0% found this document useful (0 votes)
31 views1 page

Dau Site Dev Plan-Model

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

265

250
1

PUMPHOUSE
1

PROPOSED VWSSI SITE WELL POINT


VC BLOCK 18 LOT 1-4
uP
-2 2"Ø 2
3 1
CKACE
LON SP
B OPE C
4

u PV 6
5
2
2"Ø

2"Ø
18
-3
7
3
8
17 VC

uP
VC
9
K
C K-4 uP
2"Ø 600 770

V
VC 10 16

2"
4
uP O 22

C
uP

Ø
BL OC
11 15
2"Ø 2"Ø 12

uP
20 5
17 14
BL

VC
13 18

EA

VC
ED .m.
VC 13

AR
RV sq
16 16
6
uP

SE 86

uP
12 VC

RE =
21
2"Ø

A
15 14 uP

2"Ø
11 7
14 12 19 3"Ø
1 10
- 6

VC
18 17

3"
10 29
8

CK

Ø
9
VC

uP
C 8 15
2
uP

uP
PV 8
3 u
O 13
3"Ø
27 9

6"Ø
6

V
1 2"Ø VC
BL
4

C
7 25
uP
K-
5 4 11 10
6 2"Ø 9 23 31 C
OC
7 2 C V
C 6 PV 21 30 uP 11
BL
8 7 u
PV 2"Ø

VC
u 3"Ø 19 28

3"
2"Ø
9 5

420
2"Ø 5 31

uP
12

Ø
4
10 3 17 26

uP
11 29

uP
6"Ø
12 15 7 24 C 13

V
C 1
- 27

VC
PV

202.9c
PV C

C
13 2

BL
V 22 u
CK
14 u 3
uP 13 25
2"Ø 20 2"Ø 14
15
3"Ø

BL
11
O 23 33

OC
BL

VC
16 18 C
(O
PV
9
VC 1 21 32 15

OC
uP
u
uP PE C 16 C
3"Ø
7 V 30
19
2"Ø N V uP
K-

6"Ø
uP

3"
SP 5 14 2 16
3"Ø 2"Ø 17 28

m
AC
12
3
8

uP
29 26
E)
15 17
-

-5
2"
- 29 10
4

VC
1 24 C
CK CK

Ø
13 V 1
8 uP

uP
22 18
L O uP
VC 11
O 3"Ø 2 6
B
BL

VC
6
20

PVC
2"Ø
9 3
4 8

2"
7 18 19

3"
4

Ø
6"Ø u
VC
. 5

Ø
q.m 2 1
16

uP
s 5
12
uP 10 20

uP
3
A=
VC 3"Ø
6
80 500

VC

BL
2"
3 14 2 7

VC
1
uP

Ø
3 12 21
12

80
C 2"Ø
1

2"

uP
V 8

OC
uP 9

Ø
10

VC
4
3"Ø 5 14 22

uP

2"
2 1 8 1 10

BL
11

K
VC
VC 11

3"
3 6 6 7 16 23

uP
C
VC uP

Ø
12

-9
uPV

OC
3
3"Ø
4 P 13

VC
4 9
Øu

uP
3 8 T&B
2 12 9 18 24
5 3" 7

VC
2 14
6"Ø

2"
5
2"Ø

6 15

2"

K
1 5 5 10 11

Ø
2"Ø

40X40 FLOOR TILES


13 20 25

BL
7 4
VC 16

uP
3

-1
C
uP

uP
8 V 17
uP uP
uP

3 12 13

VC
2 7 14 26

OC

2"
VC
VC

1 10
3"Ø 6
3"Ø 18 22
ST

0
VC

Ø
9 19 60X60 FLOOR TILES
1 14 15
E

uP
8 27
VC

9 5 16
4 9
EL

K
BL
8 20 C
QUARTERS
11
VC

VC
PV

2"
6 21
uP

u
16 17
BO

Ø
3 28

-1
18
2 7
3"Ø
uP

10 4

OC
6 11

510
3"Ø

10

uP
VC 13 21
LT

2"
15

2"

3"
uP
6"Ø

2 18 29

VC
Ø
Ø
5 20 19
ED
2"Ø

Ø
9 15
11
2"Ø
4 8 13

uP
12 15

K
uP
BL

uP
2"
VC
2"Ø

17 13 30
T

VC
P
uP

V
22

VC
C
7 u
AN

-1
20
11 PV

C
12 6 10 15 17 3"Ø 11

uP
14 u
V

OC
uP

CASHIER
2"Ø
19 31
K
C

24 9

VC
2
16
9 17
VC

13
60X60 FLOOR TILES
13 8 12 17 7
VC
BL

16

2"
K-
21 19 C 16 P
PV
K-

3 Øu

Ø
5 32

3"Ø
1 Øu
VC

2"
VC

11 26 14
K -CE) OC
2"

HEAD
uP
14 10 14 15 19 3" 3
OC

18 23

Ø
17
uP

12
BL
uP

VC

uP
33
O SPA
26

uP
1
13 10 15
15 12 17
BL
6"Ø

VC
BL

16
3"Ø

20 21

VC
N C
2"Ø

PE 25 C
K-

(O PV 8
PV 1 13

VC
14 15
3" Øu 6 Øu 1 34
16 19 2"
2"Ø
OC

18 22 23 17
uP

uP
4 9

17
18
27

15
VC

3"Ø
17
uP

16 21 7

K-
17 20 25 2
24 C 13 16 VC
K-

V 3

80
uP
E
VC

5
uP
US

C
HO
MP
PU

11 V 14
19 3"Ø uP
OC 3"Ø
3 1

20
770

18 23

2.9
C

18 22

cm
3"Ø
26 27 9
2"Ø 12
BL
0 INT

8
25 PO

4
LL

265
V

18
WE
PAYING AREA
K-1
2
28

600

205
1
uP

7 10

K-
VC

21
BL

2"Ø
16

uP
20 25
# 10 BORACAY PEBBLES
19 24 C C C
28 PV 5 8 V
STEEL BOLTED TANK

29

80
PV
6"Ø

uP

420
P

14
Øu
OC

VC

VC
0
50

u 4 4
Øu

51
3"Ø
3 6
80

0
3"
60X60

2"Ø
T&B FLOOR QUA

uP
40X40 RTE TILES

17
FLOOR RS
TILES

23 12
22 VC
BL
20 27
2"Ø

uP
26

80
750

D
CAS 60X60

HEA
HIE
2"Ø

FLOOR

4 2
TILES R

1 P
910

30

VC
3"

2
10 15 Øu
PAY
ING # 10
BORAC
ARE PEBBLE
AY

S A

6
2"

3"Ø
C
100

2"Ø

BL
2

205
3
0

PV
30

25
uP

21 24 8 13 VC 3
uP

28 29
Øu uP

VC
3" C
V

6 V 11 1 4
3"Ø
VC

uP
8
VC

uP 1
C

OC
27 1 5

uP
26 4 9
22 2"Ø 5 18

VC
30 2
uP

-1

2"Ø
VC
3 2 7 6

3"Ø
10

BL
VC 16
V C 3 7
6"Ø

28
K

K-
5 5
23 29 uP uP

uP
C 14
OC

uP
3"Ø PV 3
3"Ø
1 4 4
C

7 8
Øu 12

OC
3"Ø
BL
12 5
300 100

VC
PV

24 30
9
1 2 2" 1
10 2
9 5
750

19

VC
BL

-3
2"Ø
u

11 6
3 10 14
2
VC
3"Ø

4 8 7 11
C VC

K-

uP
13
CK PV
25 uP uP

BL
uP
Øu
6 6
OC

4
3"Ø
1

2"Ø
VC

3"Ø
15 8 6

3"Ø
2" 12
O 1 4 5 9
910
VC
8 13
*UNITS IN CM
BL
uP

26 17

20
2

OC

uP
10 3 6 7
2"Ø

2 10
K-

3 7 14
6"Ø

2"Ø
11
VC

12
VC

V
5
VC 15 8

VC
27 VC

C
uP uP
uP

BL
14
uP

7 4 8
uP 1

K-
12
3"Ø

uP
5

uP
9 Ø
2"Ø 13 9
16 3"
VC
30

9
2
3"Ø

2 16
28

VC
2
-3
OC

3"Ø
18 11 6 10 10
14
VC

4
VC 3 7 11

21
13 15
K uP 11
2"Ø

29
OC
C 6
uP

3"Ø
V 15 1 4
BL

8 12
uP
K-
1 16

2"Ø
8 5 9 13 C
2"Ø BL PV 12
6"Ø

uP

30 17 10 3 17
6 u
OC

10 14

uP
C
VC

12 PV
3 11 Ø 13
3"
5 7 15
22
18
Øu 7
C

VC
BL

2"Ø

31 14 3"
V

8
12 16 14
uP

5
K-

16 9 9 13
3 2

VC
17 15
uP

-3
O
3"Ø

32 18 11
C 10 14 C

uP
4
VC

13 PV 7 11 15 PV 16
K
CK

C Øu
23

18
VC

V u
OC
6
uP 2"

3"Ø
33 15 1 12 3"Ø
3"Ø 16
uP

8 17
BL
9 13
17
2"Ø

10 3 17
-2
6"Ø

34
12 VC 14 VC 18
VC

5 11 15 uP
uP

uP 18
14
2"Ø
7
3"Ø 19
4
uP

35
VC

16 16 20
2"Ø

9 13
34
2
25
3"Ø

11 17 21
18
-
K-
36 4 C
uP

13 C PV 22
CK
15
PV 18 u
C

6
VC
VC

15 Øu 1 3"Ø 23
C
V

uP O 2"
LO
37
uP

8
2"Ø 17
B L 10 3 17 25
24
B
6"Ø

38 12 5 26
VC VC
C

14 P P
Øu 27
PV

7
39 16 2" Øu 9 3" 28
Øu

2
5
-3
18 11 29
3"

4
40 13 30
VC K 6 VC
OC
P 15 uP 31
Øu 8 6"Ø
BL
41 2" 32
17 10 33
12
VC

42 VC 34
14 uP 35
uP

16 6"Ø 36
43
3"Ø

18 37
C 38
44 PV
6" Øu 39
40
41
42
43

PROJECT TITLE: SHEET CONTENT: PLANNER / ENGINEER: LOCATION: SHEET NO.:

FCI - DAU WATER DISTRIBUTION LAYOUT VILLAGES WATER SUPPLY SYSTEM INC.
BLOCK 08 LOT 14 PHASE 04, MANSFIELD RESIDENCES, BRGY. STODOMINGO, ANGELES CITY
PIPELAYING

You might also like