Field Dry Density (Sand Replacement Method)

This document summarizes the results of a field dry density test conducted according to IS:2720 standard P-16 from 2015. It provides the details of 10 separate tests measuring the weight and density of compacted soil samples taken from various locations and depths within a layer. The degree of compaction is calculated for each test and ranges from 97.23% to 98.71% compaction, meeting or exceeding the required compaction standards for the material. The reviewer has marked the testing as passing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
252 views3 pages

Field Dry Density (Sand Replacement Method)

This document summarizes the results of a field dry density test conducted according to IS:2720 standard P-16 from 2015. It provides the details of 10 separate tests measuring the weight and density of compacted soil samples taken from various locations and depths within a layer. The degree of compaction is calculated for each test and ranges from 97.23% to 98.71% compaction, meeting or exceeding the required compaction standards for the material. The reviewer has marked the testing as passing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

FIELD DRY DENSITY (SAND REPLACEMENT METHOD )

IS:2720 P-16:(2015)
RFI No : Date of Testing :
Chainage : RMM No
Layer : Source of material :
Width : Lab MDD (g/cc) :
Cylinder No : Lab OMC (%) :
Wt. of sand in cone 9,W3(gm : 2557 Bulk Density of Sand (Ys) :
Description Test 1 Test 2 Test3 Test 4 Test 5 Test 6 Test 7
Representing Test Chainage

Offsets from centre line (mtr)

Depth of Layer (mm) 250 250 250 250 250 250 250

Wt of material from hole, Ww


15577.4 14487.67 15249.77 14542.37 14893 14559.84 14601.81
(Gm)
Wt of Sandr+ cylinder before
31500 31500 31500 31500 31500 31500 31500
pouring, W1 (Gm)
Wt of Sandr+ cylinder after
18100 18950 18450 18941 18789 19000 18945
pouring,W2 (Gm)

Wt of sand in hole, Wb (gm) 10843 9993 10493 10002 10154 9943 9998
Bulk Density of Material
1.925 1.943 1.947 1.948 1.965 1.962 1.957034
Yb=(Wb/Ww)*Ys
RMM Reading 12 12 12 12.5 13 12.5 12.5
Corrected Moisture Content,(w)
12.56 12.56 12.56 13.01 13.56 13.01 13.01
%
DD, Yd=Yb/(1+w) 1.710 1.726 1.730 1.723996 1.731 1.736 1.732

Degree of compaction (%) 97.23 98.12 98.36 98.01 98.39 98.71 98.45

Avg. Compaction Obtainbed(%)

Stanadard Deviation

Required Compaction :OGL 95%, Embankment 95%, Subgrade 97%, CTSB 98%, WMM 98%, AIL 98%, GSB 98%

Remarks : Pass/ Fail

TESTED BY REVIEWED BY
For EPC Rep. For EPC Rep.
Name/ Sign Name/sign
Desigantion Designation
OD )

esting :

material :
(g/cc) : 1.759
(%) : 14.4
ity of Sand (Ys) : 1.34
Test 8 Test 9 Test 10

250 250 250

14581.28 15005.07 15573.61

31500 31500 31500

18974 18759 18474

9969 10184 10469

1.959967 1.974 1.9934

13 13.5 14.5

13.56 14.01 14.98

1.726 1.732 1.734

98.12 98.45 98.56

SB 98%
C-