Saudi Aramco Consulting Services Department Me&Ccd/Meu Procedure Review Sheet
Saudi Aramco Consulting Services Department Me&Ccd/Meu Procedure Review Sheet
Saudi Aramco Consulting Services Department Me&Ccd/Meu Procedure Review Sheet
Note: Fabrication of Jacket Legs, Deck Column, Piles, Crane Pedestal Column, Primary & Secondary Bracings
The following WPS's were all previously approved by Saudi Aramco CSD at Status 2, however, it is noted that L &
T have revised these WPS's and the following are approved for the given application. All previous approvals for the
following WPS's shall be discarded in favour of this approval.
L & T shall note that a CSD Status 1 or 2 is approved and does not require re-submission UNLESS for a technical
reason changes have to be made to the WPS.
THE REFERENCED PROCEDURE(S) HAS BEEN REVIEWED AND EVALUATED IN CONJUNCTION WITH SUPPORTING DOCUMENTATION. UTILIZATION OF THIS PROCEDURE INDICATES THAT THE
MANUFACTURER OR CONTRACTOR CERTIFIES THAT THE STATEMENTS AND DATA IN THIS DOCUMENTATION ARE CORRECT. HE ASSERTS THE TEST WELDS WERE PREPARED, WELDED,
TESTED, AND MET THE REQUIREMENTS AS INDICATED AND IN ACCORDANCE WITH THE APPLICABLE CODE AND SAUDI ARAMCO STANDARDS AND SPECIFICATIONS