Management of Product Safety: 6) Esclation Process & Information Flow
Management of Product Safety: 6) Esclation Process & Information Flow
Management of Product Safety: 6) Esclation Process & Information Flow
-
IATF 16949: 2016 Clause Ref. - 4.4.1.2, 7.5.3, 8.3.6, 8.5.2.1, 9.1.1.1 ISSUE - 01
ISSUE DATE - 01.03.17
PURPOSE : To establish a system for ensurning management of gage calibration/verification processes.
SCOPE : All standards related to calibration/verification records within organization and at customer end for customer specific product
PROCESS OWNER : Management Representative
By what (Equipment material) Risks: By whom (personal, training, know-how, skills):
MS-Excel 1) Product statutory & regulatory requirements/ CSR not addressed Production, Quality
Safety Equipments and Infrastructure result in penality, production stoppage or financial loss to organization SHE Committee Members
Display Board 2.) Product safety ignorance leads to incident/ accident within Knowledge of Product & Process Safety requirements
organization or customer end leads to branding loss/ penality Knowledge of FMEA & it's application
or complaint
Inputs: Outputs:
1) Identification of statutory & regulatory product-safety 1) Identification of Product Safety Related Characteristics
requirements
2) Human Behaviour, Capabilities and other human factors. 2) Product Safety - Risk & Control Matrix
3) Study of customer drawings & relevant standards 3) Training of respective personnel
4) Infrastructure,Equipment and Materials at the workplace
whether provided by the Organization or others. 4) Communication throughout the supply chain
5) Changes or Proposed changes in the Organization,its 5) Customer Specific Requriements Summary Updation
Activities or Materials. 6) Esclation Process & Information Flow
6) Modification/ Changes to process including temporary 7) Safety Audit Action Plan
changes
Management of
Product Safety
PAGE - 01 OF 06 SIGNATURE - MR
TITLE : Calibration/verification records DOCUMENT NO. -
Start
Update points where applicable MR Addressing of these points (where applicable) Identification of Customer Specific
in relevant documents like
in relevant documented information requirements and the Gages needed.
FMEA, Control Plan, Work
Instruction ,etc. ECN
HR
Identificaiton & training of Training as per identified customer specific
personnel involved in Gage related characteristics, controls and reaction plan
Calibration.
Update / Revise Product Safety - Risk & MR / Purchase Updation freqency is yearly basis Product Safety - Risk & Cotrol Matrix
Control Matrix whenever new
requirements from regulatory or (should be updated incase any new requirement MOM
customers are updated & Inform to
or notification received by customer or any
relevant parties in the supply chain
changes in process or product)
Finish