A thorough exercise during physical architecture is the foundation for an efficient floorplan. It helps
in reducing the overall turnaround time of the physical design phase. The broader prospective of the
floorplan should be performed during the physical architecture phase, and the actual floorplaning
phase should address the finer details of the floorplan, which impacts the physical design’s QoR.
Floorplanning guidelines
The seed for a floorplan primarily comes from physical architecture, die size-power estimation
exercise and the technology. When creating a floorplan, it’s important to consider some basic
characteristics of the process technology. The designer should have explored the technology
enough in the context of metal stack and metal configuration. Also the designer should have gained
ample experience about the availability of vertical and horizontal routing resources and their
requirements for the design as per the physical architecture.
At any level, creating “non-preferred” routing (i.e. not using the preferred routing direction for that
level) is not recommended. In the case of a channel-based floorplan, when placing blocks, four-way
intersections in top-level channels should be avoided; “T” intersections create much less
congestion. This consideration can be critical in leaving adequate space for routing channels,
especially if there is not much opportunity for over-the-cell routing. Using fly lines can help
determine optimal placement and orientation, but when the fly lines are numerous enough to “paint
the area” between blocks, designers must rely on their best judgment for block placement, and later
evaluate the results for possible modification.
Once blocks are placed, block-level pins may be placed. It is necessary to determine the correct
layer for the pins and spread the pins out to reduce congestion. Placing pins in corners where
routing access is limited should be avoided; instead, multiple pin layers for less congestion should
be used. It is worth spending the time needed to place block pins manually so that block-to-block
routs are straight, have minimum distance between them and are cross-talk immune. This will help
immensely down the line during full-chip timing closure.
While placing the hard macros, like PLL or other analog blocks, it is important to adhere to the
guidelines provided by the IP vendor. Placing cells within the perimeter of hard macros is not
recommended. To keep from blocking access to signal pins, it is a good idea to avoid placing cells
under power straps unless the straps are on high metal layers (i.e., higher than metal2). Density
constraints or placement of blockage arrays may be used to reduce congestion since these
strategies will help spread cells over a larger area, thereby reducing the routing requirements in that
area.
In any physical design work, it is essential to understand the requirements of the target process
technology. Lower utilization would result in a larger chip, but the chip is less likely to have problems
in routing. For example, most processes now require the insertion of holes in large metal areas in a
step known as “slotting” or “cheesing.” Slotting relieves stress-related problems in the metal due to
thermal effects, but may change the metal’s current-carrying characteristics. It is imperative to
consult the design rule document for this and many other physical variables.
For technology nodes below 40nm, there are other important rules that must be considered while
creating the floorplan. For example, the TCD structures are placed to monitor the various processes
on the die. These components are driven from the foundry. The TCD structure is required to be
placed at regular intervals throughout the chip. It could be a significant size, which may need to be
allocated on the die early on. This may impact a floorplan of a block at a later stage if this fact is not
considered early on, such as in a block packed with memories. Similarly, for core ESD protection, it
is recommended to place ESD clamps at regular intervals on the die. These are a few of the
mandatory components that must be considered in the early stages of full-chip floorplanning, and
must be considered for block-level floorplanning.
The RTL should be examined for logical models to break out into hierarchical physical elements. If
there are multiple instances of any logical hierarchical element, these elements can be grouped to
form one physical element. It is easier to floorplan with same-size blocks, so small blocks should be
grouped and large blocks divided when appropriate. Working with “medium-sized” blocks is typically
best; six to twelve roughly equivalent-sized blocks is a reasonable target.
Typically, floorplans should be started with I/Os at the periphery (depending on the package design).
It is crucial to determine the total number of I/Os required, and their placements. The physical
designer must calculate the number of core Vdd and Vss pads in the I/O ring for ESD protection (in
the case of a flip chip). In the case of a wire-bond chip, the core Vdd and Vss must be calculated
through a thorough analysis after considering the chip power requirements and IR drop. The SSO
ratio must also be considered for calculation of VddIO and VssIO; care must be taken for high-
speed interfaces. Apart from this, there could be some custom requirements for I/O planning, such
as the placement of PLL in the I/O rings or placement of SerDes IP or DDR IP, which is inclusive of
bumps in it. During and after the I/O planning, it is very important that the bump or bond pad DRC
and LVS is clean before a floorplan can be considered final. Hence, I/O planning is yet another seed
for floorplanning.
It is best to place parts of the design that have special layout requirements (e.g., memories, analog
circuitry, PLLs, logic that works with a double-speed clock, blocks that require a different voltage,
any exceptionally large blocks, etc.) first to ensure that their needs are accommodated. Design
blocks with special needs must be understood at the beginning; for example, flash memory has a
high-voltage programming input that must be within a certain distance of an I/O pin, so it is best to
place this element first.
If there are two or more large blocks or other features that make a reasonable floorplan impossible,
it may be necessary to increase the die size or re-arrange I/Os. Finding this problem early in the
flow enables and easier business decision about whether the chip will be financially viable with a
larger, more expensive die. If any of the large blocks are soft (synthesizable) IP or otherwise
available as RTL, it might be possible to avoid going to a larger die by repartitioning that block into
smaller pieces.
Another key aspect in I/O planning is to consider the scan I/O requirement. Here, the physical
designer must engage with the DFT architect. The scan architecture could also play a significant
role in I/O planning and floorplanning.
Block-level floorplanning
A good floorplan of theblocks is crucial to faster timing closure. The design knowledge and thedata
flow understanding help immensely in creating an optimumfloorplan, which leads to faster
convergence of the block. So, thephysical designer must engage with the RTL designer.
Establishup front whether the block floorplan needs to be pushed down from thetop or the other way
around. Typically, the block floorplan is pusheddown from top, but in the case of some critical
blocks, the topfloorplan may have to adjust to the block floorplan requirement.
– Initial synthesis should be run to determine the total area of the cells in
a block.
– Determining the area of a block beyond the area of its cells is a factor
of utilization. Utilization varies depending on the library, technology,
and characteristics of the design implemented; for the typical library,
the sweet spot is usually about 70% utilization. An unusually high
percentage of registers, or hard IP, will increase this number; large
numbers of multiplexers or other small, pin-dense cells will decrease it.
– The 70% utilization from a synthesized netlist may not be optimal for
every block. As the growth of every block is dependent upon various
factors, and more importantly the number of memories and associated
MBIST logic post DFT insertion. A block without any memory can have
a starting utilization of as high as 75%, and a block packed with
memories may have a starting utilization of a low as 60%. Therefore,
it’s best to arrive at the best utilization number after taking a block
through an entire rough PD process in the early phase.
– Care must be taken while placing the memories. For example, there is
poly orientation rule from the foundry at technology nodes below
40nm, which does not allow memory orientation to be at 90 degrees
from one another (i.e. either memories should be aligned to X axis or
should be aligned to Y axis). Realizing this at a later stage could be
catastrophic. Hence the foundry rules must be understood and
considered right from the beginning of physical design activity.
PnR consideration
Thephysical designer must not rely on the push button PnR approach. It’sbetter to take stock of the
situation at every PD stage. The physicaldesign optimization and implementation go through various
stages, likeplacement, placement optimization, CTS, post CTS optimization, holdfixing, routing and
routing optimization, crosstalk repair and chipfinishing. The best approach in physical design is to
be able to pushdown the physical information from the physical synthesis environment tothe PnR
environment. However, it may not be possible if the physicalsynthesis and PnR tool vendors are
different. In such cases, thephysical designer must build a margin of miscorrelation by
exercisingsome critical benchmark blocks through synthesis to the PnR process.
Typicallyevery block would be processed through the PD flow a couple of timesbefore going in for
the final PD implementation. Every design couldimpose its own challenges and could have its own
customization forbetter optimization. Some designs with higher pin density and morecomplex cells
can impose major routing challenges. Some designs can havea high combo vs. sequential cell ratio,
which is more challenging inPD. In general, a ratio beyond eight could be highly challenging
toconverge. Some designs may have a requirement of creating soft regions.If there are some critical
signal nets, which need higher attention,such as adopting NDRs, like clock nets, then these must be
identified. All of these issues must be identified by the physical designer prior tofinal implementation.
One should also consider incorporating theprocess technology-related requirements early on, like
well taps andend caps to avoid physical DRC-related issues later on. The routingresource allocation
and assessment for signal nets must be done when thepower structure for the chip is created. This
is where the metal stackplays a key role. A physical designer would always be comfortable with
ahigher metal stack; but the metal stack decision has to align withbusiness decisions.
The PD implementation flow from the RTL to PDenvironment could vary depending on how the
MBIST logic insertion isdone (i.e. on RTL or in the netlist). It’s better if the physicalsynthesis is done
post DFT insertion. The BIST logic-to-memory path at afunctional frequency may require physical
synthesis optimization. Thesynthesis, MBIST implementation and PD must collaborate to
achievebetter PD implementation of a block.
One of the crucial seedsto PD is the constraints. The STA and PD engineer must streamline
theconstraints before starting the PnR activity. The PD engineer mustfigure out what margins are to
be kept at different stages of PnN forbetter optimization. One important thing to assess is where you
wouldwant to fix the hold. Encounter does a good job in fixing hold after thepost CTS stage, but
care must be taken regarding the number of holdbuffers inserted. If there is a huge difference
between the estimatedrouting delay and the actual routing delay (after detailed routing),then the PD
tool might find the design environment at the post CTS stagevery pessimistic for hold and may end
up adding more hold buffers thanneeded. At the same time, it may not be effective to wait until
thecrosstalk fix stage to fix the hold violations. However, if the designis sensitive toward power, then
it may be worth it to assess the holdviolation fixing through timing ECOs.
From the chip-levelprospective, at the beginning of PnR, it is advisable to figure out theexact
number of interactions between the blocks (i.e. the interface pinsand the frequency of every
interface). This helps in allocating therouting resources or customizing the critical interfaces. The
PDengineer must consider the keep-out region for around the block to stayaway from crosstalk
issues from within the block.
PDV (physicalDRCs and LVS) is traditionally planned at a very late stage of SoCimplementation,
but it is highly recommended to look at this aspectearly on. With the increased complexity in the
designs and stringentfoundry rules at 40nm and below, PDV is no more an isolated activityleft
toward the end. In some cases it may also have an impact on thefloorplan. It is mandatory to clean
the Bump or Bond pad DRC beforefreezing the floorplan and I/O plan. The physical designer must
look atthe overall DRC and LVS situation thoroughly with the pre-final netlistso that there are no
surprises seen once the design timing is closedwith the final netlist. The block-level physical
designer must try toclean the DRC and LVS on their respective blocks before they areassembled
with the top level. The designer should assess the overall PDVsituation, and should find solutions to
every DRC at the pre-finalstage so that toward the end, with the huge schedule pressure, the
DRCand LVS cycle can be reduced and made predictable. Hence, PDV must beincorporated in the
pre-final stage of the PD schedule.
PD integration
AnSoC typically has various components on one die. It needs thoroughplanning, an extensive
manual and automatic verification to ensure thateach and every component functions as desired in
the SoC environment.The PD engineer must thoroughly study the layout integration guidelinesof
each and every standard IP being integrated. The ESD, latch-uprequirements and overall electrical
rules must be well understood. Thedesigner should also be clear on the multiple power regions and
theirisolation requirements. At a higher level, the ESD and latch-up rulesappear simple, but their
planning and verification become veryexhaustive. Therefore, it needs to be considered during
thefloorplanning stage.
ESD is the transient discharge of staticcharge or current through its component when the chip
comes in contactwith any charged body. If not designed carefully, a combination of theseparasitic
components might trigger current flow in the substrate andresult in shorting of power and ground
resulting in a huge current flowthrough its component, eventually damaging the device. This is
calledlatch up. ESD events and latch up might result in permanent damage of anASIC, so it is
imperative to take preventive measures while designingthe chip. Some of the considerations for
EAD and latch up are:
– I/Os are the only external interfaces susceptible to ESD; hence the
standalone I/O should be protected. The ESD diode provides the
protection for instant current surge and pass on to the “low resistance”
network. The designer should ensure that the power I/Os have ESD
protection.
– An ESD design should be such that for any “external interface point”
there should be a lowest-possible resistance path for ESD current.
Total bus resistance also includes resistance from Bump to the I/O, or
Bond pad to the I/O, so, the designer should ensure there are no weak
connections from the source.
– The designer must design for a common ESD path. Usually it’s the
core VSS since it has the lowest resistance mesh and it connects to a
big plane on the package.
– Every power domain needs to be understood for its ESD scheme and
needs to come up with an ESD plan that will protect the entire design.
Enough ESD clamps should be added in each of the domains.
– For latch-up protection, reduce the substrate resistance so that voltage
drop does not build to cause latch-up. Increase the substrate
resistance so there is no stray current in the substrate to cause latch
up. Use guard rings/guard bands to isolate the regions with a potential
chance of latch up.
– The designer must check that all the standard IPs have substrate
contacts. Standard cells may or may not have substrate contacts. Per
foundry rule, “TAP Cells” must be added if the substrate contacts are
not built in. Memories typically have substrate contacts.
– The designer should check that all the standard I/O has the built-in
substrate contacts. LU protection is important when I/Os are operating
at different voltages, which are placed closer together. Add substrate
contacts (with Pdiff) or guard-bands (with ndiff) or a combination of
both to avoid LU.
– For latch-up protection on IPs, designers must consider a careful
placement of memories, complex IP’s and I/O domains, while
considering voltage levels and proximity of the sensitive circuits to the
high-power/switching circuits.
Overallelectrical rule checks require identifying a lot of rules and theirverification. This should be
done both manually and automatically. Inthe early phase of implementation, PD engineers should
consideridentifying and automating those checks.
Clock planning
The foundation of the clock networkstarts right at the architecture stage. A lot of planning must go
intoarchitecting the clock before it reaches the clock tree synthesis stageat the physical design
level. Appropriate clock definitions andconstraints should be the seed for the clock network layout.
Asufficient amount of time must be spent creating a clock specificationfile. For example, the
generated clock tree constraints file may notcontain all of the necessary constraints. It might require
anunderstanding of clock strategy, which might help in defining the rootpin. Therefore, the
recommendation is not to use the auto constraintfile blindly, but to create your own file after
understanding the clockstrategy. All clock group statements must be specified before any
clockspecification. Clock grouping is done to ensure that the maximum skewbetween their sinks
does not exceed the maximum skew time specified inthe clock tree specification file.
It is crucial for physicaldesigners to understand the clocking from a design perspective. Thephysical
designer should have a clear understanding about modes andabout how various clock domains
interact. In the case of multiple clockdomain designs, it is crucial to create a worst or merged-mode
clockingconstraint, which can cover the maximum timing-critical paths. The ideamust be to create a
clock tree that is optimized for all the modes.
Thestarting point of a clock spec is to identify the appropriate clockbuffers. The libraries contain a
range of clock net buffers andinverters that are designed to have nearly matching rise and fall
signalbehavior. Such behavior helps the generation of balanced clockcircuitry. The cells also have
much finer step in drive strengthscompared to regular buffers and inverters. Additionally, the clock
netbuffers are designed such that the input capacitance of each drivestrength version is nearly
identical. This offers the possibility toexchange cells in a clock circuit to tune the drive strength
withoutaffecting the loading of the net connected to the input of the cell andaffecting the overall
clock tree performance. Usages of clock invertersare preferred over clock buffers since clock
inverters have the abilityto re-generate the edges. Clock inverters maintain the duty cyclebetter,
which is crucial for half-cycle paths.
Clock planninghas to be crosstalk aware. Having crosstalk on the clock path impactssetup paths
twice as severely as having cross talk on the data pathbecause it’s accounted for in both capture
and launch delay computation.Crosstalk in the common clock path cancels out the impact during
holdtime analysis, since analysis is done on the same edge, while for setupit’s accounted twice.
Therefore, it’s extremely important to lay out thetop-level clock tree with the least amount of
crosstalk. This willdirectly benefit the block level setup timing closure. One of thefactors that PD
engineers should consider is to budget the top-levelcrosstalk while closing the timing at the block
level. One should bepessimistic and realistic so as not to be surprised when block-leveltimings are
seen at the top-level environment.
So crosstalk awareclock planning is challenging in 40nm and below. Usually the criticalpath data
optimization is already exhausted at multiple levels fromphysical synthesis to physical optimization.
When it comes to crosstalkfixing, it is usually solved through more custom efforts. The defaultflow
does not help much. Usually there is not much room left forrouting, due to floor plan optimization
and the higher pin densityinherited from the RTL complexity. All these factors make
crosstalkoptimization a challenging job. Some of the key points to plan whilesynthesizing and
routing clocks are:
– Using max distance along with slew constraints can help in building an
SI free clock network without shielding.
– Use timing aware downsizing of aggressor net driver to fix SI issues.
– Use max distance constrains wisely. Though the number of clock
buffers used are more in the tighter Max distance constraints, the clock
latency and skew comes out to be much lesser.
– Change routing topology of aggressor and/or victim net segments.
Relyingon the tool to achieve a desired clock tree result may not be a goodidea. The physical
designer can understand and specify the requirementmuch better. Below is an example where one
can see the divergencereduction going from the tool-based CTS approach to semi-auto
(custom)CTS approach.
– There is not much common point from where the tool diverges
between the interacting blocks.
– Minimum common point between interacting blocks leads to
divergence.
– More divergence => more skew
– Total divergence distance in block1 = 6106+2402=8508u
– Total divergence distance in block2 = 2×3060+3905= 10025u
– Skew due to divergence
One can also consider creating a feed-through path through a block. Example below:
Constraintsdrive the chip implementation, and the implementation of a chip isverified against
required constraints. So, one can say constraints are abounding box of SoC implementation. A
definition of constraints muststart at a very early phase of RTL development. The starting point
mustbe the understanding of various I/O specifications and data sheets, andtranslating them into an
easily understandable spreadsheet in which SDCshould be coded. Half the job is done if the clocks
are correctlydefined, in case of multiple complex clock design.
Constraintsare typically a refinement process. It’s important that constraints arecoded from a full
chip prospective. For large hierarchical chips, thecrucial part is translating the constraints from top
to bottom (i.e.chip level to sub-chip level). It is also equally important to mergesub-chip level
constraints at the full chip level. For example, bringinga sub-chip exception to chip level. This is
where the budgetingmethodology plays a key role. The designer must be able to accuratelyestimate
the top-level interconnect delay based on the delay estimationexercise. The data from the delay
estimation can be utilized to devisethe block level I/O constraints in the early phase. The basic idea
ofaccurate budgeting is to reduce the STA iteration between blocks to thetop. The block-level
constraints should be complete and accurate enoughso that once a block is timing closed at the
block level, it shouldremain timing closed once it’s seen in the full chip prospective.
Inthe full chip context, there are two kinds of interactions that need tobe understood thoroughly
before executing the budgeting, oneblock-to-block and second block-to-chip I/O. These require a
clearunderstanding of some important parameters, like pad delays,interconnect delays, clock
propagation, data propagation, clock-dataskew and the slack margin parameters (i.e. the available
and setup/hold,max/min delay in the interface data sheet).
In fact, beforethinking about budgeting, the STA engineers must come up with the STAstrategy for
the full chip. Hierarchical STA is the way to go for largeASICs. The STA engineer must come up with
a strategy for timing andverification of the chip at various stages. In the initial phases itwould be the
model based STA. QTM, ETM or ILM models can be used. Onecan come up with a mixed model
approach depending upon the RTL and PDstage of each of the blocks. For the large and complex
ASIC, it is veryimportant that full-chip timing is continuously seen from the early RTLdevelopment
stage so that the PD and STA engineers get a good hold onthe chip interface and block-to-block
interconnect timings.
It’sworth spending time in cleaning up the constraints at the pre-layoutstage of physical design.
Constraints or timing analysis should drivethe PD implementation because eventually the quality of
PDimplementation is validated against the constraints.
Atthe design closure stage PD engineers primarily verify and signoff thedesign for timing, power and
foundry rules. However, the strategy forsignoff must be chalked out well in advance in the PD
implementationstage. The designer must have clarity on the operating condition of thechip and
create the power and timing verification environmentaccordingly. It could be wise to look into it
before the PDimplementation is in full swing.
< http://www.edn.com/user/Bhupesh%20Singh%20Dasila> Timing closure <
http://www.edn.com/user/Bhupesh%20Singh%20Dasila>
Anotherimportant aspect is to define the signoff corners. It is worth taking alook at reducing
the timing closure corner. The application of the chipshould be taken into consideration
while coming up with the variouspermutations and combinations of STA corners. One
should avoidoverdesigning for non-existing application corners. Every additional STAcorner
has a cost of efforts and iteration time.
Defining thetotal number of functional and DFT modes right at the beginning of thePD
implementation stage is crucial. It has to be thoroughly verifiedthat the STA modes of the
chip are optimum and cover everything requiredfor timing verification, keeping all the
defined applications and theenvironment in mind. STA, DFT and PD engineers must spend
time to craftan overall chip timing verification strategy. The mode coded in the SDCfor PD
implementation has to be comprehensive enough to cover all themodes. So, the key is
rightfully merging the modes for PD implementationas well as for timing verification.
Signal integrity has beenone of the key challenges in complex SoC design at technology
nodes like40nm. Coupling capacitance becomes proportionally larger at thesegeometries.
Interconnect delays become bottlenecks for performanceimprovement. Large-scale
integration of systems into silicon brings manylong interconnects between the blocks.
Signal arrival times at thedestination dynamically change on these long interconnects, as a
resultof large associated coupling capacitance. The induced delay (positive ornegative) is
called crosstalk delay. Crosstalk delay is hard to predictdue to its dynamic nature, and if not
taken care of it will adverselyaffect the performance of the device and may lead to device
failure.Some of the traditional timing closure/design budgeting techniquesbecome
ineffective while closing timing for crosstalk induced delay. Thechallenges are realistic
analysis, avoiding pessimism, carefulisolation of valid violations, and determining a
methodology forefficient fixes.
Some of the key points to drive crosstalk-aware implementation and analysis are:
– Account for larger die area for more buffers, less net congestion, more shielding,
etc. so that crosstalk effects are mitigated.
– Add a couple of weeks in the schedule just for crosstalk cleanup.
– Start the process early.
– Make sure the crosstalk settings are realistic, and have a dependable crosstalk
delay analysis flow.
– Ensure slew (transition) control from the beginning.
– Shield noisy macros like analog cells.
– Shield long busses by routing ground (VSS) stripes beside them.
– Macros like DPLLs, DLLs, DCDLs and RAMs should be placed near the blocks
that use them. Otherwise, long outputs running from such macros would be
disastrous from a crosstalk perspective. Create placement and routing
blockages around some of these skew-sensitive macros to avoid possible
crosstalk.
– Interleave address and data busses with each other during port placement of the
internal blocks. It is less likely that the address bits and data bits change their
value at the same time.
– Use ILM-like models for top-level analysis.
– Attack the root cause to reduce the number of iterations.
– Control various parameters of the flow to get the results for the right analysis.
For example, control the number of aggressors and scaling factors, clock
grouping, etc. to perform accurate analysis.
– Post-process the reports efficiently to filter out the real violations.
– Derive efficient methods to fix the violations with minimal effect on other
domains.
Thetiming closure engineers should be cognizant of the PD process and itsimpact on timing.
So, the timing closure should be a continual processwith the PD closure. The impact of chip
finishing like DFM is anotherimportant aspect that the timing engineer should not leave until
theend. The metal fill, the redundant via, etc. can impact the ground capand the net
resistance, and therefore, the crosstalk. Hence, the DFMprocess and its impact on timing
should be assessed well ahead of thetape-out phase.
Rail analysis(i.e. the static and dynamic IR) is usually done once the design has runthrough
PD once. However, this data could be very important invalidating the power plan and the
floorplan itself. Accuracy of analysisis the key. The designer should be careful in choosing
the correctcorner, while generating the power analysis data for rail analysis.Knowing where
and how to apply power rail analysis can save a great dealof time in power planning and
verification. For today’s designs, bothstatic and dynamic analysis should be utilized from
initialfloorplanning (power planning) through sign-off.
Some important points to consider when determining a methodology for power rail analysis
include:
– Use static analysis to generate robust power rails (widths, vias, etc.).
– Use dynamic analysis to optimize the insertion of de-coupling capacitance.
– In the case of power gate design, use static analysis to optimize power switch
sizes to minimize IR drop. Use dynamic power-up analysis to optimize power
switch sizes to control power-up ramp time.
– Use both static and dynamic analysis early and late in the design flow.
– Establish IR drop limits based on understanding how IR drop can affect timing.
– Try to optimize for decoupling capacitors early in the flow, since late
optimization for de-caps can lead to major re-work.
Anotherimportant part of Rail analysis is EM analysis. Designers must ensurethat the design
meets the DC current density limits of the power meshand the power rails before finalizing
the power plan. It becomes morecritical if the design is packed with memories. The power
tapping to thememories needs be sufficient to sustain the current densities.
Summary
Also see :
L EAVE A REPLY
P R E V I O U S P O S T < H T T P S : / / W W W. E D N . C O M / N O V E L C O N C E P T- A N N O U N C E S -
N E W- O N L I N E - C O U R S E S - TO - H E L P - P E O P L E - M A X I M I Z E - T H E I R - M A R K E T I N G -
EFFORTS-ON-YOUTUBE/>
N E X T P O S T < H T T P S : / / W W W. E D N . C O M / P I M S L E U R - L E A R N I N G - P R O G R A M S -
A R E - R E V I E W E D - I N - N E W- W E B S I T E - TO P L A N G U A G E G U I D E - C O M / >
OPEN
Advertisement
circuits/#comment-27667>
Archives
Select Month
Categories
Select Category
PARTNER CONTENT
The Concept of a
New Transistor
FanFET Technology
Applied to 3D-NAND Flash
09.07.2020
How Innovative
Technology Disrupts
the Electronics
Distribution Industry
02.07.2020
The Makings of a
Seamless Wireless
Experience
17.06.2020
Recent Posts
Silicon 100 report chronicles hardware startups in Silicon Valley and beyond <
https://www.edn.com/silicon-100-report-chronicles-hardware-startups-in-silicon-valley-and-
beyond/> / General-purpose FPGAs boost I/O density < https://www.edn.com/general-
purpose-fpgas-boost-i-o-density/> / Using privacy-centric Bluetooth bracelets for COVID-19
contact tracing < https://www.edn.com/using-privacy-centric-bluetooth-bracelets-for-covid-
19-contact-tracing/> / Power Tips #100: 12 years of power supply design challenges and
solutions < https://www.edn.com/power-tips-100-12-years-of-power-supply-design-
challenges-and-solutions/> / Embedding AI in smart sensors <
https://www.edn.com/embedding-ai-in-smart-sensors/>
Recent Comments