flooring and jointed
with colour cement slurry including finished with flush pointing & cleaning
45 the surface etc. comp. Size 24" x 24" (a) Light Shade (Basic Rate-
Rs.412.0/S.M.)

All floor #NAME? 0.13 S.M. #NAME?

Providing and laying Vitrified tiles of 8mm thick of Orient, Kajaria,


Jhonson, Nitco, Somani, Bell, Asian or Euro make in skirting, risers of
steps and dedo laid on 10mm thick cement mortar 1:4 (1 Cement : 4
Coarse sand) and finished with flush pointing in white or colour cement
46 comp. Size 24" x 24" (a) Light Shade For all floor (Basic Rate- #NAME? 0.20 S.M. #NAME?
Rs.412.0/S.M.) for all floor

Providing & laying granite slab 18mm thick in skirting, risers of steps,
dedo and pillars laid on 10mm thick cement mortar 1:4 (1 Cement : 4
Coarse sand) and finished with flush pointing in white or colour cement
47 including rubbing & polishing comp. For all floor (Basic Rate:- #NAME? 0.20 S.M. #NAME?
Rs.1614.0/S.M.)

Providing & laying granite slab 18mm thick in Window-Door seal Frame
Etc laid on 10mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand) with
nessary adhesive material and finished with flush pointing in white or colour
48 cement, including rubbing & polishing comp. (Basic Rate:- Rs.1200.0/S.M.) #NAME? 0.20 S.M. #NAME?

TOTAL BAGS FOR PART - E FLOORING WORKS #NAME?

PART F:- WATERPROOFING WORKS

24
NOTE :- (1) The whole work is to be executed through specialized agency
with a guarantee of 10 (Ten) years given on a prescribed proforma duly
50 stamped (2) The rate shall include for work at all floors & conducting water
proof test as directed.

(A) Providing and laying water proofing treatment to vertical and


horizontal surfaces of depressed portions of W.C.,kitchen and the like
consisting of :
(a) I course of applying cement slurry @ 4.4 kg/sqm mixed with water
proofing compound conforming to IS : 2645 in recommended proportions.
(b) II course of a layer of plaster in C.M. 1:3 with water proofing compound
confirming to IS:2645 about 25 mm. th' in the floor of the depression &
about 18mm th' On the side walls of the depression up to the floor level,
water proofing plaster about 18 mm. th' be continued on the walls above the
floor level for a height of 600 mm. with surface suitable to receive further
treatment #NAME? 0.30 S.M. #NAME?
(c) Finishing top with stone aggregate 10mm to 12mm nominal size
spreading @0.008 C.M./S.M., thoroughly embedad in plaster layer.
as per specifications & instructions of Engineer in charge (Cement
consumption 0.316 Bags / S.M.)

(B) Providing and laying integral cement based water proofing treatment
including preparation of surface as required for treatment of roofs,
balconies, terraces etc. consisting of following operations.
(a) Applying and grouting a slurry coat of neat cement using 2.75 kg/sqm of
cement admixed with proprietary water proofing compound comforming to
IS:2645 over the R.C.C. slab including cleaning the surface before tratment.
(b) Laying cement concrete using broken bricks/brick bats 25 mm to 100
mm size with 50% of cement mortar 1:5 (1 Cement : 5 Coarse sand)
admixed with proprietary water proofing compound conforming to
IS:2645 ,brick bats is finally covered by jointless cement plaster 20mm th.
in C.M. 1:4 added with special water proofing compound confirming to
IS:2645 & top smooth finished with trowel with false chequered marking of
300 mm.size.The treatment is carried along the vertical surface of the
parapet & other adjoining wall up to height of about 300 mm in a shape of
quarter round vata Incl. curing etc. Comp. With average thickness of 120
mm and minimum thickness at khurra as 65 mm. 0.00 0.30 S.M. 0.00

(c) The whole terrace so finished shall be flooded with water for a
minimum period of two weeks for curing and for final test. All above
operations to be down in order and as directed and specified by the engineer-
in-charge. With average thickness of 120 mm and minimum thickness at
khurra as 65 mm. (Cement consumption 0.511 Bags / S.M.)

Providing and laying broken china mosaic flooring for terrace using 12 mm
to 20 mm broken pieces of glazed tiles to be laid over cement mortar 1:3 to
plain or slope and to be tempered to bring mortar crème out upto surface
using white cement including rounding off junctions and extending them
52 upto 15 cm along the wall, clearing with water and oxalic acid etc. as 111.00 0.13 S.M. 14.43
directed.

TOTAL BAGS FOR PART - F WATERPROOFING WORKS #NAME?

PART G:- WATERSUPPLY & SANITARY WORKS

Providing & Fixing PVC Nanhi trap 31/2" ht.of Prince/ Supreme/ Jain/
Astral/ Tulsi/Finolex make at all floor levels of self cleaning design with
53 screwed down or hinged grating incl. cost of cutting making good the walls
& floors etc. For all Floor

All floor #NAME? 0.10 Nos. #NAME?

Providing, Lowering & laying joining R.C.C. NP2 CLASS Pipe In C.M.
56 1:1 of following nominal internal diameters incl. Testing of pipes and
joints etc. Comp

25
(B) 150 mm dia. #NAME? 0.024 R.M. #NAME?

Providing & construction simple chamber of 23 cm. th' B.B. Masonary in


C.M 1:5 with cement plaster 15 mm th' in C.M. 1:3 inside & outside to
exposed faces, R.C.C. top slab with 1:2:4 mix ( 1 cement: 2 Sand : 4 Grade
stone aggregate 20mm size) ,Foundation concrete 1:5:10 & fixing C.I. cover
58 with frame to be not less than 38 kg. On top etc. comp. Inside
dimension,455 x 610 mm &450 mm deep for single pipe

(A) Same as above but Precast RCC heavy duty Cover instead of C.I. Cover #NAME? 3.00 Nos. #NAME?

59 Extra for every additional depth of 0.1 mt beyoung 0.45 mt #NAME? 0.67 Nos. #NAME?

Providing and fixing Wash Down Water closet European type W.C. pan
with integral P or S trap with normal closing seat cover L bend ncluding
jointing the trap with soil pipe in cement mortar 1:1 (1 cement : 1 find sand)
60 (A) Viterous china pattern - I

Make- Cera, Parry ware, HindWare- 350 x 500 x 390 mm #NAME? 0.50 Nos. #NAME?

Prov.& Fixing water closet squatting pan (Orissa type W.C.pan) at all floor
levels, size 500mm x 400 mm incl. 100 mm size "P'or "S" trap for water
closet squatting pan joining the trap with the pan & soil pipe in C.M. 1:1
61 (1cement :1 fine sand) etc. Comp.(A) Vitreous china long pattern

Make- Cera, Parry ware, Jaquar ,HindWare #NAME? 0.50 Nos. #NAME?

TOTAL BAGS FOR PART - G WATERSUPPLY & SANITARY WORKS #NAME?

PART I:- PLINTH TREATMENT

Providing & laying cement concrete 1:4:8 (1 cement : 4 sand : 8 graded


87 stone agg. 40 mm nominal size) & curing comp. incl.cost of form work in #NAME? 3.23 C.M. #NAME?
(A) Foundation and Plinth

Providing & laying cement concrete 1:2:4 (1 cement:2 sand:4 graded stone
agg. 20 mm nominal size)& curing comp. Includ.cost of form work but
exclu. Cost of reinforcement for reinforced concrete work in : (A)
88 #NAME? 6.25 C.M. #NAME?
Foundation, footing, Base of columns and Mass concrete.

Providing & laying cement concrete Pavement using 1:1.5:3 (1 cement:1.5


sand:3 graded stone agg. 20 mm nominal size) & Vaccuum Dewatering
technique including floating surface with a skim powder floater, curing etc.
89 #NAME? 8.00 C.M. #NAME?
complete.

Providing & laying ordinary cement con.1:2:4 (1 cement : 2 sand : 4 graded


graded stone agg. 20 mm nominal size) finishing smooth curing etc. comp.
90
Incld. Cost of form work but excl. Cost of reinforcement for R.C.C. Work in
: Up to G.L./P.L.

(B) BEAMS :
(1)Having c/s area up to 0.08s.mt #NAME? 6.25 C.M. #NAME?
(2) Having c/s area more than 0.08 sq. mt. & upto 0.12 sq.mt #NAME? 6.25 C.M. #NAME?
(3) Having cross sectional area more than 0.12 sq. mt. #NAME? 6.25 C.M. #NAME?

TOTAL AMOUNT FOR PART - I PLINTH TREATMENT #NAME?

TOTAL BAGS FOR PART - A RCC WORKS #NAME?


TOTAL BAGS FOR PART - C REPAIR & REHABILITATION WORKS #NAME?
TOTAL BAGS FOR PART - D MASONARY & PLASTER WORKS #NAME?
TOTAL BAGS FOR PART - E FLOORING WORKS #NAME?
TOTAL BAGS FOR PART - F WATERPROOFING WORKS #NAME?
TOTAL BAGS FOR PART - G WATERSUPPLY & SANITARY WORKS #NAME?
TOTAL AMOUNT FOR PART - I PLINTH TREATMENT #NAME?

TOTAL BAGS OF ALL


PART A+ PART C + PART D + PART E + PART F + PART G + PART I #NAME?

26
NET TOTAL THEORETICAL CONSUMPTION OF BAGS #NAME?

27
SURAT MUNICIPAL CORPORATION
CENTRAL ZONE

NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN, SOUTH ZONE, SUR
MUNICIPAL CORPORATION, SURAT.

STEEL CONSUMPTION

ITEM NO
SR. QTY IN MULTIPLYING STEEL IN
AS PER ITEM RATE/KG
NO CMT FACTOR KG
SCH-B

PART A:- RCC WORKS

WORK UPTO PLINTH


1 6 #NAME? #NAME? #NAME? #NAME? 44.84
2 6 #NAME? #NAME? #NAME? #NAME? 44.84
3 6 #NAME? #NAME? #NAME? #NAME? 44.84
4 6 #NAME? #NAME? #NAME? #NAME? 44.84

WORK ABOVE PLINTH


GROUND FLOOR
1 13 #NAME? #NAME? #NAME? #NAME? 44.84
2 13 #NAME? #NAME? #NAME? #NAME? 44.84
3 13 #NAME? #NAME? #NAME? #NAME? 44.84
4 13 #NAME? #NAME? #NAME? #NAME? 44.84
5 13 #NAME? #NAME? #NAME? #NAME? 44.84
6 13 #NAME? #NAME? #NAME? #NAME? 44.84
7 13 #NAME? #NAME? #NAME? #NAME? 44.84
8 13 #NAME? #NAME? #NAME? #NAME? 44.84
9 13 #NAME? #NAME? #NAME? #NAME? 44.84

FIRST FLOOR
1 13 #NAME? #NAME? #NAME? #NAME? 45.45
2 13 #NAME? #NAME? #NAME? #NAME? 45.45
3 13 #NAME? #NAME? #NAME? #NAME? 45.45
4 13 #NAME? #NAME? #NAME? #NAME? 45.45
5 13 #NAME? #NAME? #NAME? #NAME? 45.45
6 13 #NAME? #NAME? #NAME? #NAME? 45.45
7 13 #NAME? #NAME? #NAME? #NAME? 45.45
8 13 #NAME? #NAME? #NAME? #NAME? 45.45
9 13 #NAME? #NAME? #NAME? #NAME? 45.45

SECOND FLOOR
1 13 #NAME? #NAME? #NAME? #NAME? 46.06
2 13 #NAME? #NAME? #NAME? #NAME? 46.06
3 13 #NAME? #NAME? #NAME? #NAME? 46.06
4 13 #NAME? #NAME? #NAME? #NAME? 46.06
5 13 #NAME? #NAME? #NAME? #NAME? 46.06
6 13 #NAME? #NAME? #NAME? #NAME? 46.06
7 13 #NAME? #NAME? #NAME? #NAME? 46.06
8 13 #NAME? #NAME? #NAME? #NAME? 46.06
9 13 #NAME? #NAME? #NAME? #NAME? 46.06

THIRD FLOOR
1 13 #NAME? #NAME? #NAME? #NAME? 46.66
2 13 #NAME? #NAME? #NAME? #NAME? 46.66
3 13 #NAME? #NAME? #NAME? #NAME? 46.66
4 13 #NAME? #NAME? #NAME? #NAME? 46.66
5 13 #NAME? #NAME? #NAME? #NAME? 46.66
6 13 #NAME? #NAME? #NAME? #NAME? 46.66
7 13 #NAME? #NAME? #NAME? #NAME? 46.66
8 13 #NAME? #NAME? #NAME? #NAME? 46.66
9 13 #NAME? #NAME? #NAME? #NAME? 46.66

TERRACE (FOURTH) FLOOR


1 13 #NAME? 3.00 #NAME? #NAME? 47.26
2 13 #NAME? 4.00 #NAME? #NAME? 47.26
3 13 #NAME? 4.00 #NAME? #NAME? 47.26
4 13 #NAME? 0.00 #NAME? #NAME? 47.26
5 13 #NAME? 0.10 #NAME? #NAME? 47.26
6 13 #NAME? 3.00 #NAME? #NAME? 47.26

PART I:- PLINTH TREATMENT

1 91 #NAME? #NAME? #NAME? #NAME? 44.84


2 91 #NAME? #NAME? #NAME? #NAME? 44.84
3 91 #NAME? #NAME? #NAME? #NAME? 44.84

GRAND TOTAL OF STEEL IN KG #NAME? GRAND TOTAL


HIYAN, SOUTH ZONE, SURAT

TOTAL
TOTAL AMOUNT FOR
EACH FLOOR

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME? #NAME?
#NAME?

GRAND TOTAL #NAME?


SURAT MUNICIPAL CORPORATION
SOUTH EAST ZONE (LIMBAYAT)

NAME OF WORK:- STRUCTURAL REHABILITATION WORKS OF UNN SARVSIKSHA ABHIYAN,


SOUTH ZONE, SURAT MUNICIPAL CORPORATION, SURAT.

AREA STATEMENT

Sr. No. Description Nos L mts B mts Area (Sqmt)

A Ground Floor 1 121.90 121.90


First Floor 1 122.90 122.90
Second Floor 1 123.90 123.90
Third Floor 1 124.90 124.90
Terrace (Fourth) Floor 1 7.82 7.82
area as per cad

Gross total Sq mt 501.42


I.e. Sq ft 5394.48
Say Sq ft 5395.00

Net cost Rs 1,221,132.56


Net cost of construction Rs 1,221,132.56
Cost of Construction per sq metre Rs 2,435.35
Cost of construction per sft Rs 226.37
Total steel Kg 1,436.50
26.06
26.06
26.06
26.06

1863649
Name of work :- Structural Rehabilitation Works of Various Schools at in South East
Zone (Limbayat), SMC, Surat.
ABSTRACT SHEET
SR.
DESCRIPTION NOS RATE PER
NO.

PART A:- SAMPLINGAND TESTING


ITEM NO.1
1 To carry out core sampling at various floors and testing the 3 to 5 core at each 2500.00+ Service
same for compressive strength as per standards for structural floor from column tax @ prevailling
members of Annexed Building (Northern). and 2 to 3 core per Rate
Core Size -68 to 75 mm ᴓ and 100 to 150 mm deep floor from beam 1 core
long

ITEM NO.2
2 To fill up the hole by appropriate non - shrink grout material 500.00+ Service tax
from where the cross are extracted. @ prevailling Rate
__ do __ One hole

ITEM NO.3
3 To carry out the rebound hammer test at various floors for 500.00+ Service tax
structural members of Annexed Building. __ do __ @ prevailling Rate Per Point

ITEM NO.4
4 To carry out the Ultra sonic test at various floors for structural 500.00+ Service tax
members of Annexed Building. __ do __ @ prevailling Rate Per Point

ITEM NO.5
5 To prepare photographic documentation of existing condition 50000.00+ Service
of the structure, provide general observations about structural tax @ prevailling
condition of the Annexed Building Based on visual Rate
01 Report Per Building
inspection and testing.

PART B:- Methodology of Repair and Estimation of Work


ITEM NO.6
6 To carry out core sampling at various floors and testing the
same for compressive strength as per standards for structural
members of Annexed Building (Northern).
Core Size -68 to 75 mm ᴓ and 100 to 150 mm deep 3% of Project cost (three percent in
Offer in %
project cost)
long

STEEL CONSUMPTION

ITEM
NO AS MULTIPLYI
SR. NO ITEM QTY IN CMT STEEL IN KG RATE/KG TOTAL
PER NG FACTOR
SCH-B

UP TO PLINTH
1 5 Footing #NAME? #NAME? #NAME? 44.84 #NAME?
2 Columns #NAME? #NAME? #NAME? 44.84 #NAME?
3 beams #NAME? #NAME? #NAME? 44.84 #NAME?
4 JAKETING #NAME? 44.84 #NAME?

ABOVE PLINTH
GROUND FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 44.84 #NAME?
2 12-B beams #NAME? #NAME? #NAME? 44.84 #NAME?
3 12-D lintel #NAME? #NAME? #NAME? 44.84 #NAME?
4 12-E chajja #NAME? #NAME? #NAME? 44.84 #NAME?
5 12-C slab #NAME? #NAME? #NAME? 44.84 #NAME?
6 14-A stair #NAME? #NAME? #NAME? 44.84 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 44.84 #NAME?
8 14-B Vertical fins #NAME? #NAME? #NAME? 44.84 #NAME?

FIRST FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 45.45 #NAME?
2 12-B beams #NAME? #NAME? #NAME? 45.45 #NAME?
3 12-D lintel #NAME? #NAME? #NAME? 45.45 #NAME?
4 12-E chajja #NAME? #NAME? #NAME? 45.45 #NAME?
5 12-C slab #NAME? #NAME? #NAME? 45.45 #NAME?
6 14-A stair #NAME? #NAME? #NAME? 45.45 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 45.45 #NAME?
8 14-B Vertical fins #NAME? #NAME? #NAME? 45.45 #NAME?

SECOND FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 46.06 #NAME?
2 12-B beams #NAME? #NAME? #NAME? 46.06 #NAME?
3 12-D lintel #NAME? #NAME? #NAME? 46.06 #NAME?
4 12-E chajja #NAME? #NAME? #NAME? 46.06 #NAME?
5 12-C slab #NAME? #NAME? #NAME? 46.06 #NAME?
6 14-A stair #NAME? #NAME? #NAME? 46.06 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 46.06 #NAME?
8 14-B Vertical fins #NAME? #NAME? #NAME? 46.06 #NAME?

THIRD FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 46.66 #NAME?
3 12-B beams #NAME? #NAME? #NAME? 46.66 #NAME?
4 12-D lintel #NAME? #NAME? #NAME? 46.66 #NAME?
5 12-E chajja #NAME? #NAME? #NAME? 46.66 #NAME?
6 12-C slab #NAME? #NAME? #NAME? 46.66 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 46.66 #NAME?
8 vartical fins #NAME? #NAME? #NAME? 47.66 #NAME?

THIRD FLOOR
1 12-A Columns #NAME? #NAME? #NAME? 47.27 #NAME?
3 12-B beams #NAME? #NAME? #NAME? 47.27 #NAME?
4 12-D lintel #NAME? #NAME? #NAME? 47.27 #NAME?
5 12-E chajja #NAME? #NAME? #NAME? 47.27 #NAME?
6 12-C slab #NAME? #NAME? #NAME? 47.27 #NAME?
7 12-F coping #NAME? #NAME? #NAME? 47.27 #NAME?
8 vartical fins #NAME? #NAME? #NAME? 47.27 #NAME?

GRAND TOTAL OF STEEL IN KG #NAME? GRAND TOTAL


TOTAL OF
EACH FLOOR

#NAME?

#NAME?

#NAME?
#NAME?

#NAME?

#NAME?

#NAME?